NAESB errata

RM96-1-038_NAESB errata_20150707-5191.pdf

FERC-545A, (NOPR in RM96-1-038) Gas Pipeline Rates: Rate Change Non-Formal

NAESB errata

OMB: 1902-0283

Document [pdf]
Download: pdf | pdf
NORTH AMERICAN ENERGY STANDARDS BOARD

801 Travis, Suite 1675 • Houston, Texas 77002 • Phone: (713) 356-0060 • Fax: (713) 356-0067
email: [email protected] • Web Site Address: www.naesb.org

July 6, 2015
Filed Electronically

The Honorable Kimberly D. Bose
Secretary
Federal Energy Regulatory Commission
888 First Street N.E., Room 1A
Washington, D.C. 20426

RE:

Standards for Business Practices of Interstate Natural Gas Pipelines (Docket No. RM96-1 et al.)

Dear Ms. Bose:

The North American Energy Standards Board ("NAESB") herewith submits this report to the Federal Energy
Regulatory Commission ("FERC" or "Commission") regarding errata to Versions 3.0 of the NAESB Wholesale Gas
Quadrant (“WGQ”) standards to support FERC Order No. 809, Coordination of the Scheduling Processes of
Interstate Natural Gas Pipelines and Public Utilities, issued by the Commission April 16, 2015. This report is
voluntarily submitted by NAESB in Docket No. RM96-1-000, and is submitted simultaneously with a report
regarding coordinated errata to Version 2.0 of the NAESB WGQ standards in Docket No. RM14-2-000, also in
support of FERC Order No. 809. The modifications to the NAESB WGQ Version 3.0 standards described in this
report were made to accommodate the NAESB final actions in support of WGQ Annual Plan Item 11c (Parts 1 &
2), ratified by the WGQ Membership on September 22, 2014, and minor correction request MC14018, adopted by
the WGQ Executive Committee via notational ballot on September 10, 2014. These modifications incorporate a
9:00 am Central Clock Time start to the gas operating day and correct minor errors found during the review of the
final actions and minor correction subject to FERC Order No. 809.
This report is filed electronically in Adobe Acrobat® Portable Document Format (.pdf). All of the referenced
documents are available on the NAESB web site (www.naesb.org). Should you need the report in an editable format,
we can provide it in Microsoft® Word® 2010. Please feel free to call me at (713) 356-0060 or refer to the NAESB
website (www.naesb.org) should you have any questions or need additional information regarding the errata to the
NAESB WGQ Versions 2.0 standards or any other NAESB work products.
Respectfully submitted,

Ms. Rae McQuade
President, North American Energy Standards Board

NORTH AMERICAN ENERGY STANDARDS BOARD

801 Travis, Suite 1675 • Houston, Texas 77002 • Phone: (713) 356-0060 • Fax: (713) 356-0067
email: [email protected] • Web Site Address: www.naesb.org

July 6, 2015
Page 2

cc:

Chairman Norman C. Bay, Federal Energy Regulatory Commission
Commissioner Tony Clark, Federal Energy Regulatory Commission
Commissioner Collette Honorable, Federal Energy Regulatory Commission
Commissioner Cheryl LaFleur, Federal Energy Regulatory Commission
Commissioner Philip D. Moeller, Federal Energy Regulatory Commission
Mr. Michael Bardee, Director, Office of Electric Reliability, Federal Energy Regulatory
Commission
Mr. Michael McLaughlin, Director, Office of Energy Market Regulation, Federal Energy
Regulatory Commission
Mr. David Morenoff, General Counsel, Office of the General Counsel, Federal Energy
Regulatory Commission
Ms. Jamie Simler, Director, Office of Energy Policy and Innovation, Federal Energy
Regulatory Commission
Ms. Valerie Crockett, Chairman and CEO, North American Energy Standards Board
Mr. Michael Desselle, Vice Chairman, North American Energy Standards Board
Mr. William P. Boswell, General Counsel, North American Energy Standards Board
Mr. Jonathan Booe, Executive Vice President & CAO, North American Energy Standards
Board

Report of the North American Energy Standards Board
Errata for NAESB WGQ Standards, Version 3.0 to support FERC Order No. 809
July 6, 2015
Page 1
UNITED STATES OF AMERICA
FEDERAL ENERGY REGULATORY COMMISSION

Standards for Business Practices
of Natural Gas Pipelines

)
)

Docket No. RM96-1 et al.

REPORT OF THE NORTH AMERICAN ENERGY STANDARDS BOARD

The North American Energy Standards Board (“NAESB”) is voluntarily submitting this report in accordance with
the Federal Energy Regulatory Commission (“FERC or Commission”) Order No. 809, Coordination of the
Scheduling Processes of Interstate Natural Gas Pipelines and Public Utilities, issued by the Commission April 16,
2015 in the above referenced docket. The purpose of the report is to notify the Commission of action taken by
NAESB to adopt two minor corrections, MC15009 and MC15012, that integrate the Commission’s regulation into
the NAESB Wholesale Gas Quadrant (“WGQ”) standards as requested in paragraph 11 of the March 20, 2014
Notice of Proposed Rulemaking (“NOPR”) 1 and noted in paragraph 15 of the final order. 2 The two minor
corrections described in this report are applicable to Version 3.0 of the WGQ standards and were adopted to
accommodate the NAESB final actions in support of WGQ Annual Plan Item 11c (Parts 1 & 2), and minor
correction MC14018 that have been incorporated by reference through the Commission’s Order No. 809. Version
3.0 was submitted to the Commission for its consideration on November 14, 2014. 3 The Commission has not taken
any action on Version 3.0, but to ensure that NAESB stays in sync within its versions, and the Commission has a
full record, NAESB has applied these minor corrections to Version 3.0.
Attached to this report are five appendices. A description of each appendix can be found below.
•

Appendix 1 provides access to minor correction MC15009

•

Appendix 2 provides access to minor correction MC15012

•

Appendix 3 provides access to the NAESB WGQ Executive Committee (“EC”) meeting minutes and
notational ballot through which the minor corrections were adopted

•

Appendix 4 contains the correspondence sent to all WGQ members notifying them of the EC action taken
on the minor corrections, requesting comments that opposed the minor corrections, and informing them of
future actions and timelines related to the minor corrections

•

Appendix 5 includes the NAESB Operating Procedures for minor clarifications and corrections to
standards.

Minor correction MC15009 was approved by the WGQ EC on April 30, 2015 and submitted for a two week industry
comment period ending on May 14, 2015. No comments on the minor correction were submitted and the
modifications were incorporated into both Version 2.0 and Version 3.0 of the NAESB WGQ standards on June 1,
2015. The minor correction modifies NAESB WGQ Standard No. 1.3.1 to incorporate a 9:00 am Central Clock
Time start the gas day and NAESB WGQ Standard Nos. 1.1.5, 1.3.5, 1.3.8, 1.3.9, 1.3.11, 1.3.33, and 5.3.56 to
remove a hyphen from the word “intraday” in each of the standards.

1

Coordination of the Scheduling Processes of Interstate Natural Gas Pipelines and Public Utilities, 79 FR 18223
(April 1, 2014), FERC Stats. & Regs. ¶ 32,700 (2014), 146 FERC ¶61,201 (2014) (NOPR).
2
Order No. 809, Coordination of the Scheduling Processes of Interstate Natural Gas Pipelines and Public Utilities,
151 FERC ¶ 61,049 (2015) (Order No. 809).
3
The November 14, 2014 NAESB Report to FERC containing Version 3.0 of the WGQ Business Practice Standards
may be accessed at the following link: https://www.naesb.org/pdf4/ferc111414_wgq_version_3.0_filing.pdf.

Report of the North American Energy Standards Board
Errata for NAESB WGQ Standards, Version 3.0 to support FERC Order No. 809
July 6, 2015
Page 2
Minor Correction MC15012 was approved by the WGQ EC through a notational ballot on May 29, 2015 and
submitted for a two week comment period ending on June 15, 2015. No comments on the minor correction were
submitted and the modifications were incorporated into Version 3.0 of the NAESB WGQ standards on June 29,
2015. MC15012 is split into parts A and B. Part A modifies the standards to remove references that the start of the
gas day was undefined in the NAESB final actions to support WGQ Annual Plan Item 11c (Parts 1 & 2) and
MC14008, and Part B corrects errors to the standards that were found in the review process. A summary of the
modifications made through MC15012 can be found in the following table. In addition to this report, NAESB is
simultaneously submitting a report in Docket No. RM96-1-000 that includes minor correction MC15009 and
MC15011 and ensure consistency between the standards adopted through the April 16, 2015 Order and the existing
Version 2.0 WGQ standards.

Minor Correction Cross Reference
Standard

Description

Request No.

Action

0.y.z - NAESB WGQ Additional Standards Manual
0.4.1

Storage Information

MC15012
(Ref: MC14018)

Minor correction to modify the DTM Segment in
the EDI X12 Mapping Guidelines by removing the
‘NOTE’ (MC14018) based on FERC Order No.
809 issued April 16, 2015 in Docket No. RM14-2000.

0.4.2

Operational Capacity

MC15012
(Ref: MC14018)

Minor correction to modify the Sample Paper
Transaction and Sample ASC X12 Transaction to
remove the ‘Note’ (MC14018) based on FERC
Order No. 809 issued April 16, 2015 in Docket No.
RM14-2-000.

0.4.4

Location Data
Download

MC15012
(Ref: MC14018)

Minor correction to modify the Sample Paper
Transaction to remove the ‘Note’ (MC14018) based
on FERC Order No. 809 issued April 16, 2015 in
Docket No. RM14-2-000.

1.y.z - NAESB WGQ Nomination Standards Manual
1.y.z –
Nomination
Standards
1.3.1

Business Process and
Practices

MC15012
(Ref: MC14018)

Modify Diagram 3 (Nomination Scheduling
Timeline) to remove ‘Note 1’ (MC14018) based on
FERC Order No. 809 issued April 16, 2015 in
Docket No. RM14-2-000.

Standard

MC15009

Modify to insert the Gas Day start at 9:00 a.m.

(Ref: 2014 WGQ
Annual Plan Item
11c (Part 1 of 2))
1.4.1

Nomination

MC15012
(Ref: MC14018)

Minor correction to modify the DTM Segment in
the EDI X12 Mapping Guidelines by removing the
‘NOTE’ (MC14018) based on FERC Order No.
809 issued April 16, 2015 in Docket No. RM14-2000.

1.4.2

Nomination Quick
Response

MC15011
(Ref: MC14018)

Minor correction to modify the DTM Segment in
the EDI X12 Mapping Guidelines by removing the
‘NOTE’ (MC14018) based on FERC Order No.
809 issued April 16, 2015 in Docket No. RM14-2000.

Report of the North American Energy Standards Board
Errata for NAESB WGQ Standards, Version 3.0 to support FERC Order No. 809
July 6, 2015
Page 3

Minor Correction Cross Reference
Standard

Description

Request No.

Action

1.4.3

Request for
Confirmation

MC15012
(Ref: MC14018)

Minor correction to modify the DTM Segment in
the EDI X12 Mapping Guidelines by removing the
‘NOTE’ (MC14018) based on FERC Order No.
809 issued April 16, 2015 in Docket No. RM14-2000.

1.4.4

Confirmation Response

MC15012
(Ref: MC14018)

Minor correction to modify the DTM Segment in
the EDI X12 Mapping Guidelines by removing the
‘NOTE’ (MC14018) based on FERC Order No.
809 issued April 16, 2015 in Docket No. RM14-2000.

1.4.5

Scheduled Quantity

MC15012
(Ref: MC14018)

Minor correction to modify the last section of the
Technical Implementation of Business Process for
the Elapsed Prorata Scheduled Quantity (EPSQ)
Examples by removing the ‘NOTE’ and the DTM
Segment in the EDI X12 Mapping Guidelines by
removing the ‘NOTE’ (MC14018) based on FERC
Order No. 809 issued April 16, 2015 in Docket No.
RM14-2-000.
Modify the Technical Implementation of Business
Process (TIBP) ESPQ Examples 3-2 and 3-3 for
Intraday 2 – ESPQ, SQ and Calculation of resulting
Scheduled Quantity to correct an error in the
calculation from MC14018.

(Part B)

1.4.6

Scheduled Quantity for
Operator

MC15012
(Ref: MC14018)

Minor correction to modify the DTM Segment in
the EDI X12 Mapping Guidelines by removing the
‘NOTE’ (MC14018) based on FERC Order No.
809 issued April 16, 2015 in Docket No. RM14-2000.

1.4.7

Confirmation Quick
Response

MC15012
(Ref: MC14018)

Minor correction to modify the Sample Paper
Transaction, Sample ASC X12 Transaction, and
DTM Segment in the EDI X12 Mapping Guidelines
by removing the ‘NOTE’ (MC14018) based on
FERC Order No. 809 issued April 16, 2015 in
Docket No. RM14-2-000.

2.y.z - NAESB WGQ Nomination Standards Manual
2.4.1

Pre-determined
Allocation

MC15012
(Ref: MC14018)

Minor correction to modify the DTM Segment in
the EDI X12 Mapping Guidelines by removing the
‘NOTE’ (MC14018) based on FERC Order No.
809 issued April 16, 2015 in Docket No. RM14-2000.

2.4.3

Allocation

MC15012
(Ref: MC14018)

Minor correction to modify the DTM Segment in
the EDI X12 Mapping Guidelines by removing the
‘NOTE’ (MC14018) based on FERC Order No.
809 issued April 16, 2015 in Docket No. RM14-2000.

Report of the North American Energy Standards Board
Errata for NAESB WGQ Standards, Version 3.0 to support FERC Order No. 809
July 6, 2015
Page 4

Minor Correction Cross Reference
Standard

Description

Request No.

Action

2.4.4

Shipper Imbalance

MC15012
(Ref: MC14018)

Minor correction to modify the DTM Segment in
the EDI X12 Mapping Guidelines by removing the
‘NOTE’ (MC14018) based on FERC Order No.
809 issued April 16, 2015 in Docket No. RM14-2000.

2.4.5

Measurement
Information

MC15012
(Ref: MC14018)

Minor correction to modify the DTM Segment in
the EDI X12 Mapping Guidelines by removing the
‘NOTE’ (MC14018) based on FERC Order No.
809 issued April 16, 2015 in Docket No. RM14-2000.

5.y.z - NAESB WGQ Capacity Release Standards Manual
5.y.z –
Capacity
Release
Standards

Business Processes and
Practices

MC15012
(Ref: MC14018)

(Part B)

Modify paragraph 10 to remove the Note from the
Examples of EPC (MC14018) based on FERC
Order No. 809 issued April 16, 2015 in Docket No.
RM14-2-000.
Modify the Overview Table Heading (Second
Column) to correct an error by deleting the first
instance of the word ‘More’ and replacing it with
the word ‘Less’, so it reads ‘Biddable Releases One
Year or Less and More Than One Year’.

5.4.16

System-Wide Notices

MC15012
(Ref: MC14018)

Minor correction to modify the Sample Paper
Transaction and Sample ASC X12 Transaction to
remove the ‘Note’ (MC14018) based on FERC
Order No. 809 issued April 16, 2015 in Docket No.
RM14-2-000.

5.4.24

Offer

MC15012
(Part B)

Minor correction to modify the Data Element Cross
Reference to EDI X12, Transaction Set Tables, and
EDI X12 Mapping Guidelines to add the data
element ‘Recall Notification Indicator – Intraday
3’.

5.4.26

Award Download

MC15012
(Part B)

Minor correction to modify the Data Element Cross
Reference to EDI X12 and EDI X12 Mapping
Guideline to add the data element ‘Recall
Notification Indicator – Intraday 3’.

Report of the North American Energy Standards Board
Errata for NAESB WGQ Standards, Version 3.0 to support FERC Order No. 809
July 6, 2015
Page 5
The list of appendices shown below in tabular form includes the FERC docket number for the amended standard(s),
the version(s) of standard(s) amended, and a description of the amendments:
Appendix No.

Minor Correction Description

Appendix 1

MC15009: [Docket No. RM14-2-000], Modify NAESB WGQ Standard No. 1.3.1 to insert the
Gas Day start at 9:00 a.m. (FERC Order No. 809 issued April 16, 2015 in Docket No. RM14-2000) and provide redlines to reflect consistency changes included in Final Action 2014 WGQ
Annual Plan Item 11.c (Part 1 of 2), where ‘Intra-day’ was changed to ‘Intraday’ in the following
NAESB WGQ Standard Nos. 1.1.15, 1.3.5, 1.3.8, 1.3.9, 1.3.11, 1.3.33, and 5.3.56 in NAESB
Wholesale Gas Quadrant (WGQ) Business Practice Standards Versions 2.0 and 3.0.
NAESB WGQ Business Practice Standard Nos. 1.1.15, 1.3.1, 1.3.5, 1.3.8, 1.3.9, 1.3.11, 1.3.33,
and 5.3.56, Versions 2.0 and 3.0

Appendix 2

MC15012: [Docket No. RM14-2-000], Minor Corrections to accommodate modifications in
minor correction MC14018 adopted by the WGQ EC via notational ballot on September 10, 2014
as noted in the summary. The purpose of the proposed corrections provides consistency in the
application to NAESB WGQ Version 3.0 (FERC Order No. 809 issued April 16, 2015 in Docket
No. RM14-2-000).

Part A

•

Modify Diagram 3 (Nomination Scheduling Timeline) to remove Note 1 in the Business
Process and Practices of the Nomination Related Standards Implementation Manual to
Version 3.0.

•

Modify Paragraph 10 to remove the Note from the Examples of EPC in the Business Process
and Practices of the Capacity Release Related Standards Implementation Manual to Version
3.0.

•

Modify the Sample Paper Transaction and Sample ASC X12 Transaction to remove the
‘Note’ from the following data sets:
Operational Capacity
Confirmation Quick Response
System-Wide Notices

•

Modify the Sample Paper Transaction to remove the ‘Note’ from the following data set:
Location Data Download

•

NAESB WGQ Standard No. 0.4.2
NAESB WGQ Standard No. 1.4.7
NAESB WGQ Standard No. 5.4.16

NAESB WGQ Standard No. 0.4.4

Modify the last section of the Technical Implementation of Business Process for the Elapsed
Prorata Scheduled Quantity (EPSQ) Examples by removing the ‘NOTE’ in the following data
set:
Scheduled Quantity

NAESB WGQ Standard No. 1.4.5

Report of the North American Energy Standards Board
Errata for NAESB WGQ Standards, Version 3.0 to support FERC Order No. 809
July 6, 2015
Page 6

Appendix No.

Minor Correction Description
•

Modify the DTM Segment in the EDI X12 mapping guidelines by removing the ‘NOTE’ in
the following data sets:
Storage Information
Nomination
Nomination Quick Response
Request for Confirmation
Confirmation Response
Scheduled Quantity
Scheduled Quantity for Operator
Confirmation Quick Response
Pre-determined Allocation
Allocation
Shipper Imbalance
Measurement Information

Part B

•

Modify the Data Element Cross Reference to EDI X12 to add the data element ‘Recall
Notification Indicator – Intraday 3’ in the following data sets:
Offer
Award Download

•

NAESB WGQ Standard No. 5.4.24
NAESB WGQ Standard No. 5.4.26

Modify the Technical Implementation of Business Process (TIBP) ESPQ Examples 3-2 and 33 for Intraday 2 – ESPQ, SQ and Calculation of resulting Scheduled Quantity to correct an
error in the calculation from MC14018 in the following data set:
Scheduled Quantity

•

NAESB WGQ Standard No. 5.4.24

Modify the N9 Segment in the EDI X12 mapping guidelines to add the data element ‘Recall
Notification Indicator – Intraday 3’ in the following data sets:
Offer
Award Download

•

NAESB WGQ Standard No. 5.4.24
NAESB WGQ Standard No. 5.4.26

Modify the Transaction Set Tables to add the data element ‘Recall Notification Indicator –
Intraday 3’ in the following data set:
Offer

•

NAESB WGQ Standard No. 0.4.1
NAESB WGQ Standard No. 1.4.1
NAESB WGQ Standard No. 1.4.2
NAESB WGQ Standard No. 1.4.3
NAESB WGQ Standard No. 1.4.4
NAESB WGQ Standard No. 1.4.5
NAESB WGQ Standard No. 1.4.6
NAESB WGQ Standard No. 1.4.7
NAESB WGQ Standard No. 2.4.1
NAESB WGQ Standard No. 2.4.3
NAESB WGQ Standard No. 2.4.4
NAESB WGQ Standard No. 2.4.5

NAESB WGQ Standard No. 1.4.5

Modify the Capacity Release Related Standards Manual - Business Process and Practices
Overview Table Heading (Second Column) to correct an error by deleting the first instance of
the word ‘More’ and replacing it with the word ‘Less’, so it reads ‘Biddable Releases One
Year or Less and More Than One Year’.

Appendix 3

NAESB WGQ Executive Committee notational ballot for which the NAESB WGQ minor
correction was approved.

Appendix 4

Notice to WGQ members of Executive Committee adoption of minor correction.

Appendix 5

NAESB operating procedures for minor clarifications and corrections to standards.

Appendix 1 – Minor Correction MC15009
Minor Correction for NAESB Wholesale Gas Quadrant Business Practice Standards, Version 3.0
July 6, 2015

Appendix 1 contains Minor Correction MC15009, minor correction to modify NAESB WGQ Standard No. 1.3.1
to insert the Gas Day start at 9:00 a.m. (FERC Order No. 809 issued April 16, 2015 in Docket No. RM14-2-000) and
provide redlines to reflect consistency changes included in Final Action 2014 WGQ Annual Plan Item 11.c (Part 1
of 2), where ‘Intra-day’ was changed to ‘Intraday’ in the following NAESB WGQ Standard Nos. 1.1.15, 1.3.5,
1.3.8, 1.3.9, 1.3.11, 1.3.33, and 5.3.56 in NAESB Wholesale Gas Quadrant (WGQ) Business Practice Standards
Versions 2.0 and 3.0 as approved by the WGQ Executive Committee on April 30, 2015 can be found at the
following link: https://www.naesb.org//member_login_check.asp?doc=wgq_mc15009_rec_043015.doc

Appendix 1 - Page 1 of 1

Appendix 2 – Minor Correction MC15012
Minor Correction for NAESB Wholesale Gas Quadrant Business Practice Standards, Version 3.0
July 6, 2015

Appendix 2 contains Minor Correction MC15012, Minor Corrections to accommodate modifications in minor
correction MC14018 adopted by the WGQ EC via notational ballot on September 10, 2014 as noted in the summary.
The purpose of the proposed corrections provides consistency in the application to NAESB WGQ Version 3.0
(FERC Order No. 809 issued April 16, 2015 in Docket No. RM14-2-000) as approved by the WGQ Executive
Committee via notational ballot on May 29, 2015 can be found on at the following link:
https://www.naesb.org//member_login_check.asp?doc=wgq_mc15012_rec_052915.docx

Appendix 2 - Page 1 of 1

Appendix 3 – NAESB WGQ Executive Committee Action Results
Approving NAESB Wholesale Gas Quadrant Minor Corrections
July 6, 2015

Appendix 3 contains the results of the NAESB Wholesale Gas Quadrant Executive Committee action taken to
approve the following minor corrections:

Appendix No.

NAESB WGQ Executive Committee Notational Ballot

Appendix 3

Minor Correction MC15009 as approved by the WGQ Executive Committee on April
30, 2015.
Meeting Minutes: https://www.naesb.org//pdf4/wgq_ec043015dm.docx
Minor Corrections MC15012 as approved by the WGQ Executive Committee via
notational ballot on May 29, 2015.
Results: https://www.naesb.org/pdf4/wgq_ec052215_mc_action_results.docx

Appendix 3 – Page 1 of 1

Appendix 4 – Notice to WGQ Members of Executive Committee Adoption of Minor Corrections
July 6, 2015

Appendix 4 contains the correspondence sent to all Wholesale Gas Quadrant members notifying them of the
Executive Committee action taken on the minor corrections, requesting comments that opposed the minor
corrections, and informing them of future actions and timelines related to the minor corrections.

Appendix No.

Correspondence/Notices

Appendix 4

Minor Correction MC15009 – Request for Comments due May 14, 2015:
https://www.naesb.org/pdf4/wgq_mc043015reqcom.doc (Effective June 1, 2015)
No Comments Received
Minor Correction MC15012 – Request for Comments due June 15, 2015:
https://www.naesb.org/pdf4/wgq_mc060115reqcom.doc (Effective June 29, 2015)
No Comments Received

Appendix 4 – Page 1 of 1

Appendix 5 – NAESB Operating Procedure for Minor Clarifications and Corrections to Standards
July 6, 2015

Appendix 5 contains the excerpt from the NAESB Operating Procedures detailing the procedures to be followed for
minor clarifications and corrections to existing NAESB WGQ Business Practice Standards.

Procedures for Minor Corrections as excerpted from the NAESB Operating Procedures

D. Minor Clarifications and Corrections to Standards
Minor clarifications and corrections to existing standards include: (a) clarifications or corrections made by a
regulatory agency to standards that are of a jurisdictional nature, or by the American National Standards Institute or
its successor; (b) clarifications or corrections to the format, appearance, or descriptions of standards in standards
documentation; (c) clarifications or corrections to add code values to tables; and (d) clarifications and corrections
that do not materially change a standard. Any request for a minor clarification or correction to an existing standard
should be submitted in writing to the executive director. This request shall include a description of the minor
clarification or correction and the reason the clarification or correction should be implemented.
1. Processing of Requests
The executive director shall promptly notify the EC and any appropriate subcommittee(s) of the receipt of the
request. The members of the applicable quadrant’s EC shall promptly determine whether the request meets the
definition of a minor clarification or correction. Through the decision of the vice chair of the applicable quadrant,
this determination may be delegated to one of the quadrant’s subcommittees, with the concurrence of the
subcommittee chair, in which case the subcommittee shall make a prompt decision.
If the request is determined to meet the definition of minor clarification or correction, the applicable quadrant’s EC,
with input from any subcommittee(s) to which the request has been forwarded, shall act on the request within one
month of its receipt. A meeting to discuss the request is not required; the decision may be made by notational vote.
A simple majority of the votes received shall determine the outcome. The members of the applicable quadrant’s EC
shall be given at least three working days to consider and vote on the request.
2. Public Notice
The results of the vote on the request for a minor clarification or correction shall be posted on the NAESB website
and the members of the applicable quadrant shall be notified of the request by e-mail. If the request has been
approved by the applicable quadrant’s EC, the notification shall include a brief description of the request, the contact
name and number of the requester so that further information can be obtained, and the proposed effective date of the
clarification or correction. Any interested party shall have an opportunity to comment on the request, and the
comments shall be posted on the NAESB website. The comment period is two weeks.
3. Final Disposition of Approved Requests
If no comments are received on an approved request, the standard shall be clarified or corrected as specified in the
approved request on the effective date proposed. If comments are received, they shall be forwarded to the members
of the applicable quadrant’s EC for consideration. Each comment requires a public written response from the
applicable quadrant’s EC. The applicable quadrant’s EC shall determine whether changes are necessary as a result of
the comments. Members of the applicable quadrant’s EC shall be given three working days to consider the
comments and determine the outcome, which shall be decided by a simple majority of the votes received. A meeting
to discuss the request is not required; the decision may be made by notational vote. The standard shall be clarified or
corrected in accordance with the outcome of the vote, effective with the completion of voting, and notice thereof
shall be posted on the NAESB website. In the case of minor corrections which are discovered during the editorial

Appendix 5 – Page 1 of 2

Appendix 5 – NAESB Operating Procedure for Minor Clarifications and Corrections to Standards
July 6, 2015

review process of publication of a new version and are categorized as clarifications under (b) or (c) above 4, the
proposed effective date may be (i) two weeks from the date of public notice, following simple majority approval by
the applicable Quadrant(s) EC(s) of the shortened effective date, or (ii) one month from the date of the public notice
For all others, the proposed effective date of the minor clarification or correction shall normally be one month from
the date of the public notice upon simple majority approval of the applicable Quadrant(s) EC(s).

4

Minor clarifications and corrections to existing standards include: (a) clarifications or corrections made by a regulatory agency
to standards that are of a jurisdictional nature, or by the American National Standards Institute or its successor; (b) clarifications
or corrections to the format, appearance, or descriptions of standards in standards documentation; (c) clarifications or corrections
to add code values to tables; and (d) clarifications and corrections that do not materially change a standard.

Appendix 5 – Page 2 of 2


File Typeapplication/pdf
File TitleMay 28, 2002
AuthorNAESB
File Modified2015-07-06
File Created2015-07-06

© 2024 OMB.report | Privacy Policy