Download: 
pdf | 
pdfSample Renovation Recordkeeping Checklist
Name of Firm:
Date and Location of Renovation:
Brief Description of Renovation:
Name of Assigned Renovator:
Name(s) of Trained Worker(s), if used:
Name of Dust Sampling Technician,
Inspector, or Risk Assessor, if used:
___	 Copies of renovator and dust sampling technician qualifications (training certificates, certifications) on file.
___	 Certified renovator provided training to workers on (check all that apply):
		 ___	 Posting warning signs 	
	
___ Setting up plastic containment barriers
		 ___	 Maintaining containment 		
___ Avoiding spread of dust to adjacent areas
		 ___ Waste handling	 		
___ Post-renovation cleaning
		 ___	Test kits used by certified renovator to determine whether lead was present on components affected
				 by renovation (identify kits used and describe sampling locations and results):
___	 Warning signs posted at entrance to work area.
___	 Work area contained to prevent spread of dust and debris
		 ___	All objects in the work area removed or covered (interiors)
		 ___	HVAC ducts in the work area closed and covered (interiors)
		 ___	Windows in the work area closed (interiors)
		 ___	Windows in and within 20 feet of the work area closed (exteriors)
		 ___	Doors in the work area closed and sealed (interiors)
		 ___	Doors in and within 20 feet of the work area closed and sealed (exteriors)
		 ___	Doors that must be used in the work area covered to allow passage but prevent spread of dust
		 ___	Floors in the work area covered with taped-down plastic (interiors)
		 ___	Ground covered by plastic extending 10 feet from work area—plastic anchored to building and
				 weighed down by heavy objects (exteriors)
		 ___	If necessary, vertical containment installed to prevent migration of dust and debris to adjacent
				 property (exteriors)
___	 Waste contained on-site and while being transported off-site.
___	 Work site properly cleaned after renovation
		 ___	All chips and debris picked up, protective sheeting misted, folded dirty side inward, and taped
				 for removal
		 ___	Work area surfaces and objects cleaned using HEPA vacuum and/or wet cloths or mops (interiors)
___	 Certified renovator performed post-renovation cleaning verification (describe results, including the
		 number of wet and dry cloths used):
		
		 ___	If dust clearance testing was performed instead, attach a copy of report
___	 I certify under penalty of law that the above information is true and complete.
Name and title 								
Date
29
| File Type | application/pdf | 
| File Title | Sample Renovation Recordkeeping Checklist | 
| Subject | Checklist to help contractors comply with the recordkeeping requirements of the Renovation, Repair, and Painting (RRP) rule, whi | 
| Author | US EPA, OCSPP, Office of Pollution Prevention and Toxics | 
| File Modified | 2011-05-18 | 
| File Created | 0000-00-00 |