Grantee Reporting Requirements for Industry/University Cooperative Research Center (I/UCRC)

Grantee Reporting Requirements for Industry/University Cooperative Research Center (I/UCRC)

IUCRC CD structural Data - Excel-1DataCollection(1).pptx

Grantee Reporting Requirements for Industry/University Cooperative Research Center (I/UCRC)

OMB: 3145-0088

Document [pptx]
Download: pptx | pdf

Center Director Structural Information Report

Data Collection Process & Materials

 

Overview

  • Data are collected in the Fall on an annual basis from each center with and active I/UCRC grant during the most recently completed fiscal year 

  • The 8-tab Excel workbook detailed in the following slides is sent to the Center Director of each eligible I/UCRC 

  • The Center Director is responsible for getting data from their partner sites (we provide a Partner Site Information Sheet to facilitate that process) and compiling the report for the center as a whole 

  • Data that does not typically change from one year to the next is pre-populated into the Excel workbook for Centers who have completed the report in the previous data collection year 

  • Centers are given 1 month to complete the report, with extensions available to those with a scheduling conflict 

  • When data are submitted, the NCSU Evaluation team checks the data for completeness, accuracy, and consistency 

  • Data are aggregated at the Center level and used to create an annual report for the I/UCRC program nation-wide 

  • The emailed letter accompanying the Excel workbook is available on slide 3 and screen captures from each tab of the Excel workbook are available on slides 4-13. 

 

 

 

 

 

 

 

 

 

 
File Typeapplication/vnd.openxmlformats-officedocument.presentationml.presentation
File Modified0000-00-00
File Created0000-00-00

© 2024 OMB.report | Privacy Policy