Supporting Statement A
2014-08-18
ICR Details
2060-0607 201408-2060-010
Historical Active 201103-2060-006
EPA/OAR 2268.04
NESHAP for Paint Stripping and Miscellaneous Surface Coating at Area Sources (40 CFR part 63, subpart HHHHHH) (Renewal)
Extension without change of a currently approved collection   No
Regular
Approved without change 12/22/2015
Retrieve Notice of Action (NOA) 08/18/2014
In accordance with 5 CFR 1320, the information collection is approved for three years.
  Inventory as of this Action Requested Previously Approved
12/31/2018 36 Months From Approved 12/31/2015
43,048 0 42,716
125,171 0 124,527
116,822 0 142,220

The National Emissions Standards for Hazardous Air Pollutants for Paint Stripping and Miscellaneous Surface Coating Operations at Area Sources are part of EPAs Integrated Urban Strategy to reduce cancer risk from area sources under section 112(k)(3)(C) of the Clean Air Act. Affected sources must comply with recordkeeping and reporting requirements of the rule. The owners or operators of facilities with affected operations must read instructions to determine how they will be affected by the rule. New and existing sources must submit an initial notification. New sources are also required to submit a notification of compliance status, an annual compliance report and maintain records. All surface coating sources must keep records demonstrating that spray painters have completed training. Existing paint stripping facilities using more than 150 gallons per year of methylene chloride stripping solvent must complete a methylene chloride minimization plan and submit a notification of compliance status. Annual compliance reports are also required.

US Code: 42 USC 7401 et seq Name of Law: CAA
  
None

Not associated with rulemaking

  78 FR 35023 06/11/2013
79 FR 48745 08/18/2014
No

  Total Approved Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 43,048 42,716 0 0 332 0
Annual Time Burden (Hours) 125,171 124,527 0 0 644 0
Annual Cost Burden (Dollars) 116,822 142,220 0 0 -25,398 0
No
No
There is a decrease in the total O&M cost as compared to the previous renewal. This change also is not due to any program changes, and is attributed directly to corrections made to the previous renewal's calculations. The previous renewal overestimated the number of initial report and notification that are required for new sources. This renewal revises the calculations which resulted in the observed decrease in the total O&M cost.

$1,064,942
No
No
No
No
No
Uncollected
Patrick Yellin 202 564-2970 [email protected]

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
08/18/2014


© 2024 OMB.report | Privacy Policy