Download:
pdf |
pdfKing & Spalding LLP
1700 Pennsylvania Avenue, N.W.
Washington, D.C. 20006-4706
www.kslaw.com
Main Telephone: (202) 737-0500
Main Fax: (202) 626-3737
July 10, 2014
VIA EFILING
Kimberly D. Bose
Secretary
Federal Energy Regulatory Commission
888 First Street, NE
Washington, DC 20426
Re:
Informational Report of Kevin R. Johnson Regarding Automatically
Authorized Interlocking Directorate Positions, Docket No. ID-4403-___
Dear Secretary Bose:
Pursuant to Section 305(b) of the Federal Power Act (the “FPA”)1 and Part 45 of the rules
and regulations of the Federal Energy Regulatory Commission (the “Commission”),2 LS Power
Development, LLC, on behalf of Kevin R. Johnson, hereby submits for filing an informational
report regarding automatically authorized interlocking directorate positions pursuant to Section
45.9 of the Commission’s regulations.3
Please direct all communications regarding the enclosed informational report to the
following persons:
Scott Carver
Senior Vice President and
Associate General Counsel
LS Power Development, LLC
One Tower Center, 21st Floor
East Brunswick, NJ 08816
(732) 249-6750
[email protected]
1
16 U.S.C. § 825d(b) (2012).
2
18 C.F.R. Pt. 45 (2013).
3
18 C.F.R. § 45.9(b) (2013).
Neil L. Levy
KING & SPALDING LLP
1700 Pennsylvania Ave., NW
Washington, DC 20006-4706
(202) 626-5452
(202) 626-3737 (facsimile)
[email protected]
Kimberly D. Bose
July 10, 2014
Page 2
Respectfully submitted,
/s/
Neil L. Levy
David G. Tewksbury
Counsel for LS Power Development, LLC
Enclosure
UNITED STATES OF AMERICA
BEFORE THE
FEDERAL ENERGY REGULATORY COMMISSION
Kevin R. Johnson
)
Docket No. ID-4403-___
INFORMATIONAL REPORT
Pursuant to Section 305(b) of the Federal Power Act (the “FPA”),1 and Part 45 of the
regulations of the Federal Energy Regulatory Commission (the “Commission”),2 Kevin R.
Johnson (the “Undersigned”) hereby submits the following informational report regarding
automatically authorized interlocking positions pursuant to Section 45.9 of the Commission’s
regulations.3
I.
INFORMATIONAL REPORT PURSUANT TO 18 C.F.R. § 45.9
A.
Identification of Person Submitting this Report
The Undersigned’s name and business address are:
Kevin R. Johnson
LS Power Development, LLC
One Tower Center, 21st Floor
East Brunswick, NJ 08816
B.
Identification of Interlocking Positions under Section 305(b) of the FPA
The Undersigned plans to hold the following interlocking positions with entities that are
“public utilities” within the meaning of Section 201 of the FPA:4
1
16 U.S.C. § 825d(b) (2012).
2
18 C.F.R. Pt. 45 (2013).
3
18 C.F.R. § 45.9 (2013).
4
16 U.S.C. § 824 (2012).
Name of Public Utility
Position
Centinela Solar Energy, LLC
Arlington Valley Solar Energy II, LLC
C.
Vice President
Vice President
Identification and Description of Other Entities of Which the Undersigned is
an Officer or Director
The Undersigned serves as an officer or director of the following non-public utility
entities:
Position
Name of Entity
Mesa Solar Energy, LLC
Broadbay Energy, LLC
Arlington Valley Solar Energy, LLC
LSP Centinela Services, LLC
LSP Centinela Member, LLC
Centinela Holdco, LLC
Centinela Funding, LLC
LSP AVSE II Member, LLC
LSP AVSE II Services, LLC
D.
Vice President
Vice President
Vice President
Vice President
Vice President
Vice President
Vice President
Vice President
Vice President
Explanation of the Corporate Relationship between the Public Utilities
Listed in Section B that Qualifies the Undersigned for Automatic
Authorization
Each of the public utilities identified in Part I.B above is an indirect subsidiary of LS
Power Development, LLC, which owns that percentage of each utility’s securities which is
required by each utility’s bylaws to elect officers and directors.
2
II.
STATEMENT PURSUANT TO 18 C.F.R. § 45.9(C)(5)
The Undersigned hereby states and affirms that, as of the date of this report, he has not
yet performed or assumed the duties or responsibilities of the positions with the entities which
necessitated the filing of this informational report (i.e., duties and responsibilities of the positions
identified above in Part I.B.).5
Respectfully submitted,
By:
/s/
Kevin R. Johnson
5
The Undersigned previously held interlocking positions with the entities identified above in
Part I.B., but has resigned from, and no longer holds, any interlocking positions covered under Part 45 of
the Commission’s regulations, 18 C.F.R. Pt. 45 (2013).
3
Attachment A
Verification
File Type | application/pdf |
File Title | Microsoft Word - 23012030_3.docx |
Author | 111188 |
File Modified | 2014-07-10 |
File Created | 2014-07-10 |