FCC Form 608 Schedule B

FCC Application or Notification for Spectrum Leasing Arrangement or Private Commons Arrangement: WT and PSHS Bureaus

1058_Form 608 Schedule B_120310

FCC Application or Notification for Sectrum Leasing Arrangement or Private Commons Arrangement: WTB and PSHSB

OMB: 3060-1058

Document [doc]
Download: doc | pdf


FCC Form 608 FEDERAL COMMUNICATIONS COMMISSION Approved by OMB

Schedule B 3060-1058

See 608 Main Form Instructions

Information and Instructions for public burden estimate


Instructions for Schedule for New Lease or New Sublease

FCC Form 608, Schedule B



Schedule B is a supplementary schedule that is used to provide information regarding New Leases or New Subleases. A single Schedule B is used for all of the Call Sign(s) or Lease Identifier(s) listed on the Main Form. All filings for Subleases must be filed manually and sent to the appropriate address. The mailing address can be found under the Application Fees and Filing Locations section found on page 8 of the Main Form Instructions.


Term of Lease (For New Leases Only)

Item 1 For all new leases, indicate whether the lease is Long-Term or Short-Term. The cumulative lease period for a Short-Term Lease cannot exceed 365 days from the original commencement date.


Item 2 If a Long-Term De Facto Transfer Lease, enter ‘Y’ if the licensee and lessee have entered into any Short-Term De Facto Transfer Lease(s) with regard to any spectrum covered by the license(s) that are part of this filing, or within the same geographic area(s) of the license(s) that are part of this filing. Otherwise, enter ‘N’.


Leased Spectrum (For Geographically-Licenses Services) (For New Leases Only)

Item 3a Enter ‘Y’ if this filing involves geographic area license(s) where only a portion of the licensed spectrum and/or only a portion of the licensed geographic area will be leased. Enter ‘N’ if this filing involves geographic area license(s) where all of the licensed spectrum and all of the licensed geographic area will be leased.


Item 3b If the response to 3a is ‘Y’, enter ‘Y’ in item 3b if the lease involves one or more individual point-to-point microwave links that will be leased. Otherwise, enter ‘N’.


If the response to 3b is ‘Y’, Schedule H must be completed. If the response to 3b is ‘N’, Schedule F and, if applicable, Schedule G must be completed.


Leased Spectrum (For Site-Based Services) (For New Subleases Only)

Item 3c Enter ‘Y’ if this filing involves site-based license(s) where only a portion of the licensed locations, paths and/or frequencies will be leased. Enter ‘N’ if this filing involves site-based license(s) where all of the licensed locations, paths and/or frequencies will be leased.


If the response to 3c is ‘N’, only complete Item 178 (Call Sign) and Item 179 (Radio Service Code) on the Main Form.

If the response to 3c is ‘Y’, in addition to Item 178 (Call Sign) and Item 179 (Radio Service Code), complete Items 180-184 (Location Number, Path Number, Frequency Number, Lower Frequency and/or Upper Frequency), as appropriate, on the Main Form.


Type and Term of Sublease (For New Subleases Only)

Item 4a If the existing Lease is a Long-Term De Facto Transfer Lease, indicate whether the sublease is a Long-Term De Facto Transfer Sublease or a Spectrum Manager Sublease.


Item 4b If the response to 4a is ‘Spectrum Manager Sublease’, indicate in Item 4b whether the sublease is Long-Term or Short-Term. The cumulative lease period for Short-Term cannot exceed 365 days from the original commencement date.


Item 5 If the existing lease is a Long-Term Spectrum Manager Lease, indicate whether the spectrum manager sublease is Long-Term or Short-Term. The cumulative lease period for Short-Term cannot exceed 365 days from the original commencement date.


Certifications

By signing the Main Form, FCC Form 608, the Licensee, Lessee and Sublessee certify that the applicable statements listed in this schedule are true, complete, correct, and made in good faith.





FCC Form 608 – Schedule B Instructions

(Edition Date) – Page 1

FCC Form 608 Federal Communications Commission Approved by OMB

Schedule B 3060 - 1058

See 608 Main Form Instructions

for public burden estimate


Schedule for New Lease or New Sublease


Term of Lease [For New Leases Only]

1) Indicate whether the Lease is:


( ) Short-Term or ( ) Long-Term


* The cumulative lease period for a Short-Term Lease cannot exceed 365 days from the original commencement date.


2) If this filing is a Long-Term De Facto Transfer Lease, have the Licensee and Lessee entered into any Short-Term De Facto Transfer Lease(s) with regard to any spectrum covered by the License(s) that are part of this filing, or within the same geographic area(s) of the License(s) that are part of this filing?

( ) Yes No


Leased Spectrum (For Geographically-Licensed Services) [For New Leases Only]

3a) Does this filing involve geographic-area licenses where only a portion of the licensed spectrum and/or the licensed geographic area will be leased?


( ) Yes No

3b) If the answer to 3a is ‘Y’, does this filing involve one or more individual point-to-point microwave links that will be leased?

If the response to 3b is ‘Y’, complete Schedule H.

If the response to 3b is ‘N’, complete Schedule F and, if applicable, Schedule G.


( ) Yes No

Leased Spectrum (For Site-Based Services) [For New Leases Only]

3c) Does this filing involve site-based licenses where only a portion of the licensed locations, paths and/or frequencies will be leased?

If the response to 3c is ‘N’, complete Items 178 (Call Sign) and 179 (Radio Service Code) on the Main Form.

If the response to 3c is ‘Y’, in addition to Items 178 (Call Sign) and 179 (Radio Service Code), complete Items 180-184 (Location Number, Path Number, Frequency Number, Lower Frequency and Upper Frequency), as appropriate, on the Main Form.


( ) Yes No


Type and Term of Sublease [For New Subleases Only]

4a) If the existing Lease is a Long-Term De Facto Transfer Lease, are the Lessee and Sublessee entering into a Spectrum Manager Sublease

or a Long-Term De Facto Transfer Sublease?


( ) Spectrum Manager Sublease or ( ) Long-Term De Facto Transfer Sublease


4b) If the answer to 4a is ‘Spectrum Manager Sublease’, indicate whether the Sublease is:


( ) Short-Term or ( ) Long-Term


5) If the existing Lease is a Long-Term Spectrum Manager Lease, indicate whether the Spectrum Manager Sublease is:


( ) Short-Term or ( ) Long-Term














FCC Form 608 – Schedule B

(Edition Date) – Page 1


File Typeapplication/msword
File TitleFCC 603-T
Authorbedwards
Last Modified ByJudith-B.Herman
File Modified2010-12-03
File Created2010-12-03

© 2024 OMB.report | Privacy Policy