Form PHMSA F 7000-1.1 PHMSA F 7000-1.1 Hazardous Liquid Annual Report

Pipeline Safety: New Reporting Requirements for Hazardous Liquid Pipeline Operators: Hazardous Liquid Annual Report

HL Annual Report Form - PHMSA F 7000-1.1 (rev 6-2014)

Pipeline Safety: New Reporting Requirements for Hazardous Liquid Pipeline Operators: Hazardous Liquid Annual Report

OMB: 2137-0614

Document [docx]
Download: docx | pdf

Notice: This report is required by 49 CFR Part 195. Failure to report may result in a civil penalty Form Approved

not to exceed $100,000 for each violation for each day the violation continues up to a maximum of OMB No. 2137-0614

$1,000,000 as provided in 49 USC 60122 Expires: 12/31/2015








DOT USE ONLY

U.S. Department of Transportation



ANNUAL REPORT FOR CALENDAR YEAR 20___


Initial Date Submitted



Pipeline and Hazardous Materials


HAZARDOUS LIQUID PIPELINE SYSTEMS

Report Submission Type



Safety Administration


Date Submitted



A federal agency may not conduct or sponsor, and a person is not required to respond to, nor shall a person be subject to a penalty for failure to comply with a collection of information subject to the requirements of the Paperwork Reduction Act unless that collection of information displays a current valid OMB Control Number. The OMB Control Number for this information collection is 2137-0614. Public reporting for this collection of information is estimated to be approximately 19 hours per response, including the time for reviewing instructions, gathering the data needed, and completing and reviewing the collection of information. All responses to this collection of information are mandatory. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to: Information Collection Clearance Officer, PHMSA, Office of Pipeline Safety (PHP-30) 1200 New Jersey Avenue, SE, Washington, D.C. 20590.


Important: Please read the separate instructions for completeing this form before you begin. They clarify the information requested and provide specific examples. If you do not have a copy of the instructions, you can obtain one from the PHMSA Pipeline Safety Community Web Page at http://www.phmsa.dot.gov/pipeline/library/forms.

PART A - OPERATOR INFORMATION

DOT USE ONLY










1. OPERATOR’S 5 DIGIT IDENTIFICATION NUMBER (OPID)


/ / / / / /




2. NAME OF OPERATOR:





3. Reserved



4. HEADQUARTERS ADDRESS:


Street Address


State: / / / Zip Code: / / / / / / - / / / / /


/__/__/__/-/__/__/__/-/__/__/__/__/

Telephone Number


5. THIS REPORT PERTAINS TO THE FOLLOWING COMMODITY GROUP: (Select Commodity Group based on the predominant commodity carried and complete the report for that Commodity Group. File a separate report for each Commodity Group included in this OPID.)


¨ Crude Oil


¨ Refined and/or Petroleum Product (non-HVL)


¨ HVL


¨ CO2


¨ Fuel Grade Ethanol (dedicated system)


6. Reserved



7. FOR THE DESIGNATED COMMODITY GROUP, THE PIPELINES AND/OR PIPELINE FACILITIES INCLUDED WITHIN THIS OPID ARE: (Select one or both)


¨ INTERstate pipeline List all of the States in which INTERstate pipelines and/or pipeline facilities included under this OPID exist: __, __, __, __, __, etc.


¨ INTRAstate pipeline List all of the States in which INTRAstate pipelines and/or pipeline facilities included under this OPID exist: __, __, __, __, __, etc.






8. Reserved


For all Parts, make an entry in each block for which data is available. All fields are required unless non-applicable.


For the designated Commodity Group, PARTs B, D, and E will be calculated from Parts L, P, and Q respectively. Complete PART C one time for all pipelines and/or pipeline facilities – both INTERstate and INTRAstate - included within this OPID.


PART B - MILES OF PIPE BY LOCATION


Total Segment Miles

That Could Affect HCAs

Onshore

Calc

Offshore

Calc

Total Miles

Calc



PART C - VOLUME TRANSPORTED IN BARREL-MILES (include Commodities within this Commodity Group that are not predominant)


Onshore

Offshore

Crude Oil



Refined and/or Petroleum Product (non-HVL)



HVL



CO2



Fuel Grade Ethanol (dedicated system)





PART D - MILES OF PIPE BY MATERIAL AND CORROSION PREVENTION STATUS




Steel Cathodically protected

Steel Cathodically unprotected







Bare

Coated

Bare

Coated

Plastic

Other

Total Miles

Onshore

Calc

Calc

Calc

Calc

Calc

Calc

Calc


Offshore

Calc

Calc

Calc

Calc

Calc

Calc

Calc


Total Miles

Calc

Calc

Calc

Calc

Calc

Calc

Calc



PART E - MILES OF ELECTRIC RESISTANCE WELDED (ERW) PIPE BY WELD TYPE AND DECADE


Decade Pipe Installed

Unknown

Pre-1940

1940 -1949

1950 - 1959

1960 - 1969

1970 - 1979

High Frequency

Calc

Calc

Calc

Calc

Calc

Calc

Low Frequency and DC

Calc

Calc

Calc

Calc

Calc

Calc

Total Miles

Calc

Calc

Calc

Calc

Calc

Calc

Decade Pipe Installed

1980 - 1989

1990 - 1999

2000 – 2009

2010 - 2019


Total Miles

High Frequency

Calc

Calc

Calc

Calc


Calc

Low Frequency and DC

Calc

Calc

Calc

Calc


Calc

Total Miles

Calc

Calc

Calc

Calc


Calc



For the designated Commodity Group, complete PARTs F and G one time for all INTERstate pipelines and/or pipeline facilities included within this OPID and multiple times as needed for the designated Commodity Group for each State in which INTRAstate pipelines and/or pipeline facilities included within this OPID exist. Each time these sections are completed, designate the State to which the data applies for INTRAstate pipelines and/or pipeline facilities, or that it applies to all INTERstate pipelines included within this Commodity Group and OPID.


PARTs F and G


The data reported in these PARTs F and G applies to: (select only one)

¨ Interstate pipelines/pipeline facilities


¨ Intrastate pipelines/pipeline facilities in the State of /__/__/ (complete for each State)




PART F - INTEGRITY INSPECTIONS CONDUCTED AND ACTIONS TAKEN BASED ON INSPECTION

1. MILEAGE INSPECTED IN CALENDAR YEAR USING THE FOLLOWING IN-LINE INSPECTION (ILI) TOOLS

a. Corrosion or metal loss tools


b. Dent or deformation tools


c. Crack or long seam defect detection tools


d. Any other internal inspection tools, specify other tools:


e. Total tool mileage inspected in calendar year using in-line inspection tools. (Lines a + b + c + d )

Calc

2. ACTIONS TAKEN IN CALENDAR YEAR BASED ON IN-LINE INSPECTIONS

a. Based on ILI data, total number of anomalies excavated in calendar year because they met the operator’s criteria for excavation.


b. Total number of anomalies repaired in calendar year that were identified by ILI based on the operator’s criteria, both within a segment that could affect an HCA and outside of a segment that could affect an HCA.


c. Total number of conditions repaired WITHIN A SEGMENT THAT COULD AFFECT AN HCA meeting the definition of:

Calc

1. “Immediate repair condition” [195.452(h)(4)(i)]


2. “60-day condition” [195.452(h)(4)(ii)]


3. “180-day condition” [195.452(h)(4)(iii)]


3. MILEAGE INSPECTED AND ACTIONS TAKEN IN CALENDAR YEAR BASED ON PRESSURE TESTING

a. Total mileage inspected by pressure testing in calendar year.


b. Total number of pressure test failures (ruptures and leaks) repaired in calendar year, both within a segment that could affect an HCA and outside of a segment that could affect an HCA.


c. Total number of pressure test ruptures (complete failure of pipe wall) repaired in calendar year WITHIN A SEGMENT THAT COULD AFFECT AN HCA .


d. Total number of pressure test leaks (less than complete wall failure but including escape of test medium) repaired in calendar year WITHIN A SEGMENT THAT COULD AFFECT AN HCA.






(PART F continued)


4. MILEAGE INSPECTED AND ACTIONS TAKEN IN CALENDAR YEAR BASED ON ECDA (EXTERNAL COROSION DIRECT ASSESSMENT)

a. Total mileage inspected by ECDA in calendar year.


b. Total number of anomalies identified by ECDA and repaired in calendar year based on the operator’s criteria, both within a segment that could affect an HCA and outside of a segment that could affect an HCA.


c. Total number of conditions repaired in calendar year WITHIN A SEGMENT THAT COULD AFFECT AN HCA meeting the definition of:

Calc

1. “Immediate repair condition” [195.452(h)(4)(i)]


2. “60-day condition” [195.452(h)(4)(ii)]


3. “180-day condition” [195.452(h)(4)(iii)]


5. MILEAGE INSPECTED AND ACTIONS TAKEN IN CALENDAR YEAR BASED ON OTHER INSPECTION TECHNIQUES

a. Total mileage inspected by inspection techniques other than those listed above in calendar year. Specify other inspection technique(s):


b. Total number of anomalies identified by other inspection techniques and repaired in calendar year based on the operator’s criteria, both within a segment that could affect an HCA and outside of a segment that could affect an HCA.


c. Total number of conditions repaired in calendar year WITHIN A SEGMENT THAT COULD AFFECT AN HCA meeting the definition of:

Calc

1. “Immediate repair condition” [195.452(h)(4)(i)]


2. “60-day condition” [195.452(h)(4)(ii)]


3. “180-day condition” [195.452(h)(4)(iii)]


6. TOTAL MILEAGE INSPECTED (ALL METHODS) AND ACTIONS TAKEN IN CALENDAR YEAR

a. Total mileage inspected in calendar year. (Lines 1.e + 3.a + 4.a + 5.a)

Calc

b. Total number of anomalies repaired in calendar year both within a segment that could affect an HCA and outside of a segment that could affect an HCA. (Lines 2.b + 3.b + 4.b + 5.b)

Calc

c. Total number of conditions repaired in calendar year WITHIN A SEGMENT THAT COULD AFFECT AN HCA. (Lines 2.c.1 + 2.c.2 + 2.c.3 + 3.c + 3.d + 4.c.1 + 4.c.2 + 4.c.3 + 5.c.1 + 5.c.2 + 5.c.3)

Calc

d. Total number of actionable anomalies eliminated by pipe replacement in calendar year that could affect an HCA:


e. Total number of actionable anomalies eliminated by pipe abandonment in calendar year that could affect an HCA:




PART G – MILES OF BASELINE ASSESSMENTS AND REASSESSMENTS COMPLETED IN CALENDAR YEAR (segment miles that could affect HCAs ONLY)

a. Baseline assessment miles completed during the calendar year.


b. Reassessment miles completed during the calendar year.


c. Total assessment and reassessment miles completed during the calendar year.

Calc

For the designated Commodity Group, complete PARTs H, I, J, K, L, M, P, and Q covering INTERstate pipelines and/or pipeline facilities for each State in which INTERstate systems exist within this OPID and again covering INTRAstate pipelines and/or pipeline facilities for each State in which INTRAstate systems exist within this OPID.


PARTs H, I, J, K, L, M, P, and Q


The data reported in these PARTs H, I, J, K, L, M, P, and Q applies to: (select only one)

¨ Interstate pipelines/pipeline facilities in the State of /__/__/ (complete for each State)


¨ Intrastate Pipelines/pipeline facilities in the State of /__/__/ (complete for each State)




PART H - MILES OF PIPE BY NOMINAL PIPE SIZE (NPS)

Onshore

NPS 4

or less

6

8

10

12

14

16

18

20










22

24

26

28

30

32

34

36

38










42

44

46

48

52

56

58 and over

Other Pipe Sizes

Not Listed








Size: __ Miles: ________

Add Sizes as needed

Calc

Total Miles of Onshore Pipe

Offshore

NPS 4

or less

6

8

10

12

14

16

18

20










22

24

26

28

30

32

34

36

38










42

44

46

48

52

56

58 and over

Other Pipe Sizes

Not Listed








Size: __ Miles: ________

Add Sizes as needed

Calc

Total Miles of Offshore Pipe



PART I - MILES OF PIPE BY DECADE INSTALLED


Unknown

Pre-20s

1920 -1929

1930 -1939

1940 -1949

1950 – 1959

1960 – 1969

1970 – 1979

1980 – 1989










1990 - 1999

2000 - 2009

2010 - 2019





Total Miles









Calc




PART J - MILES OF PIPE BY SPECIFIED MINIMUM YIELD STRENGTH


Pipeline Segments Subject to

ALL 49 CFR 195 Requirements

Rural Low-Stress Pipeline Segments Subject ONLY to Subpart B of

49 CFR 195

Total Miles

Onshore

Offshore

Steel Pipe

- Operating at

greater than 20% SMYS




Calc


Non-Rural Onshore

Rural

Onshore

Offshore



Steel Pipe

- Operating at less than or equal to 20% SMYS





Calc

Steel Pipe

- Operating at an

unknown stress level





Calc

Non-Steel Pipe

- Operating at

greater than 125 psig





Calc

Non-Steel Pipe

- Operating at less than

or equal to 125 psig





Calc

Total Miles

Calc

Calc

Calc

Calc



PART K - MILES OF REGULATED GATHERING LINES


Non-Rural Onshore

Rural

Onshore

Offshore

Total Miles

Steel Pipe

- Operating at greater than 20% SMYS




Calc

Steel Pipe

- Operating at less than or equal to 20% SMYS




Calc

Non-Steel Pipe

- Operating at greater than 125 psig




Calc

Non-Steel Pipe

- Operating at less than or equal to 125 psig




Calc

Total Miles

Calc

Calc

Calc

Calc










PART L – TOTAL SEGMENT MILES THAT COULD AFFECT HCAs


BY TYPE OF HCA

NOT BY TYPE

POPULATION AREAS

USAs

COMMERCIALLY NAVIGABLE WATERWAYS

TOTAL SEGMENT MILES THAT COULD AFFECT HCA’S

High Population

Other Population

Drinking Water

Ecological Resource

Onshore







Offshore









PART M - BREAKOUT TANKS


Commodity Group

Total Number of Tanks Less than or equal to 50,000 Bbls

Total Number of Tanks 50,001

to 100,000 Bbls

Total Number of Tanks 100,001 to

150,000 Bbls

Total Number of Tanks Over 150,000 Bbls

Total Number of Tanks

Crude Oil





Calc

Refined and/or Petroleum Product (non-HVL)





Calc

HVL





Calc

CO2





Calc

Fuel Grade Ethanol (dedicated system)





Calc


PART P - MILES OF PIPE BY MATERIAL AND CORROSION PREVENTION STATUS




Steel Cathodically protected

Steel Cathodically unprotected







Bare

Coated

Bare

Coated

Plastic

Other

Total Miles

Onshore

Calc

Calc

Calc

Calc

Calc

Calc

Calc


Offshore

Calc

Calc

Calc

Calc

Calc

Calc

Calc


Total Miles

Calc

Calc

Calc

Calc

Calc

Calc

Calc


Other (specify):



PART Q - MILES OF ELECTRIC RESISTANCE WELDED (ERW) PIPE BY WELD TYPE AND DECADE


Decade Pipe Installed

Unknown

Pre-1940

1940 -1949

1950 - 1959

1960 - 1969

1970 - 1979

High Frequency







Low Frequency and DC







Total Miles

Calc

Calc

Calc

Calc

Calc

Calc

Decade Pipe Installed

1980 - 1989

1990 - 1999

2000 – 2009

2010 - 2019


Total Miles

High Frequency






Calc

Low Frequency and DC






Calc

Total Miles

Calc

Calc

Calc

Calc


Calc



For the designated Commodity Group, complete PART N one time for all of the pipelines and/or pipeline facilities included within this OPID, and then also PART O if any portion(s) of the pipelines and/or pipeline facilities covered under this Commodity Group and OPID are included in an Integrity Management Program subject to 49 CFR 195.


PART N - PREPARER SIGNATURE (applicable to all PARTs)



Preparer's Name (type or print)



/__/__/__/-/__/__/__/-/__/__/__/__/

Telephone Number



Preparer's Title





/__/__/__/-/__/__/__/-/__/__/__/__/

Facsimile Number

Preparer's E-mail Address







PART O - CERTIFYING SIGNATURE (applicable only to PARTs, F, G, and L)



Senior Executive Officer’s signature certifying the information in PARTs B, F, G, and L as required by

49 U.S.C. 60109(f)



/__/__/__/-/__/__/__/-/__/__/__/__/

Telephone Number


Senior Executive Officer’s name certifying the information in PARTs B, F, G, and L as required by

49 U.S.C. 60109(f)


Senior Executive Officer’s title certifying the information in PARTs B, F, G, and L as required by

49 U.S.C. 60109(f)


Senior Executive Officer’s E-mail Address







Form PHMSA F 7000-1.1 (rev 6-2014) Pg. 12 of 12

Reproduction of this form is permitted.


File Typeapplication/vnd.openxmlformats-officedocument.wordprocessingml.document
File TitleANNUAL REPORT
SubjectGAS TRANSMISSION/GATHERING SYS
AuthorRoger Little
File Modified0000-00-00
File Created2021-01-24

© 2024 OMB.report | Privacy Policy