Download:
pdf |
pdfAppendix A
Federal Register Notices Soliciting
Comment on Information Collection
Requests
17040
Federal Register / Vol. 80, No. 61 / Tuesday, March 31, 2015 / Notices
Minutes: The minutes of the meeting
will be available for public review and
copying within 90 days on the STEAB
Web site, www.steab.org.
Issued at Washington, DC, on March 25,
2015.
LaTanya Butler,
Deputy Committee Management Officer.
[FR Doc. 2015–07379 Filed 3–30–15; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
asabaliauskas on DSK5VPTVN1PROD with NOTICES
Combined Notice of Filings #2
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC15–103–000.
Applicants: Iberdrola, S.A., Iberdrola
USA, Inc., Iberdrola USA Networks,
Inc., Green Merger Sub, Inc., UIL
Holdings Corporation.
Description: Joint Application of
Iberdrola S.A, et al. for Authorization of
Transaction under Section 203 of the
Federal Power Act and Requests for
Waivers of Filing Requirements,
Shortened Comment Period and
Expedited Consideration.
Filed Date: 3/25/15.
Accession Number: 20150325–5217.
Comments Due: 5 p.m. ET 4/15/15.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER12–348–004.
Applicants: Mercuria Energy America,
Inc.
Description: Compliance filing per 35:
MBR Tariff to be effective 3/26/2015.
Filed Date: 3/25/15.
Accession Number: 20150325–5245.
Comments Due: 5 p.m. ET 4/15/15.
Docket Numbers: ER13–1332–002.
Applicants: Canadian Hills Wind,
LLC.
Description: Tariff Cancellation per
35.17(a): CH Withdrawal to be effective
N/A.
Filed Date: 3/25/15.
Accession Number: 20150325–5165.
Comments Due: 5 p.m. ET 4/15/15.
Docket Numbers: ER15–1372–000.
Applicants: Canadian Hills Wind,
LLC.
Description: Section 205(d) rate filing
per 35.13(a)(2)(iii): Filing of Amended
Co-Tenancy and Shared Facilities
Agreement to be effective 5/12/2015.
Filed Date: 3/25/15.
Accession Number: 20150325–5174.
Comments Due: 5 p.m. ET 4/15/15.
Docket Numbers: ER15–1373–000.
VerDate Sep<11>2014
18:32 Mar 30, 2015
Jkt 235001
Applicants: Orange and Rockland
Utilities, Inc.
Description: Section 205(d) rate filing
per 35.13(a)(2)(i): Orange and Rockland
Undergrounding Rate 3.24.15 to be
effective 4/1/2015.
Filed Date: 3/25/15.
Accession Number: 20150325–5175.
Comments Due: 5 p.m. ET 4/15/15.
Docket Numbers: ER15–1374–000.
Applicants: PJM Interconnection,
L.L.C., Potomac Electric Power
Company.
Description: Section 205(d) rate filing
per 35.13(a)(2)(iii): Potomac Electric
Power Company submits revisions to
OATT Att H–9A to be effective 4/1/
2015.
Filed Date: 3/25/15.
Accession Number: 20150325–5196.
Comments Due: 5 p.m. ET 4/15/15.
Docket Numbers: ER15–1375–000.
Applicants: McCoy Solar, LLC.
Description: Baseline eTariff Filing
per 35.1: McCoy Solar, LLC Application
for Market-Based Rate Authority to be
effective 5/24/2015.
Filed Date: 3/25/15.
Accession Number: 20150325–5230.
Comments Due: 5 p.m. ET 4/15/15.
Docket Numbers: ER15–1376–000.
Applicants: Mercuria Commodities
Canada Corporation.
Description: Tariff Withdrawal per
35.15: Notice of Cancellation to be
effective 3/26/2015.
Filed Date: 3/25/15.
Accession Number: 20150325–5246.
Comments Due: 5 p.m. ET 4/15/15.
Docket Numbers: ER15–1377–000
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Section 205(d) rate filing
per 35.13(a)(2)(iii): 2015–03–25_SA
2707 NSP-Odell Wind Farm 1st Rev GIA
(G826) to be effective 3/26/2015.
Filed Date: 3/25/15.
Accession Number: 20150325–5247.
Comments Due: 5 p.m. ET 4/15/15.
Docket Numbers: ER15–1378–000.
Applicants: Mercuria Commodities
Canada Corporation.
Description: Baseline eTariff Filing
per 35.1: Refile MBR Tariff to be
effective 3/26/2015.
Filed Date: 3/25/15.
Accession Number: 20150325–5248.
Comments Due: 5 p.m. ET 4/15/15.
Docket Numbers: ER15–755–001.
Applicants: Powerex Corp.
Description: Compliance filing per 35:
FERC Rate Schedule No. 1 Compliance
Filing to be effective 3/1/2015.
Filed Date: 3/25/15.
Accession Number: 20150325–5195.
Comments Due: 5 p.m. ET 4/15/15.
The filings are accessible in the
Commission’s eLibrary system by
PO 00000
Frm 00016
Fmt 4703
Sfmt 4703
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: http://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: March 25, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–07304 Filed 3–30–15; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OW–2011–0439; EPA–HQ–OW–
2011–0442; EPA–HQ–OW–2011–0443; FRL–
9925–45–OW]
Proposed Information Collection
Request; Comment Request;
Disinfectants/Disinfection Byproducts,
Chemical and Radionuclides Rules
Renewal Information Collection
Request; Microbial Rules Renewal
Information Collection Request; Public
Water System Supervision Program
Renewal Information Collection
Request
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
The U.S. Environmental
Protection Agency (EPA) will be
submitting renewals of information
collection requests (ICRs) to the Office
of Management and Budget (OMB) for
review and approval in accordance with
the Paperwork Reduction Act (PRA; 44
U.S.C. 3501 et seq.). The ICRs included
in this renewal notice are the Microbial
Rules Renewal Information Collection
Request, EPA ICR No. 1895.08, OMB
Control No. 2040–0205, which expires
on August 31, 2015; the Public Water
System Supervision Program Renewal
Information Collection Request, EPA
ICR No. 0270.46, OMB Control No.
2040–0090, which expires on October
31, 2015; and the Disinfectants/
Disinfection Byproducts, Chemical and
Radionuclides Rules Renewal
SUMMARY:
E:\FR\FM\31MRN1.SGM
31MRN1
asabaliauskas on DSK5VPTVN1PROD with NOTICES
Federal Register / Vol. 80, No. 61 / Tuesday, March 31, 2015 / Notices
Information Collection Request (ICR),
EPA ICR No. 1896.10, OMB Control No.
2040–0204, which expires on December
31, 2015. EPA is soliciting public
comments on specific aspects of the
proposed information collections as
described in this renewal notice. The
Agency may not conduct or sponsor,
and a person is not required to respond
to, a collection of information unless it
displays a currently valid OMB control
number.
DATES: Comments must be submitted on
or before June 1, 2015.
ADDRESSES: Submit your comments,
referencing the Docket ID numbers
provided for each ICR listed in the
SUPPLEMENTARY INFORMATION section,
online using www.regulations.gov (our
preferred method), by email to [email protected] or by mail to: EPA
Docket Center, Environmental
Protection Agency, Mail Code 28221T,
1200 Pennsylvania Ave., NW.,
Washington, DC 20460.
EPA’s policy is that all comments
received will be included in the public
docket without modifications including
any personal information provided,
unless the comment includes profanity,
threats, information claimed to be
Confidential Business Information (CBI)
or other information whose disclosure is
restricted by statute.
FOR FURTHER INFORMATION CONTACT:
Kevin Roland, Drinking Water
Protection Division, Office of Ground
Water and Drinking Water, (4606M),
Environmental Protection Agency, 1200
Pennsylvania Ave., NW., Washington,
DC 20460; telephone number: 202–564–
4588; fax number: 202–564–3755; email
address: [email protected].
SUPPLEMENTARY INFORMATION:
Supporting documents that explain in
detail the information that the EPA will
be collecting are available in the public
dockets for these ICRs. The dockets can
be viewed online at
www.regulations.gov or in person at the
EPA Docket Center, WJC West, Room
3334, 1301 Constitution Ave., NW.,
Washington, DC. The telephone number
for the Docket Center is 202–566–1744.
For additional information about EPA’s
public docket, visit www.epa.gov/
dockets.
Pursuant to section 3506(c)(2)(A) of
the PRA, the EPA is soliciting comments
and information to enable it to: (i)
Evaluate whether the proposed
collection of information is necessary
for the proper performance of the
functions of the Agency, including
whether the information will have
practical utility; (ii) evaluate the
accuracy of the Agency’s estimate of the
burden of the proposed collection of
VerDate Sep<11>2014
18:32 Mar 30, 2015
Jkt 235001
information, including the validity of
the methodology and assumptions used;
(iii) enhance the quality, utility and
clarity of the information to be
collected; and (iv) minimize the burden
of the collection of information on those
who are to respond, including through
the use of appropriate automated
electronic, mechanical, or other
technological collection techniques or
other forms of information technology,
e.g., permitting electronic submission of
responses. EPA will consider the
comments received and amend the ICRs
as appropriate. The final ICR packages
will then be submitted to OMB for
review and approval. At that time, EPA
will issue another Federal Register
notice to announce the submission of
the ICRs to OMB and the opportunity to
submit additional comments to OMB.
EPA ICR No. 1895.08, OW–2011–0442
Microbial Rules Renewal Information
Collection Request
Abstract: The Microbial Rules
Renewal ICR examines public water
system and primacy agency burden and
costs for recordkeeping and reporting
requirements in support of the microbial
drinking water regulations. These
recordkeeping and reporting
requirements are mandatory for
compliance per the Code of Federal
Regulations (CFR) at 40 CFR parts 141
and 142. The following microbial
regulations are included: the Surface
Water Treatment Rule (SWTR), the Total
Coliform Rule (TCR), the Revised Total
Coliform Rule (RTCR), the Interim
Enhanced Surface Water Treatment Rule
(IESWTR), the Filter Backwash
Recycling Rule (FBRR), the Long Term
1 Enhanced Surface Water Treatment
Rule (LT1ESWTR), the Long Term 2
Enhanced Surface Water Treatment Rule
(LT2ESWTR), the Ground Water Rule
(GWR) and the Aircraft Drinking Water
Rule (ADWR). Future microbial-related
rulemakings will be added to this
consolidated ICR after the regulations
are promulgated and the initial, rulespecific, ICRs are due to expire.
Form Numbers: None.
Respondents/affected entities: Entities
potentially affected by this action are
new and existing public water systems
and primacy agencies.
Respondent’s obligation to respond:
Mandatory for compliance with 40 CFR
parts 141 and 142.
Estimated number of respondents:
153,083 (total).
Frequency of response: Varies by
requirement (i.e., on occasion, monthly,
quarterly, semi-annually and annually).
Total estimated burden: 12,930,414
hours (per year). Burden is defined in 5
CFR 1320.03(b).
PO 00000
Frm 00017
Fmt 4703
Sfmt 4703
17041
Total estimated cost: $590,507,000
(per year), includes $20,386,000
annualized capital and $115,808,000
operation and maintenance costs.
Changes in estimates: There is no
estimated increase or decrease of hours
in the total estimated respondent
burden compared with that identified in
the ICR currently approved by OMB.
EPA ICR No. 0270.46, OW–2011–0443
Public Water System Supervision
Program Renewal Information
Collection Request
Abstract: The Public Water System
Supervision (PWSS) Program Renewal
ICR examines public water system,
primacy agency and tribal operator
certification provider burden and costs
for ‘‘cross-cutting’’ recordkeeping and
reporting requirements (i.e., the burden
and costs for complying with drinking
water information requirements that are
not associated with contaminantspecific rulemakings). The following
activities have recordkeeping and
reporting requirements that are
mandatory for compliance with 40 CFR
parts 141 and 142: The Consumer
Confidence Report Rule (CCR), the
Variance and Exemption Rule (V/E
Rule), General State Primacy Activities,
the Public Notification Rule (PN) and
Proficiency Testing Studies for Drinking
Water Laboratories. The information
collection activities for both the
Operator Certification Program and the
Capacity Development Program are
driven by the grant withholding and
reporting provisions under sections
1419 and 1420, respectively, of the Safe
Drinking Water Act. Although the Tribal
Operator Certification Program is
voluntary, the information collection is
driven by grant eligibility requirements
outlined in the Drinking Water
Infrastructure Grant Tribal Set-Aside
Program Final Guidelines and the Tribal
Drinking Water Operator Certification
Program Guidelines.
Form numbers: None.
Respondents/affected entities: Entities
potentially affected by this action are
new and existing public water systems
and primacy agencies.
Respondent’s obligation to respond:
Mandatory for compliance with 40 CFR
parts 141 and 142.
Estimated number of respondents:
154,938 (total).
Frequency of response: Varies by
requirement (i.e., on occasion, monthly,
quarterly, semi-annually and annually).
Total estimated burden: 4,113,408
hours (per year). Burden is defined in 5
CFR 1320.03(b).
Total estimated cost: $227,666,000.
This includes an estimated burden cost
E:\FR\FM\31MRN1.SGM
31MRN1
17042
Federal Register / Vol. 80, No. 61 / Tuesday, March 31, 2015 / Notices
of $40,019,000 for maintenance and
operational costs.
Changes in estimates: There is no
estimated increase or decrease of hours
in the total estimated respondent
burden compared with that identified in
the ICR currently approved by OMB.
asabaliauskas on DSK5VPTVN1PROD with NOTICES
EPA ICR No. 1896.10, OW–2011–0439
Disinfectants/Disinfection Byproducts,
Chemical and Radionuclides Rules
Information Collection Request
Abstract: The Disinfectants/
Disinfection Byproducts, Chemical and
Radionuclides Rules ICR examines
public water system and primacy
agency burden and costs for
recordkeeping and reporting
requirements in support of the chemical
drinking water regulations. These
recordkeeping and reporting
requirements are mandatory for
compliance with 40 CFR parts 141 and
142. The following chemical regulations
are included: The Stage 1 Disinfectants
and Disinfection Byproducts Rule (Stage
1 DBPR), the Stage 2 Disinfectants and
Disinfection Byproducts Rule (Stage 2
DBPR), the Chemical Phase Rules
(Phases II/IIB/V), the Radionuclides
Rule, the Total Trihalomethanes
(TTHM) Rule, Disinfectant Residual
Monitoring and Associated Activities
under the Surface Water Treatment Rule
(SWTR), the Arsenic Rule, the Lead and
Copper Rule (LCR) and the Lead and
Copper Rule Short Term Revisions.
Future chemical-related rulemakings
will be added to this consolidated ICR
after the regulations are promulgated
and the initial, rule-specific, ICRs are
due to expire.
Form numbers: None
Respondents/affected entities: Entities
potentially affected by this action are
new and existing public water systems
and primacy agencies.
Respondent’s obligation to respond:
Mandatory for compliance with 40 CFR
parts 141 and 142.
Estimated number of respondents:
153,036.
Frequency of response: Varies by
requirement (i.e., on occasion, monthly,
quarterly, semi-annually, annually,
biennially and every 3, 6 and 9 years).
Total estimated burden: 5,734,335
hours (per year). Burden is defined in 5
CFR 1320.03(b).
Total estimated cost: $435,706,000
(per year), includes $4,984,000
annualized capital and $225,068,000
operation and maintenance costs.
Changes in Estimates: There is no
estimated increase or decrease of hours
in the total estimated respondent
burden compared with that identified in
the ICR currently approved by OMB.
VerDate Sep<11>2014
18:32 Mar 30, 2015
Jkt 235001
Dated: March 20, 2015.
Peter Grevatt,
Director, Office of Ground Water and Drinking
Water.
[FR Doc. 2015–07357 Filed 3–30–15; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OW–2009–0090; FRL–9925–25–
OW]
Proposed Information Collection
Request; Comment Request;
Information Collection Request
Renewal for the Unregulated
Contaminant Monitoring Rule
(UCMR 3)
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
The U.S. Environmental
Protection Agency (EPA) will be
submitting the ‘‘Information Collection
Request Renewal for the Unregulated
Contaminant Monitoring Rule (UCMR
3)’’ (EPA ICR No. 2192.06, OMB Control
No. 2040–0270) to the Office of
Management and Budget (OMB) for
review and approval in accordance with
the Paperwork Reduction Act (PRA; 44
U.S.C. 3501 et seq.). Before doing so,
EPA solicits public comments on
specific aspects of the proposed
information collection as described in
this renewal notice. This is a proposed
extension of the information collection
request (ICR), which is currently
approved through August 31, 2015. An
Agency may not conduct or sponsor and
a person is not required to respond to
a collection of information unless it
displays a currently valid OMB control
number.
DATES: Comments must be submitted on
or before June 1, 2015.
ADDRESSES: Submit your comments,
referencing Docket ID No. EPA–HQ–
OW–2009–0090, online using
www.regulations.gov (our preferred
method), by email to OW-Docket@
epa.gov or by mail to: EPA Docket
Center, Environmental Protection
Agency, Mail Code 28221T, 1200
Pennsylvania Ave. NW., Washington,
DC 20460.
EPA’s policy is that all comments
received will be included in the public
docket without change including any
personal information provided, unless
the comment includes profanity, threats,
information claimed to be Confidential
Business Information (CBI) or other
information whose disclosure is
restricted by statute.
SUMMARY:
PO 00000
Frm 00018
Fmt 4703
Sfmt 4703
FOR FURTHER INFORMATION CONTACT:
Brenda D. Parris, Technical Support
Center, Office of Ground Water and
Drinking Water, Environmental
Protection Agency, 26 West Martin
Luther King Drive (MS 140), Cincinnati,
Ohio 45268; telephone (513) 569–7961
or email at [email protected].
SUPPLEMENTARY INFORMATION:
Supporting documents that explain in
detail the information that EPA will be
collecting are available in the public
docket for this ICR. The docket can be
viewed online at www.regulations.gov
or in person at the EPA Docket Center,
WJC West, Room 3334, 1301
Constitution Ave. NW., Washington,
DC. The telephone number for the
Docket Center is 202–566–1744. For
additional information about EPA’s
public docket, visit www.epa.gov/
dockets.
Pursuant to section 3506(c)(2)(A) of
the PRA, EPA requests comments and
information to enable it to: (i) Evaluate
whether the proposed collection of
information is necessary for the proper
performance of the functions of the
Agency, including whether the
information will have practical utility;
(ii) evaluate the accuracy of the
Agency’s estimate of the burden of the
proposed collection of information,
including the validity of the
methodology and assumptions used;
(iii) enhance the quality, utility and
clarity of the information to be
collected; and (iv) minimize the burden
of the collection of information on those
who are to respond, including through
the use of appropriate automated
electronic, mechanical, or other
technological collection techniques or
other forms of information technology,
e.g., permitting electronic submission of
responses. EPA will consider the
comments received and amend the ICR
as appropriate. The final ICR package
will then be submitted to OMB for
review and approval. EPA will issue
another Federal Register notice to
announce the submission of the ICR to
OMB and the opportunity to submit
additional comments to OMB.
Abstract: The Safe Drinking Water Act
(SDWA), as amended in 1996, requires
EPA to establish criteria for a program
for public water systems (PWSs) to
monitor not more than 30 unregulated
contaminants every five years.
Information collected under the
program supports Agency decision
making regarding whether or not to
regulate particular contaminants in
drinking water. EPA published the first
group of contaminants in UCMR 1, in
the Federal Register on September 17,
1999 (64 FR 50556), and the second
E:\FR\FM\31MRN1.SGM
31MRN1
Appendix B
Stage 1 Disinfectants/Disinfection
Byproducts Rule Spreadsheets
Exhibit 1a - Stage 1 DBPR PWS Burden and Cost Summary
Requirement
Avg. Annual Avg. Annual
Respondents Responses
Annual
Burden
Annual Burden
(Labor) Cost
Annual O&M
Cost
Annual
Capital Cost
TTHM/HAA5 Monitoring
48,951
179,997
269,996
$9,339,696
$50,898,363
N/A
TOC & Alkalinity
Monitoring
2,773
104,102
78,076
$2,700,821
$5,703,266
N/A
Bromate Monitoring
279
4,322
2,161
$74,748
$617,652
N/A
Chlorine Dioxide
Monitoring
801
316,307
52,718
$1,823,616
$9,041,222
N/A
Daily Chlorite Monitoring
647
300,563
0
$0
$0
N/A
Monthly Chlorite
Monitoring
647
23,305
7,768
$268,726
$4,163,450
N/A
Residuals Monitoring
36,466
1,114,841
92,903
$3,213,714
$31,866,249
N/A
Total
48,994
2,043,437
503,623
$17,421,322
$102,290,202
N/A
Note: Respondent detail does not add to total because some respondents are subject to multiple activities.
[1] Burden and cost for daily chlorite monitoring is assumed to be a part of daily chloride dioxide burden and cost
(chlorine dioxide and chlorite can be analyzed using the same method). Therefore, no additional burden or costs are
incurred for this activity.
Exhibit 1b - Stage 1 DBPR Primacy Agency Burden and Cost Summary
Requirement
DDBP/Chem/Rads ICR - Stage 1 DBPR
Annual
Avg. Annual
Respondents Responses
Annual
Burden
Annual Burden
(Labor) Cost
Annual O&M
Cost
Annual
Capital Cost
Recordkeeping
57
48,994
148,906
$6,790,132
N/A
N/A
Total
57
48,994
148,906
$6,790,132
N/A
N/A
B-1
December 2015
Exhibit 2 - Average Number of Routine Total Coliform Samples for Ground Water Systems
(Used to Determine Number of Disinfectant Samples in Distribution System)
Ground Water
Population
Range
≤500
501-1,000
1,001-2,500
2,501-3,300
3,301-4,100
4,101-4,900
4,901-5,800
5,801-6,700
6,701-7,600
7,601-8,500
8,501-10,000
10,001-12,900
12,901-17,200
17,201-21.500
21,501-25,000
25,001-33,000
33,001-41,000
41,001-50,000
50,001-59,000
59,001-70,000
70,001-83,000
83,001-96,000
96,001-130,000
130,001-220,000
220,001-320,000
320,001-450,000
450,001-600,000
600,001-780,000
780,001-970,000
970,001-1,230,000
1,230,001-1,520,000
1,520,001-1,850,000
1,850,001-2,270,000
2,270,001-3,020,000
3,020,001-3,960,000
Over 3,960,000
Total
Routine
Repeat
A
B
1
1
2
3
4
5
6
7
8
9
10
10
15
20
25
30
40
50
60
70
80
90
100
120
150
180
210
240
270
300
330
360
390
420
450
480
Additonal
Routines
next mo
C
4
4
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
CWSs
GW PWSs
Samples
D
E=D*A
4
4
3
2
1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
NTNCWSs
GW PWSs Samples*
F
G=F*A
TNCWSs
GW PWSs Samples*
H
I=H*A
Total PWSs
GW PWSs Samples
J=D+F+H K=E+G+I
24,615
4,320
4,504
1,062
728
499
412
334
235
238
278
351
328
182
128
167
113
75
58
38
33
17
27
26
7
2
1
4
0
1
0
0
1
0
0
0
24,615
4,320
9,008
3,186
2,912
2,495
2,472
2,338
1,880
2,142
2,780
3,510
4,920
3,640
3,200
5,010
4,520
3,750
3,480
2,660
2,640
1,530
2,700
3,120
1,050
360
210
960
0
300
0
0
390
0
0
0
14,532
1,539
695
91
38
10
12
9
7
6
10
2
2
0
0
2
2
1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
4,796
508
1,390
273
152
50
72
63
56
54
100
20
30
0
0
60
80
50
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
76,570
2,040
493
46
23
9
15
5
8
3
6
3
3
2
1
1
0
0
1
1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
25,268
673
986
137
92
45
90
35
64
27
60
30
45
40
25
30
0
0
60
70
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
115,718
7,899
5,692
1,199
789
518
439
348
250
247
294
356
333
184
129
170
115
76
59
39
33
17
27
26
7
2
1
4
0
1
0
0
1
0
0
0
54,679
5,501
11,384
3,596
3,156
2,590
2,634
2,436
2,000
2,223
2,940
3,560
4,995
3,680
3,225
5,100
4,600
3,800
3,540
2,730
2,640
1,530
2,700
3,120
1,050
360
210
960
0
300
0
0
390
0
0
0
38,784
106,098
16,958
7,753
79,230
27,778
134,972
141,629
* GW noncommunity water systems serving 1,000 or fewer monitor quarterly rather than monthly. Note that as a conservative assumption, no GW noncommunity water systems
are assumed to be conducting annual routine monitoring.
Source: Based on TCR/RTCR sampling requirements.
DDBP/Chem/Rads ICR - Stage 1 DBPR
B-2
December 2015
Exhibit 3 - System Inventory and Numbers of Plants/Entry Points
Population
Category
<100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-50,000
50,001-100,000
100,001-1,000,000
>1,000,000
Total
Population
Category
<100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-50,000
50,001-100,000
100,001-1,000,000
>1,000,000
Systems
(SW/GWUDI)
CWS
NTNC
A
B
970
314
2,092
283
1,131
92
2,497
88
2,219
53
1,986
6
389
1
343
1
20
0
11,647
839
TNC
C
1,630
506
95
52
20
2
0
0
1
2,307
Systems
(Groundwater)
CWS
NTNC
TNC
D
E
F
11,212
8,279
57,321
13,403
6,254
19,250
4,320
1,539
2,040
5,566
786
539
2,724
92
69
1,344
9
10
150
0
2
63
0
0
2
0
0
38,784
16,958
79,230
% GW Systems
Disinfecting
CWS
NTNC
TNC
G
H
I
61%
43%
26%
73%
43%
26%
79%
43%
26%
93%
43%
26%
91%
43%
26%
93%
43%
26%
93%
43%
26%
94%
43%
26%
94%
43%
26%
Systems
(Disinfecting Groundwater)
CWS
NTNC
TNC
J=D*G
K=E*H
L=F*I
6,881
3,566
15,092
9,758
2,694
5,068
3,424
663
537
5,152
338
142
2,490
40
18
1,255
4
3
140
0
1
59
0
0
2
0
0
29,161
7,304
20,860
Plants Per System
(SW/GWUDI)
CWS
NTNC
TNC
M
N
O
1.02
1.0
1.0
1.06
1.0
1.0
1.03
1.0
1.0
1.00
1.0
1.0
1.07
1.0
1.0
1.08
1.0
1.0
1.35
1.0
1.0
1.69
1.0
1.0
1.69
1.0
1.0
Entry Points Per System
(SW/GWUDI)
CWS
NTNC
TNC
P
Q
R
1.07
1.0
1.0
1.12
1.0
1.0
1.32
1.0
1.0
1.26
1.0
1.0
1.20
1.0
1.0
1.41
1.0
1.0
1.98
1.0
1.0
3.13
1.0
1.0
3.13
1.0
1.0
Plants Per System
(Disinfecting Groundwater)
CWS
NTNC
TNC
S
T
U
1.07
1.0
1.0
1.18
1.0
1.0
1.52
1.0
1.0
1.80
1.0
1.0
2.11
1.0
1.0
3.50
1.0
1.0
6.83
1.0
1.0
12.34
1.0
1.0
12.34
1.0
1.0
Entry Points Per System
(Disinfecting Groundwater)
CWS
NTNC
TNC
V
W
X
1.07
1.0
1.0
1.18
1.0
1.0
1.52
1.0
1.0
1.80
1.0
1.0
2.11
1.0
1.0
3.50
1.0
1.0
6.83
1.0
1.0
12.34
1.0
1.0
12.34
1.0
1.0
Total Plants
Total Plants
Total Entry Points
Total Entry Points
(SW/GWUDI)
(Disinfecting Groundwater)
(SW/GWUDI)
(Disinfecting Groundwater)
CWS
NTNC
TNC
CWS
NTNC
TNC
CWS
NTNC
TNC
CWS
NTNC
TNC
Y=A*M
Z=B*N
AA=C*O AB=A*P AC=B*X AD=C*R
AE=J*S
AF=K*T AG=L*U
AH=J*V
AI=K*W
AJ=L*X
<100
985
314
1,630
1,042
314
1,630
7,369
3,566
15,092
7,369
3,566
15,092
101-500
2,208
283
506
2,347
283
506
11,529
2,694
5,068
11,529
2,694
5,068
501-1,000
1,165
92
95
1,494
92
95
5,207
663
537
5,207
663
537
1,001-3,300
2,497
88
52
3,157
88
52
9,254
338
142
9,254
338
142
3,301-10,000
2,372
53
20
2,660
53
20
5,260
40
18
5,260
40
18
10,001-50,000
2,147
6
2
2,804
6
2
4,389
4
3
4,389
4
3
50,001-100,000
525
1
0
771
1
0
955
0
1
955
0
1
100,001-1,000,000
578
1
0
1,074
1
0
729
0
0
729
0
0
>1,000,000
34
0
1
63
0
1
23
0
0
23
0
0
Total
12,511
839
2,307
15,411
839
2,307
44,717
7,304
20,860
44,717
7,304
20,860
Sources: Baseline number of systems from SDWIS/FED Data from October 2014. The percent of ground water CWSs that disinfect is from the 2006
Community Water Systems Survey. The percentages represent the number of ground water systems that disinfect at least one entry point. The percent of noncommunity ground water systems disinfecting is from SDWIS/FED Data from October 2014.
Note: Source was not specified in SDWIS for some systems. These PWSs were assigned to SW or GW categories based on the ratio of SW to GW systems
within a given size category.
Entry pts for CWSs: Based on analysis of data from the 2006 Community Water System Survey. Includes treated entry points. Plants per system for
SW/GWUDI systems include only treated SW entry points.
Population
Category
DDBP/Chem/Rads ICR - Stage 1 DBPR
B-3
December 2015
Exhibit 4 - Derivation of Filtered System Inventory (for Systems Monitoring TOC and Alkalinity)
Population
Category
<100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-50,000
50,001-100,000
100,001-1,000,000
>1,000,000
Total
All Surface Water
and GWUDI
CWS
NTNC
TNC
A
B
C
970
314
1,630
2,092
283
506
1,131
92
95
2,497
88
52
2,219
53
20
1,986
6
2
389
1
0
343
1
0
20
0
1
11,647
839
2,307
Non-Purchased Surface
Water/GWUDI
CWS
NTNC
TNC
D
E
F
436
122
611
620
145
356
323
51
68
927
32
42
979
15
17
987
0
0
221
0
0
245
0
0
18
0
0
4,756
365
1,094
Unfiltered Surface Water
and GWUDI
CWS
NTNC
TNC
G
H
I
3
1
7
0
4
0
6
1
4
1
6
0
2
0
1
0
1
0
34
3
3
0
0
0
0
0
0
0
0
3
Total Filtered Plants
Percentage of Filtered Plants
(SW/GWUDI)
Using Conventional Filtration
CWS
NTNC
TNC
CWS
NTNC
TNC
P=J*M
Q=K*N
R=L*O
S
T
U
<100
440
121
608
13.9%
13.9%
13.9%
101-500
647
145
356
36.3%
36.3%
36.3%
501-1,000
329
51
68
18.8%
18.8%
18.8%
1,001-3,300
921
31
42
56.5%
56.5%
56.5%
3,301-10,000
1,042
14
17
70.1%
70.1%
70.1%
10,001-50,000
1,060
0
0
76.0%
76.0%
76.0%
50,001-100,000
295
0
0
72.0%
72.0%
72.0%
100,001-1,000,000
411
0
0
82.7%
82.7%
82.7%
>1,000,000
29
0
0
82.7%
82.7%
82.7%
Total
5,174
362
1,091
[A] - [F] Number of systems from SDWIS/FED Data from October 2014.
Population
Category
Plants Per System
(SW/GWUDI)
CWS
NTNC
TNC
M
N
O
1.0
1.0
1.0
1.1
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.1
1.0
1.0
1.1
1.0
1.0
1.3
1.0
1.0
1.7
1.0
1.0
1.7
1.0
1.0
Filtered Surface Water
and GWUDI
CWS
NTNC
TNC
J=D-G
K=E-H
L=F-I
433
121
608
613
145
356
319
51
68
921
31
42
975
14
17
981
0
0
219
0
0
244
0
0
17
0
0
4,722
362
1,091
Total Filtered Plants Using
Conventional Filtration
CWS
NTNC
TNC
V=P*S
W=Q*T
X=R*U
61
17
84
235
53
129
62
10
13
520
18
24
731
10
12
806
0
0
213
0
0
340
0
0
24
0
0
2,992
106
262
[G]-[I] Number of unfiltered systems from SDWIS/FED October 2014.
[M] 2006 Community Water System Survey. Includes treated entry points.
[N], [O] Assumed to be 1.0.
[S] - [U] Percentages of systems using conventional filtration from analysis of 2006 CWSS data; percentages applied to noncommunity systems since no
noncommunity percentages are available.
December 2015
DDBP/Chem/Rads ICR - Stage 1 DBPR
B-4
Exhibit 5 - TTHM/HAA5 Monitoring Burden and Costs
(Paired TTHM/HAA5 Samples)
PWSs - SW/GWUDI
Population
Category
Applicability
(Is Monitoring
Hourly
Required?)
Number of Plants
Labor
Rate
CWS NTNC Year 1 Year 2 Year 3
Annual
Samples
Required
Per Plant
Total
Samples
Required
Per Plant
G
H
Total
Sampling
Burden Per
Plant
O&M
(Analytical)
Total O&M
Cost Per
(Analytical) Total Burden
Sample
Cost Per Plant
Hours
Average
Annual
Burden
Hours
Average
Annual Labor
Average Annual
Total O&M Cost
Cost
O&M Cost
(1.5 hr/sample)
<500
501-3,300
3,301-10,000
10,001-50,000
>50,000
A
$34.59
$34.59
$34.59
$34.59
$34.59
B
3,389
4,651
2,660
2,804
1,907
C
598
180
53
6
2
D
Yes
Yes
Yes
Yes
Yes
E
Yes
Yes
Yes
Yes
Yes
F
Yes
Yes
Yes
Yes
Yes
1
4
4
16
16
I
3
12
12
48
48
J
5
18
18
72
72
K=H*J
$304
$304
$304
$266
$266
$912
$3,646
$3,646
$12,762
$12,762
L=I*(B+C)
17,940
86,951
48,829
202,349
137,471
Total
15,411
839
493,540
Note: Burden estimates take into account the results of the May 2015 consultation with water industry representatives.
Source: Samples per plant carried forward from the 1998 Stage 1 DBPR RIA and ICR.
[B], [C] from "System Inventory and Number of Plants/Entry Points" (Exhibit 3) and includes both surface water and ground water treated entry points.
M=L/3
5,980
28,984
16,276
67,450
45,824
164,513
N=M*A
$206,855
$1,002,603
$563,036
$2,333,222
$1,585,131
$5,690,847
O=(B+C)*K
$3,634,037
$17,613,777
$9,891,435
$35,866,389
$24,366,706
91,372,344
P=O/3
$1,211,346
$5,871,259
$3,297,145
$11,955,463
$8,122,235
30,457,448
[J] Sampling cost includes analysis of both TTHM and HAA5. Laboratory cost is from the original Stage 2 DBPR ICR, inflated to 2013$. Shipping costs vary for small and large systems. Only $14 shipping is added for
large systems as many large systems have in-house capacity and will not have to ship. $58 is added for small systems because of higher shipping charges and fewer samples (no bulk discounts) and because fewer
small systems have in-house labs.
PWSs - Groundwater
Population
Category
Applicability
(Is Monitoring
Hourly
Required?)
Number of Plants
Labor
CWS NTNC Year 1 Year 2 Year 3
Rate
Annual
Samples
Required
Per Plant
Total
Samples
Required
Per Plant
W
X
Total
Sampling
Burden Per
Plant
O&M
(Analytical)
Total O&M
Cost Per
(Analytical) Total Burden
Sample
Cost Per Plant
Hours
Average
Annual
Burden
Hours
Average
Annual Labor
Average Annual
Cost
Total O&M Cost
O&M Cost
(1.5 hr/sample)
<500
501-3,300
3,301-10,000
10,001-50,000
>50,000
Q
$34.59
$34.59
$34.59
$34.59
$34.59
R
18,899
14,462
5,260
4,389
1,707
S
6,259
1,001
40
4
0
T
Yes
Yes
Yes
Yes
Yes
U
Yes
Yes
Yes
Yes
Yes
V
Yes
Yes
Yes
Yes
Yes
1
1
1
4
4
Y
3
3
3
12
12
Z
5
5
5
18
18
AA=X*Z
$304
$304
$304
$266
$266
Total
44,717 7,304
Note: Burden estimates take into account the results of the May 2015 consultation with water industry representatives.
Source: Samples per plant carried forward from the 1998 Stage 1 DBPR RIA and ICR.
[R], [S] from "System Inventory and Number of Plants/Entry Points" (Exhibit 3) and includes treated ground water entry points.
$912
$912
$912
$3,190
$3,190
AB=Y(R+S)
113,210
69,583
23,850
79,073
30,732
316,447
AC=AB/3
37,737
23,194
7,950
26,358
10,244
105,482
AD=AC*Q
$1,305,383
$802,337
$275,006
$911,761
$354,361
$3,648,849
AE=(R+S)*AA
$22,933,037
$14,095,497
$4,831,323
$14,015,629
$5,447,260
61,322,745
AF=AE/3
$7,644,346
$4,698,499
$1,610,441
$4,671,876
$1,815,753
20,440,915
[Z] Sampling cost includes analysis of both TTHM and HAA5. Laboratory cost is from Stage 2 DBPR ICR, inflated to 2013$. Only $14 shipping is added for large systems as many large systems have in-house
capacity and will not have to ship. $58 is added for small systems because of higher shipping charges and fewer samples (no bulk discounts) and because fewer small systems have in-house labs.
DDBP/Chem/Rads ICR - Stage 1 DBPR
B-5
December 2015
Exhibit 6 - Disinfection Byproduct Precursor Monitoring Burden and Costs
(Paired TOC and Alkalinity Samples)
TOC Samples
Number of
Plants
Population
Category
Hourly
Labor Rate
CWS
Number of Plants
(Reduced Monitoring)
NTNC
CWS
NTNC
Applicability
(Is Monitoring
Required?)
Year 1 Year 2 Year 3
(10% reduced after yr. 1)
A
$34.59
$34.59
$34.59
$34.59
$34.59
<500
501-3,300
3,301-10,000
10,001-50,000
>50,000
B
296
582
731
806
576
C
69
27
10
0
0
D=B*0.1
E=C*0.1
30
7
58
3
73
1
81
0
58
0
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Annual
Samples
Required
Per Plant
Annual
Samples for
Reduced
Monitoring
(2 per month)
(2 per quarter)
F
G
Yes
Yes
Yes
Yes
Yes
24
24
24
24
24
Total
Samples
Required
Per Plant
H
8
8
8
8
8
Total
Total O&M
O&M
Samples
Total O&M
Total Sampling (Analytical) (Analytical) (Analytical)
Required
Cost Per Cost Per Plant Total Burden
Per Plant Total Sampling Burden Per Plant Cost Per
Plant
(Reduced)
Sample
(Reduced) Burden Per Plant
(Reduced)
Hours
(0.75 hr per sample)
(0.75 hr per sample)
J=H*0.75
K=I*0.75
I
72
72
72
72
72
24
24
24
24
24
54
54
54
54
54
L
18
18
18
18
18
$79
$79
$79
$79
$79
M=H*L
$5,660
$5,660
$5,660
$5,660
$5,660
N=I*L
$1,887
$1,887
$1,887
$1,887
$1,887
Total
2,992
106
299
11
Notes:
1) Burden estimates take into account the results of the May 2015 consultation with water industry representatives.
2) TOC and alkalinity samples applicable to Subpart H (SW and GWUDI) systems using conventional filtration only.
Source: Numbers of samples, applicability, and costs carried forward from the 1998 Stage 1 DBPR RIA and ICR. Sample costs inflated to 2013$.
[F], [G] The two samples are comprised of one sample at the plant and one sample in source water.
[O], [R] Assumes 90 percent of plants will conduct routine monitoring and 10 percent will conduct reduced monitoring.
O
18,425
30,714
37,332
40,634
29,047
156,153
Average
Annual
Burden
Hours
P=O/3
6,142
10,238
12,444
13,545
9,682
52,051
Average
Annual Labor
Cost
Total O&M
Cost
Q=P*A
$212,458
$354,156
$430,463
$468,535
$334,935
R
$1,931,117
$3,219,066
$3,912,650
$4,258,704
$3,044,356
$1,800,547
$16,365,895
Average
Annual O&M
Cost
S=R/3
$643,706
$1,073,022
$1,304,217
$1,419,568
$1,014,785
$5,455,298
Alkalinity Samples
Number of
Plants
Population
Category
Hourly
Labor Rate
CWS
Number of Plants
(Reduced Monitoring)
NTNC
CWS
NTNC
Applicability
(Is Monitoring
Required?)
Year 1 Year 2 Year 3
(10% reduced after yr. 1)
<500
501-3,300
3,301-10,000
10,001-50,000
>50,000
T
$34.59
$34.59
$34.59
$34.59
$34.59
U
296
582
731
806
576
V
69
27
10
0
0
W=U*0.1
X=V*0.1
30
7
58
3
73
1
81
0
58
0
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Annual
Samples
Required
Per Plant
Reduced
Monitoring
(1 per month)
(1 per quarter)
Y
Z
12
12
12
12
12
Total
Samples
Required
Per Plant
Total
Total O&M
Total O&M
O&M
Samples
Total Sampling (Analytical) (Analytical) (Analytical)
Required
Cost Per Cost Per Plant Total Burden
Per Plant Total Sampling Burden Per Plant Cost Per
(Reduced)
Plant
(Reduced)
Sample
(Reduced) Burden Per Plant
Hours
(0.75 hr per sample)
AA
4
4
4
4
4
AB
36
36
36
36
36
12
12
12
12
12
AC=AA*0.75
27
27
27
27
27
Total
2,992
106
299
11
Notes:
1) Burden estimates take into account the results of the May 2015 consultation with water industry representatives.
2) TOC and alkalinity samples applicable to Subpart H (SW and GWUDI) systems using conventional filtration only.
Source: Numbers of samples, applicability, and costs carried forward from the 1998 Stage 1 DBPR RIA and ICR. Sample costs inflated to 2013$.
[AH], [AK] Assumes 90 percent of plants will conduct routine monitoring and 10 percent will conduct reduced monitoring.
[Y], [Z] Includes one sample in source water at the same time that paired TOC samples are taken.
DDBP/Chem/Rads ICR - Stage 1 DBPR
Average
Annual Labor
Cost
Total O&M
Cost
Average
Annual O&M
Cost
(0.75 hr per sample)
AD=AB*0.75
AE
9
9
9
9
9
$7
$7
$7
$7
$7
AF=AA*AE
$257
$257
$257
$257
$257
AG=AB*AE
$86
$86
$86
$86
$86
AH
9,213
15,357
18,666
20,317
14,524
78,076
B-6
Average
Annual
Burden
Hours
AI=AH/3
3,071
5,119
6,222
6,772
4,841
26,025
AJ=AI*T
$106,229
$177,078
$215,232
$234,268
$167,467
$900,274
AK
$87,778
$146,321
$177,848
$193,577
$138,380
$743,904
AL=AK/3
$29,259
$48,774
$59,283
$64,526
$46,127
$247,968
December 2015
Exhibit 7 - Bromate Monitoring Burden and Costs
PWSs - SW/GWUDI
Population
Category
Hourly
Labor
Rate
101-1,000
1,001-10,000
10,001-100,000
>100,000
A
$34.59
$34.59
$34.59
$34.59
Percent of
Number of
Plants
Affected Plants
Using
NTNC
CWS & NTNC
Ozone
Number of
Plants
CWS
Applicability
(Is Monitoring Required?)
Year 1
Year 2
Year 3
F
G
H
Annual
Total
Samples
Samples
Required Per Required
Plant
Per Plant
(1 per month)
B
3,373
4,869
2,671
612
C
375
141
7
1
D
E=(B+C)*D
2.3%
0.7%
3.9%
15.4%
88
38
104
94
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
I
Yes
Yes
Yes
Yes
Total Sampling
Burden Per Plant
O&M
Total O&M
(Analytical) (Analytical)
Cost Per
Cost Per
Sample
Plant
Total
Burden
Hours
Average
Annual
Burden
Hours
Average
Annual
Labor Cost
Total O&M
Cost
Average
Annual O&M
Cost
(30 min. per sample)
J=I*3
12
12
12
12
K=J*0.5
36
36
36
36
L
18
18
18
18
$143
$143
$143
$143
M=J*L
$5,145
$5,145
$5,145
$5,145
Total
11,525
524
324
Note: Bromate is a byproduct of ozone disinfection. Surface water systems serving ≤100 people are not expected to use ozone (therefore no bromate sampling requirements).
Burden estimates take into account the results of the May 2015 consultation with water industry representatives.
N=K*E
1,576
676
1,875
1,700
5,827
O=N/3
525
225
625
567
1,942
P=O*A
$18,173
$7,792
$21,623
$19,606
$67,195
Q=E*M
$450,484
$193,168
$536,027
$486,029
$1,665,709
R=Q/3
$150,161
$64,389
$178,676
$162,010
$555,236
Source: The percentage of plants using ozone is from the 2006 Community Water Systems Survey. For surface water, only treated surface water entry points are considered plants. Numbers of samples, applicability, burden, and costs carried
forward from the 1998 Stage 1 DBPR RIA and ICR. Sample costs inflated to 2013$.
PWSs - Groundwater
Percent of
Number of
Plants
Affected Plants
Using
Ozone
NTNC
CWS & NTNC
Number of
Plants
Population
Category
Hourly
Labor
Rate
CWS
101-1,000
1,001-10,000
10,001-100,000
>100,000
A
$34.59
$34.59
$34.59
$34.59
B
16,737
14,514
5,344
753
C
3,356
378
4
0
D
E=(B+C)*D
0.0%
0.0%
0.6%
0.3%
0
0
34
2
Applicability
(Is Monitoring Required?)
Year 1
Year 2
Year 3
F
G
H
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Annual
Total
Samples
Samples
Required Per Required
Plant
Per Plant
I
Yes
Yes
Yes
Yes
J=I*3
12
12
12
12
Total Sampling
Burden Per Plant
K=J*0.5
36
36
36
36
O&M
Total O&M
(Analytical) (Analytical)
Cost Per
Cost Per
Sample
Plant
L
18
18
18
18
$143
$143
$143
$143
M=J*L
$5,145
$5,145
$5,145
$5,145
Total
Burden
Hours
Average
Annual
Burden
Hours
N=K*E
O=N/3
0
0
619
36
0
0
206
12
Average
Annual
Labor Cost
P=O*A
$0
$0
$7,136
$418
Total O&M
Cost
Average
Annual O&M
Cost
Q=E*M
R=Q/3
$0
$0
$176,896
$10,351
Total
37,347 3,738
36
655
218
$7,554
$187,247
Burden estimates take into account the results of the May 2015 consultation with water industry representatives.
Groundwater systems serving ≤100 people are not expected to use ozone (therefore no bromate sampling requirements).
Source: The percentage of plants using ozone is from the 2006 Community Water Systems Survey. For ground water, only treated ground water entry points are considered plants. Numbers of samples, applicability, burden, and costs carried
forward from the 1998 Stage 1 DBPR RIA and ICR. Sample costs inflated to 2013$.
DDBP/Chem/Rads ICR - Stage 1 DBPR
B-7
$0
$0
$58,965
$3,450
$62,416
December 2015
Exhibit 8 - Chlorine Dioxide Monitoring Burden and Costs
PWSs - SW/GWUDI
Population
Category
Hourly
Labor
Rate
Number of Entry Points
CWS
NTNC
TNC
Percent
Chlorine
Dioxide
Number of
Affected Entry
Points
All PWSs
Applicability
(Is Monitoring Required?)
Year 1
Year 2
Year 3
Annual
Samples
Required
Per Plant
Total
Samples
Required
Per Plant
(1 per day)
101-1,000
1,001-10,000
10,001-100,000
>100,000
A
$34.59
$34.59
$34.59
$34.59
B
3,840
5,816
3,575
1,136
C
375
141
7
1
D
601
72
2
1
E
0.0%
4.8%
7.3%
5.7%
F=(B+C+D)*E
G
0
289
263
64
H
Yes
Yes
Yes
Yes
I
Yes
Yes
Yes
Yes
O&M
Total O&M
(Analytical) (Analytical) Total
Cost Per
Burden
Cost Per
Sample
Hours
Plant
Average
Annual
Burden
Hours
Average
Annual
Labor Cost
Total O&M
Cost
Average
Annual O&M
Cost
R=F*N
S=R/3
(10 min. per sample)
J
Yes
Yes
Yes
Yes
Total Sampling
Burden Per Plant
(hrs)
K
1,095
1,095
1,095
1,095
365
365
365
365
L=K*10/60
M
183
183
183
183
$29
$29
$29
$29
N=K*M
$31,299
$31,299
$31,299
$31,299
O=L*F
0
52,694
48,012
11,746
P=O/3
0
17,565
16,004
3,915
Q=P*A
$0
$607,593
$553,609
$135,445
$0
$9,037,075
$8,234,131
$2,014,544
Total
14,369
524
676
616
112,452
37,484 $1,296,646 $19,285,750
Note: Surface water systems serving ≤100 people are not expected to use chlorine dioxide (therefore no sampling requirements).
Burden estimates take into account the results of the May 2015 consultation with water industry representatives.
Source: The number of entry points is from Exhibit 3 and includes both surface water and ground water treated entry points. The percentage of entry points (both surface and ground) in surface water systems using chlorine dioxide is from the 2006
Community Water Systems Survey. Numbers of samples, applicability, burden, and costs carried forward from the 1998 Stage 1 DBPR RIA and ICR. Sample costs inflated to 2013$.
$0
$3,012,358
$2,744,710
$671,515
$6,428,583
PWSs - Groundwater
Population
Category
Hourly
Labor
Rate
Number of Entry Points
CWS
NTNC
TNC
Percent
Chlorine
Dioxide
Number of
Affected Entry
Points
All PWSs
Applicability
(Is Monitoring Required?)
Year 1
Year 2
Year 3
Annual
Samples
Required
Per Plant
Total
Samples
Required
Per Plant
(1 per day)
101-1,000
1,001-10,000
10,001-100,000
>100,000
A
$34.59
$34.59
$34.59
$34.59
B
16,737
14,514
5,344
753
C
3,356
378
4
0
D
5,605
160
3
0
E
0.7%
0.5%
0.1%
0.0%
F=(B+C+D)*E
178
69
4
0
G
H
Yes
Yes
Yes
Yes
I
Yes
Yes
Yes
Yes
Average
Annual
Burden
Hours
Average
Annual
Labor Cost
Total O&M
Cost
Average
Annual O&M
Cost
(10 min. per sample)
J
Yes
Yes
Yes
Yes
Total Sampling
Burden Per Plant
O&M
Total O&M
(Analytical) (Analytical) Total
Cost Per
Burden
Cost Per
Sample
Hours
Plant
K
1,095
1,095
1,095
1,095
365
365
365
365
L=K*10/60
M
183
183
183
183
$29
$29
$29
$29
N=K*M
$31,299
$31,299
$31,299
$31,299
O=L*F
32,419
12,542
740
0
P=O/3
10,806
4,181
247
0
Q=P*A
$373,816
$144,616
$8,537
$0
R=F*N
$5,559,972
$2,150,962
$126,982
$0
S=R/3
$1,853,324
$716,987
$42,327
$0
Total
37,347
3,738
5,769
250
45,702
15,234
$526,970
$7,837,916 $2,612,639
Note: Groundwater systems serving ≤100 people are not expected to use chlorine dioxide (therefore no sampling requirements). The number of affected entry points is most likely an overestimate, because the percent of systems using chlorine dioxide is based on
data for CWSs, and NTNCWSs and TNCWSs may be less likely to use chlorine dioxide.
Burden estimates take into account the results of the May 2015 consultation with water industry representatives.
Source: The number of entry points is from Exhibit 3 and includes ground water treated entry points. The percentage of entry points using chlorine dioxide is from the 2006 Community Water Systems Survey and is the percentage of treated entry
points in ground water systems using chlorine dioxide. Numbers of samples, applicability, burden, and costs carried forward from the 1998 Stage 1 DBPR RIA and ICR. Sample costs inflated to 2013$.
DDBP/Chem/Rads ICR - Stage 1 DBPR
B-8
December 2015
Exhibit 9 - Daily Chlorite Monitoring Burden and Costs
PWSs - SW/GWUDI
Population
Category
101-1,000
1,001-10,000
10,001-100,000
>100,000
Hourly
Labor
Rate
Number of Entry
Points
CWS
A
$34.59
$34.59
$34.59
$34.59
Total
Notes:
B
3,840
5,816
3,575
1,136
14,369
NTNC
C
375
141
7
1
Percent
Chlorine
Dioxide
D
0.0%
4.8%
7.3%
5.7%
524
Number of
Affected Entry
Points
Applicability
(Is Monitoring Required?)
All PWSs
Year 1
Year 2
Year 3
E=(B+C)*D
F
G
H
0
285
263
64
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Annual
Samples
Required
Per Plant
Total
Samples
Required
Per Plant
(1 per day)
I
365
365
365
365
J
1,095
1,095
1,095
1,095
Total Sampling
Burden Per Plant
(hrs)
(part of ClO2 daily)
K
0
0
0
0
Total O&M
O&M
(Analytical) (Analytical) Total
Cost Per
Cost Per
Burden
Plant
Sample
Hours
L
$0
$0
$0
$0
M=J*L
$0
$0
$0
$0
613
N=K*E
0
0
0
0
Average
Annual
Burden
Hours
Average
Annual
Labor Cost
O=N/3
0
0
0
0
0
0
P=O*A
$0
$0
$0
$0
Total O&M
Cost
Average
Annual O&M
Cost
Q=E*M
R=Q/3
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
1) Chlorite is a byproduct of chlorine dioxide use. Surface water systems serving <100 people are not expected to use chlorine dioxide (therefore no chlorite sampling requirements). TNCWSs that use chlorine dioxide are not required to monitor for chlorite.
2) Burden and cost for daily chlorite monitoring is assumed to be a part of daily chloride dioxide burden and cost--chlorine dioxide and chlorite can be analyzed using the same method (SM 4500--ClO2 E).
3) Burden estimates take into account the results of the May 2015 consultation with water industry representatives.
Source: The number of entry points is from Exhibit 3 and includes both surface water and ground water treated entry points. The percentage of entry points (both surface and ground) in surface water systems using chlorine dioxide is from the 2006 Community
Water Systems Survey. Numbers of samples, applicability, burden, and costs carried forward from the 1998 Stage 1 DBPR RIA and ICR. Sample costs inflated to 2013$.
PWSs - Groundwater
Population
Category
Hourly
Labor
Rate
Number of Entry
Points
CWS
NTNC
Percent
Chlorine
Dioxide
Number of
Affected Entry
Points
All PWSs
Applicability
(Is Monitoring Required?)
Year 1
Year 2
Year 3
F
G
H
Annual
Samples
Required
Per Plant
Total
Samples
Required
Per Plant
(1 per day)
101-1,000
1,001-10,000
10,001-100,000
>100,000
A
$34.59
$34.59
$34.59
$34.59
B
16,737
14,514
5,344
753
C
3,356
378
4
0
D
0.7%
0.5%
0.1%
0.0%
E=(B+C)*D
139
68
4
0
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Average
Annual
Burden
Hours
Average
Annual
Labor Cost
Total O&M
Cost
Average
Annual O&M
Cost
Q=E*M
R=Q/3
(part of ClO2 daily)
I
Yes
Yes
Yes
Yes
Total Sampling
Burden Per Plant
Total O&M
O&M
(Analytical) (Analytical) Total
Cost Per
Cost Per
Burden
Plant
Sample
Hours
J
1,095
1,095
1,095
1,095
365
365
365
365
K
L
0
0
0
0
$0
$0
$0
$0
M=J*L
$0
$0
$0
$0
N=K*E
0
0
0
0
O=N/3
0
0
0
0
P=O*A
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
Total
37,347
3,738
211
0
0
$0
$0
$0
Notes:
1) Groundwater systems ≤100 are not expected to use chlorine dioxide (therefore no chlorite sampling requirements). Groundwater TNCWSs are not required to monitor for chlorite.
2) Burden and cost for daily chlorite monitoring is assumed to be a part of daily chloride dioxide burden and cost--chlorine dioxide and chlorite can be analyzed using the same method (SM 4500--ClO2 E).
3) Burden estimates take into account the results of the May 2015 consultation with water industry representatives.
Source: The number of entry points is from Exhibit 3 and includes ground water treated entry points. The percentage of entry points using chlorine dioxide is from the 2006 Community Water Systems Survey and is the percentage of treated entry points in
ground water systems using chlorine dioxide. Numbers of samples, applicability, burden, and costs carried forward from the 1998 Stage 1 DBPR RIA and ICR. Sample costs inflated 2013$.
DDBP/Chem/Rads ICR - Stage 1 DBPR
B-9
December 2015
Exhibit 10 - Monthly Chlorite Monitoring Burden and Costs
PWSs - SW/GWUDI
Population
Category
101-1,000
1,001-10,000
10,001-100,000
>100,000
Hourly
Labor
Rate
NTNC
Percent
Chlorine
Dioxide
C
D
Number of Systems
CWS
A
$34.59
$34.59
$34.59
$34.59
B
3,223
4,716
2,375
363
375
141
7
1
0.0%
4.8%
7.3%
5.7%
Number of
Affected
Systems
Applicability
(Is Monitoring Required?)
All PWSs
Year 1
Year 2
Year 3
E=(B+C)*D
F
G
H
0
233
175
21
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Total
Annual
Total Sampling
Samples
Samples
Required Per Required Per Burden Per System
(hrs)
System
System
(3 per month)
(20 min. per sample)
I
Yes
Yes
Yes
Yes
J
36
36
36
36
K
108
108
108
108
Total O&M
O&M
(Analytical) (Analytical)
Cost Per
Cost Per
System
Sample
L
36
36
36
36
$179
$179
$179
$179
M=J*L
$19,294
$19,294
$19,294
$19,294
Total
Burden
Hours
Average
Annual
Burden
Hours
N=K*E
O=N/3
0
8,373
6,294
741
0
2,791
2,098
247
Average
Annual
Labor Cost
P=O*A
$0
$96,546
$72,573
$8,543
Total O&M
Cost
Q=E*M
$0
$4,487,467
$3,373,199
$397,075
Average
Annual O&M
Cost
R=Q/3
$0
$1,495,822
$1,124,400
$132,358
Total
10,677
524
428
15,408
5,136
$177,663
$8,257,741
$2,752,580
Notes:
1) Surface water systems serving <100 people are not expected to use chlorine dioxide (therefore no chlorite sampling requirements). TNCWSs that use chlorine dioxide are not required to monitor for chlorite.
2) Burden estimates take into account the results of the May 2015 consultation with water industry representatives.
3) Monthly chlorite monitoring is performed at 3 sites in the distribution system (daily monitoring is required at each entry point). Monthly monitoring requires use of a different analytical method (EPA 300.0 or 300.1) than is used for daily monitoring.
Source: Percentage of entry points using chlorine dioxide used as proxy for percentage of systems using chlorine dioxide. The percentage of entry points (both surface and ground) in surface water systems using chlorine dioxide is from the 2006 Community Water
Systems Survey. Numbers of samples, applicability, burden, and costs carried forward from the 1998 Stage 1 DBPR RIA and ICR. Sample costs inflated to 2013$.
PWSs - Groundwater
Population
Category
101-1,000
1,001-10,000
10,001-100,000
>100,000
Hourly
Labor
Rate
A
$34.59
$34.59
$34.59
$34.59
Number of Systems
CWS
B
17,723
8,290
1,494
65
NTNC
C
7,793
878
9
0
Percent
Chlorine
Dioxide
D
0.7%
0.5%
0.1%
0.0%
Number of
Affected
Systems
All PWSs
E=(B+C)*D
176
42
1
0
Applicability
(Is Monitoring Required?)
Year 1
Year 2
Year 3
F
G
H
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Total
Annual
Total Sampling
Samples
Samples
Required Per Required Per Burden Per System
(hrs)
System
System
(3 per month)
(20 min. per sample)
I
Yes
Yes
Yes
Yes
J
36
36
36
36
K
108
108
108
108
O&M
Total O&M
(Analytical) (Analytical)
Cost Per
Cost Per
Sample
System
L
36
36
36
36
$179
$179
$179
$179
M=J*L
$19,294
$19,294
$19,294
$19,294
Total
Burden
Hours
N=K*E
6,350
1,507
41
0
Average
Annual
Burden
Hours
O=N/3
2,117
502
14
0
Average
Annual
Labor Cost
P=O*A
$73,216
$17,375
$473
$0
Total O&M
Cost
Q=E*M
$3,403,053
$807,570
$21,987
$0
Average
Annual O&M
Cost
R=Q/3
$1,134,351
$269,190
$7,329
$0
Total
27,572
8,680
219
7,897
2,632
$91,063
$4,232,610
$1,410,870
Notes:
1) Groundwater systems ≤100 are not expected to use chlorine dioxide (therefore no chlorite sampling requirements). The number of affected entry points is most likely an overestimate, because the percent of systems using chlorite is based on data for CWSs, and
NTNCWSs may be less likely to use chlorite. Groundwater TNCWSs are not required to monitor for chlorite.
2) Burden estimates take into account the results of the May 2015 consultation with water industry representatives.
3) Monthly chlorite monitoring is performed at 3 sites in the distribution system (daily monitoring is required at each entry point). Monthly monitoring requires use of a different analytical method (EPA 300.0 or 300.1) than is used for daily monitoring.
Source: Percentage of entry points using chlorine dioxide used as proxy for percentage of systems using chlorine dioxide. The percentage of entry points using chlorine dioxide is from the 2006 Community Water Systems Survey and is the percentage of treated entry
points in ground water systems using chlorine dioxide. Numbers of samples, applicability, burden, and costs carried forward from the 1998 Stage 1 DBPR RIA and ICR. Sample costs inlfated to 2013$.
DDBP/Chem/Rads ICR - Stage 1 DBPR
B-10
December 2015
Exhibit 11 - Distribution Systems Residual Monitoring Burden and Costs
(Chlorine or Chloramines)
Disinfecting Groundwater Systems
Population
Category
Hourly
Labor
Rate
Number of GW
PWSs
Applicability
(Is Monitoring Required?)
CWS
Year 1
NTNC
Year 2
Year 3
Total
Samples
Annual Samples
Required
Required Per System Per System
(Based on TCR/RTCR
routine monitoring schedule)
<1,000
1,001-3,300
3,301-10,000
10,001-50,000
50,001-100,000
100,001-1,000,000
>1,000,000
A
$34.59
$34.59
$34.59
$34.59
$34.59
$34.59
$34.59
B
20,064
5,152
2,490
1,255
140
59
2
C
6,922
338
40
4
0
0
0
D
E
Yes
Yes
Yes
Yes
Yes
Yes
Yes
F
Yes
Yes
Yes
Yes
Yes
Yes
Yes
G
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Annual
Calculation
Burden Per
System (hrs)
Total
Burden
Hours
Average
Annual
Burden
Hours
Average
Annual Labor
Cost
Total O&M Cost
Average Annual
O&M Cost
N=M*A
$710,157
$412,869
$545,399
$925,128
$341,333
$256,428
$22,401
O=(B+C)*K
$21,125,117
$12,281,663
$16,224,057
$27,519,883
$10,153,677
$7,627,982
$666,367
P=O/3
$7,041,706
$4,093,888
$5,408,019
$9,173,294
$3,384,559
$2,542,661
$222,122
(5 min. per sample)
H
9
26
75
255
846
1,504
4,140
O&M
Total O&M
(Analytical) (Analytical)
Cost Per
Cost Per
Sample
System
I
27
78
224
765
2,539
4,513
12,420
J
2
7
19
64
212
376
1,035
$29
$29
$29
$29
$29
$29
$29
K=H*J
$783
$2,237
$6,413
$21,864
$72,587
$129,011
$355,009
L=I*(B+C)
61,589
35,806
47,300
80,232
29,602
22,239
1,943
M=L/3
20,530
11,935
15,767
26,744
9,867
7,413
648
Total
29,161
7,304
278,710
92,903
$3,213,714
$95,598,746
$31,866,249
Notes:
1) Surface water system residual monitoring conducted under the SWTR is provided in Appendix F and satisfies this requirement for the Stage 1 DBPR. To avoid double counting, only groundwater systems are analyzed here.
Source: Burden estimates based on a previous DBP/Chem ICR (identical activity conducted for SW systems, under the SWTR disinfectants residual model). Burden estimates take into account results of May 2015 consultations with water industry
representatives. O&M costs based on the 1998 Stage 1 DBPR RIA and ICR, inflated to 2013$. Number of samples based on requirements for monthly TCR sampling (see Exhibit 2). Burden associated with sampling itself is addressed under the Microbial
Rules ICR in the section on the TCR. Note that the burden for disinfectant residual monitoring is underestimated because it does not include disinfectant residual measured during repeat sampling.
DDBP/Chem/Rads ICR - Stage 1 DBPR
B-11
December 2015
Exhibit 12 - State Data Entry/Recordkeeping Burden and Costs
States
Total
Respondents
Hourly
Labor
Rate
A
2/26/1900
$ 45.60
Annual Data
Entry/Recordkeeping
(Hours Per System)
Groundwater
Systems
SW/GWUDI
Systems
Groundwater
Systems
Total
Annual
Burden
(Hours)
B
C
D
E
F=B*D+C*E
G=A*F
12,489
36,505
9
1
148,906
$6,790,132
Number of Systems
SW/GWUDI
Systems
Annual
Labor Cost
Note: [B]-[C] In addition to all CWSs and NTNCWSs, includes all TNCWSs that use chlorine dioxide (see Exhibit 8). States
will not need to review data from other TNCWSs.
DDBP/Chem/Rads ICR - Stage 1 DBPR
B-12
December 2015
Exhibit 13 - Stage I Disinfection Byproducts Rule - Summary of Original
and Revised Burden Estimates
No changes in burden estimates based on May 2015 consultations.
DDBP/Chem/Rads ICR - Stage 1 DBPR
B-13
December 2015
Appendix C
Stage 2 Disinfectants/Disinfection
Byproducts Rule Spreadsheets
Exhibit 1
Burden, Respondents, Responses, and Costs for the ICR Approval Period
Totals by Year and Annual Averages for CWS and NTNC Water Systems
PWSs
Year 1
Year 2
Year 3
Source
January 1, 2016 January 1, 2017 January 1, 2018 (Exhibit) December 31, 2016 December 31, 2017 December 31, 2018
Annual
Average
Total
Burden (hours)
2
48,820
48,820
48,820
146,459
48,820
Respondents (number)
3
47,362
47,362
47,362
47,362
47,362
Responses (number)
4
19,601
19,601
19,601
58,803
19,601
Costs (dollars)
Labor
O&M
Capital
5
$
$
$
$
7,272,863
1,688,772
5,584,091
-
$
$
$
$
7,272,863
1,688,772
5,584,091
-
$
$
$
$
7,272,863
1,688,772
5,584,091
-
$ 21,818,589 $ 7,272,863
$ 5,066,317 $ 1,688,772
$ 16,752,272 $ 5,584,091
$
- $
-
Burden per respondent
1.03
$
Cost per respondent
153.56
States
Year 1
Year 2
Year 3
Source
January 1, 2016 January 1, 2017 January 1, 2018 (Exhibit) December 31, 2016 December 31, 2017 December 31, 2018
Annual
Average
Total
Burden (hours)
2
50,822
50,822
50,822
152,466
Respondents (number)
3
57
57
57
57
57
Responses (number)
4
114
114
114
342
114
Costs (dollars)
Labor
O&M
Capital
5
$
$
$
$
2,317,483
2,317,483
-
$
$
$
$
2,317,483
2,317,483
-
$
$
$
$
2,317,483
2,317,483
-
50,822
$ 6,952,450 $ 2,317,483
$ 6,952,450 $ 2,317,483
$
- $
$
- $
891.61
Burden per respondent
Cost per respondent
$ 40,657.60
Sum for PWSs and States
Year 1
Year 2
Year 3
Source
January 1, 2016 January 1, 2017 January 1, 2018 (Exhibit) December 31, 2016 December 31, 2017 December 31, 2018
Annual
Average
Total
Burden (hours)
2
99,642
99,642
99,642
298,925
99,642
Respondents (number)
3
47,419
47,419
47,419
47,419
47,419
Responses (number)
4
19,715
19,715
19,715
59,145
19,715
Costs (dollars)
Labor
O&M
Capital
5
$
$
$
$
9,590,346
4,006,256
5,584,091
-
$
$
$
$
9,590,346
4,006,256
5,584,091
-
$
$
$
$
9,590,346
4,006,256
5,584,091
-
$ 28,771,039 $ 9,590,346
$ 12,018,767 $ 4,006,256
$ 16,752,272 $ 5,584,091
$
- $
2.10
Burden per respondent
$
Cost per respondent
202.25
Note: Detail may not appear to add to total due to rounding.
The number of state respondents is not added; rather the maximum number of respondents for the 3 years for a given activity is used to avoid doublecounting.
DDBP/Chem/Rads ICR - Stage 2 D/DBPR
C-1
December 2015
Exhibit 2:
Burden for the ICR Approval Period
PWSs
Year 1
Year 2
Year 3
January 1, 2016 December 31, 2016
January 1, 2017 December 31, 2017
January 1, 2018 December 31, 2018
Source
(Exhibit)
Subpart H and Mixed CWSs
Implementation [1]
IDSE (monitoring, system studies or
additional sample sites) [2]
Monitoring Plans [3]
Routine Monitoring [4]
Operational Evaluations
Disinfecting Ground Water CWSs
Implementation [1]
IDSE (monitoring, system studies or
additional sample sites) [2]
Monitoring Plans [3]
Routine Monitoring [4]
Operational Evaluations
Subpart H and Mixed NTNCWSs
Implementation [1]
IDSE (monitoring, system studies or
additional sample sites) [2]
Monitoring Plans [3]
Routine Monitoring [4]
Operational Evaluations
Disinfecting Ground Water NTNCWSs
Implementation [1]
IDSE (monitoring, system studies or
additional sample sites) [2]
Monitoring Plans [3]
Routine Monitoring [4]
Operational Evaluations
Yearly Total
19a
-
-
-
19a
19a
19a
19a
24,113
16,528
24,113
16,528
24,113
16,528
19a
-
19a
19a
19a
19a
-
3,347.40
-
3,347.40
-
Annual
Average
Total
-
-
72,338
49,584
24,113
16,528
3,347.40
-
-
-
10,042
-
3,347
-
19b
-
-
-
-
19b
19b
19b
19b
366.00
-
366.00
-
366.00
-
1,098
-
19b
-
19b
19b
19b
19b
-
4,465.53
48,819.74
4,465.53
48,819.74
4,465.53
48,819.74
13,397
146,459
366
4,466
48,820
States
Year 1
Year 2
Year 3
January 1, 2016 December 31, 2016
January 1, 2017 December 31, 2017
January 1, 2018 December 31, 2018
Source
(Exhibit)
States and Territories
State rule implementation activities [5]
State IDSE activities [6]
State Monitoring Plans
State Routine Monitoring
State Operational Evaluation
Yearly Total
19a
19a
19a
19a
19a
47,424.00
3,398.00
50,822.00
47,424.00
3,398.00
50,822.00
47,424.00
3,398.00
50,822.00
Total
142,272
10,194
152,466
Annual
Average
47,424
3,398
10,164
Sum for PWSs and States
CWSs
NTNCWSs
States and Territories
Yearly Total
Year 1
Year 2
Year 3
January 1, 2016 December 31, 2016
43,988.21
4,831.53
50,822.00
99,641.74
January 1, 2017 December 31, 2017
43,988.21
4,831.53
50,822.00
99,641.74
January 1, 2018 December 31, 2018
43,988.21
4,831.53
50,822.00
99,641.74
Total
131,965
14,495
152,466
298,925
Annual
Average
43,988
4,832
50,822
99,642
Note: Detail may not appear to add to total due to rounding.
[1] Implementation was completed in a previous ICR period.
[2] System IDSE activities were completed in a previous ICR period.
[3] Systems are assumed to have completed monitoring plans during a previous ICR period.
[4] Shows the difference in burden for total compliance monitoring from Stage 1 to Stage 2 for disinfecting systems and systems predicted to install disinfection for the GWR. Note that
the burden required may decrease in the transition from Stage 1 to Stage 2.
[5] State implementation activities are assumed to have been completed during a previous ICR period.
[6] State activities associated with IDSE were completed in a previous ICR period.
DDBP/Chem/Rads ICR - Stage 2 D/DBPR
C-2
December 2015
Exhibit 3:
Respondents for the ICR Approval Period [1]
PWSs [2]
Year 1
Year 2
Year 3
January 1, 2016 December 31, 2016
January 1, 2017 December 31, 2017
January 1, 2018 December 31, 2018
-
-
-
-
-
11,647
452
11,647
452
11,647
452
11,647
452
11,647
452
-
-
-
-
-
27,572
-
27,572
-
27,572
-
27,572
-
27,572
-
-
-
-
-
-
839
-
839
-
839
-
839
-
839
-
-
-
-
-
-
7,304
47,362
7,304
47,362
7,304
47,362
7,304
47,362
7,304
47,362
Source
(Exhibit)
Subpart H and Mixed CWSs
Implementation [3]
IDSE (monitoring, system studies or
additional sample sites) [4]
Monitoring Plans [5]
Routine Monitoring
Operational Evaluations
Disinfecting Ground Water CWSs
Implementation [3]
IDSE (monitoring, system studies or
additional sample sites) [4]
Monitoring Plans [5]
Routine Monitoring
Operational Evaluations
Subpart H and Mixed NTNCWSs
Implementation [3]
IDSE (monitoring, system studies or
additional sample sites) [4]
Monitoring Plans [5]
Routine Monitoring
Operational Evaluations
Disinfecting Ground Water NTNCWSs
Implementation [3]
IDSE (monitoring, system studies or
additional sample sites) [4]
Monitoring Plans [5]
Routine Monitoring
Operational Evaluations
Yearly Total [8]
7
8a & 8b
12
13a
14
7
8a & 8b
12
13a
14
7
8a & 8b
12
13a
14
7
8a & 8b
12
13a
14
Annual
Average
Total [5]
States [6]
Year 1
Year 2
Year 3
January 1, 2016 December 31, 2016
January 1, 2017 December 31, 2017
January 1, 2018 December 31, 2018
57
57
57
57
57
57
57
57
57
57
57
57
57
57
57
Year 1
Year 2
Year 3
January 1, 2016 December 31, 2016
39,219
8,143
57
47,419
January 1, 2017 December 31, 2017
39,219
8,143
57
47,419
January 1, 2018 December 31, 2018
39,219
8,143
57
47,419
Total [5]
39,219
8,143
57
47,419
Annual
Average
39,219
8,143
57
47,419
Source
(Exhibit)
States and Territories
State rule implementation activities [6]
State IDSE activities [7]
State Monitoring Plans
State Routine Monitoring
State Operational Evaluations
Yearly Total [8]
26
26
26
26
26
Annual
Average
Total [5]
Sum for PWSs and States
CWSs
NTNCWSs
States and Territories
Yearly Total
Note: Detail may not appear to add to total due to rounding.
[1] Non-treatment-related rule activities, in addition to those shown in the table, also include routine compliance monitoring. Some systems are expected to take more samples and
some are expected to take less in the transition from Stage 1 to Stage 2, depending on the number of plants in their systems. Overall, the Stage 2 DBPR results in an increase in the
total number of compliance samples taken from the Stage 1 DBPR. See Exhibit 13a column I, for the change in total samples for different system size categories.
[2] Each PWS is assumed to be a respondent.
[3] Implementation was completed in a previous ICR period.
[4] System IDSE activities were completed in a previous ICR period.
[5] Systems are assumed to have completed monitoring plans in a previous ICR period.
[6] State implementation activities were completed during a previous ICR period.
[7] State activities associated with IDSE were completed in a previous ICR period.
[8] In order to not double-count the number of respondents, the highest number of respondents for each PWS category represents the number of respondents for that year.
DDBP/Chem/Rads ICR - Stage 2 D/DBPR
C-3
December 2015
Exhibit 4:
Responses for the ICR Approval Period
PWSs
Year 1
Year 2
Year 3
January 1, 2016 December 31, 2016
January 1, 2017 December 31, 2017
January 1, 2018 December 31, 2018
-
-
-
-
-
14,036
452
14,036
452
14,036
452
42,107
1,356
14,036
452
-
-
-
-
-
1,892
-
1,892
-
1,892
-
5,677
-
1,892
-
-
-
-
-
-
244
-
244
-
244
-
732
-
244
-
-
-
-
-
-
2,977
19,601
2,977
19,601
2,977
19,601
8,931
58,803
2,977
19,601
Year 1
Year 2
Year 3
January 1, 2016 December 31, 2016
January 1, 2017 December 31, 2017
January 1, 2018 December 31, 2018
57
57
114
57
57
114
57
57
114
171
171
342
57
57
114
Year 1
Year 2
Year 3
January 1, 2016 December 31, 2016
16,380
3,221
114
19,715
January 1, 2017 December 31, 2017
16,380
3,221
114
19,715
January 1, 2018 December 31, 2018
16,380
3,221
114
19,715
Total
49,140
9,663
342
59,145
Annual
Average
16,380
3,221
114
19,715
Source
(Exhibit)
Subpart H and Mixed CWSs
Implementation [1]
IDSE (monitoring, system studies or additional
sample sites) [2]
Monitoring Plans [3]
Routine Monitoring [4]
Operational Evaluations
Disinfecting Ground Water CWSs
Implementation [1]
IDSE (monitoring, system studies or additional
sample sites) [2]
Monitoring Plans [3]
Routine Monitoring [4]
Operational Evaluations
Subpart H and Mixed NTNCWSs
Implementation [1]
IDSE (monitoring, system studies or additional
sample sites) [2]
Monitoring Plans [3]
Routine Monitoring [4]
Operational Evaluations
Disinfecting Ground Water NTNCWSs
Implementation [1]
IDSE (monitoring, system studies or additional
sample sites) [2]
Monitoring Plans [3]
Routine Monitoring [4]
Operational Evaluations
Yearly Total
7
9, 10, 11
12
13
14
7
9, 10, 11
12
13
14
7
9, 10, 11
12
13
14
7
9, 10, 11
12
13
14
Annual
Average
Total
States
Source
(Exhibit)
States and Territories
State rule implementation activities [5]
State IDSE activities [6]
State Monitoring Plans
State Routine Monitoring
Operational Evaluations
Yearly Total
26
26
26
26
26
Annual
Average
Total
Sum for PWSs and States
CWSs
NTNCWSs
States and Territories
Yearly Total
Note: Detail may not appear to add to total due to rounding.
[1] Implementation is assumed to have been completed in a previous ICR period.
[2] System IDSE activities were completed in a previous ICR period.
[3] Systems are expected to have completed routine monitoring plans in a previous ICR period.
[4] Shows the difference in responses for total compliance monitoring from Stage 1 to Stage 2 for disinfecting systems and systems predicted to install disinfection for the GWR.
Note that the number of responses required may decrease in the transition from Stage 1 to Stage 2.
[5] States are assumed to have completed implementation during a previous ICR period.
[6] State activities associated with IDSE were completed in a previous ICR period.
DDBP/Chem/Rads ICR - Stage 2 D/DBPR
C-4
December 2015
Exhibit 5:
Cost for the ICR Approval Period
PWSs
Year 1
January 1, 2016 - December 31, 2016
Labor
O&M
Capital
Source
(Exhibit)
Year 2
January 1, 2017 - December 31, 2017
Labor
O&M
Capital
Year 3
January 1, 2018 - December 31, 2018
Labor
O&M
Capital
Total
Labor
O&M
Capital
Annual
Average
Total
Subpart H and Mixed CWSs
Implementation [1]
20a
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
IDSE (monitoring, system studies
or additional sample sites) [2]
Monitoring Plans [3]
Routine Monitoring [4]
Operational Evaluations
20a
20a
20a
20a
$
$
$
$
834,110
571,737
$
$
$
$
4,033,339
-
$
$
$
$
-
$
$
$
$
834,110
571,737
$
$
$
$
4,033,339
-
$
$
$
$
-
$
$
$
$
834,110
571,737
$
$
$
$
4,033,339
-
$
$
$
$
-
$
$
$
$
2,502,331
1,715,210
$
$
$
$
12,100,017
-
$
$
$
$
-
$
$
$
$
14,602,348
1,715,210
$
$
$
$
4,867,449
571,737
Implementation [1]
20a
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
IDSE (monitoring, system studies
or additional sample sites) [2]
Monitoring Plans [3]
Routine Monitoring [4]
Operational Evaluations
20a
20a
20a
20a
$
$
$
$
115,793
-
$
$
$
$
576,104
-
$
$
$
$
-
$
$
$
$
115,793
-
$
$
$
$
576,104
-
$
$
$
$
-
$
$
$
$
115,793
-
$
$
$
$
576,104
-
$
$
$
$
-
$
$
$
$
347,380
-
$
$
$
$
1,728,312
-
$
$
$
$
-
$
$
$
$
2,075,692
-
$
$
$
$
691,897
-
Implementation [1]
20b
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
IDSE (monitoring, system studies
or additional sample sites) [2]
Monitoring Plans [3]
Routine Monitoring [4]
Operational Evaluations
20b
20b
20b
20b
$
$
$
$
12,661
-
$
$
$
$
72,926
-
$
$
$
$
-
$
$
$
$
12,661
-
$
$
$
$
72,926
-
$
$
$
$
-
$
$
$
$
12,661
-
$
$
$
$
72,926
-
$
$
$
$
-
$
$
$
$
37,982
-
$
$
$
$
218,777
-
$
$
$
$
-
$
$
$
$
256,759
-
$
$
$
$
85,586
-
Implementation [1]
20b
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
$
-
IDSE (monitoring, system studies
or additional sample sites) [2]
Monitoring Plans [3]
Routine Monitoring [4]
Operational Evaluations
20b
20b
20b
20b
$
$
$
$
$
154,472
1,688,772
$
$
$
$
$
901,722
5,584,091
$
$
$
$
$
-
$
$
$
$
$
154,472
1,688,772
$
$
$
$
$
901,722
5,584,091
$
$
$
$
$
-
$
$
$
$
$
154,472
1,688,772
$
$
$
$
$
901,722
5,584,091
$
$
$
$
$
-
$
$
$
$
$
463,415
5,066,317
$
$
$
$
$
2,705,166
16,752,272
$
$
$
$
$
-
$
$
$
$
$
3,168,580
21,818,589
$
$
$
$
$
1,056,193
7,272,863
O&M
Capital
Disinfecting Ground Water CWSs
Subpart H and Mixed NTNCWSs
Disinfecting Ground Water NTNCWSs
Yearly Total
States
Year 1
January 1, 2016 - December 31, 2016
Labor
O&M
Capital
Source
(Exhibit)
Year 2
January 1, 2017 - December 31, 2017
Labor
O&M
Capital
Year 3
January 1, 2018 - December 31, 2018
Labor
O&M
Capital
Total
Labor
Annual
Average
Total
States and Territories
State rule implementation activities [5]
State IDSE activities [6]
State Monitoring Plans
State Routine Monitoring
State Operational Evaluations
Yearly Total
20a
20a
20a
20a
20a
$
$
$
$
$
$
2,162,534
154,949
2,317,483
$
$
$
$
$
$
-
$
$
$
$
$
$
-
$
$
$
$
$
$
2,162,534
154,949
2,317,483
$
$
$
$
$
$
-
$
$
$
$
$
$
-
$
$
$
$
$
$
2,162,534
154,949
2,317,483
$
$
$
$
$
$
-
$
$
$
$
$
$
-
$
$
$
$
$
$
6,487,603
464,846
6,952,450
$
$
$
$
$
$
-
$
$
$
$
$
$
-
$
$
$
$
$
$
6,487,603
464,846
6,952,450
$
$
$
$
$
$
2,162,534
154,949
2,317,483
$
$
$
$
Total
18,393,250
3,425,339
6,952,450
28,771,039
$
$
$
$
Annual
Average
6,131,083
1,141,780
2,317,483
9,590,346
Sum for PWSs and States
Year 1
Year 2
Year 3
Total
January 1, 2016 - December 31, 2016
January 1, 2017 - December 31, 2017
January 1, 2018 - December 31, 2018
Labor
O&M
Capital
Labor
O&M
Capital
Labor
O&M
Capital
Labor
O&M
Capital
CWSs
$
1,521,640 $
4,609,443 $
- $
1,521,640 $
4,609,443 $
- $
1,521,640 $
4,609,443 $
- $
4,564,921 $
13,828,329 $
NTNCWSs
$
167,132 $
974,648 $
- $
167,132 $
974,648 $
- $
167,132 $
974,648 $
- $
501,397 $
2,923,943 $
States and Territories
$
2,317,483 $
- $
- $
2,317,483 $
- $
- $
2,317,483 $
- $
- $
6,952,450 $
- $
Yearly Total
$
4,006,256 $
5,584,091 $
- $
4,006,256 $
5,584,091 $
- $
4,006,256 $
5,584,091 $
- $
12,018,767 $
16,752,272 $
Note: Detail may not appear to add to total due to rounding.
[1] Implementation is assumed to have been completed in a previous ICR period.
[2] System IDSE activities were completed in a previous ICR period.
[3] Systems are expected to have completed their routine monitoring plans in a previous ICR period.
[4] Shows the difference in costs for total compliance monitoring from Stage 1 to Stage 2 for disinfecting systems and systems predicted to install disinfection for the GWR. Note that the costs required may decrease in the transition from Stage 1 to Stage 2.
[5] State implementation activities are assumed to have been completed during a previous ICR period.
[6] State activities associated with IDSE were completed in a previous ICR period.
DDBP/Chem/Rads ICR - Stage 2 D/DBPR
C-5
December 2015
Exhibit 6: Baseline Number of 100 Percent Purchasing Systems and Producing Systems
Systems Subject to Stage 2 DBPR
Total Number of Systems
NonPurchased
Purchased
Total
Percent of
Purchased
Systems that Buy
all of Their Water
(100% Purchasing
Systems)
A
B
C=A+B
D
Size Category
100% Purchasing Systems
Plants
Per
System
Percent
Disinfecting
E
F
Systems
G=Round
[B*D*F]
Producing Systems
Plants
H=Round
[E*G]
Systems
I=Round [(C(B*D))*F]
Plants
J=Round
[E*I]
Subpart H and Mixed CWSs
<500
1,040
1,983
3,022
80%
1.0
100%
1,579
1,657
1,444
1,515
500-3,300
1,267
2,400
3,667
80%
1.0
100%
1,911
1,930
1,756
1,774
3,301-9,999
977
1,237
2,214
80%
1.1
100%
985
1,054
1,229
1,315
10,000-49,999
988
998
1,986
80%
1.1
100%
794
857
1,192
1,287
50,000-249,999
380
249
629
80%
1.4
100%
198
272
431
592
250,000-999,999
86
19
105
80%
1.7
100%
15
25
90
152
1,000,000-4,999,999
18
4
22
80%
3.7
100%
3
11
19
70
1
80%
3.7
100%
1
National Totals
4,757
6,890
11,647
-
-
1
5,485
4
5,806
6,162
6,709
100% Ground Water CWSs (Disinfecting)
<500
23,121
1,289
24,410
100%
1.1
65%
838
952
15,027
17,065
500-9,999
1,092
12,803
100%
1.7
80%
876
1,513
9,398
16,230
44
40
152
11,711
10,000-99,999
1,463
100,000-499,999
> 500,000
National Totals
1,507
100%
3.8
91%
1,335
5,057
58
-
58
100%
12.3
90%
-
-
52
637
7
-
7
100%
12.3
90%
-
-
6
77
1,754
2,617
25,819
39,066
36,360
2,425
38,784
Subpart H and Mixed NTNCWSs
<500
264
324
589
88%
1.0
100%
284
284
305
305
500-3,300
86
103
189
88%
1.0
100%
90
90
99
99
3,301-9,999
15
38
53
88%
1.0
100%
33
33
20
20
1
10,000-49,999
-
6
6
88%
1.0
100%
5
5
50,000-249,999
-
2
2
88%
1.0
100%
2
2
-
1
-
250,000-999,999
-
-
-
88%
1.0
100%
-
-
-
-
1,000,000-4,999,999
-
-
-
88%
1.0
100%
-
-
-
-
88%
1.0
100%
-
-
-
National Totals
365
473
839
100% Ground Water NTNCWSs (Disinfecting)
<500
14,229
500-9,999
> 500,000
-
-
425
425
106
14,335
100%
1.0
43%
46
46
6,128
6,128
42
2,613
100%
1.0
43%
18
18
1,107
1,107
8
2
10
100%
1.0
43%
1
1
3
-
100%
1.0
43%
-
-
100%
1.0
43%
-
-
National Totals
414
2,571
10,000-99,999
100,000-499,999
414
16,808
150
16,958
-
-
65
65
3
-
-
-
7,239
7,238
Grand Total
58,290
9,938
68,228
7,718
8,902
39,645
53,438
Sources: (A), (B) October 2014 SDWIS frozen database. Source was not specified for some systems. These PWSs were assigned to SW or GW categories based on the ratio of SW
to GW systems within a given size category.
(D) Percentage of purchased systems that are 100% purchasing is estimated from SDWIS data.
(E) Based on analysis of data from 2006 Community Water Systems Survey.
(F) For ground water CWSs, percentage of systems that disinfect is based on 2006 CWSS; percentages include systems that disinfect at least one entry point.
For ground water NTNCWSs, the percentage disinfecting is based on the October 2014 SDWIS frozen database. All surface water systems are required to
disinfect under the Surface Water Treatment Rule.
DDBP/Chem/Rads ICR - Stage 2 D/DBPR
C-6
December 2015
Exhibit 7: Rule Implementation Costs for Systems
(Activity Completed in a Previous ICR Period)
Number of
Systems
Read Hours
per PWS
Train Hours
per PWS
Cost per
Labor Hour
Total Cost
Total Burden
(Hours)
Total Burden
(FTEs)
A
B
C
D
E = A*(B+C)*D
F = A*(B+C)
G = F/2,080
Size Category
3,022
<500
8
15
$
34.59
$
2,404,713
69,516
33.4
500-3,300
3,667
8
15
$
34.59
$
2,917,686
84,346
40.6
3,301-9,999
2,214
8
15
$
34.59
$
1,761,494
50,922
24.5
10,000-49,999
1,986
40
15
$
34.59
$
3,778,484
109,230
52.5
50,000-249,999
629
40
15
$
34.59
$
1,196,710
34,595
16.6
250,000-999,999
105
40
75
$
34.59
$
417,698
12,075
5.8
22
40
75
$
34.59
$
87,518
2,530
1.2
1
40
75
$
34.59
$
3,978
115
0.1
$
12,568,281
363,329
174.7
1,000,000-4,999,999
National Totals
11,647
100% Ground Water CWSs (Disinfecting)
<500
15,865
8
15
$
34.59
$
12,622,330
364,892
175.4
500-9,999
10,274
8
15
$
34.59
$
8,174,290
236,306
113.6
1,375
40
15
$
34.59
$
2,616,114
75,628
36.4
52
40
15
$
34.59
$
98,994
2,862
1.4
6
40
15
$
34.59
$
11,948
345
0.2
$
23,523,677
680,032
326.9
10,000-99,999
100,000-499,999
> 500,000
National Totals
27,572
Surface Water NTNCWSs
<500
589
8
15
$
34.59
$
468,300
13,538
6.5
500-3,300
189
8
15
$
34.59
$
150,455
4,349
2.1
53
8
15
$
34.59
$
42,168
1,219
0.6
10,000-49,999
6
40
15
$
34.59
$
11,415
330
0.2
50,000-249,999
2
40
15
$
34.59
$
3,805
110
0.1
3,301-9,999
250,000-999,999
-
40
25
N/A
$
-
-
-
1,000,000-4,999,999
-
40
25
N/A
$
-
-
-
-
40
25
N/A
-
-
National Totals
839
$
-
$
676,143
19,546
9.4
100% Ground Water NTNCWSs (Disinfecting)
<500
6,174
8
15
$
34.59
$
4,912,391
142,009
68.3
500-9,999
1,125
8
15
$
34.59
$
895,387
25,884
12.4
4
40
15
$
34.59
$
8,194
237
0.1
-
40
15
$
34.59
$
-
-
-
-
40
15
N/A
10,000-99,999
100,000-499,999
> 500,000
National Totals
Grand Totals
Notes:
$
-
-
-
7,304
$
5,815,973
168,131
80.8
47,362
$
42,584,075
1,231,038
591.8
Detail may not add due to rounding.
1 FTE=2,080 hours (40 hours/week; 52 weeks/year).
Burden estimates take into account results of previous consultations with water industry representatives.
Sources:
(A) Number of disinfecting systems subject to the rule from Exhibit 6, columns G and I.
(B and C) Hours for reading the rule and training appropriate personnel are estimated based on EPA experience implementing
previous regulations.
(D) Labor rates from 2013 Bureau of Labor Statistics SOC Code 51-8031, "Local Government - Water and Liquid Waste
Treatment Plant and System Operators."
DDBP/Chem/Rads ICR - Stage 2 D/DBPR
C-7
December 2015
Exhibit 8a: Percent and Number of 100 Percent Purchasing Systems in Each IDSE Category
(Note: IDSE Completed in a Previous ICR Period)
Size Category
Total
Number of
100%
Purchasing
Systems
A
Percentage
Percentage
Less than or
Receiving a
Equal to
Very Small
40/30
System Waiver
B
C
Percentage
Using
Studies
D
Systems
Conducting
IDSE Standard
Monitoring
E=A*(1-B)-F-G
Systems Receiving the
40/30 Certification
F=Round [A*(1-B)*C]
Systems Using Studies
G=Round [A*(1-B)*(1-C)*D]
Subpart H and Mixed CWSs
<500
1,579
0%
0%
0%
1,579
0
0
500-3,300
1,911
0%
0%
0%
1,911
0
0
3,301-9,999
985
0%
0%
0%
985
0
0
10,000-49,999
794
0%
14%
0%
683
111
0
50,000-249,999
198
0%
14%
5%
161
28
9
250,000-999,999
15
0%
14%
10%
12
2
1
3
0%
14%
10%
3
0
0
0%
14%
10%
0
0
5,334
141
10
1,000,000-4,999,999
-
National Totals
5,485
-
100% Ground Water CWSs (Disinfecting)
<500
838
0%
0%
0%
838
0
0
500-9,999
876
0%
0%
0%
876
0
0
40
0%
82%
0%
7
33
0
100,000-499,999
0
0%
66%
10%
0
0
0
> 500,000
0
0%
79%
10%
0
0
0
1,721
33
0
10,000-99,999
National Totals
1,754
Subpart H and Mixed NTNCWSs
284
N/A
N/A
N/A
N/A
N/A
N/A
500-3,300
90
N/A
N/A
N/A
N/A
N/A
N/A
3,301-9,999
33
N/A
N/A
N/A
N/A
N/A
N/A
10,000-49,999
5
0%
14%
0%
4
1
0
50,000-249,999
2
0%
14%
0%
2
0
0
250,000-999,999
0
0%
14%
0%
0
0
0
1,000,000-4,999,999
0
0%
14%
0%
0
0
0
0
0%
14%
0%
0
0
0
6
1
0
<500
National Totals
414
100% Ground Water NTNCWSs (Disinfecting)
<500
46
N/A
N/A
N/A
N/A
N/A
N/A
500-9,999
18
N/A
N/A
N/A
N/A
N/A
N/A
10,000-99,999
1
0%
92%
0%
0
1
0
100,000-499,999
0
0%
92%
0%
0
0
0
> 500,000
0
0%
92%
0%
0
0
0
0
1
0
National Totals
65
Grand Totals
7,718
7,061
176
10
Notes:
Detail may not add due to rounding.
Shaded areas represent systems that are not subject to IDSE requirements.
Results in columns F and G are rounded to whole systems.
Column C is the percentage of systems with TTHM concentrations less than or equal to 40 ug/L and HAA5 concentrations less than or equal to 30 ug/L for
Stage 1 DBPR monitoring.
Sources:
DDBP/Chem/Rads ICR - Stage 2 D/DBPR
(A) Number of disinfecting 100% purchasing systems (Exhibit 6, column G).
(B)-(C) 100% purchasing systems may not have DBP data with which to qualify for the waiver or certification. As a conservative assumption, 0% is used.
(D) Percentage of systems able to use historical data based on expert opinion.
C-8
December 2015
Exhibit 8b: Percent and Number of Producing Systems in Each IDSE Category
(Note: IDSE Completed in a Previous ICR Period)
Size Category
Total Number of
Producing Systems
A
Percentage
Receiving a
Very Small
System
Waiver
Percentage Having
Concentrations
Less than or Equal
to 40/30
Percentage
Using
Studies
B
C
D
Systems
Conducting IDSE
Standard
Monitoring
E=A*(1-B)-F-G
Systems Receiving the
40/30 Certification
F=Round [A*(1-B)*C]
Systems Using Studies
G=Round [A*(1-B)*(1-C)*D]
Subpart H and Mixed CWSs
<500
1,444
100%
0%
0%
-
0
0
500-3,300
1,756
0%
14%
0%
1,510
246
0
3,301-9,999
1,229
0%
14%
0%
1,057
172
0
10,000-49,999
1,192
0%
14%
0%
1,025
167
0
50,000-249,999
431
0%
14%
5%
352
60
19
250,000-999,999
90
0%
14%
10%
69
13
8
1,000,000-4,999,999
19
0%
14%
10%
14
3
2
1
0%
14%
10%
1
0
0
4,028
661
29
National Totals
6,162
100% Ground Water CWSs (Disinfecting)
15,027
<500
100%
0%
0%
0
0
0
500-9,999
9,398
0%
89%
0%
1,054
8,344
0
10,000-99,999
1,335
0%
82%
0%
236
1,099
0
52
0%
66%
10%
16
34
2
6
0%
79%
10%
1
5
0
1,307
9,482
2
100,000-499,999
> 500,000
National Totals
Subpart H and Mixed NTNCWSs
<500
25,818
305
N/A
N/A
N/A
N/A
N/A
N/A
500-3,300
99
N/A
N/A
N/A
N/A
N/A
N/A
3,301-9,999
20
N/A
N/A
N/A
N/A
N/A
N/A
10,000-49,999
1
0%
14%
0%
1
0
0
50,000-249,999
0
0%
14%
0%
0
0
0
250,000-999,999
0
0%
14%
0%
0
0
0
1,000,000-4,999,999
0
0%
14%
0%
0
0
0
0
0%
14%
0%
0
0
National Totals
424
1
0
-
-
100% Ground Water NTNCWSs (Disinfecting)
<500
6,129
N/A
N/A
N/A
N/A
N/A
N/A
500-9,999
1,107
N/A
N/A
N/A
N/A
N/A
N/A
10,000-99,999
3
0%
92%
0%
0
3
0
100,000-499,999
0
0%
92%
0%
0
0
0
> 500,000
0
0%
92%
0%
0
0
0
3
National Totals
7,239
0
-
Grand Totals
39,644
5,336
10,146
31
Detail may not add due to rounding.
Notes:
Shaded areas represent systems that are not subject to IDSE requirements.
Results in columns F and G are rounded to whole systems.
Column C is the percentage of systems with TTHM concentrations less than or equal to 40 ug/L and HAA5 concentrations less than or equal to 30 ug/L for Stage 1 DBPR
monitoring.
(A) Number of producing disinfecting systems (Exhibit 6, column I).
Sources:
(B) The percentage of small systems to receive a very small system waiver is an assumption based on EPA experience with small systems. 100% purchasing systems may
not have DBP data with which to qualify for small system waivers. As a conservative estimate 0% is assumed.
(C) Percentage of systems with all data < 40/30 for medium and large surface water and mixed systems and all groundwater systems based on Information Collection Rule
data. Percentages for small surface water systems are from National Rural Water Association data.
(D) Percentage of systems able to use historical data based on expert opinion.
DDBP/Chem/Rads ICR - Stage 2 D/DBPR
C-9
December 2015
Exhibit 9: IDSE Costs for Systems Using SMPs
(Activity Completed in a Previous ICR Period)
Sampling
Number of
Total Number Dual Sample
Sets per
of Systems
System
that Monitor
Size Category
B
A
Develop IDSE Monitoring Plan & Report
Hours
per
Sample
Sampling
Cost per
Labor Hour
Laboratory
Cost per
Sample
Preparation
of IDSE
Monitoring
Plan
Preparation
of IDSE
Report
Reporting
Cost per
Labor Hour
Total Labor Cost
Total Non-Labor
Cost
Total Cost
Total Burden
(Hours)
Total
Burden
(FTEs)
C
D
E
F
G
H
I=A*(B*C*D + (F+G)*H)
J=A*E*B
K=I+J
L=A*(B*C+(F+G))
M=L/2,080
Subpart H and Mixed CWSs
<500
1,579
2
1.5 $
34.59
$
304
6
16 $
34.59
$
1,365,128
$
959,306
$
2,324,434
39,464
19.0
500-3,300
3,421
8
1.5 $
34.59
$
304
6
16 $
34.59
$
4,023,773
$
8,316,451
$
12,340,224
116,321
55.9
3,301-9,999
2,042
16
1.5 $
34.59
$
304
6
16 $
34.59
$
3,249,296
$
9,927,614
$
13,176,910
93,932
45.2
10,000-49,999
1,708
48
1.5 $
34.59
$
266
20
16 $
34.59
$
6,380,979
$
21,797,483
$
28,178,461
184,464
88.7
50,000-249,999
513
96
1.5 $
34.59
$
266
20
24 $
34.59
$
3,336,191
$
13,093,804
$
16,429,995
96,444
46.4
250,000-999,999
81
144
1.5 $
34.59
$
266
80
40 $
34.59
$
941,456
$
3,101,164
$
4,042,620
27,216
13.1
1,000,000-4,999,999
17
192
1.5 $
34.59
$
266
100
60 $
34.59
$
263,453
$
867,815
$
1,131,268
7,616
3.7
1
240
1.5 $
34.59
$
266
100
60 $
34.59
$
17,988
$
63,810
$
81,798
520
$
19,578,263
$
58,127,448
$
77,705,711
565,977
272.1
National Totals
9,362
0.3
100% Ground Water CWSs (Disinfecting)
838
2
1.5 $
34.59
$
304
6
16 $
34.59
$
724,274
$
508,963
$
1,233,237
20,938
10.1
1,930
8
1.5 $
34.59
$
304
6
16 $
34.59
$
2,270,122
$
4,691,954
$
6,962,075
65,626
31.6
243
24
1.5 $
34.59
$
266
12
16 $
34.59
$
538,085
$
1,550,899
$
2,088,983
15,555
7.5
16
32
1.5 $
34.59
$
266
30
24 $
34.59
$
56,567
$
136,400
$
192,967
1,635
0.79
1
48
1.5 $
34.59
$
266
90
24 $
34.59
$
8,234
$
16,332
$
24,566
$
3,597,281
$
6,904,548
$
10,501,829
<500
500-9,999
10,000-99,999
100,000-499,999
> 500,000
National Totals
3,028
238
0.1
103,992
50.0
Subpart H and Mixed NTNCWSs
<500
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
500-3,300
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
3,301-9,999
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
10,000-49,999
5
48
50,000-249,999
2
96
250,000-999,999
0
144
1.5 N/A
1,000,000-4,999,999
0
192
0
240
National Totals
7
1.5 $
34.59
$
1.5 $
34.59
N/A
266
20
16 $
34.59
$
18,680
$
63,810
$
82,490
540
$
266
20
24 $
34.59
$
13,007
$
51,048
$
64,055
376
0.2
$
266
80
40 N/A
$
-
$
-
$
-
-
-
1.5 N/A
$
266
100
60 N/A
$
-
$
-
$
-
-
-
1.5 N/A
$
266
100
60 N/A
$
-
$
-
$
-
-
-
$
31,686
$
114,858
$
146,544
0.3
916
0.4
N/A
100% Ground Water NTNCWSs (Disinfecting)
<500
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
500-9,999
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
10,000-99,999
0
24
1.5 $
34.59
$
29
0.0
100,000-499,999
0
32
1.5 $
34.59
> 500,000
0
48
1.5 N/A
National Totals
0
266
12
16 $
34.59
$
$
266
30
24 $
34.59
$
266
90
24 N/A
Grand Totals
12,397
Detail may not add due to rounding.
Notes:
987
$
2,844
$
3,830
$
-
$
-
$
-
-
$
-
$
-
$
-
-
$
987
$
2,844
$
3,830
29
0.0
$
23,208,217
$
65,149,697
$
88,357,914
670,913
322.6
-
Shaded areas represent systems that are not subject to IDSE requirements.
1 FTE=2,080 hours (40 hours/week; 52 weeks/year).
Burden estimates take into account the results of previous consultations with water industry representatives.
Sources:
(A) From Exhibits 8a and 8b, column E.
(B) Number of IDSE samples per system based on rule requirements for conducting IDSE monitoring. (Number of sites multiplied by frequency of samples for one year.)
(C) Labor hours per sample reflects EPA estimate.
(D) Labor rates from 2013 Bureau of Labor Statistics SOC Code 51-8031, "Local Government - Water and Liquid Waste Treatment Plant and System Operators."
(E) Laboratory cost for TTHM and HAA5 analyses per sample based on costs incurred for the Information Collection Rule. $11 shipping is added for large systems as many large systems have in-house capacity and will not have to ship.
$45 is added for small systems because of higher shipping charges and fewer samples (no bulk discounts) and because fewer small systems have in-house labs. Laboratory costs per sample are inflated to 2013$.
(F and G) Labor hours for site selection and reporting based on expert opinion received during regulatory development process.
(H) Labor rates from 2013 Bureau of Labor Statistics SOC Code 51-8031, "Local Government - Water and Liquid Waste Treatment Plant and System Operators."
DDBP/Chem/Rads ICR - Stage 2 D/DBPR
C-10
December 2015
Exhibit 10: IDSE Costs for Systems Using SSSs
(Activity Completed in a Previous ICR Period)
Number of
Systems Qualifying for Preparation of
SSS
IDSE Study Plan Conduct Study
Size Category
A
B
C
Preparation of
IDSE Study
Report
Cost per
Labor Hour
Total Cost
Total Burden
(Hours)
Total Burden
(FTEs)
D
E
F = A*(B+C+D)*E
G = A*(B+C+D)
H = G/2,080
Subpart H and Mixed CWSs
<500
-
-
-
-
$
-
$
-
-
-
500-3,300
-
-
-
-
$
-
$
-
-
-
3,301-9,999
-
-
-
-
$
-
$
-
-
-
10,000-49,999
-
-
-
-
$
-
$
-
-
-
50,000-249,999
28
40
100
40
$
34.59
$
174,344
5,040
2.4
250,000-999,999
9
40
100
40
$
34.59
$
56,039
1,620
0.8
1,000,000-4,999,999
2
40
100
40
$
34.59
$
12,453
360
0.2
$
-
$
-
-
-
$
242,836
-
National Total
-
-
-
39
7,020
3.4
100% Ground Water CWSs (Disinfecting)
<500
-
-
-
-
$
-
$
-
-
-
500-9,999
-
-
-
-
$
-
$
-
-
-
10,000-99,999
-
-
-
$
-
$
-
-
-
$
34.59
$
12,453
$
-
$
-
$
12,453
> 500,000
2
100,000-499,999
-
National Total
40
-
100
40
-
-
2
360
0.2
-
-
360
0.2
Subpart H and Mixed NTNCWSs
<500
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
500-3,300
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
3,301-9,999
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
10,000-49,999
-
-
-
-
-
-
$
-
$
-
50,000-249,999
-
-
-
-
$
-
$
-
-
-
250,000-999,999
-
-
-
-
$
-
$
-
-
-
1,000,000-4,999,999
-
-
-
-
$
-
$
-
-
-
-
-
-
-
$
-
$
-
-
-
National Total
-
$
-
-
N/A
100% Ground Water NTNCWSs (Disinfecting)
N/A
<500
N/A
N/A
N/A
N/A
N/A
N/A
500-9,999
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
10,000-99,999
-
-
-
-
-
-
$
-
$
-
100,000-499,999
-
-
-
-
$
-
$
-
-
-
> 500,000
-
-
-
-
$
-
$
-
-
-
National Total
-
$
-
-
-
$
255,289
Grand Totals
Notes:
41
7,380
3.5
Detail may not add due to rounding.
Shaded areas represent systems that are not subject to IDSE requirements.
Burden estimates take into account the results of previous consultations with water industry representatives.
Sources:
SSS stands for systems using System-Specific Studies.
(A) Number of systems using studies to satisfy IDSE requirements from Exhibits 8a and 8b, column G.
(B), (C), (D) Reporting hours required per system based on expert opinion.
(E) Labor rates from 2013 Bureau of Labor Statistics SOC Code 51-8031, "Local Government - Water and Liquid Waste Treatment Plant and System Operators."
DDBP/Chem/Rads ICR - Stage 2 D/DBPR
C-11
December 2015
Exhibit 11: IDSE Costs for Systems Qualifying for the 40/30 Certification
(Activity Completed in a Previous ICR Period)
Selecting Additional Sites
Preparing IDSE Report
Systems
Receiving 40/30
Certification but
Adding Stage 2
site(s)
Hours per
System
Number of
Systems
Receiving 40/30
Certification
Reporting
Hours per
System
Cost per Labor
Hour
Total Cost
Total Burden
(Hours)
Total Burden
(FTEs)
A
B
C
D
E
F = (A*B+C*D)*E
G = A*B+C*D
H = G/2,080
Size Category
Subpart H and Mixed CWSs
<500
-
3
-
4
$
34.59
$
-
500-3,300
-
4
246
4
$
34.59
$
34,039
984
-
0.5
3,301-9,999
172
4
172
4
$
34.59
$
47,599
1,376
0.7
10,000-49,999
-
8
278
6
$
34.59
$
57,699
1,668
0.8
50,000-249,999
88
8
88
6
$
34.59
$
42,617
1,232
0.6
250,000-999,999
15
8
15
6
$
34.59
$
7,264
210
0.1
3
8
3
6
$
34.59
$
1,453
42
6
$
34.59
$
-
1,000,000-4,999,999
-
National Totals
278
8
100% Ground Water CWSs (Disinfecting)
<500
802
$
190,671
-
-
0.0
-
5,512
-
2.7
3
-
4
$
34.59
$
500-9,999
8,344
4
8,344
4
$
34.59
$
2,309,085
66,752
32.1
-
10,000-99,999
1,132
8
1,132
6
$
34.59
$
548,214
15,848
7.6
100,000-499,999
-
8
34
6
$
34.59
$
7,057
204
0.1
> 500,000
-
8
5
6
$
34.59
$
1,038
30
0.0
$
2,865,394
82,834
39.8
National Totals
9,476
9,515
Subpart H and Mixed NTNCWSs
<500
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
500-3,300
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
3,301-9,999
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
10,000-49,999
-
8
1
6
$
34.59
$
208
6
50,000-249,999
-
8
-
6
$
34.59
$
-
-
-
250,000-999,999
-
8
-
6
N/A
$
-
-
-
1,000,000-4,999,999
-
8
-
6
N/A
$
-
-
-
-
8
-
6
N/A
$
-
-
National Totals
-
$
208
1
100% Ground Water NTNCWSs (Disinfecting)
N/A
<500
500-9,999
6
0.0
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
4
8
4
6
$
34.59
$
1,937
56
0.0
$
34.59
$
-
-
N/A
$
-
-
$
1,937
10,000-99,999
100,000-499,999
-
8
-
6
> 500,000
-
8
-
6
National Totals
0.0
4
4
56
Grand Totals
9,758
10,322
$
3,058,210
88,408
Shaded areas represent systems that are not subject to IDSE requirements.
Notes:
Burden estimates take into account the results of previous consultations with water industry representatives.
Sources:
(A) Number of systems less than or equal to 40/30 from Exhibit 8a and 8b (column F) for only those system size categories that are predicted to have
additional routine monitoring in the transition from Stage 1 to Stage 2 (see Exhibit 13a, column H).
0.0
42.5
(B) Hours per system required to select new sites for Stage 2 based on expert opinion.
(C) Number of systems that qualify for 40/30 certification from Exhibit 8a and 8b, column F.
(D) Reporting hours are based on best professional judgment and experience with similar rules.
(E) Labor rates from 2013 Bureau of Labor Statistics SOC Code 51-8031, "Local Government - Water and Liquid Waste Treatment Plant and System
Operators."
DDBP/Chem/Rads ICR - Stage 2 D/DBPR
C-12
December 2015
Exhibit 12: Monitoring Plan Costs for Systems
(Activity Completed in a Previous ICR Period)
Number
Systems
Performing
IDSE, SSS, or
40/30
Certification
Size Category
Number of
Systems
Number of
Receiving Very
Systems Adding
Small System Disinfection for the
Waiver or Small
GWR Preparing
NTNCWS
Monitoring Plans
A
B
Hours to
Prepare
Stage 2
Monitoring
Plan
Hours to
Update
Existing
Stage 1
Monitoring
Plan
Labor Cost
D
E
F
C
Total Cost
Total
Burden
(hours)
Total
Burden
(FTEs)
G = F*((A+C)*D + B*E)
H = G/F
I = H/2080
Surface Water and Mixed CWSs
<500
1,579
1,444
-
5
-
$
34.59
$
273,026
7,893
3.8
500-3,300
3,667
-
-
5
8
$
34.59
$
634,279
18,336
8.8
3,301-9,999
2,214
-
-
5
8
$
34.59
$
382,933
11,070
5.3
10,000-49,999
1,986
-
-
10
8
$
34.59
$
686,997
19,860
9.5
50,000-249,999
629
-
-
10
8
$
34.59
$
217,584
6,290
3.0
250,000-999,999
105
-
-
20
8
$
34.59
$
72,643
2,100
1.0
22
-
-
40
8
$
34.59
$
30,441
880
0.4
1
-
-
40
8
$
34.59
$
1,384
40
0.0
10,203
1,444
-
$
2,299,287
66,469
32.0
1,000,000-4,999,999
National Totals
Disinfecting Ground Water Only CWSs
<500
500-9,999
10,000-99,999
838
15,027
793
5
-
$
34.59
$
281,999
8,152
3.9
10,274
-
237
5
2
$
34.59
$
1,817,958
52,554
25.3
1,375
-
11
10
2
$
34.59
$
479,377
13,858
6.7
52
-
2
15
2
$
34.59
$
27,880
806
0.4
6
-
0
20
2
$
34.59
$
4,402
127
0.1
12,545
15,027
1,042
$
2,611,615
75,498
36.3
100,000-499,999
> 500,000
National Totals
Surface Water and Mixed NTNCWSs
<500
-
589
-
5
-
$
34.59
$
-
-
500-3,300
-
189
-
5
2
$
34.59
$
13,083
378
0.2
3,301-9,999
-
53
-
5
2
$
34.59
$
3,667
106
0.1
10,000-49,999
6
-
-
10
2
$
34.59
$
2,076
60
0.0
50,000-249,999
2
-
-
10
2
$
34.59
$
692
20
250,000-999,999
-
-
-
15
2
N/A
$
-
-
-
0.0
-
1,000,000-4,999,999
-
-
-
20
2
N/A
$
-
-
-
-
-
-
30
2
N/A
$
-
-
-
National Totals
8
831
-
$
19,517
564
0.3
Disinfecting Ground Water Only NTNCWSs
<500
-
6,174
1,241
5
-
$
34.59
$
214,658
6,205
3.0
500-9,999
-
1,125
268
5
2
$
34.59
$
124,134
3,589
1.7
10,000-99,999
4
-
1
10
2
$
34.59
$
1,942
56
0.0
100,000-499,999
-
-
0
15
2
$
34.59
$
61
2
0.0
> 500,000
-
-
-
20
2
N/A
$
-
-
-
National Totals
Grand Totals
Notes:
4
22,760
Detail may not add due to rounding.
7,300
1,510
$
340,795
9,852
24,602
2,552
$
5,271,215
152,382
4.7
73.3
Shaded areas represent systems that are not subject to IDSE requirements.
1 FTE=2,080 hours (40 hours/week; 52 weeks/year).
Burden estimates take into account the results of previous consultations with water industry representatives.
Sources:
(A) Exhibits 8a and 8b, sum of columns E-G.
(B) From Exhibit 8a and 8b, column A (for NTNCWSs <10,000) or column A multiplied by column B (for CWSs <500)
(C), (D) Labor hours assumed to take one half the hours required to prepare the IDSE report.
(E) Labor rates from 2013 Bureau of Labor Statistics SOC Code 51-8031, "Local Government - Water and Liquid Waste Treatment Plant and System Operators."
DDBP/Chem/Rads ICR - Stage 2 D/DBPR
C-13
December 2015
Exhibit 13a: System Costs for Additional Routine Monitoring
Stage 1 Sampling
Size Category
Total Systems
A
Stage 2 Sampling
Routine
Samples Per
Plants Per
System
Total Plants
Plant
B
C=A*B
D
Total Stage 1
Samples
E = C*D
Routine
Samples Per
System
F
Total Stage 2
Samples
G
Subpart H and Mixed CWSs
<500
3,022
1.0
3,172
1
3,172
1
3,022
500-3,300
3,667
1.0
3,704
4
14,816
4
14,669
3,301-9,999
2,214
1.1
2,368
4
9,474
8
17,712
10,000-49,999
1,986
1.1
2,145
16
34,314
16
31,776
50,000-249,999
629
1.4
864
16
13,830
32
20,128
250,000-999,999
105
1.7
178
16
2,844
48
5,040
22
3.7
81
16
1,291
64
1,408
1
3.7
4
16
59
80
1,000,000-4,999,999
National Totals
11,647
100% Ground Water CWSs (Disinfecting)
<500
15,865
500-9,999
10,000-99,999
100,000-499,999
> 500,000
National Totals
12,515
79,800
80
93,835
1.1
18,016
1
18,016
10,274
1.7
17,743
1
17,743
2
20,548
1,375
3.8
5,209
4
20,837
16
22,001
52
12.3
637
4
2,550
24
1,249
6
12.3
77
4
308
32
27,572
41,682
1
59,453
15,865
201
59,864
Subpart H and Mixed NTNCWSs
<500
589
1.0
589
1
589
1
589
500-3,300
189
1.0
189
4
756
4
756
53
1.0
53
4
212
8
424
10,000-49,999
6
1.0
6
16
96
16
96
50,000-249,999
2
1.0
2
16
32
32
64
250,000-999,999
-
1.0
-
16
-
48
-
1,000,000-4,999,999
-
1.0
-
16
-
64
-
1.0
-
16
-
80
3,301-9,999
National Totals
839
839
100% Ground Water NTNCWSs (Disinfecting)
<500
6,174
1.0
500-9,999
1,685
1,929
6,174
1
6,174
1
6,174
1,125
1.0
1,125
1
1,125
2
2,251
10,000-99,999
4
1.0
4
4
17
16
69
100,000-499,999
-
1.0
-
4
-
24
-
> 500,000
-
1.0
-
4
-
32
National Totals
Grand Totals
Notes:
-
7,304
7,304
7,317
8,494
47,362
62,341
148,255
164,122
1) Detail may not added due to rounding.
2) Systems will incur routine monitoring costs only for sites and samples that are required beyond those required under the
Stage 1 DBPR (i.e., systems that, as a result of the IDSE, only move sample sites will incur no additional costs).
3) 1 FTE = 2,080 hours (40 hours/week; 52 weeks/year).
4) Burden estimates take into account the results of the May 2015 consultations with water industry representatives.
Sources: (A) From Exhibits 8a and 8b, column A.
(B) Number of plants per system based analysis of data from 2006 CWSS.
(D) Routine samples per plant from the 1998 Stage 1 Rule.
(F) Number of routine samples per system based on Stage 2 rule requirements (population-based approach). Number of
samples may be less for SW systems serving < 5,000 and GW systems serving < 500 if high TTHM and HAA5 locations are
the same.
DDBP/Chem/Rads ICR - Stage 2 D/DBPR
C-14
December 2015
Exhibit 13a: System Costs for Additional Routine Monitoring, continued
Size Category
Total Additional
Samples Required
for Stage 2
Monitoring
H = G- E
Hours per
Sample
I
Percent of
Systems with
Separate TTHM
and HAA5 Sites
J
Sampling Cost
per Labor Hour
K
Cost per
Sample
L
Additional
Labor Costs for
Systems with
Two Sites
N = I*J*K*A
Total Labor
Cost
M = H*I*K
Annual Total
Cost
P = M+N+O
Total O&M Cost
O = H*L
Annual Total
Burden (Hours)
Q = (M+N)/K
Annual Total
Burden (FTEs)
R = Q/2080
0.6
Subpart H and Mixed CWSs
<500
(149)
1.5
32% $
34.59
$
304
$
(7,749) $
49,483
$
(45,379) $
(3,645)
1,206
500-3,300
(147)
1.5
30% $
34.59
$
304
$
(7,644) $
56,349
$
(44,764) $
3,941
1,408
0.7
8,238
1.5
0% $
34.59
$
304
$
$
-
$
2,930,662
12,357
5.9
10,000-49,999
(2,538)
1.5
0% $
34.59
$
266
$
(131,691) $
-
$
(3,807)
(1.8)
50,000-249,999
6,298
1.5
0% $
34.59
$
266
$
326,777
$
-
$
1,674,408
$
2,001,184
9,447
4.5
250,000-999,999
2,196
1.5
0% $
34.59
$
266
$
113,932
$
-
$
583,788
$
697,719
3,294
1.6
117
1.5
0% $
34.59
$
266
$
6,088
$
-
$
31,196
$
37,284
176
0.1
21
1.5
0% $
34.59
$
266
$
1,107
$
-
$
5,672
$
6,779
32
0.0
$
728,278
$
105,832
$
4,033,339
$
4,867,449
24,113
11.6
(111,618) $
3,301-9,999
1,000,000-4,999,999
National Totals
14,036
100% Ground Water CWSs (Disinfecting)
(2,151)
<500
427,458
2,503,204
$
(674,785) $
1.5
2% $
34.59
$
304
$
17,598
$
(747,656)
(2,718)
(1.3)
500-9,999
2,805
1.5
0% $
34.59
$
304
$
145,571
$
-
$
852,469
$
998,040
4,208
2.0
10,000-99,999
1,164
1.5
0% $
34.59
$
266
$
60,403
$
-
$
309,504
$
369,906
1,746
0.8
(1,301)
1.5
0% $
34.59
$
266
$
(67,507) $
-
$
(413,414)
(1,952)
(0.9)
(107)
1.5
0% $
34.59
$
266
$
(5,541) $
-
$
(28,390) $
(33,931)
(160)
(0.1)
$
21,308
$
17,598
$
134,039
$
172,946
1,125
0.5
0.0
100,000-499,999
> 500,000
National Totals
411
(653,636) $
(806,476)
(345,907) $
Subpart H and Mixed NTNCWSs
<500
0
1.5
0% $
34.59
$
304
$
-
$
-
$
-
$
-
0
500-3,300
0
1.5
0% $
34.59
$
304
$
-
$
-
$
-
$
-
0
0.0
212
1.5
0% $
34.59
$
304
$
11,000
$
-
$
64,418
$
75,418
318
0.2
3,301-9,999
10,000-49,999
0
1.5
0% $
34.59
$
-
$
-
$
-
$
-
0
0.0
50,000-249,999
32
1.5
0% $
34.59
$
266
$
1,660
$
-
$
8,508
$
10,168
48
0.0
250,000-999,999
0
1.5
0%
N/A
$
266
$
-
$
-
$
-
$
-
0
0.0
1,000,000-4,999,999
0
1.5
0%
N/A
$
266
$
-
$
-
$
-
$
-
0
0.0
0
1.5
0%
N/A
$
266
$
-
$
-
$
-
$
-
0
0.0
$
12,661
$
-
$
72,926
$
85,586
366
0.2
National Totals
266
244
100% Ground Water NTNCWSs (Disinfecting)
0
<500
500-9,999
$
1.5
0% $
34.59
$
304
$
-
$
-
$
-
$
-
0
0.0
1,125
1.5
0% $
34.59
$
304
$
58,395
$
-
$
341,961
$
400,356
1,688
0.8
52
1.5
0% $
34.59
$
266
$
2,682
$
-
$
13,742
$
16,423
78
0.0
100,000-499,999
0
1.5
0% $
34.59
$
266
$
-
$
-
$
-
$
-
0
0.0
> 500,000
0
1.5
0%
N/A
$
266
$
-
$
-
$
-
$
-
0
0.0
1,177
$
61,077
$
-
$
355,703
$
416,779
1,766
0.8
15,867
$
823,324
$
123,431
$
4,596,006
$
5,542,761
27,369
13.2
10,000-99,999
National Totals
Grand Totals
Notes:
1) Detail may not added due to rounding.
2) Systems will incur routine monitoring costs only for sites and samples that are required beyond those required under the Stage 1 DBPR (i.e., systems that, as a result of the IDSE, only move sample sites
will incur no additional costs).
3) FTE = 2,080 hours (40 hours/week; 52 weeks/year).
4) Burden estimates take into account the results of the May 2015 consultations with water industry representatives.
5) Columns N and O for SW < 3,300 and GW < 500 add in an hour extra sampling time for systems which only take 1 dual sample but at two different sites. This additional labor is calculated by A*K*L
Sources:
(H), (M), (N), (O), (P) The number of samples required may decrease for some systems in the transition from the Stage 1 to Stage 2 DBPR, resulting in a cost savings.
(I) Labor hours per sample reflects EPA estimate.
(J) Estimated percent of systems that will have only one sampling site because their high TTHM and HAA5 site occur at the same location based on analysis of Information Collection Rule data from 4 distribution system
locations .
(K) Labor rates from 2013 Bureau of Labor Statistics SOC Code 51-8031, "Local Government - Water and Liquid Waste Treatment Plant and System Operators."
(L) Laboratory cost for TTHM and HAA5 analyses per sample based on costs incurred for the Information Collection Rule. $11 shipping is added for large systems as many large systems have in-house capacity and will not
have to ship. $45 is added for small systems because of higher shipping charges and fewer samples (no bulk discounts) and because fewer small systems have in-house labs. Laboratory costs per sample are inflated to
2013$.
DDBP/Chem/Rads ICR - Stage 2 D/DBPR
C-15
December 2015
Exhibit 13b: System Costs for Routine Monitoring for Systems Adding Disinfection to Comply with the GWR
Number of
Systems
Increasing
Disinfectant
Dose for GWR
Increased Number of
Samples per System
from Stage 1 DBPR to
Stage 2 DBPR (for
systems adding
disinfection)
Hours Per
Sample
Sampling
Cost Per
Labor Hour
Cost Per
Sample
Total Costs
Total
Burden
(Hours)
Total
Burden
(FTEs)
A
B
C
D
E
F = A*B*(C*D+E)
G = A*B*C
H = G/2080
Size Category
Surface Water and Mixed CWSs
<500
-
1
1.5
$
34.59
$
304
$
-
-
-
500-3,300
-
4
1.5
$
34.59
$
304
$
-
-
-
3,301-9,999
-
8
1.5
$
34.59
$
304
$
-
-
-
10,000-49,999
-
16
1.5
$
34.59
$
266
$
-
-
-
50,000-249,999
-
32
1.5
$
34.59
$
266
$
-
-
-
250,000-999,999
-
48
1.5
$
34.59
$
266
$
-
-
-
1,000,000-4,999,999
-
64
1.5
$
34.59
$
266
$
-
-
-
-
80
1.5
$
34.59
$
266
$
-
-
-
National Totals
-
$
-
-
-
Disinfecting Ground Water Only CWSs
793
1
1.5
$
34.59
$
304
$
282,079
1,189
0.57
237
2
1.5
$
34.59
$
304
$
168,402
710
0.34
11
16
1.5
$
34.59
$
266
$
54,669
258
0.12
100,000-499,999
2
24
1.5
$
34.59
$
266
$
12,952
61
0.03
> 500,000
0
32
1.5
$
34.59
$
266
$
849
4
0.00
$
518,952
2,223
1.07
<500
500-9,999
10,000-99,999
National Totals
1,042
Surface Water and Mixed NTNCWSs
<500
-
1
1.5
$
34.59
$
304
$
-
-
-
500-3,300
-
4
1.5
$
34.59
$
304
$
-
-
-
3,301-9,999
-
8
1.5
$
34.59
$
304
$
-
-
-
10,000-49,999
-
16
1.5
$
34.59
$
266
$
-
-
-
50,000-249,999
-
32
1.5
$
34.59
$
266
$
-
-
-
250,000-999,999
-
48
1.5
N/A
$
266
$
-
-
-
1,000,000-4,999,999
-
64
1.5
N/A
$
266
$
-
-
-
-
80
1.5
N/A
$
266
$
-
-
-
National Totals
-
$
Disinfecting Ground Water Only NTNCWSs
1,241
<500
-
-
-
1
1.5
$
34.59
$
304
$
441,509
1,862
0.90
268
2
1.5
$
34.59
$
304
$
190,354
803
0.39
10,000-99,999
1
16
1.5
$
34.59
$
266
$
6,648
31
0.02
100,000-499,999
0
24
1.5
$
34.59
$
266
$
904
4
0.00
32
1.5
N/A
$
266
$
-
-
0.00
$
639,414
2,700
1.30
1,158,366
4,923
2.37
500-9,999
> 500,000
National Totals
1,510
Grand Totals
2,552
$
Note: Burden estimates take into account the results of the May 2015 consultations with water industry representatives.
(A) Best estimate based on proposed Ground Water Rule.
(B) From Exhibit 13a, column F.
(C) Labor hours per sample reflects EPA estimate.
(D) Labor rates from 2013 Bureau of Labor Statistics SOC Code 51-8031, "Local Government - Water and Liquid Waste Treatment Plant and System Operators."
(E) Laboratory cost for TTHM and HAA5 analyses per sample based on costs incurred for the Information Collection Rule. $11 shipping is added for large systems as
many large systems have in-house capacity and will not have to ship. $45 is added for small systems because of higher shipping charges and fewer samples (no bulk
discounts) and because fewer small systems have in-house labs. Laboratory costs per sample are inflated to 2013$.
DDBP/Chem/Rads ICR - Stage 2 D/DBPR
C-16
December 2015
Exhibit 13c: Total System Costs for Routine Monitoring
Size Category
Total
Additional
Compliance
Samples per
Year
A
Total Labor
Costs
Total Sampling
Costs
Total Costs
B
C
D = B+C
Total
Burden
(FTEs)
F= E/2080
Total
Burden
(Hours)
E
Surface Water and Mixed CWSs
<500
(149) $
41,734
$
(45,379) $
(3,645)
1,206
500-3,300
(147) $
48,705
$
(44,764) $
3,941
1,408
0.7
427,458
$
2,930,662
12,357
5.9
8,238
3,301-9,999
$
(3,807)
(1.8)
6,298
$
326,777
$
1,674,408
$
2,001,184
9,447
4.5
250,000-999,999
2,196
$
113,932
$
583,788
$
697,719
3,294
1.6
117
$
6,088
$
31,196
$
37,284
176
0.1
21
$
1,107
$
5,672
$
6,779
32
0.0
14,036
$
834,110
$
4,033,339
$
4,867,449
24,113
11.6
1,000,000-4,999,999
National Totals
Disinfecting Ground Water Only CWSs
(1,358) $
<500
(131,691) $
$
50,000-249,999
10,000-49,999
(2,538) $
2,503,204
(1,529)
(0.7)
3,279
$
170,134
$
996,309
$
1,166,443
4,918
2.4
10,000-99,999
1,336
$
69,329
$
355,245
$
424,575
2,004
1.0
(400,462)
(1,890)
(0.9)
(156)
(0.1)
(1,260) $
(104) $
> 500,000
National Totals
1,892
(65,392) $
(5,402) $
(412,700) $
(806,476)
500-9,999
100,000-499,999
(52,876) $
(674,785) $
0.6
(335,070) $
(465,577)
(27,680) $
(33,082)
$
115,793
$
576,104
$
691,897
3,347
1.6
Surface Water and Mixed NTNCWSs
<500
-
$
-
$
-
$
-
-
500-3,300
-
$
-
$
-
$
-
-
212
$
11,000
$
64,418
$
75,418
318
3,301-9,999
0.2
-
$
-
$
-
$
-
-
32
$
1,660
$
8,508
$
10,168
48
250,000-999,999
-
$
-
$
-
$
-
-
-
1,000,000-4,999,999
-
$
-
$
-
$
-
-
-
-
$
-
$
-
$
-
-
244
$
12,661
$
72,926
$
85,586
366
0.2
Disinfecting Ground Water Only NTNCWSs
1,241 $
<500
10,000-49,999
50,000-249,999
National Totals
0.0
-
64,397
$
377,112
$
441,509
1,862
0.9
1,660
$
86,159
$
504,550
$
590,710
2,491
1.2
73
$
3,767
$
19,304
$
23,071
109
0.1
100,000-499,999
3
$
148
$
756
$
904
4
0.0
> 500,000
-
$
-
$
-
$
-
-
2,977
$
154,472
$
901,722
$
1,056,193
4,466
2.1
19,149
$
1,117,036
$
5,584,091
$
6,701,127
32,292
15.5
500-9,999
10,000-99,999
National Totals
Grand Totals
-
Notes:
(A) Shows the difference in total compliance monitoring samples from Stage 1 to Stage 2 for disinfecting systems and
systems predicted to install disinfection for the GWR. For disinfecting systems, derived from Exhibit 13a, column H.
For systems installing disinfection for the GWR, derived from Exhibit 13b, product of columns A and B. Note that the
number of samples required may decrease in the transition from Stage 1 to Stage 2.
(B) Labor costs based on burden estimates that take into account the results of the May 2015 consultations with water
industry representatives.
Sources:
(A) Sum of column H from Exhibit 13a and column (A) times column (B) from Exhibit 13b
(B) - (E) Summed from Exhibits 13a - 13b.
DDBP/Chem/Rads ICR - Stage 2 D/DBPR
C-17
December 2015
Exhibit 14: Total Systems Costs for Operational Evaluations
Size
Category
Estimated No. of
Locations/yr that
exceed Operational
Evaluation Levels
Reporting
Hours per
Operational
Evaluation
Cost per
Labor Hour
A
B
C
Total Cost
Total
Burden
(Hours)
Total
Burden
(FTEs)
D = A*B*C
E = A*B
F=E/2,080
Surface Water and Mixed CWSs
<500
12
24
$
34.59
$
9,962
288
500-3,300
28
24
$
34.59
$
23,246
672
0.3
3,301-9,999
57
24
$
34.59
$
47,322
1,368
0.7
10,000-49,999
199
40
$
34.59
$ 275,352
7,960
3.8
50,000-249,999
120
40
$
34.59
$ 166,042
4,800
2.3
250,000-999,999
27
40
$
34.59
$
37,359
1,080
0.5
1,000,000-4,999,999
8
40
$
34.59
$
11,069
320
0.2
1
40
$
34.59
$
1,384
40
0.0
$ 571,737
16,528
7.9
National Totals
452
0.1
Disinfecting Ground Water Only CWSs
<500
-
24
$
34.59
$
-
-
-
500-9,999
-
24
$
34.59
$
-
-
-
10,000-99,999
-
40
$
34.59
$
-
-
-
100,000-499,999
-
40
$
34.59
$
-
-
-
> 500,000
-
40
$
34.59
$
National Totals
-
Surface Water and Mixed NTNCWSs
<500
-
24
$
34.59
$
500-3,300
-
24
$
34.59
$
3,301-9,999
-
24
$
34.59
10,000-49,999
-
40
$
50,000-249,999
-
40
$
250,000-999,999
-
40
1,000,000-4,999,999
-
-
National Totals
-
Disinfecting Ground Water Only NTNCWSs
<500
-
-
-
-
-
-
-
-
-
-
$
-
-
-
34.59
$
-
-
-
34.59
$
-
-
-
N/A
$
-
-
-
40
N/A
$
-
-
-
40
N/A
$
-
-
-
-
-
$
$
-
-
24
$
34.59
$
-
-
-
500-9,999
-
24
$
34.59
$
-
-
-
10,000-99,999
-
40
$
34.59
$
-
-
-
100,000-499,999
-
40
$
34.59
$
-
-
-
> 500,000
-
40
N/A
-
-
National Totals
-
Grand Totals
452
$
$
-
-
-
$ 571,737
-
-
16,528
7.9
Notes:
Detail may not add to totals due to independent rounding.
1 FTE = 2,080 hours (40 hours/week; 52 weeks/year).
(B) Burden estimates take into account the results of the May 2015 consultations with water industry
representatives.
Sources:
(A) Based on modeling performed with DBP occurrence data from the 1996 Information Collection Rule, as
described in Exhibit H.10 of Appendix H of the Economic Analysis for the Stage 2 DBPR.
(B) Hours estimated by EPA to complete Operational Evaluations. EPA expects it to take less time for small
systems given they have simpler distribution systems.
(C) Labor rates from 2013 Bureau of Labor Statistics SOC Code 51-8031, "Local Government - Water and
Liquid Waste Treatment Plant and System Operators."
DDBP/Chem/Rads ICR - Stage 2 D/DBPR
C-18
December 2015
Exhibit 15: State Costs for Rule Implementation, IDSE, and Routine Monitoring
Cost per
Labor Hour
A
FTEs per
State
B
Hours per
National
State
Cost per State Total FTEs
C=B*2,080
D=A*C
E=B*57
National Total
Hours
F=C*57
National Total
Cost
G=D*57
Implementation Activities
Public Notification
Regulation Adoption and Program Development
Training State Staff
Training PWS Staff and Technical Assistants
Updating Data Management System
Totals
$
$
$
$
$
45.60
45.60
45.60
45.60
45.60
0.10
1.00
0.25
1.00
0.25
2.60
208
2,080
520
2,080
520
5,408
$
$
$
$
$
$
9,485
94,848
23,712
94,848
23,712
246,605
5.7
57.0
14.3
57.0
14.3
148.2
11,856
118,560
29,640
118,560
29,640
308,256
Annual Routine Monitoring Activities
Recordkeeping and Compliance Tracking
Totals
$
45.60
0.40
0.40
832
832
$
$
37,939
37,939
22.8
22.8
47,424
47,424
$ 2,162,534.40
$
2,162,534
3.00
6,240
284,544
171.0
355,680
16,219,008
Grand Totals
Notes:
Sources:
$
$
$
$
$
$
540,633.60
5,406,336
1,351,584
5,406,336
1,351,584
14,056,474
All states/primacy agencies are assumed to incur some costs for each activity.
Implementation and IDSE activities were completed during a previous ICR period.
Burden estimates for routine monitoring activities take into account the results of the May 2015 consultations with water industry representatives. Burden
estimates for implementation activities take into account the results of previous consultations with water industry representatives.
(A) State labor rates based on 2013 Bureau of Labor Statistics SOC Code 19-2041, "State Government - Environmental Scientists and Specialists,
Including Health."
(B) FTEs per State/Primacy Agency based on EPA experience with previous regulations.
DDBP/Chem/Rads ICR - Stage 2 D/DBPR
C-19
December 2015
Exhibit 16: State Costs for Monitoring Plans
(Activity Completed in a Previous ICR Period)
Size Category
Number of Hours to
Average State
Review Each
Number of Systems
Employee
Developing Monitoring System's Monitoring
Hourly Wage
Plan
Plan, by Category
A
B
Average Total
Costs to States
Average
Total Costs
per State
Total
Burden
D = A*B*C
E = D/57
F = A*B
C
Surface Water and Mixed CWSs
<500
1,579
-
$
45.60
$
-
$
-
500-3,300
3,667
-
$
45.60
$
-
$
-
-
3,301-9,999
2,214
4
$
45.60
$
403,834
$
7,085
8,856
10,000-49,999
1,986
8
$
45.60
$
724,493
$
12,710
15,888
50,000-249,999
629
8
$
45.60
$
229,459
$
4,026
5,032
250,000-999,999
105
8
$
45.60
$
38,304
$
672
840
22
8
$
45.60
$
8,026
$
141
176
1
8
$
45.60
365
$
6
8
1,404,480 $ 24,640.00
30,800
1,000,000-4,999,999
National Totals
10,203
$
$
Ground Water Only CWSs
<500
500-9,999
10,000-99,999
100,000-499,999
> 500,000
National Totals
1,630
-
$
45.60
$
-
$
-
-
10,511
-
$
45.60
$
-
$
-
-
1,386
-
$
45.60
$
-
$
-
-
54
-
$
45.60
$
-
$
-
-
6
-
$
45.60
13,587
$
$
-
$
$
-
-
Surface Water and Mixed NTNCWSs
<500
-
-
$
45.60
$
-
$
-
-
500-3,300
-
-
$
45.60
$
-
$
-
-
3,301-9,999
-
4
$
45.60
$
-
$
-
-
10,000-49,999
6
8
$
45.60
$
2,189
$
38
48
50,000-249,999
2
8
$
45.60
$
730
$
13
16
250,000-999,999
-
8
$
45.60
$
-
$
-
-
1,000,000-4,999,999
-
8
$
45.60
$
-
$
-
-
-
8
$
45.60
National Totals
8
$
-
$
-
-
$
2,918
$
51
64
Disinfecting Ground Water Only NTNCWSs
<500
1,241
-
$
45.60
$
-
$
-
-
268
-
$
45.60
$
-
$
-
-
10,000-99,999
6
-
$
45.60
$
-
$
-
-
100,000-499,999
0
-
$
45.60
$
-
$
-
-
> 500,000
-
-
$
45.60
$
-
$
-
-
1,514
$
-
$
-
-
25,312
$
1,407,398
$
24,691
30,864
500-9,999
National Totals
Grand Totals
Sources:
DDBP/Chem/Rads ICR - Stage 2 D/DBPR
[A]
[B]
From column A in Exhibit 12
[C]
State labor rates based on 2013 Bureau of Labor Statistics SOC Code 19-2041, "State Government - Environmental Scientists and
Specialists, Including Health."
Burden estimates based on EPA experience with other regulations, and take into account the results of previous consultations with
water industry representatives.
C-20
December 2015
Exhibit 17: State IDSE Costs
(Activity Completed in a Previous ICR Period)
Number of Systems Conducting IDSE, by
Category
Size Category
Number of Hours to Work with Systems
on IDSE and Review IDSE Reports
Standard
Monitoring
Program
SystemSpecific
Study
40/30
Certification
Standard
Monitoring
Program
SystemSpecific
Study
40/30
Certification
Average State
Employee
Hourly Wage
Average Total Costs
to States
Average
Total Costs
per State
Total
Burden
Average
Burden/
State
A
B
C
D
E
F
G
H = G*(A*D+B*E+C*F)
I = H / 57
J = A*D +
B*E + C*F
K = J / 57
Surface Water and Mixed CWSs
<500
1,579
-
-
4
12
0.5 $
45.60
$
287,927
$
5,051
6,314
110.8
500-3,300
3,421
-
246
4
12
0.5 $
45.60
$
629,636
$
11,046
13,808
242.2
3,301-9,999
2,042
-
172
4
12
0.5 $
45.60
$
376,382
$
6,603
8,254
144.8
10,000-49,999
1,708
-
278
8
16
0.5 $
45.60
$
629,417
$
11,042
13,803
242.2
50,000-249,999
513
28
88
8
16
0.5 $
45.60
$
209,578
$
3,677
4,596
80.6
250,000-999,999
81
9
15
10
24
0.5 $
45.60
$
47,128
$
827
1,034
18.1
1,000,000-4,999,999
17
2
3
12
32
0.5 $
45.60
$
12,289
$
216
270
4.7
1
-
-
12
32
0.5 $
45.60
$
547
$
10
12
0.2
9,362
39
802
$
2,192,904
$
38,472
48,090
843.7
National Totals
Ground Water Only CWSs
<500
500-9,999
10,000-99,999
100,000-499,999
> 500,000
National Totals
838
-
-
4
4
0.5 $
45.60
$
152,761
$
2,680
3,350
58.8
1,930
-
8,344
4
4
0.5 $
45.60
$
542,305
$
9,514
11,893
208.6
243
-
1,132
8
8
0.5 $
45.60
$
114,474
$
2,008
2,510
44.0
16
2
34
8
8
0.5 $
45.60
$
7,353
$
129
161
2.8
1
-
5
12
16
0.5 $
45.60
$
814
$
14
18
0.3
3,028
2
9,515
$
817,708
$
14,346
17,932
314.6
-
Surface Water and Mixed NTNCWSs
<500
-
-
-
-
-
- $
-
$
-
$
-
-
500-3,300
-
-
-
-
-
- $
-
$
-
$
-
-
-
3,301-9,999
-
-
-
-
-
- $
-
$
-
$
-
-
-
10,000-49,999
5
-
1
8
8
0.5 $
45.60
$
1,847
$
32
41
0.7
50,000-249,999
2
-
-
8
8
0.5 $
45.60
$
730
$
13
16
0.3
250,000-999,999
-
-
-
10
12
0.5 $
45.60
$
-
$
-
-
-
1,000,000-4,999,999
-
-
-
12
16
0.5 $
45.60
$
-
$
-
-
-
-
-
-
12
16
0.5 $
45.60
$
-
$
-
National Totals
7
-
1
$
2,576
$
45
-
-
57
1.0
-
Disinfecting Ground Water Only NTNCWSs
<500
-
-
-
-
-
- $
-
$
-
$
-
-
500-9,999
-
-
-
-
-
- $
-
$
-
$
-
-
-
10,000-99,999
0
-
4
8
8
0.5 $
45.60
$
254
$
6
0.1
100,000-499,999
-
-
-
8
8
0.5 $
45.60
$
-
$
-
-
-
> 500,000
-
-
-
12
16
0.5 $
45.60
$
-
$
-
-
-
National Totals
0
-
4
$
254
$
4
6
0.1
12,397
41
10,322
$
3,013,442
$
52,867
66,084
1,159.4
Grand Totals
4
Sources:
A, B, C
D, E, F
From columns E, F, and G in Exhibits 8a and 8b
Burden estimates based on EPA experience with other regulations, and take into account the results of previous consultations with water industry representatives.
DDBP/Chem/Rads ICR - Stage 2 D/DBPR
C-21
December 2015
Exhibit 18: State Operational Evaluation Costs
Size Category
Number of
Operational
Evaluation
Level
Exceedances
per Year
Number of
Hours to
Review
Operational
Evaluations
per System
Average
State
Employee
Hourly
Wage
A
B
C
Average Total
Average
Costs to
Total Costs
States
per State
D = A*B*C
E = D/57
Total
Burden
F = A*B
Surface Water and Mixed CWSs
<500
12
4
$
45.60
$
2,189
$
38
48
500-3,300
28
6
$
45.60
$
7,661
$
134
168
57
6
$
45.60
$
15,595
$
274
342
10,000-49,999
199
8
$
45.60
$
72,595
$
1,274
1,592
50,000-249,999
120
8
$
45.60
$
43,776
$
768
960
250,000-999,999
27
8
$
45.60
$
9,850
$
173
216
64
3,301-9,999
1,000,000-4,999,999
8
8
$
45.60
$
2,918
$
51
1
8
$
45.60
$
365
$
6
8
$
154,949
$
2,718
3,398
National Totals
452
Ground Water Only CWSs
<500
-
4
$
45.60
$
-
$
-
-
500-9,999
-
6
$
45.60
$
-
$
-
-
10,000-99,999
-
8
$
45.60
$
-
$
-
-
100,000-499,999
-
8
$
45.60
$
-
$
-
-
> 500,000
-
8
$
45.60
$
-
$
-
-
National Totals
-
$
-
$
-
-
Surface Water and Mixed NTNCWSs
<500
-
4
$
45.60
$
-
$
-
-
500-3,300
-
6
$
45.60
$
-
$
-
-
3,301-9,999
-
6
$
45.60
$
-
$
-
-
10,000-49,999
-
8
$
45.60
$
-
$
-
-
50,000-249,999
-
8
$
45.60
$
-
$
-
-
250,000-999,999
-
8
$
45.60
$
-
$
-
-
1,000,000-4,999,999
-
8
$
45.60
$
-
$
-
-
-
8
$
45.60
$
-
$
-
National Totals
-
$
-
$
-
-
-
Disinfecting Ground Water Only NTNCWSs
<500
-
4
$
45.60
$
-
$
-
-
500-9,999
-
6
$
45.60
$
-
$
-
-
10,000-99,999
-
8
$
45.60
$
-
$
-
-
100,000-499,999
-
8
$
45.60
$
-
$
-
-
> 500,000
-
8
$
45.60
$
-
$
-
-
National Totals
Grand Totals
-
$
-
$
-
-
452
$
154,949
$
2,718
3,398
Sources:
[A]
[B]
[C]
DDBP/Chem/Rads ICR - Stage 2 D/DBPR
From column A in Exhibit 14.
Burden estimates based on EPA experience with other regulations and take into account the results of the
May 2015 consultations with water industry representatives.
State labor rates based on 2013 Bureau of Labor Statistics SOC Code 19-2041, "State Government Environmental Scientists and Specialists, Including Health."
C-22
December 2015
Exhibit 19
Stage 2 DBPR - Summary of Original and Revised Burden Estimates
No changes in burden estimates based on May 2015 consultations.
DDBP/Chem/Rads ICR - Stage 2 D/DBPR
C-23
December 2015
Appendix D
Chemical Phase Regulation Spreadsheets
Chems Total
Exhibit 1a - Chemical Phase Rules PWS Burden and Cost Summary
Avg. Annual
Respondents
Avg. Annual
Responses
Annual
Burden
Annual Burden
(Labor) Cost
Monitoring
137,498
507,063
356,602
$12,335,586
$73,982,665
N/A
Total
137,498
507,063
356,602
$12,335,586
$73,982,665
N/A
Requirement
Annual O&M
Annual
Cost
Capital Cost
Exhibit 1b - Chemical Phase Rules Primacy Agency Burden and Cost Summary
Avg. Annual
Respondents
Avg. Annual
Responses
Annual
Burden
Annual Burden
(Labor) Cost
Reporting and
Recordkeeping
57
549,992
1,354,532
$61,766,659
N/A
N/A
Total
57
549,992
1,354,532
$61,766,659
N/A
N/A
Requirement
Annual O&M
Annual
Cost
Capital Cost
Note: State burden is based on original State Workload Model, minus 28,210 hours associated with arsenic.
This burden is assumed to remain the same from year to year and does not fluctuate with the number of
responses.
DDBP/Chem/Rads ICR - Chemical Phase Regulation
D-1
December 2015
Exhibit 2 - Monitoring Summary
Compound
Phase I
Phase I VOCs
Annual Burden
Hours
Labor Cost
Annual Cost
O&M
Total Cost
Annual
Responses
115,472
$
3,994,417
$
4,987,116
$
8,981,534
45,213
6,591
13,532
13,532
14,435
13,315
83,917
953
13,013
159,290
27,097
$
$
$
$
$
$
$
$
$
$
$
$
227,988
468,113
468,113
499,352
460,605
2,902,863
32,956
450,156
5,510,145
937,347
$
$
$
$
$
$
$
$
$
$
$
$
1,275,044
392,695
392,695
418,901
858,660
2,705,757
20,479
839,181
6,903,411
8,934,804
31,453,216
$
$
$
$
$
$
$
$
$
$
$
$
1,503,031
860,807
860,807
918,253
1,319,265
5,608,620
53,435
1,289,338
12,413,556
8,934,804
32,390,562
2,063
21,132
21,132
22,561
20,784
145,335
1,100
20,311
254,418
28,917
20,811
13,066
$
451,995
$
379,174
$
831,168
20,390
-
$
Phase II
Arsenic*
Asbestos
Cadmium
Chromium
Fluoride
Mercury
Nitrate
Nitrite
Selenium
Subtotal: Phase II IOCs
Phase II VOCs
Phase II SOCs
Phase IIb
Barium
Pentachlorophenol
-
$
-
$
-
7,369
Phase V
Adipates, Phthalates
PAH Benzo(a)pyrene
Dioxin
Diquat, Endothall, Glyphosate
Oxamyl
Dinoseb
Endrin, hexachlorobenzene, and
hexachlorocyclopentadiene
Dalapon
Picloram
Simazine
Subtotal: Phase V SOCs
13,716
6,362
3,342
-
$
$
$
$
$
$
474,448
220,079
115,599
-
$
$
$
$
$
$
6,633,491
2,128,001
9,231,110
2,154,997
-
$
$
$
$
$
$
7,107,939
2,128,001
9,451,189
2,270,596
-
21,056
6,408
4,835
4,900
6,102
6,426
23,419
$
$
$
$
$
810,126
$
$
$
$
$
20,147,599
$
$
$
$
$
20,957,725
6,407
56,134
Phase V VOCs
Phase V IOCs, except sulfate
18,257
$
$
631,556
$
$
1,177,346
$
$
1,808,902
45,213
28,599
Grand Total
356,602
*Now considered separately in the Arsenic Rule
$
12,335,586
$
73,982,665
$
86,318,251
507,063
DDBP/Chem/Rads ICR - Chemical Phase Regulation
D-2
December 2015
Exhibit 3 - Number of Non-Purchased Systems
Number of Non-Purchased Systems
CWSs
A
NTNCWSs
B
GW
SW
8,218
122
6,188
145
1,519
51
770
32
90
15
7
0
0
0
0
0
0
0
16,792
365
CWSs + NTNCWSs
C=A+B
GW
SW
19,092
558
18,602
765
5,405
374
5,879
959
2,637
994
1,312
987
146
221
63
245
2
18
53,138
5,121
TNCWSs
(nitrate & nitrite only)
D
GW
SW
56,367
611
19,155
356
2,012
68
536
42
66
17
8
0
1
0
0
0
0
0
78,145
1,094
GW
SW
Size Category
0-100
10,874
436
101-500
12,414
620
501-1,000
3,886
323
1,001-3,300
5,109
927
3,301-10,000
2,547
979
10,001-50,000
1,305
987
50,001-100,000
146
221
100,001-1,000,000
63
245
>1,000,000
2
18
Total
36,346
4,756
Source: SDWIS/FED Data from October 2014
Note: Source was not specified for some systems. These PWSs were assigned to SW or GW categories based on the ratio of SW to GW
systems within a given size category.
DDBP/Chem/Rads ICR - Chemical Phase Regulation
D-3
December 2015
Exhibit 4 - Sampling Points
Number of Entry Points per System
Size Category
0-100
101-500
501-1,000
1001-3,300
3301-10,000
10,001-50,000
50,001-100,000
100,001-1,000,000
>1,000,000
Sources/Assumptions:
Entry pts:
Compositing:
DDBP/Chem/Rads ICR - Chemical Phase Regulation
GW
A
SW
B
1.09
1.22
1.58
1.86
2.19
3.53
9.42
12.56
12.56
Number of Composited Sampling Points per System
GW
≤10K: C = (A*0.5)+(1*0.5)
>10K: C = A
1.07
1.12
1.32
1.28
1.26
1.58
1.98
3.30
3.30
SW
≤10K: D = (B*0.5)+(1*0.5)
>10K: D = B
1.05
1.11
1.29
1.43
1.60
3.53
9.42
12.56
12.56
1.04
1.06
1.16
1.14
1.13
1.58
1.98
3.30
3.30
Based on an analysis of data from the 2006 Community Water System Survey. Includes both treated and
untreated entry points.
Assumed that 50% of systems serving <10,000 people will composite all of their samples. EPA experience
regarding large systems (serving >10,000 people) is that they generally do not composite samples.
D-4
December 2015
Exhibit 5 - Burden by Chemical
Compound
Hrs. Per Sample
$ Per sample
Reference
Comments
Phase I
Phase I VOCs
Phase II
Arsenic
Asbestos
Cadmium
Chromium
Fluoride
Mercury
Nitrate
Nitrite
Selenium
Phase II VOCs
2.0
0.0
2.5
0.5
0.5
0.5
0.5
0.5
0.75
0.5
0.0
Phase II SOCs
1.0
Phase IIb
Barium
Pentachlorophenol
0.5
0.0
Phase V
Adipates, Phthalates
PAH Benzo(a)pyrene
Dioxin
0.5
0.0
1.0
Phase V VOCs
Phase V IOCs, except sulfate
Diquat, Endothall, Glyphosate
Oxamyl
0.0
0.5
0.5
0
Dinoseb
0
1993 PWSS
$86 Program ICR
$0
$484
$15
$15
$15
$32
$16
$16
$32
Burden is now covered under the Arsenic Rule
p. 24
pp. 24, a-23, a-8
pp. 24, a-33
Assumption
pp. 24, a-43
pp. 24, a-53
pp. 24, a-87
pp. 24, a-97
$242 pp. 24, b-20
$1,161 pp. 24, b-4
$15 p. III
$0 p. 15
Assumed to impose burden similar to other IOCs.
Includes cis-1,2,-Dichloroethylene, Monochlorobenzene, o-Dichlorobenzene, 1,2Dichloropropane, Tetrachloroethylene, trans-1,2-Dichloroethylene, toluene, Ethylbenzene,
Xylenes, Styrene
Includes Alachlor, Atrazine, Carbofuran, Chlordane, Dibromochloropropane, EDB,
Acrylamide, Heptachlor, Heptachlorepoxide, Lindane, Methoxchlor, PCBs, Toxaphene, 2,4D, 2,4,5-TP(silvex), Epichlorohydrin
Originally under Phase II
No incremental burden above Phase II SOCs
$242 pp. 20, A-48
$242 pp. 20, A-37
$1,451 p. 20, p. A-26
$0
$32
$322
$0
Includes 1-1-Dichloroethylene, 1,1,1-Trichloroethane, 1,2-Dichloroethane, Benzene, Carbon
tetrachloride, p-Dichlorobenzene, Trichloroethylene, Vinyl Chloride.
Burden hours based on burden per response in the 1990 and 1993 PWSS Program ICRs.
Cost per sample based 1993 ICR total cost/total annual responses.
Text says $175. Appendix says $150.
Text says $175. Appendix says $150.
Includes Dichloromethane and 1,1,2-Trichloroethane. No incremental burden above Phase
II VOCs.
Includes Antimony, Beryllium, Cyanide, Nickel, Thallium.
p. 20
p. A-2
p. A-20
p. 20
No incremental burden above Phase II SOCs
No incremental burden above Phase II SOCs since use patterns and analytical methods are
the same as those used for 2,4-D and 2,4,5-TP (silvex)
$0 p. 20
Endrin, hexachloroAssumes that no systems would be vulnerable after compliance w/ Phase II. Note that this
benzene, and hexachlorocyclopentadiene
may be an underestimate because they were present in the National Pesticide Survey.
0
$0 p. 20
Dalapon
0
$0 p. 20
No incremental burden above Phase II SOCs
Picloram
0
$0 p. 20
No incremental burden above Phase II SOCs
Simazine
0
$0 p. 20
No incremental burden above Phase II SOCs
Note:
1) Burden estimates are based on a conservative assumption that the following inorganics are separately tested: barium, cadmium, selenium, and chromium.
2) Burden estimates take into account the results of the May 2015 consultation with water industry representatives.
Sampling costs inflated from 1993 to 2013 dollars.
DDBP/Chem/Rads ICR - Chemical Phase Regulation
D-5
December 2015
Exhibit 6 - Frequency
Scenario 4
Scenario 2
Scenario 3
Scenario 1
Above trigger & below MCL
Below trigger & waiver
Above MCL
Below trigger & no waiver
GW
SW
GW
SW
GW
SW
GW
SW
≤3,300 >3,300 ≤3,300 >3,300 ≤3,300 >3,300 ≤3,300 >3,300 ≤3,300 >3,300 ≤3,300 >3,300 ≤3,300 >3,300 ≤3,300 >3,300
0.33
0.33
1
1
0.22
0.22
0.33
0.33
4
4
4
4
1.67
1.67
2.33
2.33
Compound
Trigger
Phase I
Phase I VOCs
MDL
Phase II
Arsenic***
MCL
Asbestos*
MCL
0.11
0.11
0.11
0.11
0
0
0
0
4
4
4
4
Cadmium*
MCL
0.33
0.33
1
1
0.11
0.11
0.11
0.11
4
4
4
4
Chromium*
MCL
0.33
0.33
1
1
0.11
0.11
0.11
0.11
4
4
4
4
Fluoride*
MCL
0.33
0.33
1
1
0.11
0.11
0.11
0.11
4
4
4
4
Mercury*
MCL
0.33
0.33
1
1
0.11
0.11
0.11
0.11
4
4
4
4
Nitrate**
1/2 MCL
1
1
1
1
4
4
4
4
4
Nitrite**
1/2 MCL
0
0
0
0
4
4
4
4
4
Selenium*
MCL
0.33
0.33
1
1
0.11
0.11
0.11
0.11
4
4
4
4
Phase II VOCs
MDL
0.33
0.33
1
1
0.22
0.22
0.33
0.33
4
4
4
4
1.67
Phase II SOCs
MDL
0.33
0.67
0.33
0.67
0
0
0
0
4
4
4
4
1.67
Phase IIb
Barium*
MCL
0.33
0.33
1
1
0.11
0.11
0.11
0.11
4
4
4
4
Pentachlorophenol
MDL
0.33
0.67
0.33
0.67
0
0
0
0
4
4
4
4
1.67
Phase V
Adipates, Phthalates
MDL
0.33
0.67
0.33
0.67
0
0
0
0
4
4
4
4
1.67
PAH Benzo(a)pyrene
MDL
0.33
0.67
0.33
0.67
0
0
0
0
4
4
4
4
1.67
Dioxin
MDL
0.33
0.67
0.33
0.67
0
0
0
0
4
4
4
4
1.67
Phase V VOCs
MDL
0.33
0.33
1
1
0.22
0.22
0.33
0.33
4
4
4
4
1.67
Phase V IOCs, except sulfate*
MCL
0.33
0.33
1
1
0.11
0.11
0.11
0.11
4
4
4
4
Diquat, Endothall, Glyphosate
MDL
0.33
0.67
0.33
0.67
0
0
0
0
4
4
4
4
1.67
Oxamyl
MDL
0.33
0.67
0.33
0.67
0
0
0
0
4
4
4
4
1.67
Dinoseb
MDL
0.33
0.67
0.33
0.67
0
0
0
0
4
4
4
4
1.67
Endrin, hexachlorobenzene, and
hexachlorocyclopentadiene
MDL
0.33
0.67
0.33
0.67
0
0
0
0
4
4
4
4
1.67
Dalapon
MDL
0.33
0.67
0.33
0.67
0
0
0
0
4
4
4
4
1.67
Picloram
MDL
0.33
0.67
0.33
0.67
0
0
0
0
4
4
4
4
1.67
Simazine
MDL
0.33
0.67
0.33
0.67
0
0
0
0
4
4
4
4
1.67
* Because the MCL is the trigger for IOCs (except nitrate and nitrite), there is no "Scenario 4" in which the monitoring results are below the MCL but above the trigger.
**Waivers are not available for nitrate and nitrite.
***Now considered separately in the Arsenic Rule
Source: 40 CFR 141.23 & 141.24
DDBP/Chem/Rads ICR - Chemical Phase Regulation
D-6
4
4
4
4
4
4
1.67
1.67
2.33
2.33
2.33
2.33
1.67
2.33
2.33
1.67
1.67
1.67
1.67
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
1.67
1.67
1.67
2.33
2.33
2.33
2.33
2.33
2.33
1.67
1.67
1.67
1.67
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
December 2015
Exhibit 7 - Waivers
Statewide Waivers
A
Percent of Systems Under the
Trigger that Receive Statewide
Waivers
Compound
System-Specific Waivers
B
C
Percent of Systems Under the
Percent of Eligible Systems
Trigger that Are Eligible for SystemAssumed to Receive SystemSpecific Waivers
Specific Waivers Where Available**
D=B*C
Total Percent of Eligible Systems
Assumed to Receive SystemSpecific Waivers
E=A+D
Total Percent of Eligible Systems Assumed to
Receive Waivers
Trigger
GW
SW
GW
SW
GW
SW
GW
SW
GW
SW
≤3,300 >3,300 ≤3,300 >3,300 ≤3,300 >3,300 ≤3,300 >3,300 ≤3,300 >3,300 ≤3,300 >3,300 ≤3,300 >3,300 ≤3,300 >3,300 ≤3,300
≤3,300
Phase I
>3,300
>3,300
Phase I VOCs
MDL
0.0%
0.0%
0.0%
0.0%
53.1%
53.1%
53.1%
53.1%
90.0%
90.0%
40.0%
40.0%
47.8%
47.8%
21.2%
21.2%
47.8%
47.8%
21.2%
21.2%
Phase II
Arsenic***
MCL
0.0%
0.0%
0.0%
0.0%
Asbestos
MCL
30.5%
30.5%
30.5%
30.5%
61.6%
61.6%
61.6%
61.6%
90.0%
90.0%
40.0%
40.0%
55.4%
55.4%
24.6%
24.6%
85.9%
85.9%
55.1%
55.1%
Cadmium
MCL
0.0%
0.0%
0.0%
0.0%
22.2%
22.2%
22.2%
22.2%
90.0%
90.0%
40.0%
40.0%
20.0%
20.0%
8.9%
8.9%
20.0%
20.0%
8.9%
8.9%
Chromium
MCL
0.0%
0.0%
0.0%
0.0%
22.2%
22.2%
22.2%
22.2%
90.0%
90.0%
40.0%
40.0%
20.0%
20.0%
8.9%
8.9%
20.0%
20.0%
8.9%
8.9%
Fluoride
MCL
0.0%
0.0%
0.0%
0.0%
22.2%
22.2%
22.2%
22.2%
90.0%
90.0%
40.0%
40.0%
20.0%
20.0%
8.9%
8.9%
20.0%
20.0%
8.9%
8.9%
Mercury
MCL
0.0%
0.0%
0.0%
0.0%
22.2%
22.2%
22.2%
22.2%
90.0%
90.0%
40.0%
40.0%
20.0%
20.0%
8.9%
8.9%
20.0%
20.0%
8.9%
8.9%
Nitrate*
1/2 MCL
0.0%
0.0%
0.0%
0.0%
Nitrite*
1/2 MCL
0.0%
0.0%
0.0%
0.0%
Selenium
MCL
0.0%
0.0%
0.0%
0.0%
22.2%
22.2%
22.2%
22.2%
90.0%
90.0%
40.0%
40.0%
20.0%
20.0%
8.9%
8.9%
20.0%
20.0%
8.9%
8.9%
Phase II VOCs
MDL
0.0%
0.0%
0.0%
0.0%
53.1%
53.1%
53.1%
53.1%
90.0%
90.0%
40.0%
40.0%
47.8%
47.8%
21.2%
21.2%
47.8%
47.8%
21.2%
21.2%
Phase II SOCs
MDL
1.6%
1.6%
1.6%
1.6%
83.2%
83.2%
83.2%
83.2%
90.0%
90.0%
40.0%
40.0%
74.9%
74.9%
33.3%
33.3%
76.5%
76.5%
34.9%
34.9%
Phase IIb
Barium
MCL
0.0%
0.0%
0.0%
0.0%
22.2%
22.2%
22.2%
22.2%
90.0%
90.0%
40.0%
40.0%
20.0%
20.0%
8.9%
8.9%
20.0%
20.0%
8.9%
8.9%
Pentachlorophenol
MDL
0.0%
0.0%
0.0%
0.0%
83.2%
83.2%
83.2%
83.2%
90.0%
90.0%
40.0%
40.0%
74.9%
74.9%
33.3%
33.3%
74.9%
74.9%
33.3%
33.3%
Phase V
Adipates, Phthalates
MDL
5.0%
5.0%
5.0%
5.0%
77.6%
77.6%
77.6%
77.6%
90.0%
90.0%
40.0%
40.0%
69.8%
69.8%
31.0%
31.0%
74.8%
74.8%
36.0%
36.0%
PAH Benzo(a)pyrene
MDL
6.5%
6.5%
6.5%
6.5%
79.0%
79.0%
79.0%
79.0%
90.0%
90.0%
40.0%
40.0%
71.1%
71.1%
31.6%
31.6%
77.6%
77.6%
38.1%
38.1%
Dioxin
MDL
57.8%
57.8%
57.8%
57.8%
38.6%
38.6%
38.6%
38.6%
90.0%
90.0%
40.0%
40.0%
34.7%
34.7%
15.4%
15.4%
92.5%
92.5%
73.2%
73.2%
Phase V VOCs
MDL
0.0%
0.0%
0.0%
0.0%
53.1%
53.1%
53.1%
53.1%
90.0%
90.0%
40.0%
40.0%
47.8%
47.8%
21.2%
21.2%
47.8%
47.8%
21.2%
21.2%
Phase V IOCs, except sulfate
MCL
0.0%
0.0%
0.0%
0.0%
22.2%
22.2%
22.2%
22.2%
90.0%
90.0%
40.0%
40.0%
20.0%
20.0%
8.9%
8.9%
20.0%
20.0%
8.9%
8.9%
Diquat, Endothall, Glyphosate
MDL
34.8%
34.8%
34.8%
34.8%
56.3%
56.3%
56.3%
56.3%
90.0%
90.0%
40.0%
40.0%
50.7%
50.7%
22.5%
22.5%
85.5%
85.5%
57.3%
57.3%
Oxamyl
MDL
2.0%
2.0%
2.0%
2.0%
83.2%
83.2%
83.2%
83.2%
90.0%
90.0%
40.0%
40.0%
74.9%
74.9%
33.3%
33.3%
76.9%
76.9%
35.3%
35.3%
Dinoseb
MDL
5.4%
5.4%
5.4%
5.4%
80.2%
80.2%
80.2%
80.2%
90.0%
90.0%
40.0%
40.0%
72.2%
72.2%
32.1%
32.1%
77.6%
77.6%
37.5%
37.5%
Endrin, hexachlorobenzene, and
hexachlorocyclopentadiene
MDL
11.3%
11.3%
11.3%
11.3%
76.3%
76.3%
76.3%
76.3%
90.0%
90.0%
40.0%
40.0%
68.7%
68.7%
30.5%
30.5%
80.0%
80.0%
41.8%
41.8%
Dalapon
MDL
7.7%
7.7%
7.7%
7.7%
77.8%
77.8%
77.8%
77.8%
90.0%
90.0%
40.0%
40.0%
70.0%
70.0%
31.1%
31.1%
77.7%
77.7%
38.8%
38.8%
Picloram
MDL
0.0%
0.0%
0.0%
0.0%
83.2%
83.2%
83.2%
83.2%
90.0%
90.0%
40.0%
40.0%
74.9%
74.9%
33.3%
33.3%
74.9%
74.9%
33.3%
33.3%
Simazine
MDL
0.0%
0.0%
0.0%
0.0%
83.2%
83.2%
83.2%
83.2%
90.0%
90.0%
40.0%
40.0%
74.9%
74.9%
33.3%
33.3%
74.9%
74.9%
33.3%
33.3%
* Waivers are not available for nitrate and nitrite.
** For GW systems, assumed that 90% of systems below the trigger receive system-specific waivers if available in their State. For SW systems, assumed that 40% of systems below the trigger receive system-specific waivers where available.
***Now considered separately in the Arsenic Rule
Source for Columns A&B: Data collected from 44 States during on-site data verifications conducted 1997-2001. Data are weighted based on the number of CWSs and NTNCWSs in each State.
DDBP/Chem/Rads ICR - Chemical Phase Regulation
D-7
December 2015
Exhibit 8 - Occurrence
Compound
Phase I
Phase I VOCs
Phase II
Arsenic
Asbestos
Cadmium
Chromium
Fluoride
Mercury
Nitrate
Nitrite
Selenium
Phase II VOCs
Phase II SOCs
Phase IIb
Barium
Pentachlorophenol
Phase V
Adipates, Phthalates
PAH Benzo(a)pyrene
Dioxin
Phase V VOCs
Phase V IOCs, except sulfate
Diquat, Endothall, Glyphosate
Oxamyl
Dinoseb
Endrin, hexachlorobenzene, and
hexachlorocyclopentadiene
Dalapon
Picloram
Simazine
Percent < MDL
Percent > MDL but < 1/2 MCL
Percent > 1/2 MCL but < MCL
Percent > MCL
Percent < Trigger
A
B
C
D
E
GW
SW
GW
SW
GW
SW
GW
SW
GW
SW
≤3,300 >3,300 ≤3,300
≤3,300
>3,300 ≤3,300 >3,300 ≤3,300 >3,300 ≤3,300 >3,300 ≤3,300 >3,300 ≤3,300 >3,300 ≤3,300
>3,300
>3,300
Note Trigger ≤3,300 >3,300
3
MDL
80.1%
80.1%
58.9% 58.9%
12.0% 12.0% 25.7% 25.7%
1.8%
1.8%
7.2%
7.2%
6.1%
6.1%
8.2%
8.2%
80.1%
80.1%
58.9%
58.9%
6
4
5
3
1
2
MCL
MCL
MCL
MCL
MCL
MCL
1/2 MCL
1/2 MCL
MCL
MDL
MDL
91.5%
95.1%
86.8%
27.5%
95.5%
13.1%
85.7%
91.4%
93.6%
86.6%
91.5%
95.1%
86.8%
27.5%
95.5%
13.1%
85.7%
91.4%
93.6%
86.6%
91.1%
94.9%
89.5%
22.2%
91.0%
13.1%
85.7%
88.8%
88.9%
79.6%
91.1%
94.9%
89.5%
22.2%
91.0%
13.1%
85.7%
88.8%
88.9%
79.6%
7.6%
3.7%
12.7%
69.1%
3.8%
85.0%
14.1%
8.3%
2.5%
11.5%
7.6%
3.7%
12.7%
69.1%
3.8%
85.0%
14.1%
8.3%
2.5%
11.5%
8.2%
3.8%
10.2%
77.0%
7.7%
85.0%
14.1%
11.0%
6.6%
19.2%
8.2%
3.8%
10.2%
77.0%
7.7%
85.0%
14.1%
11.0%
6.6%
19.2%
0.5%
0.6%
0.3%
2.1%
0.3%
1.9%
0.0%
0.1%
0.7%
0.9%
0.5%
0.6%
0.3%
2.1%
0.3%
1.9%
0.0%
0.1%
0.7%
0.9%
0.0%
1.1%
0.1%
0.3%
0.8%
1.9%
0.0%
0.2%
1.6%
0.3%
0.0%
1.1%
0.1%
0.3%
0.8%
1.9%
0.0%
0.2%
1.6%
0.3%
0.4%
0.6%
0.2%
1.3%
0.4%
0.0%
0.2%
0.2%
3.2%
1.0%
0.4%
0.6%
0.2%
1.3%
0.4%
0.0%
0.2%
0.2%
3.2%
1.0%
0.7%
0.2%
0.2%
0.5%
0.5%
0.0%
0.2%
0.0%
2.9%
0.9%
0.7%
0.2%
0.2%
0.5%
0.5%
0.0%
0.2%
0.0%
2.9%
0.9%
99.6%
99.4%
99.8%
98.7%
99.6%
98.1%
99.8%
99.8%
93.6%
86.6%
99.6%
99.4%
99.8%
98.7%
99.6%
98.1%
99.8%
99.8%
93.6%
86.6%
99.3%
99.8%
99.8%
99.5%
99.5%
98.1%
99.8%
100.0%
88.9%
79.6%
99.3%
99.8%
99.8%
99.5%
99.5%
98.1%
99.8%
100.0%
88.9%
79.6%
MCL
MDL
52.7%
99.3%
52.7%
99.3%
50.9%
96.9%
50.9%
96.9%
46.5%
0.6%
46.5%
0.6%
48.5%
2.7%
48.5%
2.7%
0.6%
0.1%
0.6%
0.1%
0.1%
0.2%
0.1%
0.2%
0.2%
0.0%
0.2%
0.0%
0.5%
0.2%
0.5%
0.2%
99.8%
99.3%
99.8%
99.3%
99.5%
96.9%
99.5%
96.9%
MDL
MDL
MDL
MDL
MCL
MDL
MDL
MDL
86.6%
99.5%
98.7%
80.1%
16.5%
99.2%
99.9%
99.6%
86.6%
99.5%
98.7%
80.1%
16.5%
99.2%
99.9%
99.6%
79.6% 79.6%
99.5% 99.5%
100.0% 100.0%
58.9% 58.9%
16.3% 16.3%
96.5% 96.5%
100.0% 100.0%
97.5% 97.5%
11.5%
0.4%
0.0%
12.0%
74.3%
0.8%
0.1%
0.4%
11.5%
0.4%
0.0%
12.0%
74.3%
0.8%
0.1%
0.4%
19.2%
0.5%
0.0%
25.7%
76.9%
3.5%
0.0%
2.5%
19.2%
0.5%
0.0%
25.7%
76.9%
3.5%
0.0%
2.5%
0.9%
0.0%
0.0%
1.8%
5.0%
0.0%
0.0%
0.0%
0.9%
0.0%
0.0%
1.8%
5.0%
0.0%
0.0%
0.0%
0.3%
0.0%
0.0%
7.2%
4.3%
0.0%
0.0%
0.0%
0.3%
0.0%
0.0%
7.2%
4.3%
0.0%
0.0%
0.0%
1.0%
0.1%
1.3%
6.1%
4.2%
0.0%
0.0%
0.0%
1.0%
0.1%
1.3%
6.1%
4.2%
0.0%
0.0%
0.0%
0.9%
0.0%
0.0%
8.2%
2.5%
0.0%
0.0%
0.0%
0.9%
0.0%
0.0%
8.2%
2.5%
0.0%
0.0%
0.0%
86.6%
99.5%
98.7%
80.1%
95.8%
99.2%
99.9%
99.6%
86.6%
99.5%
98.7%
80.1%
95.8%
99.2%
99.9%
99.6%
79.6%
99.5%
100.0%
58.9%
97.5%
96.5%
100.0%
97.5%
79.6%
99.5%
100.0%
58.9%
97.5%
96.5%
100.0%
97.5%
MDL
MDL
MDL
MDL
99.9%
99.2%
99.5%
98.6%
99.9%
99.2%
99.5%
98.6%
0.1%
0.8%
0.5%
1.4%
0.1%
0.8%
0.5%
1.4%
8.6%
9.2%
3.7%
13.4%
8.6%
9.2%
3.7%
13.4%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.4%
0.0%
0.0%
1.5%
0.4%
0.0%
0.0%
1.5%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.6%
0.2%
0.0%
1.0%
0.6%
0.2%
0.0%
1.0%
99.9%
99.2%
99.5%
98.6%
99.9%
99.2%
99.5%
98.6%
90.4%
90.6%
96.3%
84.1%
90.4%
90.6%
96.3%
84.1%
90.4%
90.6%
96.3%
84.1%
90.4%
90.6%
96.3%
84.1%
Source: A Review of Contaminant Occurrence in Public Drinking Water Systems (EPA 816-R-99-006, November 1999).
Note 1 Used Diquat
Note 2 Used Hexachlorocyclopentadiene
Note 3 Used VOCs-All Regulated
Note 4 Used VOCs-Group 2
Note 5 Used SOCs-Group 2
Note 6 Now covered in the Arsenic Rule
DDBP/Chem/Rads ICR - Chemical Phase Regulation
D-8
December 2015
Exhibit 9 - Percent by Scenario
Scenario 1
A
Below trigger & no waiver
(=E from "occurrence" * (1-E)
from "waivers")
Scenario 2
B
Below trigger & waiver
(=E from "occurrence" * E from
"waivers")
Scenario 3
C
Above MCL
(=D from "occurrence")
Scenario 4
D
Above trigger & below MCL
(=(1-E) - D from "occurrence")
GW
SW
GW
SW
GW
SW
Compound
Trigger
GW
SW
≤3,300 >3,300 ≤3,300 >3,300 ≤3,300 >3,300 ≤3,300 >3,300 ≤3,300 >3,300 ≤3,300 >3,300 ≤3,300
Phase I
>3,300 ≤3,300 >3,300
Phase I VOCs
MDL
41.8% 41.8% 46.4% 46.4% 38.3% 38.3% 12.5% 12.5%
6.1%
6.1%
8.2%
8.2%
13.8% 13.8% 32.9% 32.9%
Phase II
Arsenic***
MCL
Asbestos*
MCL
14.0% 14.0% 44.5% 44.5% 85.6% 85.6% 54.8% 54.8%
0.4%
0.4%
0.7%
0.7%
Cadmium*
MCL
79.5% 79.5% 90.9% 90.9% 19.9% 19.9%
8.9%
8.9%
0.6%
0.6%
0.2%
0.2%
Chromium*
MCL
79.9% 79.9% 90.9% 90.9% 19.9% 19.9%
8.9%
8.9%
0.2%
0.2%
0.2%
0.2%
Fluoride*
MCL
79.0% 79.0% 90.7% 90.7% 19.7% 19.7%
8.8%
8.8%
1.3%
1.3%
0.5%
0.5%
Mercury*
MCL
79.7% 79.7% 90.7% 90.7% 19.9% 19.9%
8.8%
8.8%
0.4%
0.4%
0.5%
0.5%
Nitrate**
1/2 MCL
98.1% 98.1% 98.1% 98.1%
0.0%
0.0%
0.0%
0.0%
1.9%
1.9%
1.9%
1.9%
Nitrite**
1/2 MCL
99.8% 99.8% 99.8% 99.8%
0.2%
0.2%
0.2%
0.2%
0.0%
0.0%
0.0%
0.0%
Selenium*
MCL
79.9% 79.9% 91.1% 91.1% 19.9% 19.9%
8.9%
8.9%
0.2%
0.2%
0.0%
0.0%
Phase II VOCs
MDL
48.9% 48.9% 70.0% 70.0% 44.7% 44.7% 18.9% 18.9%
3.2%
3.2%
2.9%
2.9%
3.2%
3.2%
8.2%
8.2%
Phase II SOCs
MDL
20.4% 20.4% 51.8% 51.8% 66.2% 66.2% 27.8% 27.8%
1.0%
1.0%
0.9%
0.9%
12.4% 12.4% 19.5% 19.5%
Phase IIb
Barium*
MCL
79.9% 79.9% 90.7% 90.7% 19.9% 19.9%
8.8%
8.8%
0.2%
0.2%
0.5%
0.5%
Pentachlorophenol
MDL
24.9% 24.9% 64.7% 64.7% 74.4% 74.4% 32.2% 32.2%
0.0%
0.0%
0.2%
0.2%
0.7%
0.7%
2.9%
2.9%
Phase V
Adipates, Phthalates
MDL
21.8% 21.8% 50.9% 50.9% 64.8% 64.8% 28.7% 28.7%
1.0%
1.0%
0.9%
0.9%
12.4% 12.4% 19.5% 19.5%
PAH Benzo(a)pyrene
MDL
22.3% 22.3% 61.6% 61.6% 77.2% 77.2% 37.9% 37.9%
0.1%
0.1%
0.0%
0.0%
0.4%
0.4%
0.5%
0.5%
Dioxin
MDL
7.4%
7.4% 26.8% 26.8% 91.3% 91.3% 73.2% 73.2%
1.3%
1.3%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
Phase V VOCs
MDL
41.8% 41.8% 46.4% 46.4% 38.3% 38.3% 12.5% 12.5%
6.1%
6.1%
8.2%
8.2%
13.8% 13.8% 32.9% 32.9%
Phase V IOCs, except sulfate*
MCL
76.7% 76.7% 88.8% 88.8% 19.1% 19.1%
8.7%
8.7%
4.2%
4.2%
2.5%
2.5%
Diquat, Endothall, Glyphosate
MDL
14.4% 14.4% 41.2% 41.2% 84.8% 84.8% 55.3% 55.3%
0.0%
0.0%
0.0%
0.0%
0.8%
0.8%
3.5%
3.5%
Oxamyl
MDL
23.1% 23.1% 64.7% 64.7% 76.8% 76.8% 35.3% 35.3%
0.0%
0.0%
0.0%
0.0%
0.1%
0.1%
0.0%
0.0%
Dinoseb
MDL
22.3% 22.3% 61.0% 61.0% 77.3% 77.3% 36.5% 36.5%
0.0%
0.0%
0.0%
0.0%
0.4%
0.4%
2.5%
2.5%
Endrin, hexachlorobenzene, and
hexachlorocyclopentadiene
MDL
20.0% 20.0% 52.6% 52.6% 79.9% 79.9% 37.8% 37.8%
0.0%
0.0%
0.6%
0.6%
0.1%
0.1%
9.0%
9.0%
Dalapon
MDL
22.1% 22.1% 55.4% 55.4% 77.1% 77.1% 35.2% 35.2%
0.0%
0.0%
0.2%
0.2%
0.8%
0.8%
9.2%
9.2%
Picloram
MDL
25.0% 25.0% 64.3% 64.3% 74.5% 74.5% 32.0% 32.0%
0.0%
0.0%
0.0%
0.0%
0.5%
0.5%
3.7%
3.7%
Simazine
MDL
24.8% 24.8% 56.1% 56.1% 73.8% 73.8% 28.0% 28.0%
0.0%
0.0%
1.0%
1.0%
1.4%
1.4% 14.9% 14.9%
* Because the MCL is the trigger for IOCs (except nitrate and nitrite), there is no "Scenario 4" in which the monitoring results are below the MCL but above the trigger.
**Waivers are not available for nitrate and nitrite.
***Now considered separately in the Arsenic Rule.
DDBP/Chem/Rads ICR - Chemical Phase Regulation
D-9
December 2015
Exhibit 10 - Phase I VOCs, Part 1
Phase I VOCs
Ground Water Systems, CWSs & NTNCWSs
# of Affected Systems
(from "systems")
Percent of Systems by Scenario
(from "% by scenario")
Number of Systems by Scenario
B
C=A*B
Scen. 3
Scen. 2
Above
Below
MCL
trigger &
waiver
A
Scen. 1
Below
trigger &
no waiver
Size Category
0-100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-50,000
50,001-100,000
100,001-1,000,000
>1,000,000
Total
19,092
18,602
5,405
5,879
2,637
1,312
146
63
2
53,138
Phase I VOCs
Surface Water Systems, CWSs & NTNCWSs
# of Affected Systems
(from "systems")
41.8%
41.8%
41.8%
41.8%
41.8%
41.8%
41.8%
41.8%
41.8%
38.3%
38.3%
38.3%
38.3%
38.3%
38.3%
38.3%
38.3%
38.3%
Phase I VOCs:
GRAND TOTAL
58,259
DDBP/Chem/Rads ICR - Chemical Phase Regulation
6.1%
6.1%
6.1%
6.1%
6.1%
6.1%
6.1%
6.1%
6.1%
13.8%
13.8%
13.8%
13.8%
13.8%
13.8%
13.8%
13.8%
13.8%
7,984
7,779
2,260
2,459
1,103
549
61
26
1
22,222
7,308
7,121
2,069
2,250
1,009
502
56
24
1
20,341
Scen. 1
Scen. 4
Below
Above
trigger &
trigger &
below MCL no waiver
1,165
1,135
330
359
161
80
9
4
0
3,241
2,635
2,567
746
811
364
181
20
9
0
7,333
Number of Systems by Scenario
B
C=A*B
Scen. 3
Scen. 2
Above
Below
MCL
trigger &
waiver
Scen. 1
Below
trigger &
no waiver
558
765
374
959
994
987
221
245
18
5,121
Scen. 1
Scen. 4
Below
Above
trigger &
trigger &
below MCL no waiver
Percent of Systems by Scenario
(from "% by scenario")
A
Size Category
0-100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-50,000
50,001-100,000
100,001-1,000,000
>1,000,000
Total
Scen. 3
Above
MCL
Scen. 2
Below
trigger &
waiver
46.4%
46.4%
46.4%
46.4%
46.4%
46.4%
46.4%
46.4%
46.4%
Scen. 2
Below
trigger &
waiver
12.5%
12.5%
12.5%
12.5%
12.5%
12.5%
12.5%
12.5%
12.5%
Scen. 3
Above
MCL
8.2%
8.2%
8.2%
8.2%
8.2%
8.2%
8.2%
8.2%
8.2%
Scen. 1
Scen. 4
Below
Above
trigger &
trigger &
below MCL no waiver
32.9%
32.9%
32.9%
32.9%
32.9%
32.9%
32.9%
32.9%
32.9%
Annual Sampling Frequency by Scenario
(from "frequency")
0.22
0.22
0.22
0.22
0.22
0.22
0.22
0.22
0.22
Scen. 3
Above
MCL
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
Scen. 1
Scen. 4
Above
Above
trigger & trigger & no
waiver
below
MCL
1.67
1.67
1.67
1.67
1.67
1.67
1.67
1.67
1.67
Annual Sampling Frequency by Scenario
(from "frequency")
Scen. 1
Scen. 4
Below
Above
trigger &
trigger &
below MCL no waiver
259
355
173
445
461
458
103
114
8
2,376
70
96
47
120
124
123
28
31
2
641
46
63
31
79
82
81
18
20
1
420
184
252
123
316
327
325
73
81
6
1,685
24,598
20,982
3,661
9,018
D-10
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
D
Scen. 2
Below
trigger &
waiver
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
D
Scen. 2
Below
trigger &
waiver
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
Scen. 3
Above
MCL
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
Annual Sampling Events by Scenario
2,635
2,567
746
811
364
181
20
9
0
7,333
1,608
1,567
455
495
222
110
12
5
0
4,475
E=C*D
Scen. 3
Above
MCL
4,658
4,539
1,319
1,434
643
320
36
15
0
12,966
Scen. 4
Above
trigger &
below MCL
4,400
4,287
1,246
1,355
608
302
34
15
0
12,246
Total
13,301
12,960
3,766
4,096
1,837
914
102
44
1
37,020
Annual Sampling Events by Scenario
Scen. 1
Scen. 4
Below
Above
trigger & trigger & no
waiver
below
MCL
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
Scen. 2
Above
trigger &
waiver
Scen. 2
Below
trigger &
waiver
E=C*D
Scen. 3
Above
MCL
Scen. 4
Above
trigger &
below MCL
Total
259
355
173
445
461
458
103
114
8
2,376
23
32
15
40
41
41
9
10
1
211
183
251
123
315
326
324
72
80
6
1,680
428
586
287
735
762
757
169
188
14
3,926
893
1,224
598
1,534
1,590
1,579
354
392
29
8,192
9,709
4,686
14,645
16,172
45,213
December 2015
Exhibit 11 - Phase I VOCs, Part 2
Phase I VOCs (continued)
Ground Water Systems, CWSs & NTNCWSs
Total Annual
Samples per Total Number
Burden
Cost
of Samples
Sampling Events
Event
Burden per
Total
Cost per
Total Cost, $
per Year
(carried forward
(from B of
Sample, hrs. Burden, hrs. Sample, $
from previous
"sampling
(from "burden
(from
pg.)
pts")
by chem")
"burden by
chem")
Size Category
E
F
G=E*F
H
I=G*H
J
K=G*J
2.0
0-100
13,301
1.05
13,906
27,812
$86
$1,201,189
2.0
101-500
12,960
1.11
14,387
28,773
$86
$1,242,684
2.0
501-1,000
3,766
1.29
4,861
9,723
$86
$419,918
2.0
1,001-3,300
4,096
1.43
5,848
11,696
$86
$505,120
2.0
3,301-10,000
1,837
1.60
2,933
5,866
$86
$253,366
2.0
10,001-50,000
914
3.53
3,231
6,461
$86
$279,053
2.0
50,001-100,000
102
9.42
958
1,916
$86
$82,731
2.0
100,001-1,000,000
44
12.56
551
1,102
$86
$47,614
2.0
>1,000,000
1
12.56
17
35
$86
$1,512
Total
37,020
46,692
93,385
$4,033,186
Phase I VOCs (continued)
Surface Water Systems, CWSs & NTNCWSs
Total Annual
Samples per Total Number
Burden
Cost
of Samples
Sampling Events
Event
Burden per
Total
Cost per
Total Cost, $
per Year
(carried forward
(from B of
Sample, hrs. Burden, hrs. Sample, $
from previous
"sampling
(from "burden
(from
pg.)
pts")
by chem")
"burden by
chem")
Size Category
E
F
G=E*F
H
I=G*H
J
K=G*J
2.0
1,852
$86
$79,989
0-100
893
1.04
926
2.0
101-500
1,224
1.06
1,298
2,597
$86
$112,153
2.0
501-1,000
598
1.16
694
1,388
$86
$59,963
2.0
1,001-3,300
1,534
1.14
1,750
3,499
$86
$151,122
2.0
3,301-10,000
1,590
1.13
1,797
3,595
$86
$155,257
2.0
10,001-50,000
1,579
1.58
2,490
4,979
$86
$215,039
2.0
50,001-100,000
354
1.98
701
1,401
$86
$60,521
2.0
100,001-1,000,000
392
3.30
1,293
2,586
$86
$111,682
2.0
>1,000,000
29
3.30
95
190
$86
$8,205
Total
8,192
11,044
22,087
$953,930
Phase I VOCs
GRAND TOTAL
45,213
57,736
115,472
Note: Burden estimates take into account the results of the May 2015 consultation with water industry representatives.
DDBP/Chem/Rads ICR - Chemical Phase Regulation
D-11
$4,987,116
December 2015
Exhibit 12 - Arsenic, Part 1
Arsenic
Ground Water Systems, CWSs & NTNCWSs
# of Affected Systems
(from C of "systems")
A
Size Category
0-100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-50,000
50,001-100,000
100,001-1,000,000
>1,000,000
Total
19,092
18,602
5,405
5,879
2,637
1,312
146
63
2
53,138
Arsenic
Surface Water Systems, CWSs & NTNCWSs
# of Affected Systems
(from C of "systems")
A
Size Category
0-100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-50,000
50,001-100,000
100,001-1,000,000
>1,000,000
Total
Arsenic:
GRAND TOTAL
Percent of Systems by Scenario
Number of Systems by Scenario
Annual Sampling Frequency by Scenario
(from "% by scenario")
(from "frequency")
D
B
C=A*B
Scen. 3
Scen. 4
Scen. 2
Scen. 1
Scen. 3
Scen. 4
Scen. 2
Scen. 1
Scen. 3
Scen. 4
Scen. 2
Scen. 1
Above
Above
Below
Below
Above
Above
Below
Below
Above
Above
Below
Below
MCL
trigger &
trigger &
trigger &
MCL
trigger &
trigger &
trigger &
MCL
trigger &
trigger &
trigger &
below
waiver
below MCL no waiver
waiver
below MCL no waiver
waiver
no waiver
MCL
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
-
-
-
-
-
-
-
-
-
Percent of Systems by Scenario
Number of Systems by Scenario
Annual Sampling Frequency by Scenario
(from "% by scenario")
(from "frequency")
B
C=A*B
D
Scen. 3
Scen. 4
Scen. 2
Scen. 1
Scen. 3
Scen. 4
Scen. 2
Scen. 1
Scen. 3
Scen. 4
Scen. 2
Scen. 1
Above
Above
Below
Below
Above
Above
Below
Below
Above
Above
Below
Below
MCL
trigger &
trigger &
trigger &
MCL
trigger &
trigger &
trigger &
MCL
trigger &
trigger &
trigger &
below
waiver
below MCL no waiver
waiver
below MCL no waiver
waiver
no waiver
MCL
558
765
374
959
994
987
221
245
18
5,121
58,259
DDBP/Chem/Rads ICR - Chemical Phase Regulation
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
-
-
-
-
-
-
-
-
-
D-12
-
-
-
-
Annual Sampling Events by Scenario
Scen. 1
Above
trigger & no
waiver
-
Scen. 2
Above
trigger &
waiver
-
E=C*D
Scen. 3
Above
MCL
-
Scen. 4
Above
trigger &
below MCL
-
Total
-
Annual Sampling Events by Scenario
Scen. 1
Above
trigger & no
waiver
Scen. 2
Above
trigger &
waiver
E=C*D
Scen. 3
Above
MCL
Scen. 4
Above
trigger &
below MCL
Total
-
-
-
-
-
-
-
-
-
-
December 2015
Exhibit 13 - Arsenic, Part 2
Arsenic (continued)
Ground Water Systems, CWSs & NTNCWSs
Samples per Total Number
Total Annual
Cost
Burden
Sampling Events Event (from B of Samples
Burden per
Total
Cost per
Total Cost, $
per Year
(carried forward of "sampling
Sample, hrs. Burden, hrs. Sample, $
pts")
from previous
(from "burden
(from
pg.)
by chem")
"burden by
chem")
Size Category
E
F
G=E*F
H
I=G*H
J
K=G*J
0.0
0-100
1.05
$0
$0
0.0
101-500
1.11
$0
$0
0.0
501-1,000
1.29
$0
$0
0.0
1,001-3,300
1.43
$0
$0
0.0
3,301-10,000
1.60
$0
$0
0.0
10,001-50,000
3.53
$0
$0
0.0
50,001-100,000
9.42
$0
$0
0.0
100,001-1,000,000
12.56
$0
$0
0.0
>1,000,000
12.56
$0
$0
Total
$0
Arsenic (continued)
Surface Water Systems, CWSs & NTNCWSs
Total Annual
Samples per Total Number
Cost
Burden
Sampling Events Event (from B of Samples
Burden per
Total
Cost per
Total Cost, $
per Year
(carried forward of "sampling
Sample, hrs. Burden, hrs. Sample, $
from previous
pts")
(from "burden
(from
pg.)
by chem")
"burden by
chem")
Size Category
E
F
G=E*F
H
I=G*H
J
K=G*J
0.0
$0
$0
0-100
1.04
0.0
101-500
1.06
$0
$0
0.0
501-1,000
1.16
$0
$0
0.0
1,001-3,300
1.14
$0
$0
0.0
3,301-10,000
1.13
$0
$0
0.0
10,001-50,000
1.58
$0
$0
0.0
50,001-100,000
1.98
$0
$0
0.0
100,001-1,000,000
3.30
$0
$0
0.0
>1,000,000
3.30
$0
$0
Total
$0
Arsenic
GRAND TOTAL
Note: Burden estimates take into account the results of the May 2015 consultation with water industry representatives.
DDBP/Chem/Rads ICR - Chemical Phase Regulation
D-13
$0
December 2015
Exhibit 14 - Asbestos, Part 1
Asbestos
Ground Water Systems, CWSs & NTNCWSs
# of Affected Systems
(from C of "systems")
Percent of Systems by Scenario
(from "% by scenario")
Number of Systems by Scenario
B
C=A*B
Scen. 2
Scen. 3
Below
Above
trigger &
MCL
waiver
A
Scen. 1
Below
trigger &
no waiver
Size Category
0-100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-50,000
50,001-100,000
100,001-1,000,000
>1,000,000
Total
19,092
18,602
5,405
5,879
2,637
1,312
146
63
2
53,138
Asbestos
Surface Water Systems, CWSs & NTNCWSs
# of Affected Systems
(from C of "systems")
14.0%
14.0%
14.0%
14.0%
14.0%
14.0%
14.0%
14.0%
14.0%
Scen. 2
Below
trigger &
waiver
85.6%
85.6%
85.6%
85.6%
85.6%
85.6%
85.6%
85.6%
85.6%
0.4%
0.4%
0.4%
0.4%
0.4%
0.4%
0.4%
0.4%
0.4%
-
2,674
2,605
757
823
369
184
20
9
0
7,441
558
765
374
959
994
987
221
245
18
5,121
58,259
DDBP/Chem/Rads ICR - Chemical Phase Regulation
44.5%
44.5%
44.5%
44.5%
44.5%
44.5%
44.5%
44.5%
44.5%
Scen. 2
Below
trigger &
waiver
54.8%
54.8%
54.8%
54.8%
54.8%
54.8%
54.8%
54.8%
54.8%
16,342
15,923
4,626
5,032
2,257
1,123
125
54
2
45,484
Scen. 4
Scen. 1
Above
Below
trigger &
trigger &
below MCL no waiver
76
74
22
24
11
5
1
0
0
213
-
Number of Systems by Scenario
0.11
0.11
0.11
0.11
0.11
0.11
0.11
0.11
0.11
D
Scen. 2
Below
trigger &
waiver
-
Scen. 3
Above
MCL
0.7%
0.7%
0.7%
0.7%
0.7%
0.7%
0.7%
0.7%
0.7%
-
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
Annual Sampling Events by Scenario
Scen. 1
Scen. 4
Above
Above
trigger & trigger & no
waiver
below
MCL
-
294
287
83
91
41
20
2
1
0
819
Scen. 2
Above
trigger &
waiver
-
Scen. 3
Above
MCL
249
341
167
427
443
440
98
109
8
2,281
306
419
205
525
544
540
121
134
10
2,804
4
5
3
7
7
7
2
2
0
36
-
9,723
48,288
248
-
D-14
0.11
0.11
0.11
0.11
0.11
0.11
0.11
0.11
0.11
Scen. 2
Below
trigger &
waiver
-
E=C*D
Scen. 3
Above
MCL
Scen. 4
Above
trigger &
below MCL
305
298
86
94
42
21
2
1
0
850
Total
600
584
170
185
83
41
5
2
0
1,669
Annual Sampling Events by Scenario
D
Scen. 1
Scen. 4
Below
Above
trigger &
trigger &
below MCL no waiver
Scen. 2
Below
trigger &
waiver
Scen. 1
Scen. 4
Below
Above
trigger &
trigger &
below MCL no waiver
Scen. 3
Above
MCL
Annual Sampling Frequency by Scenario
(from "frequency")
C=A*B
B
Scen. 1
Below
trigger &
no waiver
Asbestos:
GRAND TOTAL
Scen. 4
Scen. 1
Above
Below
trigger &
trigger &
below MCL no waiver
Percent of Systems by Scenario
(from "% by scenario")
A
Size Category
0-100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-50,000
50,001-100,000
100,001-1,000,000
>1,000,000
Total
Scen. 3
Above
MCL
Annual Sampling Frequency by Scenario
(from "frequency")
E=C*D
Scen. 3
Above
MCL
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
Scen. 1
Scen. 4
Above
Above
trigger & trigger & no
waiver
below
MCL
-
Scen. 2
Above
trigger &
waiver
Scen. 3
Above
MCL
Scen. 4
Above
trigger &
below MCL
Total
27
37
18
47
49
48
11
12
1
251
-
16
21
10
27
28
28
6
7
1
143
-
43
59
29
74
77
76
17
19
1
394
1,069
-
994
-
2,063
December 2015
Exhibit 15 - Asbestos, Part 2
Asbestos (continued)
Ground Water Systems, CWSs & NTNCWSs
Samples per Total Number
Total Annual
Cost
Burden
Sampling Events Event (from B of Samples
Burden per
Total
Cost per
Total Cost, $
per Year
(carried forward of "sampling
Sample, hrs. Burden, hrs. Sample, $
pts")
from previous
(from "burden
(from
pg.)
by chem")
"burden by
chem")
Size Category
E
F
G=E*F
H
I=G*H
J
K=G*J
2.5
0-100
600
1.05
627
1,567
$484
$303,173
2.5
101-500
584
1.11
649
1,621
$484
$313,646
2.5
501-1,000
170
1.29
219
548
$484
$105,985
2.5
1,001-3,300
185
1.43
264
659
$484
$127,489
2.5
3,301-10,000
83
1.60
132
331
$484
$63,948
2.5
10,001-50,000
41
3.53
146
364
$484
$70,431
2.5
50,001-100,000
5
9.42
43
108
$484
$20,881
2.5
100,001-1,000,000
2
12.56
25
62
$484
$12,017
2.5
>1,000,000
0
12.56
1
2
$484
$382
Total
1,669
2,105
5,262
$1,017,953
Asbestos (continued)
Surface Water Systems, CWSs & NTNCWSs
Total Annual
Samples per Total Number
Cost
Burden
Sampling Events Event (from B of Samples
Burden per
Total
Cost per
Total Cost, $
per Year
(carried forward of "sampling
Sample, hrs. Burden, hrs. Sample, $
from previous
pts")
(from "burden
(from
pg.)
by chem")
"burden by
chem")
Size Category
E
F
G=E*F
H
I=G*H
J
K=G*J
2.5
111
$484
$21,558
0-100
43
1.04
45
2.5
101-500
59
1.06
62
156
$484
$30,226
2.5
501-1,000
29
1.16
33
84
$484
$16,160
2.5
1,001-3,300
74
1.14
84
211
$484
$40,728
2.5
3,301-10,000
77
1.13
87
216
$484
$41,843
2.5
10,001-50,000
76
1.58
120
300
$484
$57,954
2.5
50,001-100,000
17
1.98
34
84
$484
$16,311
2.5
100,001-1,000,000
19
3.30
62
156
$484
$30,099
2.5
>1,000,000
1
3.30
5
11
$484
$2,211
Total
394
532
1,329
$257,090
Asbestos
GRAND TOTAL
2,063
2,636
6,591
Note: Burden estimates take into account the results of the May 2015 consultation with water industry representatives.
DDBP/Chem/Rads ICR - Chemical Phase Regulation
D-15
$1,275,044
December 2015
Exhibit 16 - Cadmium, Part 1
Cadmium
Ground Water Systems, CWSs & NTNCWSs
# of Affected Systems
(from C of "systems")
A
Size Category
0-100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-50,000
50,001-100,000
100,001-1,000,000
>1,000,000
Total
19,092
18,602
5,405
5,879
2,637
1,312
146
63
2
53,138
Cadmium
Surface Water Systems, CWSs & NTNCWSs
# of Affected Systems
(from C of "systems")
A
Size Category
0-100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-50,000
50,001-100,000
100,001-1,000,000
>1,000,000
Total
Cadmium:
GRAND TOTAL
558
765
374
959
994
987
221
245
18
5,121
58,259
DDBP/Chem/Rads ICR - Chemical Phase Regulation
Percent of Systems by Scenario
Number of Systems by Scenario
Annual Sampling Frequency by Scenario
Annual Sampling Events by Scenario
(from "frequency")
(from "% by scenario")
C=A*B
B
D
E=C*D
Scen. 4
Scen. 3
Scen. 2
Scen. 1
Scen. 4
Scen. 3
Scen. 2
Scen. 1
Scen. 4
Scen. 3
Scen. 2
Scen. 1
Scen. 4
Scen. 3
Scen. 2
Scen. 1
Above
Above
Above
Above
Above
Above
Below
Below
Above
Above
Below
Below
Above
Above
Below
Below
trigger &
MCL
trigger & trigger & no trigger &
MCL
trigger &
trigger &
trigger &
MCL
trigger &
trigger &
trigger &
MCL
trigger &
trigger &
below MCL
waiver
waiver
below
waiver
below MCL no waiver
waiver
below MCL no waiver
waiver
no waiver
MCL
79.5%
79.5%
79.5%
79.5%
79.5%
79.5%
79.5%
79.5%
79.5%
19.9%
19.9%
19.9%
19.9%
19.9%
19.9%
19.9%
19.9%
19.9%
0.6%
0.6%
0.6%
0.6%
0.6%
0.6%
0.6%
0.6%
0.6%
-
15,186
14,796
4,299
4,676
2,097
1,044
116
50
2
42,266
3,792
3,694
1,073
1,168
524
261
29
13
0
10,553
115
112
32
35
16
8
1
0
0
319
-
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.11
0.11
0.11
0.11
0.11
0.11
0.11
0.11
0.11
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
-
5,011
4,883
1,419
1,543
692
344
38
17
1
13,948
417
406
118
128
58
29
3
1
0
1,161
458
446
130
141
63
31
4
2
0
1,275
-
Number of Systems by Scenario
Annual Sampling Frequency by Scenario
Annual Sampling Events by Scenario
Percent of Systems by Scenario
(from "frequency")
(from "% by scenario")
B
C=A*B
D
E=C*D
Scen. 4
Scen. 3
Scen. 2
Scen. 1
Scen. 4
Scen. 3
Scen. 2
Scen. 1
Scen. 4
Scen. 3
Scen. 2
Scen. 1
Scen. 4
Scen. 3
Scen. 2
Scen. 1
Above
Above
Above
Above
Above
Above
Below
Below
Above
Above
Below
Below
Above
Above
Below
Below
trigger &
MCL
trigger & trigger & no trigger &
MCL
trigger &
trigger &
trigger &
MCL
trigger &
trigger &
trigger &
MCL
trigger &
trigger &
below MCL
waiver
waiver
below
waiver
below MCL no waiver
waiver
below MCL no waiver
waiver
no waiver
MCL
90.9%
90.9%
90.9%
90.9%
90.9%
90.9%
90.9%
90.9%
90.9%
8.9%
8.9%
8.9%
8.9%
8.9%
8.9%
8.9%
8.9%
8.9%
0.2%
0.2%
0.2%
0.2%
0.2%
0.2%
0.2%
0.2%
0.2%
-
507
696
340
872
904
898
201
223
16
4,657
49
68
33
85
88
87
20
22
2
454
1
2
1
2
2
2
0
0
0
10
-
46,923
11,007
329
-
D-16
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.11
0.11
0.11
0.11
0.11
0.11
0.11
0.11
0.11
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
-
Total
5,887
5,736
1,667
1,813
813
405
45
19
1
16,384
Total
507
696
340
872
904
898
201
223
16
4,657
5
7
4
9
10
10
2
2
0
50
4
6
3
8
8
8
2
2
0
41
-
517
709
347
889
922
915
205
227
17
4,748
18,605
1,211
1,316
-
21,132
December 2015
Exhibit 17 - Cadmium, Part 2
Cadmium (continued)
Ground Water Systems, CWSs & NTNCWSs
Samples per Total Number
Total Annual
Cost
Burden
Sampling Events Event (from B of Samples
Burden per
Total
Cost per
Total Cost, $
per Year
(carried forward of "sampling
Sample, hrs. Burden, hrs. Sample, $
pts")
from previous
(from "burden
(from
pg.)
by chem")
"burden by
chem")
Size Category
E
F
G=E*F
H
I=G*H
J
K=G*J
0.5
0-100
5,887
1.05
6,154
3,077
$15
$89,297
0.5
101-500
5,736
1.11
6,367
3,184
$15
$92,382
0.5
501-1,000
1,667
1.29
2,151
1,076
$15
$31,217
0.5
1,001-3,300
1,813
1.43
2,588
1,294
$15
$37,551
0.5
3,301-10,000
813
1.60
1,298
649
$15
$18,835
0.5
10,001-50,000
405
3.53
1,430
715
$15
$20,745
0.5
50,001-100,000
45
9.42
424
212
$15
$6,150
0.5
100,001-1,000,000
19
12.56
244
122
$15
$3,540
0.5
>1,000,000
1
12.56
8
4
$15
$112
Total
16,384
20,664
10,332
$299,830
Cadmium (continued)
Surface Water Systems, CWSs & NTNCWSs
Total Annual
Samples per Total Number
Cost
Burden
Sampling Events Event (from B of Samples
Burden per
Total
Cost per
Total Cost, $
per Year
(carried forward of "sampling
Sample, hrs. Burden, hrs. Sample, $
from previous
pts")
(from "burden
(from
pg.)
by chem")
"burden by
chem")
Size Category
E
F
G=E*F
H
I=G*H
J
K=G*J
0.5
268
$15
$7,787
0-100
517
1.04
537
0.5
101-500
709
1.06
752
376
$15
$10,918
0.5
501-1,000
347
1.16
402
201
$15
$5,837
0.5
1,001-3,300
889
1.14
1,014
507
$15
$14,712
0.5
3,301-10,000
922
1.13
1,042
521
$15
$15,114
0.5
10,001-50,000
915
1.58
1,443
721
$15
$20,934
0.5
50,001-100,000
205
1.98
406
203
$15
$5,892
0.5
100,001-1,000,000
227
3.30
749
375
$15
$10,872
0.5
>1,000,000
17
3.30
55
28
$15
$799
Total
4,748
6,400
3,200
$92,865
Cadmium
GRAND TOTAL
21,132
27,065
13,532
Note: Burden estimates take into account the results of the May 2015 consultation with water industry representatives.
DDBP/Chem/Rads ICR - Chemical Phase Regulation
D-17
$392,695
December 2015
Exhibit 18 - Chromium, Part 1
Chromium
Ground Water Systems, CWSs & NTNCWSs
# of Affected Systems
(from C of "systems")
Percent of Systems by Scenario
(from "% by scenario")
Number of Systems by Scenario
B
C=A*B
Scen. 2
Scen. 3
Below
Above
trigger &
MCL
waiver
A
Scen. 1
Below
trigger &
no waiver
Size Category
0-100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-50,000
50,001-100,000
100,001-1,000,000
>1,000,000
Total
19,092
18,602
5,405
5,879
2,637
1,312
146
63
2
53,138
Chromium
Surface Water Systems, CWSs & NTNCWSs
# of Affected Systems
(from C of "systems")
79.5%
79.5%
79.5%
79.5%
79.5%
79.5%
79.5%
79.5%
79.5%
Scen. 2
Below
trigger &
waiver
19.9%
19.9%
19.9%
19.9%
19.9%
19.9%
19.9%
19.9%
19.9%
Chromium:
GRAND TOTAL
58,259
DDBP/Chem/Rads ICR - Chemical Phase Regulation
0.6%
0.6%
0.6%
0.6%
0.6%
0.6%
0.6%
0.6%
0.6%
-
15,186
14,796
4,299
4,676
2,097
1,044
116
50
2
42,266
3,792
3,694
1,073
1,168
524
261
29
13
0
10,553
Scen. 4
Scen. 1
Above
Below
trigger &
trigger &
below MCL no waiver
115
112
32
35
16
8
1
0
0
319
-
Number of Systems by Scenario
B
C=A*B
Scen. 3
Scen. 2
Above
Below
MCL
trigger &
waiver
Scen. 1
Below
trigger &
no waiver
558
765
374
959
994
987
221
245
18
5,121
Scen. 4
Scen. 1
Above
Below
trigger &
trigger &
below MCL no waiver
Percent of Systems by Scenario
(from "% by scenario")
A
Size Category
0-100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-50,000
50,001-100,000
100,001-1,000,000
>1,000,000
Total
Scen. 3
Above
MCL
90.9%
90.9%
90.9%
90.9%
90.9%
90.9%
90.9%
90.9%
90.9%
Scen. 2
Below
trigger &
waiver
8.9%
8.9%
8.9%
8.9%
8.9%
8.9%
8.9%
8.9%
8.9%
Scen. 3
Above
MCL
0.2%
0.2%
0.2%
0.2%
0.2%
0.2%
0.2%
0.2%
0.2%
Scen. 1
Scen. 4
Below
Above
trigger &
trigger &
below MCL no waiver
-
Annual Sampling Frequency by Scenario
(from "frequency")
0.11
0.11
0.11
0.11
0.11
0.11
0.11
0.11
0.11
Scen. 3
Above
MCL
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
Scen. 1
Scen. 4
Above
Above
trigger & trigger & no
waiver
below
MCL
-
Annual Sampling Frequency by Scenario
(from "frequency")
Scen. 1
Scen. 4
Below
Above
trigger &
trigger &
below MCL no waiver
507
696
340
872
904
898
201
223
16
4,657
49
68
33
85
88
87
20
22
2
454
1
2
1
2
2
2
0
0
0
10
-
46,923
11,007
329
-
D-18
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
D
Scen. 2
Below
trigger &
waiver
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
D
Scen. 2
Below
trigger &
waiver
0.11
0.11
0.11
0.11
0.11
0.11
0.11
0.11
0.11
Scen. 3
Above
MCL
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
Annual Sampling Events by Scenario
5,011
4,883
1,419
1,543
692
344
38
17
1
13,948
417
406
118
128
58
29
3
1
0
1,161
E=C*D
Scen. 3
Above
MCL
458
446
130
141
63
31
4
2
0
1,275
Scen. 4
Above
trigger &
below MCL
-
Total
5,887
5,736
1,667
1,813
813
405
45
19
1
16,384
Annual Sampling Events by Scenario
Scen. 1
Scen. 4
Above
Above
trigger & trigger & no
waiver
below
MCL
-
Scen. 2
Above
trigger &
waiver
Scen. 2
Above
trigger &
waiver
E=C*D
Scen. 3
Above
MCL
Scen. 4
Above
trigger &
below MCL
Total
507
696
340
872
904
898
201
223
16
4,657
5
7
4
9
10
10
2
2
0
50
4
6
3
8
8
8
2
2
0
41
-
517
709
347
889
922
915
205
227
17
4,748
18,605
1,211
1,316
-
21,132
December 2015
Exhibit 19 - Chromium, Part 2
Chromium (continued)
Ground Water Systems, CWSs & NTNCWSs
Total Annual
Samples per Total Number
Burden
Cost
Sampling Events Event (from B of Samples
Burden per
Total
Cost per
Total Cost, $
per Year
(carried forward of "sampling
Sample, hrs. Burden, hrs. Sample, $
from previous
pts")
(from "burden
(from
pg.)
by chem")
"burden by
chem")
Size Category
E
F
G=E*F
H
I=G*H
J
K=G*J
0.5
0-100
5,887
1.05
6,154
3,077
$15
$89,297
0.5
101-500
5,736
1.11
6,367
3,184
$15
$92,382
0.5
501-1,000
1,667
1.29
2,151
1,076
$15
$31,217
0.5
1,001-3,300
1,813
1.43
2,588
1,294
$15
$37,551
0.5
3,301-10,000
813
1.60
1,298
649
$15
$18,835
0.5
10,001-50,000
405
3.53
1,430
715
$15
$20,745
0.5
50,001-100,000
45
9.42
424
212
$15
$6,150
0.5
100,001-1,000,000
19
12.56
244
122
$15
$3,540
0.5
>1,000,000
1
12.56
8
4
$15
$112
Total
16,384
20,664
10,332
$299,830
Chromium (continued)
Surface Water Systems, CWSs & NTNCWSs
Total Annual
Samples per Total Number
Burden
Cost
Sampling Events Event (from B of Samples
Burden per
Total
Cost per
Total Cost, $
(carried forward of "sampling
per Year
Sample, hrs. Burden, hrs. Sample, $
from previous
pts")
(from "burden
(from
pg.)
by chem")
"burden by
chem")
Size Category
E
F
G=E*F
H
I=G*H
J
K=G*J
0.5
268
$15
$7,787
0-100
517
1.04
537
0.5
101-500
709
1.06
752
376
$15
$10,918
0.5
501-1,000
347
1.16
402
201
$15
$5,837
0.5
1,001-3,300
889
1.14
1,014
507
$15
$14,712
0.5
3,301-10,000
922
1.13
1,042
521
$15
$15,114
0.5
10,001-50,000
915
1.58
1,443
721
$15
$20,934
0.5
50,001-100,000
205
1.98
406
203
$15
$5,892
0.5
100,001-1,000,000
227
3.30
749
375
$15
$10,872
0.5
>1,000,000
17
3.30
55
28
$15
$799
Total
4,748
6,400
3,200
$92,865
Chromium
GRAND TOTAL
21,132
27,065
13,532
Note: Burden estimates take into account the results of the May 2015 consultation with water industry representatives.
DDBP/Chem/Rads ICR - Chemical Phase Regulation
D-19
$392,695
December 2015
Exhibit 20 - Fluoride, Part 1
Fluoride
Ground Water Systems, CWSs & NTNCWSs
# of Affected Systems
(from C of "systems")
Percent of Systems by Scenario (from "% by
scenario")
Number of Systems by Scenario
D
C=A*B
Scen. 3
Scen. 2
Above
Below
MCL
trigger &
waiver
A
Scen. 1
Below
trigger &
no waiver
Size Category
0-100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-50,000
50,001-100,000
100,001-1,000,000
>1,000,000
Total
19,092
18,602
5,405
5,879
2,637
1,312
146
63
2
53,138
Fluoride
Surface Water Systems, CWSs & NTNCWSs
# of Affected Systems
(from C of "systems")
79.0%
79.0%
79.0%
79.0%
79.0%
79.0%
79.0%
79.0%
79.0%
19.7%
19.7%
19.7%
19.7%
19.7%
19.7%
19.7%
19.7%
19.7%
Fluoride:
GRAND TOTAL
58,259
DDBP/Chem/Rads ICR - Chemical Phase Regulation
-
15,079
14,692
4,269
4,643
2,083
1,036
115
50
2
41,968
3,765
3,668
1,066
1,159
520
259
29
12
0
10,479
Scen. 1
Scen. 4
Below
Above
trigger &
trigger &
below MCL no waiver
248
242
70
76
34
17
2
1
0
691
-
Number of Systems by Scenario
D
C=A*B
Scen. 3
Scen. 2
Above
Below
MCL
trigger &
waiver
Scen. 1
Below
trigger &
no waiver
558
765
374
959
994
987
221
245
18
5,121
1.3%
1.3%
1.3%
1.3%
1.3%
1.3%
1.3%
1.3%
1.3%
Scen. 1
Scen. 4
Below
Above
trigger &
trigger &
below MCL no waiver
Percent of Systems by Scenario (from "% by
scenario")
A
Size Category
0-100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-50,000
50,001-100,000
100,001-1,000,000
>1,000,000
Total
Scen. 3
Above
MCL
Scen. 2
Below
trigger &
waiver
90.7%
90.7%
90.7%
90.7%
90.7%
90.7%
90.7%
90.7%
90.7%
Scen. 2
Below
trigger &
waiver
8.8%
8.8%
8.8%
8.8%
8.8%
8.8%
8.8%
8.8%
8.8%
Scen. 3
Above
MCL
0.5%
0.5%
0.5%
0.5%
0.5%
0.5%
0.5%
0.5%
0.5%
Scen. 1
Scen. 4
Below
Above
trigger &
trigger &
below MCL no waiver
-
Annual Sampling Frequency by Scenario
(from "frequency")
0.11
0.11
0.11
0.11
0.11
0.11
0.11
0.11
0.11
Scen. 3
Above
MCL
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
Scen. 1
Scen. 4
Above
Above
trigger & trigger & no
waiver
below
MCL
-
Annual Sampling Frequency by Scenario
(from "frequency")
Scen. 1
Scen. 4
Below
Above
trigger &
trigger &
below MCL no waiver
506
694
339
869
901
895
200
222
16
4,643
49
68
33
85
88
87
20
22
2
452
3
4
2
5
5
5
1
1
0
26
-
46,611
10,931
716
-
D-20
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
D
Scen. 2
Below
trigger &
waiver
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
D
Scen. 2
Below
trigger &
waiver
0.11
0.11
0.11
0.11
0.11
0.11
0.11
0.11
0.11
Scen. 3
Above
MCL
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
Annual Sampling Events by Scenario
4,976
4,848
1,409
1,532
687
342
38
16
1
13,850
414
404
117
128
57
28
3
1
0
1,153
E=C*D
Scen. 3
Above
MCL
993
967
281
306
137
68
8
3
0
2,763
Scen. 4
Above
trigger &
below MCL
-
Total
6,383
6,219
1,807
1,965
882
439
49
21
1
17,765
Annual Sampling Events by Scenario
Scen. 1
Scen. 4
Above
Above
trigger & trigger & no
waiver
below
MCL
-
Scen. 2
Above
trigger &
waiver
Scen. 2
Above
trigger &
waiver
E=C*D
Scen. 3
Above
MCL
Scen. 4
Above
trigger &
below MCL
Total
506
694
339
869
901
895
200
222
16
4,643
5
7
4
9
10
10
2
2
0
50
11
15
7
19
20
20
4
5
0
102
-
522
716
350
898
931
924
207
229
17
4,795
18,492
1,202
2,866
-
22,561
December 2015
Exhibit 21 - Fluoride, Part 2
Fluoride (continued)
Ground Water Systems, CWSs & NTNCWSs
Samples per Total Number
Total Annual
Burden
Cost
Event
of Samples
Sampling Events
Burden per
Total
Cost per
Total Cost, $
(from B of
per Year
(carried forward
Sample, hrs. Burden, hrs. Sample, $
"sampling
from previous
(from "burden
(from
pts")
pg.)
by chem")
"burden by
chem")
Size Category
0-100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-50,000
50,001-100,000
100,001-1,000,000
>1,000,000
Total
E
F
6,383
6,219
1,807
1,965
882
439
49
21
1
17,765
1.05
1.11
1.29
1.43
1.60
3.53
9.42
12.56
12.56
G=E*F
6,673
6,904
2,333
2,806
1,408
1,550
460
265
8
22,407
H
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
I=G*H
3,337
3,452
1,166
1,403
704
775
230
132
4
11,203
J
$15
$15
$15
$15
$15
$15
$15
$15
$15
K=G*J
$96,827
$100,171
$33,849
$40,717
$20,424
$22,494
$6,669
$3,838
$122
$325,111
Fluoride (continued)
Surface Water Systems, CWSs & NTNCWSs
Total Annual
Samples per Total Number
Burden
Cost
Sampling Events
Event
of Samples
Burden per
Total
Cost per
Total Cost, $
(carried forward
(from B of
per Year
Sample, hrs. Burden, hrs. Sample, $
from previous
"sampling
(from "burden
(from
pg.)
pts")
by chem")
"burden by
chem")
Size Category
E
F
G=E*F
H
I=G*H
J
K=G*J
0.5
271
$15
$7,864
0-100
522
1.04
542
0.5
101-500
716
1.06
760
380
$15
$11,027
0.5
501-1,000
350
1.16
406
203
$15
$5,895
0.5
1,001-3,300
898
1.14
1,024
512
$15
$14,858
0.5
3,301-10,000
931
1.13
1,052
526
$15
$15,265
0.5
10,001-50,000
924
1.58
1,457
729
$15
$21,143
0.5
50,001-100,000
207
1.98
410
205
$15
$5,950
0.5
100,001-1,000,000
229
3.30
757
378
$15
$10,981
0.5
>1,000,000
17
3.30
56
28
$15
$807
Total
4,795
6,464
3,232
$93,790
Fluoride
GRAND TOTAL
22,561
28,871
14,435
Note: Burden estimates take into account the results of the May 2015 consultation with water industry representatives.
DDBP/Chem/Rads ICR - Chemical Phase Regulation
D-21
$418,901
December 2015
Exhibit 22 - Mercury, Part 1
Mercury
Ground Water Systems, CWSs & NTNCWSs
# of Affected Systems
(from C of "systems")
A
Percent of Systems by Scenario
(from "% by scenario")
B
Scen. 1
Below
trigger &
no waiver
Size Category
0-100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-50,000
50,001-100,000
100,001-1,000,000
>1,000,000
Total
19,092
18,602
5,405
5,879
2,637
1,312
146
63
2
53,138
Mercury
Surface Water Systems, CWSs & NTNCWSs
# Affected Systems (from C of
systems)
A
79.7%
79.7%
79.7%
79.7%
79.7%
79.7%
79.7%
79.7%
79.7%
Mercury:
GRAND TOTAL
558
765
374
959
994
987
221
245
18
5,121
58,259
DDBP/Chem/Rads ICR - Chemical Phase Regulation
19.9%
19.9%
19.9%
19.9%
19.9%
19.9%
19.9%
19.9%
19.9%
Scen. 3
Above
MCL
0.4%
0.4%
0.4%
0.4%
0.4%
0.4%
0.4%
0.4%
0.4%
90.7%
90.7%
90.7%
90.7%
90.7%
90.7%
90.7%
90.7%
90.7%
Scen. 2
Below
trigger &
waiver
8.8%
8.8%
8.8%
8.8%
8.8%
8.8%
8.8%
8.8%
8.8%
Scen. 3
Above
MCL
0.5%
0.5%
0.5%
0.5%
0.5%
0.5%
0.5%
0.5%
0.5%
Annual Sampling Frequency by Scenario
(from "frequency")
D
C=A*B
Scen. 1
Scen. 4
Below
Above
trigger &
trigger &
below MCL no waiver
-
Percent of Systems by Scenario
(from "% by scenario")
B
Scen. 1
Below
trigger &
no waiver
Size Category
0-100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-50,000
50,001-100,000
100,001-1,000,000
>1,000,000
Total
Scen. 2
Below
trigger &
waiver
Number of Systems by Scenario
15,216
14,826
4,308
4,686
2,102
1,046
116
50
2
42,351
Scen. 2
Below
trigger &
waiver
Scen. 3
Above
MCL
3,799
3,702
1,076
1,170
525
261
29
13
0
10,575
76
74
22
24
11
5
1
0
0
213
Scen. 1
Scen. 4
Below
Above
trigger &
trigger &
below MCL no waiver
-
Number of Systems by Scenario
C=A*B
-
Scen. 1
Scen. 4
Below
Above
trigger &
trigger &
below MCL no waiver
Scen. 3
Above
MCL
506
694
339
869
901
895
200
222
16
4,643
49
68
33
85
88
87
20
22
2
452
3
4
2
5
5
5
1
1
0
26
-
46,994
11,027
238
-
D-22
Scen. 3
Above
MCL
0.11
0.11
0.11
0.11
0.11
0.11
0.11
0.11
0.11
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Scen. 2
Below
trigger &
waiver
Scen. 3
Above
MCL
0.11
0.11
0.11
0.11
0.11
0.11
0.11
0.11
0.11
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
E=C*D
Scen. 1
Scen. 4
Above
Above
trigger & trigger & no
waiver
below
MCL
-
Annual Sampling Frequency by Scenario
(from "frequency")
D
Scen. 2
Below
trigger &
waiver
Scen. 1
Scen. 4
Below
Above
trigger &
trigger &
below MCL no waiver
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
Scen. 2
Below
trigger &
waiver
Annual Sampling Events by Scenario
5,021
4,893
1,422
1,546
694
345
38
17
1
13,976
418
407
118
129
58
29
3
1
0
1,163
Scen. 3
Above
MCL
305
298
86
94
42
21
2
1
0
850
Scen. 4
Above
trigger &
below MCL
-
Total
5,745
5,597
1,626
1,769
793
395
44
19
1
15,989
Annual Sampling Events by Scenario
E=C*D
Scen. 1
Scen. 4
Below
Above
trigger & trigger & no
waiver
below
MCL
-
Scen. 2
Above
trigger &
waiver
Scen. 2
Below
trigger &
waiver
Scen. 3
Above
MCL
Scen. 4
Above
trigger &
below MCL
Total
506
694
339
869
901
895
200
222
16
4,643
5
7
4
9
10
10
2
2
0
50
11
15
7
19
20
20
4
5
0
102
-
522
716
350
898
931
924
207
229
17
4,795
18,619
1,213
953
-
20,784
December 2015
Exhibit 23 - Mercury, Part 2
Mercury (continued)
Ground Water Systems, CWSs & NTNCWSs
Samples per Total Number
Total Annual
Cost
Burden
Event
of Samples
Sampling Events
Burden per
Total
Cost per
Total Cost, $
(from B of
per Year
(carried forward
Sample, hrs. Burden, hrs. Sample, $
"sampling
from previous
(from "burden
(from
pg.)
pts")
by chem")
"burden by
chem")
Size Category
E
F
G=E*F
H
I=G*H
J
K=G*J
0.5
0-100
5,745
1.05
6,006
3,003
$32
$193,658
0.5
101-500
5,597
1.11
6,214
3,107
$32
$200,348
0.5
501-1,000
1,626
1.29
2,100
1,050
$32
$67,700
0.5
1,001-3,300
1,769
1.43
2,526
1,263
$32
$81,436
0.5
3,301-10,000
793
1.60
1,267
633
$32
$40,848
0.5
10,001-50,000
395
3.53
1,395
698
$32
$44,989
0.5
50,001-100,000
44
9.42
414
207
$32
$13,338
0.5
100,001-1,000,000
19
12.56
238
119
$32
$7,676
0.5
>1,000,000
1
12.56
8
4
$32
$244
Total
15,989
20,167
10,083
$650,237
Mercury (continued)
Surface Water Systems, CWSs & NTNCWSs
Total Annual
Samples per Total Number
Cost
Burden
of Samples
Sampling Events
Event
Burden per
Total
Cost per
Total Cost, $
per Year
(carried forward
(from B of
Sample, hrs. Burden, hrs. Sample, $
from previous
"sampling
(from "burden
(from
pg.)
pts")
by chem")
"burden by
chem")
Size Category
E
F
G=E*F
H
I=G*H
J
K=G*J
0.5
271
$32
$17,477
0-100
522
1.04
542
0.5
101-500
716
1.06
760
380
$32
$24,504
0.5
501-1,000
350
1.16
406
203
$32
$13,101
0.5
1,001-3,300
898
1.14
1,024
512
$32
$33,018
0.5
3,301-10,000
931
1.13
1,052
526
$32
$33,922
0.5
10,001-50,000
924
1.58
1,457
729
$32
$46,984
0.5
50,001-100,000
207
1.98
410
205
$32
$13,223
0.5
100,001-1,000,000
229
3.30
757
378
$32
$24,401
0.5
>1,000,000
17
3.30
56
28
$32
$1,793
Total
4,795
6,464
3,232
$208,423
Mercury
GRAND TOTAL
20,784
26,631
13,315
Note: Burden estimates take into account the results of the May 2015 consultation with water industry representatives.
DDBP/Chem/Rads ICR - Chemical Phase Regulation
D-23
$858,660
December 2015
Exhibit 24 - Nitrate, Part 1
Nitrate
Ground Water Systems, CWSs, NTNCWSs, and TNCWSs
Percent of Systems by Scenario
Number of Systems by Scenario
Annual Sampling Frequency by Scenario
# of Affected Systems
(from "% by scenario")
(from "frequency")
(from C+D of "systems")
C=A*B
D
A
B
Scen. 4
Scen. 3
Scen. 2
Scen. 1
Scen. 4
Scen. 3
Scen. 2
Scen. 1
Scen. 4
Scen. 3
Scen. 2
Scen. 1
Above
Above
Below
Below
Above
Above
Below
Below
Above
Above
Below
Below
trigger &
MCL
trigger &
trigger &
trigger &
MCL
trigger &
trigger &
trigger &
MCL
trigger &
trigger &
below
waiver
below MCL no waiver
waiver
below MCL no waiver
waiver
no waiver
MCL
Size Category
0-100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-50,000
50,001-100,000
100,001-1,000,000
>1,000,000
Total
75,459
37,757
7,417
6,415
2,703
1,320
147
63
2
131,283
98.1%
98.1%
98.1%
98.1%
98.1%
98.1%
98.1%
98.1%
98.1%
-
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
1.9%
1.9%
1.9%
1.9%
1.9%
1.9%
1.9%
1.9%
1.9%
74,025
37,040
7,276
6,293
2,652
1,295
144
62
2
128,789
-
-
1,434
717
141
122
51
25
3
1
0
2,494
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
-
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
Nitrate
Surface Water Systems, CWSs, NTNCWSs, and TNCWSs
Percent of Systems by Scenario
# of Affected Systems
Number of Systems by Scenario
Annual Sampling Frequency by Scenario
(from "% by scenario")
(from C+D of "systems")
(from "frequency")
A
B
C=A*B
D
Scen. 4
Scen. 3
Scen. 2
Scen. 1
Scen. 4
Scen. 3
Scen. 2
Scen. 1
Scen. 4
Scen. 3
Scen. 2
Scen. 1
Above
Above
Below
Below
Above
Above
Below
Below
Above
Above
Below
Below
trigger &
MCL
trigger &
trigger &
trigger &
MCL
trigger &
trigger &
trigger &
MCL
trigger &
trigger &
below
waiver
below MCL no waiver
waiver
below MCL no waiver
waiver
no waiver
MCL
Size Category
0-100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-50,000
50,001-100,000
100,001-1,000,000
>1,000,000
Total
Nitrate:
GRAND TOTAL
1,169
1,121
442
1,001
1,011
987
221
245
18
6,215
137,498
DDBP/Chem/Rads ICR - Chemical Phase Regulation
98.1%
98.1%
98.1%
98.1%
98.1%
98.1%
98.1%
98.1%
98.1%
-
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
1.9%
1.9%
1.9%
1.9%
1.9%
1.9%
1.9%
1.9%
1.9%
1,147
1,100
434
982
992
968
217
240
18
6,097
-
-
22
21
8
19
19
19
4
5
0
118
134,886
-
-
2,612
D-24
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
-
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
Annual Sampling Events by Scenario
Scen. 1
Above
trigger & no
waiver
74,025
37,040
7,276
6,293
2,652
1,295
144
62
2
128,789
Scen. 2
Above
trigger &
waiver
-
E=C*D
Scen. 3
Above
MCL
-
Scen. 4
Above
trigger &
below MCL
5,735
2,870
564
488
205
100
11
5
0
9,978
Total
79,760
39,909
7,840
6,781
2,857
1,395
155
67
2
138,766
Annual Sampling Events by Scenario
Scen. 1
Above
trigger & no
waiver
Scen. 2
Above
trigger &
waiver
E=C*D
Scen. 3
Above
MCL
Scen. 4
Above
trigger &
below MCL
Total
1,147
1,100
434
982
992
968
217
240
18
6,097
-
-
89
85
34
76
77
75
17
19
1
472
1,236
1,185
467
1,058
1,069
1,043
234
259
19
6,569
134,886
-
-
10,450
145,335
December 2015
Exhibit 25 - Nitrate, Part 2
Nitrate (continued)
Ground Water Systems, CWSs, NTNCWSs, and TNCWSs
Samples per Total Number
Total Annual
Cost
Burden
Event
of Samples
Sampling Events
Burden per
Total
Cost per
(carried forward
(from B of
per Year
Sample, hrs. Burden, hrs. Sample, $
Total Cost, $
from previous
"sampling
(=E*F)
(from "burden
(=G*H)
(from
pg.)
pts")
by chem")
"burden by
chem")
Size Category
E
F
G=E*F
H
I
J
K=G*J
0.5
0-100
79,760
1.05
83,389
41,695
$16
$1,344,366
0.5
101-500
39,909
1.11
44,303
22,152
$16
$714,241
0.5
501-1,000
7,840
1.29
10,121
5,061
$16
$163,171
0.5
1,001-3,300
6,781
1.43
9,681
4,841
$16
$156,075
0.5
3,301-10,000
2,857
1.60
4,562
2,281
$16
$73,541
0.5
10,001-50,000
1,395
3.53
4,931
2,466
$16
$79,501
0.5
50,001-100,000
155
9.42
1,463
732
$16
$23,587
0.5
100,001-1,000,000
67
12.56
836
418
$16
$13,483
0.5
>1,000,000
2
12.56
27
13
$16
$428
Total
138,766
159,314
79,657
$2,568,394
Nitrate (continued)
Surface Water Systems, CWSs, NTNCWSs, and TNCWSs
Total Annual
Samples per Total Number
Cost
Burden
of Samples
Sampling Events
Event
Burden per
Total
Cost per
Total Cost, $
per Year
(carried forward
(from B of
Sample, hrs. Burden, hrs. Sample, $
from previous
"sampling
(from "burden
(from
pg.)
pts")
by chem")
"burden by
chem")
Size Category
E
F
G=E*F
H
I=G*H
J
K=G*J
0.5
641
$16
$20,665
0-100
1,236
1.04
1,282
0.5
101-500
1,185
1.06
1,257
629
$16
$20,267
0.5
501-1,000
467
1.16
542
271
$16
$8,739
0.5
1,001-3,300
1,058
1.14
1,207
603
$16
$19,452
0.5
3,301-10,000
1,069
1.13
1,208
604
$16
$19,474
0.5
10,001-50,000
1,043
1.58
1,645
822
$16
$26,518
0.5
50,001-100,000
234
1.98
463
231
$16
$7,463
0.5
100,001-1,000,000
259
3.30
854
427
$16
$13,772
0.5
>1,000,000
19
3.30
63
31
$16
$1,012
Total
6,569
8,520
4,260
$137,363
Nitrate
GRAND TOTAL
145,335
167,834
83,917
Note: Burden estimates take into account the results of the May 2015 consultation with water industry representatives.
DDBP/Chem/Rads ICR - Chemical Phase Regulation
D-25
$2,705,757
December 2015
Exhibit 26 - Nitrite, Part 1
Nitrite
Ground Water Systems, CWSs, NTNCWSs, and TNCWSs
# of Affected Systems
Number of Systems by Scenario
Annual Sampling Frequency by Scenario
Annual Sampling Events by Scenario
Percent of Systems by Scenario
(from C+D of "systems")
(from "frequency")
(from "% by scenario")
C=A*B
D
E=C*D
A
B
Scen. 3
Scen. 4
Scen. 2
Scen. 1
Scen. 3
Scen. 4
Scen. 2
Scen. 1
Scen. 3
Scen. 4
Scen. 2
Scen. 1
Scen. 3
Scen. 4
Scen. 2
Scen. 1
Above
Above
Above
Above
Above
Above
Below
Below
Above
Above
Below
Below
Above
Above
Below
Below
MCL
trigger &
MCL
trigger & trigger & no trigger &
trigger &
trigger &
MCL
trigger &
trigger &
trigger &
MCL
trigger &
trigger &
trigger &
below MCL
waiver
waiver
below
waiver
below MCL no waiver
waiver
below MCL no waiver
waiver
no waiver
MCL
Size Category
0-100
75,459
99.8%
0.2%
0.0%
75,308
151
4.00
4.00
604
101-500
37,757
99.8%
0.2%
0.0%
37,681
76
4.00
4.00
302
501-1,000
7,417
99.8%
0.2%
0.0%
7,402
15
4.00
4.00
59
1,001-3,300
6,415
99.8%
0.2%
0.0%
6,402
13
4.00
4.00
51
3,301-10,000
2,703
99.8%
0.2%
0.0%
2,698
5
4.00
4.00
22
10,001-50,000
1,320
99.8%
0.2%
0.0%
1,317
3
4.00
4.00
11
50,001-100,000
147
99.8%
0.2%
0.0%
147
0
4.00
4.00
1
100,001-1,000,000
63
99.8%
0.2%
0.0%
63
0
4.00
4.00
1
4.00
4.00
0
>1,000,000
2
99.8%
0.2%
0.0%
2
0
Total
131,283
131,020
263
1,050
-
Nitrite
Surface Water Systems, CWSs, NTNCWSs, and TNCWSs
# of Affected Systems
Number of Systems by Scenario
Annual Sampling Frequency by Scenario
Percent of Systems by Scenario
(from C+D of "systems")
(from "frequency")
(from "% by scenario")
A
C=A*B
D
B
Scen. 3
Scen. 4
Scen. 2
Scen. 1
Scen. 3
Scen. 4
Scen. 2
Scen. 1
Scen. 3
Scen. 4
Scen. 2
Scen. 1
Above
Above
Below
Below
Above
Above
Below
Below
Above
Above
Below
Below
MCL
trigger &
trigger &
trigger &
MCL
trigger &
trigger &
trigger &
MCL
trigger &
trigger &
trigger &
below
waiver
below MCL no waiver
waiver
below MCL no waiver
waiver
no waiver
MCL
Size Category
0-100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-50,000
50,001-100,000
100,001-1,000,000
>1,000,000
Total
Nitrite:
GRAND TOTAL
1,169
1,121
442
1,001
1,011
987
221
245
18
6,215
137,498
DDBP/Chem/Rads ICR - Chemical Phase Regulation
99.8%
99.8%
99.8%
99.8%
99.8%
99.8%
99.8%
99.8%
99.8%
-
0.2%
0.2%
0.2%
0.2%
0.2%
0.2%
0.2%
0.2%
0.2%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
1,167
1,119
441
999
1,009
985
221
245
18
6,203
-
2
2
1
2
2
2
0
0
0
12
-
137,223
-
275
-
D-26
-
-
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
Total
604
302
59
51
22
11
1
1
0
1,050
Annual Sampling Events by Scenario
Scen. 1
Above
trigger & no
waiver
Scen. 2
Above
trigger &
waiver
E=C*D
Scen. 3
Above
MCL
Scen. 4
Above
trigger &
below MCL
Total
-
-
9
9
4
8
8
8
2
2
0
50
-
9
9
4
8
8
8
2
2
0
50
-
-
1,100
-
1,100
December 2015
Exhibit 27 - Nitrite, Part 2
Nitrite (continued)
Ground Water Systems, CWSs, NTNCWSs, and TNCWSs
Samples per Total Number
Total Annual
Cost
Burden
Event
of Samples
Sampling Events
Burden per
Total
Cost per
Total Cost, $
(from B of
per Year
(carried forward
Sample, hrs. Burden, hrs. Sample, $
"sampling
from previous
(from "burden
(from
pts")
pg.)
by chem")
"burden by
chem")
Size Category
E
F
G=E*F
H
I=G*H
J
K=G*J
0.8
0-100
604
1.05
631
473
$16
$10,175
0.8
101-500
302
1.11
335
251
$16
$5,406
0.8
501-1,000
59
1.29
77
57
$16
$1,235
0.8
1,001-3,300
51
1.43
73
55
$16
$1,181
0.8
3,301-10,000
22
1.60
35
26
$16
$557
0.8
10,001-50,000
11
3.53
37
28
$16
$602
0.8
50,001-100,000
1
9.42
11
8
$16
$179
0.8
100,001-1,000,000
1
12.56
6
5
$16
$102
0.8
>1,000,000
0
12.56
0
0
$16
$3
Total
1,050
1,206
904
$19,439
Nitrite (continued)
Surface Water Systems, CWSs, NTNCWSs, and TNCWSs
Samples per Total Number
Total Annual
Burden
Cost
Event
of Samples
Sampling Events
Burden per
Total
Cost per
Total Cost, $
(from B of
per Year
(carried forward
Sample, hrs. Burden, hrs. Sample, $
"sampling
from previous
(from "burden
(from
pg.)
pts")
by chem")
"burden by
chem")
Size Category
E
F
G=E*F
H
I=G*H
J
K=G*J
0.8
7
$16
$156
0-100
9
1.04
10
0.8
101-500
9
1.06
10
7
$16
$153
0.8
501-1,000
4
1.16
4
3
$16
$66
0.8
1,001-3,300
8
1.14
9
7
$16
$147
0.8
3,301-10,000
8
1.13
9
7
$16
$147
0.8
10,001-50,000
8
1.58
12
9
$16
$201
0.8
50,001-100,000
2
1.98
4
3
$16
$56
0.8
100,001-1,000,000
2
3.30
6
5
$16
$104
0.8
>1,000,000
0
3.30
0
0
$16
$8
Total
50
64
48
$1,040
Nitrite
GRAND TOTAL
1,100
1,270
953
Note: Burden estimates take into account the results of the May 2015 consultation with water industry representatives.
DDBP/Chem/Rads ICR - Chemical Phase Regulation
D-27
$20,479
December 2015
Exhibit 28 - Selenium, Part 1
Selenium
Ground Water Systems, CWSs & NTNCWSs
# of Affected Systems
(from C of "systems")
Percent of Systems by Scenario
(from "% by scenario")
Number of Systems by Scenario
B
C=A*B
Scen. 3
Scen. 2
Above
Below
MCL
trigger &
waiver
A
Scen. 1
Below
trigger &
no waiver
Size Category
0-100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-50,000
50,001-100,000
100,001-1,000,000
>1,000,000
Total
19,092
18,602
5,405
5,879
2,637
1,312
146
63
2
53,138
Selenium
Surface Water Systems, CWSs & NTNCWSs
# of Affected Systems
(from C of "systems")
79.9%
79.9%
79.9%
79.9%
79.9%
79.9%
79.9%
79.9%
79.9%
19.9%
19.9%
19.9%
19.9%
19.9%
19.9%
19.9%
19.9%
19.9%
Selenium:
GRAND TOTAL
58,259
DDBP/Chem/Rads ICR - Chemical Phase Regulation
0.2%
0.2%
0.2%
0.2%
0.2%
0.2%
0.2%
0.2%
0.2%
-
15,247
14,856
4,316
4,695
2,106
1,048
117
50
2
42,436
3,807
3,709
1,078
1,172
526
262
29
13
0
10,596
Scen. 1
Scen. 4
Below
Above
trigger &
trigger &
below MCL no waiver
38
37
11
12
5
3
0
0
0
106
-
Number of Systems by Scenario
B
C=A*B
Scen. 3
Scen. 2
Above
Below
MCL
trigger &
waiver
Scen. 1
Below
trigger &
no waiver
558
765
374
959
994
987
221
245
18
5,121
Scen. 1
Scen. 4
Below
Above
trigger &
trigger &
below MCL no waiver
Percent of Systems by Scenario
(from "% by scenario")
A
Size Category
0-100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-50,000
50,001-100,000
100,001-1,000,000
>1,000,000
Total
Scen. 3
Above
MCL
Scen. 2
Below
trigger &
waiver
91.1%
91.1%
91.1%
91.1%
91.1%
91.1%
91.1%
91.1%
91.1%
Scen. 2
Below
trigger &
waiver
8.9%
8.9%
8.9%
8.9%
8.9%
8.9%
8.9%
8.9%
8.9%
Scen. 3
Above
MCL
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
Scen. 1
Scen. 4
Below
Above
trigger &
trigger &
below MCL no waiver
-
508
697
341
874
906
899
201
223
16
4,666
50
68
33
85
88
88
20
22
2
455
47,102
11,050
Annual Sampling Frequency by Scenario
(from "frequency")
0.11
0.11
0.11
0.11
0.11
0.11
0.11
0.11
0.11
Scen. 3
Above
MCL
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
Scen. 1
Scen. 4
Above
Above
trigger & trigger & no
waiver
below
MCL
-
Annual Sampling Frequency by Scenario
(from "frequency")
Scen. 1
Scen. 4
Below
Above
trigger &
trigger &
below MCL no waiver
-
-
106
-
D-28
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
D
Scen. 2
Below
trigger &
waiver
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
D
Scen. 2
Below
trigger &
waiver
0.11
0.11
0.11
0.11
0.11
0.11
0.11
0.11
0.11
Scen. 3
Above
MCL
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
Annual Sampling Events by Scenario
5,031
4,902
1,424
1,549
695
346
38
17
1
14,004
419
408
119
129
58
29
3
1
0
1,166
E=C*D
Scen. 3
Above
MCL
153
149
43
47
21
10
1
1
0
425
Scen. 4
Above
trigger &
below MCL
-
Total
5,603
5,459
1,586
1,725
774
385
43
18
1
15,595
Annual Sampling Events by Scenario
Scen. 1
Scen. 4
Above
Above
trigger & trigger & no
waiver
below
MCL
-
Scen. 2
Above
trigger &
waiver
Scen. 2
Above
trigger &
waiver
508
697
341
874
906
899
201
223
16
4,666
5
7
4
9
10
10
2
2
0
50
18,670
1,216
E=C*D
Scen. 3
Above
MCL
Scen. 4
Above
trigger &
below MCL
Total
-
-
514
705
344
883
915
909
204
226
17
4,716
425
-
20,311
December 2015
Exhibit 29 - Selenium, Part 2
Selenium (continued)
Ground Water Systems, CWSs & NTNCWSs
Samples per Total Number
Total Annual
Cost
Burden
Event
of Samples
Sampling Events
Total Cost, $
Total
Cost per
Burden per
(from B of
per Year
(carried forward
Sample, hrs. Burden, hrs. Sample, $
"sampling
from previous
(from
(from "burden
pts")
pg.)
"burden by
by chem")
chem")
Size Category
0-100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-50,000
50,001-100,000
100,001-1,000,000
>1,000,000
Total
E
F
5,603
5,459
1,586
1,725
774
385
43
18
1
15,595
1.05
1.11
1.29
1.43
1.60
3.53
9.42
12.56
12.56
G=E*F
5,858
6,060
2,048
2,463
1,236
1,361
403
232
7
19,669
H
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
I=G*H
2,929
3,030
1,024
1,232
618
680
202
116
4
9,834
J
$32
$32
$32
$32
$32
$32
$32
$32
$32
K=G*J
$188,877
$195,402
$66,029
$79,426
$39,840
$43,879
$13,009
$7,487
$238
$634,185
Selenium (continued)
Surface Water Systems, CWSs & NTNCWSs
Samples per Total Number
Total Annual
Burden
Cost
Event
of Samples
Sampling Events
Burden per
Total
Cost per
Total Cost, $
(from B of
per Year
(carried forward
Sample, hrs. Burden, hrs. Sample, $
"sampling
from previous
(from "burden
(from
pg.)
pts")
by chem")
"burden by
chem")
Size Category
0-100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-50,000
50,001-100,000
100,001-1,000,000
>1,000,000
Total
Selenium
GRAND TOTAL
E
F
514
705
344
883
915
909
204
226
17
4,716
20,311
1.04
1.06
1.16
1.14
1.13
1.58
1.98
3.30
3.30
G=E*F
533
747
400
1,007
1,035
1,433
403
744
55
6,358
26,027
H
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
I=G*H
267
374
200
504
517
717
202
372
27
3,179
J
13,013
$32
$32
$32
$32
$32
$32
$32
$32
$32
K=G*J
$17,189
$24,101
$12,886
$32,476
$33,364
$46,211
$13,006
$24,000
$1,763
$204,996
$839,181
Note: Burden estimates take into account the results of the May 2015 consultation with water industry representatives.
DDBP/Chem/Rads ICR - Chemical Phase Regulation
D-29
December 2015
Exhibit 30 - Phase II VOCs, Part 1
Phase II VOCs
Ground Water Systems, CWSs & NTNCWSs
# of Affected Systems
(from C of "systems")
A
Size Category
0-100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-50,000
50,001-100,000
100,001-1,000,000
>1,000,000
Total
19,092
18,602
5,405
5,879
2,637
1,312
146
63
2
53,138
Phase II VOCs
Surface Water Systems, CWSs & NTNCWSs
# of Affected Systems
(from C of "systems")
A
Size Category
0-100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-50,000
50,001-100,000
100,001-1,000,000
>1,000,000
Total
Phase II VOCs:
GRAND TOTAL
558
765
374
959
994
987
221
245
18
5,121
58,259
DDBP/Chem/Rads ICR - Chemical Phase Regulation
Percent of Systems by Scenario
Number of Systems by Scenario
Annual Sampling Frequency by Scenario
Annual Sampling Events by Scenario
(from "% by scenario")
(from "frequency")
B
C=A*B
D
E=C*D
Scen. 4
Scen. 3
Scen. 2
Scen. 1
Scen. 4
Scen. 3
Scen. 2
Scen. 1
Scen. 4
Scen. 3
Scen. 2
Scen. 1
Scen. 4
Scen. 3
Scen. 2
Scen. 1
Above
Above
Above
Above
Above
Above
Below
Below
Above
Above
Below
Below
Above
Above
Below
Below
trigger &
MCL
trigger & trigger & no trigger &
MCL
trigger &
trigger &
trigger &
MCL
trigger &
trigger &
trigger &
MCL
trigger &
trigger &
below MCL
waiver
waiver
below
waiver
below MCL no waiver
waiver
below MCL no waiver
waiver
no waiver
MCL
48.9%
48.9%
48.9%
48.9%
48.9%
48.9%
48.9%
48.9%
48.9%
44.7%
44.7%
44.7%
44.7%
44.7%
44.7%
44.7%
44.7%
44.7%
3.2%
3.2%
3.2%
3.2%
3.2%
3.2%
3.2%
3.2%
3.2%
3.2%
3.2%
3.2%
3.2%
3.2%
3.2%
3.2%
3.2%
3.2%
9,330
9,091
2,641
2,873
1,289
641
71
31
1
25,968
8,540
8,321
2,418
2,630
1,180
587
65
28
1
23,769
611
595
173
188
84
42
5
2
0
1,700
611
595
173
188
84
42
5
2
0
1,700
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.22
0.22
0.22
0.22
0.22
0.22
0.22
0.22
0.22
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
1.67
1.67
1.67
1.67
1.67
1.67
1.67
1.67
1.67
3,079
3,000
872
948
425
212
24
10
0
8,569
1,879
1,831
532
579
260
129
14
6
0
5,229
2,444
2,381
692
753
338
168
19
8
0
6,802
1,020
994
289
314
141
70
8
3
0
2,840
Number of Systems by Scenario
Annual Sampling Frequency by Scenario
Annual Sampling Events by Scenario
Percent of Systems by Scenario
(from "frequency")
(from "% by scenario")
B
C=A*B
D
E=C*D
Scen. 4
Scen. 3
Scen. 2
Scen. 1
Scen. 4
Scen. 3
Scen. 2
Scen. 1
Scen. 4
Scen. 3
Scen. 2
Scen. 1
Scen. 4
Scen. 3
Scen. 2
Scen. 1
Above
Above
Above
Above
Above
Above
Below
Below
Above
Above
Below
Below
Above
Above
Below
Below
trigger &
MCL
trigger & trigger & no trigger &
MCL
trigger &
trigger &
trigger &
MCL
trigger &
trigger &
trigger &
MCL
trigger &
trigger &
below MCL
waiver
waiver
below
waiver
below MCL no waiver
waiver
below MCL no waiver
waiver
no waiver
MCL
70.0%
70.0%
70.0%
70.0%
70.0%
70.0%
70.0%
70.0%
70.0%
18.9%
18.9%
18.9%
18.9%
18.9%
18.9%
18.9%
18.9%
18.9%
2.9%
2.9%
2.9%
2.9%
2.9%
2.9%
2.9%
2.9%
2.9%
8.2%
8.2%
8.2%
8.2%
8.2%
8.2%
8.2%
8.2%
8.2%
391
536
262
671
696
691
155
172
13
3,586
105
144
71
181
188
186
42
46
3
967
16
22
11
28
29
29
6
7
1
149
46
63
31
79
82
81
18
20
1
420
29,553
24,736
1,849
2,120
D-30
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
Total
8,422
8,206
2,384
2,593
1,163
579
64
28
1
23,440
Total
391
536
262
671
696
691
155
172
13
3,586
35
48
23
60
62
62
14
15
1
319
65
89
43
111
115
114
26
28
2
594
107
146
71
183
190
189
42
47
3
978
597
818
400
1,026
1,063
1,056
236
262
19
5,477
12,155
5,548
7,396
3,818
28,917
December 2015
Exhibit 31 - Phase II VOCs, Part 2
Phase II VOCs (continued)
Ground Water Systems, CWSs & NTNCWSs
Samples per Total Number
Total Annual
Cost
Burden
Event
of Samples
Sampling Events
Burden per
Total
Cost per
Total Cost, $
(from B of
per Year
(carried forward
Sample, hrs. Burden, hrs. Sample, $
"sampling
from previous
(from "burden
(from
pg.)
pts")
by chem")
"burden by
chem")
Size Category
E
F
G=E*F
H
I=G*H
J
K=G*J
0.0
0-100
8,422
1.05
8,805
$242
$2,129,249
0.0
101-500
8,206
1.11
9,109
$242
$2,202,802
0.0
501-1,000
2,384
1.29
3,078
$242
$744,355
0.0
1,001-3,300
2,593
1.43
3,703
$242
$895,384
0.0
3,301-10,000
1,163
1.60
1,857
$242
$449,121
0.0
10,001-50,000
579
3.53
2,046
$242
$494,654
0.0
50,001-100,000
64
9.42
606
$242
$146,650
0.0
100,001-1,000,000
28
12.56
349
$242
$84,401
0.0
>1,000,000
1
12.56
11
$242
$2,679
Total
23,440
29,564
$7,149,295
Phase II VOCs (continued)
Surface Water Systems, CWSs & NTNCWSs
Total Annual
Samples per Total Number
Cost
Burden
of Samples
Sampling Events
Event
Burden per
Total
Cost per
Total Cost, $
per Year
(carried forward
(from B of
Sample, hrs. Burden, hrs. Sample, $
from previous
"sampling
(from "burden
(from
pg.)
pts")
by chem")
"burden by
chem")
Size Category
E
F
G=E*F
H
I=G*H
J
K=G*J
0.0
$242
$149,718
0-100
597
1.04
619
0.0
101-500
818
1.06
868
$242
$209,921
0.0
501-1,000
400
1.16
464
$242
$112,234
0.0
1,001-3,300
1,026
1.14
1,170
$242
$282,861
0.0
3,301-10,000
1,063
1.13
1,202
$242
$290,601
0.0
10,001-50,000
1,056
1.58
1,664
$242
$402,497
0.0
50,001-100,000
236
1.98
468
$242
$113,279
0.0
100,001-1,000,000
262
3.30
864
$242
$209,039
0.0
>1,000,000
19
3.30
64
$242
$15,358
Total
5,477
7,384
$1,785,509
Phase II VOCs
GRAND TOTAL
28,917
36,948
Note: Burden estimates take into account the results of the May 2015 consultation with water industry representatives.
DDBP/Chem/Rads ICR - Chemical Phase Regulation
D-31
$8,934,804
December 2015
Exhibit 32 - Phase II SOCs, Part 1
Phase II SOCs
Ground Water Systems, CWSs & NTNCWSs
# of Affected Systems
(from C of "systems")
A
Size Category
0-100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-50,000
50,001-100,000
100,001-1,000,000
>1,000,000
Total
19,092
18,602
5,405
5,879
2,637
1,312
146
63
2
53,138
Phase II SOCs
Surface Water Systems, CWSs & NTNCWSs
# of Affected Systems
(from C of "systems")
A
Size Category
0-100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-50,000
50,001-100,000
100,001-1,000,000
>1,000,000
Total
Phase II SOCs:
GRAND TOTAL
558
765
374
959
994
987
221
245
18
5,121
58,259
DDBP/Chem/Rads ICR - Chemical Phase Regulation
Percent of Systems by Scenario
Number of Systems by Scenario
Annual Sampling Frequency by Scenario
Annual Sampling Events by Scenario
(from "% by scenario")
(from "frequency")
B
C=A*B
D
E=C*D
Scen. 4
Scen. 3
Scen. 2
Scen. 1
Scen. 4
Scen. 3
Scen. 2
Scen. 1
Scen. 4
Scen. 3
Scen. 2
Scen. 1
Scen. 4
Scen. 3
Scen. 2
Scen. 1
Above
Above
Above
Above
Above
Above
Below
Below
Above
Above
Below
Below
Above
Above
Below
Below
trigger &
MCL
trigger & trigger & no trigger &
MCL
trigger &
trigger &
trigger &
MCL
trigger &
trigger &
trigger &
MCL
trigger &
trigger &
below MCL
waiver
waiver
below
waiver
below MCL no waiver
waiver
below MCL no waiver
waiver
no waiver
MCL
20.4%
20.4%
20.4%
20.4%
20.4%
20.4%
20.4%
20.4%
20.4%
66.2%
66.2%
66.2%
66.2%
66.2%
66.2%
66.2%
66.2%
66.2%
1.0%
1.0%
1.0%
1.0%
1.0%
1.0%
1.0%
1.0%
1.0%
12.4%
12.4%
12.4%
12.4%
12.4%
12.4%
12.4%
12.4%
12.4%
3,889
3,789
1,101
1,197
537
267
30
13
0
10,823
12,645
12,320
3,580
3,894
1,747
869
97
42
1
35,194
191
186
54
59
26
13
1
1
0
531
2,367
2,307
670
729
327
163
18
8
0
6,589
0.33
0.33
0.33
0.33
0.67
0.67
0.67
0.67
0.67
-
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
1.67
1.67
1.67
1.67
1.67
1.67
1.67
1.67
1.67
1,283
1,250
363
395
360
179
20
9
0
3,860
-
764
744
216
235
105
52
6
3
0
2,126
3,954
3,852
1,119
1,217
546
272
30
13
0
11,004
Number of Systems by Scenario
Annual Sampling Frequency by Scenario
Annual Sampling Events by Scenario
Percent of Systems by Scenario
(from "frequency")
(from "% by scenario")
B
C=A*B
D
E=C*D
Scen. 4
Scen. 3
Scen. 2
Scen. 1
Scen. 4
Scen. 3
Scen. 2
Scen. 1
Scen. 4
Scen. 3
Scen. 2
Scen. 1
Scen. 4
Scen. 3
Scen. 2
Scen. 1
Above
Above
Above
Above
Above
Above
Below
Below
Above
Above
Below
Below
Above
Above
Below
Below
trigger &
MCL
trigger & trigger & no trigger &
MCL
trigger &
trigger &
trigger &
MCL
trigger &
trigger &
trigger &
MCL
trigger &
trigger &
below MCL
waiver
waiver
below
waiver
below MCL no waiver
waiver
below MCL no waiver
waiver
no waiver
MCL
51.8%
51.8%
51.8%
51.8%
51.8%
51.8%
51.8%
51.8%
51.8%
27.8%
27.8%
27.8%
27.8%
27.8%
27.8%
27.8%
27.8%
27.8%
0.9%
0.9%
0.9%
0.9%
0.9%
0.9%
0.9%
0.9%
0.9%
19.5%
19.5%
19.5%
19.5%
19.5%
19.5%
19.5%
19.5%
19.5%
289
397
194
497
515
512
115
127
9
2,654
155
212
104
266
276
274
61
68
5
1,422
5
7
3
9
9
9
2
2
0
46
109
149
73
187
194
192
43
48
4
999
13,478
36,616
577
7,588
D-32
0.33
0.33
0.33
0.33
0.67
0.67
0.67
0.67
0.67
-
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
Total
6,001
5,847
1,699
1,848
1,011
503
56
24
1
16,989
Total
95
131
64
164
345
343
77
85
6
1,310
-
20
28
13
35
36
36
8
9
1
184
254
348
170
436
452
448
100
111
8
2,327
369
506
247
634
833
827
185
205
15
3,821
5,170
-
2,310
13,331
20,811
December 2015
Exhibit 33 - Phase II SOCs, Part 2
Phase II SOCs (continued)
Ground Water Systems, CWSs & NTNCWSs
Samples per Total Number
Total Annual
Burden
Event
of Samples
Sampling Events
Burden per
Total
Cost per
(from B of
(carried forward
per Year
Sample, hrs. Burden, hrs. Sample, $
"sampling
from previous
(from "burden
(from
pts")
pg.)
by chem")
"burden by
chem")
Size Category
0-100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-50,000
50,001-100,000
100,001-1,000,000
>1,000,000
Total
E
F
6,001
5,847
1,699
1,848
1,011
503
56
24
1
16,989
1.05
1.11
1.29
1.43
1.60
3.53
9.42
12.56
12.56
G=E*F
6,274
6,490
2,193
2,638
1,615
1,779
527
303
10
21,829
H
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
I=G*H
6,274
6,490
2,193
2,638
1,615
1,779
527
303
10
21,829
J
$1,161
$1,161
$1,161
$1,161
$1,161
$1,161
$1,161
$1,161
$1,161
Phase II SOCs (continued)
Surface Water Systems, CWSs & NTNCWSs
Samples per Total Number
Total Annual
Burden
Event
of Samples
Sampling Events
Burden per
Total
Cost per
(from B of
per Year
(carried forward
Sample, hrs. Burden, hrs. Sample, $
"sampling
from previous
(from "burden
(from
pg.)
pts")
by chem")
"burden by
chem")
Size Category
E
F
G=E*F
H
I=G*H
J
1.0
383
$1,161
0-100
369
1.04
383
1.0
101-500
506
1.06
537
537
$1,161
1.0
501-1,000
247
1.16
287
287
$1,161
1.0
1,001-3,300
634
1.14
723
723
$1,161
1.0
3,301-10,000
833
1.13
941
941
$1,161
1.0
10,001-50,000
827
1.58
1,304
1,304
$1,161
1.0
50,001-100,000
185
1.98
367
367
$1,161
1.0
100,001-1,000,000
205
3.30
677
677
$1,161
1.0
>1,000,000
15
3.30
50
50
$1,161
Total
3,821
5,268
5,268
Phase II SOCs
GRAND TOTAL
20,811
27,097
27,097
Note: Burden estimates take into account the results of the May 2015 consultation with water industry representatives.
DDBP/Chem/Rads ICR - Chemical Phase Regulation
D-33
Cost
Total Cost, $
K=G*J
$7,282,048
$7,533,601
$2,545,699
$3,062,221
$1,874,441
$2,064,476
$612,056
$352,253
$11,183
$25,337,977
Cost
Total Cost, $
K=G*J
$444,411
$623,110
$333,146
$839,620
$1,092,445
$1,513,091
$425,846
$785,834
$57,735
$6,115,238
$31,453,216
December 2015
Exhibit 34 - Barium, Part 1
Barium
Ground Water Systems, CWSs & NTNCWSs
# of Affected Systems
(from C of "systems")
A
Size Category
0-100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-50,000
50,001-100,000
100,001-1,000,000
>1,000,000
Total
19,092
18,602
5,405
5,879
2,637
1,312
146
63
2
53,138
Barium
Surface Water Systems, CWSs & NTNCWSs
# of Affected Systems
(from C of "systems")
A
Size Category
0-100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-50,000
50,001-100,000
100,001-1,000,000
>1,000,000
Total
Barium:
GRAND TOTAL
558
765
374
959
994
987
221
245
18
5,121
58,259
DDBP/Chem/Rads ICR - Chemical Phase Regulation
Percent of Systems by Scenario
Number of Systems by Scenario
Annual Sampling Frequency by Scenario
Annual Sampling Events by Scenario
(from "% by scenario")
(from "frequency")
C=A*B
D
E=C*D
B
Scen. 4
Scen. 3
Scen. 2
Scen. 1
Scen. 4
Scen. 3
Scen. 2
Scen. 1
Scen. 4
Scen. 3
Scen. 2
Scen. 1
Scen. 4
Scen. 3
Scen. 2
Scen. 1
Above
Above
Above
Above
Above
Above
Below
Below
Above
Above
Below
Below
Above
Above
Below
Below
trigger &
MCL
trigger & trigger & no trigger &
MCL
trigger &
trigger &
trigger &
MCL
trigger &
trigger &
trigger &
MCL
trigger &
trigger &
below MCL
waiver
waiver
below
waiver
below MCL no waiver
waiver
below MCL no waiver
waiver
no waiver
MCL
79.9%
79.9%
79.9%
79.9%
79.9%
79.9%
79.9%
79.9%
79.9%
19.9%
19.9%
19.9%
19.9%
19.9%
19.9%
19.9%
19.9%
19.9%
0.2%
0.2%
0.2%
0.2%
0.2%
0.2%
0.2%
0.2%
0.2%
-
15,247
14,856
4,316
4,695
2,106
1,048
117
50
2
42,436
3,807
3,709
1,078
1,172
526
262
29
13
0
10,596
38
37
11
12
5
3
0
0
0
106
-
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.11
0.11
0.11
0.11
0.11
0.11
0.11
0.11
0.11
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
-
5,031
4,902
1,424
1,549
695
346
38
17
1
14,004
419
408
119
129
58
29
3
1
0
1,166
153
149
43
47
21
10
1
1
0
425
-
Percent of Systems by Scenario
Number of Systems by Scenario
Annual Sampling Frequency by Scenario
Annual Sampling Events by Scenario
(from "% by scenario")
(from "frequency")
E=C*D
B
C=A*B
D
Scen. 4
Scen. 3
Scen. 2
Scen. 1
Scen. 4
Scen. 3
Scen. 2
Scen. 1
Scen. 4
Scen. 3
Scen. 2
Scen. 1
Scen. 4
Scen. 3
Scen. 2
Scen. 1
Above
Above
Above
Above
Above
Above
Below
Below
Above
Above
Below
Below
Above
Above
Below
Below
trigger &
MCL
trigger & trigger & no trigger &
MCL
trigger &
trigger &
trigger &
MCL
trigger &
trigger &
trigger &
MCL
trigger &
trigger &
below MCL
waiver
waiver
below
waiver
below MCL no waiver
waiver
below MCL no waiver
waiver
no waiver
MCL
90.7%
90.7%
90.7%
90.7%
90.7%
90.7%
90.7%
90.7%
90.7%
8.8%
8.8%
8.8%
8.8%
8.8%
8.8%
8.8%
8.8%
8.8%
0.5%
0.5%
0.5%
0.5%
0.5%
0.5%
0.5%
0.5%
0.5%
-
506
694
339
869
901
895
200
222
16
4,643
49
68
33
85
88
87
20
22
2
452
3
4
2
5
5
5
1
1
0
26
-
47,079
11,048
132
-
D-34
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.11
0.11
0.11
0.11
0.11
0.11
0.11
0.11
0.11
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
-
Total
5,603
5,459
1,586
1,725
774
385
43
18
1
15,595
Total
506
694
339
869
901
895
200
222
16
4,643
5
7
4
9
10
10
2
2
0
50
11
15
7
19
20
20
4
5
0
102
-
522
716
350
898
931
924
207
229
17
4,795
18,647
1,215
528
-
20,390
December 2015
Exhibit 35 - Barium, Part 2
Barium (continued)
Ground Water Systems, CWSs & NTNCWSs
Samples per Total Number
Total Annual
Cost
Burden
Event
of Samples
Sampling Events
Burden per
Total
Cost per
Total Cost, $
(from B of
per Year
(carried forward
Sample, hrs. Burden, hrs. Sample, $
"sampling
from previous
(from "burden
(from
pg.)
pts")
by chem")
"burden by
chem")
Size Category
E
F
G=E*F
H
I=G*H
J
K=G*J
0.5
0-100
5,603
1.05
5,858
2,929
$15
$84,995
0.5
101-500
5,459
1.11
6,060
3,030
$15
$87,931
0.5
501-1,000
1,586
1.29
2,048
1,024
$15
$29,713
0.5
1,001-3,300
1,725
1.43
2,463
1,232
$15
$35,742
0.5
3,301-10,000
774
1.60
1,236
618
$15
$17,928
0.5
10,001-50,000
385
3.53
1,361
680
$15
$19,745
0.5
50,001-100,000
43
9.42
403
202
$15
$5,854
0.5
100,001-1,000,000
18
12.56
232
116
$15
$3,369
0.5
>1,000,000
1
12.56
7
4
$15
$107
Total
15,595
19,669
9,834
$285,383
Barium (continued)
Surface Water Systems, CWSs & NTNCWSs
Total Annual
Samples per Total Number
Cost
Burden
of Samples
Sampling Events
Event
Burden per
Total
Cost per
Total Cost, $
per Year
(carried forward
(from B of
Sample, hrs. Burden, hrs. Sample, $
from previous
"sampling
(from "burden
(from
pg.)
pts")
by chem")
"burden by
chem")
Size Category
E
F
G=E*F
H
I=G*H
J
K=G*J
0.5
271
$15
$7,864
0-100
522
1.04
542
0.5
101-500
716
1.06
760
380
$15
$11,027
0.5
501-1,000
350
1.16
406
203
$15
$5,895
0.5
1,001-3,300
898
1.14
1,024
512
$15
$14,858
0.5
3,301-10,000
931
1.13
1,052
526
$15
$15,265
0.5
10,001-50,000
924
1.58
1,457
729
$15
$21,143
0.5
50,001-100,000
207
1.98
410
205
$15
$5,950
0.5
100,001-1,000,000
229
3.30
757
378
$15
$10,981
0.5
>1,000,000
17
3.30
56
28
$15
$807
Total
4,795
6,464
3,232
$93,790
Barium
GRAND TOTAL
20,390
26,133
13,066
Note: Burden estimates take into account the results of the May 2015 consultation with water industry representatives.
DDBP/Chem/Rads ICR - Chemical Phase Regulation
D-35
$379,174
December 2015
Exhibit 36 - Pentachlorophenol, Part 1
Pentachlorophenol
Ground Water Systems, CWSs & NTNCWSs
# of Affected Systems
(from C of "systems")
A
Size Category
0-100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-50,000
50,001-100,000
100,001-1,000,000
>1,000,000
Total
19,092
18,602
5,405
5,879
2,637
1,312
146
63
2
53,138
Pentachlorophenol
Surface Water Systems, CWSs & NTNCWSs
# of Affected Systems
(from C of "systems")
A
Size Category
0-100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-50,000
50,001-100,000
100,001-1,000,000
>1,000,000
Total
558
765
374
959
994
987
221
245
18
5,121
Pentachlorophenol:
GRAND TOTAL
58,259
DDBP/Chem/Rads ICR - Chemical Phase Regulation
Percent of Systems by Scenario
Number of Systems by Scenario
Annual Sampling Frequency by Scenario
Annual Sampling Events by Scenario
(from "% by scenario")
(from "frequency")
B
C=A*B
D
E=C*D
Scen. 4
Scen. 3
Scen. 2
Scen. 1
Scen. 4
Scen. 3
Scen. 2
Scen. 1
Scen. 4
Scen. 3
Scen. 2
Scen. 1
Scen. 4
Scen. 3
Scen. 2
Scen. 1
Above
Above
Above
Above
Above
Above
Below
Below
Above
Above
Below
Below
Above
Above
Below
Below
trigger &
MCL
trigger & trigger & no trigger &
MCL
trigger &
trigger &
trigger &
MCL
trigger &
trigger &
trigger &
MCL
trigger &
trigger &
below MCL
waiver
waiver
below
waiver
below MCL no waiver
waiver
below MCL no waiver
waiver
no waiver
MCL
24.9%
24.9%
24.9%
24.9%
24.9%
24.9%
24.9%
24.9%
24.9%
74.4%
74.4%
74.4%
74.4%
74.4%
74.4%
74.4%
74.4%
74.4%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.7%
0.7%
0.7%
0.7%
0.7%
0.7%
0.7%
0.7%
0.7%
4,762
4,640
1,348
1,466
658
327
36
16
0
13,255
14,196
13,832
4,019
4,371
1,961
976
109
47
1
39,511
-
134
130
38
41
18
9
1
0
0
372
0.33
0.33
0.33
0.33
0.67
0.67
0.67
0.67
0.67
-
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
1.67
1.67
1.67
1.67
1.67
1.67
1.67
1.67
1.67
1,572
1,531
445
484
441
219
24
11
0
4,727
-
-
223
217
63
69
31
15
2
1
0
621
Percent of Systems by Scenario
Number of Systems by Scenario
Annual Sampling Frequency by Scenario
Annual Sampling Events by Scenario
(from "% by scenario")
(from "frequency")
B
C=A*B
D
E=C*D
Scen. 4
Scen. 3
Scen. 2
Scen. 1
Scen. 4
Scen. 3
Scen. 2
Scen. 1
Scen. 4
Scen. 3
Scen. 2
Scen. 1
Scen. 4
Scen. 3
Scen. 2
Scen. 1
Above
Above
Above
Above
Above
Above
Below
Below
Above
Above
Below
Below
Above
Above
Below
Below
trigger &
MCL
trigger & trigger & no trigger &
MCL
trigger &
trigger &
trigger &
MCL
trigger &
trigger &
trigger &
MCL
trigger &
trigger &
below MCL
waiver
waiver
below
waiver
below MCL no waiver
waiver
below MCL no waiver
waiver
no waiver
MCL
64.7%
64.7%
64.7%
64.7%
64.7%
64.7%
64.7%
64.7%
64.7%
32.2%
32.2%
32.2%
32.2%
32.2%
32.2%
32.2%
32.2%
32.2%
0.2%
0.2%
0.2%
0.2%
0.2%
0.2%
0.2%
0.2%
0.2%
2.9%
2.9%
2.9%
2.9%
2.9%
2.9%
2.9%
2.9%
2.9%
361
495
242
620
643
638
143
158
12
3,311
180
247
121
309
321
318
71
79
6
1,651
1
2
1
2
2
2
0
0
0
10
16
22
11
28
29
29
6
7
1
149
16,566
41,163
10
520
D-36
0.33
0.33
0.33
0.33
0.67
0.67
0.67
0.67
0.67
-
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
Total
1,795
1,749
508
553
472
235
26
11
0
5,348
Total
119
163
80
205
431
428
96
106
8
1,634
-
4
6
3
8
8
8
2
2
0
41
38
52
25
65
67
67
15
17
1
346
161
221
108
277
506
502
112
125
9
2,021
6,361
-
41
967
7,369
December 2015
Exhibit 37 - Pentachlorophenol, Part 2
Pentachlorophenol (continued)
Ground Water Systems, CWSs & NTNCWSs
Samples per Total Number
Total Annual
Cost
Burden
Event
of Samples
Sampling Events
Burden per
Total
Cost per
Total Cost, $
(from B of
per Year
(carried forward
Sample, hrs. Burden, hrs. Sample, $
"sampling
from previous
(from "burden
(from
pg.)
pts")
by chem")
"burden by
chem")
Size Category
E
F
G=E*F
H
I=G*H
J
K=G*J
0.0
0-100
1,795
1.05
1,876
$0
$0
0.0
101-500
1,749
1.11
1,941
$0
$0
0.0
501-1,000
508
1.29
656
$0
$0
0.0
1,001-3,300
553
1.43
789
$0
$0
0.0
3,301-10,000
472
1.60
753
$0
$0
0.0
10,001-50,000
235
3.53
829
$0
$0
0.0
50,001-100,000
26
9.42
246
$0
$0
0.0
100,001-1,000,000
11
12.56
141
$0
$0
0.0
>1,000,000
0
12.56
4
$0
$0
Total
5,348
7,237
$0
Pentachlorophenol (continued)
Surface Water Systems, CWSs & NTNCWSs
Total Annual
Samples per Total Number
Cost
Burden
of Samples
Sampling Events
Event
Burden per
Total
Cost per
Total Cost, $
per Year
(carried forward
(from B of
Sample, hrs. Burden, hrs. Sample, $
from previous
"sampling
(from "burden
(from
pg.)
pts")
by chem")
"burden by
chem")
Size Category
E
F
G=E*F
H
I=G*H
J
K=G*J
0.0
$0
$0
0-100
161
1.04
167
0.0
101-500
221
1.06
234
$0
$0
0.0
501-1,000
108
1.16
125
$0
$0
0.0
1,001-3,300
277
1.14
316
$0
$0
0.0
3,301-10,000
506
1.13
572
$0
$0
0.0
10,001-50,000
502
1.58
792
$0
$0
0.0
50,001-100,000
112
1.98
223
$0
$0
0.0
100,001-1,000,000
125
3.30
411
$0
$0
0.0
>1,000,000
9
3.30
30
$0
$0
Total
2,021
2,871
$0
Pentachlorophenol
GRAND TOTAL
7,369
10,107
Note: Burden estimates take into account the results of the May 2015 consultation with water industry representatives.
DDBP/Chem/Rads ICR - Chemical Phase Regulation
D-37
$0
December 2015
Exhibit 38 - Adipates, Phthalates, Part 1
Adipates, Phthalates
Ground Water Systems, CWSs & NTNCWSs
# of Affected Systems
(from C of "systems")
A
Size Category
0-100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-50,000
50,001-100,000
100,001-1,000,000
>1,000,000
Total
Percent of Systems by Scenario
Number of Systems by Scenario
Annual Sampling Frequency by Scenario
Annual Sampling Events by Scenario
(from "% by scenario")
(from "frequency")
B
C=A*B
D
E=C*D
Scen. 4
Scen. 3
Scen. 2
Scen. 1
Scen. 4
Scen. 3
Scen. 2
Scen. 1
Scen. 4
Scen. 3
Scen. 2
Scen. 1
Scen. 4
Scen. 3
Scen. 2
Scen. 1
Above
Above
Above
Above
Above
Above
Below
Below
Above
Above
Below
Below
Above
Above
Below
Below
trigger &
MCL
trigger & trigger & no trigger &
MCL
trigger &
trigger &
trigger &
MCL
trigger &
trigger &
trigger &
MCL
trigger &
trigger &
below MCL
waiver
waiver
below
waiver
below MCL no waiver
waiver
below MCL no waiver
waiver
no waiver
MCL
19,092
18,602
5,405
5,879
2,637
1,312
146
63
2
53,138
Adipates, Phthalates
Surface Water Systems, CWSs & NTNCWSs
# of Affected Systems
(from C of "systems")
A
Size Category
0-100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-50,000
50,001-100,000
100,001-1,000,000
>1,000,000
Total
Adipates,
Phthalates :
GRAND TOTAL
558
765
374
959
994
987
221
245
18
5,121
58,259
DDBP/Chem/Rads ICR - Chemical Phase Regulation
21.8%
21.8%
21.8%
21.8%
21.8%
21.8%
21.8%
21.8%
21.8%
64.8%
64.8%
64.8%
64.8%
64.8%
64.8%
64.8%
64.8%
64.8%
1.0%
1.0%
1.0%
1.0%
1.0%
1.0%
1.0%
1.0%
1.0%
12.4%
12.4%
12.4%
12.4%
12.4%
12.4%
12.4%
12.4%
12.4%
4,160
4,053
1,178
1,281
575
286
32
14
0
11,578
12,374
12,056
3,503
3,810
1,709
850
95
41
1
34,440
191
186
54
59
26
13
1
1
0
531
2,367
2,307
670
729
327
163
18
8
0
6,589
0.33
0.33
0.33
0.33
0.67
0.67
0.67
0.67
0.67
-
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
1.67
1.67
1.67
1.67
1.67
1.67
1.67
1.67
1.67
1,373
1,338
389
423
385
192
21
9
0
4,129
-
764
744
216
235
105
52
6
3
0
2,126
3,954
3,852
1,119
1,217
546
272
30
13
0
11,004
Percent of Systems by Scenario
Number of Systems by Scenario
Annual Sampling Frequency by Scenario
Annual Sampling Events by Scenario
(from "frequency")
(from "% by scenario")
B
C=A*B
D
E=C*D
Scen. 4
Scen. 3
Scen. 2
Scen. 1
Scen. 4
Scen. 3
Scen. 2
Scen. 1
Scen. 4
Scen. 3
Scen. 2
Scen. 1
Scen. 4
Scen. 3
Scen. 2
Scen. 1
Above
Above
Above
Above
Above
Above
Below
Below
Above
Above
Below
Below
Above
Above
Below
Below
trigger &
MCL
trigger & trigger & no trigger &
MCL
trigger &
trigger &
trigger &
MCL
trigger &
trigger &
trigger &
MCL
trigger &
trigger &
below MCL
waiver
waiver
below
waiver
below MCL no waiver
waiver
below MCL no waiver
waiver
no waiver
MCL
50.9%
50.9%
50.9%
50.9%
50.9%
50.9%
50.9%
50.9%
50.9%
28.7%
28.7%
28.7%
28.7%
28.7%
28.7%
28.7%
28.7%
28.7%
0.9%
0.9%
0.9%
0.9%
0.9%
0.9%
0.9%
0.9%
0.9%
19.5%
19.5%
19.5%
19.5%
19.5%
19.5%
19.5%
19.5%
19.5%
284
389
190
488
506
503
113
125
9
2,607
160
219
107
275
285
283
63
70
5
1,469
5
7
3
9
9
9
2
2
0
46
109
149
73
187
194
192
43
48
4
999
14,185
35,909
577
7,588
D-38
0.33
0.33
0.33
0.33
0.67
0.67
0.67
0.67
0.67
-
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
Total
6,090
5,934
1,724
1,875
1,037
516
57
25
1
17,258
Total
94
129
63
161
339
337
75
84
6
1,287
-
20
28
13
35
36
36
8
9
1
184
254
348
170
436
452
448
100
111
8
2,327
367
504
246
631
826
821
184
204
15
3,798
5,416
-
2,310
13,331
21,056
December 2015
Exhibit 39 - Adipates, Phthalates, Part 2
Adipates, Phthalates (continued)
Ground Water Systems, CWSs & NTNCWSs
Samples per Total Number
Total Annual
Cost
Burden
Event
of Samples
Sampling Events
Burden per
Total
Cost per
Total Cost, $
(from B of
per Year
(carried forward
Sample, hrs. Burden, hrs. Sample, $
"sampling
from previous
(from "burden
(from
pts")
pg.)
by chem")
"burden by
chem")
Size Category
E
F
G=E*F
H
I=G*H
J
K=G*J
0.5
0-100
6,090
1.05
6,367
3,184
$242
$1,539,716
0.5
101-500
5,934
1.11
6,587
3,294
$242
$1,592,905
0.5
501-1,000
1,724
1.29
2,226
1,113
$242
$538,263
0.5
1,001-3,300
1,875
1.43
2,677
1,339
$242
$647,476
0.5
3,301-10,000
1,037
1.60
1,655
827
$242
$400,197
0.5
10,001-50,000
516
3.53
1,823
911
$242
$440,770
0.5
50,001-100,000
57
9.42
540
270
$242
$130,675
0.5
100,001-1,000,000
25
12.56
311
155
$242
$75,207
0.5
>1,000,000
1
12.56
10
5
$242
$2,388
Total
17,258
22,196
11,098
$5,367,595
Adipates, Phthalates (continued)
Surface Water Systems, CWSs & NTNCWSs
Samples per Total Number
Total Annual
Burden
Cost
Event
of Samples
Sampling Events
Burden per
Total
Cost per
Total Cost, $
(from B of
per Year
(carried forward
Sample, hrs. Burden, hrs. Sample, $
"sampling
from previous
(from "burden
(from
pg.)
pts")
by chem")
"burden by
chem")
Size Category
E
F
G=E*F
H
I=G*H
J
K=G*J
0.5
191
$242
$92,159
0-100
367
1.04
381
0.5
101-500
504
1.06
534
267
$242
$129,217
0.5
501-1,000
246
1.16
286
143
$242
$69,086
0.5
1,001-3,300
631
1.14
720
360
$242
$174,115
0.5
3,301-10,000
826
1.13
934
467
$242
$225,912
0.5
10,001-50,000
821
1.58
1,294
647
$242
$312,899
0.5
50,001-100,000
184
1.98
364
182
$242
$88,063
0.5
100,001-1,000,000
204
3.30
672
336
$242
$162,506
0.5
>1,000,000
15
3.30
49
25
$242
$11,939
Total
3,798
5,235
2,617
$1,265,896
Adipates, Phthalates
GRAND TOTAL
21,056
27,431
13,716
Note: Burden estimates take into account the results of the May 2015 consultation with water industry representatives.
DDBP/Chem/Rads ICR - Chemical Phase Regulation
D-39
$6,633,491
December 2015
Exhibit 40 - PAH Benzo(a)pyrene, Part 1
PAH Benzo(a)pyrene
Ground Water Systems, CWSs & NTNCWSs
Percent of Systems by Scenario
# of Affected
(from "% by scenario")
Systems
(from C of
"systems")
A
B
Scen. 1
Below
trigger &
no waiver
Size Category
0-100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-50,000
50,001-100,000
100,001-1,000,000
>1,000,000
Total
Number of Systems by Scenario
19,092
18,602
5,405
5,879
2,637
1,312
146
63
2
53,138
22.3%
22.3%
22.3%
22.3%
22.3%
22.3%
22.3%
22.3%
22.3%
Scen. 3
Above
MCL
Scen. 2
Below
trigger &
waiver
77.2%
77.2%
77.2%
77.2%
77.2%
77.2%
77.2%
77.2%
77.2%
Scen. 1
Scen. 4
Below
Above
trigger &
trigger &
below MCL no waiver
0.1%
0.1%
0.1%
0.1%
0.1%
0.1%
0.1%
0.1%
0.1%
0.4%
0.4%
0.4%
0.4%
0.4%
0.4%
0.4%
0.4%
0.4%
PAH Benzo(a)pyrene
Surface Water Systems, CWSs & NTNCWSs
Percent of Systems by Scenario
# of Affected
(from "% by scenario")
Systems
(from C of
"systems")
A
PAH Benzo(a)pyrene
:
GRAND TOTAL
558
765
374
959
994
987
221
245
18
5,121
61.6%
61.6%
61.6%
61.6%
61.6%
61.6%
61.6%
61.6%
61.6%
58,259
DDBP/Chem/Rads ICR - Chemical Phase Regulation
Scen. 2
Below
trigger &
waiver
37.9%
37.9%
37.9%
37.9%
37.9%
37.9%
37.9%
37.9%
37.9%
Scen. 3
Above
MCL
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
14,741
14,363
4,173
4,539
2,036
1,013
113
49
2
41,029
Scen. 1
Scen. 4
Below
Above
trigger &
trigger &
below MCL no waiver
19
19
5
6
3
1
0
0
0
53
76
74
22
24
11
5
1
0
0
213
Number of Systems by Scenario
B
Scen. 1
Below
trigger &
no waiver
Size Category
0-100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-50,000
50,001-100,000
100,001-1,000,000
>1,000,000
Total
4,255
4,146
1,205
1,310
588
292
33
14
0
11,843
C=A*B
Scen. 3
Scen. 2
Above
Below
MCL
trigger &
waiver
Annual Sampling Frequency by Scenario
(from "frequency")
Scen. 1
Scen. 4
Below
Above
trigger &
trigger &
below MCL no waiver
0.5%
0.5%
0.5%
0.5%
0.5%
0.5%
0.5%
0.5%
0.5%
C=A*B
Scen. 3
Scen. 2
Above
Below
MCL
trigger &
waiver
344
471
230
591
612
608
136
151
11
3,154
212
290
142
364
377
374
84
93
7
1,941
14,997
42,970
0.33
0.33
0.33
0.33
0.67
0.67
0.67
0.67
0.67
3
4
2
5
5
5
1
1
0
26
53
D-40
-
Scen. 3
Above
MCL
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
Scen. 4
Above
trigger &
below
MCL
Scen. 1
Above
trigger & no
waiver
1.67
1.67
1.67
1.67
1.67
1.67
1.67
1.67
1.67
1,404
1,368
398
432
394
196
22
9
0
4,224
Annual Sampling Frequency by Scenario
(from "frequency")
Scen. 1
Scen. 4
Below
Above
trigger &
trigger &
below MCL no waiver
-
D
Scen. 2
Below
trigger &
waiver
Annual Sampling Events by Scenario
238
0.33
0.33
0.33
0.33
0.67
0.67
0.67
0.67
0.67
D
Scen. 2
Below
trigger &
waiver
-
Scen. 3
Above
MCL
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
Scen. 2
Above
trigger &
waiver
-
E=C*D
Scen. 3
Above
MCL
76
74
22
24
11
5
1
0
0
213
Scen. 4
Above
trigger &
below MCL
128
124
36
39
18
9
1
0
0
355
Total
1,608
1,567
455
495
422
210
23
10
0
4,791
Annual Sampling Events by Scenario
Scen. 2
Above
trigger &
waiver
E=C*D
Scen. 3
Above
MCL
Scen. 4
Above
trigger &
below
MCL
Scen. 1
Above
trigger & no
waiver
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
113
155
76
195
410
407
91
101
7
1,557
-
-
5,781
-
213
Scen. 4
Above
trigger &
below MCL
Total
7
9
4
11
12
11
3
3
0
60
120
164
80
206
422
419
94
104
8
1,617
415
6,408
December 2015
Exhibit 41 - PAH Benzo(a)pyrene, Part 2
PAH Benzo(a)pyrene (continued)
Ground Water Systems, CWSs & NTNCWSs
Samples per Total Number
Total Annual
Cost
Burden
Event
of Samples
Sampling Events
Burden per
Total
Cost per
Total Cost, $
(from B of
per Year
(carried forward
Sample, hrs. Burden, hrs. Sample, $
"sampling
from previous
(from "burden
(from
pg.)
pts")
by chem")
"burden by
chem")
Size Category
E
F
G=E*F
H
I=G*H
J
K=G*J
0.0
0-100
1,608
1.05
1,681
$242
$406,577
0.0
101-500
1,567
1.11
1,739
$242
$420,622
0.0
501-1,000
455
1.29
588
$242
$142,134
0.0
1,001-3,300
495
1.43
707
$242
$170,972
0.0
3,301-10,000
422
1.60
674
$242
$162,913
0.0
10,001-50,000
210
3.53
742
$242
$179,430
0.0
50,001-100,000
23
9.42
220
$242
$53,196
0.0
100,001-1,000,000
10
12.56
127
$242
$30,615
0.0
>1,000,000
0
12.56
4
$242
$972
Total
4,791
6,482
$1,567,432
PAH Benzo(a)pyrene (continued)
Surface Water Systems, CWSs & NTNCWSs
Total Annual
Samples per Total Number
Burden
Cost
Sampling Events
of Samples
Event
Burden per
Total
Cost per
Total Cost, $
(carried forward
per Year
(from B of
Sample, hrs. Burden, hrs. Sample, $
from previous
"sampling
(from "burden
(from
pg.)
pts")
by chem")
"burden by
chem")
Size Category
E
F
G=E*F
H
I=G*H
J
K=G*J
0.0
$242
$30,082
0-100
120
1.04
124
0.0
101-500
164
1.06
174
$242
$42,178
0.0
501-1,000
80
1.16
93
$242
$22,551
0.0
1,001-3,300
206
1.14
235
$242
$56,834
0.0
3,301-10,000
422
1.13
477
$242
$115,286
0.0
10,001-50,000
419
1.58
660
$242
$159,677
0.0
50,001-100,000
94
1.98
186
$242
$44,940
0.0
100,001-1,000,000
104
3.30
343
$242
$82,929
0.0
>1,000,000
8
3.30
25
$242
$6,093
Total
1,617
2,318
$560,569
PAH Benzo(a)pyrene
GRAND TOTAL
6,408
8,800
Note: Burden estimates take into account the results of the May 2015 consultation with water industry representatives.
DDBP/Chem/Rads ICR - Chemical Phase Regulation
D-41
$2,128,001
December 2015
Exhibit 42 - Dioxin, Part 1
Dioxin
Ground Water Systems, CWSs & NTNCWSs
# of Affected Systems
(from C of "systems")
Percent of Systems by Scenario
(from "% by scenario")
Number of Systems by Scenario
B
C=A*B
Scen. 2
Scen. 3
Below
Above
trigger &
MCL
waiver
A
Scen. 1
Below
trigger &
no waiver
Size Category
0-100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-50,000
50,001-100,000
100,001-1,000,000
>1,000,000
Total
19,092
18,602
5,405
5,879
2,637
1,312
146
63
2
53,138
Dioxin
Surface Water Systems, CWSs & NTNCWSs
# of Affected Systems
(from C of "systems")
7.4%
7.4%
7.4%
7.4%
7.4%
7.4%
7.4%
7.4%
7.4%
Scen. 2
Below
trigger &
waiver
91.3%
91.3%
91.3%
91.3%
91.3%
91.3%
91.3%
91.3%
91.3%
Dioxin :
GRAND TOTAL
58,259
DDBP/Chem/Rads ICR - Chemical Phase Regulation
1.30%
1.30%
1.30%
1.30%
1.30%
1.30%
1.30%
1.30%
1.30%
0%
0%
0%
0%
0%
0%
0%
0%
0%
1,406
1,370
398
433
194
97
11
5
0
3,913
17,438
16,991
4,937
5,370
2,409
1,198
133
58
2
48,535
Scen. 4
Scen. 1
Above
Below
trigger &
trigger &
below MCL no waiver
248
242
70
76
34
17
2
1
0
691
-
Number of Systems by Scenario
B
C=A*B
Scen. 3
Scen. 2
Above
Below
MCL
trigger &
waiver
Scen. 1
Below
trigger &
no waiver
558
765
374
959
994
987
221
245
18
5,121
Scen. 4
Scen. 1
Above
Below
trigger &
trigger &
below MCL no waiver
Percent of Systems by Scenario
(from "% by scenario")
A
Size Category
0-100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-50,000
50,001-100,000
100,001-1,000,000
>1,000,000
Total
Scen. 3
Above
MCL
26.8%
26.8%
26.8%
26.8%
26.8%
26.8%
26.8%
26.8%
26.8%
Scen. 2
Below
trigger &
waiver
73.2%
73.2%
73.2%
73.2%
73.2%
73.2%
73.2%
73.2%
73.2%
Scen. 3
Above
MCL
0%
0%
0%
0%
0%
0%
0%
0%
0%
Scen. 1
Scen. 4
Below
Above
trigger &
trigger &
below MCL no waiver
0%
0%
0%
0%
0%
0%
0%
0%
0%
149
205
100
257
266
264
59
66
5
1,370
409
560
274
702
728
723
162
179
13
3,751
5,283
52,285
Annual Sampling Frequency by Scenario
(from "frequency")
-
Scen. 3
Above
MCL
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
Scen. 1
Scen. 4
Above
Above
trigger & trigger & no
waiver
below
MCL
1.67
1.67
1.67
1.67
1.67
1.67
1.67
1.67
1.67
Annual Sampling Frequency by Scenario
(from "frequency")
Scen. 1
Scen. 4
Below
Above
trigger &
trigger &
below MCL no waiver
-
-
691
-
D-42
0.33
0.33
0.33
0.33
0.67
0.67
0.67
0.67
0.67
D
Scen. 2
Below
trigger &
waiver
0.33
0.33
0.33
0.33
0.67
0.67
0.67
0.67
0.67
D
Scen. 2
Below
trigger &
waiver
-
Scen. 3
Above
MCL
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
Annual Sampling Events by Scenario
464
452
131
143
130
65
7
3
0
1,395
-
E=C*D
Scen. 3
Above
MCL
993
967
281
306
137
68
8
3
0
2,763
Scen. 4
Above
trigger &
below MCL
-
Total
1,457
1,419
412
449
267
133
15
6
0
4,158
Annual Sampling Events by Scenario
Scen. 1
Scen. 4
Above
Above
trigger & trigger & no
waiver
below
MCL
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
Scen. 2
Above
trigger &
waiver
Scen. 2
Above
trigger &
waiver
E=C*D
Scen. 3
Above
MCL
Scen. 4
Above
trigger &
below MCL
Total
49
68
33
85
178
177
40
44
3
677
-
-
-
49
68
33
85
178
177
40
44
3
677
2,072
-
2,763
-
4,835
December 2015
Exhibit 43 - Dioxin, Part 2
Dioxin (continued)
Ground Water Systems, CWSs & NTNCWSs
Samples per Total Number
Total Annual
Cost
Burden
Event
of Samples
Sampling Events
Burden per
Total
Cost per
Total Cost, $
(from B of
per Year
(carried forward
Sample, hrs. Burden, hrs. Sample, $
"sampling
from previous
(from "burden
(from
pg.)
pts")
by chem")
"burden by
chem")
Size Category
E
F
G=E*F
H
I=G*H
J
K=G*J
1.0
0-100
1,457
1.05
1,523
1,523
$1,451
$2,209,726
1.0
101-500
1,419
1.11
1,576
1,576
$1,451
$2,286,059
1.0
501-1,000
412
1.29
532
532
$1,451
$772,488
1.0
1,001-3,300
449
1.43
640
640
$1,451
$929,226
1.0
3,301-10,000
267
1.60
427
427
$1,451
$619,027
1.0
10,001-50,000
133
3.53
470
470
$1,451
$681,786
1.0
50,001-100,000
15
9.42
139
139
$1,451
$202,129
1.0
100,001-1,000,000
6
12.56
80
80
$1,451
$116,330
1.0
>1,000,000
0
12.56
3
3
$1,451
$3,693
Total
4,158
5,390
5,390
$7,820,466
Dioxin (continued)
Surface Water Systems, CWSs & NTNCWSs
Total Annual
Samples per Total Number
Cost
Burden
of Samples
Sampling Events
Event
Burden per
Total
Cost per
Total Cost, $
per Year
(carried forward
(from B of
Sample, hrs. Burden, hrs. Sample, $
from previous
"sampling
(from "burden
(from
pg.)
pts")
by chem")
"burden by
chem")
Size Category
E
F
G=E*F
H
I=G*H
J
K=G*J
1.0
51
$1,451
$74,170
0-100
49
1.04
51
1.0
101-500
68
1.06
72
72
$1,451
$103,993
1.0
501-1,000
33
1.16
38
38
$1,451
$55,600
1.0
1,001-3,300
85
1.14
97
97
$1,451
$140,128
1.0
3,301-10,000
178
1.13
201
201
$1,451
$292,287
1.0
10,001-50,000
177
1.58
279
279
$1,451
$404,832
1.0
50,001-100,000
40
1.98
79
79
$1,451
$113,936
1.0
100,001-1,000,000
44
3.30
145
145
$1,451
$210,252
1.0
>1,000,000
3
3.30
11
11
$1,451
$15,447
Total
677
972
972
$1,410,645
Dioxin
GRAND TOTAL
4,835
6,362
6,362
Note: Burden estimates take into account the results of the May 2015 consultation with water industry representatives.
DDBP/Chem/Rads ICR - Chemical Phase Regulation
D-43
$9,231,110
December 2015
Exhibit 44 - Phase V VOCs, Part 1
Phase V VOCs
Ground Water Systems, CWSs & NTNCWSs
# of Affected Systems
(from C of "systems")
A
Size Category
0-100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-50,000
50,001-100,000
100,001-1,000,000
>1,000,000
Total
19,092
18,602
5,405
5,879
2,637
1,312
146
63
2
53,138
Phase V VOCs
Surface Water Systems, CWSs & NTNCWSs
# of Affected Systems
(from C of "systems")
A
Size Category
0-100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-50,000
50,001-100,000
100,001-1,000,000
>1,000,000
Total
Phase V VOCs:
GRAND TOTAL
558
765
374
959
994
987
221
245
18
5,121
58,259
DDBP/Chem/Rads ICR - Chemical Phase Regulation
Percent of Systems by Scenario
Number of Systems by Scenario
Annual Sampling Frequency by Scenario
Annual Sampling Events by Scenario
(from "% by scenario")
(from "frequency")
B
C=A*B
D
E=C*D
Scen. 4
Scen. 3
Scen. 2
Scen. 1
Scen. 4
Scen. 3
Scen. 2
Scen. 1
Scen. 4
Scen. 3
Scen. 2
Scen. 1
Scen. 4
Scen. 3
Scen. 2
Scen. 1
Above
Above
Above
Above
Above
Above
Below
Below
Above
Above
Below
Below
Above
Above
Below
Below
trigger &
MCL
trigger & trigger & no trigger &
MCL
trigger &
trigger &
trigger &
MCL
trigger &
trigger &
trigger &
MCL
trigger &
trigger &
below MCL
waiver
waiver
below
waiver
below MCL no waiver
waiver
below MCL no waiver
waiver
no waiver
MCL
41.8%
41.8%
41.8%
41.8%
41.8%
41.8%
41.8%
41.8%
41.8%
38.3%
38.3%
38.3%
38.3%
38.3%
38.3%
38.3%
38.3%
38.3%
6.1%
6.1%
6.1%
6.1%
6.1%
6.1%
6.1%
6.1%
6.1%
13.8%
13.8%
13.8%
13.8%
13.8%
13.8%
13.8%
13.8%
13.8%
7,984
7,779
2,260
2,459
1,103
549
61
26
1
22,222
7,308
7,121
2,069
2,250
1,009
502
56
24
1
20,341
1,165
1,135
330
359
161
80
9
4
0
3,241
2,635
2,567
746
811
364
181
20
9
0
7,333
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.22
0.22
0.22
0.22
0.22
0.22
0.22
0.22
0.22
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
1.67
1.67
1.67
1.67
1.67
1.67
1.67
1.67
1.67
2,635
2,567
746
811
364
181
20
9
0
7,333
1,608
1,567
455
495
222
110
12
5
0
4,475
4,658
4,539
1,319
1,434
643
320
36
15
0
12,966
4,400
4,287
1,246
1,355
608
302
34
15
0
12,246
Number of Systems by Scenario
Annual Sampling Frequency by Scenario
Annual Sampling Events by Scenario
Percent of Systems by Scenario
(from "frequency")
(from "% by scenario")
B
C=A*B
D
E=C*D
Scen. 4
Scen. 3
Scen. 2
Scen. 1
Scen. 4
Scen. 3
Scen. 2
Scen. 1
Scen. 4
Scen. 3
Scen. 2
Scen. 1
Scen. 4
Scen. 3
Scen. 2
Scen. 1
Above
Above
Above
Above
Above
Above
Below
Below
Above
Above
Below
Below
Above
Above
Below
Below
trigger &
MCL
trigger & trigger & no trigger &
MCL
trigger &
trigger &
trigger &
MCL
trigger &
trigger &
trigger &
MCL
trigger &
trigger &
below MCL
waiver
waiver
below
waiver
below MCL no waiver
waiver
below MCL no waiver
waiver
no waiver
MCL
46.4%
46.4%
46.4%
46.4%
46.4%
46.4%
46.4%
46.4%
46.4%
12.5%
12.5%
12.5%
12.5%
12.5%
12.5%
12.5%
12.5%
12.5%
8.2%
8.2%
8.2%
8.2%
8.2%
8.2%
8.2%
8.2%
8.2%
32.9%
32.9%
32.9%
32.9%
32.9%
32.9%
32.9%
32.9%
32.9%
259
355
173
445
461
458
103
114
8
2,376
70
96
47
120
124
123
28
31
2
641
46
63
31
79
82
81
18
20
1
420
184
252
123
316
327
325
73
81
6
1,685
24,598
20,982
3,661
9,018
D-44
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
Total
13,301
12,960
3,766
4,096
1,837
914
102
44
1
37,020
Total
259
355
173
445
461
458
103
114
8
2,376
23
32
15
40
41
41
9
10
1
211
183
251
123
315
326
324
72
80
6
1,680
428
586
287
735
762
757
169
188
14
3,926
893
1,224
598
1,534
1,590
1,579
354
392
29
8,192
9,709
4,686
14,645
16,172
45,213
December 2015
Exhibit 45 - Phase V VOCs, Part 2
Phase V VOCs (continued)
Ground Water Systems, CWSs & NTNCWSs
Samples per Total Number
Total Annual
Cost
Burden
Event
of Samples
Sampling Events
Burden per
Total
Cost per
Total Cost, $
(from B of
per Year
(carried forward
Sample, hrs. Burden, hrs. Sample, $
"sampling
from previous
(from "burden
(from
pts")
pg.)
by chem") [1]
"burden by
chem")
Size Category
E
F
G=E*F
H
I=G*H
J
K=G*J
0.0
0-100
13,301
1.05
13,906
$0
$0
0.0
101-500
12,960
1.11
14,387
$0
$0
0.0
501-1,000
3,766
1.29
4,861
$0
$0
0.0
1,001-3,300
4,096
1.43
5,848
$0
$0
0.0
3,301-10,000
1,837
1.60
2,933
$0
$0
0.0
10,001-50,000
914
3.53
3,231
$0
$0
0.0
50,001-100,000
102
9.42
958
$0
$0
0.0
100,001-1,000,000
44
12.56
551
$0
$0
0.0
>1,000,000
1
12.56
17
$0
$0
Total
37,020
46,692
$0
[1] Includes Dichloromethane and 1,1,2-Trichloroethane. No incremental burden above Phase II VOCs.
Phase V VOCs (continued)
Surface Water Systems, CWSs & NTNCWSs
Samples per Total Number
Total Annual
Burden
Cost
Event
of Samples
Sampling Events
Burden per
Total
Cost per
Total Cost, $
(carried forward
(from B of
per Year
Sample, hrs. Burden, hrs. Sample, $
from previous
"sampling
(from "burden
(from
pg.)
pts")
by chem") [1]
"burden by
chem")
Size Category
E
F
G=E*F
H
I=G*H
J
K=G*J
0.0
$0
$0
0-100
893
1.04
926
0.0
101-500
1,224
1.06
1,298
$0
$0
0.0
501-1,000
598
1.16
694
$0
$0
0.0
1,001-3,300
1,534
1.14
1,750
$0
$0
0.0
3,301-10,000
1,590
1.13
1,797
$0
$0
0.0
10,001-50,000
1,579
1.58
2,490
$0
$0
0.0
50,001-100,000
354
1.98
701
$0
$0
0.0
100,001-1,000,000
392
3.30
1,293
$0
$0
0.0
>1,000,000
29
3.30
95
$0
$0
Total
8,192
11,044
$0
[1] Includes Dichloromethane and 1,1,2-Trichloroethane. No incremental burden above Phase II VOCs.
Phase V VOCs
GRAND TOTAL
45,213
57,736
Note: Burden estimates take into account the results of the May 2015 consultation with water industry representatives.
DDBP/Chem/Rads ICR - Chemical Phase Regulation
D-45
$0
December 2015
Exhibit 46 - Phase V IOCs, Part 1
Phase V IOCs, except sulfate
Ground Water Systems, CWSs & NTNCWSs
Percent of Systems by Scenario
# of Affected
(from "% by scenario")
Systems
(from C of
"systems")
A
B
Scen. 1
Below
trigger &
no waiver
Size Category
0-100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-50,000
50,001-100,000
100,001-1,000,000
>1,000,000
Total
Number of Systems by Scenario
19,092
18,602
5,405
5,879
2,637
1,312
146
63
2
53,138
76.7%
76.7%
76.7%
76.7%
76.7%
76.7%
76.7%
76.7%
76.7%
Scen. 3
Above
MCL
Scen. 2
Below
trigger &
waiver
19.1%
19.1%
19.1%
19.1%
19.1%
19.1%
19.1%
19.1%
19.1%
Scen. 1
Scen. 4
Below
Above
trigger &
trigger &
below MCL no waiver
4.2%
4.2%
4.2%
4.2%
4.2%
4.2%
4.2%
4.2%
4.2%
-
Phase V IOCs, except sulfate
Surface Water Systems, CWSs & NTNCWSs
Percent of Systems by Scenario
# of Affected
(from "% by scenario")
Systems
(from C of
"systems")
A
Phase V IOCs,
except sulfate:
GRAND TOTAL
558
765
374
959
994
987
221
245
18
5,121
88.8%
88.8%
88.8%
88.8%
88.8%
88.8%
88.8%
88.8%
88.8%
58,259
DDBP/Chem/Rads ICR - Chemical Phase Regulation
Scen. 2
Below
trigger &
waiver
8.7%
8.7%
8.7%
8.7%
8.7%
8.7%
8.7%
8.7%
8.7%
Scen. 3
Above
MCL
2.5%
2.5%
2.5%
2.5%
2.5%
2.5%
2.5%
2.5%
2.5%
3,654
3,561
1,035
1,125
505
251
28
12
0
10,171
Scen. 1
Scen. 4
Below
Above
trigger &
trigger &
below MCL no waiver
802
781
227
247
111
55
6
3
0
2,232
-
Number of Systems by Scenario
B
Scen. 1
Below
trigger &
no waiver
Size Category
0-100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-50,000
50,001-100,000
100,001-1,000,000
>1,000,000
Total
14,636
14,260
4,143
4,507
2,022
1,006
112
48
2
40,735
C=A*B
Scen. 3
Scen. 2
Above
Below
MCL
trigger &
waiver
Scen. 1
Scen. 4
Below
Above
trigger &
trigger &
below MCL no waiver
-
C=A*B
Scen. 3
Scen. 2
Above
Below
MCL
trigger &
waiver
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
D
Scen. 2
Below
trigger &
waiver
0.11
0.11
0.11
0.11
0.11
0.11
0.11
0.11
0.11
Scen. 3
Above
MCL
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
Scen. 4
Above
trigger &
below
MCL
-
Scen. 1
Above
trigger & no
waiver
4,830
4,706
1,367
1,487
667
332
37
16
1
13,443
Annual Sampling Frequency by Scenario
(from "frequency")
Scen. 1
Scen. 4
Below
Above
trigger &
trigger &
below MCL no waiver
496
680
332
852
883
877
196
218
16
4,550
48
66
32
83
86
85
19
21
2
443
14
19
9
24
25
25
6
6
0
128
-
45,285
10,614
2,360
-
D-46
Annual Sampling Events by Scenario
Annual Sampling Frequency by Scenario
(from "frequency")
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
D
Scen. 2
Below
trigger &
waiver
0.11
0.11
0.11
0.11
0.11
0.11
0.11
0.11
0.11
Scen. 3
Above
MCL
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
Scen. 4
Above
trigger &
below
MCL
-
Scen. 2
Above
trigger &
waiver
402
392
114
124
56
28
3
1
0
1,119
E=C*D
Scen. 3
Above
MCL
3,207
3,125
908
988
443
220
25
11
0
8,927
Scen. 4
Above
trigger &
below MCL
-
Total
8,439
8,223
2,389
2,599
1,166
580
65
28
1
23,489
Annual Sampling Events by Scenario
Scen. 1
Above
trigger & no
waiver
Scen. 2
Above
trigger &
waiver
E=C*D
Scen. 3
Above
MCL
Scen. 4
Above
trigger &
below MCL
Total
496
680
332
852
883
877
196
218
16
4,550
5
7
4
9
9
9
2
2
0
49
56
77
37
96
99
99
22
25
2
512
-
557
763
373
957
992
985
221
244
18
5,110
17,992
1,168
9,439
-
28,599
December 2015
Exhibit 47 - Phase V IOCs, Part 2
Phase V IOCs, except sulfate (continued)
Ground Water Systems, CWSs & NTNCWSs
Samples per Total Number
Total Annual
Cost
Burden
Event
Sampling Events
of Samples
Total Cost, $
Total
Cost per
Burden per
(from B of
(carried forward
per Year
Sample, hrs. Burden, hrs. Sample, $
"sampling
from previous
(from
(from "burden
pg.)
pts")
"burden by
by chem")
chem")
Size Category
0-100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-50,000
50,001-100,000
100,001-1,000,000
>1,000,000
Total
E
F
8,439
8,223
2,389
2,599
1,166
580
65
28
1
23,489
1.05
1.11
1.29
1.43
1.60
3.53
9.42
12.56
12.56
G=E*F
8,823
9,128
3,084
3,710
1,861
2,050
608
350
11
29,625
H
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
I=G*H
4,412
4,564
1,542
1,855
931
1,025
304
175
6
14,813
J
$32
$32
$32
$32
$32
$32
$32
$32
$32
K=G*J
$284,489
$294,316
$99,453
$119,632
$60,007
$66,091
$19,594
$11,277
$358
$955,216
Phase V IOCs, except sulfate (continued)
Surface Water Systems, CWSs & NTNCWSs
Samples per Total Number
Total Annual
Burden
Cost
Sampling Events
Event
of Samples
Burden per
Total
Cost per
Total Cost, $
(carried forward
(from B of
per Year
Sample, hrs. Burden, hrs. Sample, $
from previous
"sampling
(from "burden
(from
pg.)
pts")
by chem")
"burden by
chem")
Size Category
0-100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-50,000
50,001-100,000
100,001-1,000,000
>1,000,000
Total
Phase V IOCs, except
sulfate
GRAND TOTAL
E
F
557
763
373
957
992
985
221
244
18
5,110
28,599
1.04
1.06
1.16
1.14
1.13
1.58
1.98
3.30
3.30
G=E*F
578
810
433
1,091
1,121
1,553
437
807
59
6,889
36,515
H
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
I=G*H
289
405
217
546
561
776
219
403
30
3,445
J
18,257
$32
$32
$32
$32
$32
$32
$32
$32
$32
K=G*J
$18,626
$26,116
$13,963
$35,190
$36,153
$50,073
$14,093
$26,006
$1,911
$222,130
$1,177,346
Note: Burden estimates take into account the results of the May 2015 consultation with water industry representatives.
DDBP/Chem/Rads ICR - Chemical Phase Regulation
D-47
December 2015
Exhibit 48 - Diquat, Part 1
Diquat, Endothall, Glyphosate
Ground Water Systems, CWSs & NTNCWSs
Percent of Systems by Scenario
# of Affected
(from "% by scenario")
Systems
(from C of
"systems")
A
B
Scen. 1
Below
trigger &
no waiver
Size Category
0-100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-50,000
50,001-100,000
100,001-1,000,000
>1,000,000
Total
Number of Systems by Scenario
19,092
18,602
5,405
5,879
2,637
1,312
146
63
2
53,138
14.4%
14.4%
14.4%
14.4%
14.4%
14.4%
14.4%
14.4%
14.4%
Scen. 3
Above
MCL
Scen. 2
Below
trigger &
waiver
84.8%
84.8%
84.8%
84.8%
84.8%
84.8%
84.8%
84.8%
84.8%
Scen. 4
Above
trigger &
below MCL
Scen. 1
Below
trigger &
no waiver
0.8%
0.8%
0.8%
0.8%
0.8%
0.8%
0.8%
0.8%
0.8%
2,752
2,681
779
847
380
189
21
9
0
7,659
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
Diquat, Endothall, Glyphosate
Surface Water Systems, CWSs & NTNCWSs
# of Affected
Percent of Systems by Scenario
Systems
(from "% by scenario")
(from C of
"systems")
A
Size Category
0-100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-50,000
50,001-100,000
100,001-1,000,000
>1,000,000
Total
558
765
374
959
994
987
221
245
18
5,121
Diquat, Endothall,
Glyphosate:
GRAND TOTAL
58,259
41.2%
41.2%
41.2%
41.2%
41.2%
41.2%
41.2%
41.2%
41.2%
Scen. 2
Below
trigger &
waiver
55.3%
55.3%
55.3%
55.3%
55.3%
55.3%
55.3%
55.3%
55.3%
DDBP/Chem/Rads ICR - Chemical Phase Regulation
Scen. 3
Above
MCL
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
16,187
15,772
4,583
4,985
2,236
1,112
124
53
2
45,054
Scen. 4
Above
trigger &
below MCL
Scen. 1
Below
trigger &
no waiver
153
149
43
47
21
10
1
1
0
425
0.33
0.33
0.33
0.33
0.67
0.67
0.67
0.67
0.67
-
Number of Systems by Scenario
B
Scen. 1
Below
trigger &
no waiver
C=A*B
Scen. 3
Scen. 2
Above
Below
MCL
trigger &
waiver
Annual Sampling Frequency by Scenario
(from "frequency")
C=A*B
Scen. 3
Scen. 2
Above
Below
MCL
trigger &
waiver
Scen. 4
Above
trigger &
below MCL
Scen. 1
Below
trigger &
no waiver
3.5%
3.5%
3.5%
3.5%
3.5%
3.5%
3.5%
3.5%
3.5%
230
315
154
395
409
407
91
101
7
2,109
309
423
207
530
550
546
122
136
10
2,833
9,768
47,886
-
Scen. 3
Above
MCL
Scen. 4
Above
trigger &
below
MCL
Scen. 1
Above
trigger & no
waiver
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
1.67
1.67
1.67
1.67
1.67
1.67
1.67
1.67
1.67
908
885
257
280
255
127
14
6
0
2,731
Annual Sampling Frequency by Scenario
(from "frequency")
Scen. 4
Above
trigger &
below MCL
Scen. 1
Below
trigger &
no waiver
-
20
27
13
34
35
35
8
9
1
179
0.33
0.33
0.33
0.33
0.67
0.67
0.67
0.67
0.67
-
604
D-48
D
Scen. 2
Below
trigger &
waiver
Annual Sampling Events by Scenario
D
Scen. 2
Below
trigger &
waiver
-
Scen. 2
Above
trigger &
waiver
-
E=C*D
Scen. 3
Above
MCL
-
Scen. 4
Above
trigger &
below MCL
255
249
72
79
35
18
2
1
0
710
Total
1,163
1,133
329
358
290
144
16
7
0
3,441
Annual Sampling Events by Scenario
Scen. 2
Above
trigger &
waiver
E=C*D
Scen. 3
Above
MCL
Scen. 4
Above
trigger &
below MCL
Total
Scen. 3
Above
MCL
Scen. 4
Above
trigger &
below
MCL
Scen. 1
Above
trigger & no
waiver
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
76
104
51
130
274
272
61
68
5
1,041
-
-
46
62
30
78
81
80
18
20
1
418
121
166
81
209
355
353
79
88
6
1,459
3,773
-
-
1,128
4,900
December 2015
Exhibit 49 - Diquat, Part 2
Diquat, Endothall, Glyphosate (continued)
Ground Water Systems, CWSs & NTNCWSs
Total Annual
Samples per Total Number
Burden
Cost
Sampling Events
of Samples
Event
Total Cost, $
Total
Cost per
Burden per
(carried forward
per Year
(from B of
Sample, hrs. Burden, hrs. Sample, $
from previous
"sampling
(from
(from "burden
pts")
pg.)
"burden by
by chem")
chem")
Size Category
0-100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-50,000
50,001-100,000
100,001-1,000,000
>1,000,000
Total
E
F
1,163
1,133
329
358
290
144
16
7
0
3,441
1.05
1.11
1.29
1.43
1.60
3.53
9.42
12.56
12.56
G=E*F
1,216
1,258
425
511
463
510
151
87
3
4,624
H
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
I=G*H
608
629
213
256
231
255
76
43
1
2,312
J
$322
$322
$322
$322
$322
$322
$322
$322
$322
K=G*J
$392,113
$405,658
$137,077
$164,890
$149,236
$164,366
$48,730
$28,045
$890
$1,491,006
Diquat, Endothall, Glyphosate (continued)
Surface Water Systems, CWSs & NTNCWSs
Samples per Total Number
Total Annual
Burden
Cost
Event
Sampling Events
of Samples
Total Cost, $
Total
Cost per
Burden per
(from B of
(carried forward
per Year
Sample, hrs. Burden, hrs. Sample, $
"sampling
from previous
(from
(from "burden
pts")
pg.)
"burden by
by chem")
chem")
Size Category
E
F
G=E*F
H
I=G*H
J
K=G*J
0.5
0-100
121
1.04
126
63
$322
$40,588
0.5
101-500
166
1.06
176
88
$322
$56,909
0.5
501-1,000
81
1.16
94
47
$322
$30,427
0.5
1,001-3,300
209
1.14
238
119
$322
$76,683
0.5
3,301-10,000
355
1.13
402
201
$322
$129,512
0.5
10,001-50,000
353
1.58
556
278
$322
$179,380
0.5
50,001-100,000
79
1.98
157
78
$322
$50,485
0.5
100,001-1,000,000
88
3.30
289
144
$322
$93,162
0.5
>1,000,000
6
3.30
21
11
$322
$6,845
Total
1,459
2,059
1,030
$663,990
Diquat, Endothall,
Glyphosate
GRAND TOTAL
4,900
6,684
3,342
Note: Burden estimates take into account the results of the May 2015 consultation with water industry representatives.
DDBP/Chem/Rads ICR - Chemical Phase Regulation
D-49
$2,154,997
December 2015
Exhibit 50 - Oxamyl, Part 1
Oxamyl
Ground Water Systems, CWSs & NTNCWSs
# of Affected
Percent of Systems by Scenario
Systems
(from "% by scenario")
(from C of
"systems")
A
B
Scen. 1
Below
trigger &
no waiver
Size Category
0-100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-50,000
50,001-100,000
100,001-1,000,000
>1,000,000
Total
Number of Systems by Scenario
19,092
18,602
5,405
5,879
2,637
1,312
146
63
2
53,138
23.1%
23.1%
23.1%
23.1%
23.1%
23.1%
23.1%
23.1%
23.1%
Scen. 3
Above
MCL
Scen. 2
Below
trigger &
waiver
76.8%
76.8%
76.8%
76.8%
76.8%
76.8%
76.8%
76.8%
76.8%
Scen. 1
Scen. 4
Below
Above
trigger &
trigger &
below MCL no waiver
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.1%
0.1%
0.1%
0.1%
0.1%
0.1%
0.1%
0.1%
0.1%
Oxamyl
Surface Water Systems, CWSs & NTNCWSs
# of Affected
Percent of Systems by Scenario
Systems
(from "% by scenario")
(from C of
"systems")
A
Oxamyl:
GRAND TOTAL
558
765
374
959
994
987
221
245
18
5,121
64.7%
64.7%
64.7%
64.7%
64.7%
64.7%
64.7%
64.7%
64.7%
58,259
DDBP/Chem/Rads ICR - Chemical Phase Regulation
Scen. 2
Below
trigger &
waiver
35.3%
35.3%
35.3%
35.3%
35.3%
35.3%
35.3%
35.3%
35.3%
Scen. 3
Above
MCL
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
14,663
14,287
4,151
4,515
2,025
1,008
112
48
2
40,812
Scen. 1
Scen. 4
Below
Above
trigger &
trigger &
below MCL no waiver
-
19
19
5
6
3
1
0
0
0
53
Number of Systems by Scenario
B
Scen. 1
Below
trigger &
no waiver
Size Category
0-100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-50,000
50,001-100,000
100,001-1,000,000
>1,000,000
Total
4,410
4,296
1,248
1,358
609
303
34
15
0
12,273
C=A*B
Scen. 3
Scen. 2
Above
Below
MCL
trigger &
waiver
Annual Sampling Frequency by Scenario
(from "frequency")
Scen. 1
Scen. 4
Below
Above
trigger &
trigger &
below MCL no waiver
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
C=A*B
Scen. 3
Scen. 2
Above
Below
MCL
trigger &
waiver
361
495
242
621
643
639
143
159
12
3,314
197
270
132
338
351
348
78
86
6
1,807
-
15,588
42,618
-
0.33
0.33
0.33
0.33
0.67
0.67
0.67
0.67
0.67
-
Scen. 3
Above
MCL
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
Scen. 4
Above
trigger &
below
MCL
Scen. 1
Above
trigger & no
waiver
1.67
1.67
1.67
1.67
1.67
1.67
1.67
1.67
1.67
1,455
1,418
412
448
408
203
23
10
0
4,377
Annual Sampling Frequency by Scenario
(from "frequency")
Scen. 1
Scen. 4
Below
Above
trigger &
trigger &
below MCL no waiver
-
53
D-50
D
Scen. 2
Below
trigger &
waiver
Annual Sampling Events by Scenario
0.33
0.33
0.33
0.33
0.67
0.67
0.67
0.67
0.67
D
Scen. 2
Below
trigger &
waiver
-
Scen. 3
Above
MCL
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
Scen. 2
Above
trigger &
waiver
-
E=C*D
Scen. 3
Above
MCL
-
Scen. 4
Above
trigger &
below MCL
32
31
9
10
4
2
0
0
0
89
Total
1,487
1,449
421
458
412
205
23
10
0
4,466
Annual Sampling Events by Scenario
Scen. 2
Above
trigger &
waiver
E=C*D
Scen. 3
Above
MCL
Scen. 4
Above
trigger &
below
MCL
Scen. 1
Above
trigger & no
waiver
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
119
163
80
205
431
428
96
106
8
1,636
-
-
6,013
-
-
Scen. 4
Above
trigger &
below MCL
-
89
Total
119
163
80
205
431
428
96
106
8
1,636
6,102
December 2015
Exhibit 51 - Oxamyl, Part 2
Oxamyl (continued)
Ground Water Systems, CWSs & NTNCWSs
Samples per Total Number
Total Annual
Cost
Burden
Event
of Samples
Sampling Events
Burden per
Total
Cost per
Total Cost, $
(from B of
per Year
(carried forward
Sample, hrs. Burden, hrs. Sample, $
"sampling
from previous
(from "burden
(from
pts")
pg.)
by chem") [1]
"burden by
chem")
Size Category
E
F
G=E*F
H
I=G*H
J
K=G*J
0.0
0-100
1,487
1.05
1,555
$0
$0
0.0
101-500
1,449
1.11
1,608
$0
$0
0.0
501-1,000
421
1.29
544
$0
$0
0.0
1,001-3,300
458
1.43
654
$0
$0
0.0
3,301-10,000
412
1.60
659
$0
$0
0.0
10,001-50,000
205
3.53
725
$0
$0
0.0
50,001-100,000
23
9.42
215
$0
$0
0.0
100,001-1,000,000
10
12.56
124
$0
$0
0.0
>1,000,000
0
12.56
4
$0
$0
Total
4,466
6,087
$0
[1] No incremental burden above Phase II SOCs.
Oxamyl (continued)
Surface Water Systems, CWSs & NTNCWSs
Samples per Total Number
Total Annual
Burden
Cost
Event
of Samples
Sampling Events
Burden per
Total
Cost per
Total Cost, $
(carried forward
(from B of
per Year
Sample, hrs. Burden, hrs. Sample, $
from previous
"sampling
(from "burden
(from
pg.)
pts")
by chem") [1]
"burden by
chem")
Size Category
E
F
G=E*F
H
I=G*H
J
K=G*J
0.0
$0
$0
0-100
119
1.04
124
0.0
101-500
163
1.06
173
$0
$0
0.0
501-1,000
80
1.16
93
$0
$0
0.0
1,001-3,300
205
1.14
234
$0
$0
0.0
3,301-10,000
431
1.13
487
$0
$0
0.0
10,001-50,000
428
1.58
675
$0
$0
0.0
50,001-100,000
96
1.98
190
$0
$0
0.0
100,001-1,000,000
106
3.30
350
$0
$0
0.0
>1,000,000
8
3.30
26
$0
$0
Total
1,636
2,351
$0
[1] No incremental burden above Phase II SOCs.
Oxamyl
GRAND TOTAL
6,102
8,438
Note: Burden estimates take into account the results of the May 2015 consultation with water industry representatives.
DDBP/Chem/Rads ICR - Chemical Phase Regulation
D-51
$0
December 2015
Exhibit 52 - Dinoseb, Part 1
Dinoseb
Ground Water Systems, CWSs & NTNCWSs
# of Affected
Percent of Systems by Scenario
Systems
(from "% by scenario")
(from C of
"systems")
A
B
Scen. 1
Below
trigger &
no waiver
Size Category
0-100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-50,000
50,001-100,000
100,001-1,000,000
>1,000,000
Total
Number of Systems by Scenario
19,092
18,602
5,405
5,879
2,637
1,312
146
63
2
53,138
22.3%
22.3%
22.3%
22.3%
22.3%
22.3%
22.3%
22.3%
22.3%
Scen. 3
Above
MCL
Scen. 2
Below
trigger &
waiver
77.3%
77.3%
77.3%
77.3%
77.3%
77.3%
77.3%
77.3%
77.3%
Scen. 1
Scen. 4
Below
Above
trigger &
trigger &
below MCL no waiver
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.4%
0.4%
0.4%
0.4%
0.4%
0.4%
0.4%
0.4%
0.4%
Dinoseb
Surface Water Systems, CWSs & NTNCWSs
Percent of Systems by Scenario
# of Affected
(from "% by scenario")
Systems
(from C of
"systems")
A
Dinoseb:
GRAND TOTAL
558
765
374
959
994
987
221
245
18
5,121
61.0%
61.0%
61.0%
61.0%
61.0%
61.0%
61.0%
61.0%
61.0%
58,259
DDBP/Chem/Rads ICR - Chemical Phase Regulation
Scen. 2
Below
trigger &
waiver
36.5%
36.5%
36.5%
36.5%
36.5%
36.5%
36.5%
36.5%
36.5%
Scen. 3
Above
MCL
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
14,752
14,374
4,176
4,543
2,038
1,014
113
49
2
41,060
Scen. 1
Scen. 4
Below
Above
trigger &
trigger &
below MCL no waiver
-
76
74
22
24
11
5
1
0
0
213
Number of Systems by Scenario
B
Scen. 1
Below
trigger &
no waiver
Size Category
0-100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-50,000
50,001-100,000
100,001-1,000,000
>1,000,000
Total
4,263
4,154
1,207
1,313
589
293
33
14
0
11,866
C=A*B
Scen. 3
Scen. 2
Above
Below
MCL
trigger &
waiver
Annual Sampling Frequency by Scenario
(from "frequency")
Scen. 1
Scen. 4
Below
Above
trigger &
trigger &
below MCL no waiver
2.5%
2.5%
2.5%
2.5%
2.5%
2.5%
2.5%
2.5%
2.5%
C=A*B
Scen. 3
Scen. 2
Above
Below
MCL
trigger &
waiver
0.33
0.33
0.33
0.33
0.67
0.67
0.67
0.67
0.67
-
Scen. 3
Above
MCL
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
Scen. 4
Above
trigger &
below
MCL
Scen. 1
Above
trigger & no
waiver
1.67
1.67
1.67
1.67
1.67
1.67
1.67
1.67
1.67
1,407
1,371
398
433
395
196
22
9
0
4,232
Annual Sampling Frequency by Scenario
(from "frequency")
Scen. 1
Scen. 4
Below
Above
trigger &
trigger &
below MCL no waiver
340
466
228
585
606
602
135
149
11
3,122
204
280
137
350
363
361
81
90
7
1,871
-
14
19
9
24
25
25
6
6
0
128
14,987
42,931
-
341
D-52
D
Scen. 2
Below
trigger &
waiver
Annual Sampling Events by Scenario
0.33
0.33
0.33
0.33
0.67
0.67
0.67
0.67
0.67
D
Scen. 2
Below
trigger &
waiver
-
Scen. 3
Above
MCL
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
Scen. 2
Above
trigger &
waiver
-
E=C*D
Scen. 3
Above
MCL
-
Scen. 4
Above
trigger &
below MCL
128
124
36
39
18
9
1
0
0
355
Total
1,534
1,495
434
472
412
205
23
10
0
4,587
Annual Sampling Events by Scenario
Scen. 2
Above
trigger &
waiver
E=C*D
Scen. 3
Above
MCL
Scen. 4
Above
trigger &
below MCL
Total
Scen. 4
Above
trigger &
below
MCL
Scen. 1
Above
trigger & no
waiver
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
112
154
75
193
406
403
90
100
7
1,541
-
-
33
45
22
56
58
57
13
14
1
298
145
198
97
249
464
461
103
114
8
1,839
5,773
-
-
653
6,426
December 2015
Exhibit 53 - Dinoseb, Part 2
Dinoseb (continued)
Ground Water Systems, CWSs & NTNCWSs
Samples per Total Number
Total Annual
Cost
Burden
Event
of Samples
Sampling Events
Burden per
Total
Cost per
Total Cost, $
(carried forward
(from B of
per Year
Sample, hrs. Burden, hrs. Sample, $
from previous
"sampling
(from "burden
(from
pg.)
pts")
by chem") [1]
"burden by
chem")
Size Category
E
F
G=E*F
H
I=G*H
J
K=G*J
0.0
0-100
1,534
1.05
1,604
$0
$0
0.0
101-500
1,495
1.11
1,660
$0
$0
0.0
501-1,000
434
1.29
561
$0
$0
0.0
1,001-3,300
472
1.43
675
$0
$0
0.0
3,301-10,000
412
1.60
658
$0
$0
0.0
10,001-50,000
205
3.53
725
$0
$0
0.0
50,001-100,000
23
9.42
215
$0
$0
0.0
100,001-1,000,000
10
12.56
124
$0
$0
0.0
>1,000,000
0
12.56
4
$0
$0
Total
4,587
6,225
$0
[1] No incremental burden above Phase II SOCs.
Dinoseb (continued)
Surface Water Systems, CWSs & NTNCWSs
Total Annual
Samples per Total Number
Cost
Burden
of Samples
Sampling Events
Event
Burden per
Total
Cost per
Total Cost, $
per Year
(carried forward
(from B of
Sample, hrs. Burden, hrs. Sample, $
from previous
"sampling
(from "burden
(from
pg.)
pts")
by chem") [1]
"burden by
chem")
Size Category
E
F
G=E*F
H
I=G*H
J
K=G*J
0.0
$0
$0
0-100
145
1.04
150
0.0
101-500
198
1.06
211
$0
$0
0.0
501-1,000
97
1.16
113
$0
$0
0.0
1,001-3,300
249
1.14
284
$0
$0
0.0
3,301-10,000
464
1.13
524
$0
$0
0.0
10,001-50,000
461
1.58
726
$0
$0
0.0
50,001-100,000
103
1.98
204
$0
$0
0.0
100,001-1,000,000
114
3.30
377
$0
$0
0.0
>1,000,000
8
3.30
28
$0
$0
Total
1,839
2,617
$0
[1] No incremental burden above Phase II SOCs.
Dinoseb
GRAND TOTAL
6,426
8,841
Note: Burden estimates take into account the results of the May 2015 consultation with water industry representatives.
DDBP/Chem/Rads ICR - Chemical Phase Regulation
D-53
$0
December 2015
Exhibit 54 - Endrin, Hexachlorobenzene, and hexachlorocyclopentadiene, Part 1
Endrin, hexachlorobenzene, and hexachlorocyclopentadiene
Ground Water Systems, CWSs & NTNCWSs
Percent of Systems by Scenario
# of Affected
(from "% by scenario")
Systems
(from C of
"systems")
A
B
Scen. 1
Below
trigger &
no waiver
Size Category
0-100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-50,000
50,001-100,000
100,001-1,000,000
>1,000,000
Total
Number of Systems by Scenario
19,092
18,602
5,405
5,879
2,637
1,312
146
63
2
53,138
20.0%
20.0%
20.0%
20.0%
20.0%
20.0%
20.0%
20.0%
20.0%
Scen. 2
Below
trigger &
waiver
Scen. 3
Above
MCL
79.9%
79.9%
79.9%
79.9%
79.9%
79.9%
79.9%
79.9%
79.9%
Scen. 4
Scen. 1
Above
Below
trigger &
trigger &
below MCL no waiver
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.1%
0.1%
0.1%
0.1%
0.1%
0.1%
0.1%
0.1%
0.1%
Endrin, hexachlorobenzene, and hexachlorocyclopentadiene
Surface Water Systems, CWSs & NTNCWSs
Percent of Systems by Scenario
# of Affected
(from "% by scenario")
Systems
(from C of
"systems")
A
Endrin, hexachlorobenzene, and
hexachlorocyclopentadiene:
GRAND TOTAL
558
765
374
959
994
987
221
245
18
5,121
58,259
DDBP/Chem/Rads ICR - Chemical Phase Regulation
52.6%
52.6%
52.6%
52.6%
52.6%
52.6%
52.6%
52.6%
52.6%
Scen. 2
Below
trigger &
waiver
37.8%
37.8%
37.8%
37.8%
37.8%
37.8%
37.8%
37.8%
37.8%
Scen. 3
Above
MCL
0.6%
0.6%
0.6%
0.6%
0.6%
0.6%
0.6%
0.6%
0.6%
15,253
14,861
4,318
4,697
2,107
1,048
117
50
2
42,452
Scen. 4
Scen. 1
Above
Below
trigger &
trigger &
below MCL no waiver
-
19
19
5
6
3
1
0
0
0
53
Number of Systems by Scenario
B
Scen. 1
Below
trigger &
no waiver
Size Category
0-100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-50,000
50,001-100,000
100,001-1,000,000
>1,000,000
Total
3,820
3,722
1,082
1,176
528
263
29
13
0
10,633
C=A*B
Scen. 2
Scen. 3
Below
Above
trigger &
MCL
waiver
Annual Sampling Frequency by Scenario
(from "frequency")
Scen. 1
Scen. 4
Below
Above
trigger &
trigger &
below MCL no waiver
9.0%
9.0%
9.0%
9.0%
9.0%
9.0%
9.0%
9.0%
9.0%
C=A*B
Scen. 3
Scen. 2
Above
Below
MCL
trigger &
waiver
-
Scen. 3
Above
MCL
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
Scen. 4
Scen. 1
Above
Above
trigger & trigger & no
below
waiver
MCL
1.67
1.67
1.67
1.67
1.67
1.67
1.67
1.67
1.67
Annual Sampling Frequency by Scenario
(from "frequency")
Scen. 1
Scen. 4
Below
Above
trigger &
trigger &
below MCL no waiver
293
402
197
504
523
519
116
129
9
2,693
211
289
141
363
376
373
84
93
7
1,936
3
5
2
6
6
6
1
1
0
31
50
69
34
86
89
89
20
22
2
461
13,326
44,388
31
514
D-54
0.33
0.33
0.33
0.33
0.67
0.67
0.67
0.67
0.67
D
Scen. 2
Below
trigger &
waiver
0.33
0.33
0.33
0.33
0.67
0.67
0.67
0.67
0.67
D
Scen. 2
Below
trigger &
waiver
-
Scen. 3
Above
MCL
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
4.00
Annual Sampling Events by Scenario
1,261
1,228
357
388
354
176
20
8
0
3,792
-
E=C*D
Scen. 3
Above
MCL
-
Scen. 4
Above
trigger &
below MCL
32
31
9
10
4
2
0
0
0
89
Total
1,293
1,259
366
398
358
178
20
9
0
3,881
Annual Sampling Events by Scenario
Scen. 1
Scen. 4
Above
Above
trigger & trigger & no
waiver
below
MCL
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
2.33
Scen. 2
Above
trigger &
waiver
Scen. 2
Above
trigger &
waiver
E=C*D
Scen. 3
Above
MCL
Scen. 4
Above
trigger &
below MCL
Total
97
133
65
166
350
348
78
86
6
1,330
-
13
18
9
23
24
24
5
6
0
123
117
160
78
201
208
207
46
51
4
1,074
227
312
152
391
583
578
130
144
11
2,526
5,121
-
123
1,163
6,407
December 2015
Exhibit 55 - Endrin, Hexachlorobenzene, and hexachlorocyclopentadiene, Part 2
Endrin, hexachlorobenzene, and hexachlorocyclopentadiene (continued)
Ground Water Systems, CWSs & NTNCWSs
Samples per Total Number
Total Annual
Cost
Burden
Event
of Samples
Sampling Events
Total
Cost per
Burden per
Total Cost, $
(from B of
per Year
(carried forward
Sample, hrs. Burden, hrs. Sample, $
"sampling
from previous
(from
(from "burden
pts")
pg.)
by chem") [1]
"burden by
chem")
Size Category
0-100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-50,000
50,001-100,000
100,001-1,000,000
>1,000,000
Total
E
F
1,293
1,259
366
398
358
178
20
9
0
3,881
1.05
1.11
1.29
1.43
1.60
3.53
9.42
12.56
12.56
G=E*F
1,351
1,398
472
568
571
629
187
107
3
5,289
H
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
I=G*H
J
0
0
0
0
0
0
0
0
0
0
K=G*J
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
[1] Assumes that no systems would be vulnerable after compliance with Phase II. Note that this may be an underestimate because they were
present in the National Pesticide Survey.
Endrin, hexachlorobenzene, and hexachlorocyclopentadiene (continued)
Surface Water Systems, CWSs & NTNCWSs
Total Annual
Samples per Total Number
Cost
Burden
Sampling Events
Event
of Samples
Burden per
Total
Cost per
Total Cost, $
(carried forward
(from B of
per Year
Sample, hrs. Burden, hrs. Sample, $
from previous
"sampling
(from "burden
(from
pg.)
pts")
by chem") [1]
"burden by
chem")
Size Category
0-100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-50,000
50,001-100,000
100,001-1,000,000
>1,000,000
Total
E
F
227
312
152
391
583
578
130
144
11
2,526
1.04
1.06
1.16
1.14
1.13
1.58
1.98
3.30
3.30
G=E*F
236
331
177
445
659
912
257
474
35
3,524
H
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
I=G*H
J
0
0
0
0
0
0
0
0
0
0
K=G*J
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
[1] Assumes that no systems would be vulnerable after compliance with Phase II. Note that this may be an underestimate because they were
present in the National Pesticide Survey.
Endrin, hexachlorobenzene, and
hexachlorocyclopentadiene
GRAND TOTAL
6,407
8,813
Note: Burden estimates take into account the results of the May 2015 consultation with water industry representatives.
DDBP/Chem/Rads ICR - Chemical Phase Regulation
D-55
$0
December 2015
Exhibit 56 - Chemicals - Summary of Original and Revised Burden Estimates
No changes in burden estimates based on May 2015 consultations.
DDBP/Chem/Rads ICR - Chemical Phase Regulation
D-56
December 2015
Appendix E
Radionuclides Rule Spreadsheets
Exhibit 1a - Radionuclides PWS Burden and Cost Summary
Avg. Annual
Respondents
Avg. Annual
Responses
Annual
Burden
Annual Burden
(Labor) Cost
Annual
O&M Cost
Annual
Capital Cost
Monitoring
50,431
91,261
45,631
$1,578,457
$9,703,298
N/A
Total
50,431
91,261
45,631
$1,578,457
$9,703,298
N/A
Requirement
Note: Initial monitoring was completed under the 2004 OMB-approved ICR.
Exhibit 1b - Radionuclides Primacy Agency Burden and Cost Summary
Avg. Annual
Respondents
Avg. Annual
Responses
Annual
Burden
Annual Burden
(Labor) Cost
Annual
O&M Cost
Annual
Capital Cost
Monitoring
57
91,261
5,476
$249,691
N/A
N/A
Total
57
91,261
5,476
$249,691
N/A
N/A
Requirement
Note: Initial monitoring was completed under the 2004 OMB-approved ICR.
DDBP/Chem/Rads ICR - Radionuclides
E-1
December 2015
Exhibit 2 - STATE BURDEN ASSOCIATED WITH RADIONUCLIDES MONITORING
Monitoring Related Burden and Costs - Primacy Agencies
Hours/1000
Labor rate
Total Cost/ 1000
Analyses
($/hr)
Analyses
Activity
Recordkeeping
12
45.60 $
547
Reporting
26
45.60 $
1,186
Compliance Tracking and Analysis
22
45.60 $
1,003
Total
60
45.60 $
2,736
Note: Burden estimates are carried forward from estimates in the 2000 Radionuclides Rule ICR.
Burden estimates take into account the results of the May 2015 consultation with water industry
representatives.
DDBP/Chem/Rads ICR - Radionuclides
E-2
December 2015
Exhibit 3
GROSS ALPHA MONITORING
Years:
2016
2017
2018
3-Yr.Avg
1
GA<3 SM GF
Sites per System
Sampling Frequency per Site
Systems
Total Samples
Cost per Sample
Total Cost
1.36
26,460
$64
$0
1.36
1
26,460
36,075
$64
$2,320,076
1.36
26,460
$64
$0
1.36
0
26,460
12,025
$64
$773,359
3.52
18,219
0
$64
$0
3.52
1
18,219
64,147
$64
$4,125,534
3.52
18,219
0
$64
$0
3.52
0
18,219
21,382
$64
$1,375,178
315 AND AGA<15 SM GF7
Sites per System
Sampling Frequency per Site
Systems
Total Samples
Cost per Sample
Total Cost
DDBP/Chem/Rads ICR - Radionuclides
E-3
December 2015
Exhibit 3 (continued)
GROSS ALPHA MONITORING
8
GA>15 AND AGA<15 LG GF
Sites per System
Sampling Frequency per Site
Systems
Total Samples
Cost per Sample
Total Cost
3.52
185
$64
$0
3.52
1
185
651
$64
$41,900
3.52
185
$64
$0
3.52
0
185
217
$64
$13,967
1.36
1
238
325
$64
$20,884
1.36
1
238
325
$64
$20,884
1.36
1
238
325
$64
$20,884
1.36
1
238
325
$64
$20,884
3.52
1
261
919
$64
$59,090
3.52
1
261
919
$64
$59,090
3.52
1
261
919
$64
$59,090
3.52
1
261
919
$64
$59,090
50,431
1,243
622
$79,973
3-Yr.Avg
50,431
36,628
18,314
$2,355,680
9
GA>15 and AGA>15 SM NO GF
Sites per System
Sampling Frequency per Site
Systems
Total Samples
Cost per Sample
Total Cost
10
GA>15 and AGA>15 LG NO GF
Sites per System
Sampling Frequency per Site
Systems
Total Samples
Cost per Sample
Total Cost
Years:
2000 GROSS ALPHA SCENARIO 3
Systems
Total Samples
Collection Burden (0.5 hrs/sample)
Total Cost
2016
2017
50,431
5,955
2,977
$382,975
50,431
102,686
51,343
$6,604,091
2018
Source:
Total number of systems from October 2014 SDWIS.
Distribution of systems based on 2000 Radionuclides Rule ICR.
Number of sites (entry points) per system from analysis of 2006 CWSS data.
As defined in 2000 Radionuclides Rule ICR, small systems are those serving 10,000 or fewer. Large systems serve more than 10,000.
Sampling costs from 2000 Radionuclides Rule ICR, updated from 1998$ to 2013$.
Notes:
ICR period covers January 2016 - December 2018.
1 - small systems with gross alpha < 3 and grandfathered data monitor every 9 years beginning in 2008
2 - large systems with gross alpha < 3 and grandfathered data monitor every 9 years beginning in 2008
3 - small systems with gross alpha between 3 and 7.5 and grandfathered data monitor every 6 years beginning in 2009
4 - large systems with gross alpha between 3 and 7.5 and grandfathered data monitor every 6 years beginning in 2009
5 - small systems with gross alpha between 7.5 and 15 and grandfathered data monitor every 3 years beginning in 2010
6 - large systems with gross alpha between 7.5 and 15 and grandfathered data monitor every 3 years beginning in 2010
7 - small systems with gross alpha higher than 15 and adjusted gross alpha less than 15 and grandfathered data monitor every 9 years beginning in
2008
8 - large systems with gross alpha higher than 15 and adjusted gross alpha lower than 15 and grandfathered data monitor every 9 years starting in
2008
9 - small systems with gross alpha higher than 15 and adjusted gross alpha higher than 15 are assumed not to grandfather data, and are assumed
to monitor annually beginning in 2005
10 - large systems with gross alpha higher than 15 and adjusted gross alpha higher than 15 are assumed not to grandfather data and to monitor
annually beginning in 2005
DDBP/Chem/Rads ICR - Radionuclides
E-4
December 2015
Exhibit 4
GROSS BETA MONITORING
Years:
2016
Not Vulnerable1
Sites per System
Samples per Site
Systems
Total Samples
Average Cost per Sample
Total Cost
2017
2018
3-Yr.Avg
1.56
48,414
0
$64
$0
1.56
48,414
0
$64
$0
1.56
48,414
0
$64
$0
1.56
48,414
0
$64
$0
3.30
10
0
$219
$0
3.30
10
0
$219
$0
3.30
10
0
$219
$0
3.30
10
0
$219
$0
Vulnerable w/o known contam., GB < 43
Sites per System
Samples per Site
Systems
Total Samples
Average Cost per Sample
Total Cost
1.56
6
2,007
18,769
$94
$1,756,977
1.56
6
2,007
18,769
$94
$1,756,977
1.56
6
2,007
18,769
$94
$1,756,977
1.56
6
2,007
18,769
$94
$1,756,977
Vulnerable w/o known contam., GB > 44
Sites per System
Samples per Site
Systems
Total Samples
Average Cost per Sample
Total Cost
1.56
20
0
$99
$0
1.56
20
0
$99
$0
1.56
20
0
$99
$0
1.56
20
0
$99
$0
Vulnerable w/ known contam.5
Sites per System
Samples per Site
Systems
Total Samples
Average Cost per Sample
Total Cost
1.56
10
0
$131
$0
1.56
10
0
$131
$0
1.56
10
0
$131
$0
1.56
10
0
$131
$0
2018
50,431
18,769
9,384
$1,756,977
3-Yr.Avg
50,431
18,769
9,384
$1,756,977
Vulnerable SW > 100,0002
Sites per System
Samples per Site
Systems
Total Samples
Average Cost per Sample
Total Cost
2000 GROSS BETA
Systems
Total Samples
Collection Burden (0.5 hrs/sample)
Total Cost
2016
50,431
18,769
9,384
$1,756,977
Years:
2017
50,431
18,769
9,384
$1,756,977
Source:
Total number of systems from October 2014 SDWIS
Distribution of systems based on 2000 Radionuclides Rule ICR
Number of sites (entry points) per system from analysis of 2006 CWSS data
Sampling costs from 2000 Radionuclides Rule ICR, updated from 1998$ to 2013$.
Notes:
ICR period covers January 2016 - December 2018.
1 - not vulnerable systems are not required to monitor
2 - vulnerable SW systems serving more than 100,000 are not automatically required to monitor
3 - vulnerable systems without known contamination and gross beta less than 4 take 6 samples per year beginning in 2004 (quarterly gross
beta, 1 tritium, and 1 strontium)
4 - vulnerable systems without known contamination and gross beta greater than 4 take 20 samples per year beginning in 2004 (monthly
gross beta, quarterly tritium, and quarterly strontium)
5 - vulnerable systems with known contamination take 10 samples a year beginning in 2004 (quarterly gross beta, quarterly iodine, 1
strontium, and 1 tritium)
DDBP/Chem/Rads ICR - Radionuclides
E-5
December 2015
Exhibit 5
COMBINED RADIUM MONITORING
Years:
2016
2017
2018
3-Yr.Avg
GA<5 and RA228<2.5 and CR<1 SM1
Sites per System
1.36
Sampling Frequency per Site
1.36
-
Systems
22,205
Total Samples
1.36
1
22,205
-
1.36
-
0
22,205
30,273
22,205
-
10,091
Average Cost per Sample
$
157.21
$
157.21
$
157.21
$
157.21
Total Cost
$
-
$
4,759,152.66
$
-
$
1,586,384.22
GA<5 and RA228<2.5 and CR<1 LG2
Sites per System
3.52
Sampling Frequency per Site
3.52
-
Systems
15,214
Total Samples
3.52
1
15,214
-
3.52
-
0
15,214
53,566
15,214
-
17,855
Average Cost per Sample
$
157.21
$
157.21
$
157.21
$
157.21
Total Cost
$
-
$
8,421,121.32
$
-
$
2,807,040.44
GA<5 and RA228<2.5 and 15 SM7
Sites per System
Sampling Frequency per Site
Systems
Total Samples
Average Cost per Sample
Total Cost
GA<5 and RA228<2.5 and CR>5 LG8
Sites per System
Sampling Frequency per Site
Systems
Total Samples
Average Cost per Sample
Total Cost
GA<5 and RA228>2.5 and CR<1 SM9
Sites per System
Sampling Frequency per Site
Systems
Total Samples
Average Cost per Sample
Total Cost
GA<5 and RA228>2.5 and CR<1 LG10
Sites per System
Sampling Frequency per Site
Systems
Total Samples
Average Cost per Sample
Total Cost
GA<5 and RA228>2.5 and 12.5 and 12.5 and 2.52.5 and 2.52.5 and CR>5 SM15
Sites per System
Sampling Frequency per Site
Systems
Total Samples
Average Cost per Sample
Total Cost
GA<5 and RA228>2.5 and CR>5 LG16
Sites per System
Sampling Frequency per Site
Systems
Total Samples
Average Cost per Sample
Total Cost
GA>5 and CR<1 w/GF SM17
Sites per System
Sampling Frequency per Site
Systems
Total Samples
Average Cost per Sample
Total Cost
GA>5 and CR<1 w/GF LG18
Sites per System
Sampling Frequency per Site
Systems
Total Samples
Average Cost per Sample
Total Cost
DDBP/Chem/Rads ICR - Radionuclides
$
$
1.36
1
9
12
157.21 $
1,829.51 $
1.36
9
157.21 $
$
1.36
9
157.21 $
$
1.36
0
9
4
157.21
609.84
$
$
3.52
1
9
30
157.21 $
4,724.77 $
3.52
9
157.21 $
$
3.52
9
157.21 $
$
3.52
0
9
10
157.21
1,574.92
$
$
1.36
2
2
5
142.92 $
739.19 $
1.36
2
2
5
142.92 $
739.19 $
1.36
2
2
5
142.92 $
739.19 $
1.36
2
2
5
142.92
739.19
$
$
3.52
2
2
13
142.92 $
1,909.00 $
3.52
2
2
13
142.92 $
1,909.00 $
3.52
2
2
13
142.92 $
1,909.00 $
3.52
2
2
13
142.92
1,909.00
$
$
1.36
238
142.92 $
$
1.36
2
238
649
142.92 $
92,768.85 $
1.36
238
142.92 $
$
1.36
1
238
216
142.92
30,922.95
$
$
3.52
267
142.92 $
$
3.52
2
267
1,883
142.92 $
269,168.92 $
3.52
267
142.92 $
$
3.52
1
267
628
142.92
89,722.97
E-8
December 2015
Exhibit 5 (continued)
COMBINED RADIUM MONITORING
GA>5 and 15 and 15 and 2.55 and 2.55 and CR>5 SM23
Sites per System
Sampling Frequency per Site
Systems
Total Samples
Average Cost per Sample
Total Cost
GA>5 and CR>5 LG24
Sites per System
Sampling Frequency per Site
Systems
Total Samples
Average Cost per Sample
Total Cost
DDBP/Chem/Rads ICR - Radionuclides
$
$
1.36
149
142.92 $
$
1.36
149
142.92 $
$
1.36
149
142.92 $
$
1.36
149
142.92
-
$
$
3.52
185
142.92 $
$
3.52
185
142.92 $
$
3.52
185
142.92 $
$
3.52
185
142.92
-
$
$
1.36
2
89
243
142.92 $
34,742.12 $
1.36
89
142.92 $
$
1.36
89
142.92 $
$
1.36
1
89
81
142.92
11,580.71
$
$
3.52
2
83
581
142.92 $
83,041.47 $
3.52
83
142.92 $
$
3.52
83
142.92 $
$
3.52
1
83
194
142.92
27,680.49
$
$
1.36
2
417
1,138
142.92 $
162,622.68 $
1.36
2
417
1,138
142.92 $
162,622.68 $
1.36
2
417
1,138
142.92 $
162,622.68 $
1.36
2
417
1,138
142.92
162,622.68
3.52
2
185
1,302
$143
$186,127
3.52
2
185
1,302
$143
$186,127
3.52
2
185
1,302
$143
$186,127
E-9
3.52
2
185
1,302
$143
$186,127
December 2015
Exhibit 5 (continued)
COMBINED RADIUM MONITORING
Years:
2000 COMBINED RADIUMS SCENARIO 2
2016
2017
2018
3-Yr.Avg
Sites per System
Sampling Frequency per Site
Systems
50,431
50,431
50,431
50,431
Total Samples
8,520
91,579
4,193
34,764
Collection Burden (0.5 hrs/sample)
4,260
45,789
2,097
17,382
Total Cost
$1,267,729
$14,300,987
$599,288
$5,389,335
Source:
Total number of systems from October 2014 SDWIS
Distribution of systems based on 2000 Radionuclides Rule ICR
Number of sites (entry points) per system from analysis of 2006 CWSS data
As defined in 2000 Radionuclides ICR, small systems are those serving 10,000 or fewer. Large systems serve more than 10,000.
Sampling costs from 2000 Radionuclides Rule ICR, updated from 1998$ to 2013$.
Notes:
ICR period covers January 2016 - December 2018.
1 - Small systems with gross alpha less than 5, Ra-228 less than 2.5 and combined radium less than 1 monitor Ra-228 every 9 years beginning in 2008
2 - Large systems with gross alpha less than 5, Ra-228 less than 2.5 and combined radium less than 1 monitor Ra-228 every 9 years beginning in 2008
3 - Small systems with gross alpha less than 5, Ra-228 less than 2.5 and combined radium between 1 and 2.5 monitor Ra-228 every 6 years beginning in 2009
4 - Large systems with gross alpha less than 5, Radium 228 less than 2.5 and combined radium between 1 and 2.5 monitor every 6 years beginning in 2009
5 - Small systems with gross alpha less than 5, Ra-228 less than 2.5 and combined radium between 2.5 and 5 monitor Ra-228 every 3 years beginning in 2010
6 - Large systems with gross alpha less than 5, Ra-228 less than 2.5 and combined radium between 2.5 and 5 monitor Ra-228 every 3 years beginning in 2010
7 - Small systems with gross alpha less than 5, Ra-228 less than 2.5 and combined radium greater than 5 monitor Ra-226 and Ra-228 annually beginning in 2005
8 - Large systems with gross alpha less than 5, Ra-228 less than 2.5 and combined radium greater than 5 monitor Ra-226 and Ra-228 annually beginning in 2005
9 - Small systems with gross alpha less than 5, Ra-228 greater than 2.5 and combined radium less than 1 monitor Ra-228 every 9 years beginning in 2008
10 - Large systems with gross alpha less than 5, Ra-228 greater than 2.5 and combined radium less than 1 monitor Ra-228 every 9 years beginning in 2008
11 - Small systems with gross alpha less than 5, Ra-228 greater than 2.5 and combined radium between 1 and 2.5 monitor Ra-228 every 6 years beginning in 2009
12 - Large systems with gross alpha less than 5, Ra-228 greater than 2.5 and combined radium between 1 and 2.5 monitor Ra-228 every 6 years beginning in 2009
13 - Small systems with gross alpha less than 5, Ra-228 greater than 2.5 and combined radium between 2.5 and 5 monitor Ra-228 every 3 years beginning in 2010
14 - Large systems with gross alpha less than 5, Ra-228 greater than 2.5 and combined radium between 2.5 and 5 monitor Ra-228 every 3 years beginning in 2010
15 - Small systems with gross alpha less than 5, Ra-228 greater than 2.5 and combined radium greater than 5 monitor Ra-226 and Ra-228 annually beginning in 2005
16 - Large systems with gross alpha less than 5, Ra-228 greater than 2.5 and combined radium greater than 5 monitor Ra-226 and Ra-228 annually beginning in 2005
17 - Small systems with gross alpha greater than 5 and combined radium less than 1 with grandfathered data monitor Ra-226 and Ra-228 every 9 years beginning in 2008
18 - Large systems with gross alpha greater than 5 and combined radium less than 1 with grandfathered data monitor Ra-226 and Ra-228 every 9 years beginning in 2008
19 - Small systems with gross alpha greater than 5 and combined radium between 1 and 2.5 with grandfathered data monitor Ra-226 and Ra-228 every 6 years beginning in 2009
20 - Large systems with gross alpha greater than 5 and combined radium between 1 and 2.5 with grandfathered data monitor Ra-226 and Ra-228 every 6 years beginning in 2009
21 - Small systems with gross alpha greater than 5 and combined radium between 2.5 and 5 with grandfathered data monitor Ra-226 and Ra-228 every 3 years beginning in 2010
22 - Large systems with gross alpha greater than 5 and combined radium between 2.5 and 5 with grandfathered data monitor Ra-226 and Ra-228 every 3 years beginning in 2010
23 - Small systems with gross alpha greater than 5 and combined radium greater than 5 monitor Ra-226 and Ra-228 annually beginning in 2005
24 - Large systems with gross alpha greater than 5 and combined radium greater than 5 monitor Ra-226 and Ra-228 annually beginning in 2005
DDBP/Chem/Rads ICR - Radionuclides
E-10
December 2015
Exhibit 6
URANIUM MONITORING
Years:
2016
2017
2018
3-Yr.Avg
1
GA>15 AND U<30 with GF
Sites per System
Sampling Frequency per Site
Systems
Total Samples
Cost per Sample
Total Cost
1.56
290
0
$183
$0
1.56
1
290
451
$183
$82,562
1.56
290
0
$183
$0
1.56
0
290
150
$183
$27,521
GA>15 AND U<30, No GF2
Sites per System
Sampling Frequency per Site
Systems
Total Samples
Cost per Sample
Total Cost
1.56
239
$183
$0
1.56
239
$183
$0
1.56
1
239
373
$183
$68,215
1.56
0
239
124
$183
$22,738
GA>15 and U>303
Sites per System
Sampling Frequency per Site
Systems
Total Samples
Cost per Sample
Total Cost
1.56
1
530
826
$183
$151,047
1.56
1
530
826
$183
$151,047
1.56
1
530
826
$183
$151,047
1.56
1
530
826
$183
$151,047
2000 URANIUM SCENARIO 2
Systems
Total Samples
Collection Burden (0.5 hrs/sample)
Total Cost
2016
1,059
826
413
$151,047
Years:
2017
2018
1,059
1,059
1,277
1,199
639
599
$233,609
$219,262
3-Yr.Avg
1,059
1,100
550
$201,306
Source:
Total number of systems from October 2014 SDWIS
Distribution of systems based on 2000 Radionuclides Rule ICR
Number of sites (entry points) per system from analysis of 2006 CWSS data
Sampling costs from 2000 Radionuclides Rule ICR, updated from 1998$ to 2013$.
Notes:
ICR period covers January 2016 - December 2018.
Assumes uranium monitoring not required for systems with gross alpha less than 15.
1 - Systems with gross alpha greater than 15 and uranium less than 30 and grandfathered data
monitor every 3 years beginning in 2008
2 - System with gross alpha greater than 15 and uranium less than 30 with no grandfathered data
monitor every 3 years beginning in 2009
3 - Systems with gross alpha greater than 15 and uranium greater than 30 monitor annually
beginning in 2005
DDBP/Chem/Rads ICR - Radionuclides
E-11
December 2015
Exhibit 7
Radionuclides - Summary of Original and Revised Burden Estimates
No changes in burden estimates based on May 2015 consultations.
DDBP/Chem/Rads ICR - Radionuclides
E-12
December 2015
Appendix F
Disinfectant Residual Monitoring and
Associated Activities under the Surface
Water Treatment Rule Spreadsheets
Exhibit 1a - SWTR Residual Monitoring PWS Burden and Cost Summary
Requirement
Distribution System
Residuals
Entry Point Residuals Filtered Systems
Entry Point Residuals Unfiltered Systems
Total
Avg. Annual
Respondents
Avg. Annual
Responses
Annual
Burden
Annual Burden
(Labor) Cost
Annual O&M
Cost
Annual
Capital Cost
14,792
1,887,419
157,285
$5,440,799
$53,949,374
N/A
14,758
7,144,724
898,782
$31,090,651
$1,256,526
$5,465,223
34
19,782
3,297
$114,051
$15,082
$26,631
14,792
9,051,925
1,059,363
$36,645,501
$55,220,981
$5,491,854
Exhibit 1b - SWTR Residual Monitoring Primacy Agency Burden and Cost Summary
Requirement
Residual Monitoring
Review
Total
Annual
Respondents
Avg. Annual
Responses
Annual
Burden
Annual Burden
(Labor) Cost
Annual O&M
Cost
Annual
Capital Cost
57
177,507
157,975
$7,203,642
N/A
N/A
57
177,507
157,975
$7,203,642
N/A
N/A
Note: State burden associated with SWTR residual derived from the original State Workload Model and apportioned based on
the percentage of PWS burden associated with residual monitoring. The remaining SWTR state burden is discussed in the
Microbial ICR.
DDBP/Chem/Rads ICR - SWTR Rule
F-1
December 2015
Exhibit 2 - Average Number of Routine Total Coliform Samples Surface/GWUDI Systems
(Used to Determine Number of Disinfectant Samples in Distribution System)
SURFACE/GWUDI
Population
Range
Routine Samples
Required
A
≤500
501-1,000
1,001-2,500
2,501-3,300
3,301-4,100
4,101-4,900
4,901-5,800
5,801-6,700
6,701-7,600
7,601-8,500
8,501-10,000
10,001-12,900
12,901-17,200
17,201-21.500
21,501-25,000
25,001-33,000
33,001-41,000
41,001-50,000
50,001-59,000
59,001-70,000
70,001-83,000
83,001-96,000
96,001-130,000
130,001-220,000
220,001-320,000
320,001-450,000
450,001-600,000
600,001-780,000
780,001-970,000
970,001-1,230,000
1,230,001-1,520,000
1,520,001-1,850,000
1,850,001-2,270,000
2,270,001-3,020,000
3,020,001-3,960,000
Over 3,960,000
1
1
2
3
4
5
6
7
8
9
10
10
15
20
25
30
40
50
60
70
80
90
100
120
150
180
210
240
270
300
330
360
390
420
450
480
CWSs
SW PWSs Samples
B
C=B*A
NTNCWSs
SW PWSs Samples
D
E=D*A
TNCWSs
SW PWSs
Samples
F
G=F*A
Total PWSs
SW PWSs
Samples
H=B+D+F
I=C+E+G
3,062
1,131
1,862
635
442
354
362
271
231
212
347
374
438
307
181
302
224
160
115
113
75
68
118
120
57
25
16
13
8
9
6
4
1
2
1
1
3,062
1,131
3,724
1,905
1,768
1,770
2,172
1,897
1,848
1,908
3,470
3,740
6,570
6,140
4,525
9,060
8,960
8,000
6,900
7,910
6,000
6,120
11,800
14,400
8,550
4,500
3,360
3,120
2,160
2,700
1,980
1,440
390
840
450
480
598
92
69
19
10
5
13
8
5
6
6
2
0
1
0
2
0
1
0
0
1
0
0
1
0
0
0
0
0
0
0
0
0
0
0
0
598
92
138
57
40
25
78
56
40
54
60
20
0
20
0
60
0
50
0
0
80
0
0
120
0
0
0
0
0
0
0
0
0
0
0
0
2,137
95
39
13
7
3
2
4
1
0
3
0
1
0
0
1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1
0
0
0
2,137
95
78
40
28
15
12
28
8
0
30
0
15
0
0
30
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
390
0
0
0
5,796
1,318
1,970
667
459
362
377
283
237
218
356
376
439
308
181
305
224
161
115
113
76
68
118
121
57
25
16
13
8
9
6
4
2
2
1
1
5,796
1,318
3,940
2,002
1,836
1,810
2,262
1,981
1,896
1,962
3,560
3,760
6,585
6,160
4,525
9,150
8,960
8,050
6,900
7,910
6,080
6,120
11,800
14,520
8,550
4,500
3,360
3,120
2,160
2,700
1,980
1,440
780
840
450
480
11,647
154,750
839
1,588
2,307
2,905
14,793
159,244
Source: Number of PWSs from SDWIS October 2014.
Note: All surface water systems are assumed to be conducting monthly routine monitoring.
DDBP/Chem/Rads ICR - SWTR Rule
F-2
December 2015
Exhibit 3 - System Inventory and Entry Points
Population
Category
<100
101-500
501-1000
1,001-3,300
3,301-10,000
10,001-50,000
50,001-100,000
100,001-1,000,000
>1,000,000
Systems
(SW/GWUDI)
CWS
NTNC
A
B
970
314
2,092
283
1,131
92
2,497
88
2,219
53
1,986
6
389
1
343
1
20
0
TNC
C
1,630
506
95
52
20
2
0
0
1
Unfiltered Surface
Water/GWUDI
CWS
NTNC
TNC
D
E
F
3
1
7
0
4
0
6
1
4
1
6
0
2
0
1
0
1
0
3
0
0
0
0
0
0
0
0
Filtered Surface Water/GWUDI
CWS
NTNC
TNC
G
H
I
967
313
1,627
2,085
283
506
1,127
92
95
2,491
87
52
2,215
52
20
1,980
6
2
387
1
0
342
1
0
19
0
1
Entry Points Per System
Total Filtered Entry Points
Total Unfiltered Entry Points
(SW/GWUDI)
(SW/GWUDI)
(SW/GWUDI)
Population
CWS
NTNC
TNC
CWS
NTNC
TNC
CWS
NTNC
TNC
Category
J
K
L
M=G*J
N=H*K
O=I*L
P=D*J
Q=E*K
R=F*L
<100
1.0
1.0
1.0
982
313
1,627
3
1
3
101-500
1.1
1.0
1.0
2,201
283
506
7
0
0
501-1,000
1.0
1.0
1.0
1,161
92
95
4
0
0
1,001-3,300
1.0
1.0
1.0
2,491
87
52
6
1
0
3,301-10,000
1.1
1.0
1.0
2,367
52
20
4
1
0
10,001-50,000
1.1
1.0
1.0
2,140
6
2
6
0
0
50,001-100,000
1.3
1.0
1.0
522
1
0
3
0
0
100,001-1,000,000
1.7
1.0
1.0
577
1
0
2
0
0
>1,000,000
1.7
1.0
1.0
32
0
1
2
0
0
Source: Number of systems from SDWIS/FED data from October 2014. Source was not specified for some systems.
These PWSs were assigned to SW or GW categories based on the ratio of SW to GW systems within a given size
category.
Note: This inventory is based on the assumption that all non-community SW/GWUDI systems will conduct filtration, and
all SW/GWUDI systems will conduct monitoring for disinfectant residual, whether or not they purchase their water or treat
their own. (The turbidity requirements of the Surface Water Treatment Rule, addressed in the Microbial Rules ICR, are
assumed to apply only to systems that have treatment plants).
Entry Points: From analysis of data from the 2006 Community Water System Survey. Includes treated surface water entry
points.
DDBP/Chem/Rads ICR - SWTR Rule
F-3
December 2015
Exhibit 4 - Distribution System Residual Monitoring Burden and Costs
SW/GWUDI Systems
Population
Category
< 1000
1,001-3,300
3,301-10,000
10,001-50,000
50,001-100,000
100,001-1,000,000
>1,000,000
Hourly
Labor
Rate
Number of SW Systems
CWS
A
$34.59
$34.59
$34.59
$34.59
$34.59
$34.59
$34.59
B
4,193
2,497
2,219
1,986
389
343
20
NTNC
C
690
88
53
6
1
1
0
TNC
D
2,232
52
20
2
0
0
1
Annual Samples
Required Per System
Annual
Calculation
Burden Per
System (hrs)
(Based on TCR/RTCR routine
monitoring schedule)
(5 min. per sample)
E
F=E*5/60
12
27
80
284
871
1,609
4,162
O&M
Annual O&M
(Analytical) (Analytical)
Cost Per
Cost Per
Sample
System
G
1
2
7
24
73
134
347
$29
$29
$29
$29
$29
$29
$29
Average
Annual
Burden
Hours
H=E*G
I=F(B+C+D)
$343
7,114
$773
5,942
$2,291
15,307
$8,118
47,190
$24,905
28,317
$45,999
46,133
$118,954
7,283
Average
Average
Annual
Annual O&M
Labor Cost
Cost
J=I*A
$246,090
$205,531
$529,500
$1,632,396
$979,539
$1,595,816
$251,927
K=H(B+C+D)
$2,440,156
$2,037,983
$5,250,365
$16,186,367
$9,712,827
$15,823,645
$2,498,031
Total
11,647
839
2,307
157,285 $5,440,799 $53,949,374
Source: Burden estimates based on a previous DBP/Chem ICR. Burden estimates take into account results of May 2015 consultations with water industry representatives. O&M
costs based on figures from the Stage 1 DBPR ICR, inflated to 2013 dollars. Number of samples based on requirements for monthly TCR sampling (see Exhibit 2). Burden
associated with sampling itself is addressed under the Microbial Rules ICR in the section on the TCR. Note that the burden for disinfectant residual monitoring is underestimated
because it does not include disinfectant residual measured during repeat sampling.
DDBP/Chem/Rads ICR - SWTR Rule
F-4
December 2015
Exhibit 5 - Entry Point Residual Monitoring Burden and Labor Costs (Filtered Surface Water Systems)
Filtered SW/GWUDI Systems
Population
Category
Hourly
Labor
Rate
Number of Filtered Entry
Points
CWS
NTNC
TNC
% Cont.
Monitoring
Annual
Annual Calculations Annual Calculations Annual Calc/Reporting Calc/Reporting
Required Per Entry
Required Per Entry Burden Per Entry Point Burden Per Entry
Average
Point- Cont.
- Cont. Monitoring
Point - Grab
Point - Grab
Average Annual
Annual
Monitoring
(hrs)
Sampling (hrs)
Sampling
Burden Hours Labor Cost
(5.5 min. per calc.)
A
< 500
$34.59
501-1,000
$34.59
1,001-2,500
$34.59
2,501-3,300
$34.59
3,301-10,000
$34.59
10,001-50,000
$34.59
50,001-100,000
$34.59
100,001-1,000,000 $34.59
>1,000,000
$34.59
B
3,183
1,161
1,246
1,246
2,367
2,140
522
577
32
C
597
92
44
44
52
6
1
1
0
D
2,134
95
26
26
20
2
0
0
1
E
50%
50%
50%
50%
100%
100%
100%
100%
100%
G
F
365
365
365
365
365
365
365
365
365
(10.0 min. per calc.)
H=F*5.5/60
365
730
1,095
1,460
N/A
N/A
N/A
N/A
N/A
I=G*10/60
33
33
33
33
33
33
33
33
33
61
122
183
243
N/A
N/A
N/A
N/A
N/A
J
278,782
104,576
142,003
182,004
81,619
71,871
17,497
19,324
1,105
K=J*A
$9,643,640
$3,617,493
$4,912,161
$6,295,868
$2,823,360
$2,486,167
$605,260
$668,472
$38,230
Total
12,473
836
2,304
898,782 $31,090,651
Source: Burden estimates based on a previous DDBP/Chem/Rads ICR. Burden estimates take into account results of May 2015 consultations with water industry representatives.
[B] - [D] Number of filtered entry points from System Inventory and Entry Points sheet (see Exhibit 3).
[E] Assumes 50 percent of systems serving 3,300 or less will conduct grab sampling and the other 50 percent will conduct continuous monitoring.
[G] According to 40 CFR 141.74(c)(2), systems conducting grab sampling and serving 500 or less must sample once per day. Systems serving 501-1,000 must sample twice a day. Systems serving
1,001-2,500 must take 3 samples a day. Systems serving 2,501-3,300 must take 4 samples a day.
[I] Burden for collecting grab samples addressed in the Microbial Rules ICR under the section on SWTR and turbidity monitoring.
[J] = (B+C+D)(E*H+(1-E)*I)
DDBP/Chem/Rads ICR - SWTR Rule
F-5
December 2015
Exhibit 6 - Entry Point Residual Monitoring O&M and Capital Costs (Filtered Surface Water Systems)
Filtered SW/GWUDI Systems
Number of Filtered
Entry Points
Population
Category
CWS
NTNC
TNC
Calculations/Entry
Point/Year - Grab
Sampling
Continuous
Monitoring
Materials (per
calc.)
< 500
501-1000
1,001-2,500
2,501-3,300
3,301-10,000
10,001-50,000
50,001-100,000
100,001-1,000,000
>1,000,000
3,183
1,161
1,246
1,246
2,367
2,140
522
577
32
597
92
44
44
52
6
1
1
0
2,134
95
26
26
20
2
0
0
1
50%
50%
50%
50%
100%
100%
100%
100%
100%
365
365
365
365
365
365
365
365
365
365
730
1095
1460
N/A
N/A
N/A
N/A
N/A
Annual Capital Costs
Capital Unit Costs
Grab
Sampling
Continuous
Monitoring
Grab Sampling
Continuous
Monitoring
Grab
Sampling
Continuous
Monitoring
Grab Sampling
Materials (per
calc.)
Unit O&M costs * #
Entry Points * #
Samples
Unit O&M costs * #
Entry Points * #
Samples
In-line Analyzer
Bench-Top
Unit
1/7 of systems
replace per year
1/7 of systems replace
per year
$0.18
$0.18
$0.18
$0.18
$0.18
$0.18
$0.18
$0.18
$0.18
$0.18
$0.18
$0.18
$0.18
$0.18
$0.18
$0.18
$0.18
$0.18
Total
12,473
836 2,304
Source: Number of filtered entry points from System Inventory and Entry Points sheet (Exhibit 3).
Note: O&M and capital unit costs updated from $2000 to $2013
DDBP/Chem/Rads ICR - SWTR Rule
Annual O&M Costs
O&M Unit Costs
Calculations/Entry
% Cont.
Point/Year - Cont.
Monitoring
Monitoring
F-6
$189,789
$43,274
$42,209
$42,209
$156,590
$137,889
$33,569
$37,075
$2,120
$189,789
$86,548
$126,627
$168,836
N/A
N/A
N/A
N/A
N/A
$684,725
$571,801
$3,398
$3,398
$3,398
$3,398
$3,398
$3,398
$3,398
$3,398
$3,398
$406
$406
$406
$406
N/A
N/A
N/A
N/A
N/A
$1,435,345
$327,276
$319,221
$319,221
$1,184,269
$1,042,832
$253,879
$280,393
$16,036
$171,419
$39,086
$38,124
$38,124
N/A
N/A
N/A
N/A
N/A
$5,178,472
$286,751
December 2015
Exhibit 7 - Entry Point Residual Monitoring Burden and Labor Costs (Unfiltered Surface Water Systems)
Unfiltered SW/GWUDI Systems
Population
Category
< 500
501-1,000
1,001-2,500
2,501-3,300
3,301-10,000
10,001-50,000
50,001-100,000
100,001-1,000,000
>1,000,000
Hourly
Labor
Rate
A
$34.59
$34.59
$34.59
$34.59
$34.59
$34.59
$34.59
$34.59
$34.59
Number of Unfiltered
Entry Points
CWS
B
NTNC
C
10
4
3
3
4
6
3
2
2
% Cont.
Monitoring
TNC
D
1
0
1
1
1
0
0
0
0
E
3
0
0
0
0
0
0
0
0
Annual
Calculations
Required Per
Entry Point- Cont.
Monitoring
G
F
50%
50%
50%
50%
100%
100%
100%
100%
100%
Annual
Calculations
Required Per
Entry Point Grab Sampling
365
365
365
365
365
365
365
365
365
365
730
1,095
1,460
N/A
N/A
N/A
N/A
N/A
Annual
Calc/Reporting
Burden Per Entry
Point - Cont.
Monitoring (hrs)
Annual
Calc/Reporting
Burden Per Entry
Point - Grab
Sampling (hrs)
(10 min. per calc.)
(10 min. per calc.)
H
I
61
61
61
61
61
61
61
61
61
Average
Annual
Burden
Hours
J
61
122
183
243
N/A
N/A
N/A
N/A
N/A
878
376
426
532
321
395
164
103
103
Average
Annual
Labor Cost
K=J*A
$30,381
$13,006
$14,730
$18,413
$11,101
$13,647
$5,676
$3,548
$3,548
Total
37
3
3
3,297
$114,051
Source: Burden estimates based on a previous DBP/Chem ICR. Burden estimates take into account results of May 2015 consultations with water industry representatives. The calculation
and reporting burden is higher for unfiltered systems because they must determine CT (i.e., calculate whether required disinfection has been achieved).
[E] Assumes 50 percent of systems serving 3,300 or less will conduct grab sampling and the other 50 percent will conduct continuous monitoring.
[G] According to 40 CFR 141.74(b)(5), systems conducting grab sampling and serving 500 or less must sample once per day. Systems serving 501-1,000 must sample twice a day.
Systems serving 1,001-2,500 must take 3 samples a day. Systems serving 2,501-3,300 must take 4 samples a day.
[H]-[I] Includes burden for recording pH and temperature (used to calculate CT). Burden for collecting grab samples addressed in the Microbial Rules ICR under the section on SWTR and
turbidity monitoring.
[J] = (B+C+D)(E*H+(1-E)*I)
DDBP/Chem/Rads ICR - SWTR Rule
F-7
December 2015
Exhibit 8 - Entry Point Residual Monitoring O&M and Capital Costs (Unfiltered Surface Water Systems)
Unfiltered SW/GWUDI Systems
Residual Analyzers
Number of Unfiltered
Entry Points
Population
Category
CWS
NTNC
TNC
A
B
C
Annual O&M Costs
O&M Unit Costs
Calculations/Entry
% Cont.
Point/Year - Cont.
Monitoring
Monitoring
D
< 500
501-1,000
1,001-2,500
2,501-3,300
3,301-10,000
10,001-50,000
50,001-100,000
100,001-1,000,000
>1,000,000
10
4
3
3
4
6
3
2
2
1
0
1
1
1
0
0
0
0
3
0
0
0
0
0
0
0
0
Total
37
3
3
E
50%
50%
50%
50%
100%
100%
100%
100%
100%
Calculations/Entry
Point/Year - Grab
Sampling
Continuous
Monitoring
Grab Sampling
Continuous
Monitoring
Grab Sampling
Continuous
Monitoring
Grab Sampling
Continuous
Monitoring
Grab
Sampling
Materials (per calc.)
Materials (per calc.)
Unit O&M costs * # Entry
Points * # Samples
Unit O&M costs * # Entry
Points * # Samples
In-line Analyzer
Bench-Top
Unit
1/7 of systems replace
per year
1/7 of systems
replace per year
G
H
I
J
L
M
N
F
365
365
365
365
365
365
365
365
365
Annual Capital Costs
Capital Unit Costs
365
730
1095
1460
N/A
N/A
N/A
N/A
N/A
$0.18
$0.18
$0.18
$0.18
$0.18
$0.18
$0.18
$0.18
$0.18
$0.18
$0.18
$0.18
$0.18
$0.18
$0.18
$0.18
$0.18
$0.18
$463
$132
$112
$112
$339
$416
$173
$108
$108
$463
$264
$337
$449
N/A
N/A
N/A
N/A
N/A
$1,965
$1,514
K
$3,398
$3,398
$3,398
$3,398
$3,398
$3,398
$3,398
$3,398
$3,398
$406
$406
$406
$406
N/A
N/A
N/A
N/A
N/A
$3,505
$1,000
$850
$850
$2,561
$3,148
$1,310
$818
$818
$419
$119
$101
$101
N/A
N/A
N/A
N/A
N/A
$14,860
$741
pH Monitors
Number of Unfiltered
Entry Points
Population
Category
CWS
A
< 500
501-1,000
1,001-2,500
2,501-3,300
3,301-10,000
10,001-50,000
50,001-100,000
100,001-1,000,000
>1,000,000
NTNC
B
10
4
3
3
4
6
3
2
2
TNC
C
1
0
1
1
1
0
0
0
0
D
3
0
0
0
0
0
0
0
0
50%
50%
50%
50%
100%
100%
100%
100%
100%
E
Calculations/Entry
Point/Year - Grab
Sampling
Grab Sampling
Continuous
Monitoring
Grab Sampling
Continuous
Monitoring
Grab Sampling
Continuous
Monitoring
Grab
Sampling
Materials (per entry
point)
Materials (per entry point)
Unit O&M costs * # Entry
Points
Unit O&M costs * # Entry
Points
In-line Analyzer
Bench-Top
Unit
1/7 of systems replace
per year
1/7 of systems
replace per year
G
H
I
J
L
M
N
F
365
365
365
365
365
365
365
365
365
Annual Capital Costs
Capital Unit Costs
Continuous
Monitoring
365
730
1095
1460
N/A
N/A
N/A
N/A
N/A
$244
$244
$244
$244
$244
$244
$244
$244
$244
$325
$325
$325
$325
$325
$325
$325
$325
$325
Total
37
3
3
Source: Number of unfiltered entry points based on System Inventory and Entry Points sheet (see Exhibit 3).
Note: O&M and capital unit costs updated from $2000 to $2013.
DDBP/Chem/Rads ICR - SWTR Rule
Annual O&M Costs
O&M Unit Costs
Calculations/Entry
% Cont.
Point/Year - Cont.
Monitoring
Monitoring
F-8
$1,758
$502
$426
$426
$1,285
$1,579
$657
$411
$411
$2,344
$669
$568
$568
N/A
N/A
N/A
N/A
N/A
$7,453
$4,149
K
$2,178
$2,178
$2,178
$2,178
$2,178
$2,178
$2,178
$2,178
$2,178
$825
$825
$825
$825
N/A
N/A
N/A
N/A
N/A
$2,246
$641
$545
$545
$1,641
$2,018
$839
$525
$525
$851
$243
$206
$206
N/A
N/A
N/A
N/A
N/A
$9,524
$1,507
December 2015
Exhibit 9
Surface Water Treatment Rule - Summary of Original and Revised
Burden Estimates
No changes in burden estimates based on May 2015 consultations.
DDBP/Chem/Rads ICR - SWTR Rule
F-9
December 2015
Appendix G
Arsenic Rule Spreadsheets
Exhibit 1a - Arsenic Rule PWS Burden and Cost Summary
Avg. Annual
Respondents
Avg. Annual
Responses
Annual
Burden
Annual Burden
(Labor) Cost
Waivers
6,849
6,849
109,580
$3,790,600
N/A
N/A
Sampling
19,420
25,914
90,700
$3,137,496
$1,721,210
N/A
Total
19,420
32,763
200,280
$6,928,096
$1,721,210
N/A
Requirement
Annual O&M
Annual
Cost
Capital Cost
Exhibit 1b - Arsenic Rule Primacy Agency Burden and Cost Summary
Avg. Annual
Respondents
Avg. Annual
Responses
Annual
Burden
Annual Burden
(Labor) Cost
Waiver Review
57
6,849
54,790
$2,498,430
N/A
N/A
Sampling
Recordkeeping
57
25,914
25,914
$1,181,692
N/A
N/A
Total
57
32,763
80,704
3,680,122
N/A
N/A
Requirement
DDBP/Chem/Rads ICR - Arsenic Rule
G-1
Annual O&M
Annual
Cost
Capital Cost
December 2015
Exhibit 2 - System Inventory and Average Number of Entry Points
Number of Non-Purchased Systems
CWSs
Size Category
0-100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-50,000
50,001-100,000
100,001-1,000,000
>1,000,000
Total
A
GW
10,874
12,414
3,886
5,109
2,547
1,305
146
63
2
36,346
B
SW
436
620
323
927
979
987
221
245
18
4,756
NTNCWSs
D
C
GW
SW
8,218
122
6,188
145
1,519
51
770
32
90
15
7
16,792
365
CWSs + NTNCWSs
F=B+D
E=A+C
GW
SW
19,092
558
18,602
765
5,405
374
5,879
959
2,637
994
1,312
987
146
221
63
245
2
18
53,138
5,121
Number of Entry Points per System
CWSs
G
GW
1.1
1.2
1.6
1.9
2.2
3.5
9.4
12.6
12.6
H
SW
1.1
1.1
1.3
1.3
1.3
1.6
2.0
3.3
3.3
NTNCWSs
I
GW & SW
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
Composited Entry Points per System
CWSs
NTNCWSs
K=(H*0.5)+(1*0.5)
J=(G*0.5)+(1*0.5)
L=I
GW
SW
GW & SW
1.0
1.0
1.0
1.1
1.1
1.0
1.3
1.2
1.0
1.4
1.1
1.0
1.6
1.1
1.0
3.5
1.6
1.0
9.4
2.0
1.0
12.6
3.3
1.0
12.6
3.3
1.0
Sources:
[A]-[D] SDWIS/FED data from October 2014. Source was not specified for some systems. These PWSs were assigned to SW or GW categories based on the ratio of SW to GW systems within a given size
category.
[G]-[H] From analysis of data from the 2006 Community Water System Survey. Includes both treated and untreated entry points.
[I] EPA Best Professional Judgement.
[J]-[K] Assumed that 50% of systems serving <10,000 people will composite all of their samples. EPA experience regarding large systems (serving >10,000 people) is that they generally do not composite samples.
DDBP/Chem/Rads ICR - Arsenic Rule
G-2
December 2015
Exhibit 3 - Arsenic Monitoring Burden and Costs - CWSs
Waiver Application
Ground Water CWSs
Population
Category
0-100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-50,000
50,001-100,000
100,001-1,000,000
>1,000,000
%
Hourly
Labor Number of Exceeding
MCL
Systems
Rate
A
$34.59
$34.59
$34.59
$34.59
$34.59
$34.59
$34.59
$34.59
$34.59
Total
B
10,874
12,414
3,886
5,109
2,547
1,305
146
63
2
C
5.33%
5.33%
5.33%
5.33%
5.33%
5.33%
5.33%
5.33%
5.33%
%
Exceeding
50% of
MCL
%
Receiving
Waiver
Number
of
Systems
Receiving
Waiver
D
E=(1-D)*0.4
11.99%
35.20%
11.99%
35.20%
11.99%
35.20%
11.99%
35.20%
11.99%
35.20%
11.99%
35.20%
11.99%
35.20%
11.99%
35.20%
11.99%
35.20%
36,346
Total Samples by Year
2016
2017
2018
I
F=B*E
3,828
4,370
1,368
1,799
897
459
51
22
1
G
11,369
13,781
5,017
7,294
4,067
4,612
1,375
791
25
H
-
12,795
48,331
-
-
-
Average
Annual
Samples
(2016-2018)
J=(G+H+I)/3
3,790
4,594
1,672
2,431
1,356
1,537
458
264
8
Application
Burden per
Waiver
(hrs)
K
16.0
16.0
16.0
16.0
16.0
16.0
16.0
16.0
16.0
16,110
Sampling
Average
Annual
Waiver
Burden
(hrs)
Average
Collection Reporting
Annual
Burden per Burden per Sampling
Average
Sample
Burden
Sample
Annual Waiver
(hrs)
(hrs)
(hrs)
Labor Cost
L=(F*K)/3
20,416.4
23,307.9
7,296.1
9,592.4
4,782.1
2,450.2
274.1
118.3
3.8
$
$
$
$
$
$
$
$
$
M=L*A
706,246
806,266
252,388
331,820
165,423
84,757
9,482
4,092
130
68,241 $
2,360,603
N
O
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
P=(N+O)*J
13,264
16,078
5,853
8,510
4,744
5,381
1,604
923
29
Average
Annual
O&M Cost
Sampling
per
Labor Cost
Sample
$
$
$
$
$
$
$
$
$
Q=A*P
458,813
556,159
202,469
294,383
164,117
186,144
55,482
31,931
1,014
$
$
$
$
$
$
$
$
$
R
66.42
66.42
66.42
66.42
66.42
66.42
66.42
66.42
66.42
56,386 $ 1,950,511
Average
Annual
O&M
Cost
$
$
$
$
$
$
$
$
$
S=J*R
251,702
305,105
111,073
161,497
90,033
102,117
30,437
17,517
556
$ 1,070,038
Average
Annual
Respondents
Average
Annual
Responses
T
U=J
3,625
4,138
1,295
1,703
849
435
49
21
1
3,790
4,594
1,672
2,431
1,356
1,537
458
264
8
12,115
16,110
Note: Burden estimates take into account the results of the May 2015 consultation with water industry representatives.
[C], [D] Percentage of systems exceeding the MCL is from model results in the 2000 Arsenic Rule ICR
[E] Percentage of systems receiving a waiver is based on occurrence estimates in Arsenic Occurrence in Public Water Supplies and is carried over from 2000 Arsenic Rule ICR. Twenty states (40 percent) are known to have adequate historical data to grant waivers. Therefore, EPA assumes that 40 percent of systems with levels below 50 percent of the MCL will qualify for a waiver.
[G], [H], [I] Assumes that those ground water systems that do not receive waivers will monitor every 3 years.
[J] The ICR period covers January 2016 - December 2018.
[R] Sampling cost (including shipping) based on 2000 Arsenic Rule ICR, updated to 2013$.
[T] = [J] divided by composited number of entry points per system
Surface Water CWSs
Population
Category
0-100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-50,000
50,001-100,000
100,001-1,000,000
>1,000,000
Total
Hourly
%
Labor Number of Exceeding
Rate
Systems
MCL
A
$34.59
$34.59
$34.59
$34.59
$34.59
$34.59
$34.59
$34.59
$34.59
B
436
620
323
927
979
987
221
245
18
C
1.12%
1.12%
1.12%
1.12%
1.12%
1.12%
1.12%
1.12%
1.12%
%
Exceeding
50% of
MCL
%
Receiving
Waiver
D
E=(1-D)*0.4
2.96%
38.82%
2.96%
38.82%
2.96%
38.82%
2.96%
38.82%
2.96%
38.82%
2.96%
38.82%
2.96%
38.82%
2.96%
38.82%
2.96%
38.82%
4,756
Number
of
Systems
Receiving
Waiver
Total Samples by Year
2016
2017
2018
F=B*E
169
241
125
360
380
383
86
95
7
G
277
402
229
647
677
952
268
495
36
H
277
402
229
647
677
952
268
495
36
I
277
402
229
647
677
952
268
495
36
1,846
3,983
3,983
3,983
Average
Annual
Samples
(2016-2018)
J=(G+H+I)/3
277
402
229
647
677
952
268
495
36
Application
Burden per
Waiver
(hrs)
K
16.0
16.0
16.0
16.0
16.0
16.0
16.0
16.0
16.0
3,983
Average
Annual
Waiver
Burden
(hrs)
Average
Annual
Collection Reporting
Burden per Burden per Sampling
Average
Burden
Sample
Sample
Annual Waiver
(hrs)
(hrs)
(hrs)
Labor Cost
L=(F*K)/3
902.6
1,283.5
668.7
1,919.1
2,026.7
2,043.3
457.5
507.2
37.3
$
$
$
$
$
$
$
$
$
M=L*A
31,223
44,399
23,131
66,384
70,108
70,681
15,826
17,545
1,289
9,846 $
340,586
N
O
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
P=(N+O)*J
969
1,409
803
2,264
2,370
3,332
938
1,731
127
Average
Annual
O&M
Cost
Average
Annual
O&M Cost
Sampling
per
Labor Cost
Sample
$
$
$
$
$
$
$
$
$
Q=A*P
33,505
48,727
27,761
78,310
81,974
115,278
32,444
59,870
4,399
13,942 $
482,267
$
$
$
$
$
$
$
$
$
R
66.42
66.42
66.42
66.42
66.42
66.42
66.42
66.42
66.42
$
$
$
$
$
$
$
$
$
S=J*R
18,381
26,731
15,230
42,960
44,970
63,241
17,798
32,844
2,413
$
264,568
Average
Annual
Respondents
Average
Annual
Responses
T
U=J
267
379
198
567
599
604
135
150
11
2,910
277
402
229
647
677
952
268
495
36
3,983
Note: Burden estimates take into account the results of the May 2015 consultation with water industry representatives.
[C], [D] Percent of systems exceeding the MCL is from model results in the 2000 Arsenic Rule ICR
[E] Percentage of systems receiving a waiver is based on occurrence estimates in Arsenic Occurrence in Public Water Supplies and is carried over from 2000 Arsenic Rule ICR. Twenty states (40 percent) are known to have adequate historical data to grant waivers. Therefore, EPA assumes that 40 percent of systems with levels below 50 percent of the MCL will qualify for a waiver.
[G], [H], [I] Assumes that those surface water systems that do not receive waivers will monitor annually.
[J] The ICR period covers January 2016 - December 2018.
[R] Sampling cost (including shipping) based on 2000 Arsenic Rule ICR, updated to 2013$.
[T] = [J] divided by composited number of entry points per system
DDBP/Chem/Rads ICR - Arsenic Rule
G-3
December 2015
Exhibit 4 - Arsenic Monitoring Burden and Costs - NTNCWSs
Ground Water NTNCWSs
Population
Category
0-100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-50,000
50,001-100,000
100,001-1,000,000
>1,000,000
%
Hourly Number
%
Exceeding
Labor
Exceeding
50% of
of
Rate Systems
MCL
MCL
A
$34.59
$34.59
$34.59
$34.59
$34.59
$34.59
$34.59
$34.59
$34.59
Total
B
8,218
6,188
1,519
770
90
7
0
0
0
C
6.14%
6.14%
6.14%
6.14%
6.14%
6.14%
6.14%
6.14%
6.14%
%
Receiving
Waiver
D
E=(1-D)*0.4
14.20%
34.32%
14.20%
34.32%
14.20%
34.32%
14.20%
34.32%
14.20%
34.32%
14.20%
34.32%
14.20%
34.32%
14.20%
34.32%
14.20%
34.32%
16,792
Number
of
Systems
Total Samples by Year
Receiving
Waiver
2016
2017 2018
F=B*E
2,821
2,124
521
264
31
2
-
G
8,218
6,188
1,519
770
90
7
-
H
-
I
-
5,763
16,792
-
-
Average
Annual
Samples
(2016-2018)
Application
Burden per
Waiver
(hrs)
J=(G+H+I)/3
2,739
2,063
506
257
30
2
-
K
16.0
16.0
16.0
16.0
16.0
16.0
16.0
16.0
16.0
5,597
Average
Annual
Waiver
Burden
(hrs)
Average
Annual
Average
Collection Reporting
Annual
Burden per Burden per Sampling
Burden
Waiver
Sample
Sample
(hrs)
Labor Cost
(hrs)
(hrs)
L=(F*K)/3
15,042.9
11,327.0
2,780.5
1,409.5
164.7
12.8
-
$
$
$
$
$
$
$
$
$
M=L*A
520,365
391,825
96,183
48,757
5,699
443
-
N
O
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
30,738 $ 1,063,272
P=(N+O)*J
9,588
7,219
1,772
898
105
8
0
0
0
Average
Annual
Sampling
Labor Cost
$
$
$
$
$
$
$
$
$
Q=A*P
331,657
249,731
61,303
31,075
3,632
283
-
19,591 $
677,680
Average
Annual
O&M
Cost
O&M Cost
per
Sample
$
$
$
$
$
$
$
$
$
R
66.42
66.42
66.42
66.42
66.42
66.42
66.42
66.42
66.42
$
$
$
$
$
$
$
$
$
S=J*R
181,945
137,001
33,630
17,048
1,993
155
-
$
371,771
Average
Average
Annual
Annual
Respondents Responses
T
2,739
2,063
506
257
30
2
0
0
0
5,597
U=J
2,739
2,063
506
257
30
2
0
0
0
5,597
Note: Burden estimates take into account the results of the May 2015 consultation with water industry representatives.
[C], [D] Percentage of systems exceeding the MCL is from model results in the 2000 Arsenic Rule ICR
[E] Percentage of systems receiving a waiver is based on occurrence estimates in Arsenic Occurrence in Public Water Supplies and is carried over from 2000 Arsenic Rule ICR. Twenty states (40 percent) are known to have adequate historical data to grant waivers. Therefore, EPA assumes that 40 percent of systems with levels below 50 percent of the MCL will qualify for a waiver.
[G], [H], [I] Assumes that those ground water systems that do not receive waivers will monitor every 3 years.
[J] The ICR period covers January 2016 - December 2018.
[R] Sampling cost (including shipping) based on 2000 Arsenic Rule ICR, updated to 2013$.
[T] = [J] divided by number of entry points per system
Surface Water NTNCWSs
Population
Category
0-100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-50,000
50,001-100,000
100,001-1,000,000
>1,000,000
%
Exceeding
Hourly Number
%
50% of
Labor
Exceeding
of
MCL
Rate Systems
MCL
A
$34.59
$34.59
$34.59
$34.59
$34.59
$34.59
$34.59
$34.59
$34.59
Total
B
122
145
51
32
15
0
0
0
0
C
1.12%
1.12%
1.12%
1.12%
1.12%
1.12%
1.12%
1.12%
1.12%
%
Receiving
Waiver
D
E=(1-D)*0.4
2.96%
38.82%
2.96%
38.82%
2.96%
38.82%
2.96%
38.82%
2.96%
38.82%
2.96%
38.82%
2.96%
38.82%
2.96%
38.82%
2.96%
38.82%
365
Number
of
Systems
Total Samples by Year
Receiving
Waiver
2016
2017 2018
F=B*E
47
56
20
12
6
142
G
-
H
75
89
31
20
9
-
-
-
223
223
223
223
75
89
31
20
9
I
Application
Burden per
Waiver
(hrs)
Average
Annual
Samples
(2012-2014)
J=(G+H+I)/3
75
89
31
20
9
K
75
89
31
20
9
16.0
16.0
16.0
16.0
16.0
16.0
16.0
16.0
16.0
Average
Annual
Waiver
Burden
(hrs)
Average
Collection Reporting
Average
Annual
Burden per Burden per Sampling
Annual
Sample
Waiver
Burden
Sample
(hrs)
Labor Cost
(hrs)
(hrs)
L=(F*K)/3
252.6
300.2
105.6
66.2
31.1
-
$
$
$
$
$
$
$
$
$
M=L*A
8,737
10,384
3,652
2,292
1,074
-
756 $
26,138
N
O
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
P=(N+O)*J
261
311
109
69
32
0
0
0
0
Average
Annual
Sampling
Labor Cost
$
$
$
$
$
$
$
$
$
Q=A*P
9,037
10,741
3,778
2,370
1,111
-
782 $
27,038
Average
Annual
O&M
Cost
O&M Cost
per
Sample
$
$
$
$
$
$
$
$
$
R
66.42
66.42
66.42
66.42
66.42
66.42
66.42
66.42
66.42
$
$
$
$
$
$
$
$
$
S=J*R
4,958
5,893
2,073
1,300
610
-
$
14,833
Average
Average
Annual
Annual
Respondents Responses
T
U=J
75
89
31
20
9
0
0
0
0
75
89
31
20
9
0
0
0
0
223
223
Note: Burden estimates take into account the results of the May 2015 consultation with water industry representatives.
[C], [D] Percent of systems exceeding the MCL is from model results in the 2000 Arsenic Rule ICR.
[E] Percentage of systems receiving a waiver is based on occurrence estimates in Arsenic Occurrence in Public Water Supplies and is carried over from 2000 Arsenic Rule ICR. Twenty states (40 percent) are known to have adequate historical data to grant waivers. Therefore, EPA assumes that 40 percent of systems with levels below 50 percent of the MCL will qualify for a
waiver.
[G]-[I] Assumes that those surface water systems that do not receive waivers will monitor annually.
[J] The ICR period covers January 2016 - December 2018.
[R] Sampling cost (including shipping) based on 2000 Arsenic Rule ICR, updated to 2013$.
[T] = [J] divided by number of entry points per system
DDBP/Chem/Rads ICR - Arsenic Rule
G-4
December 2015
Exhibit 5 - Primacy Agency Burden and Costs
Waiver Review
Population
Category
Hourly
Labor
Rate
0-100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-50,000
50,001-100,000
100,001-1,000,000
>1,000,000
A
$45.60
$45.60
$45.60
$45.60
$45.60
$45.60
$45.60
$45.60
$45.60
Total
Number
of
Systems
Receiving
Waiver
B
Waiver Reviews by Year
2016
2017
2018
6,865
6,791
2,035
2,435
1,313
845
137
117
8
C
6,649
6,494
1,889
2,063
928
462
51
22
1
D
-
E
-
20,546
18,559
-
-
Review
Burden per
Waiver
(hrs)
F
8.0
8.0
8.0
8.0
8.0
8.0
8.0
8.0
8.0
Average
Annual
Waiver
Burden
(hrs)
Average Annual O&M Cost
Waiver Labor
per
Cost
Review
G=(B*F)/3
18,307.3
18,109.3
5,425.5
6,493.6
3,502.3
2,253.1
365.8
312.7
20.5
$
$
$
$
$
$
$
$
$
H=G*A
834,811
825,784
247,401
296,107
159,705
102,743
16,681
14,261
935
54,790 $
2,498,430
Average
Annual
O&M
Cost
I
$
$
$
$
$
$
$
$
$
J
-
Average
Average
Annual
Annual
Respondents Responses
K
$
$
$
$
$
$
$
$
$
-
57
57
57
57
57
57
57
57
57
$
-
57
L=B/3
2,288
2,264
678
812
438
282
46
39
3
6,849
Notes:
[B] Number of systems receiving a waiver is based on occurrence estimates in Arsenic Occurrence in Public Water Supplies . EPA assumes that 40 percent of systems with levels below 50 percent of the MCL will qualify for a waiver. Also note that NTNCWSs applied for
waivers in 2015 (before this 3-year ICR period), which results in the number of systems receiving waivers to exceed the number of waivers reviewed by states in this 3-year ICR period.
40 CFR 141.23(c)(3) states that the term of a waiver may not exceed 9 years.
DDBP/Chem/Rads ICR - Arsenic Rule
G-5
December 2015
Sampling Recordkeeping
Hourly
Labor
Rate
A
0-100
$45.60
101-500
$45.60
501-1,000
$45.60
1,001-3,300
$45.60
3,301-10,000
$45.60
10,001-50,000
$45.60
50,001-100,000
$45.60
100,001-1,000,000 $45.60
>1,000,000
$45.60
Population
Category
Average Annual
Number of
Submitted
Sampling Results
(2016-2018)
B=(C+D+E)/3
6,880
7,147
2,439
3,355
2,072
2,492
726
758
45
2016
C
19,938
20,460
6,796
8,731
4,843
5,572
1,643
1,286
61
2017
D
351
491
260
666
686
952
268
495
36
2018
E
351
491
260
666
686
952
268
495
36
25,914
69,330
4,207
4,207
Total
Total Samples by Year
Record-keeping Burden
per Sample (hrs)
F
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
Average Annual Recordkeeping Burden (hrs)
(2016-2018)
G=B*F
6,880
7,147
2,439
3,355
2,072
2,492
726
758
45
Average Annual O&M Cost
Record-Keeping
per
Labor Cost
Record
H=G*A
I
$
313,742 $
$
325,924 $
$
111,224 $
$
152,966 $
$
94,473 $
$
113,632 $
$
33,116 $
$
34,576 $
$
2,038 $
-
25,914 $
1,181,692
Average
Annual
O&M Cost
J
$
$
$
$
$
$
$
$
$
$
-
Average
Average
Annual
Annual
Respondents Responses
K
L=B
57
6,880
57
7,147
57
2,439
57
3,355
57
2,072
57
2,492
57
726
57
758
57
45
57
25,914
Notes:
The ICR covers the period January 2016 - December 2018.
Burden estimates take into account the results of the May 2015 consultation with water industry representatives.
[C]-[E] Number of samples equals total number of samples taken by CWSs and NTNCWSs each year.
DDBP/Chem/Rads ICR - Arsenic Rule
G-6
December 2015
Exhibit 6
Arsenic Rule - Summary of Original and Revised Burden
Estimates
No changes in burden estimates based on May 2015 consultations.
DDBP/Chem/Rads ICR - Arsenic Rule
G-7
December 2015
Appendix H
Lead and Copper Rule Spreadsheets
Exhibit 1 - TAP MONITORING FOR LEAD & COPPER - SYSTEM INVENTORY
GROUND WATER: CWSs
Size
Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1 Million
> 1 Million
TOTAL:
SURFACE WATER: CWSs
Size
Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1 Million
> 1 Million
TOTAL:
Total
Systems
11,212
13,403
4,320
5,566
2,724
989
355
106
44
58
5
2
38,784
Total
Systems
970
2,092
1,131
2,497
2,219
1,300
686
256
133
308
35
20
11,647
GROUND WATER: NTNCWSs
Size
Total
Category
Systems
≤100
8,279
101-500
6,254
501-1,000
1,539
1,001-3,300
786
3,301-10,000
92
10,001-25,000
4
25,001-50,000
5
50,001-75,000
0
75,001-100,000
0
100,001-500,000
0
500,001-1,000,000
0
> 1,000,000
0
TOTAL:
16,958
SURFACE WATER: NTNCWSs
Size
Total
Category
Systems
≤100
314
101-500
283
501-1,000
92
1,001-3,300
88
3,301-10,000
53
10,001-25,000
3
25,001-50,000
3
50,001-75,000
1
75,001-100,000
0
100,001-500,000
1
500,001-1,000,000
0
> 1,000,000
0
TOTAL:
839
GROUND WATER: ALL SYSTEMS
Size
Total
Category
Systems
≤100
19,491
101-500
19,657
501-1,000
5,859
1,001-3,300
6,352
3,301-10,000
2,816
10,001-25,000
993
25,001-50,000
360
50,001-75,000
106
75,001-100,000
44
100,001-500,000
58
500,001-1,000,000
5
> 1,000,000
2
TOTAL:
55,743
Source: SDWIS/FED Data from October 2014
SURFACE WATER: ALL SYSTEMS
Size
Total
Category
Systems
≤100
1,284
101-500
2,375
501-1,000
1,223
1,001-3,300
2,585
3,301-10,000
2,272
10,001-25,000
1,303
25,001-50,000
689
50,001-75,000
257
75,001-100,000
133
100,001-500,000
309
500,001-1,000,000
35
> 1,000,000
20
TOTAL:
12,485
DDBP/Chem/Rads ICR - Lead and Copper Rule
H-1
December 2015
Exhibit 2 - TAP MONITORING FOR LEAD & COPPER - LABOR RATES
State Labor Rate
$45.60
Base (Hourly)
System Labor Rates
Load Factor
$21.62
1.6
PWS Labor Rate
2013$ National Occupational Employment and Wage Estimates, United States, BLS SOC Code
51-8031, "Local Government - Water and Liquid Waste Treatment Plant and System
Operators". May 2013 data (published in April 2014).
≤100
$34.59
Inflation Factor
1.0
1 ECI New
101-500
$34.59
Total
$34.59
1 ECI Base
501-1,000
$34.59
$28.50
1,001-3,300
$34.59
3,301-10,000
$34.59
Base (Hourly)
10,001-25,000
$34.59
Load Factor
25,001-50,000
$34.59
Inflation Factor
50,001-75,000
$34.59
Total
75,001-100,000
$34.59
100,001-500,000
$34.59
500,001-1,000,000
$34.59
> 1,000,000
$34.59
1.6
State Labor Rate
2013$ National Occupational Employment and Wage Estimates, United States, BLS SOC Code
19-2041, "State Government - Environmental Scientists and Specialists, Including Health".
May 2013 data (published in April 2014). http://www.bls.gov/oes/2013/may/oes192041.htm
1.0
1 ECI New
$45.60
1 ECI Base
Sampling Cost Inflation Factor
Inflation Factor
1.40
DDBP/Chem/Rads ICR - Lead and Copper Rule
CPI All Urban Consumers (CPI-U): U.S. City Average, by Expenditure Category and Commodity and Service Group. All urban
233.0 consumers, All items, Not seasonally adjusted. 2013 Annual Average.
166.6 CPI-U Base Year
H-2
December 2015
Exhibit 3 - TAP MONITORING FOR LEAD & COPPER - MONITORING, BURDEN, AND COST ASSUMPTIONS
GROUND WATER: CWSs
Avg. # of
Samples per
Mon. Event
Size
Total
(Regular
Category
Systems Schedule)
≤100
11,212
5
101-500
13,403
10
4,320
20
501-1,000
1,001-3,300
5,566
20
2,724
40
3,301-10,000
10,001-25,000
989
60
25,001-50,000
355
60
106
60
50,001-75,000
75,001-100,000
44
60
58
100
100,001-500,000
500,001-1,000,000
5
100
2
100
> 1,000,000
TOTAL:
38,784
Avg. # of
Samples per
Mon. Event
(Reduced
Schedule)
5
5
10
10
20
30
30
30
30
50
50
50
Average
Labor Hrs.
For Collection
and Analysis
(Per Sample)
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
Avg. # of
Samples per
Mon. Event
Size
Total
(Regular
Category
Systems Schedule)
≤100
8,279
5
101-500
6,254
10
1,539
20
501-1,000
1,001-3,300
786
20
92
40
3,301-10,000
10,001-25,000
4
60
25,001-50,000
5
60
60
50,001-75,000
75,001-100,000
60
100
100,001-500,000
500,001-1,000,000
100
100
> 1,000,000
TOTAL:
16,958
Avg. # of
Samples per
Mon. Event
(Reduced
Schedule)
5
5
10
10
20
30
30
30
30
50
50
50
Average
Labor Hrs.
For Collection
and Analysis
(Per Sample)
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
Avg. # of
Samples per
Mon. Event
Size
Total
(Regular
Category
Systems Schedule)
≤100
19,491
5
101-500
19,657
10
5,859
20
501-1,000
1,001-3,300
6,352
20
2,816
40
3,301-10,000
10,001-25,000
993
60
25,001-50,000
360
60
106
60
50,001-75,000
75,001-100,000
44
60
58
100
100,001-500,000
500,001-1,000,000
5
100
2
100
> 1,000,000
TOTAL:
55,743
Avg. # of
Samples per
Mon. Event
(Reduced
Schedule)
5
5
10
10
20
30
30
30
30
50
50
50
Average
Labor Hrs.
For Collection
and Analysis
(Per Sample)
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
Labor Rate
For
Collection
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
Average
O&M Cost
Per
Sample
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
Total Average
Labor Cost Per
Mon. Event
(Regular Sched.)
691.84
$
$
1,383.68
$
2,767.36
$
2,767.36
$
5,534.72
$
8,302.08
$
8,302.08
$
8,302.08
$
8,302.08
$
13,836.80
$
13,836.80
$
13,836.80
Total Average
Labor Cost Per
Mon. Event
(Reduced Sched.)
$
691.84
$
691.84
1,383.68
$
$
1,383.68
2,767.36
$
$
4,151.04
$
4,151.04
4,151.04
$
$
4,151.04
6,918.40
$
$
6,918.40
6,918.40
$
Total Average
O&M Cost Per
Mon. Event
(Regular Sched.)
$
36.79
$
73.57
147.14
$
$
147.14
294.28
$
$
441.42
$
441.42
441.42
$
$
441.42
735.70
$
$
735.70
735.70
$
Total Average
O&M Cost Per
Mon. Event
(Reduced Sched.)
$
36.79
$
36.79
73.57
$
$
73.57
147.14
$
$
220.71
$
220.71
220.71
$
$
220.71
367.85
$
$
367.85
367.85
$
Total Average
Labor Cost Per
Mon. Event
(Reduced Sched.)
691.84
$
$
691.84
1,383.68
$
$
1,383.68
2,767.36
$
$
4,151.04
$
4,151.04
4,151.04
$
$
4,151.04
6,918.40
$
$
6,918.40
6,918.40
$
Total Average
O&M Cost Per
Mon. Event
(Regular Sched.)
36.79
$
$
73.57
147.14
$
$
147.14
294.28
$
$
441.42
$
441.42
441.42
$
$
441.42
735.70
$
$
735.70
735.70
$
Total Average
O&M Cost Per
Mon. Event
(Reduced Sched.)
36.79
$
$
36.79
73.57
$
$
73.57
147.14
$
$
220.71
$
220.71
220.71
$
$
220.71
367.85
$
$
367.85
367.85
$
Total Average
Labor Cost Per
Mon. Event
(Reduced Sched.)
691.84
$
$
691.84
1,383.68
$
$
1,383.68
2,767.36
$
$
4,151.04
$
4,151.04
4,151.04
$
$
4,151.04
6,918.40
$
$
6,918.40
6,918.40
$
Total Average
O&M Cost Per
Mon. Event
(Regular Sched.)
36.79
$
$
73.57
147.14
$
$
147.14
294.28
$
$
441.42
$
441.42
441.42
$
$
441.42
735.70
$
$
735.70
735.70
$
Total Average
O&M Cost Per
Mon. Event
(Reduced Sched.)
36.79
$
$
36.79
73.57
$
$
73.57
147.14
$
$
220.71
$
220.71
220.71
$
$
220.71
367.85
$
$
367.85
367.85
$
GROUND WATER: NTNCWSs
Labor Rate
For
Collection
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
Average
O&M Cost
Per
Sample
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
Total Average
Labor Cost Per
Mon. Event
(Regular Sched.)
691.84
$
$
1,383.68
$
2,767.36
$
2,767.36
$
5,534.72
$
8,302.08
$
8,302.08
$
8,302.08
$
8,302.08
$
13,836.80
$
13,836.80
$
13,836.80
GROUND WATER: ALL SYSTEMS
DDBP/Chem/Rads ICR - Lead and Copper Rule
Labor Rate
For
Collection
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
Average
O&M Cost
Per
Sample
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
H-3
Total Average
Labor Cost Per
Mon. Event
(Regular Sched.)
691.84
$
$
1,383.68
$
2,767.36
$
2,767.36
$
5,534.72
$
8,302.08
$
8,302.08
$
8,302.08
$
8,302.08
$
13,836.80
$
13,836.80
$
13,836.80
December 2015
Exhibit 3 - TAP MONITORING FOR LEAD & COPPER - MONITORING, BURDEN, AND COST ASSUMPTIONS (cont.)
SURFACE WATER: CWSs
Avg. # of
Samples per
Mon. Event
Size
Total
(Regular
Category
Systems Schedule)
≤100
970
5
101-500
2,092
10
501-1,000
1,131
20
1,001-3,300
2,497
20
3,301-10,000
2,219
40
10,001-25,000
1,300
60
25,001-50,000
686
60
50,001-75,000
256
60
75,001-100,000
133
60
100,001-500,000
308
100
500,001-1,000,000
35
100
> 1,000,000
20
100
TOTAL:
11,647
Avg. # of
Samples per
Mon. Event
(Reduced
Schedule)
5
5
10
10
20
30
30
30
30
50
50
50
Average
Labor Hrs.
For Collection
and Analysis
(Per Sample)
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
Avg. # of
Samples per
Mon. Event
Size
Total
(Regular
Category
Systems Schedule)
≤100
314
5
101-500
283
10
501-1,000
92
20
1,001-3,300
88
20
3,301-10,000
53
40
10,001-25,000
3
60
25,001-50,000
3
60
50,001-75,000
1
60
75,001-100,000
60
100,001-500,000
1
100
500,001-1,000,000
100
> 1,000,000
100
TOTAL:
839
Avg. # of
Samples per
Mon. Event
(Reduced
Schedule)
5
5
10
10
20
30
30
30
30
50
50
50
Average
Labor Hrs.
For Collection
and Analysis
(Per Sample)
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
4.0
Labor Rate
For
Collection
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
Average
O&M Cost
Per
Sample
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
Total Average
Labor Cost Per
Mon. Event
(Regular Sched.)
691.84
$
$
1,383.68
$
2,767.36
$
2,767.36
$
5,534.72
$
8,302.08
$
8,302.08
$
8,302.08
$
8,302.08
$
13,836.80
$
13,836.80
$
13,836.80
Total Average
Labor Cost Per
Mon. Event
(Reduced Sched.)
691.84
$
$
691.84
$
1,383.68
$
1,383.68
$
2,767.36
$
4,151.04
$
4,151.04
$
4,151.04
$
4,151.04
$
6,918.40
$
6,918.40
6,918.40
$
Total Average
O&M Cost Per
Mon. Event
(Regular Sched.)
36.79
$
$
73.57
$
147.14
$
147.14
$
294.28
$
441.42
$
441.42
$
441.42
$
441.42
$
735.70
$
735.70
$
735.70
Total Average
O&M Cost Per
Mon. Event
(Reduced Sched.)
36.79
$
$
36.79
$
73.57
$
73.57
$
147.14
$
220.71
$
220.71
$
220.71
$
220.71
$
367.85
$
367.85
$
367.85
Total Average
Labor Cost Per
Mon. Event
(Reduced Sched.)
691.84
$
$
691.84
$
1,383.68
$
1,383.68
$
2,767.36
$
4,151.04
$
4,151.04
$
4,151.04
$
4,151.04
$
6,918.40
$
6,918.40
$
6,918.40
Total Average
O&M Cost Per
Mon. Event
(Regular Sched.)
36.79
$
$
73.57
$
147.14
$
147.14
$
294.28
$
441.42
$
441.42
$
441.42
$
441.42
$
735.70
$
735.70
$
735.70
Total Average
O&M Cost Per
Mon. Event
(Reduced Sched.)
36.79
$
$
36.79
$
73.57
$
73.57
$
147.14
$
220.71
$
220.71
$
220.71
$
220.71
$
367.85
$
367.85
$
367.85
Total Average
Labor Cost Per
Mon. Event
(Reduced Sched.)
691.84
$
$
691.84
$
1,383.68
$
1,383.68
$
2,767.36
$
4,151.04
$
4,151.04
$
4,151.04
$
4,151.04
$
6,918.40
$
6,918.40
$
6,918.40
Total Average
O&M Cost Per
Mon. Event
(Regular Sched.)
36.79
$
$
73.57
$
147.14
$
147.14
$
294.28
$
441.42
$
441.42
$
441.42
$
441.42
$
735.70
$
735.70
$
735.70
Total Average
O&M Cost Per
Mon. Event
(Reduced Sched.)
36.79
$
$
36.79
$
73.57
$
73.57
$
147.14
$
220.71
$
220.71
$
220.71
$
220.71
$
367.85
$
367.85
$
367.85
SURFACE WATER: NTNCWSs
Labor Rate
For
Collection
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
Average
Total Average
O&M Cost Labor Cost Per
Mon. Event
Per
Sample (Regular Sched.)
691.84
$
7.36 $
$
7.36 $
1,383.68
$
7.36 $
2,767.36
$
7.36 $
2,767.36
$
7.36 $
5,534.72
$
7.36 $
8,302.08
$
7.36 $
8,302.08
$
7.36 $
8,302.08
$
7.36 $
8,302.08
$
7.36 $
13,836.80
$
7.36 $
13,836.80
$
7.36 $
13,836.80
SURFACE WATER: ALL SYSTEMS
Avg. # of
Avg. # of
Average
Average
Samples per Samples per
Labor Hrs.
Total Average
Mon. Event
Mon. Event
For Collection Labor Rate O&M Cost Labor Cost Per
Size
Total
(Regular
(Reduced
and Analysis
For
Mon. Event
Per
Category
Systems Schedule)
Schedule)
(Per Sample)
Collection Sample (Regular Sched.)
≤100
1,284
5
5
4.0 $
34.59 $
7.36 $
691.84
101-500
2,375
10
5
4.0 $
34.59 $
7.36 $
1,383.68
501-1,000
1,223
20
10
4.0 $
34.59 $
7.36 $
2,767.36
1,001-3,300
2,585
20
10
4.0 $
34.59 $
7.36 $
2,767.36
3,301-10,000
2,272
40
20
4.0 $
34.59 $
7.36 $
5,534.72
10,001-25,000
1,303
60
30
4.0 $
34.59 $
7.36 $
8,302.08
25,001-50,000
689
60
30
4.0 $
34.59 $
7.36 $
8,302.08
50,001-75,000
257
60
30
4.0 $
34.59 $
7.36 $
8,302.08
75,001-100,000
133
60
30
4.0 $
34.59 $
7.36 $
8,302.08
100,001-500,000
309
100
50
4.0 $
34.59 $
7.36 $
13,836.80
500,001-1,000,000
35
100
50
4.0 $
34.59 $
7.36 $
13,836.80
> 1,000,000
20
100
50
4.0 $
34.59 $
7.36 $
13,836.80
TOTAL:
12,485
Note: Burden estimates take into account the results of the May 2015 consultation with water industry representatives.
DDBP/Chem/Rads ICR - Lead and Copper Rule
H-4
December 2015
Exhibit 4 - TAP MONITORING FOR LEAD & COPPER - MONITORING SCENARIO ALLOCATION
GROUND WATER: CWSs
1
Size
Total
Category
Systems
≤100
11,212
101-500
13,403
501-1,000
4,320
1,001-3,300
5,566
3,301-10,000
2,724
10,001-25,000
989
25,001-50,000
355
50,001-75,000
106
75,001-100,000
44
100,001-500,000
58
500,001-1,000,000
5
> 1,000,000
2
TOTAL:
38,784
Monitor
Only
60.00%
60.00%
60.00%
60.00%
75.00%
75.00%
75.00%
99.72%
99.86%
99.84%
99.58%
100.00%
Percent of Systems Under Each Monitoring Scenario
2a
2b
3a
3b
1R
3aAR
2aAR
2bAR
Exceed, Then Exceed, Then Exceed, Treat, Exceed, Treat,
Monitor Only
Exceed, Treat, Accelerated Accelerated
Treat Works, Treat Works,
Still Exceed Then Still Exceed Reduced Mon.
Enter Accel.
Reduced
Reduced
Study Req. No Study Req.
Study Req.
No Study Req.
All-Plastic
Reduced Sched. Study Req. No Study Req.
5.77%
17.30%
0.29%
0.87%
10.00%
1.44%
4.33%
5.77%
17.32%
0.28%
0.85%
10.00%
1.44%
4.33%
5.83%
17.49%
0.21%
0.63%
10.00%
1.46%
4.37%
5.84%
17.52%
0.20%
0.60%
10.00%
1.46%
4.38%
4.85%
14.55%
0.19%
0.56%
1.21%
3.64%
4.87%
14.61%
0.16%
0.49%
1.22%
3.65%
4.87%
14.60%
0.17%
0.50%
1.22%
3.65%
0.28%
0.83%
0.00%
0.14%
0.42%
0.00%
0.16%
0.48%
0.00%
0.42%
1.25%
0.00%
0.00%
0.00%
0.00%
GROUND WATER: NTNCWSs
1
Size
Total
Category
Systems
≤100
8,279
101-500
6,254
501-1,000
1,539
1,001-3,300
786
3,301-10,000
92
10,001-25,000
4
25,001-50,000
5
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
TOTAL:
16,958
DDBP/Chem/Rads ICR - Lead and Copper Rule
Monitor
Only
60.00%
60.00%
60.00%
60.00%
75.00%
75.00%
75.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Percent of Systems Under Each Monitoring Scenario
2a
2b
3a
3b
1R
3aAR
2aAR
2bAR
Exceed, Then Exceed, Then Exceed, Treat, Exceed, Treat,
Monitor Only
Exceed, Treat, Accelerated Accelerated
Treat Works, Treat Works,
Still Exceed Then Still Exceed Reduced Mon.
Enter Accel.
Reduced
Reduced
Study Req. No Study Req.
Study Req.
No Study Req.
All-Plastic
Reduced Sched. Study Req. No Study Req.
5.63%
16.88%
0.47%
1.40%
10.00%
1.41%
4.22%
5.63%
16.88%
0.47%
1.40%
10.00%
1.41%
4.22%
5.69%
17.08%
0.38%
1.15%
10.00%
1.42%
4.27%
5.57%
16.70%
0.54%
1.63%
10.00%
1.39%
4.17%
4.72%
14.17%
0.34%
1.03%
1.18%
3.54%
2.14%
6.43%
3.57%
10.71%
0.54%
1.61%
5.00%
15.00%
0.00%
0.00%
1.25%
3.75%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
-
H-5
December 2015
Exhibit 4 - TAP MONITORING FOR LEAD & COPPER - MONITORING SCENARIO ALLOCATION (cont.)
SURFACE WATER: CWSs
Size
Total
Category
Systems
≤100
970
101-500
2,092
501-1,000
1,131
1,001-3,300
2,497
3,301-10,000
2,219
10,001-25,000
1,300
25,001-50,000
686
50,001-75,000
256
75,001-100,000
133
100,001-500,000
308
500,001-1,000,000
35
> 1,000,000
20
TOTAL:
11,647
Actual
Number
of B3
Systems
38
16
57
3
2
1
Monitor
Only
60.00%
60.00%
60.00%
60.00%
75.00%
75.00%
75.00%
99.72%
99.86%
99.84%
99.58%
100.00%
Percent of Systems Under Each Monitoring Scenario
2a
2b
3a
3b
1R
3aAR
2aAR
2bAR
Exceed, Then Exceed, Then Exceed, Treat, Exceed, Treat,
Monitor Only
Exceed, Treat, Accelerated Accelerated
Treat Works, Treat Works,
Still Exceed Then Still Exceed Reduced Mon.
Enter Accel.
Reduced
Reduced
Study Req. No Study Req.
Study Req.
No Study Req.
All-Plastic
Reduced Sched. Study Req. No Study Req.
5.77%
17.30%
0.29%
0.87%
10.00%
0.00%
1.44%
4.33%
5.77%
17.32%
0.28%
0.85%
10.00%
0.00%
1.44%
4.33%
5.83%
17.49%
0.21%
0.63%
10.00%
0.00%
1.46%
4.37%
5.84%
17.52%
0.20%
0.60%
10.00%
0.00%
1.46%
4.38%
4.85%
14.55%
0.19%
0.56%
0.00%
0.00%
1.21%
3.64%
4.87%
14.61%
0.16%
0.49%
0.00%
0.00%
1.22%
3.65%
4.87%
14.60%
0.17%
0.50%
0.00%
0.00%
1.22%
3.65%
0.00%
0.00%
0.28%
0.83%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.14%
0.42%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.16%
0.48%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.42%
1.25%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
SURFACE WATER: NTNCWSs
Size
Total
Category
Systems
≤100
314
101-500
283
501-1,000
92
1,001-3,300
88
3,301-10,000
53
10,001-25,000
3
25,001-50,000
3
50,001-75,000
1
75,001-100,000
100,001-500,000
1
500,001-1,000,000
> 1,000,000
TOTAL:
839
Actual
Number
of B3
Systems
-
1
Monitor
Only
60.00%
60.00%
60.00%
60.00%
75.00%
75.00%
75.00%
100.00%
100.00%
100.00%
100.00%
100.00%
Percent of Systems Under Each Monitoring Scenario
2a
2b
3a
3b
1R
3aAR
2aAR
2bAR
Exceed, Then Exceed, Then Exceed, Treat, Exceed, Treat,
Monitor Only
Exceed, Treat, Accelerated Accelerated
Treat Works, Treat Works,
Still Exceed Then Still Exceed Reduced Mon.
Enter Accel.
Reduced
Reduced
Study Req. No Study Req.
Study Req.
No Study Req.
All-Plastic
Reduced Sched. Study Req. No Study Req.
5.63%
16.88%
0.47%
1.40%
10.00%
0.00%
1.41%
4.22%
5.63%
16.88%
0.47%
1.40%
10.00%
0.00%
1.41%
4.22%
5.69%
17.08%
0.38%
1.15%
10.00%
0.00%
1.42%
4.27%
5.57%
16.70%
0.54%
1.63%
10.00%
0.00%
1.39%
4.17%
4.72%
14.17%
0.34%
1.03%
0.00%
0.00%
1.18%
3.54%
2.14%
6.43%
3.57%
10.71%
0.00%
0.00%
0.54%
1.61%
5.00%
15.00%
0.00%
0.00%
0.00%
0.00%
1.25%
3.75%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Percentages exceeding, treating, and still exceeding based on 2004 numbers from the STR EA. 25% of small exceeding systems assumed to require study. 20% of systems that
exceed but treat and comply are assumed to qualify for reduced schedule. Numbers of systems exceeding lead action level based on SDWIS 2014 data.
DDBP/Chem/Rads ICR - Lead and Copper Rule
H-6
December 2015
Exhibit 5 - Tap Monitoring for Lead & Copper: Number of Monitoring Events, per System, per Year
SCENARIO 1: Monitor Only
Ground Water Systems
Years
(Representing 9-Year Cycle)
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
2014
2015
2016
2017
1
1
1
1
2018
2019
2020
1
1
1
1
2021
2022
Total
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
3
3
3
3
3
3
3
3
3
3
3
3
1
1
1
1
1
1
1
1
1
1
1
1
1
Surface Water Systems
Years
(Representing 9-Year Cycle)
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
2014
2015
2016
2017
1
1
1
1
DDBP/Chem/Rads ICR - Lead and Copper Rule
2018
2019
2020
1
1
1
1
2021
2022
Total
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
H-7
1
1
1
1
1
1
1
1
3
3
3
3
3
3
3
3
3
3
3
3
December 2015
Exhibit 5 (continued): SCENARIO 2a: Exceed>>Install Treatment>>No Longer Exceed (Study Required)
Ground Water Systems
Years
(Representing 9-Year Cycle)
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
2014
2015
2016
2017
2018
2019
1
1
1
1
2020
2021
2022
1
1
1
1
1
1
1
Total
1
1
1
1
1
1
1
3
3
3
3
2
2
2
0
0
0
0
0
1
1
1
Surface Water Systems
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
2014
2015
DDBP/Chem/Rads ICR - Lead and Copper Rule
1
1
1
Years
(Representing 9-Year Cycle)
2016
2017
2018
2019
1
1
1
1
1
1
1
1
1
1
1
H-8
2020
2021
2022
Total
1
1
1
1
1
1
1
3
3
3
3
3
3
3
0
0
0
0
0
December 2015
Exhibit 5 - Tap Monitoring for Lead & Copper: Number of Monitoring Events, per System, per Year (cont.)
SCENARIO 2b: Exceed>>Install Treatment>>No Longer Exceed (No Study Required)
Ground Water Systems
Years
(Representing 9-Year Cycle)
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
2014
2015
2016
2017
2018
1
1
1
1
1
1
1
2014
2019
2020
1
1
1
1
1
1
1
DDBP/Chem/Rads ICR - Lead and Copper Rule
2022
Total
1
1
1
1
1
1
1
2015
2021
1
1
1
1
3
3
3
3
3
3
3
0
0
0
0
0
1
1
1
Surface Water Systems
Years
(Representing 9-Year Cycle)
2016
2017
2018
2019
1
1
1
1
1
1
1
H-9
2020
2021
2022
1
1
1
1
1
1
1
Total
3
3
3
3
3
3
3
0
0
0
0
0
December 2015
Exhibit 5 (continued): SCENARIO 3a: Exceed>>Install Treatment>>Still Exceed (Study Required)
Ground Water Systems
Years
(Representing 9-Year Cycle)
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
2014
2015
2
2
2
2
2
2
2
2
2
2
2
2
2016
2
2
2
2
2
2
2
2
2
2
2
2
2017
2
2
2
2
2
2
2
2
2
2
2
2
2018
2
2
2
2
2
2
2
2
2
2
2
2
2019
2
2
2
2
2
2
2
2
2
2
2
2
2020
2
2
2
2
2
2
2
2
2
2
2
2
2021
2
2
2
2
2
2
2
2
2
2
2
2
2022
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
Total
18
18
18
18
18
18
18
18
18
18
18
18
2
2
2
2
2
2
2
2
2
2
2
2
Total
18
18
18
18
18
18
18
18
18
18
18
18
Surface Water Systems
Years
(Representing 9-Year Cycle)
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
2014
2015
2
2
2
2
2
2
2
2
2
2
2
2
DDBP/Chem/Rads ICR - Lead and Copper Rule
2016
2
2
2
2
2
2
2
2
2
2
2
2
2017
2
2
2
2
2
2
2
2
2
2
2
2
2018
2
2
2
2
2
2
2
2
2
2
2
2
2019
2
2
2
2
2
2
2
2
2
2
2
2
H-10
2020
2
2
2
2
2
2
2
2
2
2
2
2
2021
2
2
2
2
2
2
2
2
2
2
2
2
2022
2
2
2
2
2
2
2
2
2
2
2
2
December 2015
Exhibit 5 - Tap Monitoring for Lead & Copper: Number of Monitoring Events, per System, per Year (cont.)
SCENARIO 3b: Exceed>>Install Treatment>>Still Exceed (No Study Required)
Ground Water Systems
Years
(Representing 9-Year Cycle)
Size Category
2014
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
2015
2
2
2
2
2
2
2
2
2
2
2
2
2014
2016
2
2
2
2
2
2
2
2
2
2
2
2
2015
2
2
2
2
2
2
2
2
2
2
2
2
DDBP/Chem/Rads ICR - Lead and Copper Rule
2
2
2
2
2
2
2
2
2
2
2
2
2017
2
2
2
2
2
2
2
2
2
2
2
2
2018
2
2
2
2
2
2
2
2
2
2
2
2
2019
2
2
2
2
2
2
2
2
2
2
2
2
Surface Water Systems
Years
2016
2017
2018
2019
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
H-11
2020
2
2
2
2
2
2
2
2
2
2
2
2
2021
2
2
2
2
2
2
2
2
2
2
2
2
2020
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2021
2
2
2
2
2
2
2
2
2
2
2
2
Total
2022
2
2
2
2
2
2
2
2
2
2
2
2
18
18
18
18
18
18
18
18
18
18
18
18
2
2
2
2
2
2
2
2
2
2
2
2
Total
18
18
18
18
18
18
18
18
18
18
18
18
2022
2
2
2
2
2
2
2
2
2
2
2
2
December 2015
Exhibit 5 (continued): SCENARIO 1R: Monitor Only - Reduced (All Plastic)
Ground Water Systems
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
2014
2015
2016
Years
(Representing 9-Year Cycle)
2017
2018
2019
2020
2021
2022
Total
1
1
1
1
1
1
1
1
0
0
0
0
0
0
0
0
Surface Water Systems
Years
(Representing 9-Year Cycle)
2017
2018
2019
2014
2015
2016
Size Category
≤100
1
101-500
1
501-1,000
1
1,001-3,300
1
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Note: Systems with waivers must monitor every 9 years.
DDBP/Chem/Rads ICR - Lead and Copper Rule
2020
2021
2022
Total
1
1
1
1
0
0
0
0
0
0
0
0
H-12
December 2015
Exhibit 5 - Tap Monitoring for Lead & Copper: Number of Monitoring Events, per System, per Year (cont.)
SCENARIO 3aAR: Treat, Then Enter Accelerated Reduced Monitoring Schedule
Ground Water Systems
Years
(Representing 9-Year Cycle)
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
2014
2015
2017
2018
2019
1
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
2016
2014
2015
500,001-1,000,000
> 1,000,000
DDBP/Chem/Rads ICR - Lead and Copper Rule
1
1
1
1
Surface Water Systems
Years
2016
2017
2018
2019
2020
2021
Total
2022
1
1
0
0
0
0
0
0
0
3
1
1
1
1
1
1
1
1
3
3
3
3
2020
2021
2022
Total
1
1
1
1
1
1
1
1
1
0
0
0
0
0
0
0
3
3
3
1
1
1
1
1
1
3
3
H-13
December 2015
Exhibit 5 (continued): SCENARIO 2aAR: Accelerated Reduced Monitoring After Treatment (Study)
Ground Water Systems
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
2014
2015
1
1
1
1
Years
(Representing 9-Year Cycle)
2016
2017
2018
2019
1
1
1
1
1
1
1
1
1
1
2020
2021
Total
2022
1
1
1
1
3
3
3
3
3
3
3
0
0
0
0
0
1
1
1
Surface Water Systems
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
2014
2015
1
1
1
1
Years
(Representing 9-Year Cycle)
2016
2017
2018
2019
1
1
1
1
1
1
1
1
1
1
2020
2021
2022
Total
1
1
1
1
1
1
1
3
3
3
3
3
3
3
0
75,001-100,000
100,001-500,000
0
0
500,001-1,000,000
> 1,000,000
0
0
DDBP/Chem/Rads ICR - Lead and Copper Rule
H-14
December 2015
Exhibit 5 - Tap Monitoring for Lead & Copper: Number of Monitoring Events, per System, per Year (cont.)
SCENARIO 2bAR: Accelerated Reduced Monitoring After Treatment (No Study)
Ground Water Systems
Size Category
≤100
101-500
501-1,000
1,001-3,300
2014
2015
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Years
(Representing 9-Year Cycle)
2016
2017
2018
2019
1
1
1
1
1
1
1
1
1
1
1
2020
2021
Total
2022
1
1
1
1
1
1
1
3
3
3
3
1
1
1
3
3
3
0
0
0
0
0
Surface Water Systems
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
2014
2015
Years
(Representing 9-Year Cycle)
2016
2017
2018
2019
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2020
2021
2022
Total
1
1
1
1
1
1
1
3
3
3
3
3
3
3
0
0
0
0
0
Under the short term revisions all systems that continue to exceed must perform semi-annual monitoring.
DDBP/Chem/Rads ICR - Lead and Copper Rule
H-15
December 2015
Exhibit 5 - Tap Monitoring for Lead & Copper: Number of Samples, per System, per Year
SCENARIO 1: Monitor Only
Ground Water Systems
Years
(Representing 9-Year Cycle)
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
2014
5
5
10
10
0
0
0
0
0
0
0
0
2015
0
0
0
0
0
0
0
30
30
50
50
50
2016
2017
0
0
0
0
20
30
30
0
0
0
0
0
5
5
10
10
0
0
0
0
0
0
0
0
2018
2019
0
0
0
0
0
0
0
30
30
50
50
50
0
0
0
0
20
30
30
0
0
0
0
0
2020
5
5
10
10
0
0
0
0
0
0
0
0
2021
0
0
0
0
0
0
0
30
30
50
50
50
2022
0
0
0
0
20
30
30
0
0
0
0
0
Total
15
15
30
30
60
90
90
90
90
150
150
150
Surface Water Systems
Years
(Representing 9-Year Cycle)
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
2014
5
5
10
10
0
0
0
0
0
0
0
0
DDBP/Chem/Rads ICR - Lead and Copper Rule
2015
0
0
0
0
0
0
0
30
30
50
50
50
2016
0
0
0
0
20
30
30
0
0
0
0
0
2017
5
5
10
10
0
0
0
0
0
0
0
0
H-16
2018
0
0
0
0
0
0
0
30
30
50
50
50
2019
0
0
0
0
20
30
30
0
0
0
0
0
2020
5
5
10
10
0
0
0
0
0
0
0
0
2021
0
0
0
0
0
0
0
30
30
50
50
50
2022
0
0
0
0
20
30
30
0
0
0
0
0
Total
15
15
30
30
60
90
90
90
90
150
150
150
December 2015
Exhibit 5 (continued): SCENARIO 2a: Exceed>>Install Treatment>>No Longer Exceed (Study Required)
Ground Water Systems
Years
(Representing 9-Year Cycle)
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
2014
2015
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
20
30
30
0
0
0
0
0
2016
2017
5
5
10
10
0
0
0
0
0
0
0
0
2018
0
0
0
0
0
0
0
0
0
0
0
0
2019
0
0
0
0
20
30
30
0
0
0
0
0
2020
5
5
10
10
0
0
0
0
0
0
0
0
2021
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
20
30
30
0
0
0
0
0
2022
Total
5
5
10
10
0
0
0
0
0
0
0
0
15
15
30
30
60
90
90
0
0
0
0
0
Surface Water Systems
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
2014
2015
0
0
0
0
0
0
0
0
0
0
0
0
DDBP/Chem/Rads ICR - Lead and Copper Rule
0
0
0
0
20
30
30
0
0
0
0
0
Years
(Representing 9-Year Cycle)
2016
2017
2018
2019
5
0
0
5
5
0
0
5
10
0
0
10
10
0
0
10
0
0
20
0
0
0
30
0
0
0
30
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
H-17
2020
2021
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
20
30
30
0
0
0
0
0
2022
5
5
10
10
0
0
0
0
0
0
0
0
Total
15
15
30
30
60
90
90
0
0
0
0
0
December 2015
Exhibit 5 - Tap Monitoring for Lead & Copper: Number of Samples, per System, per Year (cont.)
SCENARIO 2b: Exceed>>Install Treatment>>No Longer Exceed (No Study Required)
Ground Water Systems
Years
(Representing 9-Year Cycle)
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
2014
0
0
0
0
20
30
30
0
0
0
0
0
2014
0
0
0
0
20
30
30
0
0
0
0
0
DDBP/Chem/Rads ICR - Lead and Copper Rule
2015
5
5
10
10
0
0
0
0
0
0
0
0
2015
5
5
10
10
0
0
0
0
0
0
0
0
2016
2017
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
20
30
30
0
0
0
0
0
2018
5
5
10
10
0
0
0
0
0
0
0
0
2019
2020
0
0
0
0
0
0
0
0
0
0
0
0
Surface Water Systems
Years
(Representing 9-Year Cycle)
2016
2017
2018
2019
0
0
5
0
0
0
5
0
0
0
10
0
0
0
10
0
0
20
0
0
0
30
0
0
0
30
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
H-18
0
0
0
0
20
30
30
0
0
0
0
0
2020
0
0
0
0
20
30
30
0
0
0
0
0
2021
2022
5
5
10
10
0
0
0
0
0
0
0
0
2021
5
5
10
10
0
0
0
0
0
0
0
0
Total
0
0
0
0
0
0
0
0
0
0
0
0
2022
15
15
30
30
60
90
90
0
0
0
0
0
Total
0
0
0
0
0
0
0
0
0
0
0
0
15
15
30
30
60
90
90
0
0
0
0
0
December 2015
Exhibit 5 (continued): SCENARIO 3a: Exceed>>Install Treatment>>Still Exceed (Study Required)
Ground Water Systems
Years
(Representing 9-Year Cycle)
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
2014
10
20
40
40
80
120
120
120
120
200
200
200
2015
10
20
40
40
80
120
120
120
120
200
200
200
2016
10
20
40
40
80
120
120
120
120
200
200
200
2017
10
20
40
40
80
120
120
120
120
200
200
200
2018
10
20
40
40
80
120
120
120
120
200
200
200
2019
10
20
40
40
80
120
120
120
120
200
200
200
2020
10
20
40
40
80
120
120
120
120
200
200
200
2021
10
20
40
40
80
120
120
120
120
200
200
200
2022
10
20
40
40
80
120
120
120
120
200
200
200
Total
2020
10
20
40
40
80
120
120
120
120
200
200
200
2021
10
20
40
40
80
120
120
120
120
200
200
200
2022
10
20
40
40
80
120
120
120
120
200
200
200
Total
90
180
360
360
720
1080
1080
1080
1080
1800
1800
1800
Surface Water Systems
Years
(Representing 9-Year Cycle)
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
2014
10
20
40
40
80
120
120
120
120
200
200
200
DDBP/Chem/Rads ICR - Lead and Copper Rule
2015
10
20
40
40
80
120
120
120
120
200
200
200
2016
10
20
40
40
80
120
120
120
120
200
200
200
2017
10
20
40
40
80
120
120
120
120
200
200
200
H-19
2018
10
20
40
40
80
120
120
120
120
200
200
200
2019
10
20
40
40
80
120
120
120
120
200
200
200
90
180
360
360
720
1080
1080
1080
1080
1800
1800
1800
December 2015
Exhibit 5 - Tap Monitoring for Lead & Copper: Number of Samples, per System, per Year (cont.)
SCENARIO 3b: Exceed>>Install Treatment>>Still Exceed (No Study Required)
Ground Water Systems
Years
(Representing 9-Year Cycle)
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
2014
10
20
40
40
80
120
120
120
120
200
200
200
2015
10
20
40
40
80
120
120
120
120
200
200
200
2016
2017
10
20
40
40
80
120
120
120
120
200
200
200
10
20
40
40
80
120
120
120
120
200
200
200
2018
2019
10
20
40
40
80
120
120
120
120
200
200
200
2020
2021
2022
10
20
40
40
80
120
120
120
120
200
200
200
10
20
40
40
80
120
120
120
120
200
200
200
10
20
40
40
80
120
120
120
120
200
200
200
10
20
40
40
80
120
120
120
120
200
200
200
2019
10
20
40
40
80
120
120
120
120
200
200
200
2020
10
20
40
40
80
120
120
120
120
200
200
200
2021
10
20
40
40
80
120
120
120
120
200
200
200
2022
10
20
40
40
80
120
120
120
120
200
200
200
Total
90
180
360
360
720
1080
1080
1080
1080
1800
1800
1800
Surface Water Systems
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
2014
10
20
40
40
80
120
120
120
120
200
200
200
DDBP/Chem/Rads ICR - Lead and Copper Rule
2015
10
20
40
40
80
120
120
120
120
200
200
200
2016
10
20
40
40
80
120
120
120
120
200
200
200
2017
10
20
40
40
80
120
120
120
120
200
200
200
H-20
Years
2018
10
20
40
40
80
120
120
120
120
200
200
200
Total
90
180
360
360
720
1080
1080
1080
1080
1800
1800
1800
December 2015
Exhibit 5 (continued): SCENARIO 1R: Monitor Only - Reduced (All Plastic)
Ground Water Systems
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
2014
5
5
10
10
0
0
0
0
0
0
0
0
2015
0
0
0
0
0
0
0
0
0
0
0
0
Years
(Representing 9-Year Cycle)
2016
2017
2018
2019
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
2020
2021
0
0
0
0
0
0
0
0
0
0
0
0
2022
0
0
0
0
0
0
0
0
0
0
0
0
Total
0
0
0
0
0
0
0
0
0
0
0
0
5
5
10
10
0
0
0
0
0
0
0
0
Surface Water Systems
Years
(Representing 9-Year Cycle)
2014
2015
2016
2017
2018
2019
Size Category
≤100
5
0
0
0
0
0
101-500
5
0
0
0
0
0
501-1,000
10
0
0
0
0
0
1,001-3,300
10
0
0
0
0
0
3,301-10,000
0
0
0
0
0
0
10,001-25,000
0
0
0
0
0
0
25,001-50,000
0
0
0
0
0
0
50,001-75,000
0
0
0
0
0
0
75,001-100,000
0
0
0
0
0
0
100,001-500,000
0
0
0
0
0
0
500,001-1,000,000
0
0
0
0
0
0
> 1,000,000
0
0
0
0
0
0
Note: Systems with waivers must monitor every 9 years.
DDBP/Chem/Rads ICR - Lead and Copper Rule
H-21
2020
2021
0
0
0
0
0
0
0
0
0
0
0
0
2022
0
0
0
0
0
0
0
0
0
0
0
0
Total
0
0
0
0
0
0
0
0
0
0
0
0
5
5
10
10
0
0
0
0
0
0
0
0
December 2015
Exhibit 5 - Tap Monitoring for Lead & Copper: Number of Samples, per System, per Year (cont.)
SCENARIO 3aAR: Treat, Then Enter Accelerated Reduced Monitoring Schedule
Ground Water Systems
Years
(Representing 9-Year Cycle)
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
2014
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
2015
2016
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
2014
2015
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
DDBP/Chem/Rads ICR - Lead and Copper Rule
0
0
0
0
0
0
0
30
2017
2018
2019
2021
2022
Total
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
30
0
0
0
0
0
0
0
90
30
0
0
30
50
0
0
50
50
0
0
50
50
0
0
50
Surface Water Systems
Years
2016
2017
2018
2019
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
60
0
0
60
30
0
0
30
50
0
0
50
0
0
0
0
0
0
0
0
30
50
50
50
90
150
150
150
0
0
H-22
0
0
0
0
0
0
0
0
2020
0
0
0
0
0
0
0
30
50
50
0
0
0
0
0
0
0
0
0
0
50
50
2020
2021
2022
Total
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
60
30
50
0
0
0
0
0
0
0
180
90
150
0
0
0
0
50
50
150
150
December 2015
Exhibit 5 (continued): SCENARIO 2aAR: Accelerated Reduced Monitoring After Treatment (Study)
Ground Water Systems
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
2014
2015
5
5
10
10
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Years
(Representing 9-Year Cycle)
2016
2017
2018
2019
0
5
0
0
0
5
0
0
0
10
0
0
0
10
0
0
20
0
0
20
30
0
0
30
30
0
0
30
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
2020
2021
5
5
10
10
0
0
0
0
0
0
0
0
Total
2022
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
20
30
30
0
0
0
0
0
15
15
30
30
60
90
90
0
0
0
0
0
Surface Water Systems
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
2014
2015
Years
(Representing 9-Year Cycle)
2016
2017
2018
2019
0
5
0
0
0
5
0
0
0
10
0
0
0
10
0
0
20
0
0
20
30
0
0
30
30
0
0
30
0
0
0
0
5
5
10
10
0
0
0
0
0
0
0
0
0
0
0
0
75,001-100,000
100,001-500,000
0
0
0
0
0
0
0
0
0
0
500,001-1,000,000
> 1,000,000
0
0
0
0
0
0
0
0
0
0
DDBP/Chem/Rads ICR - Lead and Copper Rule
H-23
2020
2021
2022
Total
5
5
10
10
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
20
30
30
0
15
15
30
30
60
90
90
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
December 2015
Exhibit 5 - Tap Monitoring for Lead & Copper: Number of Samples, per System, per Year (cont.)
SCENARIO 2bAR: Accelerated Reduced Monitoring After Treatment (No Study)
Ground Water Systems
Size Category
≤100
101-500
501-1,000
1,001-3,300
2014
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
2015
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Years
(Representing 9-Year Cycle)
2016
2017
2018
2019
5
0
0
5
5
0
0
5
10
0
0
10
10
0
0
10
20
30
30
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
2020
20
30
30
0
0
0
0
0
2021
2022
Total
0
0
0
0
0
0
0
0
5
5
10
10
15
15
30
30
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
20
30
30
0
0
0
0
0
60
90
90
0
0
0
0
0
Surface Water Systems
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
2014
2015
0
0
0
0
0
0
0
0
0
0
0
0
DDBP/Chem/Rads ICR - Lead and Copper Rule
0
0
0
0
0
0
0
0
0
0
0
0
Years
(Representing 9-Year Cycle)
2016
2017
2018
2019
5
0
0
5
5
0
0
5
10
0
0
10
10
0
0
10
20
0
0
20
30
0
0
30
30
0
0
30
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
H-24
2020
2021
0
0
0
0
0
0
0
0
0
0
0
0
2022
0
0
0
0
0
0
0
0
0
0
0
0
5
5
10
10
20
30
30
0
0
0
0
0
Total
15
15
30
30
60
90
90
0
0
0
0
0
December 2015
Exhibit 6 - TAP MONITORING FOR LEAD & COPPER - MONITORING, BURDEN, AND COST SUMMARY
SCENARIO 1: Monitor Only
GROUND WATER: CWSs
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
Samples by Year
(Representing 9-Year Cycle)
Number of
Systems
6,727
8,042
2,592
3,340
2,043
742
266
106
44
58
5
2
23,967
2014
33,635
40,210
25,920
33,400
133,165
2015
3,180
1,320
2,900
250
100
7,750
2016
40,860
22,260
7,980
71,100
2017
33,635
40,210
25,920
33,400
133,165
2018
3,180
1,320
2,900
250
100
7,750
2019
40,860
22,260
7,980
71,100
2020
33,635
40,210
25,920
33,400
133,165
2021
3,180
1,320
2,900
250
100
7,750
2022
40,860
22,260
7,980
71,100
Total
Samples
Annual
Samples
33,635
40,210
25,920
33,400
40,860
22,260
7,980
3,180
1,320
2,900
250
100
212,015
11,212
13,403
8,640
11,133
13,620
7,420
2,660
1,060
440
967
83
33
70,672
Total
Monitoring
Events
6,727
8,042
2,592
3,340
2,043
742
266
106
44
58
5
2
23,967
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Annual
Total
Total Labor Annual Labor
Annual
Monitoring
Cost
Burden
Cost
Burden
Events
2,242
134,540
44,847 $ 4,654,008 $ 1,551,336
2,681
160,840
53,613 $ 5,563,777 $ 1,854,592
864
103,680
34,560 $ 3,586,499 $ 1,195,500
1,113
133,600
44,533 $ 4,621,491 $ 1,540,497
681
163,440
54,480 $ 5,653,716 $ 1,884,572
247
89,040
29,680 $ 3,080,072 $ 1,026,691
89
31,920
10,640 $ 1,104,177 $ 368,059
35
12,720
4,240 $
440,010 $ 146,670
15
5,280
1,760 $
182,646 $
60,882
19
11,600
3,867 $
401,267 $ 133,756
2
1,000
333 $
34,592 $
11,531
1
400
133 $
13,837 $
4,612
7,989
848,060
282,687 $ 29,336,092 $ 9,778,697
Total O&M
Cost
Annual O&M
Cost
$ 247,454
$ 295,827
$ 190,694
$ 245,725
$ 300,609
$ 163,768
$
58,709
$
23,395
$
9,711
$
21,335
$
1,839
$
736
$ 1,559,803
$
$
$
$
$
$
$
$
$
$
$
$
$
82,485
98,609
63,565
81,908
100,203
54,589
19,570
7,798
3,237
7,112
613
245
519,934
GROUND WATER: NTNCWSs
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
Number of
Systems
4,967
3,752
923
472
69
3
4
10,190
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
2014
24,835
18,760
9,230
4,720
57,545
2015
-
2016
1,380
90
120
1,590
2017
24,835
18,760
9,230
4,720
57,545
2018
-
2019
1,380
90
120
1,590
2020
24,835
18,760
9,230
4,720
57,545
2021
-
2022
1,380
90
120
1,590
Total
Samples
Annual
Samples
24,835
18,760
9,230
4,720
1,380
90
120
59,135
8,278
6,253
3,077
1,573
460
30
40
19,712
Total
Monitoring
Events
4,967
3,752
923
472
69
3
4
10,190
Annual
Monitoring
Events
1,656
1,251
308
157
23
1
1
3,397
Total
Burden
99,340
75,040
36,920
18,880
5,520
360
480
236,540
Annual
Burden
33,113
25,013
12,307
6,293
1,840
120
160
78,847
Total Labor
Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
3,436,369
2,595,784
1,277,137
653,097
190,948
12,453
16,604
8,182,392
Annual Labor Total O&M
Cost
Cost
$ 1,145,456
$ 865,261
$ 425,712
$ 217,699
$
63,649
$
4,151
$
5,535
$
$
$
$
$
$ 2,727,464
$
$
$
$
$
$
$
$
$
$
$
$
$
182,712
138,018
67,905
34,725
10,153
662
883
435,059
Annual O&M
Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
60,904
46,006
22,635
11,575
3,384
221
294
145,020
GROUND WATER: ALL SYSTEMS
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
11,694
11,794
3,515
3,812
2,112
745
270
106
44
58
5
2
34,157
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
Number of
Systems
2014
58,470
58,970
35,150
38,120
190,710
DDBP/Chem/Rads ICR - Lead and Copper Rule
2015
3,180
1,320
2,900
250
100
7,750
2016
42,240
22,350
8,100
72,690
2017
58,470
58,970
35,150
38,120
190,710
2018
3,180
1,320
2,900
250
100
7,750
2019
42,240
22,350
8,100
72,690
2020
58,470
58,970
35,150
38,120
190,710
2021
3,180
1,320
2,900
250
100
7,750
2022
42,240
22,350
8,100
72,690
Total
Samples
Annual
Samples
58,470
58,970
35,150
38,120
42,240
22,350
8,100
3,180
1,320
2,900
250
100
271,150
19,490
19,657
11,717
12,707
14,080
7,450
2,700
1,060
440
967
83
33
90,383
H-25
Total
Monitoring
Events
11,694
11,794
3,515
3,812
2,112
745
270
106
44
58
5
2
34,157
Annual
Monitoring
Events
3,898
3,931
1,172
1,271
704
248
90
35
15
19
2
1
11,386
Total
Burden
233,880
235,880
140,600
152,480
168,960
89,400
32,400
12,720
5,280
11,600
1,000
400
1,084,600
Annual
Burden
77,960
78,627
46,867
50,827
56,320
29,800
10,800
4,240
1,760
3,867
333
133
361,533
Total Labor
Cost
$ 8,090,377
$ 8,159,561
$ 4,863,635
$ 5,274,588
$ 5,844,664
$ 3,092,525
$ 1,120,781
$
440,010
$
182,646
$
401,267
$
34,592
$
13,837
$ 37,518,483
Annual Labor Total O&M
Cost
Cost
$ 2,696,792
$ 2,719,854
$ 1,621,212
$ 1,758,196
$ 1,948,221
$ 1,030,842
$ 373,594
$ 146,670
$
60,882
$ 133,756
$
11,531
$
4,612
$12,506,161
$ 430,166
$ 433,845
$ 258,600
$ 280,450
$ 310,761
$ 164,430
$
59,592
$
23,395
$
9,711
$
21,335
$
1,839
$
736
$ 1,994,861
Annual O&M
Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
143,389
144,615
86,200
93,483
103,587
54,810
19,864
7,798
3,237
7,112
613
245
664,954
December 2015
Exhibit 6 - TAP MONITORING FOR LEAD & COPPER - MONITORING, BURDEN, AND COST SUMMARY (cont.)
Scenario1: Monitor Only (cont.)
SURFACE WATER: CWSs
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
Number of
Systems
582
1,255
679
1,498
1,664
975
515
255
133
308
35
20
7,919
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
2014
2,910
6,275
6,790
14,980
30,955
2015
7,650
3,990
15,400
1,750
1,000
29,790
2016
33,280
29,250
15,450
77,980
2017
2,910
6,275
6,790
14,980
30,955
2018
7,650
3,990
15,400
1,750
1,000
29,790
2019
33,280
29,250
15,450
77,980
2020
2,910
6,275
6,790
14,980
30,955
2021
7,650
3,990
15,400
1,750
1,000
29,790
2022
33,280
29,250
15,450
77,980
Total
Samples
Annual
Samples
2,910
6,275
6,790
14,980
33,280
29,250
15,450
7,650
3,990
15,400
1,750
1,000
138,725
970
2,092
2,263
4,993
11,093
9,750
5,150
2,550
1,330
5,133
583
333
46,242
Total
Monitoring
Events
582
1,255
679
1,498
1,664
975
515
255
133
308
35
20
7,919
Annual
Monitoring
Events
194
418
226
499
555
325
172
85
44
103
12
7
2,640
Total
Burden
11,640
25,100
27,160
59,920
133,120
117,000
61,800
30,600
15,960
61,600
7,000
4,000
554,900
Annual
Burden
3,880
8,367
9,053
19,973
44,373
39,000
20,600
10,200
5,320
20,533
2,333
1,333
184,967
Total Labor
Cost
$
402,651
$
868,259
$
939,519
$ 2,072,753
$ 4,604,887
$ 4,047,264
$ 2,137,786
$ 1,058,515
$
552,088
$ 2,130,867
$
242,144
$
138,368
$ 19,195,101
Annual Labor Total O&M
Cost
Cost
$ 134,217
$ 289,420
$ 313,173
$ 690,918
$ 1,534,962
$ 1,349,088
$ 712,595
$ 352,838
$ 184,029
$ 710,289
$
80,715
$
46,123
$ 6,398,367
$
21,409
$
46,165
$
49,954
$ 110,208
$ 244,842
$ 215,193
$ 113,666
$
56,281
$
29,355
$ 113,298
$
12,875
$
7,357
$ 1,020,605
Annual O&M
Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
7,136
15,388
16,651
36,736
81,614
71,731
37,889
18,760
9,785
37,766
4,292
2,452
340,202
SURFACE WATER: NTNCWSs
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
189
170
55
53
40
2
2
1
1
513
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
Number of
Systems
2014
945
850
550
530
2,875
2015
30
50
80
2016
800
60
60
920
2017
945
850
550
530
2,875
2018
30
50
80
2019
800
60
60
920
2020
945
850
550
530
2,875
2021
30
50
80
2022
800
60
60
920
Total
Samples
Annual
Samples
945
850
550
530
800
60
60
30
50
3,875
315
283
183
177
267
20
20
10
17
1,292
Total
Monitoring
Events
189
170
55
53
40
2
2
1
1
513
Annual
Monitoring
Events
63
57
18
18
13
1
1
0
0
171
Total
Burden
3,780
3,400
2,200
2,120
3,200
240
240
120
200
15,500
Annual
Burden
1,260
1,133
733
707
1,067
80
80
40
67
5,167
Total Labor
Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
130,758
117,613
76,102
73,335
110,694
8,302
8,302
4,151
6,918
536,176
Annual Labor Total O&M
Cost
Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
43,586
39,204
25,367
24,445
36,898
2,767
2,767
1,384
2,306
178,725
$
$
$
$
$
$
$
$
$
$
$
$
$
6,952
6,253
4,046
3,899
5,886
441
441
221
368
28,509
Annual O&M
Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
2,317
2,084
1,349
1,300
1,962
147
147
74
123
9,503
SURFACE WATER: ALL SYSTEMS
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
771
1,425
734
1,551
1,704
977
517
256
133
309
35
20
8,432
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
Number of
Systems
2014
3,855
7,125
7,340
15,510
33,830
DDBP/Chem/Rads ICR - Lead and Copper Rule
2015
7,680
3,990
15,450
1,750
1,000
29,870
2016
34,080
29,310
15,510
78,900
2017
3,855
7,125
7,340
15,510
33,830
2018
7,680
3,990
15,450
1,750
1,000
29,870
2019
34,080
29,310
15,510
78,900
2020
3,855
7,125
7,340
15,510
33,830
2021
7,680
3,990
15,450
1,750
1,000
29,870
2022
34,080
29,310
15,510
78,900
Total
Samples
Annual
Samples
3,855
7,125
7,340
15,510
34,080
29,310
15,510
7,680
3,990
15,450
1,750
1,000
142,600
1,285
2,375
2,447
5,170
11,360
9,770
5,170
2,560
1,330
5,150
583
333
47,533
H-26
Total
Monitoring
Events
771
1,425
734
1,551
1,704
977
517
256
133
309
35
20
8,432
Annual
Monitoring
Events
257
475
245
517
568
326
172
85
44
103
12
7
2,811
Total
Burden
15,420
28,500
29,360
62,040
136,320
117,240
62,040
30,720
15,960
61,800
7,000
4,000
570,400
Annual
Burden
5,140
9,500
9,787
20,680
45,440
39,080
20,680
10,240
5,320
20,600
2,333
1,333
190,133
Total Labor
Cost
$
533,409
$
985,872
$ 1,015,621
$ 2,146,088
$ 4,715,581
$ 4,055,566
$ 2,146,088
$ 1,062,666
$
552,088
$ 2,137,786
$
242,144
$
138,368
$ 19,731,277
Annual Labor Total O&M
Cost
Cost
$ 177,803
$ 328,624
$ 338,540
$ 715,363
$ 1,571,860
$ 1,351,855
$ 715,363
$ 354,222
$ 184,029
$ 712,595
$
80,715
$
46,123
$ 6,577,092
$
28,361
$
52,419
$
54,001
$ 114,108
$ 250,728
$ 215,635
$ 114,108
$
56,502
$
29,355
$ 113,666
$
12,875
$
7,357
$ 1,049,114
Annual O&M
Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
9,454
17,473
18,000
38,036
83,576
71,878
38,036
18,834
9,785
37,889
4,292
2,452
349,705
December 2015
Exhibit 6 - TAP MONITORING FOR LEAD & COPPER - MONITORING, BURDEN, AND COST SUMMARY
SCENARIO 2a: Exceed>>Install Treatment>>No Longer Exceed (Study Required)
GROUND WATER: CWSs
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
Number
of
Systems
647
774
252
325
132
48
17
2,195
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
2014
-
2015
####
####
510
####
2016
3,235
3,870
2,520
3,250
12,875
2017
-
2018
2,640
1,440
510
4,590
2019
3,235
3,870
2,520
3,250
12,875
2020
-
2021
2,640
1,440
510
4,590
2022
3,235
3,870
2,520
3,250
12,875
Total
Samples
3,235
3,870
2,520
3,250
2,640
1,440
510
17,465
Annual
Total
Annual
Total
Monitoring Monitoring
Samples
Burden
Events
Events
1,078
647
216
12,940
1,290
774
258
15,480
840
252
84
10,080
1,083
325
108
13,000
880
132
44
10,560
480
48
16
5,760
170
17
6
2,040
5,822
2,195
732
69,860
Total O&M
Annual Total Labor
Annual
Annual
Cost
Cost
Burden
Labor Cost
O&M Cost
4,313
5,160
3,360
4,333
3,520
1,920
680
23,287
$ 447,620
$ 535,484
$ 348,687
$ 449,696
$ 365,292
$ 199,250
$ 70,568
$
$
$
$
$
$2,416,597
$
$
$
$
$
$
$
$
$
$
$
$
$
149,207
178,495
116,229
149,899
121,764
66,417
23,523
805,532
$ 23,800
$ 28,472
$ 18,540
$ 23,910
$ 19,423
$ 10,594
$ 3,752
$
$
$
$
$
$ 128,491
$
$
$
$
$
$
$
$
$
$
$
$
$
7,933
9,491
6,180
7,970
6,474
3,531
1,251
42,830
GROUND WATER: NTNCWSs
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
466
352
88
44
4
954
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
Number
of
Systems
2014
-
2015
80
80
2016
2,330
1,760
880
440
5,410
2017
-
2018
80
80
2019
2,330
1,760
880
440
5,410
2020
-
2021
80
80
2022
2,330
1,760
880
440
5,410
Total
Samples
2,330
1,760
880
440
80
5,490
Annual
Total
Annual
Total
Monitoring Monitoring
Samples
Burden
Events
Events
777
466
155
9,320
587
352
117
7,040
293
88
29
3,520
147
44
15
1,760
27
4
1
320
1,830
954
318
21,960
Annual
Annual
Total O&M
Annual Total Labor
Labor Cost
O&M Cost
Cost
Burden
Cost
3,107
2,347
1,173
587
107
7,320
$
$
$
$
$
$
$
$
$
$
$
$
$
322,397
243,528
121,764
60,882
11,069
759,640
$ 107,466
$ 81,176
$ 40,588
$ 20,294
$
3,690
$
$
$
$
$
$
$
$ 253,213
$ 17,142
$ 12,948
$ 6,474
$ 3,237
$
589
$
$
$
$
$
$
$
$ 40,390
$
$
$
$
$
$
$
$
$
$
$
$
$
5,714
4,316
2,158
1,079
196
13,463
GROUND WATER: ALL SYSTEMS
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
1,113
1,126
340
369
136
48
17
3,149
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
Number
of
Systems
2014
-
DDBP/Chem/Rads ICR - Lead and Copper Rule
2015
2,720
1,440
510
####
2016
5,565
5,630
3,400
3,690
18,285
2017
-
2018
2,720
1,440
510
4,670
2019
5,565
5,630
3,400
3,690
18,285
2020
-
2021
2,720
1,440
510
4,670
2022
5,565
5,630
3,400
3,690
18,285
Total
Samples
5,565
5,630
3,400
3,690
2,720
1,440
510
22,955
H-27
Annual
Total
Total
Annual
Monitoring Monitoring
Burden
Samples
Events
Events
1,855
1,113
371
22,260
1,877
1,126
375
22,520
1,133
340
113
13,600
1,230
369
123
14,760
907
136
45
10,880
480
48
16
5,760
170
17
6
2,040
7,652
3,149
1,050
91,820
Annual Total Labor
Annual
Total O&M
Annual
Burden
Labor Cost
Cost
Cost
O&M Cost
7,420
7,507
4,533
4,920
3,627
1,920
680
30,607
$ 770,018
$ 779,012
$ 470,451
$ 510,578
$ 376,361
$ 199,250
$ 70,568
$
$
$
$
$
$3,176,237
$ 256,673
$ 259,671
$ 156,817
$ 170,193
$ 125,454
$ 66,417
$ 23,523
$
$
$
$
$
########
$ 40,942
$ 41,420
$ 25,014
$ 27,147
$ 20,011
$ 10,594
$ 3,752
$
$
$
$
$
$ 168,881
$
$
$
$
$
$
$
$
$
$
$
$
$
13,647
13,807
8,338
9,049
6,670
3,531
1,251
56,294
December 2015
Exhibit 6 - TAP MONITORING FOR LEAD & COPPER - MONITORING, BURDEN, AND COST SUMMARY (cont.)
SCENARIO 2a: Exceed>>Install Treatment>>No Longer Exceed (Study Required)(cont.)
SURFACE WATER: CWSs
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
56
121
66
146
108
63
33
593
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
Number
of
Systems
2014
-
2015
2,160
1,890
990
5,040
2016
280
605
660
1,460
3,005
2017
-
2018
2,160
1,890
990
5,040
2019
280
605
660
1,460
3,005
2020
-
2021
2,160
1,890
990
5,040
2022
280
605
660
1,460
3,005
Total
Samples
280
605
660
1,460
2,160
1,890
990
8,045
Total
Annual
Annual
Total
Monitoring Monitoring
Samples
Burden
Events
Events
93
202
220
487
720
630
330
2,682
56
121
66
146
108
63
33
593
19
40
22
49
36
21
11
198
1,120
2,420
2,640
5,840
8,640
7,560
3,960
32,180
Annual Total Labor
Annual
Annual
Total O&M
Burden
Cost
O&M Cost
Labor Cost
Cost
373
807
880
1,947
2,880
2,520
1,320
10,727
$ 38,743
$ 83,713
$ 91,323
$ 202,017
$ 298,875
$ 261,516
$ 136,984
$
$
$
$
$
$1,113,171
$ 12,914
$ 27,904
$ 30,441
$ 67,339
$ 99,625
$ 87,172
$ 45,661
$
$
$
$
$
$ 371,057
$
$
$
$
$
$
$
$
$
$
$
$
$
2,060
4,451
4,856
10,741
15,891
13,905
7,283
59,187
$
$
$
$
$
$
$
$
$
$
$
$
$
687
1,484
1,619
3,580
5,297
4,635
2,428
19,729
SURFACE WATER: NTNCWSs
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
Number
of
Systems
18
16
5
5
3
47
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
2014
-
2015
60
60
2016
90
80
50
50
270
2017
-
2018
60
60
2019
90
80
50
50
270
2020
-
2021
60
60
2022
90
80
50
50
270
Total
Samples
90
80
50
50
60
330
Annual
Total
Annual
Total
Monitoring Monitoring
Samples
Burden
Events
Events
30
18
6
360
27
16
5
320
17
5
2
200
17
5
2
200
20
3
1
240
110
47
16
1,320
Annual
Annual
Total O&M
Annual Total Labor
Cost
O&M Cost
Labor Cost
Cost
Burden
120 $
107 $
67 $
67 $
80 $
$
$
$
$
$
$
$
440 $
12,453
11,069
6,918
6,918
8,302
45,661
$
$
$
$
$
$
$
$
$
$
$
$
$
4,151
3,690
2,306
2,306
2,767
15,220
$
$
$
$
$
$
$
$
$
$
$
$
$
662
589
368
368
441
2,428
$
$
$
$
$
$
$
$
$
$
$
$
$
221
196
123
123
147
809
SURFACE WATER: ALL SYSTEMS
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
Number
of
Systems
74
137
71
151
111
63
33
640
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
2014
-
DDBP/Chem/Rads ICR - Lead and Copper Rule
2015
2,220
1,890
990
5,100
2016
370
685
710
1,510
3,275
2017
-
2018
2,220
1,890
990
5,100
2019
370
685
710
1,510
3,275
2020
-
2021
2,220
1,890
990
5,100
2022
370
685
710
1,510
3,275
Total
Samples
370
685
710
1,510
2,220
1,890
990
8,375
H-28
Annual
Total
Total
Annual
Monitoring Monitoring
Burden
Samples
Events
Events
123
74
25
1,480
228
137
46
2,740
237
71
24
2,840
503
151
50
6,040
740
111
37
8,880
630
63
21
7,560
330
33
11
3,960
2,792
640
213
33,500
Annual Total Labor
Annual
Total O&M
Annual
Burden
Cost
Labor Cost
Cost
O&M Cost
493
913
947
2,013
2,960
2,520
1,320
11,167
$ 51,196
$ 94,782
$ 98,241
$ 208,936
$ 307,177
$ 261,516
$ 136,984
$
$
$
$
$
$1,158,832
$ 17,065
$ 31,594
$ 32,747
$ 69,645
$ 102,392
$ 87,172
$ 45,661
$
$
$
$
$
$ 386,277
$
$
$
$
$
$
$
$
$
$
$
$
$
2,722
5,040
5,223
11,109
16,333
13,905
7,283
61,615
$
$
$
$
$
$
$
$
$
$
$
$
$
907
1,680
1,741
3,703
5,444
4,635
2,428
20,538
December 2015
Exhibit 6 - TAP MONITORING FOR LEAD & COPPER - MONITORING, BURDEN, AND COST SUMMARY
SCENARIO 2b: Exceed>>Install Treatment>>No Longer Exceed (No Study Required)
GROUND WATER: CWSs
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
Samples by Year
(Representing 9-Year Cycle)
Number of
Systems
1,940
2,321
756
975
396
144
52
6,584
2014
7,920
4,320
1,560
13,800
2015
9,700
11,605
7,560
9,750
38,615
2016
-
2017
7,920
4,320
1,560
13,800
2018
9,700
11,605
7,560
9,750
38,615
2019
-
2020
7,920
4,320
1,560
13,800
2021
9,700
11,605
7,560
9,750
38,615
2022
-
Total
Samples
9,700
11,605
7,560
9,750
7,920
4,320
1,560
52,415
Annual
Samples
3,233
3,868
2,520
3,250
2,640
1,440
520
17,472
Total
Monitoring
Events
1,940
2,321
756
975
396
144
52
6,584
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Annual
Annual
Annual
Total
Total Labor
Monitoring
Burden
Labor Cost
Burden
Cost
Events
647
38,800
12,933 $ 1,342,170 $ 447,390
774
46,420
15,473 $ 1,605,761 $ 535,254
252
30,240
10,080 $ 1,046,062 $ 348,687
325
39,000
13,000 $ 1,349,088 $ 449,696
132
31,680
10,560 $ 1,095,875 $ 365,292
48
17,280
5,760 $ 597,750 $ 199,250
17
6,240
2,080 $ 215,854 $
71,951
$
$
$
$
$
$
$
$
$
$
2,195
209,660
69,887 $ 7,252,559 $ 2,417,520
Total
Monitoring
Events
1,397
1,056
263
131
13
1
2,861
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Annual
Total
Annual
Total Labor
Annual
Monitoring
Cost
Labor Cost
Burden
Burden
Events
466
27,940
9,313 $ 966,500 $ 322,167
352
21,120
7,040 $ 730,583 $ 243,528
88
10,520
3,507 $ 363,908 $ 121,303
44
5,240
1,747 $ 181,262 $
60,421
4
1,040
347 $
35,976 $
11,992
$
$
0
120
40 $
4,151 $
1,384
$
$
$
$
$
$
$
$
$
$
954
65,980
21,993 $ 2,282,380 $ 760,793
Total
Monitoring
Events
3,337
3,377
1,019
1,106
409
144
53
9,445
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Annual
Total Labor
Annual
Total
Annual
Monitoring
Burden
Burden
Cost
Labor Cost
Events
1,112
66,740
22,247 $ 2,308,670 $ 769,557
1,126
67,540
22,513 $ 2,336,344 $ 778,781
340
40,760
13,587 $ 1,409,970 $ 469,990
369
44,240
14,747 $ 1,530,350 $ 510,117
136
32,720
10,907 $ 1,131,850 $ 377,283
48
17,280
5,760 $ 597,750 $ 199,250
18
6,360
2,120 $ 220,005 $
73,335
$
$
$
$
$
$
$
$
$
$
3,148
275,640
91,880 $ 9,534,939 $ 3,178,313
Total O&M
Cost
Annual O&M
Cost
$ 71,363
$ 85,378
$ 55,619
$ 71,731
$ 58,268
$ 31,782
$ 11,477
$
$
$
$
$
$ 385,619
$
$
$
$
$
$
$
$
$
$
$
$
$
Total O&M
Cost
Annual O&M
Cost
$ 51,389
$ 38,845
$ 19,349
$
9,638
$
1,913
$
$
221
$
$
$
$
$
$ 121,354
$
$
$
$
$
$
$
$
$
$
$
$
$
Total O&M
Cost
Annual O&M
Cost
$ 122,752
$ 124,224
$ 74,968
$ 81,369
$ 60,181
$ 31,782
$ 11,698
$
$
$
$
$
$ 506,974
$
$
$
$
$
$
$
$
$
$
$
$
$
23,788
28,459
18,540
23,910
19,423
10,594
3,826
128,540
GROUND WATER: NTNCWSs
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
Samples by Year
(Representing 9-Year Cycle)
Number of
Systems
1,397
1,056
263
131
13
1
2,861
2014
260
30
290
2015
6,985
5,280
2,630
1,310
16,205
2016
-
2017
260
30
290
2018
6,985
5,280
2,630
1,310
16,205
2019
-
2020
260
30
290
2021
6,985
5,280
2,630
1,310
16,205
2022
-
Total
Samples
6,985
5,280
2,630
1,310
260
30
16,495
Annual
Samples
2,328
1,760
877
437
87
10
5,498
17,130
12,948
6,450
3,213
638
74
40,451
GROUND WATER: ALL SYSTEMS
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
Samples by Year
(Representing 9-Year Cycle)
Number of
Systems
3,337
3,377
1,019
1,106
409
144
53
9,445
2014
8,180
4,320
1,590
14,090
DDBP/Chem/Rads ICR - Lead and Copper Rule
2015
16,685
16,885
10,190
11,060
54,820
2016
-
2017
8,180
4,320
1,590
14,090
2018
16,685
16,885
10,190
11,060
54,820
2019
-
2020
8,180
4,320
1,590
14,090
2021
16,685
16,885
10,190
11,060
54,820
2022
-
Total
Samples
16,685
16,885
10,190
11,060
8,180
4,320
1,590
68,910
H-29
Annual
Samples
5,562
5,628
3,397
3,687
2,727
1,440
530
22,970
40,917
41,408
24,989
27,123
20,060
10,594
3,899
168,991
December 2015
Exhibit 6 - TAP MONITORING FOR LEAD & COPPER - MONITORING, BURDEN AND COST SUMMARY (Cont.)
SCENARIO 2b: Exceed>>Install Treatment>>No Longer Exceed (No Study Required) (cont.)
SURFACE WATER: CWSs
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
168
362
198
437
323
190
100
1,778
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
Number of
Systems
2014
6,460
5,700
3,000
15,160
2015
840
1,810
1,980
4,370
9,000
2016
-
2017
6,460
5,700
3,000
15,160
2018
840
1,810
1,980
4,370
9,000
2019
-
2020
6,460
5,700
3,000
15,160
2021
840
1,810
1,980
4,370
9,000
2022
-
Total
Samples
840
1,810
1,980
4,370
6,460
5,700
3,000
24,160
Annual
Samples
280
603
660
1,457
2,153
1,900
1,000
8,053
Total
Monitoring
Events
168
362
198
437
323
190
100
1,778
Annual
Monitoring
Events
56
121
66
146
108
63
33
593
Total
Burden
3,360
7,240
7,920
17,480
25,840
22,800
12,000
96,640
Annual
Burden
1,120
2,413
2,640
5,827
8,613
7,600
4,000
32,213
Total Labor
Cost
Annual
Labor Cost
Total O&M
Cost
Annual O&M
Cost
$ 116,229
$ 250,446
$ 273,969
$ 604,668
$ 893,857
$ 788,698
$ 415,104
$
$
$
$
$
$ 3,342,971
$
38,743
$
83,482
$
91,323
$ 201,556
$ 297,952
$ 262,899
$ 138,368
$
$
$
$
$
$ 1,114,324
$
6,180
$ 13,316
$ 14,567
$ 32,150
$ 47,526
$ 41,935
$ 22,071
$
$
$
$
$
$ 177,746
$
$
$
$
$
$
$
$
$
$
$
$
$
Total O&M
Cost
Annual O&M
Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
2,060
4,439
4,856
10,717
15,842
13,978
7,357
59,249
SURFACE WATER: NTNCWSs
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
Samples by Year
(Representing 9-Year Cycle)
Number of
Systems
53
48
16
15
8
140
2014
160
160
2015
265
240
160
150
815
2016
-
2017
160
160
2018
265
240
160
150
815
2019
-
2020
160
160
2021
265
240
160
150
815
2022
-
Total
Samples
265
240
160
150
160
975
Annual
Samples
88
80
53
50
53
325
Total
Monitoring
Events
53
48
16
15
8
140
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Annual
Total
Total Labor
Annual
Annual
Monitoring
Burden
Cost
Burden
Labor Cost
Events
18
1,060
353 $
36,668 $
12,223
16
960
320 $
33,208 $
11,069
5
640
213 $
22,139 $
7,380
5
600
200 $
20,755 $
6,918
3
640
213 $
22,139 $
7,380
$
$
$
$
$
$
$
$
$
$
$
$
$
$
47
3,900
1,300 $ 134,909 $
44,970
Total
Monitoring
Events
221
410
214
452
331
190
100
1,918
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Annual
Annual
Total Labor
Annual
Total
Monitoring
Burden
Cost
Labor Cost
Burden
Events
74
4,420
1,473 $ 152,897 $
50,966
137
8,200
2,733 $ 283,654 $
94,551
71
8,560
2,853 $ 296,108 $
98,703
151
18,080
6,027 $ 625,423 $ 208,474
110
26,480
8,827 $ 915,996 $ 305,332
63
22,800
7,600 $ 788,698 $ 262,899
33
12,000
4,000 $ 415,104 $ 138,368
$
$
$
$
$
$
$
$
$
$
639
100,540
33,513 $ 3,477,880 $ 1,159,293
1,950
1,766
1,177
1,104
1,177
7,173
650
589
392
368
392
2,391
SURFACE WATER: ALL SYSTEMS
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
Samples by Year
(Representing 9-Year Cycle)
Number of
Systems
221
410
214
452
331
190
100
1,918
2014
6,620
5,700
3,000
15,320
DDBP/Chem/Rads ICR - Lead and Copper Rule
2015
1,105
2,050
2,140
4,520
9,815
2016
-
2017
6,620
5,700
3,000
15,320
2018
1,105
2,050
2,140
4,520
9,815
2019
-
2020
6,620
5,700
3,000
15,320
2021
1,105
2,050
2,140
4,520
9,815
2022
-
Total
Samples
1,105
2,050
2,140
4,520
6,620
5,700
3,000
25,135
H-30
Annual
Samples
368
683
713
1,507
2,207
1,900
1,000
8,378
Total O&M
Cost
Annual O&M
Cost
$
8,130
$ 15,082
$ 15,744
$ 33,254
$ 48,704
$ 41,935
$ 22,071
$
$
$
$
$
$ 184,919
$
$
$
$
$
$
$
$
$
$
$
$
$
2,710
5,027
5,248
11,085
16,235
13,978
7,357
61,640
December 2015
Exhibit 6 - TAP MONITORING FOR LEAD & COPPER - MONITORING, BURDEN, AND COST SUMMARY
SCENARIO 3a: Exceed>>Install Treatment>>Still Exceed (Study Required)
GROUND WATER: CWSs
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
Samples by Year
(Representing 9-Year Cycle)
Number of
Systems
33
38
9
11
5
2
1
99
2014
330
760
360
440
400
240
120
2,650
2015
330
760
360
440
400
240
120
2,650
2016
330
760
360
440
400
240
120
2,650
2017
330
760
360
440
400
240
120
2,650
2018
330
760
360
440
400
240
120
2,650
2019
330
760
360
440
400
240
120
2,650
2020
330
760
360
440
400
240
120
2,650
2021
330
760
360
440
400
240
120
2,650
2022
330
760
360
440
400
240
120
2,650
Total
Samples
Annual
Samples
990
2,280
1,080
1,320
1,200
720
360
7,950
330
760
360
440
400
240
120
2,650
Total
Monitoring
Events
198
456
108
132
60
24
12
990
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Annual
Total
Annual
Annual
Monitoring
Total Labor Cost
Labor Cost
Burden Burden
Events
66
3,960
1,320 $
136,984 $ 45,661
152
9,120
3,040 $
315,479 $ 105,160
36
4,320
1,440 $
149,437 $ 49,812
44
5,280
1,760 $
182,646 $ 60,882
20
4,800
1,600 $
166,042 $ 55,347
8
2,880
960 $
99,625 $ 33,208
4
1,440
480 $
49,812 $ 16,604
$
$
$
$
$
$
$
$
$
$
330
31,800
10,600 $
1,100,026 $ 366,675
Total
Monitoring
Events
234
348
72
48
702
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Annual
Annual
Annual
Total
Total Labor Cost
Monitoring
Labor Cost
Burden Burden
Events
78
4,680
1,560 $
161,891 $ 53,964
116
6,960
2,320 $
240,760 $ 80,253
24
2,880
960 $
99,625 $ 33,208
16
1,920
640 $
66,417 $ 22,139
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
234
16,440
5,480 $
568,692 $ 189,564
Total
Monitoring
Events
432
804
180
180
60
24
12
1,692
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Annual
Total
Annual
Annual
Monitoring
Total Labor Cost
Burden Burden
Labor Cost
Events
144
8,640
2,880 $
298,875 $ 99,625
268
16,080
5,360 $
556,239 $ 185,413
60
7,200
2,400 $
249,062 $ 83,021
60
7,200
2,400 $
249,062 $ 83,021
20
4,800
1,600 $
166,042 $ 55,347
8
2,880
960 $
99,625 $ 33,208
4
1,440
480 $
49,812 $ 16,604
$
$
$
$
$
$
$
$
$
$
564
48,240
16,080 $
1,668,718 $ 556,239
Total O&M
Cost
Annual
O&M Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
7,283
16,774
7,946
9,711
8,828
5,297
2,649
58,488
$
2,428
$
5,591
$
2,649
$
3,237
$
2,943
$
1,766
$
883
$
$
$
$
$
$ 19,496
Total O&M
Cost
Annual
O&M Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
8,608
12,801
5,297
3,531
30,237
$
2,869
$
4,267
$
1,766
$
1,177
$
$
$
$
$
$
$
$
$ 10,079
Total O&M
Cost
Annual
O&M Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
$
5,297
$
9,858
$
4,414
$
4,414
$
2,943
$
1,766
$
883
$
$
$
$
$
$ 29,575
GROUND WATER: NTNCWSs
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
Samples by Year
(Representing 9-Year Cycle)
Number of
Systems
39
29
6
4
78
2014
390
580
240
160
1,370
2015
390
580
240
160
1,370
2016
390
580
240
160
1,370
2017
390
580
240
160
1,370
2018
390
580
240
160
1,370
2019
390
580
240
160
1,370
2020
390
580
240
160
1,370
2021
390
580
240
160
1,370
2022
390
580
240
160
1,370
Total
Samples
Annual
Samples
1,170
1,740
720
480
4,110
390
580
240
160
1,370
GROUND WATER: ALL SYSTEMS
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
Samples by Year
(Representing 9-Year Cycle)
Number of
Systems
72
67
15
15
5
2
1
177
DDBP/Chem/Rads ICR - Lead and Copper Rule
2014
720
1,340
600
600
400
240
120
4,020
2015
720
1,340
600
600
400
240
120
4,020
2016
720
1,340
600
600
400
240
120
4,020
2017
720
1,340
600
600
400
240
120
4,020
2018
720
1,340
600
600
400
240
120
4,020
2019
720
1,340
600
600
400
240
120
4,020
2020
720
1,340
600
600
400
240
120
4,020
2021
720
1,340
600
600
400
240
120
4,020
2022
720
1,340
600
600
400
240
120
4,020
Total
Samples
Annual
Samples
2,160
4,020
1,800
1,800
1,200
720
360
12,060
720
1,340
600
600
400
240
120
4,020
H-31
15,891
29,575
13,243
13,243
8,828
5,297
2,649
88,726
December 2015
Exhibit 6 - TAP MONITORING FOR LEAD & COPPER - MONITORING, BURDEN, AND COST SUMMARY (cont.)
Scenario 3a: Exceed>>Install Treatment>>Still Exceed (Study Required) (cont.)
SURFACE WATER: CWSs
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
Samples by Year
(Representing 9-Year Cycle)
Number of
Systems
3
6
2
5
4
2
1
1
24
2014
30
120
80
200
320
240
120
120
1,230
2015
30
120
80
200
320
240
120
120
1,230
2016
30
120
80
200
320
240
120
120
1,230
2017
30
120
80
200
320
240
120
120
1,230
2018
30
120
80
200
320
240
120
120
1,230
2019
30
120
80
200
320
240
120
120
1,230
2020
30
120
80
200
320
240
120
120
1,230
2021
30
120
80
200
320
240
120
120
1,230
2022
30
120
80
200
320
240
120
120
1,230
Total
Samples
Annual
Samples
90
360
240
600
960
720
360
360
3,690
30
120
80
200
320
240
120
120
1,230
Total
Monitoring
Events
18
72
24
60
48
24
12
12
270
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Annual
Annual
Total
Annual
Monitoring
Total Labor Cost
Burden Burden
Labor Cost
Events
6
360
120 $
12,453 $
4,151
24
1,440
480 $
49,812 $ 16,604
8
960
320 $
33,208 $ 11,069
20
2,400
800 $
83,021 $ 27,674
16
3,840
1,280 $
132,833 $ 44,278
8
2,880
960 $
99,625 $ 33,208
4
1,440
480 $
49,812 $ 16,604
4
1,440
480 $
49,812 $ 16,604
$
$
$
$
$
$
$
$
90
14,760
4,920 $
510,578 $ 170,193
Total
Monitoring
Events
6
12
18
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Annual
Annual
Total
Annual
Monitoring
Total Labor Cost
Labor Cost
Burden Burden
Events
2
120
40 $
4,151 $
1,384
4
240
80 $
8,302 $
2,767
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
6
360
120 $
12,453 $
4,151
Total
Monitoring
Events
24
84
24
60
48
24
12
12
288
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Annual
Total
Annual
Annual
Monitoring
Total Labor Cost
Burden Burden
Labor Cost
Events
8
480
160 $
16,604 $
5,535
28
1,680
560 $
58,115 $ 19,372
8
960
320 $
33,208 $ 11,069
20
2,400
800 $
83,021 $ 27,674
16
3,840
1,280 $
132,833 $ 44,278
8
2,880
960 $
99,625 $ 33,208
4
1,440
480 $
49,812 $ 16,604
4
1,440
480 $
49,812 $ 16,604
$
$
$
$
$
$
$
$
96
15,120
5,040 $
523,031 $ 174,344
Total O&M
Cost
Annual
O&M Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
662
2,649
1,766
4,414
7,063
5,297
2,649
2,649
27,147
221
883
589
1,471
2,354
1,766
883
883
9,049
SURFACE WATER: NTNCWSs
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
Samples by Year
(Representing 9-Year Cycle)
Number of
Systems
1
1
2
2014
10
20
30
2015
10
20
30
2016
10
20
30
2017
10
20
30
2018
10
20
30
2019
10
20
30
2020
10
20
30
2021
10
20
30
2022
10
20
30
Total
Samples
Annual
Samples
30
60
-
10
20
-
90
30
Total O&M
Cost
Annual
O&M Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
221
441
662
74
147
221
SURFACE WATER: ALL SYSTEMS
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
Samples by Year
(Representing 9-Year Cycle)
Number of
Systems
4
7
2
5
4
2
1
1
26
DDBP/Chem/Rads ICR - Lead and Copper Rule
2014
40
140
80
200
320
240
120
120
1,260
2015
40
140
80
200
320
240
120
120
1,260
2016
40
140
80
200
320
240
120
120
1,260
2017
40
140
80
200
320
240
120
120
1,260
2018
40
140
80
200
320
240
120
120
1,260
2019
40
140
80
200
320
240
120
120
1,260
2020
40
140
80
200
320
240
120
120
1,260
2021
40
140
80
200
320
240
120
120
1,260
2022
40
140
80
200
320
240
120
120
1,260
Total
Samples
Annual
Samples
120
420
240
600
960
720
360
360
3,780
40
140
80
200
320
240
120
120
1,260
H-32
Total O&M
Cost
Annual
O&M Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
883
3,090
1,766
4,414
7,063
5,297
2,649
2,649
27,810
294
1,030
589
1,471
2,354
1,766
883
883
9,270
December 2015
Exhibit 6 - TAP MONITORING FOR LEAD & COPPER - MONITORING, BURDEN, AND COST SUMMARY
SCENARIO 3b: Exceed>>Install Treatment>>Still Exceed (No Study Required)
GROUND WATER: CWSs
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
98
114
27
34
15
5
2
1
296
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
Number of
Systems
2014
980
2,280
1,080
1,360
1,200
600
240
120
7,860
2015
980
2,280
1,080
1,360
1,200
600
240
120
7,860
2016
980
2,280
1,080
1,360
1,200
600
240
120
7,860
2017
980
2,280
1,080
1,360
1,200
600
240
120
7,860
2018
980
2,280
1,080
1,360
1,200
600
240
120
7,860
2019
980
2,280
1,080
1,360
1,200
600
240
120
7,860
2020
980
2,280
1,080
1,360
1,200
600
240
120
7,860
2021
980
2,280
1,080
1,360
1,200
600
240
120
7,860
2022
980
2,280
1,080
1,360
1,200
600
240
120
7,860
Total
Samples
Annual
Samples
2,940
6,840
3,240
4,080
3,600
1,800
720
360
23,580
980
2,280
1,080
1,360
1,200
600
240
120
7,860
Total
Monitoring
Events
588
1,368
324
408
180
60
24
12
2,964
Annual
Monitoring
Events
196
456
108
136
60
20
8
4
988
Total
Burden
Annual
Burden
11,760
27,360
12,960
16,320
14,400
7,200
2,880
1,440
94,320
3,920
9,120
4,320
5,440
4,800
2,400
960
480
31,440
Total Labor
Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
406,802
946,437
448,312
564,541
498,125
249,062
99,625
49,812
3,262,717
Annual Labor Total O&M
Annual
Cost
Cost
O&M Cost
$
135,601
$
315,479
$
149,437
$
188,180
$
166,042
$
83,021
$
33,208
$
16,604
$
$
$
$
$ 1,087,572
$ 21,630
$ 50,322
$ 23,837
$ 30,017
$ 26,485
$ 13,243
$ 5,297
$ 2,649
$
$
$
$
$ 173,479
$
7,210
$ 16,774
$
7,946
$ 10,006
$
8,828
$
4,414
$
1,766
$
883
$
$
$
$
$ 57,826
GROUND WATER: NTNCWSs
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
116
87
18
13
1
235
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
Number of
Systems
2014
1,160
1,740
720
520
80
4,220
2015
1,160
1,740
720
520
80
4,220
2016
1,160
1,740
720
520
80
4,220
2017
1,160
1,740
720
520
80
4,220
2018
1,160
1,740
720
520
80
4,220
2019
1,160
1,740
720
520
80
4,220
2020
1,160
1,740
720
520
80
4,220
2021
1,160
1,740
720
520
80
4,220
2022
1,160
1,740
720
520
80
4,220
Total
Samples
Annual
Samples
3,480
5,220
2,160
1,560
240
12,660
1,160
1,740
720
520
80
4,220
Total
Monitoring
Events
696
1,044
216
156
12
2,124
Annual
Monitoring
Events
232
348
72
52
4
708
Total
Burden
Annual
Burden
13,920
20,880
8,640
6,240
960
50,640
4,640
6,960
2,880
2,080
320
16,880
Total Labor
Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
481,521
722,281
298,875
215,854
33,208
1,751,739
Annual
Annual Labor Total O&M
Cost
O&M Cost
Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
160,507
240,760
99,625
71,951
11,069
583,913
$
$
$
$
$
$
$
$
$
$
$
$
$
25,602
38,404
15,891
11,477
1,766
93,140
$
8,534
$ 12,801
$
5,297
$
3,826
$
589
$
$
$
$
$
$
$
$ 31,047
GROUND WATER: ALL SYSTEMS
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
214
201
45
47
16
5
2
1
531
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
Number of
Systems
2014
2,140
4,020
1,800
1,880
1,280
600
240
120
12,080
DDBP/Chem/Rads ICR - Lead and Copper Rule
2015
2,140
4,020
1,800
1,880
1,280
600
240
120
12,080
2016
2,140
4,020
1,800
1,880
1,280
600
240
120
12,080
2017
2,140
4,020
1,800
1,880
1,280
600
240
120
12,080
2018
2,140
4,020
1,800
1,880
1,280
600
240
120
12,080
2019
2,140
4,020
1,800
1,880
1,280
600
240
120
12,080
2020
2,140
4,020
1,800
1,880
1,280
600
240
120
12,080
2021
2,140
4,020
1,800
1,880
1,280
600
240
120
12,080
2022
2,140
4,020
1,800
1,880
1,280
600
240
120
12,080
Total
Samples
Annual
Samples
6,420
12,060
5,400
5,640
3,840
1,800
720
360
36,240
2,140
4,020
1,800
1,880
1,280
600
240
120
12,080
H-33
Total
Monitoring
Events
1,284
2,412
540
564
192
60
24
12
5,088
Annual
Monitoring
Events
428
804
180
188
64
20
8
4
1,696
Total
Burden
Annual
Burden
25,680
48,240
21,600
22,560
15,360
7,200
2,880
1,440
144,960
8,560
16,080
7,200
7,520
5,120
2,400
960
480
48,320
Total Labor
Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
888,323
1,668,718
747,187
780,396
531,333
249,062
99,625
49,812
5,014,456
Annual
Annual Labor Total O&M
Cost
O&M Cost
Cost
$
296,108
$
556,239
$
249,062
$
260,132
$
177,111
$
83,021
$
33,208
$
16,604
$
$
$
$
$ 1,671,485
$ 47,232
$ 88,726
$ 39,728
$ 41,494
$ 28,251
$ 13,243
$ 5,297
$ 2,649
$
$
$
$
$ 266,619
$
$
$
$
$
$
$
$
$
$
$
$
$
15,744
29,575
13,243
13,831
9,417
4,414
1,766
883
88,873
December 2015
Exhibit 6 - TAP MONITORING FOR LEAD & COPPER - MONITORING, BURDEN, AND COST SUMMARY (cont.)
SCENARIO 3b: Exceed>>Install Treatment>>Still Exceed (No Study Required) (cont.)
SURFACE WATER: CWSs
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
8
18
7
15
12
6
3
2
1
1
73
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
Number of
Systems
2014
80
360
280
600
960
720
360
240
120
200
3,920
2015
80
360
280
600
960
720
360
240
120
200
3,920
2016
80
360
280
600
960
720
360
240
120
200
3,920
2017
80
360
280
600
960
720
360
240
120
200
3,920
2018
80
360
280
600
960
720
360
240
120
200
3,920
2019
80
360
280
600
960
720
360
240
120
200
3,920
2020
80
360
280
600
960
720
360
240
120
200
3,920
2021
80
360
280
600
960
720
360
240
120
200
3,920
2022
80
360
280
600
960
720
360
240
120
200
3,920
Total
Samples
Annual
Samples
240
1,080
840
1,800
2,880
2,160
1,080
720
360
600
11,760
80
360
280
600
960
720
360
240
120
200
3,920
Total
Monitoring
Events
48
216
84
180
144
72
36
24
12
12
828
Annual
Monitoring
Events
16
72
28
60
48
24
12
8
4
4
276
Total
Burden
Annual
Burden
960
4,320
3,360
7,200
11,520
8,640
4,320
2,880
1,440
2,400
47,040
320
1,440
1,120
2,400
3,840
2,880
1,440
960
480
800
15,680
Total Labor
Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
33,208
149,437
116,229
249,062
398,500
298,875
149,437
99,625
49,812
83,021
1,627,208
Annual
Annual Labor Total O&M
Cost
O&M Cost
Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
11,069
49,812
38,743
83,021
132,833
99,625
49,812
33,208
16,604
27,674
542,403
$
$
$
$
$
$
$
$
$
$
$
$
$
1,766
7,946
6,180
13,243
21,188
15,891
7,946
5,297
2,649
4,414
86,519
$
589
$
2,649
$
2,060
$
4,414
$
7,063
$
5,297
$
2,649
$
1,766
$
883
$
1,471
$
$
$ 28,840
SURFACE WATER: NTNCWSs
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
4
4
1
1
1
11
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
Number of
Systems
2014
40
80
40
40
80
280
2015
40
80
40
40
80
280
2016
40
80
40
40
80
280
2017
40
80
40
40
80
280
2018
40
80
40
40
80
280
2019
40
80
40
40
80
280
2020
40
80
40
40
80
280
2021
40
80
40
40
80
280
2022
40
80
40
40
80
280
Total
Samples
Annual
Samples
120
240
120
120
240
840
40
80
40
40
80
280
Total
Monitoring
Events
24
48
12
12
12
108
Annual
Monitoring
Events
8
16
4
4
4
36
Total
Burden
Annual
Burden
480
960
480
480
960
3,360
160
320
160
160
320
1,120
Total Labor
Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
16,604
33,208
16,604
16,604
33,208
116,229
Annual
Annual Labor Total O&M
O&M Cost
Cost
Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
5,535
11,069
5,535
5,535
11,069
38,743
$
$
$
$
$
$
$
$
$
$
$
$
$
883
1,766
883
883
1,766
6,180
$
$
$
$
$
$
$
$
$
$
$
$
$
294
589
294
294
589
2,060
SURFACE WATER: ALL SYSTEMS
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
12
22
8
16
13
6
3
2
1
1
84
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
Number of
Systems
2014
120
440
320
640
1,040
720
360
240
120
200
4,200
DDBP/Chem/Rads ICR - Lead and Copper Rule
2015
120
440
320
640
1,040
720
360
240
120
200
4,200
2016
120
440
320
640
1,040
720
360
240
120
200
4,200
2017
120
440
320
640
1,040
720
360
240
120
200
4,200
2018
120
440
320
640
1,040
720
360
240
120
200
4,200
2019
120
440
320
640
1,040
720
360
240
120
200
4,200
2020
120
440
320
640
1,040
720
360
240
120
200
4,200
2021
120
440
320
640
1,040
720
360
240
120
200
4,200
2022
120
440
320
640
1,040
720
360
240
120
200
4,200
Total
Samples
Annual
Samples
360
1,320
960
1,920
3,120
2,160
1,080
720
360
600
12,600
120
440
320
640
1,040
720
360
240
120
200
4,200
H-34
Total
Monitoring
Events
72
264
96
192
156
72
36
24
12
12
936
Annual
Monitoring
Events
24
88
32
64
52
24
12
8
4
4
312
Total
Burden
Annual
Burden
1,440
5,280
3,840
7,680
12,480
8,640
4,320
2,880
1,440
2,400
50,400
480
1,760
1,280
2,560
4,160
2,880
1,440
960
480
800
16,800
Total Labor
Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
49,812
182,646
132,833
265,667
431,708
298,875
149,437
99,625
49,812
83,021
1,743,437
Annual Labor Total O&M
Annual
Cost
Cost
O&M Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
16,604
60,882
44,278
88,556
143,903
99,625
49,812
33,208
16,604
27,674
581,146
$
$
$
$
$
$
$
$
$
$
$
$
$
2,649
9,711
7,063
14,126
22,954
15,891
7,946
5,297
2,649
4,414
92,699
$
883
$
3,237
$
2,354
$
4,709
$
7,651
$
5,297
$
2,649
$
1,766
$
883
$
1,471
$
$
$ 30,900
December 2015
Exhibit 6 - TAP MONITORING FOR LEAD & COPPER - MONITORING, BURDEN, AND COST SUMMARY
SCENARIO 1R: Monitor Only - Reduced (All Plastic)
GROUND WATER: CWSs
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
1,121
1,340
432
557
3,450
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
Number of
Systems
2014
5,605
6,700
4,320
5,570
22,195
2015
-
2016
-
2017
-
2018
-
2019
-
2020
-
2021
-
2022
-
Total
Samples
-
Annual
Samples
-
Total
Monitoring
Events
-
Annual
Monitoring
Events
-
Total
Burden
-
Annual
Burden
-
Total Labor
Cost
Annual
Total O&M
Labor Cost
Cost
Annual
O&M Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
-
-
$
$
$
$
$
$
$
$
$
$
$
$
$
-
-
GROUND WATER: NTNCWSs
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
828
625
154
79
1,686
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
Number of
Systems
2014
4,140
3,125
1,540
790
9,595
2015
-
2016
-
2017
-
2018
-
2019
-
2020
-
2021
-
2022
-
Total
Samples
-
Annual
Samples
-
Total
Monitoring
Events
-
Annual
Monitoring
Events
-
Total
Burden
-
Annual
Burden
-
Total Labor
Cost
Annual
Total O&M
Labor Cost
Cost
Annual
O&M Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
-
-
$
$
$
$
$
$
$
$
$
$
$
$
$
-
-
GROUND WATER: ALL SYSTEMS
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
1,949
1,965
586
636
5,136
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
Number of
Systems
2014
9,745
9,825
5,860
6,360
31,790
DDBP/Chem/Rads ICR - Lead and Copper Rule
2015
-
2016
-
2017
-
2018
-
2019
-
2020
-
2021
-
2022
-
Total
Samples
-
H-35
Annual
Samples
-
Total
Monitoring
Events
-
Annual
Monitoring
Events
-
Total
Burden
-
Annual
Burden
-
Total Labor
Cost
Annual
Total O&M
Labor Cost
Cost
Annual
O&M Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
-
-
$
$
$
$
$
$
$
$
$
$
$
$
$
-
-
December 2015
Exhibit 6 - TAP MONITORING FOR LEAD & COPPER - MONITORING, BURDEN, AND COST SUMMARY (cont)
SCENARIO 1R: Monitor Only - Reduced (All Plastic)(cont.)
SURFACE WATER: CWSs
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
97
209
113
250
669
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
Number of
Systems
2014
485
1,045
1,130
2,500
5,160
2015
-
2016
-
2017
-
2018
-
2019
-
2020
-
2021
-
2022
-
Total
Samples
-
Annual
Samples
-
Total
Monitoring
Events
-
Annual
Monitoring
Events
-
Total
Burden
-
Annual
Burden
-
Total Labor
Cost
Annual
Total O&M
Labor Cost
Cost
Annual
O&M Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
-
-
$
$
$
$
$
$
$
$
$
$
$
$
$
-
-
SURFACE WATER: NTNCWSs
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
Number of
Systems
31
28
9
9
77
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
2014
155
140
90
90
475
2015
-
2016
-
2017
-
2018
-
2019
-
2020
-
2021
-
2022
-
Total
Samples
-
Annual
Samples
-
Total
Monitoring
Events
-
Annual
Monitoring
Events
-
Total
Burden
-
Annual
Burden
-
Total Labor
Cost
Annual
Total O&M
Labor Cost
Cost
Annual
O&M Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
-
-
$
$
$
$
$
$
$
$
$
$
$
$
$
-
-
SURFACE WATER: ALL SYSTEMS
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
Number of
Systems
128
237
122
259
746
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
2014
640
1,185
1,220
2,590
5,635
DDBP/Chem/Rads ICR - Lead and Copper Rule
2015
-
2016
-
2017
-
2018
-
2019
-
2020
-
2021
-
2022
-
Total
Samples
-
H-36
Annual
Samples
-
Total
Monitoring
Events
-
Annual
Monitoring
Events
-
Total
Burden
-
Annual
Burden
-
Total Labor
Cost
Annual
Total O&M
Labor Cost
Cost
Annual
O&M Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
-
-
$
$
$
$
$
$
$
$
$
$
$
$
$
-
-
December 2015
Exhibit 6 - TAP MONITORING FOR LEAD & COPPER - MONITORING, BURDEN, AND COST SUMMARY
SCENARIO 3aAR: Treat, Then Enter Accelerated Reduced Monitoring Schedule
GROUND WATER: CWSs
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
Number
of
Systems
-
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
2014
-
2015
-
2016
-
2017
-
2018
-
2019
-
2020
-
2021
-
2022
-
Total
Samples
-
Annual
Samples
-
Total
Monitoring
Events
-
Annual
Monitoring
Events
-
Total
Burden
-
Annual
Burden
-
Total Labor
Annual
Cost
Labor Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
$
$
$
$
$
$
$
$
$
$
$
$
$
-
Total O&M
Cost
Annual
O&M Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
-
-
GROUND WATER: NTNCWSs
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
Number
of
Systems
-
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
2014
-
2015
-
2016
-
2017
-
2018
-
2019
-
2020
-
2021
-
2022
-
Total
Samples
-
Annual
Samples
-
Total
Monitoring
Events
-
Annual
Monitoring
Events
-
Total
Burden
-
Annual
Burden
-
Total Labor
Annual
Cost
Labor Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
$
$
$
$
$
$
$
$
$
$
$
$
$
-
Total O&M
Cost
Annual
O&M Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
-
-
GROUND WATER: ALL SYSTEMS
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
-
DDBP/Chem/Rads ICR - Lead and Copper Rule
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
Number
of
Systems
2014
-
2015
-
2016
-
2017
-
2018
-
2019
-
2020
-
2021
-
2022
-
Total
Samples
-
H-37
Annual
Samples
-
Total
Monitoring
Events
-
Annual
Monitoring
Events
-
Total
Burden
-
Annual
Burden
-
Total Labor
Annual
Cost
Labor Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
$
$
$
$
$
$
$
$
$
$
$
$
$
-
Total O&M
Cost
Annual
O&M Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
-
-
December 2015
Exhibit 6 - TAP MONITORING FOR LEAD & COPPER - MONITORING, BURDEN, AND COST SUMMARY (cont.)
SCENARIO 3aAR: Treat, Then Enter Accelerated Reduced Monitoring Schedule (cont.)
SURFACE WATER: CWSs
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
-
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
Number
of
Systems
2014
-
2015
-
2016
-
2017
-
2018
-
2019
-
2020
-
2021
-
2022
-
Total
Samples
-
Annual
Samples
-
Total
Monitoring
Events
-
Annual
Monitoring
Events
-
Total
Burden
-
Annual
Burden
-
Annual
Total Labor
Labor Cost
Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
$
$
$
$
$
$
$
$
$
$
$
$
$
-
Total O&M
Cost
Annual
O&M Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
-
-
SURFACE WATER: NTNCWSs
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
-
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
Number
of
Systems
2014
-
2015
-
2016
-
2017
-
2018
-
2019
-
2020
-
2021
-
2022
-
Total
Samples
-
Annual
Samples
-
Total
Monitoring
Events
-
Annual
Monitoring
Events
-
Total
Burden
-
Annual
Burden
-
Annual
Total Labor
Labor Cost
Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
$
$
$
$
$
$
$
$
$
$
$
$
$
-
Total O&M
Cost
Annual
O&M Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
-
-
SURFACE WATER: ALL SYSTEMS
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
-
DDBP/Chem/Rads ICR - Lead and Copper Rule
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
Number
of
Systems
2014
-
2015
-
2016
-
2017
-
2018
-
2019
-
2020
-
2021
-
2022
-
Total
Samples
-
H-38
Annual
Samples
-
Total
Monitoring
Events
-
Annual
Monitoring
Events
-
Total
Burden
-
Annual
Burden
-
Total Labor
Annual
Cost
Labor Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
$
$
$
$
$
$
$
$
$
$
$
$
$
-
Total O&M
Cost
Annual
O&M Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
-
-
December 2015
Exhibit 6 - TAP MONITORING FOR LEAD & COPPER - MONITORING, BURDEN, AND COST SUMMARY
SCENARIO 2aAR: Accelerated Reduced Monitoring After Treatment (Study)
GROUND WATER: CWSs
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
162
193
63
81
33
12
4
548
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
Number
of
Systems
2014
810
965
630
810
3,215
2015
-
2016
660
360
120
1,140
2017
810
965
630
810
3,215
2018
-
2019
660
360
120
1,140
2020
810
965
630
810
3,215
2021
-
2022
660
360
120
1,140
Total
Samples
Annual
Samples
810
965
630
810
660
360
120
4,355
270
322
210
270
220
120
40
1,452
Total
Monitoring
Events
162
193
63
81
33
12
4
548
Annual
Monitoring
Events
54
64
21
27
11
4
1
183
Total
Burden
Annual
Burden
3,240
3,860
2,520
3,240
2,640
1,440
480
17,420
1,080
1,287
840
1,080
880
480
160
5,807
Total Labor Annual Labor Total O&M
Annual
Cost
Cost
O&M Cost
Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
112,078
133,525
87,172
112,078
91,323
49,812
16,604
602,593
$
$
$
$
$
$
$
$
$
$
$
$
$
37,359
44,508
29,057
37,359
30,441
16,604
5,535
200,864
$
$
$
$
$
$
$
$
$
$
$
$
$
5,959
7,100
4,635
5,959
4,856
2,649
883
32,040
$ 1,986
$ 2,367
$ 1,545
$ 1,986
$ 1,619
$
883
$
294
$
$
$
$
$
$ 10,680
GROUND WATER: NTNCWSs
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
116
88
22
11
1
238
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
Number
of
Systems
2014
580
440
220
110
1,350
2015
-
2016
20
20
2017
580
440
220
110
1,350
2018
-
2019
20
20
2020
580
440
220
110
1,350
2021
-
2022
20
20
Total
Samples
Annual
Samples
580
440
220
110
20
1,370
193
147
73
37
7
457
Total
Monitoring
Events
116
88
22
11
1
238
Annual
Monitoring
Events
39
29
7
4
0
79
Total
Burden
Annual
Burden
2,320
1,760
880
440
80
5,480
773
587
293
147
27
1,827
Total Labor Annual Labor Total O&M
Annual
Cost
Cost
O&M Cost
Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
80,253
60,882
30,441
15,220
2,767
189,564
$
$
$
$
$
$
$
$
$
$
$
$
$
26,751
20,294
10,147
5,073
922
63,188
$
$
$
$
$
$
$
$
$
$
$
$
$
4,267
3,237
1,619
809
147
10,079
$
$
$
$
$
$
$
$
$
$
$
$
$
1,422
1,079
540
270
49
3,360
GROUND WATER: ALL SYSTEMS
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
278
281
85
92
34
12
4
786
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
Number
of
Systems
2014
1,390
1,405
850
920
4,565
DDBP/Chem/Rads ICR - Lead and Copper Rule
2015
-
2016
680
360
120
1,160
2017
1,390
1,405
850
920
4,565
2018
-
2019
680
360
120
1,160
2020
1,390
1,405
850
920
4,565
2021
-
2022
680
360
120
1,160
Total
Samples
Annual
Samples
1,390
1,405
850
920
680
360
120
5,725
463
468
283
307
227
120
40
1,908
H-39
Total
Monitoring
Events
278
281
85
92
34
12
4
786
Annual
Monitoring
Events
93
94
28
31
11
4
1
262
Total
Burden
Annual
Burden
5,560
5,620
3,400
3,680
2,720
1,440
480
22,900
1,853
1,873
1,133
1,227
907
480
160
7,633
Total Labor Annual Labor Total O&M
Annual
Cost
Cost
O&M Cost
Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
192,332
194,407
117,613
127,299
94,090
49,812
16,604
792,157
$
$
$
$
$
$
$
$
$
$
$
$
$
64,111
64,802
39,204
42,433
31,363
16,604
5,535
264,052
$
$
$
$
$
$
$
$
$
$
$
$
$
10,226
10,337
6,253
6,768
5,003
2,649
883
42,119
$ 3,409
$ 3,446
$ 2,084
$ 2,256
$ 1,668
$
883
$
294
$
$
$
$
$
$ 14,040
December 2015
Exhibit 6 - TAP MONITORING FOR LEAD & COPPER - MONITORING, BURDEN, AND COST SUMMARY (cont.)
SCENARIO 2aAR: Accelerated Reduced Monitoring After Treatment (Study) (cont.)
SURFACE WATER: CWSs
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
Number
of
Systems
14
30
16
36
27
16
8
147
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
2014
70
150
160
360
740
2015
-
2016
540
480
240
1,260
2017
70
150
160
360
740
2018
-
2019
540
480
240
1,260
2020
70
150
160
360
740
2021
-
2022
540
480
240
1,260
Total
Samples
Annual
Samples
70
150
160
360
540
480
240
2,000
23
50
53
120
180
160
80
667
Total
Monitoring
Events
14
30
16
36
27
16
8
147
Annual
Monitoring
Events
5
10
5
12
9
5
3
49
Total
Burden
Annual
Burden
280
600
640
1,440
2,160
1,920
960
8,000
93
200
213
480
720
640
320
2,667
Total Labor Annual Labor Total O&M
Annual
Cost
Cost
Cost
O&M Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
9,686
20,755
22,139
49,812
74,719
66,417
33,208
276,736
$
$
$
$
$
$
$
$
$
$
$
$
$
3,229
6,918
7,380
16,604
24,906
22,139
11,069
92,245
$
$
$
$
$
$
$
$
$
$
$
$
$
515
1,104
1,177
2,649
3,973
3,531
1,766
14,714
$
$
$
$
$
$
$
$
$
$
$
$
$
172
368
392
883
1,324
1,177
589
4,905
SURFACE WATER: NTNCWSs
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
Number
of
Systems
4
4
1
1
1
11
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
2014
20
20
10
10
60
2015
-
2016
20
20
2017
20
20
10
10
60
2018
-
2019
20
20
2020
20
20
10
10
60
2021
-
2022
20
20
Total
Samples
Annual
Samples
20
20
10
10
20
80
7
7
3
3
7
27
Total
Monitoring
Events
4
4
1
1
1
11
Annual
Monitoring
Events
1
1
0
0
0
4
Total
Burden
Annual
Burden
80
80
40
40
80
320
27
27
13
13
27
107
Total Labor Annual Labor Total O&M
Annual
Cost
O&M Cost
Cost
Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
2,767
2,767
1,384
1,384
2,767
11,069
$
$
$
$
$
$
$
$
$
$
$
$
$
922
922
461
461
922
3,690
$
$
$
$
$
$
$
$
$
$
$
$
$
147
147
74
74
147
589
$
$
$
$
$
$
$
$
$
$
$
$
$
49
49
25
25
49
196
SURFACE WATER: ALL SYSTEMS
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
18
34
17
37
28
16
8
158
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
Number
of
Systems
2014
90
170
170
370
800
DDBP/Chem/Rads ICR - Lead and Copper Rule
2015
-
2016
560
480
240
1,280
2017
90
170
170
370
800
2018
-
2019
560
480
240
1,280
2020
90
170
170
370
800
2021
-
2022
560
480
240
1,280
Total
Samples
Annual
Samples
90
170
170
370
560
480
240
2,080
30
57
57
123
187
160
80
693
H-40
Total
Monitoring
Events
18
34
17
37
28
16
8
158
Annual
Monitoring
Events
6
11
6
12
9
5
3
53
Total
Burden
Annual
Burden
360
680
680
1,480
2,240
1,920
960
8,320
120
227
227
493
747
640
320
2,773
Total Labor Annual Labor Total O&M
Annual
Cost
Cost
Cost
O&M Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
12,453
23,523
23,523
51,196
77,486
66,417
33,208
287,805
$
$
$
$
$
$
$
$
$
$
$
$
$
4,151
7,841
7,841
17,065
25,829
22,139
11,069
95,935
$
$
$
$
$
$
$
$
$
$
$
$
$
662
1,251
1,251
2,722
4,120
3,531
1,766
15,303
$
$
$
$
$
$
$
$
$
$
$
$
$
221
417
417
907
1,373
1,177
589
5,101
December 2015
Exhibit 6 - TAP MONITORING FOR LEAD & COPPER - MONITORING, BURDEN, AND COST SUMMARY
SCENARIO 2bAR: Accelerated Reduced Monitoring After Treatment (No Study)
GROUND WATER: CWSs
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
Samples by Year
(Representing 9-Year Cycle)
Number
of
Systems
485
580
189
244
99
36
13
1,646
2014
-
2015
-
2016
2,425
2,900
1,890
2,440
1,980
1,080
390
13,105
2017
-
2018
-
2019
2,425
2,900
1,890
2,440
1,980
1,080
390
13,105
2020
-
2021
-
2022
2,425
2,900
1,890
2,440
1,980
1,080
390
13,105
Total
Samples
Annual
Samples
2,425
2,900
1,890
2,440
1,980
1,080
390
13,105
808
967
630
813
660
360
130
4,368
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Annual
Annual Total Labor Annual Labor
Total
Monitoring
Cost
Burden Burden
Cost
Events
162
9,700
3,233 $ 335,542 $ 111,847
193
11,600
3,867 $ 401,267 $ 133,756
63
7,560
2,520 $ 261,516 $
87,172
81
9,760
3,253 $ 337,618 $ 112,539
33
7,920
2,640 $ 273,969 $
91,323
12
4,320
1,440 $ 149,437 $
49,812
4
1,560
520 $
53,964 $
17,988
$
$
$
$
$
$
$
$
$
$
549
52,420
17,473 $ 1,813,313 $ 604,438
Total
Monitoring
Events
485
580
189
244
99
36
13
1,646
Total O&M
Annual
Cost
O&M Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
17,841
21,335
13,905
17,951
14,567
7,946
2,869
96,414
$ 5,947
$ 7,112
$ 4,635
$ 5,984
$ 4,856
$ 2,649
$
956
$
$
$
$
$
$ 32,138
GROUND WATER: NTNCWSs
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
Samples by Year
(Representing 9-Year Cycle)
Number
of
Systems
349
264
66
33
3
715
2014
-
2015
-
2016
1,745
1,320
660
330
60
4,115
2017
-
2018
-
2019
1,745
1,320
660
330
60
4,115
2020
-
2021
-
2022
1,745
1,320
660
330
60
4,115
Total
Samples
Annual
Samples
1,745
1,320
660
330
60
4,115
582
440
220
110
20
1,372
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Annual
Total
Annual Total Labor Annual Labor
Monitoring
Burden Burden
Cost
Cost
Events
116
6,980
2,327 $ 241,452 $
80,484
88
5,280
1,760 $ 182,646 $
60,882
22
2,640
880 $
91,323 $
30,441
11
1,320
440 $
45,661 $
15,220
1
240
80 $
8,302 $
2,767
$
$
$
$
$
$
$
$
$
$
$
$
$
$
238
16,460
5,487 $ 569,384 $ 189,795
Total
Monitoring
Events
349
264
66
33
3
715
Annual
Total O&M
O&M Cost
Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
12,838
9,711
4,856
2,428
441
30,274
$ 4,279
$ 3,237
$ 1,619
$
809
$
147
$
$
$
$
$
$
$
$ 10,091
GROUND WATER: ALL SYSTEMS
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
Samples by Year
(Representing 9-Year Cycle)
Number
of
Systems
834
844
255
277
102
36
13
2,361
DDBP/Chem/Rads ICR - Lead and Copper Rule
2014
-
2015
-
2016
4,170
4,220
2,550
2,770
2,040
1,080
390
17,220
2017
-
2018
-
2019
4,170
4,220
2,550
2,770
2,040
1,080
390
17,220
2020
-
2021
-
2022
4,170
4,220
2,550
2,770
2,040
1,080
390
17,220
Total
Samples
Annual
Samples
4,170
4,220
2,550
2,770
2,040
1,080
390
17,220
1,390
1,407
850
923
680
360
130
5,740
H-41
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Annual
Annual Total Labor Annual Labor
Total
Monitoring
Cost
Cost
Burden Burden
Events
278
16,680
5,560 $ 576,995 $ 192,332
281
16,880
5,627 $ 583,913 $ 194,638
85
10,200
3,400 $ 352,838 $ 117,613
92
11,080
3,693 $ 383,279 $ 127,760
34
8,160
2,720 $ 282,271 $
94,090
12
4,320
1,440 $ 149,437 $
49,812
4
1,560
520 $
53,964 $
17,988
$
$
$
$
$
$
$
$
$
$
787
68,880
22,960 $ 2,382,697 $ 794,232
Total
Monitoring
Events
834
844
255
277
102
36
13
2,361
Total O&M
Annual
Cost
O&M Cost
$ 30,679
$ 31,047
$ 18,760
$ 20,379
$ 15,008
$
7,946
$
2,869
$
$
$
$
$
$ 126,688
$ 10,226
$ 10,349
$ 6,253
$ 6,793
$ 5,003
$ 2,649
$
956
$
$
$
$
$
$ 42,229
December 2015
Exhibit 6 - TAP MONITORING FOR LEAD & COPPER - MONITORING, BURDEN, AND COST SUMMARY (cont.)
SCENARIO 2bAR: Accelerated Reduced Monitoring After Treatment (No Study)(cont.)
SURFACE WATER: CWSs
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
42
91
49
109
81
47
25
444
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
Number
of
Systems
2014
-
2015
-
2016
210
455
490
1,090
1,620
1,410
750
6,025
2017
-
2018
-
2019
210
455
490
1,090
1,620
1,410
750
6,025
2020
-
2021
-
2022
210
455
490
1,090
1,620
1,410
750
6,025
Total
Samples
Annual
Samples
210
455
490
1,090
1,620
1,410
750
6,025
70
152
163
363
540
470
250
2,008
Total
Monitoring
Events
42
91
49
109
81
47
25
444
Annual
Monitoring
Events
14
30
16
36
27
16
8
148
Total
Burden
Annual
Burden
840
1,820
1,960
4,360
6,480
5,640
3,000
24,100
280
607
653
1,453
2,160
1,880
1,000
8,033
Total Labor Annual Labor Total O&M
Annual
Cost
Cost
Cost
O&M Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
29,057
62,957
67,800
150,821
224,156
195,099
103,776
833,667
$
$
$
$
$
$
$
$
$
$
$
$
$
9,686
20,986
22,600
50,274
74,719
65,033
34,592
277,889
$
$
$
$
$
$
$
$
$
$
$
$
$
1,545
3,347
3,605
8,019
11,918
10,373
5,518
44,326
$
515
$ 1,116
$ 1,202
$ 2,673
$ 3,973
$ 3,458
$ 1,839
$
$
$
$
$
$ 14,775
SURFACE WATER: NTNCWSs
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
Samples by Year
(Representing 9-Year Cycle)
Number
of
Systems
13
12
4
4
2
35
2014
-
2015
-
2016
65
60
40
40
40
245
2017
-
2018
-
2019
65
60
40
40
40
245
2020
-
2021
-
2022
65
60
40
40
40
245
Total
Samples
Annual
Samples
65
60
40
40
40
22
20
13
13
13
245
82
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Annual
Total
Annual Total Labor Annual Labor
Monitoring
Cost
Cost
Burden Burden
Events
4
260
87 $
8,994 $
2,998
4
240
80 $
8,302 $
2,767
1
160
53 $
5,535 $
1,845
1
160
53 $
5,535 $
1,845
1
160
53 $
5,535 $
1,845
$
$
$
$
$
$
$
$
$
$
$
$
$
$
12
980
327 $
33,900 $
11,300
Total
Monitoring
Events
13
12
4
4
2
35
Total O&M
Annual
Cost
O&M Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
478
441
294
294
294
1,802
$
$
$
$
$
$
$
$
$
$
$
$
$
159
147
98
98
98
601
SURFACE WATER: ALL SYSTEMS
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
Samples by Year
(Representing 9-Year Cycle)
Number
of
Systems
55
103
53
113
83
47
25
479
DDBP/Chem/Rads ICR - Lead and Copper Rule
2014
-
2015
-
2016
275
515
530
1,130
1,660
1,410
750
6,270
2017
-
2018
-
2019
275
515
530
1,130
1,660
1,410
750
6,270
2020
-
2021
-
2022
275
515
530
1,130
1,660
1,410
750
6,270
Total
Samples
Annual
Samples
275
515
530
1,130
1,660
1,410
750
6,270
92
172
177
377
553
470
250
2,090
H-42
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Annual
Total
Annual Total Labor Annual Labor
Monitoring
Cost
Cost
Burden Burden
Events
18
1,100
367 $
38,051 $
12,684
34
2,060
687 $
71,260 $
23,753
18
2,120
707 $
73,335 $
24,445
38
4,520
1,507 $ 156,356 $
52,119
28
6,640
2,213 $ 229,691 $
76,564
16
5,640
1,880 $ 195,099 $
65,033
8
3,000
1,000 $ 103,776 $
34,592
$
$
$
$
$
$
$
$
$
$
160
25,080
8,360 $ 867,567 $ 289,189
Total
Monitoring
Events
55
103
53
113
83
47
25
479
Total O&M
Annual
Cost
O&M Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
2,023
3,789
3,899
8,313
12,213
10,373
5,518
46,129
$
674
$ 1,263
$ 1,300
$ 2,771
$ 4,071
$ 3,458
$ 1,839
$
$
$
$
$
$ 15,376
December 2015
Exhibit 6 - TAP MONITORING FOR LEAD & COPPER - MONITORING, BURDEN, AND COST SUMMARY
Summary - All Scenarios
GROUND WATER: CWSs
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
Samples by Year
(Representing 9-Year Cycle)
Number of
Systems
11,212
13,403
4,320
5,566
2,724
989
355
106
44
58
5
2
38,784
2014
41,360
50,915
32,310
41,580
9,520
5,160
1,920
120
182,885
2015
11,010
14,645
9,000
11,550
4,240
2,280
870
3,300
1,320
2,900
250
100
61,465
2016
6,970
9,810
5,850
7,490
45,100
24,540
8,850
120
108,730
2017
35,755
44,215
27,990
36,010
9,520
5,160
1,920
120
160,690
2018
11,010
14,645
9,000
11,550
4,240
2,280
870
3,300
1,320
2,900
250
100
61,465
2019
6,970
9,810
5,850
7,490
45,100
24,540
8,850
120
108,730
2020
35,755
44,215
27,990
36,010
9,520
5,160
1,920
120
160,690
2021
11,010
14,645
9,000
11,550
4,240
2,280
870
3,300
1,320
2,900
250
100
61,465
2022
6,970
9,810
5,850
7,490
45,100
24,540
8,850
120
108,730
Total
Samples
Annual
Samples
53,735
68,670
42,840
55,050
58,860
31,980
11,640
3,540
1,320
2,900
250
100
330,885
17,912
22,890
14,280
18,350
19,620
10,660
3,880
1,180
440
967
83
33
110,295
Total
Monitoring
Events
10,747
13,734
4,284
5,505
2,943
1,066
388
118
44
58
5
2
38,894
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Annual
Total
Annual
Total Labor
Annual Labor
Monitoring
Burden
Burden
Cost
Cost
Events
3,582
4,578
1,428
1,835
981
355
129
39
15
19
2
1
12,965
214,940
274,680
171,360
220,200
235,440
127,920
46,560
14,160
5,280
11,600
1,000
400
1,323,540
71,647
91,560
57,120
73,400
78,480
42,640
15,520
4,720
1,760
3,867
333
133
441,180
$
$
$
$
$
$
$
$
$
$
$
$
$
7,435,204
9,501,731
5,927,685
7,617,158
8,144,340
4,425,009
1,610,604
489,823
182,646
401,267
34,592
13,837
45,783,896
$ 2,478,401
$ 3,167,244
$ 1,975,895
$ 2,539,053
$ 2,714,780
$ 1,475,003
$
536,868
$
163,274
$
60,882
$
133,756
$
11,531
$
4,612
$ 15,261,299
Total O&M
Cost
Annual O&M
Cost
$ 395,331
$ 505,208
$ 315,176
$ 405,005
$ 433,035
$ 235,278
$
85,636
$
26,044
$
9,711
$
21,335
$
1,839
$
736
$ 2,434,334
$
$
$
$
$
$
$
$
$
$
$
$
$
131,777
168,403
105,059
135,002
144,345
78,426
28,545
8,681
3,237
7,112
613
245
811,445
GROUND WATER: NTNCWSs
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
Samples by Year
(Representing 9-Year Cycle)
Number of
Systems
8,279
6,254
1,539
786
92
4
5
16,958
2014
31,105
24,645
11,950
6,300
340
30
74,370
2015
8,535
7,600
3,590
1,990
160
21,875
2016
5,625
5,400
2,500
1,450
1,540
90
120
16,725
2017
26,965
21,520
10,410
5,510
340
30
64,775
2018
8,535
7,600
3,590
1,990
160
21,875
2019
5,625
5,400
2,500
1,450
1,540
90
120
16,725
2020
26,965
21,520
10,410
5,510
340
30
64,775
2021
8,535
7,600
3,590
1,990
160
21,875
2022
5,625
5,400
2,500
1,450
1,540
90
120
16,725
Total
Samples
Annual
Samples
41,125
34,520
16,500
8,950
2,040
90
150
103,375
13,708
11,507
5,500
2,983
680
30
50
34,458
Total
Monitoring
Events
8,225
6,904
1,650
895
102
3
5
17,784
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Annual
Total
Annual
Total Labor
Annual Labor
Monitoring
Burden
Burden
Cost
Cost
Events
2,742
164,500
54,833 $
5,690,384 $ 1,896,795
2,301
138,080
46,027 $
4,776,463 $ 1,592,154
550
66,000
22,000 $
2,283,072 $
761,024
298
35,800
11,933 $
1,238,394 $
412,798
34
8,160
2,720 $
282,271 $
94,090
1
360
120 $
12,453 $
4,151
2
600
200 $
20,755 $
6,918
$
$
$
$
$
$
$
$
$
$
5,928
413,500
137,833 $ 14,303,792 $ 4,767,931
Total O&M
Cost
Annual O&M
Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Total
Monitoring
Events
18,972
20,638
5,934
6,400
3,045
1,069
393
118
44
58
5
2
56,678
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Annual
Total
Annual Labor
Annual
Total Labor
Monitoring
Burden
Cost
Burden
Cost
Events
6,324
379,440
126,480 $ 13,125,588 $ 4,375,196
6,879
412,760
137,587 $ 14,278,194 $ 4,759,398
1,978
237,360
79,120 $
8,210,757 $ 2,736,919
2,133
256,000
85,333 $
8,855,552 $ 2,951,851
1,015
243,600
81,200 $
8,426,611 $ 2,808,870
356
128,280
42,760 $
4,437,462 $ 1,479,154
131
47,160
15,720 $
1,631,359 $
543,786
39
14,160
4,720 $
489,823 $
163,274
15
5,280
1,760 $
182,646 $
60,882
19
11,600
3,867 $
401,267 $
133,756
2
1,000
333 $
34,592 $
11,531
1
400
133 $
13,837 $
4,612
18,893
1,737,040
579,013 $ 60,087,688 $ 20,029,229
Total O&M
Cost
Annual O&M
Cost
$ 697,889
$ 759,173
$ 436,567
$ 470,851
$ 448,044
$ 235,940
$
86,739
$
26,044
$
9,711
$
21,335
$
1,839
$
736
$ 3,194,868
$
232,630
$
253,058
$
145,522
$
156,950
$
149,348
$
78,647
$
28,913
$
8,681
$
3,237
$
7,112
$
613
$
245
$ 1,064,956
302,558
253,965
121,391
65,846
15,008
662
1,104
760,534
100,853
84,655
40,464
21,949
5,003
221
368
253,511
GROUND WATER: ALL SYSTEMS
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
Samples by Year
(Representing 9-Year Cycle)
Number of
Systems
19,491
19,657
5,859
6,352
2,816
993
360
106
44
58
5
2
55,743
2014
72,465
75,560
44,260
47,880
9,860
5,160
1,950
120
257,255
DDBP/Chem/Rads ICR - Lead and Copper Rule
2015
19,545
22,245
12,590
13,540
4,400
2,280
870
3,300
1,320
2,900
250
100
83,340
2016
12,595
15,210
8,350
8,940
46,640
24,630
8,970
120
125,455
2017
62,720
65,735
38,400
41,520
9,860
5,160
1,950
120
225,465
2018
19,545
22,245
12,590
13,540
4,400
2,280
870
3,300
1,320
2,900
250
100
83,340
2019
12,595
15,210
8,350
8,940
46,640
24,630
8,970
120
125,455
2020
62,720
65,735
38,400
41,520
9,860
5,160
1,950
120
225,465
2021
19,545
22,245
12,590
13,540
4,400
2,280
870
3,300
1,320
2,900
250
100
83,340
2022
12,595
15,210
8,350
8,940
46,640
24,630
8,970
120
125,455
Total
Samples
Annual
Samples
94,860
103,190
59,340
64,000
60,900
32,070
11,790
3,540
1,320
2,900
250
100
434,260
31,620
34,397
19,780
21,333
20,300
10,690
3,930
1,180
440
967
83
33
144,753
H-43
December 2015
Exhibit 6 - TAP MONITORING FOR LEAD & COPPER - MONITORING, BURDEN, AND COST SUMMARY (cont.
Summary - All Scenarios (Cont.):
SURFACE WATER: CWSs
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
970
2,092
1,131
2,497
2,219
1,300
686
256
133
308
35
20
11,647
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
Number of
Systems
2014
3,575
7,950
8,440
18,640
7,740
6,660
3,480
360
120
200
57,165
2015
950
2,290
2,340
5,170
3,440
2,850
1,470
8,010
4,110
15,600
1,750
1,000
48,980
2016
600
1,540
1,510
3,350
36,720
32,100
16,920
360
120
200
93,420
2017
3,090
6,905
7,310
16,140
7,740
6,660
3,480
360
120
200
52,005
2018
950
2,290
2,340
5,170
3,440
2,850
1,470
8,010
4,110
15,600
1,750
1,000
48,980
2019
600
1,540
1,510
3,350
36,720
32,100
16,920
360
120
200
93,420
2020
3,090
6,905
7,310
16,140
7,740
6,660
3,480
360
120
200
52,005
2021
950
2,290
2,340
5,170
3,440
2,850
1,470
8,010
4,110
15,600
1,750
1,000
48,980
2022
600
1,540
1,510
3,350
36,720
32,100
16,920
360
120
200
93,420
Total
Samples
Annual
Samples
4,640
10,735
11,160
24,660
47,900
41,610
21,870
8,730
4,350
16,000
1,750
1,000
194,405
1,547
3,578
3,720
8,220
15,967
13,870
7,290
2,910
1,450
5,333
583
333
64,802
Total
Monitoring
Events
928
2,147
1,116
2,466
2,395
1,387
729
291
145
320
35
20
11,979
Annual
Monitoring
Events
309
716
372
822
798
462
243
97
48
107
12
7
3,993
Total
Monitoring
Events
307
310
93
90
66
2
2
1
1
872
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Annual
Total
Annual
Total Labor
Annual Labor
Monitoring
Burden
Burden
Cost
Cost
Events
102
6,140
2,047 $
212,395 $
70,798
103
6,200
2,067 $
214,470 $
71,490
31
3,720
1,240 $
128,682 $
42,894
30
3,600
1,200 $
124,531 $
41,510
22
5,280
1,760 $
182,646 $
60,882
1
240
80 $
8,302 $
2,767
1
240
80 $
8,302 $
2,767
0
120
40 $
4,151 $
1,384
$
$
0
200
67 $
6,918 $
2,306
$
$
$
$
291
25,740
8,580 $
890,398 $
296,799
Total
Monitoring
Events
1,235
2,457
1,209
2,556
2,461
1,389
731
292
145
321
35
20
12,851
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Annual
Annual Labor
Total Labor
Annual
Total
Monitoring
Cost
Cost
Burden
Burden
Events
412
24,700
8,233 $
854,422 $
284,807
819
49,140
16,380 $
1,699,851 $
566,617
403
48,360
16,120 $
1,672,869 $
557,623
852
102,240
34,080 $
3,536,686 $ 1,178,895
820
196,880
65,627 $
6,810,473 $ 2,270,158
463
166,680
55,560 $
5,765,795 $ 1,921,932
244
87,720
29,240 $
3,034,410 $ 1,011,470
97
35,040
11,680 $
1,212,104 $
404,035
48
17,400
5,800 $
601,901 $
200,634
107
64,200
21,400 $
2,220,806 $
740,269
12
7,000
2,333 $
242,144 $
80,715
7
4,000
1,333 $
138,368 $
46,123
4,284
803,360
267,787 $ 27,789,829 $ 9,263,276
Total
Burden
18,560
42,940
44,640
98,640
191,600
166,440
87,480
34,920
17,400
64,000
7,000
4,000
777,620
Annual
Burden
6,187
14,313
14,880
32,880
63,867
55,480
29,160
11,640
5,800
21,333
2,333
1,333
259,207
Total Labor
Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
642,028
1,485,380
1,544,187
3,412,155
6,627,827
5,757,492
3,026,108
1,207,953
601,901
2,213,888
242,144
138,368
26,899,431
Annual Labor
Cost
Total O&M
Cost
Annual O&M
Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
$
34,137
$
78,978
$
82,105
$ 181,425
$ 352,402
$ 306,126
$ 160,898
$
64,227
$
32,003
$ 117,713
$
12,875
$
7,357
$ 1,430,245
$
$
$
$
$
$
$
$
$
$
$
$
$
Total O&M
Cost
Annual O&M
Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
214,009
495,127
514,729
1,137,385
2,209,276
1,919,164
1,008,703
402,651
200,634
737,963
80,715
46,123
8,966,477
11,379
26,326
27,368
60,475
117,467
102,042
53,633
21,409
10,668
39,238
4,292
2,452
476,748
SURFACE WATER: NTNCWSs
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
Samples by Year
(Representing 9-Year Cycle)
Number of
Systems
314
283
92
88
53
3
3
1
1
839
2014
1,170
1,110
690
670
240
3,880
2015
315
340
200
190
140
30
50
1,265
2016
205
240
130
130
940
60
60
1,765
2017
1,015
970
600
580
240
3,405
2018
315
340
200
190
140
30
50
1,265
2019
205
240
130
130
940
60
60
1,765
2020
1,015
970
600
580
240
3,405
2021
315
340
200
190
140
30
50
1,265
2022
205
240
130
130
940
60
60
1,765
Total
Samples
Annual
Samples
1,535
1,550
930
900
1,320
60
60
30
50
6,435
512
517
310
300
440
20
20
10
17
2,145
11,293
11,403
6,842
6,621
9,711
441
441
221
368
47,343
3,764
3,801
2,281
2,207
3,237
147
147
74
123
15,781
SURFACE WATER: ALL SYSTEMS
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
Samples by Year
(Representing 9-Year Cycle)
Number of
Systems
1,284
2,375
1,223
2,585
2,272
1,303
689
257
133
309
35
20
12,485
2014
4,745
9,060
9,130
19,310
7,980
6,660
3,480
360
120
200
61,045
DDBP/Chem/Rads ICR - Lead and Copper Rule
2015
1,265
2,630
2,540
5,360
3,580
2,850
1,470
8,040
4,110
15,650
1,750
1,000
50,245
2016
805
1,780
1,640
3,480
37,660
32,160
16,980
360
120
200
95,185
2017
4,105
7,875
7,910
16,720
7,980
6,660
3,480
360
120
200
55,410
2018
1,265
2,630
2,540
5,360
3,580
2,850
1,470
8,040
4,110
15,650
1,750
1,000
50,245
2019
805
1,780
1,640
3,480
37,660
32,160
16,980
360
120
200
95,185
2020
4,105
7,875
7,910
16,720
7,980
6,660
3,480
360
120
200
55,410
2021
1,265
2,630
2,540
5,360
3,580
2,850
1,470
8,040
4,110
15,650
1,750
1,000
50,245
2022
805
1,780
1,640
3,480
37,660
32,160
16,980
360
120
200
95,185
Total
Samples
Annual
Samples
6,175
12,285
12,090
25,560
49,220
41,670
21,930
8,760
4,350
16,050
1,750
1,000
200,840
2,058
4,095
4,030
8,520
16,407
13,890
7,310
2,920
1,450
5,350
583
333
66,947
H-44
Total O&M
Cost
Annual O&M
Cost
$
45,430
$
90,381
$
88,947
$ 188,046
$ 362,113
$ 306,568
$ 161,340
$
64,448
$
32,003
$ 118,080
$
12,875
$
7,357
$ 1,477,588
$
$
$
$
$
$
$
$
$
$
$
$
$
15,143
30,127
29,649
62,682
120,704
102,189
53,780
21,483
10,668
39,360
4,292
2,452
492,529
December 2015
Exhibit 6 - TAP MONITORING FOR LEAD & COPPER - MONITORING, BURDEN, AND COST SUMMARY (cont.
Summary - All Scenarios (cont.)
ALL SYSTEMS
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
Samples by Year
(Representing 9-Year Cycle)
Number of
Systems
20,775
22,032
7,082
8,937
5,088
2,296
1,049
363
177
367
40
22
68,228
2014
77,210
84,620
53,390
67,190
17,840
11,820
5,430
480
120
200
318,300
DDBP/Chem/Rads ICR - Lead and Copper Rule
2015
20,810
24,875
15,130
18,900
7,980
5,130
2,340
11,340
5,430
18,550
2,000
1,100
133,585
2016
13,400
16,990
9,990
12,420
84,300
56,790
25,950
480
120
200
220,640
2017
66,825
73,610
46,310
58,240
17,840
11,820
5,430
480
120
200
280,875
2018
20,810
24,875
15,130
18,900
7,980
5,130
2,340
11,340
5,430
18,550
2,000
1,100
133,585
2019
13,400
16,990
9,990
12,420
84,300
56,790
25,950
480
120
200
220,640
2020
66,825
73,610
46,310
58,240
17,840
11,820
5,430
480
120
200
280,875
2021
20,810
24,875
15,130
18,900
7,980
5,130
2,340
11,340
5,430
18,550
2,000
1,100
133,585
2022
13,400
16,990
9,990
12,420
84,300
56,790
25,950
480
120
200
220,640
Total
Samples
Annual
Samples
101,035
115,475
71,430
89,560
110,120
73,740
33,720
12,300
5,670
18,950
2,000
1,100
635,100
33,678
38,492
23,810
29,853
36,707
24,580
11,240
4,100
1,890
6,317
667
367
211,700
H-45
Total
Monitoring
Events
20,207
23,095
7,143
8,956
5,506
2,458
1,124
410
189
379
40
22
69,529
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Annual
Total Labor
Annual Labor
Total
Annual
Monitoring
Cost
Cost
Burden
Burden
Events
6,736
7,698
2,381
2,985
1,835
819
375
137
63
126
13
7
23,176
404,140
461,900
285,720
358,240
440,480
294,960
134,880
49,200
22,680
75,800
8,000
4,400
2,540,400
134,713
153,967
95,240
119,413
146,827
98,320
44,960
16,400
7,560
25,267
2,667
1,467
846,800
$
$
$
$
$
$
$
$
$
$
$
$
$
13,980,011
15,978,045
9,883,626
12,392,238
15,237,084
10,203,256
4,665,769
1,701,926
784,547
2,622,074
276,736
152,205
87,877,517
$ 4,660,004
$ 5,326,015
$ 3,294,542
$ 4,130,746
$ 5,079,028
$ 3,401,085
$ 1,555,256
$
567,309
$
261,516
$
874,025
$
92,245
$
50,735
$ 29,292,506
Total O&M
Cost
Annual O&M
Cost
$ 743,318
$ 849,554
$ 525,513
$ 658,896
$ 810,157
$ 542,508
$ 248,079
$
90,492
$
41,714
$ 139,416
$
14,714
$
8,093
$ 4,672,456
$
247,773
$
283,185
$
175,171
$
219,632
$
270,052
$
180,836
$
82,693
$
30,164
$
13,905
$
46,472
$
4,905
$
2,698
$ 1,557,485
December 2015
Exhibit 7 - WQP MONITORING FOR LEAD & COPPER - SYSTEM INVENTORY
Source: SDWIS/FED Data from October 2014
GROUND WATER: CWSs
Size
Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
TOTAL:
DDBP/Chem/Rads ICR - Lead and Copper Rule
SURFACE WATER: CWSs
Size
Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
TOTAL:
Total
Systems
11,212
13,403
4,320
5,566
2,724
989
355
106
44
58
5
2
38,784
Total
Systems
970
2,092
1,131
2,497
2,219
1,300
686
256
133
308
35
20
11,647
GROUND WATER: NTNCWSs
Size
Total
Category
Systems
≤100
8,279
101-500
6,254
501-1,000
1,539
1,001-3,300
786
3,301-10,000
92
10,001-25,000
4
25,001-50,000
5
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
TOTAL:
16,958
SURFACE WATER: NTNCWSs
Size
Total
Category
Systems
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
TOTAL:
GROUND WATER: ALL SYSTEMS
Size
Total
Category
Systems
≤100
19,491
101-500
19,657
501-1,000
5,859
1,001-3,300
6,352
3,301-10,000
2,816
10,001-25,000
993
25,001-50,000
360
50,001-75,000
106
75,001-100,000
44
100,001-500,000
58
500,001-1,000,000
5
> 1,000,000
2
TOTAL:
55,743
SURFACE WATER: ALL SYSTEMS
Size
Total
Category
Systems
≤100
1,284
101-500
2,375
501-1,000
1,223
1,001-3,300
2,585
3,301-10,000
2,272
10,001-25,000
1,303
25,001-50,000
689
50,001-75,000
257
75,001-100,000
133
100,001-500,000
309
500,001-1,000,000
35
> 1,000,000
20
TOTAL:
12,485
H-46
314
283
92
88
53
3
3
1
1
839
December 2015
Exhibit 8 - WQP MONITORING - LABOR RATES
State Labor Rate
$45.60
Base (Hourly)
System Labor Rates
Load Factor
$21.62
1.6
PWS Labor Rate
2013$ National Occupational Employment and Wage Estimates, United States, BLS SOC Code
51-8031, "Local Government - Water and Liquid Waste Treatment Plant and System
Operators". May 2013 data (published in April 2014).
≤100
$34.59
Inflation Factor
1.0
1 ECI New
101-500
$34.59
Total
$34.59
1 ECI Base
501-1,000
$34.59
1,001-3,300
$34.59
3,301-10,000
$34.59
Base (Hourly)
$28.50
10,001-25,000
$34.59
Load Factor
25,001-50,000
$34.59
Inflation Factor
50,001-75,000
$34.59
Total
75,001-100,000
$34.59
100,001-500,000
$34.59
500,001-1,000,000
$34.59
> 1,000,000
$34.59
1.6
State Labor Rate
2013$ National Occupational Employment and Wage Estimates, United States, BLS SOC Code
19-2041, "State Government - Environmental Scientists and Specialists, Including Health".
May 2013 data (published in April 2014). http://www.bls.gov/oes/2013/may/oes192041.htm
1.0
1 ECI New
$45.60
1 ECI Base
Sampling Cost Inflation Factor
Inflation Factor
1.40
CPI All Urban Consumers (CPI-U): U.S. City Average, by Expenditure Category
and Commodity and Service Group. All urban consumers, All items, Not
233.0 seasonally adjusted. 2013 Annual Average.
166.6 CPI-U Base Year
DDBP/Chem/Rads ICR - Lead and Copper Rule
H-47
December 2015
Exhibit 9 - WQP MONITORING - MONITORING, BURDEN, AND COST ASSUMPTIONS
GROUND WATER: CWSs
Size
Total
Category
Systems
≤100
11,212
101-500
13,403
501-1,000
4,320
1,001-3,300
5,566
3,301-10,000
2,724
10,001-25,000
989
25,001-50,000
355
50,001-75,000
106
75,001-100,000
44
100,001-500,000
58
500,001-1,000,000
5
> 1,000,000
2
TOTAL:
38,784
Avg. # of
Entry Pts.
(Samples)
1.1
1.2
1.6
1.9
2.2
3.5
3.5
9.4
9.4
12.6
12.6
12.6
Avg. # of
Representative
Entry Points
(Samples)
1.1
1.2
1.6
1.9
1.1
1.8
1.8
3.1
3.1
4.2
4.2
4.2
Average
Labor Hrs.
for Collection
(Entry Point)
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
Average
Labor Hrs.
for Collection
(Tap)
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
Average
Labor Hrs.
for Analysis
(Entry Point)
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
Avg. # of
Entry Pts.
(Samples)
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
Avg. # of
Representative
Entry Points
(Samples)
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
Average
Labor Hrs.
for Collection
(Entry Point)
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
Average
Labor Hrs.
for Collection
(Tap)
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
Average
Labor Hrs.
for Analysis
(Entry Point)
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
Avg. # of
Entry Pts.
(Samples)
varies
varies
varies
varies
varies
varies
varies
varies
varies
varies
varies
varies
Avg. # of
Representative
Entry Points
(Samples)
varies
varies
varies
varies
varies
varies
varies
varies
varies
varies
varies
varies
Average
Labor Hrs.
for Collection
(Entry Point)
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
Average
Labor Hrs.
for Collection
(Tap)
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
Average
Labor Hrs.
for Analysis
(Entry Point)
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
Average
Labor Hrs.
for Analysis
(Tap)
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
Labor Rate
For
Collection
& Analysis
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
Average
Material Cost
Per Sample
(Entry Point)
Average
Material Cost
Per Sample
(Tap)
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
34.96
34.96
34.96
34.96
34.96
34.96
34.96
34.96
34.96
34.96
34.96
34.96
55.93
55.93
55.93
55.93
55.93
55.93
55.93
55.93
55.93
55.93
55.93
55.93
Total Average
Labor Cost Per
Mon. Event
(Entry Point)
$
33.97
37.99
$
49.25
$
$
57.77
34.14
$
$
55.02
$
55.02
$
97.72
97.72
$
$
130.33
$
130.33
$
130.33
Total Average
Labor Cost Per
Mon. Event
(Tap)
$
86.48
86.48
$
$
86.48
$
86.48
$
86.48
$
86.48
$
86.48
$
86.48
$
86.48
$
86.48
86.48
$
$
86.48
Total Average
O&M Cost Per
Mon. Event
(Entry Point)
$
38.14
42.66
$
$
55.30
$
64.86
$
38.34
$
61.78
$
61.78
$
109.72
$
109.72
$
146.34
$
146.34
$
146.34
Total Average
O&M Cost Per
Mon. Event
(Tap)
$
55.93
55.93
$
$
55.93
$
55.93
$
55.93
$
55.93
$
55.93
$
55.93
$
55.93
$
55.93
$
55.93
$
55.93
Total Average
Labor Cost Per
Mon. Event
(Entry Point)
$
31.13
$
31.13
31.13
$
$
31.13
31.13
$
$
31.13
$
31.13
$
31.13
$
31.13
31.13
$
$
31.13
31.13
$
Total Average
Labor Cost Per
Mon. Event
(Tap)
$
86.48
$
86.48
$
86.48
$
86.48
$
86.48
$
86.48
$
86.48
$
86.48
$
86.48
$
86.48
$
86.48
$
86.48
Total Average
O&M Cost Per
Mon. Event
(Entry Point)
$
34.96
$
34.96
$
34.96
$
34.96
$
34.96
$
34.96
$
34.96
$
34.96
$
34.96
$
34.96
$
34.96
$
34.96
Total Average
O&M Cost Per
Mon. Event
(Tap)
$
55.93
$
55.93
$
55.93
$
55.93
$
55.93
$
55.93
$
55.93
$
55.93
$
55.93
$
55.93
$
55.93
$
55.93
Total Average
Labor Cost Per
Mon. Event
(Entry Point)
31.13
$
$
31.13
$
31.13
31.13
$
$
31.13
31.13
$
$
31.13
$
31.13
31.13
$
$
31.13
$
31.13
31.13
$
Total Average
Labor Cost Per
Mon. Event
(Tap)
$
86.48
$
86.48
$
86.48
$
86.48
$
86.48
$
86.48
$
86.48
$
86.48
$
86.48
$
86.48
$
86.48
$
86.48
Total Average
O&M Cost Per
Mon. Event
(Entry Point)
$
34.96
$
34.96
$
34.96
$
34.96
$
34.96
$
34.96
$
34.96
$
34.96
$
34.96
$
34.96
$
34.96
$
34.96
Total Average
O&M Cost Per
Mon. Event
(Tap)
$
55.93
$
55.93
$
55.93
$
55.93
$
55.93
$
55.93
$
55.93
$
55.93
$
55.93
$
55.93
$
55.93
$
55.93
GROUND WATER: NTNCWSs
Size
Total
Category
Systems
≤100
8,279
101-500
6,254
501-1,000
1,539
1,001-3,300
786
3,301-10,000
92
10,001-25,000
4
25,001-50,000
5
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
TOTAL:
16,958
Average
Labor Hrs.
for Analysis
(Tap)
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
Labor Rate
For
Collection
& Analysis
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
Average
Material Cost
Per Sample
(Entry Point)
Average
Material Cost
Per Sample
(Tap)
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
34.96
34.96
34.96
34.96
34.96
34.96
34.96
34.96
34.96
34.96
34.96
34.96
55.93
55.93
55.93
55.93
55.93
55.93
55.93
55.93
55.93
55.93
55.93
55.93
GROUND WATER: ALL SYSTEMS
Size
Total
Category
Systems
≤100
19,491
101-500
19,657
501-1,000
5,859
1,001-3,300
6,352
3,301-10,000
2,816
10,001-25,000
993
25,001-50,000
360
50,001-75,000
106
75,001-100,000
44
100,001-500,000
58
500,001-1,000,000
5
> 1,000,000
2
TOTAL:
55,743
DDBP/Chem/Rads ICR - Lead and Copper Rule
Average
Labor Hrs.
for Analysis
(Tap)
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
H-48
Labor Rate
For
Collection
& Analysis
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
Average
Material Cost
Per Sample
(Entry Point)
Average
Material Cost
Per Sample
(Tap)
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
34.96
34.96
34.96
34.96
34.96
34.96
34.96
34.96
34.96
34.96
34.96
34.96
55.93
55.93
55.93
55.93
55.93
55.93
55.93
55.93
55.93
55.93
55.93
55.93
December 2015
Exhibit 9 - WQP MONITORING - MONITORING, BURDEN, AND COST ASSUMPTIONS (cont.)
SURFACE WATER: CWSs
Size
Total
Category
Systems
≤100
970
101-500
2,092
501-1,000
1,131
1,001-3,300
2,497
3,301-10,000
2,219
10,001-25,000
1,300
25,001-50,000
686
50,001-75,000
256
75,001-100,000
133
100,001-500,000
308
500,001-1,000,000
35
> 1,000,000
20
TOTAL:
11,647
Avg. # of
Entry Pts.
(Samples)
1.1
1.1
1.3
1.3
1.3
1.6
1.6
2.0
2.0
3.3
3.3
3.3
Avg. # of
Representative
Entry Points
(Samples)
1.1
1.1
1.3
1.3
1.3
1.6
1.6
2.0
2.0
3.3
3.3
3.3
Average
Labor Hrs.
for Collection
(Entry Point)
-
Average
Labor Hrs.
for Collection
(Tap)
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
Average
Labor Hrs.
for Analysis
(Entry Point)
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
Avg. # of
Entry Pts.
(Samples)
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
Avg. # of
Representative
Entry Points
(Samples)
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
Average
Labor Hrs.
for Collection
(Entry Point)
-
Average
Labor Hrs.
for Collection
(Tap)
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
Average
Labor Hrs.
for Analysis
(Entry Point)
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
Avg. # of
Entry Pts
(Samples)
varies
varies
varies
varies
varies
varies
varies
varies
varies
varies
varies
varies
Avg. # of
Representative
Entry Points
(Samples)
varies
varies
varies
varies
varies
varies
varies
varies
varies
varies
varies
varies
Average
Labor Hrs.
for Collection
(Entry Point)
-
Average
Labor Hrs.
for Collection
(Tap)
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
Average
Labor Hrs.
for Analysis
(Entry Point)
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
Average
Labor Hrs.
for Analysis
(Tap)
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
Labor Rate
For
Collection
& Analysis
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
Average
Material Cost
Per Sample
(Entry Point)
Average
Material Cost
Per Sample
(Tap)
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
34.96
34.96
34.96
34.96
34.96
34.96
34.96
34.96
34.96
34.96
34.96
34.96
55.93
55.93
55.93
55.93
55.93
55.93
55.93
55.93
55.93
55.93
55.93
55.93
Total Average
Labor Cost Per
Mon. Event
(Entry Point)
18.59
$
19.40
$
22.84
$
22.15
$
21.80
$
27.27
$
$
27.27
34.28
$
34.28
$
57.06
$
57.06
$
57.06
$
Total Average
Labor Cost Per
Mon. Event
(Tap)
86.48
$
86.48
$
$
86.48
86.48
$
$
86.48
86.48
$
$
86.48
86.48
$
$
86.48
86.48
$
$
86.48
86.48
$
Total Average
O&M Cost Per
Mon. Event
(Entry Point)
37.57
$
39.22
$
$
46.16
44.77
$
$
44.07
55.12
$
$
55.12
69.28
$
$
69.28
115.32
$
$
115.32
115.32
$
Total Average
O&M Cost Per
Mon. Event
(Tap)
55.93
$
55.93
$
$
55.93
55.93
$
$
55.93
55.93
$
$
55.93
55.93
$
$
55.93
55.93
$
$
55.93
55.93
$
Total Average
Labor Cost Per
Mon. Event
(Entry Point)
$
17.30
17.30
$
17.30
$
17.30
$
17.30
$
17.30
$
17.30
$
$
17.30
17.30
$
17.30
$
17.30
$
17.30
$
Total Average
Labor Cost Per
Mon. Event
(Tap)
$
86.48
86.48
$
$
86.48
86.48
$
$
86.48
86.48
$
86.48
$
$
86.48
86.48
$
$
86.48
86.48
$
$
86.48
Total Average
O&M Cost Per
Mon. Event
(Entry Point)
$
34.96
34.96
$
$
34.96
34.96
$
$
34.96
34.96
$
34.96
$
$
34.96
34.96
$
$
34.96
34.96
$
$
34.96
Total Average
O&M Cost Per
Mon. Event
(Tap)
$
55.93
55.93
$
$
55.93
55.93
$
$
55.93
55.93
$
55.93
$
$
55.93
55.93
$
$
55.93
55.93
$
$
55.93
Total Average
Labor Cost Per
Mon. Event
(Entry Point)
17.30
$
$
17.30
17.30
$
17.30
$
17.30
$
17.30
$
17.30
$
17.30
$
17.30
$
$
17.30
17.30
$
17.30
$
Total Average
Labor Cost Per
Mon. Event
(Tap)
86.48
$
$
86.48
86.48
$
$
86.48
86.48
$
$
86.48
86.48
$
86.48
$
$
86.48
$
86.48
86.48
$
$
86.48
Total Average
O&M Cost Per
Mon. Event
(Entry Point)
34.96
$
$
34.96
34.96
$
$
34.96
34.96
$
$
34.96
34.96
$
34.96
$
$
34.96
$
34.96
34.96
$
$
34.96
Total Average
O&M Cost Per
Mon. Event
(Tap)
55.93
$
$
55.93
55.93
$
$
55.93
55.93
$
$
55.93
55.93
$
55.93
$
$
55.93
$
55.93
55.93
$
$
55.93
SURFACE WATER: NTNCWSs
Size
Total
Category
Systems
≤100
314
101-500
283
501-1,000
92
1,001-3,300
88
3,301-10,000
53
10,001-25,000
3
25,001-50,000
3
50,001-75,000
1
75,001-100,000
100,001-500,000
1
500,001-1,000,000
> 1,000,000
TOTAL:
839
Average
Labor Hrs.
for Analysis
(Tap)
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
Labor Rate
For
Collection
& Analysis
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
Average
Material Cost
Per Sample
(Entry Point)
Average
Material Cost
Per Sample
(Tap)
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
34.96
34.96
34.96
34.96
34.96
34.96
34.96
34.96
34.96
34.96
34.96
34.96
55.93
55.93
55.93
55.93
55.93
55.93
55.93
55.93
55.93
55.93
55.93
55.93
SURFACE WATER: ALL SYSTEMS
Size
Total
Category
Systems
≤100
1,284
101-500
2,375
501-1,000
1,223
1,001-3,300
2,585
3,301-10,000
2,272
10,001-25,000
1,303
25,001-50,000
689
50,001-75,000
257
75,001-100,000
133
100,001-500,000
309
500,001-1,000,000
35
> 1,000,000
20
TOTAL:
12,485
Notes:
Average
Labor Hrs.
for Analysis
(Tap)
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
Labor Rate
For
Collection
& Analysis
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
Average
Material Cost
Per Sample
(Entry Point)
Average
Material Cost
Per Sample
(Tap)
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
34.96
34.96
34.96
34.96
34.96
34.96
34.96
34.96
34.96
34.96
34.96
34.96
55.93
55.93
55.93
55.93
55.93
55.93
55.93
55.93
55.93
55.93
55.93
55.93
Samples at representative entry points account for the allowance for medium and large systems to collect from representative entry points. EPA estimates that large ground water systems will reduce their number of samples by two-thirds and
medium systems by one-half.
No WQP entry point collection burden is assumed for 20% of ground water and all surface water systems - samples assumed to be collected with other samples.
Material Costs updated from the 1999 ICR using the CPI-U index for 2010
Burden estimates take into account the results of the May 2015 consultation with water industry representatives.
DDBP/Chem/Rads ICR - Lead and Copper Rule
H-49
December 2015
Exhibit 10 - WQP MONITORING - MONITORING SCENARIO ALLOCATION
GROUND WATER: CWSs
Percent of Systems Under Each Monitoring Scenario
2
3a
3a
3aAR
3aAR
Actual
Accel. Reduced Accel. Reduced
Number
Monitor Only Monitor Only Don't Exceed
Don't Exceed
Exceed After
Exceed After
Exceed After
Exceed After
of B3
-- only b3s -- -- only b3s -- After Treatment After Treatment Treatment, Study Treatment, Study Treatment, Study Treatment, Study
Systems (ENTRY POINT)
(TAP)
(ENTRY POINT)
(TAP)
(Entry Point)
(Tap)
(Entry Point)
(Tap)
0.29%
0.29%
0.28%
0.28%
0.21%
0.21%
0.20%
0.20%
0.19%
0.19%
0.16%
0.16%
0.17%
0.17%
0.28%
0.28%
22
10
0.14%
0.14%
22
0.16%
0.16%
0.42%
0.42%
1
0.00%
0.00%
1
Size
Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1 Million
> 1 Million
TOTAL:
Total
Systems
11,212
13,403
4,320
5,566
2,724
989
355
106
44
58
5
2
38,784
1
2
3b
3b
Exceed After Exceed After
Treatment,
Treatment,
No Study
No Study
(Entry Point)
(Tap)
0.87%
0.87%
0.85%
0.85%
0.63%
0.63%
0.60%
0.60%
0.56%
0.56%
0.49%
0.49%
0.50%
0.50%
0.83%
0.83%
0.42%
0.42%
0.48%
0.48%
1.25%
1.25%
0.00%
0.00%
GROUND WATER: NTNCWSs
Percent of Systems Under Each Monitoring Scenario
2
3a
3a
3aAR
3aAR
Accel. Reduced Accel. Reduced
Actual
Number
Monitor Only Monitor Only Don't Exceed
Don't Exceed
Exceed After
Exceed After
Exceed After
Exceed After
of B3
-- only b3s -- -- only b3s -- After Treatment After Treatment Treatment, Study Treatment, Study Treatment, Study Treatment, Study
Systems (ENTRY POINT)
(TAP)
(ENTRY POINT)
(TAP)
(Entry Point)
(Tap)
(Entry Point)
(Tap)
0.47%
0.47%
0.47%
0.47%
0.38%
0.38%
0.54%
0.54%
0.34%
0.34%
3.57%
3.57%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
1
Size
Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1 Million
> 1 Million
TOTAL:
Total
Systems
8,279
6,254
1,539
786
92
4
5
16,958
1
2
3b
3b
Exceed After Exceed After
Treatment,
Treatment,
No Study
No Study
(Entry Point)
(Tap)
1.40%
1.40%
1.40%
1.40%
1.15%
1.15%
1.63%
1.63%
1.03%
1.03%
10.71%
10.71%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
-
SURFACE WATER: CWSs
Percent of Systems Under Each Monitoring Scenario
2
3a
3a
3aAR
3aAR
3b
3b
Actual
Accel. Reduced Accel. Reduced Exceed After Exceed After
Number
Monitor Only Monitor Only Don't Exceed
Don't Exceed
Exceed After
Exceed After
Exceed After
Exceed After
Treatment,
Treatment,
No Study
No Study
of B3
-- only b3s -- -- only b3s -- After Treatment After Treatment Treatment, Study Treatment, Study Treatment, Study Treatment, Study
Systems (ENTRY POINT)
(TAP)
(ENTRY POINT)
(TAP)
(Entry Point)
(Tap)
(Entry Point)
(Tap)
(Entry Point)
(Tap)
0.29%
0.29%
0.00%
0.00%
0.87%
0.87%
0.28%
0.28%
0.00%
0.00%
0.85%
0.85%
0.21%
0.21%
0.00%
0.00%
0.63%
0.63%
0.20%
0.20%
0.00%
0.00%
0.60%
0.60%
0.19%
0.19%
0.00%
0.00%
0.56%
0.56%
0.16%
0.16%
0.00%
0.00%
0.49%
0.49%
0.17%
0.17%
0.00%
0.00%
0.50%
0.50%
38
0.28%
0.28%
0.00%
0.00%
0.83%
0.01
0.14%
0.14%
0.00%
0.00%
0.42%
0.00
16
57
0.16%
0.16%
0.00%
0.00%
0.48%
0.00
3
0.42%
0.42%
0.00%
0.00%
1.25%
0.01
0.00%
0.00%
0.00%
0.00%
0.00%
2
1
Size
Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1 Million
> 1 Million
TOTAL:
Total
Systems
970
2,092
1,131
2,497
2,219
1,300
686
256
133
308
35
20
11,647
1
2
SURFACE WATER: NTNCWSs
Percent of Systems Under Each Monitoring Scenario
2
3a
3a
3aAR
3aAR
3b
3b
Actual
Accel. Reduced Accel. Reduced Exceed After Exceed After
Number
Monitor Only Monitor Only Don't Exceed
Don't Exceed
Exceed After
Exceed After
Exceed After
Exceed After
Treatment,
Treatment,
No Study
No Study
of B3
-- only b3s -- -- only b3s -- After Treatment After Treatment Treatment, Study Treatment, Study Treatment, Study Treatment, Study
Systems (ENTRY POINT)
(TAP)
(ENTRY POINT)
(TAP)
(Entry Point)
(Tap)
(Entry Point)
(Tap)
(Entry Point)
(Tap)
0.47%
0.47%
0.00%
0.00%
1.40%
1.40%
0.47%
0.47%
0.00%
1.40%
1.40%
0.38%
0.38%
0.00%
1.15%
1.15%
0.54%
0.54%
0.00%
1.63%
1.63%
0.34%
0.34%
0.00%
1.03%
1.03%
3.57%
3.57%
0.00%
10.71%
10.71%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
1
Size
Total
Category
Systems
≤100
314
101-500
283
501-1,000
92
1,001-3,300
88
3,301-10,000
53
10,001-25,000
3
25,001-50,000
3
50,001-75,000
1
75,001-100,000
100,001-500,000
1
500,001-1,000,000
> 1,000,000
TOTAL:
839
Notes:
DDBP/Chem/Rads ICR - Lead and Copper Rule
1
2
For scenarios in which the system no longer exceeded an action level after treatment (i.e., 1 and 2), it was assumed that by 1999 these systems would no longer be conducting WQP monitoring.
H-50
December 2015
Exhibit 11 - WQP MONITORING: NUMBER OF MONITORING EVENTS PER SYSTEM, PER YEAR
Exhibit 11 - WQP MONITORING: NUMBER OF MONITORING EVENTS PER SYSTEM, PER YEAR
SCENARIO 3a: Exceed After Treatment>>Study Required (Entry Point)
SCENARIO 3a: Exceed After Treatment>>Study Required (Entry Point)
Ground Water Systems
Ground Water Systems
Years
(Representing 9-Year Cycle)
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
2014
26
26
26
26
26
26
26
26
26
26
26
26
2015
26
26
26
26
26
26
26
26
26
26
26
26
2016
26
26
26
26
26
26
26
26
26
26
26
26
2017
26
26
26
26
26
26
26
26
26
26
26
26
2018
26
26
26
26
26
26
26
26
26
26
26
26
2019
26
26
26
26
26
26
26
26
26
26
26
26
Years
(Representing 9-Year Cycle)
2020
26
26
26
26
26
26
26
26
26
26
26
26
2021
26
26
26
26
26
26
26
26
26
26
26
26
2022
26
26
26
26
26
26
26
26
26
26
26
26
Total
234
234
234
234
234
234
234
234
234
234
234
234
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
2014
28
32
41
48
29
46
46
82
82
109
109
109
2015
28
32
41
48
29
46
46
82
82
109
109
109
2016
28
32
41
48
29
46
46
82
82
109
109
109
Surface Water Systems
2014
26
26
26
26
26
26
26
26
26
26
26
26
2015
26
26
26
26
26
26
26
26
26
26
26
26
2016
26
26
26
26
26
26
26
26
26
26
26
26
2017
26
26
26
26
26
26
26
26
26
26
26
26
2018
26
26
26
26
26
26
26
26
26
26
26
26
2019
26
26
26
26
26
26
26
26
26
26
26
26
2020
26
26
26
26
26
26
26
26
26
26
26
26
2021
26
26
26
26
26
26
26
26
26
26
26
26
2022
26
26
26
26
26
26
26
26
26
26
26
26
Total
234
234
234
234
234
234
234
234
234
234
234
234
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
2014
28
29
34
33
33
41
41
52
52
86
86
86
2015
28
29
34
33
33
41
41
52
52
86
86
86
2016
28
29
34
33
33
41
41
52
52
86
86
86
2017
28
29
34
33
33
41
41
52
52
86
86
86
6
14
14
-
2016
2017
2018
2
2
4
4
-
2019
2
2
4
4
6
14
14
14
14
20
20
20
-
14
14
20
20
20
2020
-
2021
2022
2
2
4
4
6
14
14
-
14
14
20
20
20
Total
6
6
12
12
18
42
42
42
42
60
60
60
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Exhibit 11 - WQP MONITORING: NUMBER OF MONITORING EVENTS PER SYSTEM, PER YEAR (cont.)
2014
6
14
14
-
2015
2
2
4
4
-
2016
14
14
20
20
20
2016
26
26
26
26
26
2017
26
26
26
26
26
2015
26
26
26
26
26
2016
26
26
26
26
26
2017
26
26
26
26
26
2018
26
26
26
26
26
2019
26
26
26
26
26
2020
26
26
26
26
26
2021
26
26
26
26
26
2022
26
26
26
26
26
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
234
234
234
234
234
2014
82
82
109
109
109
2015
82
82
109
109
109
2016
82
82
109
109
109
2018
26
26
26
26
26
2019
26
26
26
26
26
2020
26
26
26
26
26
2021
26
26
26
26
26
2022
26
26
26
26
26
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
234
234
234
234
234
2014
52
52
86
86
86
2015
52
52
86
86
86
2016
52
52
86
86
86
DDBP/Chem/Rads ICR - Lead and Copper Rule
2016
-
2017
14
14
20
20
20
2018
-
Total
251.5
262.5
309.0
299.7
295.0
368.9
368.9
463.7
463.7
771.9
771.9
771.9
2017
6
14
14
-
2018
2
2
4
4
-
2019
14
14
20
20
20
2020
-
2021
2022
14
14
20
20
20
Total
6
14
14
-
2
2
4
4
-
6
6
12
12
18
42
42
42
42
60
60
60
2017
82
82
109
109
109
2018
82
82
109
109
109
2019
82
82
109
109
109
2020
82
82
109
109
109
2021
82
82
109
109
109
2022
82
82
109
109
109
Total
2020
52
52
86
86
86
2021
52
52
86
86
86
2022
52
52
86
86
86
Total
734.5
734.5
979.6
979.6
979.6
2017
52
52
86
86
86
2018
52
52
86
86
86
2019
52
52
86
86
86
463.7
463.7
771.9
771.9
771.9
SCENARIO 3aAR: Accelerated Reduced Monitoring>>Exceed After Treatment>>Study Required (Tap)
All Systems
Years
(Representing 9-Year Cycle)
Years
(Representing 9-Year Cycle)
2015
-
2022
28
29
34
33
33
41
41
52
52
86
86
86
Surface Water Systems
All Systems
2014
14
14
20
20
20
2021
28
29
34
33
33
41
41
52
52
86
86
86
Years
(Representing 9-Year Cycle)
SCENARIO 3aAR: Accelerated Reduced Monitoring>>Exceed After Treatment>>Study Required (Tap)
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
2020
28
29
34
33
33
41
41
52
52
86
86
86
Ground Water Systems
Years
(Representing 9-Year Cycle)
2014
26
26
26
26
26
2019
28
29
34
33
33
41
41
52
52
86
86
86
Years
(Representing 9-Year Cycle)
Surface Water Systems
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
2018
28
29
34
33
33
41
41
52
52
86
86
86
Exhibit 11 - WQP MONITORING: NUMBER OF MONITORING EVENTS PER SYSTEM, PER YEAR (cont.)
Years
(Representing 9-Year Cycle)
2015
26
26
26
26
26
Total
255.3
285.5
370.2
434.2
256.6
413.5
413.5
734.5
734.5
979.6
979.6
979.6
SCENARIO 3aAR: Accelerated Reduced Monitoring>>Exceed After Treatment>>Study Required (Entry Point)
Ground Water Systems
2014
26
26
26
26
26
2022
28
32
41
48
29
46
46
82
82
109
109
109
Years
(Representing 9-Year Cycle)
SCENARIO 3aAR: Accelerated Reduced Monitoring>>Exceed After Treatment>>Study Required (Entry Point)
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
2021
28
32
41
48
29
46
46
82
82
109
109
109
All Systems
Years
(Representing 9-Year Cycle)
2015
2020
28
32
41
48
29
46
46
82
82
109
109
109
SCENARIO 3a: Exceed After Treatment>>Study Required (Tap)
All Systems
2014
-
2019
28
32
41
48
29
46
46
82
82
109
109
109
Surface Water Systems
SCENARIO 3a: Exceed After Treatment>>Study Required (Tap)
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
2018
28
32
41
48
29
46
46
82
82
109
109
109
Years
(Representing 9-Year Cycle)
Years
(Representing 9-Year Cycle)
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
2017
28
32
41
48
29
46
46
82
82
109
109
109
2019
-
2020
14
14
20
20
20
2021
-
2022
-
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
42
42
60
60
60
H-51
2014
14
14
20
20
20
2015
-
2016
-
2017
14
14
20
20
20
2018
-
2019
-
2020
14
14
20
20
20
2021
-
2022
-
Total
42
42
60
60
60
December 2015
Exhibit 11 - WQP MONITORING: NUMBER OF MONITORING EVENTS PER SYSTEM, PER YEAR (cont.)
Exhibit 11 - WQP MONITORING: NUMBER OF MONITORING EVENTS PER SYSTEM, PER YEAR (cont.)
SCENARIO 3b: Exceed After Treatment>>No Study Required (Entry Point)
SCENARIO 3b: Exceed After Treatment>>No Study Required (Entry Point)
Ground Water Systems
Ground Water Systems
Years
(Representing 9-Year Cycle)
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
2014
26
26
26
26
26
26
26
-
2015
26
26
26
26
26
26
26
-
2016
26
26
26
26
26
26
26
-
2017
26
26
26
26
26
26
26
-
2018
26
26
26
26
26
26
26
-
2019
26
26
26
26
26
26
26
-
Years
(Representing 9-Year Cycle)
2020
26
26
26
26
26
26
26
-
2021
26
26
26
26
26
26
26
-
2022
26
26
26
26
26
26
26
-
Total
234
234
234
234
234
234
234
-
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
2014
28
32
41
48
29
46
46
-
2015
28
32
41
48
29
46
46
-
2016
28
32
41
48
29
46
46
-
Surface Water Systems
2014
26
26
26
26
26
26
26
-
2015
26
26
26
26
26
26
26
-
2016
26
26
26
26
26
26
26
-
2017
26
26
26
26
26
26
26
-
2018
26
26
26
26
26
26
26
-
2019
26
26
26
26
26
26
26
-
2020
26
26
26
26
26
26
26
-
2021
26
26
26
26
26
26
26
-
2022
26
26
26
26
26
26
26
-
Total
234
234
234
234
234
234
234
-
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
2014
28
29
34
33
33
41
41
-
2015
28
29
34
33
33
41
41
-
2016
28
29
34
33
33
41
41
-
2017
28
29
34
33
33
41
41
-
DDBP/Chem/Rads ICR - Lead and Copper Rule
-
2015
-
2016
6
14
14
-
2017
2
2
4
4
-
2018
-
2021
28
32
41
48
29
46
46
-
2022
28
32
41
48
29
46
46
-
Total
255.3
285.5
370.2
434.2
256.6
413.5
413.5
-
2018
28
29
34
33
33
41
41
-
2019
28
29
34
33
33
41
41
-
2020
28
29
34
33
33
41
41
-
2021
28
29
34
33
33
41
41
-
2022
28
29
34
33
33
41
41
-
Total
251.5
262.5
309.0
299.7
295.0
368.9
368.9
-
2020
2021
-
2022
-
Total
All Systems
Years
(Representing 9-Year Cycle)
2
2
4
4
2020
28
32
41
48
29
46
46
-
SCENARIO 3b: Exceed After Treatment>>No Study Required (Tap)
All Systems
2014
2019
28
32
41
48
29
46
46
-
Surface Water Systems
SCENARIO 3b: Exceed After Treatment>>No Study Required (Tap)
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
2018
28
32
41
48
29
46
46
-
Years
(Representing 9-Year Cycle)
Years
(Representing 9-Year Cycle)
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
2017
28
32
41
48
29
46
46
-
2019
6
14
14
-
Years
(Representing 9-Year Cycle)
2020
2
2
4
4
-
2021
-
2022
6
14
14
-
Total
6
6
12
12
18
42
42
-
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
H-52
2014
2
2
4
4
-
2015
-
2016
6
14
14
-
2017
2
2
4
4
-
2018
-
2019
6
14
14
-
2
2
4
4
-
6
6
12
12
18
42
42
6
14
14
-
-
December 2015
Exhibit 12 - WQP MONITORING - MONITORING, BURDEN, AND COST SUMMARY
SCENARIO 3a: Exceed After Treatment>>Study Required (Entry Point)
GROUND WATER: CWSs
Number
of
Size Category Systems
≤100
33
101-500
38
501-1,000
9
1,001-3,300
11
3,301-10,000
5
10,001-25,000
2
25,001-50,000
1
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
99
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
2014
936
1,206
370
531
143
92
46
3,323
2015
936
1,206
370
531
143
92
46
3,323
2016
936
1,206
370
531
143
92
46
3,323
2017
936
1,206
370
531
143
92
46
3,323
2018
936
1,206
370
531
143
92
46
3,323
2019
936
1,206
370
531
143
92
46
3,323
2020
936
1,206
370
531
143
92
46
3,323
2021
936
1,206
370
531
143
92
46
3,323
2022
936
1,206
370
531
143
92
46
3,323
Total
Samples
2,808
3,617
1,111
1,592
428
276
138
9,969
Annual
Samples
936
1,206
370
531
143
92
46
3,323
Annual
Total
Monitoring Monitoring
Events
Events
2,574
858
2,964
988
702
234
858
286
390
130
156
52
78
26
7,722
2,574
Total
Burden
2,527
3,255
1,000
1,433
385
248
124
8,972
Annual
Burden
842
1,085
333
478
128
83
41
2,991
Total Labor Annual Labor
Cost
Cost
87,428 $
29,143
112,598 $
37,533
34,576 $
11,525
49,564 $
16,521
13,315 $
4,438
8,583 $
2,861
4,291 $
1,430
$
$
$
$
$
310,356 $
103,452
$
$
$
$
$
$
$
$
$
$
$
$
$
Total O&M
Cost
98,169
126,431
38,824
55,654
14,951
9,637
4,819
348,484
Annual O&M
Cost
$
32,723
$
42,144
$
12,941
$
18,551
$
4,984
$
3,212
$
1,606
$
$
$
$
$
$
116,161
$
$
$
$
$
$
$
$
$
$
$
$
$
Total O&M
Cost
106,341
79,074
16,360
10,907
212,682
Annual O&M
Cost
$
35,447
$
26,358
$
5,453
$
3,636
$
$
$
$
$
$
$
$
$
70,894
Total O&M
Cost
204,510
205,505
55,184
66,560
14,951
9,637
4,819
561,165
Annual O&M
Cost
$
68,170
$
68,502
$
18,395
$
22,187
$
4,984
$
3,212
$
1,606
$
$
$
$
$
$
187,055
$
$
$
$
$
$
$
$
$
$
$
$
$
Total O&M
Cost
8,792
18,354
7,201
17,462
13,750
8,598
4,299
5,404
83,860
Annual O&M
Cost
$
2,931
$
6,118
$
2,400
$
5,821
$
4,583
$
2,866
$
1,433
$
1,801
$
$
$
$
$
27,953
$
$
$
$
$
$
$
$
$
$
$
$
$
Total O&M
Cost
2,727
2,727
5,453
Annual O&M
Cost
$
909
$
909
$
$
$
$
$
$
$
$
$
$
$
1,818
Total O&M
Cost
11,518
21,081
7,201
17,462
13,750
8,598
4,299
5,404
89,313
Annual O&M
Cost
$
3,839
$
7,027
$
2,400
$
5,821
$
4,583
$
2,866
$
1,433
$
1,801
$
$
$
$
$
29,771
$
$
$
$
$
$
$
$
$
$
$
$
$
GROUND WATER: NTNCWSs
Number
of
Size Category Systems
≤100
39
101-500
29
501-1,000
6
1,001-3,300
4
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
78
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
2014
1,014
754
156
104
2,028
2015
1,014
754
156
104
2,028
2016
1,014
754
156
104
2,028
2017
1,014
754
156
104
2,028
2018
1,014
754
156
104
2,028
2019
1,014
754
156
104
2,028
2020
1,014
754
156
104
2,028
2021
1,014
754
156
104
2,028
2022
1,014
754
156
104
2,028
Total
Samples
3,042
2,262
468
312
6,084
Annual
Samples
1,014
754
156
104
2,028
Annual
Total
Monitoring Monitoring
Events
Events
3,042
1,014
2,262
754
468
156
312
104
6,084
2,028
Total
Burden
2,738
2,036
421
281
5,476
Annual
Burden
913
679
140
94
1,825
Total Labor Annual Labor
Cost
Cost
94,706 $
31,569
70,422 $
23,474
14,570 $
4,857
9,713 $
3,238
$
$
$
$
$
$
$
$
189,412 $
63,137
$
$
$
$
$
$
$
$
$
$
$
$
$
GROUND WATER: ALL SYSTEMS
Number
of
Size Category Systems
≤100
72
101-500
67
501-1,000
15
1,001-3,300
15
3,301-10,000
5
10,001-25,000
2
25,001-50,000
1
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
177
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
2014
1,950
1,960
526
635
143
92
46
5,351
2015
1,950
1,960
526
635
143
92
46
5,351
2016
1,950
1,960
526
635
143
92
46
5,351
2017
1,950
1,960
526
635
143
92
46
5,351
2018
1,950
1,960
526
635
143
92
46
5,351
2019
1,950
1,960
526
635
143
92
46
5,351
2020
1,950
1,960
526
635
143
92
46
5,351
2021
1,950
1,960
526
635
143
92
46
5,351
2022
1,950
1,960
526
635
143
92
46
5,351
Total
Samples
5,850
5,879
1,579
1,904
428
276
138
16,053
Annual
Samples
1,950
1,960
526
635
143
92
46
5,351
Total
Annual
Monitoring Monitoring
Events
Events
5,616
1,872
5,226
1,742
1,170
390
1,170
390
390
130
156
52
78
26
13,806
4,602
Total
Burden
5,265
5,291
1,421
1,714
385
248
124
14,447
Annual
Burden
1,755
1,764
474
571
128
83
41
4,816
Total Labor Annual Labor
Cost
Cost
182,134 $
60,711
183,021 $
61,007
49,146 $
16,382
59,278 $
19,759
13,315 $
4,438
8,583 $
2,861
4,291 $
1,430
$
$
$
$
$
499,768 $
166,589
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Exhibit 12 - WQP MONITORING - MONITORING, BURDEN, AND COST SUMMARY (cont.)
Scenario 3a: Exceed After Treatment>>Study Required (Entry Point) (cont.)
SURFACE WATER: CWSs
Number
of
Size Category Systems
≤100
3
101-500
6
501-1,000
2
1,001-3,300
5
3,301-10,000
4
10,001-25,000
2
25,001-50,000
1
50,001-75,000
1
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
24
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
2014
84
175
69
167
131
82
41
52
800
2015
84
175
69
167
131
82
41
52
800
2016
84
175
69
167
131
82
41
52
800
2017
84
175
69
167
131
82
41
52
800
2018
84
175
69
167
131
82
41
52
800
2019
84
175
69
167
131
82
41
52
800
2020
84
175
69
167
131
82
41
52
800
2021
84
175
69
167
131
82
41
52
800
2022
84
175
69
167
131
82
41
52
800
Total
Samples
251
525
206
500
393
246
123
155
2,399
Annual
Samples
84
175
69
167
131
82
41
52
800
Annual
Total
Monitoring Monitoring
Events
Events
234
78
468
156
156
52
390
130
312
104
156
52
78
26
78
26
1,872
624
Total
Burden
126
263
103
250
197
123
61
77
1,199
Annual
Burden
42
88
34
83
66
41
20
26
400
Total Labor Annual Labor
Cost
Cost
4,350 $
1,450
9,081 $
3,027
3,563 $
1,188
8,639 $
2,880
6,803 $
2,268
4,254 $
1,418
2,127 $
709
2,674 $
891
$
$
$
$
41,492 $
13,831
$
$
$
$
$
$
$
$
$
$
$
$
$
SURFACE WATER: NTNCWSs
Number
of
Size Category Systems
≤100
1
101-500
1
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
2
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
2014
26
26
52
2015
26
26
52
2016
26
26
52
2017
26
26
52
2018
26
26
52
2019
26
26
52
2020
26
26
52
2021
26
26
52
2022
26
26
52
Total
Samples
78
78
156
Annual
Samples
26
26
52
Total
Annual
Monitoring Monitoring
Events
Events
78
26
78
26
156
52
Total
Burden
39
39
78
Annual
Burden
13
13
26
Total Labor Annual Labor
Cost
Cost
1,349 $
450
1,349 $
450
$
$
$
$
$
$
$
$
$
$
2,698 $
899
$
$
$
$
$
$
$
$
$
$
$
$
$
SURFACE WATER: ALL SYSTEMS
Number
of
Size Category Systems
≤100
4
101-500
7
501-1,000
2
1,001-3,300
5
3,301-10,000
4
10,001-25,000
2
25,001-50,000
1
50,001-75,000
1
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
26
DDBP/Chem/Rads ICR - Lead and Copper Rule
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
2014
110
201
69
167
131
82
41
52
852
2015
110
201
69
167
131
82
41
52
852
2016
110
201
69
167
131
82
41
52
852
2017
110
201
69
167
131
82
41
52
852
2018
110
201
69
167
131
82
41
52
852
2019
110
201
69
167
131
82
41
52
852
2020
110
201
69
167
131
82
41
52
852
2021
110
201
69
167
131
82
41
52
852
2022
110
201
69
167
131
82
41
52
852
Total
Samples
329
603
206
500
393
246
123
155
2,555
H-53
Total
Annual
Annual Monitoring Monitoring
Samples
Events
Events
110
312
104
201
546
182
69
156
52
167
390
130
131
312
104
82
156
52
41
78
26
52
78
26
852
2,028
676
Total
Burden
165
302
103
250
197
123
61
77
1,277
Annual
Burden
55
101
34
83
66
41
20
26
426
Total Labor Annual Labor
Cost
Cost
5,699 $
1,900
10,430 $
3,477
3,563 $
1,188
8,639 $
2,880
6,803 $
2,268
4,254 $
1,418
2,127 $
709
2,674 $
891
$
$
$
$
44,190 $
14,730
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
December 2015
Exhibit 12 - WQP MONITORING - MONITORING, BURDEN, AND COST SUMMARY (cont.)
SCENARIO 3a: Exceed After Treatment>>Study Required (Tap)
GROUND WATER: CWSs
Number
of
Size Category Systems
≤100
33
101-500
38
501-1,000
9
1,001-3,300
11
3,301-10,000
5
10,001-25,000
2
25,001-50,000
1
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
99
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
2014
30
28
14
72
2015
66
76
36
44
222
2016
-
2017
30
28
14
72
2018
66
76
36
44
222
2019
-
2020
30
28
14
72
2021
66
76
36
44
222
2022
-
Total
Samples
66
76
36
44
30
28
14
294
Annual
Samples
22
25
12
15
10
9
5
98
Total
Annual
Monitoring Monitoring
Events
Events
66
22
76
25
36
12
44
15
30
10
28
9
14
5
294
98
Total
Burden
165
190
90
110
75
70
35
735
Annual
Burden
55
63
30
37
25
23
12
245
Total Labor Annual Labor
Cost
Cost
5,708 $
1,903
6,572 $
2,191
3,113 $
1,038
3,805 $
1,268
2,594 $
865
2,421 $
807
1,211 $
404
$
$
$
$
$
25,425 $
8,475
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Total O&M
Cost
3,692
4,251
2,014
2,461
1,678
1,566
783
16,444
Annual O&M
Cost
$
1,231
$
1,417
$
671
$
820
$
559
$
522
$
261
$
$
$
$
$
$
5,481
$
$
$
$
$
$
$
$
$
$
$
$
$
Total O&M
Cost
4,363
3,244
1,342
895
9,844
Annual O&M
Cost
$
1,454
$
1,081
$
447
$
298
$
$
$
$
$
$
$
$
$
3,281
$
$
$
$
$
$
$
$
$
$
$
$
$
Total O&M
Cost
8,054
7,495
3,356
3,356
1,678
1,566
783
26,288
Annual O&M
Cost
$
2,685
$
2,498
$
1,119
$
1,119
$
559
$
522
$
261
$
$
$
$
$
$
8,763
$
$
$
$
$
$
$
$
$
$
$
$
$
Total O&M
Cost
336
671
447
1,119
1,342
1,566
783
783
7,047
Annual O&M
Cost
$
112
$
224
$
149
$
373
$
447
$
522
$
261
$
261
$
$
$
$
$
2,349
$
$
$
$
$
$
$
$
$
$
$
$
$
Total O&M
Cost
112
112
224
Annual O&M
Cost
$
37
$
37
$
$
$
$
$
$
$
$
$
$
$
75
Total O&M
Cost
447
783
447
1,119
1,342
1,566
783
783
7,271
Annual O&M
Cost
$
149
$
261
$
149
$
373
$
447
$
522
$
261
$
261
$
$
$
$
$
2,424
GROUND WATER: NTNCWSs
Number
of
Size Category Systems
≤100
39
101-500
29
501-1,000
6
1,001-3,300
4
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
78
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
2014
-
2015
78
58
24
16
176
2016
-
2017
-
2018
78
58
24
16
176
2019
-
2020
-
2021
78
58
24
16
176
2022
-
Total
Samples
78
58
24
16
176
Annual
Samples
26
19
8
5
59
Total
Annual
Monitoring Monitoring
Events
Events
78
26
58
19
24
8
16
5
176
59
Total
Burden
195
145
60
40
440
Annual
Burden
65
48
20
13
147
Total Labor Annual Labor
Cost
Cost
6,745 $
2,248
5,016 $
1,672
2,076 $
692
1,384 $
461
$
$
$
$
$
$
$
$
15,220 $
5,073
$
$
$
$
$
$
$
$
$
$
$
$
$
GROUND WATER: ALL SYSTEMS
Number
of
Size Category Systems
≤100
72
101-500
67
501-1,000
15
1,001-3,300
15
3,301-10,000
5
10,001-25,000
2
25,001-50,000
1
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
177
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
2014
30
28
14
72
2015
144
134
60
60
398
2016
-
2017
30
28
14
72
2018
144
134
60
60
398
2019
-
2020
30
28
14
72
2021
144
134
60
60
398
2022
-
Total
Samples
144
134
60
60
30
28
14
470
Annual
Samples
48
45
20
20
10
9
5
157
Total
Annual
Monitoring Monitoring
Events
Events
144
48
134
45
60
20
60
20
30
10
28
9
14
5
470
157
Total
Burden
360
335
150
150
75
70
35
1,175
Annual
Burden
120
112
50
50
25
23
12
392
Total Labor Annual Labor
Cost
Cost
12,453 $
4,151
11,588 $
3,863
5,189 $
1,730
5,189 $
1,730
2,594 $
865
2,421 $
807
1,211 $
404
$
$
$
$
$
40,646 $
13,549
$
$
$
$
$
$
$
$
$
$
$
$
$
Exhibit 12 - WQP MONITORING - MONITORING, BURDEN, AND COST SUMMARY (cont.)
Scenario 3a: Exceed After Treatment>>Study Required (Tap) (cont.)
SURFACE WATER: CWSs
Number
of
Size Category Systems
≤100
3
101-500
6
501-1,000
2
1,001-3,300
5
3,301-10,000
4
10,001-25,000
2
25,001-50,000
1
50,001-75,000
1
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
24
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
2014
24
28
14
66
2015
6
12
8
20
46
2016
14
14
2017
24
28
14
66
2018
6
12
8
20
46
2019
14
14
2020
24
28
14
66
2021
6
12
8
20
46
2022
14
14
Total
Samples
6
12
8
20
24
28
14
14
126
Annual
Samples
2
4
3
7
8
9
5
5
42
Total
Annual
Monitoring Monitoring
Events
Events
2
6
12
4
8
3
20
7
24
8
28
9
14
5
14
5
126
42
Total
Burden
15
30
20
50
60
70
35
35
315
Annual
Burden
5
10
7
17
20
23
12
12
105
Total Labor Annual Labor
Cost
Cost
519 $
173
1,038 $
346
692 $
231
1,730 $
577
2,076 $
692
2,421 $
807
1,211 $
404
1,211 $
404
$
$
$
$
10,896 $
3,632
$
$
$
$
$
$
$
$
$
$
$
$
$
SURFACE WATER: NTNCWSs
Number
of
Size Category Systems
≤100
1
101-500
1
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
2
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
2014
-
2015
2
2
4
2016
-
2017
-
2018
2
2
4
2019
-
2020
-
2021
2
2
4
2022
-
Total
Samples
2
2
4
Annual
Samples
1
1
1
Total
Annual
Monitoring Monitoring
Events
Events
1
2
2
1
4
1
Total
Burden
5
5
10
Annual
Burden
2
2
3
Total Labor Annual Labor
Cost
Cost
173 $
58
173 $
58
$
$
$
$
$
$
$
$
$
$
346 $
115
$
$
$
$
$
$
$
$
$
$
$
$
$
SURFACE WATER: ALL SYSTEMS
Number
of
Size Category Systems
≤100
4
101-500
7
501-1,000
2
1,001-3,300
5
3,301-10,000
4
10,001-25,000
2
25,001-50,000
1
50,001-75,000
1
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
26
DDBP/Chem/Rads ICR - Lead and Copper Rule
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
2014
24
28
14
66
2015
8
14
8
20
50
2016
14
14
2017
24
28
14
66
2018
8
14
8
20
50
2019
14
14
2020
24
28
14
66
2021
8
14
8
20
50
2022
14
14
Total
Samples
8
14
8
20
24
28
14
14
130
H-54
Annual
Samples
3
5
3
7
8
9
5
5
43
Total
Annual
Monitoring Monitoring
Events
Events
8
3
14
5
8
3
20
7
24
8
28
9
14
5
14
5
130
43
Total
Burden
20
35
20
50
60
70
35
35
325
Annual
Burden
7
12
7
17
20
23
12
12
108
Total Labor Annual Labor
Cost
Cost
692 $
231
1,211 $
404
692 $
231
1,730 $
577
2,076 $
692
2,421 $
807
1,211 $
404
1,211 $
404
$
$
$
$
11,242 $
3,747
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
December 2015
Exhibit 12 - WQP MONITORING - MONITORING, BURDEN, AND COST SUMMARY (cont.)
SCENARIO 3aAR: Accelerated Reduced Monitoring>>Exceed After Treatment>>Study Required (Entry Point)
GROUND WATER: CWSs
Number
of
Size Category Systems
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
-
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
2014
-
2015
-
2016
-
2017
-
2018
-
2019
-
2020
-
2021
-
2022
-
Total
Samples
-
Annual
Samples
-
Total
Annual
Monitoring Monitoring
Events
Events
-
Total
Burden
-
Annual
Burden
-
Total Labor
Cost
-
$
$
$
$
$
$
$
$
$
$
$
$
$
Annual Labor
Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
$
$
$
$
$
$
$
$
$
$
$
$
$
Total O&M
Cost
-
Annual O&M
Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
$
$
$
$
$
$
$
$
$
$
$
$
$
Total O&M
Cost
-
Annual O&M
Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
$
$
$
$
$
$
$
$
$
$
$
$
$
Total O&M
Cost
-
Annual O&M
Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
$
$
$
$
$
$
$
$
$
$
$
$
$
Total O&M
Cost
-
Annual O&M
Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
$
$
$
$
$
$
$
$
$
$
$
$
$
Total O&M
Cost
-
Annual O&M
Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
Total O&M
Cost
-
Annual O&M
Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
GROUND WATER: NTNCWSs
Number
of
Size Category Systems
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
-
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
2014
-
2015
-
2016
-
2017
-
2018
-
2019
-
2020
-
2021
-
2022
-
Total
Samples
-
Annual
Samples
-
Total
Annual
Monitoring Monitoring
Events
Events
-
Total
Burden
-
Annual
Burden
-
Total Labor
Cost
-
$
$
$
$
$
$
$
$
$
$
$
$
$
Annual Labor
Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
GROUND WATER: ALL SYSTEMS
Number
of
Size Category Systems
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
-
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
2014
-
2015
-
2016
-
2017
-
2018
-
2019
-
2020
-
2021
-
2022
-
Total
Samples
-
Annual
Samples
-
Total
Annual
Monitoring Monitoring
Events
Events
-
Total
Burden
-
Annual
Burden
-
Total Labor
Cost
-
$
$
$
$
$
$
$
$
$
$
$
$
$
Annual Labor
Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
Exhibit 12 - WQP MONITORING - MONITORING, BURDEN, AND COST SUMMARY (cont.)
Scenario 3AR: Accelerated Reduction Monitoring>>Exceed After Treatment>>Study Required (Entry Point) (cont.)
SURFACE WATER: CWSs
Number
of
Size Category Systems
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
-
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
2014
-
2015
-
2016
-
2017
-
2018
-
2019
-
2020
-
2021
-
2022
-
Total
Samples
-
Annual
Samples
-
Total
Annual
Monitoring Monitoring
Events
Events
-
Total
Burden
-
Annual
Burden
-
Total Labor
Cost
-
$
$
$
$
$
$
$
$
$
$
$
$
$
Annual Labor
Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
SURFACE WATER: NTNCWSs
Number
of
Size Category Systems
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
-
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
2014
-
2015
-
2016
-
2017
-
2018
-
2019
-
2020
-
2021
-
2022
-
Total
Samples
-
Annual
Samples
-
Total
Annual
Monitoring Monitoring
Events
Events
-
Total
Burden
-
Annual
Burden
-
Total Labor
Cost
-
$
$
$
$
$
$
$
$
$
$
$
$
$
Annual Labor
Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
SURFACE WATER: ALL SYSTEMS
Number
of
Size Category Systems
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
-
DDBP/Chem/Rads ICR - Lead and Copper Rule
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
2014
-
2015
-
2016
-
2017
-
2018
-
2019
-
2020
-
2021
-
2022
-
Total
Samples
-
H-55
Annual
Samples
-
Total
Annual
Monitoring Monitoring
Events
Events
-
Total
Burden
-
Annual
Burden
-
Total Labor
Cost
-
$
$
$
$
$
$
$
$
$
$
$
$
$
Annual Labor
Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
$
$
$
$
$
$
$
$
$
$
$
$
$
December 2015
Exhibit 12 - WQP MONITORING - MONITORING, BURDEN, AND COST SUMMARY (cont.)
SCENARIO 3aAR: Accelerated Reduced Monitoring>>Exceed After Treatment>>Study Required (Tap)
GROUND WATER: CWSs
Number
of
Size Category Systems
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
-
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
2014
-
2015
-
2016
-
2017
-
2018
-
2019
-
2020
-
2021
-
2022
-
Total
Samples
-
Annual
Samples
-
Total
Annual
Monitoring Monitoring
Events
Events
-
Total
Burden
-
Annual
Burden
-
Total Labor
Cost
-
$
$
$
$
$
$
$
$
$
$
$
$
$
Annual Labor
Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
$
$
$
$
$
$
$
$
$
$
$
$
$
Total O&M
Cost
-
Annual O&M
Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
$
$
$
$
$
$
$
$
$
$
$
$
$
Total O&M
Cost
-
Annual O&M
Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
$
$
$
$
$
$
$
$
$
$
$
$
$
Total O&M
Cost
-
Annual O&M
Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
$
$
$
$
$
$
$
$
$
$
$
$
$
Total O&M
Cost
-
Annual O&M
Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
$
$
$
$
$
$
$
$
$
$
$
$
$
Total O&M
Cost
-
Annual O&M
Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
Total O&M
Cost
-
Annual O&M
Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
GROUND WATER: NTNCWSs
Number
of
Size Category Systems
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
-
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
2014
-
2015
-
2016
-
2017
-
2018
-
2019
-
2020
-
2021
-
2022
-
Total
Samples
-
Annual
Samples
-
Annual
Total
Monitoring Monitoring
Events
Events
-
Total
Burden
-
Annual
Burden
-
Total Labor
Cost
-
$
$
$
$
$
$
$
$
$
$
$
$
$
Annual Labor
Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
GROUND WATER: ALL SYSTEMS
Number
of
Size Category Systems
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
-
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
2014
-
2015
-
2016
-
2017
-
2018
-
2019
-
2020
-
2021
-
2022
-
Total
Samples
-
Annual
Samples
-
Total
Annual
Monitoring Monitoring
Events
Events
-
Total
Burden
-
Annual
Burden
-
Total Labor
Cost
-
$
$
$
$
$
$
$
$
$
$
$
$
$
Annual Labor
Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
Exhibit 12 - WQP MONITORING - MONITORING, BURDEN, AND COST SUMMARY (cont.)
Scenario 3AR: Accelerated Reduction Monitoring>>Exceed After Treatment>>Study Required (Tap) (cont.)
SURFACE WATER: CWSs
Number
of
Size Category Systems
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
-
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
2014
-
2015
-
2016
-
2017
-
2018
-
2019
-
2020
-
2021
-
2022
-
Total
Samples
-
Annual
Samples
-
Annual
Total
Monitoring Monitoring
Events
Events
-
Total
Burden
-
Annual
Burden
-
Total Labor
Cost
-
$
$
$
$
$
$
$
$
$
$
$
$
$
Annual Labor
Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
SURFACE WATER: NTNCWSs
Number
of
Size Category Systems
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
-
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
2014
-
2015
-
2016
-
2017
-
2018
-
2019
-
2020
-
2021
-
2022
-
Total
Samples
-
Annual
Samples
-
Total
Annual
Monitoring Monitoring
Events
Events
-
Total
Burden
-
Annual
Burden
-
Total Labor
Cost
-
$
$
$
$
$
$
$
$
$
$
$
$
$
Annual Labor
Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
SURFACE WATER: ALL SYSTEMS
Number
of
Size Category Systems
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
-
DDBP/Chem/Rads ICR - Lead and Copper Rule
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
2014
-
2015
-
2016
-
2017
-
2018
-
2019
-
2020
-
2021
-
2022
-
Total
Samples
-
H-56
Annual
Samples
-
Total
Annual
Monitoring Monitoring
Events
Events
-
Total
Burden
-
Annual
Burden
-
Total Labor
Cost
-
$
$
$
$
$
$
$
$
$
$
$
$
$
Annual Labor
Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
$
$
$
$
$
$
$
$
$
$
$
$
$
December 2015
Exhibit 12 - WQP MONITORING - MONITORING, BURDEN, AND COST SUMMARY (cont.)
SCENARIO 3b: Exceed After Treatment>>No Study Required (Entry Point)
GROUND WATER: CWSs
Number
of
Size Category
Systems
≤100
98
101-500
114
501-1,000
27
1,001-3,300
34
3,301-10,000
15
10,001-25,000
5
25,001-50,000
2
50,001-75,000
1
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
296
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
2014
2,780
3,617
1,111
1,640
428
230
92
9,897
2015
2,780
3,617
1,111
1,640
428
230
92
9,897
2016
2,780
3,617
1,111
1,640
428
230
92
9,897
2017
2,780
3,617
1,111
1,640
428
230
92
9,897
2018
2,780
3,617
1,111
1,640
428
230
92
9,897
2019
2,780
3,617
1,111
1,640
428
230
92
9,897
2020
2,780
3,617
1,111
1,640
428
230
92
9,897
2021
2,780
3,617
1,111
1,640
428
230
92
9,897
2022
2,780
3,617
1,111
1,640
428
230
92
9,897
Total
Samples
8,340
10,850
3,332
4,921
1,283
689
276
29,690
Annual
Samples
2,780
3,617
1,111
1,640
428
230
92
9,897
Annual
Total
Monitoring Monitoring
Events
Events
7,644
2,548
8,892
2,964
2,106
702
2,652
884
1,170
390
390
130
156
52
23,010
7,670
Total
Burden
7,506
9,765
2,999
4,429
1,155
620
248
26,721
Annual
Burden
2,502
3,255
1,000
1,476
385
207
83
8,907
Total Labor Annual Labor
Cost
Cost
259,635 $
86,545
337,795 $
112,598
103,727 $
34,576
153,199 $
51,066
39,945 $
13,315
21,457 $
7,152
8,583 $
2,861
$
$
$
$
$
924,341 $
308,114
$
$
$
$
$
$
$
$
$
$
$
$
$
Total O&M
Cost
291,531
379,294
116,471
172,020
44,852
24,093
9,637
-
Annual O&M
Cost
$
97,177
$
126,431
$
38,824
$
57,340
$
14,951
$
8,031
$
3,212
$
$
$
$
$
$
345,966
$
$
$
$
$
$
$
$
$
$
$
$
$
Total O&M
Cost
316,296
237,222
49,080
35,447
2,727
640,772
Annual O&M
Cost
$
105,432
$
79,074
$
16,360
$
11,816
$
909
$
$
$
$
$
$
$
$
213,591
Total O&M
Cost
$ 607,827
$ 616,515
$ 165,551
$ 207,467
$
47,579
$
24,093
$
9,637
$
$
$
$
$
$ 1,678,670
Annual O&M
Cost
$
202,609
$
205,505
$
55,184
$
69,156
$
15,860
$
8,031
$
3,212
$
$
$
$
$
$
559,557
Total O&M
Cost
23,445
55,063
25,204
52,385
41,250
25,795
12,897
236,039
Annual O&M
Cost
$
7,815
$
18,354
$
8,401
$
17,462
$
13,750
$
8,598
$
4,299
$
$
$
$
$
$
78,680
$
$
$
$
$
$
$
$
$
$
$
$
$
Total O&M
Cost
10,907
10,907
2,727
2,727
2,727
29,994
Annual O&M
Cost
$
3,636
$
3,636
$
909
$
909
$
909
$
$
$
$
$
$
$
$
9,998
Total O&M
Cost
34,351
65,970
27,931
55,111
43,977
25,795
12,897
266,033
Annual O&M
Cost
$
11,450
$
21,990
$
9,310
$
18,370
$
14,659
$
8,598
$
4,299
$
$
$
$
$
$
88,678
$
$
$
$
$
$
$
$
$
$
$
$
$
GROUND WATER: NTNCWSs
Number
of
Size Category
Systems
≤100
116
101-500
87
501-1,000
18
1,001-3,300
13
3,301-10,000
1
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
235
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
2014
3,016
2,262
468
338
26
6,110
2015
3,016
2,262
468
338
26
6,110
2016
3,016
2,262
468
338
26
6,110
2017
3,016
2,262
468
338
26
6,110
2018
3,016
2,262
468
338
26
6,110
2019
3,016
2,262
468
338
26
6,110
2020
3,016
2,262
468
338
26
6,110
2021
3,016
2,262
468
338
26
6,110
2022
3,016
2,262
468
338
26
6,110
Total
Samples
9,048
6,786
1,404
1,014
78
18,330
Annual
Samples
3,016
2,262
468
338
26
6,110
Annual
Total
Monitoring Monitoring
Events
Events
9,048
3,016
6,786
2,262
1,404
468
1,014
338
78
26
18,330
6,110
Total
Burden
8,143
6,107
1,264
913
70
16,497
Annual
Burden
2,714
2,036
421
304
23
5,499
Total Labor Annual Labor
Cost
Cost
281,690 $
93,897
211,267 $
70,422
43,710 $
14,570
31,569 $
10,523
2,428 $
809
$
$
$
$
$
$
$
570,664 $
190,221
$
$
$
$
$
$
$
$
$
$
$
$
$
GROUND WATER: ALL SYSTEMS
Number
of
Size Category
Systems
≤100
214
101-500
201
501-1,000
45
1,001-3,300
47
3,301-10,000
16
10,001-25,000
5
25,001-50,000
2
50,001-75,000
1
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
531
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
2014
5,796
5,879
1,579
1,978
454
230
92
16,007
2015
5,796
5,879
1,579
1,978
454
230
92
16,007
2016
5,796
5,879
1,579
1,978
454
230
92
16,007
2017
5,796
5,879
1,579
1,978
454
230
92
16,007
2018
5,796
5,879
1,579
1,978
454
230
92
16,007
2019
5,796
5,879
1,579
1,978
454
230
92
16,007
2020
5,796
5,879
1,579
1,978
454
230
92
16,007
2021
5,796
5,879
1,579
1,978
454
230
92
16,007
2022
5,796
5,879
1,579
1,978
454
230
92
16,007
Total
Samples
17,388
17,636
4,736
5,935
1,361
689
276
48,020
Annual
Samples
5,796
5,879
1,579
1,978
454
230
92
16,007
Total
Annual
Monitoring Monitoring
Events
Events
16,692
5,564
15,678
5,226
3,510
1,170
3,666
1,222
1,248
416
390
130
156
52
41,340
13,780
Total
Burden
15,649
15,873
4,262
5,341
1,225
620
248
43,218
Annual
Burden
5,216
5,291
1,421
1,780
408
207
83
14,406
Total Labor Annual Labor
Cost
Cost
$
541,324 $
180,441
$
549,062 $
183,021
$
147,438 $
49,146
$
184,768 $
61,589
$
42,373 $
14,124
$
21,457 $
7,152
$
8,583 $
2,861
$
$
$
$
$
$
$
$
$
$
$ 1,495,005 $
498,335
Exhibit 12 - WQP MONITORING - MONITORING, BURDEN, AND COST SUMMARY (cont.)
SCENARIO 3b: Exceed After Treatment>>No Study Required (Entry Point) (cont.)
SURFACE WATER: CWSs
Number
of
Size Category
Systems
≤100
8
101-500
18
501-1,000
7
1,001-3,300
15
3,301-10,000
12
10,001-25,000
6
25,001-50,000
3
50,001-75,000
2
75,001-100,000
1
100,001-500,000
1
500,001-1,000,000
> 1,000,000
Total
73
Number
of
Systems
Size Category
≤100
4
101-500
4
501-1,000
1
1,001-3,300
1
3,301-10,000
1
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
11
Number
of
Size Category
Systems
≤100
12
101-500
22
501-1,000
8
1,001-3,300
16
3,301-10,000
13
10,001-25,000
6
25,001-50,000
3
50,001-75,000
2
75,001-100,000
1
100,001-500,000
1
500,001-1,000,000
> 1,000,000
Total
84
DDBP/Chem/Rads ICR - Lead and Copper Rule
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
2014
224
525
240
500
393
246
123
2,251
2015
224
525
240
500
393
246
123
2,251
2016
224
525
240
500
393
246
123
2,251
2017
224
525
240
500
393
246
123
2,251
2018
224
525
240
500
393
246
123
2,251
2019
224
525
240
500
393
246
123
2,251
2020
224
525
240
500
393
246
123
2,251
2015
104
104
26
26
26
286
2016
104
104
26
26
26
286
2017
104
104
26
26
26
286
2018
104
104
26
26
26
286
2019
104
104
26
26
26
286
2020
104
104
26
26
26
286
Total
Annual
Total
Annual Monitoring Monitoring
2021
2022
Events
Samples Samples
Events
104
104
312
104
312
104
104
104
312
104
312
104
26
26
78
26
78
26
26
26
78
26
78
26
26
26
78
26
78
26
286
286
858
286
858
286
SURFACE WATER: ALL SYSTEMS
2015
328
629
266
526
419
246
123
2,537
2016
328
629
266
526
419
246
123
2,537
2017
328
629
266
526
419
246
123
2,537
2018
328
629
266
526
419
246
123
2,537
2019
328
629
266
526
419
246
123
2,537
Annual
Burden
112
263
120
250
197
123
61
1,125
Total Labor Annual Labor
Cost
Cost
11,600 $
3,867
27,244 $
9,081
12,470 $
4,157
25,918 $
8,639
20,409 $
6,803
12,763 $
4,254
6,381 $
2,127
$
$
$
$
$
116,785 $
38,928
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Total
Burden
156
156
39
39
39
429
Annual
Burden
52
52
13
13
13
143
Total Labor Annual Labor
Cost
Cost
5,396 $
1,799
5,396 $
1,799
1,349 $
450
1,349 $
450
1,349 $
450
$
$
$
$
$
$
$
14,840 $
4,947
$
$
$
$
$
$
$
$
$
$
$
$
$
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
2014
328
629
266
526
419
246
123
2,537
Total
Burden
335
788
361
749
590
369
184
3,376
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
2014
104
104
26
26
26
286
Total
Annual
2021
2022
Samples Samples
224
224
671
224
525
525
1,575
525
240
240
721
240
500
500
1,499
500
393
393
1,180
393
246
246
738
246
123
123
369
123
2,251
2,251
6,752
2,251
SURFACE WATER: NTNCWSs
Annual
Total
Monitoring Monitoring
Events
Events
624
208
1,404
468
546
182
1,170
390
936
312
468
156
234
78
5,382
1,794
2020
328
629
266
526
419
246
123
2,537
2021
328
629
266
526
419
246
123
2,537
2022
328
629
266
526
419
246
123
2,537
Total
Samples
983
1,887
799
1,577
1,258
738
369
7,610
H-57
Annual
Samples
328
629
266
526
419
246
123
2,537
Total
Annual
Monitoring Monitoring
Events
Events
936
312
1,716
572
624
208
1,248
416
1,014
338
468
156
234
78
6,240
2,080
Total
Burden
491
944
400
788
629
369
184
3,805
Annual
Burden
164
315
133
263
210
123
61
1,268
Total Labor Annual Labor
Cost
Cost
16,996 $
5,665
32,640 $
10,880
13,820 $
4,607
27,268 $
9,089
21,759 $
7,253
12,763 $
4,254
6,381 $
2,127
$
$
$
$
$
131,625 $
43,875
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
December 2015
Exhibit 12 - WQP MONITORING - MONITORING, BURDEN, AND COST SUMMARY (cont.)
SCENARIO 3b: Exceed After Treatment>>No Study Required (Tap)
GROUND WATER: CWSs
Number
of
Size Category Systems
≤100
98
101-500
114
501-1,000
27
1,001-3,300
34
3,301-10,000
15
10,001-25,000
5
25,001-50,000
2
50,001-75,000
1
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
296
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
2014
196
228
108
136
668
2015
-
2016
90
70
28
188
2017
196
228
108
136
668
2018
-
2019
90
70
28
188
2020
196
228
108
136
668
2021
-
2022
90
70
28
188
Total
Samples
196
228
108
136
90
70
28
856
Annual
Samples
65
76
36
45
30
23
9
285
Total
Annual
Monitoring Monitoring
Events
Events
196
65
228
76
108
36
136
45
90
30
70
23
28
9
856
285
Total
Burden
490
570
270
340
225
175
70
2,140
Annual
Burden
163
190
90
113
75
58
23
713
Total Labor Annual Labor
Cost
Cost
16,950 $
5,650
19,717 $
6,572
9,340 $
3,113
11,761 $
3,920
7,783 $
2,594
6,054 $
2,018
2,421 $
807
$
$
$
$
$
74,027 $
24,676
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Total O&M
Cost
10,963
12,753
6,041
7,607
5,034
3,915
1,566
47,878
Annual O&M
Cost
$
3,654
$
4,251
$
2,014
$
2,536
$
1,678
$
1,305
$
522
$
$
$
$
$
$
15,959
$
$
$
$
$
$
$
$
$
$
$
$
$
Total O&M
Cost
12,976
9,732
4,027
2,908
336
29,980
Annual O&M
Cost
$
4,325
$
3,244
$
1,342
$
969
$
112
$
$
$
$
$
$
$
$
9,993
$
$
$
$
$
$
$
$
$
$
$
$
$
Total O&M
Cost
23,939
22,485
10,068
10,515
5,369
3,915
1,566
77,857
Annual O&M
Cost
$
7,980
$
7,495
$
3,356
$
3,505
$
1,790
$
1,305
$
522
$
$
$
$
$
$
25,952
$
$
$
$
$
$
$
$
$
$
$
$
$
Total O&M
Cost
895
2,014
1,566
3,356
4,027
4,698
2,349
18,905
Annual O&M
Cost
$
298
$
671
$
522
$
1,119
$
1,342
$
1,566
$
783
$
$
$
$
$
$
6,302
$
$
$
$
$
$
$
$
$
$
$
$
$
Total O&M
Cost
447
447
224
224
336
1,678
Annual O&M
Cost
$
149
$
149
$
75
$
75
$
112
$
$
$
$
$
$
$
$
559
Total O&M
Cost
1,342
2,461
1,790
3,580
4,363
4,698
2,349
20,583
Annual O&M
Cost
$
447
$
820
$
597
$
1,193
$
1,454
$
1,566
$
783
$
$
$
$
$
$
6,861
GROUND WATER: NTNCWSs
Number
of
Size Category Systems
≤100
116
101-500
87
501-1,000
18
1,001-3,300
13
3,301-10,000
1
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
235
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
2014
232
174
72
52
530
2015
-
2016
6
6
2017
232
174
72
52
530
2018
-
2019
6
6
2020
232
174
72
52
530
2021
-
2022
6
6
Total
Samples
232
174
72
52
6
536
Annual
Samples
77
58
24
17
2
179
Total
Annual
Monitoring Monitoring
Events
Events
232
77
174
58
72
24
52
17
6
2
536
179
Total
Burden
580
435
180
130
15
1,340
Annual
Burden
193
145
60
43
5
447
Total Labor Annual Labor
Cost
Cost
20,063 $
6,688
15,048 $
5,016
6,227 $
2,076
4,497 $
1,499
519 $
173
$
$
$
$
$
$
$
46,353 $
15,451
$
$
$
$
$
$
$
$
$
$
$
$
$
GROUND WATER: ALL SYSTEMS
Number
of
Size Category Systems
≤100
214
101-500
201
501-1,000
45
1,001-3,300
47
3,301-10,000
16
10,001-25,000
5
25,001-50,000
2
50,001-75,000
1
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
531
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
2014
428
402
180
188
1,198
2015
-
2016
96
70
28
194
2017
428
402
180
188
1,198
2018
-
2019
96
70
28
194
2020
428
402
180
188
1,198
2021
-
2022
96
70
28
194
Total
Samples
428
402
180
188
96
70
28
1,392
Annual
Samples
143
134
60
63
32
23
9
464
Total
Annual
Monitoring Monitoring
Events
Events
428
143
402
134
180
60
188
63
96
32
70
23
28
9
1,392
464
Total
Burden
1,070
1,005
450
470
240
175
70
3,480
Annual
Burden
357
335
150
157
80
58
23
1,160
Total Labor Annual Labor
Cost
Cost
37,013 $
12,338
34,765 $
11,588
15,566 $
5,189
16,258 $
5,419
8,302 $
2,767
6,054 $
2,018
2,421 $
807
$
$
$
$
$
120,380 $
40,127
$
$
$
$
$
$
$
$
$
$
$
$
$
Exhibit 12 - WQP MONITORING - MONITORING, BURDEN, AND COST SUMMARY (cont.)
SCENARIO 3b: Exceed After Treatment>>No Study Required (Tap) (cont.)
SURFACE WATER: CWSs
Number
of
Size Category Systems
≤100
8
101-500
18
501-1,000
7
1,001-3,300
15
3,301-10,000
12
10,001-25,000
6
25,001-50,000
3
50,001-75,000
2
75,001-100,000
1
100,001-500,000
1
500,001-1,000,000
> 1,000,000
Total
73
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
2014
16
36
28
60
140
2015
-
2016
72
84
42
198
2017
16
36
28
60
140
2018
-
2019
72
84
42
198
2020
16
36
28
60
140
2021
-
2022
72
84
42
198
Total
Samples
16
36
28
60
72
84
42
338
Annual
Samples
5
12
9
20
24
28
14
113
Total
Annual
Monitoring Monitoring
Events
Events
16
5
36
12
28
9
60
20
72
24
84
28
42
14
338
113
Total
Burden
40
90
70
150
180
210
105
845
Annual
Burden
13
30
23
50
60
70
35
282
Total Labor Annual Labor
Cost
Cost
1,384 $
461
3,113 $
1,038
2,421 $
807
5,189 $
1,730
6,227 $
2,076
7,264 $
2,421
3,632 $
1,211
$
$
$
$
$
29,230 $
9,743
$
$
$
$
$
$
$
$
$
$
$
$
$
SURFACE WATER: NTNCWSs
Number
of
Size Category Systems
≤100
4
101-500
4
501-1,000
1
1,001-3,300
1
3,301-10,000
1
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
11
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
2014
8
8
4
4
24
2015
-
2016
-
2017
8
8
4
4
6
6
24
2018
-
2019
-
2020
8
8
4
4
6
6
24
2021
-
2022
6
6
Total
Samples
8
8
4
4
6
30
Annual
Samples
3
3
1
1
2
10
Total
Annual
Monitoring Monitoring
Events
Events
8
3
8
3
4
1
4
1
6
2
30
10
Total
Burden
20
20
10
10
15
75
Annual
Burden
7
7
3
3
5
25
Total Labor Annual Labor
Cost
Cost
692 $
231
692 $
231
346 $
115
346 $
115
519 $
173
$
$
$
$
$
$
$
2,594 $
865
$
$
$
$
$
$
$
$
$
$
$
$
$
SURFACE WATER: ALL SYSTEMS
Number
of
Size Category Systems
≤100
12
101-500
22
501-1,000
8
1,001-3,300
16
3,301-10,000
13
10,001-25,000
6
25,001-50,000
3
50,001-75,000
2
75,001-100,000
1
100,001-500,000
1
500,001-1,000,000
> 1,000,000
Total
84
DDBP/Chem/Rads ICR - Lead and Copper Rule
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
2014
24
44
32
64
164
2015
-
2016
78
84
42
204
2017
24
44
32
64
164
2018
-
2019
78
84
42
204
2020
24
44
32
64
164
2021
-
2022
78
84
42
204
Total
Samples
24
44
32
64
78
84
42
368
H-58
Annual
Samples
8
15
11
21
26
28
14
123
Total
Annual
Monitoring Monitoring
Events
Events
24
8
44
15
32
11
64
21
78
26
84
28
42
14
368
123
Total
Burden
60
110
80
160
195
210
105
920
Annual
Burden
20
37
27
53
65
70
35
307
Total Labor Annual Labor
Cost
Cost
2,076 $
692
3,805 $
1,268
2,767 $
922
5,535 $
1,845
6,745 $
2,248
7,264 $
2,421
3,632 $
1,211
$
$
$
$
$
31,825 $
10,608
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
December 2015
Exhibit 12 - WQP MONITORING - MONITORING, BURDEN, AND COST SUMMARY (cont.)
Summary - All Sample Types and Scenarios
GROUND WATER: CWSs
Number
of
Size Category
Systems
≤100
262
101-500
304
501-1,000
72
1,001-3,300
90
3,301-10,000
40
10,001-25,000
14
25,001-50,000
6
50,001-75,000
2
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
790
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
2014
3,912
5,050
1,589
2,307
600
350
152
13,960
2015
3,782
4,898
1,517
2,215
570
322
138
13,442
2016
3,716
4,822
1,481
2,171
660
392
166
13,408
2017
3,912
5,050
1,589
2,307
600
350
152
13,960
2018
3,782
4,898
1,517
2,215
570
322
138
13,442
2019
3,716
4,822
1,481
2,171
660
392
166
13,408
2020
3,912
5,050
1,589
2,307
600
350
152
13,960
2021
3,782
4,898
1,517
2,215
570
322
138
13,442
2022
3,716
4,822
1,481
2,171
660
392
166
13,408
Total
Samples
11,410
14,771
4,586
6,693
1,831
1,063
456
40,809
Total
Annual
Annual Monitoring Monitoring
Samples
Events
Events
3,803
10,480
3,493
4,924
12,160
4,053
1,529
2,952
984
2,231
3,690
1,230
610
1,680
560
354
644
215
152
276
92
13,603
31,882
10,627
Total
Burden
10,688
13,780
4,358
6,312
1,840
1,113
477
38,568
Annual
Burden
3,563
4,593
1,453
2,104
613
371
159
12,856
Total Labor
Cost
369,721
476,683
150,756
218,330
63,637
38,515
16,506
1,334,148
$
$
$
$
$
$
$
$
$
$
$
$
$
Annual Labor
Cost
$
123,240
$
158,894
$
50,252
$
72,777
$
21,212
$
12,838
$
5,502
$
$
$
$
$
$
444,716
Total O&M
Cost
404,354
522,728
163,348
237,741
66,515
39,212
16,805
1,450,703
$
$
$
$
$
$
$
$
$
$
$
$
$
Annual O&M
Cost
$
134,785
$
174,243
$
54,449
$
79,247
$
22,172
$
13,071
$
5,602
$
$
$
$
$
$
483,568
GROUND WATER: NTNCWSs
Number
of
Size Category
Systems
≤100
310
101-500
232
501-1,000
48
1,001-3,300
34
3,301-10,000
2
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
626
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
2014
4,262
3,190
696
494
26
8,668
2015
4,108
3,074
648
458
26
8,314
2016
4,030
3,016
624
442
32
8,144
2017
4,262
3,190
696
494
26
8,668
2018
4,108
3,074
648
458
26
8,314
2019
4,030
3,016
624
442
32
8,144
2020
4,262
3,190
696
494
26
8,668
2021
4,108
3,074
648
458
26
8,314
2022
4,030
3,016
624
442
32
8,144
Total
Samples
12,400
9,280
1,968
1,394
84
25,126
Total
Annual
Annual Monitoring Monitoring
Events
Samples
Events
4,133
12,400
4,133
3,093
9,280
3,093
656
1,968
656
465
1,394
465
28
84
28
8,375
25,126
8,375
Total
Burden
11,656
8,723
1,925
1,363
85
23,753
Annual
Burden
3,885
2,908
642
454
28
7,918
Total Labor Annual Labor
Cost
Cost
403,204 $
134,401
301,753 $
100,584
66,583 $
22,194
47,163 $
15,721
2,947 $
982
$
$
$
$
$
$
$
821,650 $
273,883
$
$
$
$
$
$
$
$
$
$
$
$
$
Total O&M
Annual O&M
Cost
Cost
439,976 $
146,659
329,272 $
109,757
70,810 $
23,603
50,157 $
16,719
3,062 $
1,021
$
$
$
$
$
$
$
893,277 $
297,759
$
$
$
$
$
$
$
$
$
$
$
$
$
GROUND WATER: ALL SYSTEMS
Number
of
Size Category
Systems
≤100
572
101-500
536
501-1,000
120
1,001-3,300
124
3,301-10,000
42
10,001-25,000
14
25,001-50,000
6
50,001-75,000
2
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
1,416
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
2014
8,174
8,240
2,285
2,801
626
350
152
22,628
2015
7,890
7,972
2,165
2,673
596
322
138
21,756
2016
7,746
7,838
2,105
2,613
692
392
166
21,552
2017
8,174
8,240
2,285
2,801
626
350
152
22,628
2018
7,890
7,972
2,165
2,673
596
322
138
21,756
2019
7,746
7,838
2,105
2,613
692
392
166
21,552
2020
8,174
8,240
2,285
2,801
626
350
152
22,628
2021
7,890
7,972
2,165
2,673
596
322
138
21,756
2022
7,746
7,838
2,105
2,613
692
392
166
21,552
Total
Samples
23,810
24,051
6,554
8,087
1,915
1,063
456
65,935
Annual
Total
Annual Monitoring Monitoring
Events
Samples
Events
7,937
22,880
7,627
8,017
21,440
7,147
2,185
4,920
1,640
2,696
5,084
1,695
638
1,764
588
354
644
215
152
276
92
21,978
57,008
19,003
Total
Burden
22,344
22,503
6,283
7,675
1,925
1,113
477
62,321
Annual
Burden
7,448
7,501
2,094
2,558
642
371
159
20,774
Total Labor
Cost
772,925
778,436
217,339
265,493
66,585
38,515
16,506
2,155,798
$
$
$
$
$
$
$
$
$
$
$
$
$
Annual Labor
Cost
$
257,642
$
259,479
$
72,446
$
88,498
$
22,195
$
12,838
$
5,502
$
$
$
$
$
$
718,599
Total O&M
Cost
844,330
852,000
234,158
287,898
69,577
39,212
16,805
2,343,980
$
$
$
$
$
$
$
$
$
$
$
$
$
Annual O&M
Cost
$
281,443
$
284,000
$
78,053
$
95,966
$
23,192
$
13,071
$
5,602
$
$
$
$
$
$
781,327
Exhibit 12 - WQP MONITORING - MONITORING, BURDEN, AND COST SUMMARY (cont.)
Summary - All Sample Types and Scenarios (cont.)
SURFACE WATER: CWSs
Number
of
Size Category
Systems
≤100
22
101-500
48
501-1,000
18
1,001-3,300
40
3,301-10,000
32
10,001-25,000
16
25,001-50,000
8
50,001-75,000
6
75,001-100,000
2
100,001-500,000
2
500,001-1,000,000
> 1,000,000
Total
194
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
2014
323
736
337
726
548
356
178
52
3256
2015
313
712
317
686
524
328
164
52
3096
2016
307
700
309
666
596
412
206
66
3,262
2017
323
736
337
726
548
356
178
52
3,256
2018
313
712
317
686
524
328
164
52
3,096
2019
307
700
309
666
596
412
206
66
3,262
2020
323
736
337
726
548
356
178
52
3,256
2021
313
712
317
686
524
328
164
52
3,096
2022
307
700
309
666
596
412
206
66
3,262
Total
Samples
944
2,148
963
2,078
1,669
1,096
548
169
9,615
Annual
Samples
315
716
321
693
556
365
183
56
3,205
Total
Annual
Monitoring Monitoring
Events
Events
880
293
1,920
640
738
246
1,640
547
1,344
448
736
245
368
123
92
31
7,718
2,573
Total
Burden
516
1,170
554
1,199
1,027
772
386
112
5,736
Annual
Burden
172
390
185
400
342
257
129
37
1,912
Total Labor Annual Labor
Cost
Cost
17,852 $
5,951
40,476 $
13,492
19,147 $
6,382
41,476 $
13,825
35,515 $
11,838
26,702 $
8,901
13,351 $
4,450
3,884 $
1,295
$
$
$
$
198,404 $
66,135
$
$
$
$
$
$
$
$
$
$
$
$
$
Total O&M
Annual O&M
Cost
Cost
33,467 $
11,156
76,102 $
25,367
34,419 $
11,473
74,321 $
24,774
60,370 $
20,123
40,657 $
13,552
20,329 $
6,776
6,187 $
2,062
$
$
$
$
345,852 $
115,284
$
$
$
$
$
$
$
$
$
$
$
$
$
SURFACE WATER: NTNCWSs
Number
of
Size Category
Systems
≤100
10
101-500
10
501-1,000
2
1,001-3,300
2
3,301-10,000
2
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
26
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
2014
138
138
30
30
26
362
2015
132
132
26
26
26
342
2016
130
130
26
26
32
344
2017
138
138
30
30
26
362
2018
132
132
26
26
26
342
2019
130
130
26
26
32
344
2020
138
138
30
30
26
362
2021
132
132
26
26
26
342
2022
130
130
26
26
32
344
Total
Samples
400
400
82
82
84
1,048
Annual
Samples
133
133
27
27
28
349
Total
Annual
Monitoring Monitoring
Events
Events
400
133
400
133
82
27
82
27
84
28
1,048
349
Total
Burden
220
220
49
49
54
592
Annual
Burden
73
73
16
16
18
197
Total Labor Annual Labor
Cost
Cost
7,610 $
2,537
7,610 $
2,537
1,695 $
565
1,695 $
565
1,868 $
623
$
$
$
$
$
$
$
20,478 $
6,826
$
$
$
$
$
$
$
$
$
$
$
$
$
Total O&M
Annual O&M
Cost
Cost
14,193 $
4,731
14,193 $
4,731
2,950 $
983
2,950 $
983
3,062 $
1,021
$
$
$
$
$
$
$
37,349 $
12,450
$
$
$
$
$
$
$
$
$
$
$
$
$
SURFACE WATER: ALL SYSTEMS
Number
of
Size Category
Systems
≤100
32
101-500
58
501-1,000
20
1,001-3,300
42
3,301-10,000
34
10,001-25,000
16
25,001-50,000
8
50,001-75,000
6
75,001-100,000
2
100,001-500,000
2
500,001-1,000,000
> 1,000,000
Total
220
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
2014
461
874
367
756
574
356
178
52
3,618
2015
445
844
343
712
550
328
164
52
3,438
2016
437
830
335
692
628
412
206
66
3,606
2017
461
874
367
756
574
356
178
52
3,618
2018
445
844
343
712
550
328
164
52
3,438
2019
437
830
335
692
628
412
206
66
3,606
2020
461
874
367
756
574
356
178
52
3,618
2021
445
844
343
712
550
328
164
52
3,438
2022
437
830
335
692
628
412
206
66
3,606
Total
Samples
1,344
2,548
1,045
2,160
1,753
1,096
548
169
10,663
Annual
Samples
448
849
348
720
584
365
183
56
3,554
Annual
Total
Monitoring Monitoring
Events
Events
1,280
427
2,320
773
820
273
1,722
574
1,428
476
736
245
368
123
92
31
8,766
2,922
Total
Burden
736
1,390
603
1,248
1,081
772
386
112
6,328
Annual
Burden
245
463
201
416
360
257
129
37
2,109
Total Labor Annual Labor
Cost
Cost
25,462 $
8,487
48,086 $
16,029
20,842 $
6,947
43,171 $
14,390
37,383 $
12,461
26,702 $
8,901
13,351 $
4,450
3,884 $
1,295
$
$
$
$
218,882 $
72,961
$
$
$
$
$
$
$
$
$
$
$
$
$
Total O&M
Annual O&M
Cost
Cost
47,660 $
15,887
90,295 $
30,098
37,370 $
12,457
77,271 $
25,757
63,432 $
21,144
40,657 $
13,552
20,329 $
6,776
6,187 $
2,062
$
$
$
$
383,200 $
127,733
$
$
$
$
$
$
$
$
$
$
$
$
$
Exhibit 12 - WQP MONITORING - MONITORING, BURDEN, AND COST SUMMARY (cont.)
Summary - All Sample Types and Scenarios (cont.)
ALL SYSTEMS
Number
of
Size Category
Systems
≤100
604
101-500
594
501-1,000
140
1,001-3,300
166
3,301-10,000
76
10,001-25,000
30
25,001-50,000
14
50,001-75,000
8
75,001-100,000
2
100,001-500,000
2
500,001-1,000,000
> 1,000,000
Total
1,636
DDBP/Chem/Rads ICR - Lead and Copper Rule
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
2014
8,635
9,114
2,652
3,557
1,201
706
330
52
26,246
2015
8,335
8,816
2,508
3,385
1,147
650
302
52
25,194
2016
8,183
8,668
2,440
3,305
1,321
804
372
66
25,158
2017
8,635
9,114
2,652
3,557
1,201
706
330
52
26,246
2018
8,335
8,816
2,508
3,385
1,147
650
302
52
25,194
2019
8,183
8,668
2,440
3,305
1,321
804
372
66
25,158
2020
8,635
9,114
2,652
3,557
1,201
706
330
52
26,246
2021
8,335
8,816
2,508
3,385
1,147
650
302
52
25,194
2022
8,183
8,668
2,440
3,305
1,321
804
372
66
25,158
Total
Samples
25,154
26,599
7,599
10,247
3,668
2,159
1,003
169
76,598
H-59
Annual
Samples
8,385
8,866
2,533
3,416
1,223
720
334
56
25,533
Total
Annual
Monitoring Monitoring
Events
Events
24,160
8,053
23,760
7,920
5,740
1,913
6,806
2,269
3,192
1,064
1,380
460
644
215
92
31
65,774
21,925
Total
Burden
23,080
23,893
6,885
8,923
3,006
1,885
863
112
68,648
Annual
Burden
7,693
7,964
2,295
2,974
1,002
628
288
37
22,883
Total Labor
Cost
798,387
826,522
238,181
308,664
103,967
65,217
29,858
3,884
2,374,681
$
$
$
$
$
$
$
$
$
$
$
$
$
Annual Labor
Cost
$
266,129
$
275,507
$
79,394
$
102,888
$
34,656
$
21,739
$
9,953
$
1,295
$
$
$
$
$
791,560
Total O&M
Cost
891,990
942,295
271,528
365,170
133,009
79,869
37,134
6,187
2,727,181
$
$
$
$
$
$
$
$
$
$
$
$
$
Annual O&M
Cost
$
297,330
$
314,098
$
90,509
$
121,723
$
44,336
$
26,623
$
12,378
$
2,062
$
$
$
$
$
909,060
December 2015
Exhibit 13 - SOURCE WATER MONITORING FOR LEAD & COPPER - SYSTEM INVENTORY
Source: SDWIS/FED Data from October 2014
GROUND WATER: CWSs
Size
Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
TOTAL:
SURFACE WATER: CWSs
Size
Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
TOTAL:
Total
Systems
11,212
13,403
4,320
5,566
2,724
989
355
106
44
58
5
2
38,784
Total
Systems
970
2,092
1,131
2,497
2,219
1,300
686
256
133
308
35
20
11,647
GROUND WATER: NTNCWSs
Size
Total
Category
Systems
≤100
8,279
101-500
6,254
501-1,000
1,539
1,001-3,300
786
3,301-10,000
92
10,001-25,000
4
25,001-50,000
5
50,001-75,000
0
75,001-100,000
0
100,001-500,000
0
500,001-1,000,000
0
> 1,000,000
0
TOTAL:
16,958
SURFACE WATER: NTNCWSs
Size
Total
Category
Systems
≤100
314
101-500
283
501-1,000
92
1,001-3,300
88
3,301-10,000
53
10,001-25,000
3
25,001-50,000
3
50,001-75,000
1
75,001-100,000
0
100,001-500,000
1
500,001-1,000,000
0
> 1,000,000
0
TOTAL:
839
GROUND WATER: ALL SYSTEMS
Size
Total
Category
Systems
≤100
19,491
101-500
19,657
501-1,000
5,859
1,001-3,300
6,352
3,301-10,000
2,816
10,001-25,000
993
25,001-50,000
360
50,001-75,000
106
75,001-100,000
44
100,001-500,000
58
500,001-1,000,000
5
> 1,000,000
2
TOTAL:
55,743
SURFACE WATER: ALL SYSTEMS
Size
Total
Category
Systems
≤100
1,284
101-500
2,375
501-1,000
1,223
1,001-3,300
2,585
3,301-10,000
2,272
10,001-25,000
1,303
25,001-50,000
689
50,001-75,000
257
75,001-100,000
133
100,001-500,000
309
500,001-1,000,000
35
> 1,000,000
20
TOTAL:
12,485
DDBP/Chem/Rads ICR - Lead and Copper Rule
H-60
December 2015
Exhibit 14 - SOURCE WATER MONITORING FOR LEAD & COPPER - LABOR RATES
State Labor Rate
$45.60
System Labor Rates
≤100
101-500
501-1,000
1,001-3,300
$34.59
$34.59
$34.59
$34.59
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
$34.59
$34.59
$34.59
$34.59
$34.59
$34.59
$34.59
$34.59
Base (Hourly)
$21.62
Load Factor
Inflation Factor
Total
1.6
1.0
$34.59
PWS Labor Rate
2013$ National Occupational Employment and Wage Estimates, United States, BLS SOC Code 51-8031, "Local
Government - Water and Liquid Waste Treatment Plant and System Operators". May 2013 data (published in April
2014). http://www.bls.gov/oes/2013/may/oes518031.htm
1 ECI New
1 ECI Base
$28.50
1.6
1.0
$45.60
State Labor Rate
2013$ National Occupational Employment and Wage Estimates, United States, BLS SOC Code 19-2041, "State
Government - Environmental Scientists and Specialists, Including Health". May 2013 data (published in April 2014).
http://www.bls.gov/oes/2013/may/oes192041.htm
1 ECI New
1 ECI Base
Base (Hourly)
Load Factor
Inflation Factor
Total
Sampling Cost Inflation Factor
Inflation Factor
DDBP/Chem/Rads ICR - Lead and Copper Rule
1.40
CPI All Urban Consumers (CPI-U): U.S. City
Average, by Expenditure Category and Commodity
and Service Group. All urban consumers, All items,
233.0 Not seasonally adjusted. 2013 Annual Average.
166.6 CPI-U Base Year
H-61
December 2015
Exhibit 15 - SOURCE WATER MONITORING FOR LEAD & COPPER - MONITORING, BURDEN, AND COST ASSUMPTIONS
GROUND WATER: CWSs
Size
Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1 Million
> 1 Million
TOTAL:
Total
Systems
11,212
13,403
4,320
5,566
2,724
989
355
106
44
58
5
2
38,784
Avg. # of
Entry Pts.
(Samples)
1.1
1.2
1.6
1.9
2.2
3.5
3.5
9.4
9.4
12.6
12.6
12.6
Avg. # of
Samples per
Mon. Event
(Composited)
1.1
1.2
1.6
1.8
2.2
3.4
3.4
9.2
9.2
12.3
12.3
12.3
Average
Labor Hrs.
for Collection
(Per Sample)
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
Avg. # of
Entry Pts.
(Samples)
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
Avg. # of
Samples per
Mon. Event
(Composited)
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
Average
Labor Hrs.
for Collection
(Per Sample)
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
Avg. # of
Entry Pts.
(Samples)
varies
varies
varies
varies
varies
varies
varies
varies
varies
varies
varies
varies
Avg. # of
Samples per
Mon. Event
(Composited)
varies
varies
varies
varies
varies
varies
varies
varies
varies
varies
varies
varies
Average
Labor Hrs.
for Analysis
(Per Sample)
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
Labor Rate
For
Collection
& Analysis
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
Average
O&M
Cost Per
Sample
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
Total
Average Labor
Cost Per
Mon. Event
$
56.47
$
62.97
$
81.18
$
94.95
$
111.95
$
178.99
$
178.99
$
476.86
$
476.86
$
636.02
$
636.02
$
636.02
Total Average
O&M Cost Per
Mon. Event
$
8.01
$
8.93
$
11.51
$
13.46
$
15.87
$
25.38
$
25.38
$
67.61
$
67.61
$
90.18
$
90.18
$
90.18
Labor Rate
For
Collection
& Analysis
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
Average
O&M
Cost Per
Sample
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
Total
Average Labor
Cost Per
Mon. Event
$
51.89
$
51.89
$
51.89
$
51.89
$
51.89
$
51.89
$
51.89
$
51.89
$
51.89
$
51.89
$
51.89
$
51.89
Total Average
O&M Cost Per
Mon. Event
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
Labor Rate
For
Collection
& Analysis
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
Average
O&M
Cost Per
Sample
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
Total
Average Labor
Cost Per
Mon. Event
varies
varies
varies
varies
varies
varies
varies
varies
varies
varies
varies
varies
Total Average
O&M Cost Per
Mon. Event
varies
varies
varies
varies
varies
varies
varies
varies
varies
varies
varies
varies
GROUND WATER: NTNCWSs
Size
Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1 Million
> 1 Million
TOTAL:
Total
Systems
8,279
6,254
1,539
786
92
4
5
16,958
Average
Labor Hrs.
for Analysis
(Per Sample)
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
GROUND WATER: ALL SYSTEMS
Size
Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1 Million
> 1 Million
TOTAL:
Total
Systems
19,491
19,657
5,859
6,352
2,816
993
360
106
44
58
5
2
55,743
DDBP/Chem/Rads ICR - Lead and Copper Rule
Average
Labor Hrs.
for Collection
(Per Sample)
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
Average
Labor Hrs.
for Analysis
(Per Sample)
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
H-62
December 2015
Exhibit 15 - SOURCE WATER MONITORING FOR LEAD & COPPER - MONITORING, BURDEN, AND COST ASSUMPTIONS (cont.)
SURFACE WATER: CWSs
Size
Total
Category
Systems
≤100
970
101-500
2,092
1,131
501-1,000
1,001-3,300
2,497
3,301-10,000
2,219
10,001-25,000
1,300
25,001-50,000
686
50,001-75,000
256
75,001-100,000
133
100,001-500,000
308
500,001-1,000,000
35
> 1,000,000
20
TOTAL:
11,647
Average
Labor Hrs.
for Collection
(Per Sample)
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
Average
Labor Hrs.
for Analysis
(Per Sample)
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
Avg. # of
Entry Pts.
(Samples)
1.1
1.1
1.3
1.3
1.3
1.6
1.6
2.0
2.0
3.3
3.3
3.3
Avg. # of
Samples per
Mon. Event
(Composited)
1.1
1.1
1.3
1.3
1.3
1.6
1.6
2.0
2.0
3.2
3.2
3.2
Avg. # of
Entry Pts.
(Samples)
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
Avg. # of
Samples per
Mon. Event
(Composited)
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
Average
Labor Hrs.
for Collection
(Per Sample)
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
Avg. # of
Entry Pts.
(Samples)
varies
varies
varies
varies
varies
varies
varies
varies
varies
varies
varies
varies
Avg. # of
Samples per
Mon. Event
(Composited)
varies
varies
varies
varies
varies
varies
varies
varies
varies
varies
varies
varies
SURFACE WATER: ALL SYSTEMS
Average
Average
Labor Hrs.
Labor Hrs.
for Collection
for Analysis
(Per Sample)
(Per Sample)
0.5
1.0
0.5
1.0
0.5
1.0
0.5
1.0
0.5
1.0
0.5
1.0
0.5
1.0
0.5
1.0
0.5
1.0
0.5
1.0
0.5
1.0
0.5
1.0
Labor Rate
For
Collection
& Analysis
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
Average
O&M
Cost Per
Sample
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
Total
Average Labor
Cost Per
Mon. Event
$
55.65
$
58.02
68.02
$
$
66.02
$
65.01
$
80.91
$
80.91
$
101.30
$
101.30
$
167.59
$
167.59
$
167.59
Total Average
O&M Cost Per
Mon. Event
$
7.89
$
8.23
9.64
$
$
9.36
$
9.22
$
11.47
$
11.47
$
14.36
$
14.36
$
23.76
$
23.76
$
23.76
Labor Rate
For
Collection
& Analysis
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
Average
O&M
Cost Per
Sample
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
Total
Average Labor
Cost Per
Mon. Event
$
51.89
$
51.89
51.89
$
$
51.89
$
51.89
$
51.89
$
51.89
$
51.89
$
51.89
$
51.89
$
51.89
$
51.89
Total Average
O&M Cost Per
Mon. Event
$
7.36
$
7.36
7.36
$
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
Labor Rate
For
Collection
& Analysis
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
$
34.59
Average
O&M
Cost Per
Sample
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
$
7.36
Total
Average Labor
Cost Per
Mon. Event
varies
varies
varies
varies
varies
varies
varies
varies
varies
varies
varies
varies
Total Average
O&M Cost Per
Mon. Event
varies
varies
varies
varies
varies
varies
varies
varies
varies
varies
varies
varies
SURFACE WATER: NTNCWSs
Size
Total
Category
Systems
≤100
314
101-500
283
92
501-1,000
1,001-3,300
88
3,301-10,000
53
10,001-25,000
3
25,001-50,000
3
50,001-75,000
1
75,001-100,000
100,001-500,000
1
500,001-1,000,000
> 1,000,000
839
TOTAL:
Size
Total
Category
Systems
≤100
1,284
101-500
2,375
501-1,000
1,223
1,001-3,300
2,585
2,272
3,301-10,000
1,303
10,001-25,000
689
25,001-50,000
257
50,001-75,000
133
75,001-100,000
309
100,001-500,000
35
500,001-1,000,000
> 1,000,000
20
TOTAL:
12,485
Notes:
Average
Labor Hrs.
for Analysis
(Per Sample)
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
Number of composited samples per monitoring event based on the assumption that 3% of systems will composite, with a maximum of 5 samples per composited
sample.
O&M Costs per sample updated from the 1999 ICR using the CPI-U index for 2013.
Burden estimates take into account the results of the May 2015 consultation with water industry representatives.
DDBP/Chem/Rads ICR - Lead and Copper Rule
H-63
December 2015
Exhibit 16 - SOURCE WATER MONITORING FOR LEAD & COPPER - MONITORING SCENARIO ALLOCATION
GROUND WATER: CWSs
Size
Total
Systems
Category
≤100
11,212
101-500
13,403
501-1,000
4,320
1,001-3,300
5,566
3,301-10,000
2,724
10,001-25,000
989
25,001-50,000
355
50,001-75,000
106
75,001-100,000
44
500,001-1,000,000
58
> 1,000,000
5
> 1 Million
2
TOTAL:
38,784
Percent of Systems Under Each Monitoring Scenario
Actual
1b
2a
2b
2c
3a
3b
Number
>AL, No SOWT,
>AL, No SOWT,
>AL, SOWT,
of B3
B3
>AL, No SOWT,
Study,
No Study,
>AL, SOWT,
Study,
Systems Systems >AL after treatment AL after treatment AL, SOWT,
No Study,
1,000,000
TOTAL:
16,958
Actual
1b
Number
of B3
B3
Systems Systems
0
0
0
0
0
0
0
0
0
0
0
0
-
2a
>AL, No SOWT,
>AL after treatment
1.81%
1.80%
1.48%
2.10%
1.33%
13.81%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Percent of Systems Under Each Monitoring Scenario
2b
2c
3a
3b
>AL, No SOWT,
>AL, No SOWT,
>AL, SOWT,
Study,
No Study,
>AL, SOWT,
Study,
AL after treatment AL, SOWT,
No Study,
1,000,000
20
TOTAL:
11,647
Percent of Systems Under Each Monitoring Scenario
Actual
1b
2a
2b
2c
3a
3b
Number
>AL, No SOWT,
>AL, No SOWT,
>AL, SOWT,
of B3
B3
>AL, No SOWT,
Study,
No Study,
>AL, SOWT,
Study,
Systems Systems >AL after treatment AL after treatment AL, SOWT,
No Study,
1,000,000
TOTAL:
839
Notes:
Actual
1b
Number
of B3
B3
Systems Systems
0
0
0
0
0
0
0
0
0
0
0
0
-
2a
>AL, No SOWT,
>AL after treatment
1.81%
1.80%
1.48%
2.10%
1.33%
13.81%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
Percent of Systems Under Each Monitoring Scenario
2b
2c
3a
3b
>AL, No SOWT,
>AL, No SOWT,
>AL, SOWT,
Study,
No Study,
>AL, SOWT,
Study,
AL after treatment AL, SOWT,
No Study,
1,000,000
2014
-
2015
1
1
1
1
1
2016
-
Years
(Representing 9-Year Cycle)
2017
2018
2019
1
1
1
1
1
-
2020
-
2021
-
2020
-
2021
-
Total
-
1
1
1
1
1
2022
-
Total
-
1
1
1
1
1
2022
-
3
3
3
3
3
Surface Water Systems
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
2014
-
2015
1
1
1
1
1
DDBP/Chem/Rads ICR - Lead and Copper Rule
2016
-
Years
(Representing 9-Year Cycle)
2017
2018
2019
1
1
1
1
1
-
H-65
3
3
3
3
3
December 2015
Exhibit 17 (continued) - Scenario 2a: Exceed Action Level>>Not Required to Install Source Water
Treatment>>Continue to Exceed Action Level
Ground Water Systems
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
2014
-
2015
-
2016
-
Years
(Representing 9-Year Cycle)
2017
2018
2019
1
1
1
1
1
1
1
1
-
2020
-
2021
-
2022
-
Total
-
2020
-
2021
-
2022
-
Total
1
1
1
1
1
1
1
1
Surface Water Systems
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
2014
1
1
1
1
1
1
1
1
1
1
1
1
2015
-
DDBP/Chem/Rads ICR - Lead and Copper Rule
2016
-
Years
(Representing 9-Year Cycle)
2017
2018
2019
-
H-66
1
1
1
1
1
1
1
1
1
1
1
1
December 2015
Exhibit 17 - SOURCE WATER MONITORING FOR LEAD & COPPER : Number of Monitoring Events, per System,
per Year (cont.)
Ground Water Systems
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
2014
-
2015
-
2016
-
Years
(Representing 9-Year Cycle)
2017
2018
2019
1
1
1
1
1
1
1
1
2020
1
1
1
1
-
2021
-
2022
-
Total
2021
-
2022
-
Total
-
1
1
1
1
1
1
1
1
1
1
1
1
Surface Water Systems
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
2014
-
2015
-
DDBP/Chem/Rads ICR - Lead and Copper Rule
2016
-
Years
(Representing 9-Year Cycle)
2017
2018
2019
-
H-67
2020
-
1
1
1
-
1
1
1
-
December 2015
Exhibit 18 - Source Water Monitoring: Number of Samples per System, per Year
Scenario 1b: Systems
Ground Water Systems
2014
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,00
> 1,000,000
-
2015
9.2
9.2
12.3
12.3
12.3
2016
-
Years
(Representing 9-Year Cycle)
2017
2018
2019
9.2
9.2
12.3
12.3
12.3
-
2020
-
2021
9.2
9.2
12.3
12.3
12.3
2022
-
Total
27.6
27.6
36.8
36.8
36.8
2020
-
2021
2.0
2.0
3.2
3.2
3.2
2022
-
Total
5.9
5.9
9.7
9.7
9.7
Surface Water Systems
2014
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,00
> 1,000,000
-
2015
2.0
2.0
3.2
3.2
3.2
DDBP/Chem/Rads ICR - Lead and Copper Rule
2016
-
Years
(Representing 9-Year Cycle)
2017
2018
2019
2.0
2.0
3.2
3.2
3.2
-
H-68
December 2015
Exhibit 18 (continued) - Scenario 2a: Exceed Action Level>>Not Required to Install Source Water
Treatment>>Continue to Exceed Action Level
Ground Water Systems
2014
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,00
> 1,000,000
-
2015
-
2016
-
Years
(Representing 9-Year Cycle)
2017
2018
2019
2.2
3.4
3.4
9.2
9.2
12.3
12.3
12.3
-
2020
-
2021
-
2022
-
Total
2.2
3.4
3.4
9.2
9.2
12.3
12.3
12.3
2020
-
2021
-
2022
-
Total
1.1
1.1
1.3
1.3
1.3
1.6
1.6
2.0
2.0
3.2
3.2
3.2
Surface Water Systems
2014
Size Category
≤100
1.1
101-500
1.1
501-1,000
1.3
1,001-3,300
1.3
3,301-10,000
1.3
10,001-25,000
1.6
25,001-50,000
1.6
50,001-75,000
2.0
75,001-100,000
2.0
100,001-500,000
3.2
500,001-1,000,00
3.2
> 1,000,000
3.2
2015
-
DDBP/Chem/Rads ICR - Lead and Copper Rule
2016
-
Years
(Representing 9-Year Cycle)
2017
2018
2019
-
H-69
December 2015
Exhibit 18 - Source Water Monitoring: Number of Samples per System, per Year (cont.)
Ground Water Systems
2014
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,00
> 1,000,000
-
2015
-
2016
-
Years
(Representing 9-Year Cycle)
2017
2018
2019
2.2
3.4
3.4
9.2
9.2
12.3
12.3
12.3
2020
1.1
1.2
1.6
1.8
-
2021
-
2022
-
Total
1.1
1.2
1.6
1.8
2.2
3.4
3.4
9.2
9.2
12.3
12.3
12.3
2020
-
2021
-
2022
1.3
1.6
1.6
-
Total
1.3
1.6
1.6
-
Surface Water Systems
2014
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,00
> 1,000,000
-
2015
-
DDBP/Chem/Rads ICR - Lead and Copper Rule
2016
-
Years
(Representing 9-Year Cycle)
2017
2018
2019
-
H-70
December 2015
Exhibit 19 - SOURCE WATER MONITORING FOR LEAD & COPPER - MONITORING, BURDEN, AND COST SUMMARY
Scenario 1b: Systems
GROUND WATER: CWSs
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
Number of
Size Category
Systems
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
22
75,001-100,000
10
100,001-500,000
22
500,001-1,000,000
1
> 1,000,000
Total
55
2014
-
2015
202
92
270
12
576
2016
-
2017
-
2018
202
92
270
12
576
2019
-
2020
-
2021
202
92
270
12
576
2022
-
Total
Samples
202
92
270
12
576
Annual
Samples
67
31
90
4
192
Total
Monitoring
Events
22
10
22
1
55
Annual
Monitoring
Events
7
3
7
0
18
Total
Burden
303
138
404
18
864
Annual Total Labor
Cost
Burden
$
$
$
$
$
$
$
101 $ 10,491
46 $
4,769
135 $ 13,992
6 $
636
$
288 $ 29,888
Annual
Labor Cost
$
$
$
$
$
$
$
$
3,497
$
1,590
$
4,664
$
212
$
$
9,963
Total
O&M
Cost
$
$
$
$
$
$
$
$ 1,487
$
676
$ 1,984
$
90
$
$ 4,238
Annual
O&M
Cost
$
$
$
$
$
$
$
$
496
$
225
$
661
$
30
$
$
1,413
GROUND WATER: NTNCWSs
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
Number of
Size Category
Systems
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
-
2014
-
2015
-
2016
-
2017
-
2018
-
2019
-
2020
-
2021
-
2022
-
Total
Samples
-
Annual
Samples
-
Total
Monitoring
Events
-
Annual
Monitoring
Events
-
Total
Burden
-
Annual Total Labor
Burden
Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
Annual
Labor Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
$
$
$
$
$
$
$
$
$
$
$
$
$
Total
O&M
Cost
-
Annual
O&M
Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
GROUND WATER: ALL SYSTEMS
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
Number of
Size Category
Systems
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
22
75,001-100,000
10
100,001-500,000
22
500,001-1,000,000
1
> 1,000,000
Total
55
DDBP/Chem/Rads ICR - Lead and Copper Rule
2014
-
2015
202
92
270
12
576
2016
-
2017
-
2018
202
92
270
12
576
2019
-
2020
-
2021
202
92
270
12
576
2022
-
Total
Samples
202
92
270
12
576
H-71
Annual
Samples
67
31
90
4
192
Total
Monitoring
Events
22
10
22
1
55
Annual
Monitoring
Events
7
3
7
0
18
Total
Burden
303
138
404
18
864
Annual Total Labor
Burden
Cost
$
$
$
$
$
$
$
101 $ 10,491
46 $
4,769
135 $ 13,992
6 $
636
$
288 $ 29,888
Annual
Labor Cost
$
$
$
$
$
$
$
$
3,497
$
1,590
$
4,664
$
212
$
$
9,963
Total
O&M
Cost
$
$
$
$
$
$
$
$ 1,487
$
676
$ 1,984
$
90
$
$ 4,238
Annual
O&M
Cost
$
$
$
$
$
$
$
$
496
$
225
$
661
$
30
$
$
1,413
December 2015
Exhibit 19 - SOURCE WATER MONITORING FOR LEAD & COPPER - MONITORING, BURDEN, AND COST SUMMARY (cont.)
Scenario 1b: Systems (cont.)
SURFACE WATER: CWSs
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
Number of
Size Category
Systems
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
38
75,001-100,000
16
100,001-500,000
57
500,001-1,000,000
3
> 1,000,000
2
Total
116
2014
-
2015
74
31
184
10
6
306
2016
-
2017
-
2018
74
31
184
10
6
306
2019
-
2020
-
2021
74
31
184
10
6
306
2022
-
Total
Samples
74
31
184
10
6
306
Annual
Samples
25
10
61
3
2
102
Total
Monitoring
Events
38
16
57
3
2
116
Annual
Monitoring
Events
13
5
19
1
1
39
Total
Burden
111
47
276
15
10
459
Annual Total Labor
Cost
Burden
$
$
$
$
$
$
$
37 $
3,850
16 $
1,621
92 $
9,553
5 $
503
3 $
335
153 $ 15,861
Annual
Labor Cost
$
$
$
$
$
$
$
$
1,283
$
540
$
3,184
$
168
$
112
$
5,287
Total
O&M
Cost
$
$
$
$
$
$
$
$
546
$
230
$ 1,354
$
71
$
48
$ 2,249
Annual
O&M
Cost
$
$
$
$
$
$
$
$
182
$
77
$
451
$
24
$
16
$
750
SURFACE WATER: NTNCWSs
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
Number of
Size Category
Systems
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
-
2014
-
2015
-
2016
-
2017
-
2018
-
2019
-
2020
-
2021
-
2022
-
Total
Samples
-
Annual
Samples
-
Total
Monitoring
Events
-
Annual
Monitoring
Events
-
Total
Burden
-
Annual Total Labor
Burden
Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
Annual
Labor Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
$
$
$
$
$
$
$
$
$
$
$
$
$
Total
O&M
Cost
-
Annual
O&M
Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
SURFACE WATER: ALL SYSTEMS
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
Number of
Size Category
Systems
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
38
75,001-100,000
16
100,001-500,000
57
500,001-1,000,000
3
> 1,000,000
2
Total
116
DDBP/Chem/Rads ICR - Lead and Copper Rule
2014
-
2015
74
31
184
10
6
306
2016
-
2017
-
2018
74
31
184
10
6
306
2019
-
2020
-
2021
74
31
184
10
6
306
2022
-
Total
Samples
74
31
184
10
6
306
H-72
Annual
Samples
25
10
61
3
2
102
Total
Monitoring
Events
38
16
57
3
2
116
Annual
Monitoring
Events
13
5
19
1
1
39
Total
Burden
111
47
276
15
10
459
Annual Total Labor
Burden
Cost
$
$
$
$
$
$
$
37 $
3,850
16 $
1,621
92 $
9,553
5 $
503
3 $
335
153 $ 15,861
Annual
Labor Cost
$
$
$
$
$
$
$
$
1,283
$
540
$
3,184
$
168
$
112
$
5,287
Total
O&M
Cost
$
$
$
$
$
$
$
$
546
$
230
$ 1,354
$
71
$
48
$ 2,249
Annual
O&M
Cost
$
$
$
$
$
$
$
$
182
$
77
$
451
$
24
$
16
$
750
December 2015
Exhibit 19 - SOURCE WATER MONITORING FOR LEAD & COPPER - MONITORING, BURDEN, AND COST SUMMARY (cont.)
Scenario 2a: Exceed Action Level>>Not Required to Install Source Water Treatment>>Continue to Exceed Action Level
GROUND WATER: CWSs
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
Number of
Systems
126
147
35
43
20
6
2
1
380
2014
-
2015
-
2016
-
2017
9
9
2018
43
21
7
71
2019
-
2020
-
2021
-
2022
-
Total
Samples
43
21
7
9
71
Annual
Samples
14
7
2
3
27
Total
Monitoring
Events
20
6
2
1
29
Annual
Monitoring
Events
7
2
1
0
10
Total
Burden
65
31
10
14
120
Annual Total Labor
Burden
Cost
$
$
$
$
22 $
2,239
10 $
1,074
3 $
358
5 $
477
$
$
$
$
40 $
4,148
Annual
Labor Cost
$
$
$
$
$
746
$
358
$
119
$
159
$
$
$
$
$
1,383
$
$
$
$
$
$
$
$
$
$
$
$
$
Total
O&M
Cost
317
152
51
68
588
Annual
O&M
Cost
$
$
$
$
$
106
$
51
$
17
$
23
$
$
$
$
$
196
Total
O&M
Cost
-
15
Annual
O&M
Cost
$
$
$
$
$
2
$
2
$
$
$
$
$
$
$
5
Total
O&M
Cost
325
160
51
68
603
Annual
O&M
Cost
$
$
$
$
$
108
$
53
$
17
$
23
$
$
$
$
$
201
GROUND WATER: NTNCWSs
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
Number of
Systems
150
113
23
17
1
1
305
2014
-
2015
1
1
2
2016
-
2017
-
2018
1
1
2
2019
-
2020
-
2021
-
2022
-
Total
Samples
1
1
2
Annual
Samples
0
0
1
Total
Monitoring
Events
1
1
2
Annual
Monitoring
Events
0
0
1
Total
Burden
2
2
3
Annual Total Labor
Burden
Cost
$
$
$
$
1 $
52
1 $
52
$
$
$
$
$
$
1 $
104
Annual
Labor Cost
$
$
$
$
$
17
$
17
$
$
$
$
$
$
$
35
$
$
$
$
$
$
$
$
$
$
$
$
$
7
7
-
GROUND WATER: ALL SYSTEMS
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
Number of
Systems
276
260
58
60
21
7
2
1
685
DDBP/Chem/Rads ICR - Lead and Copper Rule
2014
-
2015
1
1
2
2016
-
2017
9
9
2018
44
22
7
73
2019
-
2020
-
2021
-
2022
-
Total
Samples
44
22
7
9
73
H-73
Annual
Samples
15
7
2
3
27
Total
Monitoring
Events
21
7
2
1
31
Annual
Monitoring
Events
7
2
1
0
10
Total
Burden
66
33
10
14
123
Annual Total Labor
Cost
Burden
$
$
$
$
22 $
2,291
11 $
1,126
3 $
358
5 $
477
$
$
$
$
41 $
4,251
Annual
Labor Cost
$
$
$
$
$
764
$
375
$
119
$
159
$
$
$
$
$
1,417
$
$
$
$
$
$
$
$
$
$
$
$
$
December 2015
Exhibit 19 - SOURCE WATER MONITORING FOR LEAD & COPPER - MONITORING, BURDEN, AND COST SUMMARY (cont.)
Scenario 2a: Exceed Action Level>>Not Required to Install Source Water Treatment>>Continue to Exceed Action Level (cont.)
SURFACE WATER: CWSs
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
Number of
Systems
11
23
9
19
16
8
4
3
1
2
1
97
2014
12
26
12
24
20
12
6
6
2
6
3
130
2015
-
2016
-
2017
-
2018
-
2019
-
2020
-
2021
-
2022
-
Total
Samples
-
Annual
Samples
-
Total
Monitoring
Events
-
Annual
Monitoring
Events
-
Total
Burden
-
Annual Total Labor
Cost
Burden
$
$
$
$
$
$
$
$
$
$
$
$
$
-
Annual
Labor Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
$
$
$
$
$
$
$
$
$
$
$
$
$
Total
O&M
Cost
-
Annual
O&M
Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
$
$
$
$
$
$
$
$
$
$
$
$
$
Total
O&M
Cost
-
Annual
O&M
Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
$
$
$
$
$
$
$
$
$
$
$
$
$
Total
O&M
Cost
-
Annual
O&M
Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
SURFACE WATER: NTNCWSs
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
Number of
Systems
6
5
1
2
1
15
2014
6
5
1
2
1
15
2015
-
2016
-
2017
-
2018
-
2019
-
2020
-
Total
Annual
2021
2022
Samples
Samples
SURFACE WATER: ALL SYSTEMS
Number of
Systems
17
28
10
21
17
8
4
3
1
2
1
112
DDBP/Chem/Rads ICR - Lead and Copper Rule
2014
18
31
13
26
21
12
6
6
2
6
3
145
2015
-
2016
-
2017
-
2018
-
2019
-
Annual
Monitoring
Events
-
Total
Burden
-
Annual Total Labor
Cost
Burden
$
$
$
$
$
$
$
$
$
$
$
$
$
-
Annual
Labor Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
Total
Monitoring
Events
-
2020
-
2021
-
2022
-
Total
Samples
-
H-74
Annual
Samples
-
Total
Monitoring
Events
-
Annual
Monitoring
Events
-
Total
Burden
-
Annual Total Labor
Burden
Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
Annual
Labor Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
December 2015
Exhibit 19 - SOURCE WATER MONITORING FOR LEAD & COPPER - MONITORING, BURDEN, AND COST SUMMARY (cont.
GROUND WATER: CWSs
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
Number of
Size Category Systems
≤100
4
101-500
5
501-1,000
1
1,001-3,300
1
3,301-10,000
1
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
12
2014
-
2015
-
2016
-
2017
-
2018
-
2019
2
2
2020
4
6
2
2
14
2021
-
2022
-
Total
Samples
-
Annual
Samples
-
Total
Monitoring
Events
-
Annual
Monitoring
Events
-
Total
Burden
-
Annual Total Labor
Burden
Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
Annual
Labor Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
$
$
$
$
$
$
$
$
$
$
$
$
$
Total
O&M
Cost
-
Annual
O&M
Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
$
$
$
$
$
$
$
$
$
$
$
$
$
Total
O&M
Cost
-
Annual
O&M
Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
$
$
$
$
$
$
$
$
$
$
$
$
$
Total
O&M
Cost
-
Annual
O&M
Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
GROUND WATER: NTNCWSs
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
Number of
Size Category Systems
≤100
5
101-500
4
501-1,000
1
1,001-3,300
1
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
11
2014
-
2015
-
2016
-
2017
-
2018
-
2019
-
2020
5
4
1
1
11
2021
-
2022
-
Total
Samples
-
Annual
Samples
-
Total
Monitoring
Events
-
Annual
Monitoring
Events
-
Total
Burden
-
Annual Total Labor
Burden
Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
Annual
Labor Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
GROUND WATER: ALL SYSTEMS
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
Number of
Size Category Systems
≤100
9
101-500
9
501-1,000
2
1,001-3,300
2
3,301-10,000
1
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
23
2014
-
DDBP/Chem/Rads ICR - Lead and Copper Rule
2015
-
2016
-
2017
-
2018
-
2019
2
2
2020
9
10
3
3
25
2021
-
2022
-
Total
Samples
-
H-75
Annual
Samples
-
Total
Monitoring
Events
-
Annual
Monitoring
Events
-
Total
Burden
-
Annual Total Labor
Burden
Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
Annual
Labor Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
December 2015
Exhibit 19 - SOURCE WATER MONITORING FOR LEAD & COPPER - MONITORING, BURDEN, AND COST SUMMARY (cont.
Scenario 3a: Exceed Action Level>>Required to Install Source Water Treatment>>Continue to Exceed Action Level (cont.)
SURFACE WATER: CWSs
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
Number of
Size Category Systems
≤100
101-500
1
501-1,000
1,001-3,300
1
3,301-10,000
1
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
3
2014
-
2015
-
2016
-
2017
-
2018
-
2019
-
2020
-
2021
-
2022
1
1
Total
Samples
-
Annual
Samples
-
Total
Monitoring
Events
-
Annual
Monitoring
Events
-
Total
Burden
-
Annual Total Labor
Cost
Burden
$
$
$
$
$
$
$
$
$
$
$
$
$
-
Annual
Labor Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
$
$
$
$
$
$
$
$
$
$
$
$
$
Total
O&M
Cost
-
Annual
O&M
Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
$
$
$
$
$
$
$
$
$
$
$
$
$
Total
O&M
Cost
-
Annual
O&M
Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
$
$
$
$
$
$
$
$
$
$
$
$
$
Total
O&M
Cost
-
Annual
O&M
Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
SURFACE WATER: NTNCWSs
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
Number of
Size Category Systems
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
-
2014
-
2015
-
2016
-
2017
-
2018
-
2019
-
2020
-
2021
-
Total
Samples
-
2022
-
Annual
Samples
-
Total
Monitoring
Events
-
Annual
Monitoring
Events
-
Total
Burden
-
Annual Total Labor
Burden
Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
Annual
Labor Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
SURFACE WATER: ALL SYSTEMS
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
Number of
Size Category Systems
≤100
101-500
1
501-1,000
1,001-3,300
1
3,301-10,000
1
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
3
2014
-
DDBP/Chem/Rads ICR - Lead and Copper Rule
2015
-
2016
-
2017
-
2018
-
2019
-
2020
-
2021
-
2022
1
1
Total
Samples
-
H-76
Annual
Samples
-
Total
Monitoring
Events
-
Annual
Monitoring
Events
-
Total
Burden
-
Annual Total Labor
Burden
Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
Annual
Labor Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
December 2015
Exhibit 19 - SOURCE WATER MONITORING FOR LEAD & COPPER - MONITORING, BURDEN, AND COST SUMMARY (cont.)
Summary - All Scenarios
GROUND WATER: CWSs
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
Number of
Size Category
Systems
≤100
130
101-500
152
501-1,000
36
1,001-3,300
44
3,301-10,000
21
10,001-25,000
6
25,001-50,000
2
50,001-75,000
23
75,001-100,000
10
100,001-500,000
22
500,001-1,000,000
1
> 1,000,000
Total
447
2014
-
2015
202
92
270
12
576
2016
-
2017
9
9
2018
43
21
7
202
92
270
12
647
2019
-
2020
4
6
2
2
2
-
-
2
14
2021
202
92
270
12
576
2022
-
Total
Samples
43
21
7
211
92
270
12
656
Annual
Samples
14
7
2
70
31
90
4
219
Total
Monitoring
Events
20
6
2
23
10
22
1
84
Annual
Monitoring
Events
7
2
1
8
3
7
0
28
Total
Burden
65
31
10
317
138
404
18
984
Annual Total Labor
Burden
Cost
$
$
$
$
22 $
2,239
10 $
1,074
3 $
358
106 $ 10,968
46 $
4,769
135 $ 13,992
6 $
636
$
328 $ 34,036
Annual
Labor Cost
$
$
$
$
$
746
$
358
$
119
$
3,656
$
1,590
$
4,664
$
212
$
$
11,345
$
$
$
$
$
$
$
$
$
$
$
$
$
Total
O&M
Cost
317
152
51
1,555
676
1,984
90
4,826
Annual
O&M
Cost
$
$
$
$
$
106
$
51
$
17
$
518
$
225
$
661
$
30
$
$
1,609
Total
O&M
Cost
-
15
Annual
O&M
Cost
$
$
$
$
$
2
$
2
$
$
$
$
$
$
$
5
Total
O&M
Cost
325
160
51
1,555
676
1,984
90
4,841
Annual
O&M
Cost
$
$
$
$
$
108
$
53
$
17
$
518
$
225
$
661
$
30
$
$
1,614
GROUND WATER: NTNCWSs
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
Number of
Size Category
Systems
≤100
155
101-500
117
501-1,000
24
1,001-3,300
18
3,301-10,000
1
10,001-25,000
1
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
316
2014
-
2015
1
1
2
2016
-
2017
-
2018
1
1
2
2019
-
2020
5
4
1
1
11
2021
-
2022
-
Total
Samples
1
1
2
Annual
Samples
0
0
1
Total
Monitoring
Events
1
1
2
Annual
Monitoring
Events
0
0
1
Total
Burden
2
2
3
Annual Total Labor
Cost
Burden
$
$
$
$
1 $
52
1 $
52
$
$
$
$
$
$
1 $
104
Annual
Labor Cost
$
$
$
$
$
17
$
17
$
$
$
$
$
$
$
35
$
$
$
$
$
$
$
$
$
$
$
$
$
7
7
-
GROUND WATER: ALL SYSTEMS
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
Number of
Size Category
Systems
≤100
285
101-500
269
501-1,000
60
1,001-3,300
62
3,301-10,000
22
10,001-25,000
7
25,001-50,000
2
50,001-75,000
23
75,001-100,000
10
100,001-500,000
22
500,001-1,000,000
1
> 1,000,000
Total
763
2014
-
DDBP/Chem/Rads ICR - Lead and Copper Rule
2015
1
1
202
92
270
12
578
2016
-
2017
9
9
2018
44
22
7
202
92
270
12
649
2019
-
2020
2
2
9
10
3
3
25
2021
202
92
270
12
576
2022
-
Total
Samples
44
22
7
211
92
270
12
658
H-77
Annual
Samples
15
7
2
70
31
90
4
219
Total
Monitoring
Events
21
7
2
23
10
22
1
86
Annual
Monitoring
Events
7
2
1
8
3
7
0
29
Total
Burden
66
33
10
317
138
404
18
987
Annual Total Labor
Burden
Cost
$
$
$
$
22 $
2,291
11 $
1,126
3 $
358
106 $ 10,968
46 $
4,769
135 $ 13,992
6 $
636
$
329 $ 34,140
Annual
Labor Cost
$
$
$
$
$
764
$
375
$
119
$
3,656
$
1,590
$
4,664
$
212
$
$
11,380
$
$
$
$
$
$
$
$
$
$
$
$
$
December 2015
Exhibit 19 - SOURCE WATER MONITORING FOR LEAD & COPPER - MONITORING, BURDEN, AND COST SUMMARY (cont.)
Summary - All Scenarios (cont.)
SURFACE WATER: CWSs
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
Number of
Size Category
Systems
≤100
11
101-500
24
501-1,000
9
1,001-3,300
20
3,301-10,000
17
10,001-25,000
8
25,001-50,000
4
50,001-75,000
41
75,001-100,000
17
100,001-500,000
59
500,001-1,000,000
4
> 1,000,000
2
Total
216
2014
12
26
12
24
20
12
6
6
2
6
3
130
2015
74
31
184
10
6
306
2016
-
2017
-
2018
74
31
184
10
6
306
2019
-
2020
-
2021
74
31
184
10
6
306
2022
1
1
Total
Samples
74
31
184
10
6
306
Annual
Samples
25
10
61
3
2
102
Total
Monitoring
Events
38
16
57
3
2
116
Annual
Monitoring
Events
13
5
19
1
1
39
Total
Burden
111
47
276
15
10
459
Annual Total Labor
Cost
Burden
$
$
$
$
$
$
$
37 $
3,850
16 $
1,621
92 $
9,553
5 $
503
3 $
335
153 $ 15,861
Annual
Labor Cost
$
$
$
$
$
$
$
$
1,283
$
540
$
3,184
$
168
$
112
$
5,287
$
$
$
$
$
$
$
$
$
$
$
$
$
Total
O&M
Cost
546
230
1,354
71
48
2,249
Annual
O&M
Cost
$
$
$
$
$
$
$
$
182
$
77
$
451
$
24
$
16
$
750
$
$
$
$
$
$
$
$
$
$
$
$
$
Total
O&M
Cost
-
Annual
O&M
Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
$
$
$
$
$
$
$
$
$
$
$
$
$
Total
O&M
Cost
546
230
1,354
71
48
2,249
Annual
O&M
Cost
$
$
$
$
$
$
$
$
182
$
77
$
451
$
24
$
16
$
750
SURFACE WATER: NTNCWSs
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
Number of
Size Category
Systems
≤100
6
101-500
5
501-1,000
1
1,001-3,300
2
3,301-10,000
1
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
15
2014
6
5
1
2
1
15
2015
-
2016
-
2017
-
2018
-
2019
-
2020
-
Total
Annual
2021
2022
Samples
Samples
SURFACE WATER: ALL SYSTEMS
2014
18
31
13
26
21
12
6
6
2
6
3
145
DDBP/Chem/Rads ICR - Lead and Copper Rule
2015
74
31
184
10
6
306
2016
-
2017
-
2018
74
31
184
10
6
306
2019
-
Annual
Monitoring
Events
-
Total
Burden
-
Annual
Burden
-
Total Labor
Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
Annual
Labor Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
Number of
Size Category
Systems
≤100
17
101-500
29
501-1,000
10
1,001-3,300
22
3,301-10,000
18
10,001-25,000
8
25,001-50,000
4
50,001-75,000
41
75,001-100,000
17
100,001-500,000
59
500,001-1,000,000
4
> 1,000,000
2
Total
231
Total
Monitoring
Events
-
2020
-
2021
74
31
184
10
6
306
2022
1
1
Total
Samples
74
31
184
10
6
306
H-78
Annual
Samples
25
10
61
3
2
102
Total
Monitoring
Events
38
16
57
3
2
116
Annual
Monitoring
Events
13
5
19
1
1
39
Total
Burden
111
47
276
15
10
459
Annual Total Labor
Cost
Burden
$
$
$
$
$
$
$
37 $
3,850
16 $
1,621
92 $
9,553
5 $
503
3 $
335
153 $ 15,861
Annual
Labor Cost
$
$
$
$
$
$
$
$
1,283
$
540
$
3,184
$
168
$
112
$
5,287
December 2015
Exhibit 19 - SOURCE WATER MONITORING FOR LEAD & COPPER - MONITORING, BURDEN, AND COST SUMMARY (cont.)
Summary - All Scenarios (cont.)
ALL SYSTEMS
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
Number of
Size Category
Systems
≤100
302
101-500
298
501-1,000
70
1,001-3,300
84
3,301-10,000
40
10,001-25,000
15
25,001-50,000
6
50,001-75,000
64
75,001-100,000
27
100,001-500,000
81
500,001-1,000,000
5
> 1,000,000
2
Total
994
2014
18
31
13
26
21
12
6
6
2
6
3
145
DDBP/Chem/Rads ICR - Lead and Copper Rule
2015
1
1
276
123
454
22
6
884
2016
-
2017
9
9
2018
44
22
7
276
123
454
22
6
954
2019
-
2020
2
2
9
10
3
3
25
2021
276
123
454
22
6
882
2022
1
1
Total
Samples
44
22
7
286
123
454
22
6
964
H-79
Annual
Samples
15
7
2
95
41
151
7
2
321
Total
Monitoring
Events
21
7
2
61
26
79
4
2
202
Annual
Monitoring
Events
7
2
1
20
9
26
1
1
67
Total
Burden
66
33
10
428
185
681
33
10
1,445
Annual Total Labor
Burden
Cost
$
$
$
$
22 $
2,291
11 $
1,126
3 $
358
143 $ 14,817
62 $
6,389
227 $ 23,545
11 $
1,139
3 $
335
482 $ 50,001
Annual
Labor Cost
$
$
$
$
$
764
$
375
$
119
$
4,939
$
2,130
$
7,848
$
380
$
112
$
16,667
$
$
$
$
$
$
$
$
$
$
$
$
$
Total
O&M
Cost
325
160
51
2,101
906
3,338
161
48
7,089
Annual
O&M
Cost
$
$
$
$
$
108
$
53
$
17
$
700
$
302
$
1,113
$
54
$
16
$
2,363
December 2015
Exhibit 20 - Number of Public Water Systems, Population Served, and Service
Connections
Size
Category
Number of
Systems
Community Water Systems (CWSs)
Average
Service
Popul
Popul/Sys
Connections
Average
SCon/Sys
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
12,182
15,495
5,451
8,063
4,943
2,289
1,041
362
177
366
40
22
733,993
3,924,113
4,031,218
15,372,493
28,787,912
36,249,684
36,616,560
21,925,548
15,275,305
68,881,675
28,065,535
42,731,781
60
253
740
1,907
5,824
15,836
35,174
60,568
86,301
188,201
701,638
1,942,354
1,462,800
2,196,618
1,587,232
5,804,192
10,323,261
12,606,720
12,047,573
7,291,921
4,642,177
20,920,595
8,216,318
10,017,379
120
142
291
720
2,088
5,508
11,573
20,143
26,227
57,160
205,408
455,335
Total
50,431
302,595,817
6,000
97,116,786
1,926
Size
Category
Nontransient Noncommunity Water Systems (NTNCWSs)
Number of
Average
Service
Average
Systems
Popul
Popul/Sys
Connections
SCon/Sys
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
8,593
6,537
1,631
874
145
7
8
1
0
1
0
0
476,708
1,639,996
1,172,829
1,495,302
815,831
91,800
294,593
71,963
0
203,375
0
0
55
251
719
1,711
5,626
13,114
36,824
71,963
N/A
203,375
N/A
N/A
38,871
51,284
21,124
33,154
14,478
381
432
184
0
1,109
0
0
5
8
13
38
100
54
54
184
N/A
1,109
N/A
N/A
Total
17,797
6,262,397
352
161,017
9
Source: SDWIS/FED Data from October 2014
DDBP/Chem/Rads ICR - Lead and Copper Rule
H-80
December 2015
Exhibit 21 - LSL MONITORING - MONITORING, NOTIFICATION, BURDEN, AND COST ASSUMPTIONS
State Labor Rate
$45.60
System Labor Rates
≤100
101-500
501-1,000
1,001-3,300
$34.59
$34.59
$34.59
$34.59
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
$34.59
$34.59
$34.59
$34.59
$34.59
$34.59
$34.59
$34.59
$21.62
Load Factor
Inflation Factor
Total
1.6
1.0
$34.59
PWS Labor Rate
2013$ National Occupational Employment and Wage Estimates, United States, BLS SOC Code 51-8031, "Local Government
- Water and Liquid Waste Treatment Plant and System Operators". May 2013 data (published in April 2014).
http://www.bls.gov/oes/2013/may/oes518031.htm
1 ECI New
1 ECI Base
$28.50
1.6
1.0
$45.60
State Labor Rate
2013$ National Occupational Employment and Wage Estimates, United States, BLS SOC Code 19-2041, "State Government
- Environmental Scientists and Specialists, Including Health". May 2013 data (published in April 2014).
http://www.bls.gov/oes/2013/may/oes192041.htm
1 ECI New
1 ECI Base
Base (Hourly)
Load Factor
Inflation Factor
Total
2.3
Households/Service Connection
Inflation Factor
Postage
Paper and Envelope (O&M)
Base (Hourly)
1.40
$
$
DDBP/Chem/Rads ICR - Lead and Copper Rule
CPI All Urban Consumers (CPI-U): U.S. City Average, by
Expenditure Category and Commodity and Service Group.
All urban consumers, All items, Not seasonally adjusted.
233.0 2013 Annual Average.
166.6 CPI-U Base Year
0.49
0.06
H-81
December 2015
Exhibit 22 - LSL MONITORING - MONITORING, NOTIFICATION, BURDEN, AND COST ASSUMPTIONS
Number of
Systems
Required to
Monitor
Size Category
≤100
36
101-500
44
501-1,000
11
1,001-3,300
16
3,301-10,000
9
10,001-25,000
4
25,001-50,000
2
50,001-75,000
1
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
TOTAL:
123
Number of
Systems
Required to
Size Category
Monitor
≤100
106
101-500
132
501-1,000
34
1,001-3,300
49
3,301-10,000
27
10,001-25,000
11
25,001-50,000
5
50,001-75,000
3
75,001-100,000
1
100,001-500,000
1
0
500,001-1,000,000
> 1,000,000
0
TOTAL:
369
Notes:
CWSs: Study Required
Avg. Number of
Avg. Labor
Service
Avg. Labor
Hrs. for
Avg. Number
Connections
Hrs. for
Avg. Material
of Households Collection & Notification
(LSLs) per
Labor
(O&M) Cost
Preparation
per System
System
Rate
Analysis
per Sample
120
276
2.5
0.25 $ 34.59 $
3.68
142
327
2.5
0.25 $ 34.59 $
3.68
291
669
2.5
0.25 $ 34.59 $
3.68
720
1,656
2.5
0.25 $ 34.59 $
3.68
2,088
4,802
2.5
0.25 $ 34.59 $
3.68
5,508
12,668
2.5
0.25 $ 34.59 $
3.68
11,573
26,618
2.5
0.25 $ 34.59 $
3.68
20,143
46,329
2.5
0.50 $ 34.59 $
3.68
26,227
60,322
2.5
0.50 $ 34.59 $
3.68
57,160
131,468
2.5
0.50 $ 34.59 $
3.68
205,408
472,438
2.5
0.50 $ 34.59 $
3.68
455,335
1,047,271
2.5
0.50 $ 34.59 $
3.68
Avg. Material
(O&M) Cost per
Notification
$
0.55
$
0.55
$
0.55
$
0.55
$
0.55
$
0.55
$
0.55
$
0.55
$
0.55
$
0.55
$
0.55
$
0.55
Total Avg.
Labor Cost for
Collection & Total Avg. Labor Cost
Analysis
for Notification
$
86.48 $
8.65
$
86.48 $
8.65
$
86.48 $
8.65
$
86.48 $
8.65
$
86.48 $
8.65
$
86.48 $
8.65
$
86.48 $
8.65
$
86.48 $
17.30
$
86.48 $
17.30
$
86.48 $
17.30
$
86.48 $
17.30
$
86.48 $
17.30
CWSs: No Study Required
Avg. Number of
Avg. Labor
Avg. Labor
Service
Hrs. for
Hrs. for
Avg. Material
Connections
Avg. Number
Labor
(O&M) Cost
(LSLs) per
of Households Collection & Notification
Preparation
Rate
Analysis
per Sample
System
per System
120
276
2.5
0.25 $ 34.59 $
3.68
142
327
2.5
0.25 $ 34.59 $
3.68
291
669
2.5
0.25 $ 34.59 $
3.68
720
1,656
2.5
0.25 $ 34.59 $
3.68
2,088
4,802
2.5
0.25 $ 34.59 $
3.68
5,508
12,668
2.5
0.25 $ 34.59 $
3.68
11,573
26,618
2.5
0.25 $ 34.59 $
3.68
3.68
20,143
46,329
2.5
0.50 $ 34.59 $
26,227
60,322
2.5
0.50 $ 34.59 $
3.68
57,160
131,468
2.5
0.50 $ 34.59 $
3.68
205,408
472,438
2.5
0.50 $ 34.59 $
3.68
455,335
1,047,271
2.5
0.50 $ 34.59 $
3.68
Avg. Material
(O&M) Cost per
Notification
$
0.55
$
0.55
$
0.55
$
0.55
$
0.55
$
0.55
$
0.55
$
0.55
$
0.55
$
0.55
$
0.55
$
0.55
Total Avg.
Labor Cost for
Collection & Total Avg. Labor Cost
Analysis
for Notification
$
86.48 $
8.65
$
86.48 $
8.65
$
86.48 $
8.65
$
86.48 $
8.65
$
86.48 $
8.65
$
86.48 $
8.65
$
86.48 $
8.65
$
86.48 $
17.30
$
86.48 $
17.30
$
86.48 $
17.30
$
86.48 $
17.30
$
86.48 $
17.30
Number of systems required to monitor based on actual number of systems exceeding action levels.
Average number of service connections (LSLs) per system from SDWIS database as of October 2014.
Total households per system calculated based on EPA estimate of 2.3 households per service connection (LSL) - assumption carried forward from a previous ICR.
Burden estimates take into account the results of the May 2015 consultation with water industry representatives.
DDBP/Chem/Rads ICR - Lead and Copper Rule
H-82
December 2015
Exhibit 23 - LSL MONITORING - MONITORING SCENARIO ALLOCATION
CWSs: Study Required
Size
Total
Category
Systems
≤100
36
101-500
44
501-1,000
11
1,001-3,300
16
3,301-10,000
9
10,001-25,000
4
25,001-50,000
2
50,001-75,000
1
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
TOTAL:
123
Percent of Systems Under Each Monitoring Scenario
1
2
3
4
Initial LSL
Initial LSL
Partial LSL
Partial LSL
Monitoring
Monitoring
Monitoring
Monitoring
(Study Required) (No Study Required) (Study Required) (No Study Required)
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
CWSs: No Study Required
Size
Total
Category
Systems
≤100
106
101-500
132
501-1,000
34
1,001-3,300
49
3,301-10,000
27
10,001-25,000
11
25,001-50,000
5
50,001-75,000
3
75,001-100,000
1
100,001-500,000
1
500,001-1,000,000
> 1,000,000
TOTAL:
369
DDBP/Chem/Rads ICR - Lead and Copper Rule
Percent of Systems Under Each Monitoring Scenario
1
2
3
4
Initial LSL
Initial LSL
Partial LSL
Partial LSL
Monitoring
Monitoring
Monitoring
Monitoring
(Study Required) (No Study Required) (Study Required) (No Study Required)
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
-
H-83
December 2015
Exhibit 24 - LSL Monitoring: Number of Monitoring and Notification Events per System, per Year
SCENARIO 1: Initial LSL Monitoring (Study Required)
CWSs (Monitoring)
Years
(Representing 9-Year Cycle)
2014
Size Category
≤100
8
101-500
9
501-1,000
19
1,001-3,300
48
3,301-10,000
139
10,001-25,000
367
25,001-50,000
772
50,001-75,000
1,343
75,001-100,000
1,748
100,001-500,000
3,811
500,001-1,000,000 13,694
> 1,000,000
30,356
2015
2016
2017
2018
2019
2020
2021
2022
8
9
19
48
139
367
772
1,343
1,748
3,811
13,694
30,356
8
9
19
48
139
367
772
1,343
1,748
3,811
13,694
30,356
8
9
19
48
139
367
772
1,343
1,748
3,811
13,694
30,356
8
9
19
48
139
367
772
1,343
1,748
3,811
13,694
30,356
8
9
19
48
139
367
772
1,343
1,748
3,811
13,694
30,356
8
9
19
48
139
367
772
1,343
1,748
3,811
13,694
30,356
8
9
19
48
139
367
772
1,343
1,748
3,811
13,694
30,356
8
9
19
48
139
367
772
1,343
1,748
3,811
13,694
30,356
2020
2021
2022
Total
72
85
175
432
1,253
3,305
6,944
12,086
15,736
34,296
123,245
273,201
SCENARIO 2: Initial LSL Monitoring (No Study Required)
CWSs (Monitoring)
Years
(Representing 9-Year Cycle)
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
DDBP/Chem/Rads ICR - Lead and Copper Rule
2014
8
9
19
48
139
367
772
-
2015
8
9
19
48
139
367
772
-
2016
8
9
19
48
139
367
772
-
2017
8
9
19
48
139
367
772
-
2018
8
9
19
48
139
367
772
-
H-84
2019
8
9
19
48
139
367
772
-
8
9
19
48
139
367
772
-
8
9
19
48
139
367
772
-
8
9
19
48
139
367
772
-
Total
72
85
175
432
1,253
3,305
6,944
-
December 2015
Exhibit 24 - LSL Monitoring: Number of Monitoring and Notification Events per System, per Year (cont.)
SCENARIO 3: Partial LSL Replacement (Study Required)
CWSs (Monitoring)
Years
(Representing 9-Year Cycle)
2014
Size Category
≤100
8
101-500
6
501-1,000
12
1,001-3,300
29
3,301-10,000
84
10,001-25,000
220
25,001-50,000
463
50,001-75,000
806
75,001-100,000
1,049
100,001-500,000
2,286
500,001-1,000,000 8,216
> 1,000,000
18,213
2015
2016
2017
2018
2019
2020
2021
2022
8
6
12
29
84
220
463
806
1,049
2,286
8,216
18,213
8
6
12
29
84
220
463
806
1,049
2,286
8,216
18,213
8
6
12
29
84
220
463
806
1,049
2,286
8,216
18,213
8
6
12
29
84
220
463
806
1,049
2,286
8,216
18,213
8
6
12
29
84
220
463
806
1,049
2,286
8,216
18,213
8
6
12
29
84
220
463
806
1,049
2,286
8,216
18,213
8
6
12
29
84
220
463
806
1,049
2,286
8,216
18,213
8
6
12
29
84
220
463
806
1,049
2,286
8,216
18,213
2020
18
13
27
66
192
507
1,065
1,853
2,413
5,259
18,898
41,891
2021
18
13
27
66
192
507
1,065
1,853
2,413
5,259
18,898
41,891
2022
18
13
27
66
192
507
1,065
1,853
2,413
5,259
18,898
41,891
Total
72
51
105
259
752
1,983
4,166
7,251
9,442
20,578
73,947
163,921
CWSs (Notifications)
Years
(Representing 9-Year Cycle)
2014
Size Category
≤100
18
101-500
13
501-1,000
27
1,001-3,300
66
3,301-10,000
192
10,001-25,000
507
25,001-50,000
1,065
50,001-75,000
1,853
75,001-100,000
2,413
100,001-500,000
5,259
500,001-1,000,000 18,898
> 1,000,000
41,891
DDBP/Chem/Rads ICR - Lead and Copper Rule
2015
18
13
27
66
192
507
1,065
1,853
2,413
5,259
18,898
41,891
2016
18
13
27
66
192
507
1,065
1,853
2,413
5,259
18,898
41,891
2017
18
13
27
66
192
507
1,065
1,853
2,413
5,259
18,898
41,891
2018
18
13
27
66
192
507
1,065
1,853
2,413
5,259
18,898
41,891
H-85
2019
18
13
27
66
192
507
1,065
1,853
2,413
5,259
18,898
41,891
Total
166
118
241
596
1,729
4,561
9,582
16,678
21,716
47,328
170,078
377,017
December 2015
Exhibit 24 - LSL Monitoring: Number of Monitoring and Notification Events per System, per Year (cont.)
SCENARIO 4: Partial LSL Replacement (No Study Required)
CWSs (Monitoring)
Years
(Representing 9-Year Cycle)
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
2014
8
6
12
29
84
220
463
-
2015
8
6
12
29
84
220
463
-
2016
8
6
12
29
84
220
463
-
2017
8
6
12
29
84
220
463
-
2018
2019
8
6
12
29
84
220
463
-
8
6
12
29
84
220
463
-
2020
2021
2022
8
6
12
29
84
220
463
-
8
6
12
29
84
220
463
-
8
6
12
29
84
220
463
-
2020
18
13
27
66
192
507
1,065
-
2021
18
13
27
66
192
507
1,065
-
2022
18
13
27
66
192
507
1,065
-
Total
72
51
105
259
752
1,983
4,166
-
CWSs (Notifications)
Years
(Representing 9-Year Cycle)
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
DDBP/Chem/Rads ICR - Lead and Copper Rule
2014
18
13
27
66
192
507
1,065
-
2015
18
13
27
66
192
507
1,065
-
2016
18
13
27
66
192
507
1,065
-
2017
18
13
27
66
192
507
1,065
-
2018
18
13
27
66
192
507
1,065
-
H-86
2019
18
13
27
66
192
507
1,065
-
Total
166
118
241
596
1,729
4,561
9,582
-
December 2015
Exhibit 25 - LSL MONITORING - MONITORING, NOTIFICATION, BURDEN, AND COST SUMMARY
SCENARIO 1: Initial LSL Monitoring (Study Required)
CWSs
Number
of
Size Category
Systems
≤100
36
101-500
44
501-1,000
11
1,001-3,300
16
3,301-10,000
9
10,001-25,000
4
25,001-50,000
2
50,001-75,000
1
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
123
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
2014
288
417
213
768
1,253
1,469
1,543
1,343
7,293
DDBP/Chem/Rads ICR - Lead and Copper Rule
2015
288
417
213
768
1,253
1,469
1,543
1,343
7,293
2016
288
417
213
768
1,253
1,469
1,543
1,343
7,293
2017
288
417
213
768
1,253
1,469
1,543
1,343
7,293
2018
288
417
213
768
1,253
1,469
1,543
1,343
7,293
2019
288
417
213
768
1,253
1,469
1,543
1,343
7,293
2020
288
417
213
768
1,253
1,469
1,543
1,343
7,293
2021
288
417
213
768
1,253
1,469
1,543
1,343
7,293
H-87
2022
288
417
213
768
1,253
1,469
1,543
1,343
7,293
Total
Samples
864
1,250
640
2,304
3,758
4,406
4,629
4,029
21,880
Annual
Samples
288
417
213
768
1,253
1,469
1,543
1,343
7,293
Total
Burden
2,160
3,124
1,601
5,760
9,396
11,016
11,573
10,072
54,701
Annual
Burden
720
1,041
534
1,920
3,132
3,672
3,858
3,357
18,234
Total Labor Annual Labor
Cost
Cost
$
74,719 $
24,906
$
108,065 $
36,022
$
55,364 $
18,455
$
199,250 $
66,417
$
325,026 $
108,342
$
381,065 $
127,022
$
400,333 $
133,444
$
348,393 $
116,131
$
$
$
$
$
$
$
$
$ 1,892,217 $
630,739
Total O&M
Cost
$
3,178
$
4,597
$
2,355
$
8,475
$
13,825
$
16,209
$
17,029
$
14,819
$
$
$
$
$
80,487
Annual O&M
Cost
$
1,059
$
1,532
$
785
$
2,825
$
4,608
$
5,403
$
5,676
$
4,940
$
$
$
$
$
26,829
December 2015
Exhibit 25 - LSL MONITORING - MONITORING, NOTIFICATION, BURDEN, AND COST SUMMARY (cont.
SCENARIO 2: Initial LSL Monitoring (No Study Required)
CWSs
Number
of
Size Category Systems
≤100
106
101-500
132
501-1,000
34
1,001-3,300
49
3,301-10,000
27
10,001-25,000
11
25,001-50,000
5
50,001-75,000
3
75,001-100,000
1
100,001-500,000
1
500,001-1,000,000
> 1,000,000
Total
369
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
2014
848
1,250
660
2,352
3,758
4,039
3,858
16,764
DDBP/Chem/Rads ICR - Lead and Copper Rule
2015
848
1,250
660
2,352
3,758
4,039
3,858
16,764
2016
848
1,250
660
2,352
3,758
4,039
3,858
16,764
2017
848
1,250
660
2,352
3,758
4,039
3,858
16,764
2018
848
1,250
660
2,352
3,758
4,039
3,858
16,764
2019
848
1,250
660
2,352
3,758
4,039
3,858
16,764
2020
848
1,250
660
2,352
3,758
4,039
3,858
16,764
2021
848
1,250
660
2,352
3,758
4,039
3,858
16,764
2022
848
1,250
660
2,352
3,758
4,039
3,858
16,764
H-88
Total
Samples
2,544
3,749
1,979
7,056
11,275
12,118
11,573
50,293
Annual
Samples
848
1,250
660
2,352
3,758
4,039
3,858
16,764
Total
Burden
6,360
9,372
4,947
17,640
28,188
30,294
28,933
125,734
Annual
Burden
2,120
3,124
1,649
5,880
9,396
10,098
9,644
41,911
Total Labor Annual Labor
Cost
Cost
$ 220,005 $
73,335
$ 324,196 $
108,065
$ 171,127 $
57,042
$ 610,203 $
203,401
$ 975,079 $
325,026
$ 1,047,930 $
349,310
$ 1,000,833 $
333,611
$
$
$
$
$
$
$
$
$
$
$ 4,349,373 $ 1,449,791
Total O&M Annual O&M
Cost
Cost
$
9,358 $
3,119
$
13,790 $
4,597
$
7,279 $
2,426
$
25,956 $
8,652
$
41,476 $
13,825
$
44,575 $
14,858
$
42,572 $
14,191
$
$
$
$
$
$
$
$
$
$
$ 185,005 $
61,668
December 2015
Exhibit 25 - LSL MONITORING - MONITORING, NOTIFICATION, BURDEN, AND COST SUMMARY (cont.)
SCENARIO 3: Partial LSL Replacement (Study Required)
CWSs (Monitoring)
Number
of
Size Category
Systems
≤100
36
101-500
44
501-1,000
11
1,001-3,300
16
3,301-10,000
9
10,001-25,000
4
25,001-50,000
2
50,001-75,000
1
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
123
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
2014
288
250
128
461
752
881
926
806
4,491
2015
288
250
128
461
752
881
926
806
4,491
2016
288
250
128
461
752
881
926
806
4,491
2017
288
250
128
461
752
881
926
806
4,491
2018
288
250
128
461
752
881
926
806
4,491
2019
288
250
128
461
752
881
926
806
4,491
2020
288
250
128
461
752
881
926
806
4,491
2021
288
250
128
461
752
881
926
806
4,491
2022
288
250
128
461
752
881
926
806
4,491
Total
Samples
864
750
384
1,382
2,255
2,644
2,778
2,417
13,474
Annual
Samples
288
250
128
461
752
881
926
806
4,491
Total
Burden
2,160
1,874
960
3,456
5,638
6,610
6,944
6,043
33,685
Annual
Burden
720
625
320
1,152
1,879
2,203
2,315
2,014
11,228
Total Labor Annual Labor
Cost
Cost
$
74,719 $
24,906
$
64,839 $
21,613
$
33,219 $
11,073
$
119,550 $
39,850
$
195,016 $
65,005
$
228,639 $
76,213
$
240,200 $
80,067
$
209,036 $
69,679
$
$
$
$
$
$
$
$
$ 1,165,218 $
388,406
Total O&M
Cost
3,178
2,758
1,413
5,085
8,295
9,725
10,217
8,892
49,564
$
$
$
$
$
$
$
$
$
$
$
$
$
Annual O&M
Cost
$
1,059
$
919
$
471
$
1,695
$
2,765
$
3,242
$
3,406
$
2,964
$
$
$
$
$
16,521
CWSs (Notifications)
Number
of
Size Category
Systems
≤100
36
101-500
44
501-1,000
11
1,001-3,300
16
3,301-10,000
9
10,001-25,000
4
25,001-50,000
2
50,001-75,000
1
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
123
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Notifications by Year
(Representing 9-Year Cycle)
2014
662
575
294
1,060
1,729
2,027
2,129
1,853
10,330
DDBP/Chem/Rads ICR - Lead and Copper Rule
2015
662
575
294
1,060
1,729
2,027
2,129
1,853
10,330
2016
662
575
294
1,060
1,729
2,027
2,129
1,853
10,330
2017
662
575
294
1,060
1,729
2,027
2,129
1,853
10,330
2018
662
575
294
1,060
1,729
2,027
2,129
1,853
10,330
2019
662
575
294
1,060
1,729
2,027
2,129
1,853
10,330
2020
662
575
294
1,060
1,729
2,027
2,129
1,853
10,330
2021
662
575
294
1,060
1,729
2,027
2,129
1,853
10,330
Annual
Total
2022
Notifications Notifications
662
1,987
662
575
1,724
575
294
883
294
1,060
3,180
1,060
1,729
5,187
1,729
2,027
6,081
2,027
2,129
6,388
2,129
1,853
5,559
1,853
10,330
30,990
10,330
H-89
Total
Burden
497
431
221
795
1,297
1,520
1,597
2,780
9,137
Annual
Burden
166
144
74
265
432
507
532
927
3,046
Total Labor Annual Labor
Cost
Cost
$
17,185 $
5,728
$
14,913 $
4,971
$
7,640 $
2,547
$
27,496 $
9,165
$
44,854 $
14,951
$
52,587 $
17,529
$
55,246 $
18,415
$
96,157 $
32,052
$
$
$
$
$
$
$
$
$
316,078 $
105,359
Total O&M
Cost
$
1,085
$
941
$
482
$
1,736
$
2,832
$
3,320
$
3,488
$
3,035
$
$
$
$
$
16,918
Annual O&M
Cost
$
362
$
314
$
161
$
579
$
944
$
1,107
$
1,163
$
1,012
$
$
$
$
$
5,639
December 2015
Exhibit 25 - LSL MONITORING - MONITORING, NOTIFICATION, BURDEN, AND COST SUMMARY (cont.)
SCENARIO 4: Partial LSL Replacement (No Study Required)
CWSs (Monitoring)
Number
of
Size Category Systems
≤100
106
101-500
132
501-1,000
34
1,001-3,300
49
3,301-10,000
27
10,001-25,000
11
25,001-50,000
5
50,001-75,000
3
75,001-100,000
1
100,001-500,000
1
500,001-1,000,000
> 1,000,000
Total
369
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
2014
848
750
396
1,411
2,255
2,424
2,315
2,417
1,049
2,286
16,151
2015
848
750
396
1,411
2,255
2,424
2,315
2,417
1,049
2,286
16,151
2016
848
750
396
1,411
2,255
2,424
2,315
2,417
1,049
2,286
16,151
2017
848
750
396
1,411
2,255
2,424
2,315
2,417
1,049
2,286
16,151
2018
848
750
396
1,411
2,255
2,424
2,315
2,417
1,049
2,286
16,151
2019
848
750
396
1,411
2,255
2,424
2,315
2,417
1,049
2,286
16,151
2020
848
750
396
1,411
2,255
2,424
2,315
2,417
1,049
2,286
16,151
2021
848
750
396
1,411
2,255
2,424
2,315
2,417
1,049
2,286
16,151
2022
848
750
396
1,411
2,255
2,424
2,315
2,417
1,049
2,286
16,151
Total Samples
2,544
2,249
1,187
4,234
6,765
7,271
6,944
7,251
3,147
6,859
48,452
Annual Samples
848
750
396
1,411
2,255
2,424
2,315
2,417
1,049
2,286
16,151
Total
Burden
6,360
5,623
2,968
10,584
16,913
18,176
17,360
18,129
7,868
17,148
121,129
Annual
Burden
2,120
1,874
989
3,528
5,638
6,059
5,787
6,043
2,623
5,716
40,376
Total Labor Annual Labor
Cost
Cost
$
220,005 $
73,335
$
194,518 $
64,839
$
102,676 $
34,225
$
366,122 $
122,041
$
585,048 $
195,016
$
628,758 $
209,586
$
600,500 $
200,167
$
627,108 $
209,036
$
272,173 $
90,724
$
593,184 $
197,728
$
$
$
$
$ 4,190,091 $ 1,396,697
Total O&M
Cost
$
9,358
$
8,274
$
4,367
$
15,573
$
24,886
$
26,745
$
25,543
$
26,675
$
11,577
$
25,232
$
$
$ 178,230
Annual O&M
Cost
$
3,119
$
2,758
$
1,456
$
5,191
$
8,295
$
8,915
$
8,514
$
8,892
$
3,859
$
8,411
$
$
$
59,410
Total O&M
Cost
$
3,194
$
2,824
$
1,491
$
5,316
$
8,495
$
9,129
$
8,719
$
9,105
$
3,952
$
8,613
$
$
$
60,838
Annual O&M
Cost
$
1,065
$
941
$
497
$
1,772
$
2,832
$
3,043
$
2,906
$
3,035
$
1,317
$
2,871
$
$
$
20,279
CWSs (Notifications)
Number
of
Size Category Systems
≤100
106
101-500
132
501-1,000
34
1,001-3,300
49
3,301-10,000
27
10,001-25,000
11
25,001-50,000
5
50,001-75,000
3
75,001-100,000
1
100,001-500,000
1
500,001-1,000,000
> 1,000,000
Total
369
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
2014
1,950
1,724
910
3,246
5,187
5,574
5,324
5,559
2,413
5,259
37,146
DDBP/Chem/Rads ICR - Lead and Copper Rule
2015
1,950
1,724
910
3,246
5,187
5,574
5,324
5,559
2,413
5,259
37,146
2016
1,950
1,724
910
3,246
5,187
5,574
5,324
5,559
2,413
5,259
37,146
2017
1,950
1,724
910
3,246
5,187
5,574
5,324
5,559
2,413
5,259
37,146
2018
1,950
1,724
910
3,246
5,187
5,574
5,324
5,559
2,413
5,259
37,146
2019
1,950
1,724
910
3,246
5,187
5,574
5,324
5,559
2,413
5,259
37,146
2020
1,950
1,724
910
3,246
5,187
5,574
5,324
5,559
2,413
5,259
37,146
2021
1,950
1,724
910
3,246
5,187
5,574
5,324
5,559
2,413
5,259
37,146
2022
1,950
1,724
910
3,246
5,187
5,574
5,324
5,559
2,413
5,259
37,146
H-90
Total
Notifications
5,851
5,173
2,731
9,737
15,560
16,722
15,971
16,678
7,239
15,776
111,439
Annual
Notifications
1,950
1,724
910
3,246
5,187
5,574
5,324
5,559
2,413
5,259
37,146
Total
Burden
1,463
1,293
683
2,434
3,890
4,181
3,993
8,339
3,619
7,888
37,783
Annual
Burden
488
431
228
811
1,297
1,394
1,331
2,780
1,206
2,629
12,594
Total Labor Annual Labor
Cost
Cost
$
50,601 $
16,867
$
44,739 $
14,913
$
23,615 $
7,872
$
84,208 $
28,069
$
134,561 $
44,854
$
144,614 $
48,205
$
138,115 $
46,038
$
288,470 $
96,157
$
125,200 $
41,733
$
272,864 $
90,955
$
$
$
$
$ 1,306,988 $
435,663
December 2015
Exhibit 25 - LSL MONITORING - MONITORING, NOTIFICATION, BURDEN, AND COST SUMMARY (cont.
Summary
All CWSs (Monitoring)
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Samples by Year
(Representing 9-Year Cycle)
Number of
Size Category
Systems
≤100
142
101-500
176
501-1,000
45
1,001-3,300
65
3,301-10,000
36
10,001-25,000
15
25,001-50,000
7
50,001-75,000
4
75,001-100,000
1
100,001-500,000
1
500,001-1,000,000
> 1,000,000
Total
492
2014
2,272
2,666
1,397
4,992
8,018
8,813
8,641
4,566
1,049
2,286
44,700
2015
2,272
2,666
1,397
4,992
8,018
8,813
8,641
4,566
1,049
2,286
44,700
2016
2,272
2,666
1,397
4,992
8,018
8,813
8,641
4,566
1,049
2,286
44,700
2017
2,272
2,666
1,397
4,992
8,018
8,813
8,641
4,566
1,049
2,286
44,700
2018
2,272
2,666
1,397
4,992
8,018
8,813
8,641
4,566
1,049
2,286
44,700
2019
2,272
2,666
1,397
4,992
8,018
8,813
8,641
4,566
1,049
2,286
44,700
2020
2,272
2,666
1,397
4,992
8,018
8,813
8,641
4,566
1,049
2,286
44,700
2021
2,272
2,666
1,397
4,992
8,018
8,813
8,641
4,566
1,049
2,286
44,700
Total
Samples
6,816
7,997
4,190
14,976
24,054
26,438
25,924
13,697
3,147
6,859
134,099
2022
2,272
2,666
1,397
4,992
8,018
8,813
8,641
4,566
1,049
2,286
44,700
Annual
Samples
2,272
2,666
1,397
4,992
8,018
8,813
8,641
4,566
1,049
2,286
44,700
Total
Burden
17,040
19,994
10,476
37,440
60,134
66,096
64,809
34,243
7,868
17,148
335,248
Annual
Burden
5,680
6,665
3,492
12,480
20,045
22,032
21,603
11,414
2,623
5,716
111,749
Total Labor
Cost
$
589,448
$
691,619
$
362,386
$ 1,295,124
$ 2,080,169
$ 2,286,393
$ 2,241,866
$ 1,184,537
$
272,173
$
593,184
$
$
$ 11,596,899
Annual Labor
Cost
$
196,483
$
230,540
$
120,795
$
431,708
$
693,390
$
762,131
$
747,289
$
394,846
$
90,724
$
197,728
$
$
$ 3,865,633
Total O&M
Cost
25,073
29,419
15,414
55,090
88,482
97,254
95,360
50,386
11,577
25,232
493,287
Annual O&M
Cost
$
8,358
$
9,806
$
5,138
$
18,363
$
29,494
$
32,418
$
31,787
$
16,795
$
3,859
$
8,411
$
$
$
164,429
Total O&M
Cost
$
4,279
$
3,766
$
1,973
$
7,052
$
11,326
$
12,449
$
12,207
$
12,140
$
3,952
$
8,613
$
$
$
77,756
Annual O&M
Cost
$
1,426
$
1,255
$
658
$
2,351
$
3,775
$
4,150
$
4,069
$
4,047
$
1,317
$
2,871
$
$
$
25,919
$
$
$
$
$
$
$
$
$
$
$
$
$
All CWSs (Notifications)
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Notifications by Year
(Representing 9-Year Cycle)
Number of
Size Category
Systems
≤100
142
101-500
176
501-1,000
45
1,001-3,300
65
3,301-10,000
36
10,001-25,000
15
25,001-50,000
7
50,001-75,000
4
75,001-100,000
1
100,001-500,000
1
500,001-1,000,000
> 1,000,000
Total
492
2014
2,613
2,299
1,205
4,306
6,915
7,601
7,453
7,413
2,413
5,259
47,476
2015
2,613
2,299
1,205
4,306
6,915
7,601
7,453
7,413
2,413
5,259
47,476
2016
2,613
2,299
1,205
4,306
6,915
7,601
7,453
7,413
2,413
5,259
47,476
2017
2,613
2,299
1,205
4,306
6,915
7,601
7,453
7,413
2,413
5,259
47,476
2018
2,613
2,299
1,205
4,306
6,915
7,601
7,453
7,413
2,413
5,259
47,476
2019
2,613
2,299
1,205
4,306
6,915
7,601
7,453
7,413
2,413
5,259
47,476
2020
2,613
2,299
1,205
4,306
6,915
7,601
7,453
7,413
2,413
5,259
47,476
2021
2,613
2,299
1,205
4,306
6,915
7,601
7,453
7,413
2,413
5,259
47,476
2022
2,613
2,299
1,205
4,306
6,915
7,601
7,453
7,413
2,413
5,259
47,476
Annual
Total
Notifications Notifications
7,838
2,613
6,898
2,299
3,614
1,205
12,917
4,306
20,746
6,915
22,803
7,601
22,359
7,453
22,238
7,413
7,239
2,413
15,776
5,259
142,428
47,476
Total
Burden
1,960
1,724
904
3,229
5,187
5,701
5,590
11,119
3,619
7,888
46,920
Annual
Burden
653
575
301
1,076
1,729
1,900
1,863
3,706
1,206
2,629
15,640
Total Labor
Cost
$
67,786
$
59,652
$
31,256
$
111,704
$
179,415
$
197,201
$
193,361
$
384,626
$
125,200
$
272,864
$
$
$ 1,623,066
Annual Labor
Cost
$
22,595
$
19,884
$
10,419
$
37,235
$
59,805
$
65,734
$
64,454
$
128,209
$
41,733
$
90,955
$
$
$
541,022
All CWSs (LSL Total)
Summary of Monitoring, Burden, and Cost for ICR Period
(2016-2018)
Events by Year
(Representing 9-Year Cycle)
Number of
Size Category
Systems
≤100
142
101-500
176
501-1,000
45
1,001-3,300
65
3,301-10,000
36
10,001-25,000
15
25,001-50,000
7
50,001-75,000
4
75,001-100,000
1
100,001-500,000
1
500,001-1,000,000
> 1,000,000
Total
492
2014
4,885
4,965
2,602
9,298
14,933
16,414
16,094
11,978
3,462
7,545
92,176
DDBP/Chem/Rads ICR - Lead and Copper Rule
2015
4,885
4,965
2,602
9,298
14,933
16,414
16,094
11,978
3,462
7,545
92,176
2016
4,885
4,965
2,602
9,298
14,933
16,414
16,094
11,978
3,462
7,545
92,176
2017
4,885
4,965
2,602
9,298
14,933
16,414
16,094
11,978
3,462
7,545
92,176
2018
4,885
4,965
2,602
9,298
14,933
16,414
16,094
11,978
3,462
7,545
92,176
2019
4,885
4,965
2,602
9,298
14,933
16,414
16,094
11,978
3,462
7,545
92,176
2020
4,885
4,965
2,602
9,298
14,933
16,414
16,094
11,978
3,462
7,545
92,176
2021
4,885
4,965
2,602
9,298
14,933
16,414
16,094
11,978
3,462
7,545
92,176
2022
4,885
4,965
2,602
9,298
14,933
16,414
16,094
11,978
3,462
7,545
92,176
H-91
Total
Annual
Notifications Notifications
14,654
4,885
14,895
4,965
7,805
2,602
27,893
9,298
44,800
14,933
49,242
16,414
48,283
16,094
35,935
11,978
10,386
3,462
22,635
7,545
276,528
92,176
Total
Burden
19,000
21,718
11,380
40,669
65,321
71,797
70,399
45,362
11,487
25,036
382,168
Annual
Burden
6,333
7,239
3,793
13,556
21,774
23,932
23,466
15,121
3,829
8,345
127,389
Total Labor
Cost
$
657,234
$
751,271
$
393,642
$ 1,406,829
$ 2,259,584
$ 2,483,594
$ 2,435,227
$ 1,569,164
$
397,373
$
866,048
$
$
$ 13,219,965
Annual Labor
Cost
$
219,078
$
250,424
$
131,214
$
468,943
$
753,195
$
827,865
$
811,742
$
523,055
$
132,458
$
288,683
$
$
$ 4,406,655
$
$
$
$
$
$
$
$
$
$
$
$
$
Total O&M
Cost
29,352
33,184
17,388
62,141
99,808
109,703
107,567
62,526
15,529
33,844
571,043
Annual O&M
Cost
$
9,784
$
11,061
$
5,796
$
20,714
$
33,269
$
36,568
$
35,856
$
20,842
$
5,176
$
11,281
$
$
$
190,348
December 2015
Exhibit 26 - SYSTEM INVENTORY
GROUND WATER: CWSs
Size
Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
TOTAL:
DDBP/Chem/Rads ICR - Lead and Copper Rule
SURFACE WATER: CWSs
Size
Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
TOTAL:
Total
Systems
11,212
13,403
4,320
5,566
2,724
989
355
106
44
58
5
2
38,784
Total
Systems
970
2,092
1,131
2,497
2,219
1,300
686
256
133
308
35
20
11,647
GROUND WATER: NTNCWSs
Size
Total
Category
Systems
≤100
8,279
101-500
6,254
501-1,000
1,539
1,001-3,300
786
3,301-10,000
92
10,001-25,000
4
25,001-50,000
5
50,001-75,000
0
75,001-100,000
0
100,001-500,000
0
500,001-1,000,000
0
> 1,000,000
0
TOTAL:
16,958
SURFACE WATER: NTNCWSs
Size
Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
TOTAL:
GROUND WATER: ALL SYSTEMS
Size
Total
Category
Systems
≤100
19,491
101-500
19,657
501-1,000
5,859
1,001-3,300
6,352
3,301-10,000
2,816
10,001-25,000
993
25,001-50,000
360
50,001-75,000
106
75,001-100,000
44
100,001-500,000
58
500,001-1,000,000
5
> 1,000,000
2
TOTAL:
55,743
Source: SDWIS/FED Data from October 2014
SURFACE WATER: ALL SYSTEMS
Size
Total
Category
Systems
≤100
1,284
101-500
2,375
501-1,000
1,223
1,001-3,300
2,585
3,301-10,000
2,272
10,001-25,000
1,303
25,001-50,000
689
50,001-75,000
257
75,001-100,000
133
100,001-500,000
309
500,001-1,000,000
35
> 1,000,000
20
TOTAL:
12,485
H-92
Total
Systems
314
283
92
88
53
3
3
1
0
1
0
0
839
December 2015
Exhibit 27 - Labor Rates
State Labor Rate
$45.60
Base (Hourly)
$21.62
Exhibit 27 - System Labor Rates
≤100
$34.59
101-500
$34.59
501-1,000
$34.59
1,001-3,300
$34.59
Load Factor
Inflation Factor
Total
1.6
1.0
$34.59
3,301-10,000
$34.59
Base (Hourly)
$28.50
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
$34.59
$34.59
$34.59
$34.59
$34.59
$34.59
$34.59
Load Factor
Inflation Factor
Total
1.6
1.0
$45.60
Postage (First Class)
Paper + Envelope (O&M)
$
$0.49
0.06
Inflation Factor
DDBP/Chem/Rads ICR - Lead and Copper Rule
1.40
PWS Labor Rate
2013$ National Occupational Employment and Wage Estimates, United States, BLS
SOC Code 51-8031, "Local Government - Water and Liquid Waste Treatment
Plant and System Operators". May 2013 data (published in April 2014).
http://www.bls.gov/oes/2013/may/oes518031.htm
1 ECI New
1 ECI Base
State Labor Rate
2013$ National Occupational Employment and Wage Estimates, United States, BLS
SOC Code 19-2041, "State Government - Environmental Scientists and
Specialists, Including Health". May 2013 data (published in April
2014).http://www.bls.gov/oes/2013/may/oes192041.htm
1 ECI New
1 ECI Base
$0.03 for envelope, and $0.01 for paper, inflated to 2013$.
CPI All Urban Consumers (CPI-U): U.S. City Average, by
Expenditure Category and Commodity and Service Group.
All urban consumers, All items, Not seasonally adjusted.
233.0 2013 Annual Average.
166.6 CPI-U Base Year
H-93
December 2015
Exhibit 28 - Number of Public Water Systems, Population Served, and Service
Connections
Size
Category
Number of
Systems
Community Water Systems (CWSs)
Average
Service
Pop.
Pop./Sys.
Connections
Average
Scon./Sys.
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
12,182
15,495
5,451
8,063
4,943
2,289
1,041
362
177
366
40
22
733,993
3,924,113
4,031,218
15,372,493
28,787,912
36,249,684
36,616,560
21,925,548
15,275,305
68,881,675
28,065,535
42,731,781
60
253
740
1,907
5,824
15,836
35,174
60,568
86,301
188,201
701,638
1,942,354
1,462,800
2,196,618
1,587,232
5,804,192
10,323,261
12,606,720
12,047,573
7,291,921
4,642,177
20,920,595
8,216,318
10,017,379
120
142
291
720
2,088
5,508
11,573
20,143
26,227
57,160
205,408
455,335
Total
50,431
302,595,817
6,000
97,116,786
1,926
Size
Category
Nontransient Noncommunity Water Systems (NTNCWSs)
Number of
Average
Service
Average
Systems
Pop.
Pop./Sys.
Connections Scon./Sys.
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
8,593
6,537
1,631
874
145
7
8
1
0
1
0
0
476,708
1,639,996
1,172,829
1,495,302
815,831
91,800
294,593
71,963
0
203,375
0
0
55
251
719
1,711
5,626
13,114
36,824
71,963
0
203,375
N/A
N/A
38,871
51,284
21,124
33,154
14,478
381
432
184
0
1,109
0
0
5
8
13
38
100
54
54
184
N/A
1,109
N/A
N/A
Total
17,797
6,262,397
352
161,017
9
Source: SDWIS/FED Data from October 2014
DDBP/Chem/Rads ICR - Lead and Copper Rule
H-94
December 2015
Exhibit 29 - Notification of Sampling Results for Customers Whose Taps Are Sampled
System Size
Category
Number of
Systems
A
Percentage of
Systems Required
to Notify
Customers
B
Total Number
Annual Number of
of Systems
Systems Affected by
Affected by Regulatory Change III.C
Reg Change
That Are Affected by
III.E
Reg. Change III.E
C=A*B
D
Total Annual
Monitoring
Events
E
Total Customer
Annual
Annual
Notification
System
System Labor
Letters
Burden (hrs)
Cost
F
G
H
Annual System
O&M Cost
I
CWSs:
≤100
12,182
100%
12,182
5,888
29,440
1,472
$50,919.14
$16,072.15
142
101-500
15,495
100%
15,495
7,489
37,446
1,872
$64,767.03
$20,443.11
176
501-1,000
5,451
100%
5,451
2,635
13,173
659
$22,784.45
$7,191.70
46
1,001-3,300
8,063
100%
8,063
3,897
19,486
974
$33,702.26
$10,637.80
65
3,301-10,000
4,943
100%
4,943
2,389
11,946
1,327
$45,913.51
$6,521.48
37
10,001-25,000
2,289
100%
2,289
1,106
5,532
615
$21,261.59
$3,019.96
15
25,001-50,000
1,041
100%
1,041
503
2,516
280
$9,669.42
$1,373.43
7
50,001-75,000
362
100%
362
175
875
97
$3,362.47
$477.60
4
75,001-100,000
177
100%
177
86
428
48
$1,644.08
$233.52
1
100,001-500,000
366
100%
366
177
885
98
$3,399.62
$482.88
2
500,001-1,000,000
40
100%
40
19
97
11
$371.54
$52.77
1
> 1,000,000
22
100%
22
11
53
6
$204.35
$29.03
0
NTNCWSs:
≤100
8,593
100%
8,593
161
4,153
4,153
$143,670.38
$0.00
101-500
6,537
100%
6,537
122
3,160
3,160
$109,295.15
$0.00
501-1,000
1,631
100%
1,631
25
788
788
$27,269.45
$0.00
1,001-3,300
874
100%
874
19
422
422
$14,612.81
$0.00
3,301-10,000
145
100%
145
2
70
70
$2,424.32
$0.00
10,001-25,000
7
100%
7
1
3
3
$117.04
$0.00
25,001-50,000
8
100%
8
0
4
4
$133.76
$0.00
50,001-75,000
1
100%
1
0
0
0
$16.72
$0.00
75,001-100,000
0
100%
0
0
0
$0.00
$0.00
100,001-500,000
1
100%
1
0
0
$0.00
$0.00
500,001-1,000,000
0
100%
0
0
$0.00
> 1,000,000
0
100%
0
0
$0.00
Total
68,228
100%
68,228
824
32,977
16,060
$555,539.11
$66,535.42
Note:
Burden estimates take into account the results of the May 2015 consultation with water industry representatives.
Assumptions:
[A] Number of CWS and NTNCWS systems per SDWIS/FED Data 2014.
[B] 40 CFR 141.85(d) requires all water systems to provide consumers with testing results when their drinking water is tested for lead and copper.
[D] The annual number of systems affected by regulatory change III.C is estimated as one third of the systems with lead ALEs during monitoring periods beginning and ending anytime
between 7/1/2011 and 6/30/2014 (SDWIS/FED Data 2014).
[E] For the subtotal of systems affected by Reg. Change III.E, it is assumed that 9% of systems use a standard monitoring schedule with 6 monitoring events in 3 years or 2 monitoring events
each year. It is also assumed that 91% of systems are on a reduced monitoring schedule with 1 monitoring event in 3 years. In addition, systems affected by Reg. Change III.C that are also
affected by Reg. Change III.E use a standard monitoring schedule with 2 monitoring events each year. (Source: USEPA Survey of States - Questions on State Implementation of Lead and
Copper Rule. July 2004). For systems affected by Reg. Change III.C, assume all systems have reverted to a standard monitoring schedule.
[F] The number of customer notification letters on lead monitoring results is based on the sampling schedule for standard and reduced monitoring as summarized in the LCR Short Term
Revisions Economic Analysis Exhibit H.21. It is assumed that one letter is sent for each sampling site required by 40 CFR 141.86(c).
[G] For CWSs, assume burden of 1 hour per 20 letters for systems serving <3,300 people. For systems serving > 3,300 people, assume burden of 1 hour per 9 letters. For NTNCWSs,
assume 1 hour per monitoring event for all system sizes. Burden estimates based on recommendations of Expert Review Panel (November 2005).
[I] For CWSs, the annual system O&M cost equals $0.55 per sample letter ($0.49 postage, $0.06 for paper plus envelope) multiplied by the number of sample letters. For NTNCWSs, the
O&M cost is assumed to be negligible.
DDBP/Chem/Rads ICR - Lead and Copper Rule
H-95
December 2015
Exhibit 30 - CWS Public Education Delivery Requirements (Inserts and Pamphlets)
Size
Category
A
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
Notes:
Assumptions:
Total CWSs
B
12,182
15,495
5,451
8,063
4,943
2,289
1,041
362
177
366
40
22
50,431
CWSs - Public
Total
Education Required
Population
[1]
Served
C
D
730,920
142
3,920,235
176
4,033,740
46
15,376,141
65
28,788,032
37
36,248,604
15
36,616,134
7
21,925,616
4
15,275,277
1
68,881,566
2
28,065,520
1
42,731,788
302,593,573
495
Avg. Pop. Avg. No. Inserts per
Per
System [2]
(E/2.58)*4
System
E
F
60
93
253
392
740
1,147
1,907
2,957
5,824
9,029
15,836
24,552
35,174
54,533
60,568
93,904
86,301
133,800
188,201
291,784
701,638
1,087,811
1,942,354
3,011,402
Avg. No. of Avg. No. of All
Pamphlets
Materials per
per System
System
(F+G)
[3]
G
H
5
98
5
397
5
1,152
5
2,962
14
9,043
53
24,605
76
54,609
175
94,079
207
134,007
519
292,303
1,931
1,089,742
5,465
3,016,867
Training
Material
Cost per
Piece [4]
I
$
0.36
$
0.36
$
0.36
$
0.36
$
0.36
$
0.36
$
0.36
$
0.36
$
0.36
$
0.36
$
0.36
$
0.36
Training
Material
Cost per
System
Total
Training
Material
Cost
Mailing
Cost per
System [5]
Total
Mailing
Cost
(H*I)
(D*J)
(H*0.5*$0.49)
(D*L)
J
K
L
Total
Total Annual
Material and
Material and
Mailing Costs Mailing (O&M)
per System
Costs
(J+L)
M
(K+M)
N
O
$
$
$
$
$
$
$
$
$
$
$
$
35
143
415
1,066
3,256
8,858
19,659
33,868
48,243
105,229
392,307
1,086,072
$
$
$
$
$
$
$
$
$
$
$
$
4,999
25,122
19,082
69,301
119,374
132,867
137,616
135,474
48,243
245,535
261,538
-
$
$
$
$
$
$
$
$
$
$
$
$
24
97
282
726
2,216
6,028
13,379
23,049
32,832
71,614
266,987
739,132
$
$
$
$
$
$
$
$
$
$
$
$
3,402
17,097
12,986
47,163
81,240
90,423
93,655
92,197
32,832
167,100
177,991
-
$
$
$
$
$
$
$
$
$
$
$
$
59
240
697
1,792
5,471
14,886
33,039
56,918
81,074
176,844
659,294
1,825,204
$
$
$
$
$
$
$
$
$
$
$
$
8,401
42,219
32,068
116,464
200,614
223,290
231,271
227,671
81,074
412,635
439,529
-
$
1,699,151
$
1,199,149
$
1,156,367
$
816,088
$
2,855,518
$
2,015,237
Labor Hours
to Mail Materials
(per System) [6]
Direct Mail
P
15
15
25
25
144
183
258
356
456
851
2,841
7,650
Total
Labor
Unit
Burden
Total Labor Hours
to Mail Materials
Bill Stuffer
Direct Mail
Bill Stuffer
Total
6
6
10
10
54
93
168
266
366
761
2,751
7,560
1,063
1,318
575
813
2,641
1,372
902
713
228
993
947
-
425
527
230
325
991
697
587
533
183
888
917
-
1,488
1,845
805
1,138
3,633
2,068
1,490
1,245
411
1,881
1,864
-
11,563
6,303
17,866
Q
(Q/D)
R
10.5
10.5
17.5
17.5
99.1
137.9
212.8
311.3
411.0
806.0
2,796.0
-
Labor
Rate
S
$ 34.59
$ 34.59
$ 34.59
$ 34.59
$ 34.59
$ 34.59
$ 34.59
$ 34.59
$ 34.59
$ 34.59
$ 34.59
$ 34.59
Total Annual
Labor Cost
(Q*S)
$
$
$
$
$
$
$
$
$
$
$
$
T
51,456
63,805
27,847
39,348
125,662
71,543
51,536
43,068
14,217
65,053
64,480
-
$
618,016
Burden estimates take into account the results of the May 2015 consultation with water industry representatives.
[1] See Exhibit 29, column D.
[2] The average number of households per system receiving inserts is assumed to equal the average population served per system for a given size category divided by 2.58 (2010 Census figure for the average number of people per household) times 4 for 1 notification for each quarterly billing cycle.
[3] For systems serving > 3,300 people, the number of pamphlets and brochures was derived by assuming 90.9 doctors and 32.1 schools for every 100,000 people. This estimate is considered to be conservative enough to cover other facilities and organizations that are likely to provide services to pregnant women and children. For systems serving 3,300 or fewer people, the
number of pamphlets and brochures was estimated at 5. These systems were assumed to be too small to have their own doctors and schools, but that they would have other areas in the town where pamphlets would be beneficial to children and pregnant women. Child care centers added for STR based on 178/100,000 and 15 ob/gyns/100,000.
[4] CWSs will buy material already printed (1991 RIA assumption). The cost per piece is taken from the AWWA 2015 bookstore catalog and assumes an AWWA member rate.
[5] The cost to mail public education materials is 49 cents, the first class rate. It is assumed that 50% of systems will mail public education materials separately, and 50% will mail materials with their water bills.
[6] The burden per system to conduct separate mailings (50% of systems) is assumed to be 15 hours for systems serving 500 or fewer, 25 hours for systems serving 501-3,300, and 120 hours for systems serving over 3,300. For the 50% of systems assumed to mail materials with the water bill, for systems serving 500 or fewer the burden is 6 hours, for systems serving 5013,300 the burden is 10 hours, and for systems >3,300 the burden is 1/4 of the burden for systems conducting separate mailings. In addtion, systems serving over 3,300 include an extra hour and a half burden to draw up lists of additional groups receiving pamphlets and to contact the public health agency, and 0.25 hours per 100 brochures for production.
DDBP/Chem/Rads ICR - Lead and Copper Rule
H-96
December 2015
Exhibit 31 - CWS Public Education Delivery Requirements (PSAs)
Size
Category
A
Total CWSs
B
≤100
12,182
101-500
15,495
501-1,000
5,451
1,001-3,300
8,063
3,301-10,000
4,943
10,001-25,000
2,289
25,001-50,000
1,041
50,001-75,000
362
75,001-100,000
177
100,001-500,000
366
500,001-1,000,000
40
> 1,000,000
22
Total
50,431
Notes:
Assumptions:
Total
Population
Served
C
730,920
3,920,235
4,033,740
15,376,141
28,788,032
36,248,604
36,616,134
21,925,616
15,275,277
68,881,566
28,065,520
42,731,788
302,593,573
CWSs - Public
Education
Required [1]
D
142
176
46
65
37
15
7
4
1
2
1
495
No. of Entities
Requiring
Notification [2]
E
8
8
8
8
8
8
8
8
PSA
Frequency
(per Year)
F
2
2
2
2
2
2
2
2
2
2
2
2
Avg.
Labor
Annual
Hours Burden per
per PSA
System
(F*G)
[3]
G
H
5.0
10
5.0
10
5.0
10
5.0
10
5.0
10
5.0
10
5.0
10
5.0
10
Total
Annual
PSA
Burden
(D*H)
I
367
150
70
40
10
23
7
667
PSA
Material
Cost per
Piece [4]
J
$
0.36
$
0.36
$
0.36
$
0.36
$
0.36
$
0.36
$
0.36
$
0.36
$
0.36
$
0.36
$
0.36
$
0.36
Mailing
Cost per
System
Material
and
Mailing
Costs per
System
Material
and
Mailing
(O&M)
Costs
(E*F*J)
(E*F*$0.49)
(K+L)
(D*M)
K
L
M
N
PSA
Material
Cost per
System
$
$
$
$
$
$
$
$
$
$
$
$
5.76
5.76
5.76
5.76
5.76
5.76
5.76
5.76
$
$
$
$
$
$
$
$
$
$
$
$
7.84
7.84
7.84
7.84
7.84
7.84
7.84
7.84
$
$
$
$
$
$
$
$
$
$
$
$
13.60
13.60
13.60
13.60
13.60
13.60
13.60
13.60
$
$
$
$
$
$
$
$
$
$
$
$
$
499
204
95
54
14
32
9
907
Labor
Rate
O
$ 34.59
$ 34.59
$ 34.59
$ 34.59
$ 34.59
$ 34.59
$ 34.59
$ 34.59
$ 34.59
$ 34.59
$ 34.59
$ 34.59
Total
Annual
Labor
Cost
(I*O)
P
$
$
$
$
$ 12,684
$ 5,189
$ 2,421
$ 1,384
$
346
$
807
$
231
$
$ 23,061
Burden estimates take into account the results of the May 2015 consultation with water industry representatives.
[1] See Exhibit 29, column D.
[2] The LCRMR model assumes that each system serving >3,300 people will send materials to 8 facilities, but States will not require systems serving
<3,300 people to deliver PSAs or send notices to newspapers.
[3] Systems estimated to require 5 hours to prepare and mail notification to newspapers and radio and TV stations. It is assumed that these entities will
run the public education materials as a public service announcment, free of charge.
[4] CWSs will buy material already printed (1991 RIA assumption). The cost per piece is taken from the AWWA 2015 bookstore catalog and assumes
an AWWA member rate.
DDBP/Chem/Rads ICR - Lead and Copper Rule
H-97
December 2015
Exhibit 32 - NTNCWS Public Education Delivery Requirements (Inserts and Pamphlets)
Size
Category
A
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
Total
NTNCWSs
B
8,593
6,537
1,631
874
145
7
8
1
1
17,797
161
122
25
19
2
1
-
Annual System
Labor Hours
Total Annual
to Post and
System
Distribute
Burden
(C*D)
Handouts
D
E
0.5
80.3
0.5
60.8
0.5
12.5
0.5
9.5
0.5
1.0
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
-
329
164.7
NTNCWSs - Public
Education
Required [1]
C
Labor
Rate
F
$ 34.59
$ 34.59
$ 34.59
$ 34.59
$ 34.59
$ 34.59
$ 34.59
$ 34.59
$ 34.59
$ 34.59
$ 34.59
$ 34.59
Total Annual
Labor Cost
(E*F)
G
$
$
$
$
$
$
$
$
$
$
$
$
2,779
2,104
432
329
35
17
-
$
5,696
Note: Burden estimates take into account the results of the May 2015 consultation with water industry representatives.
Assumptions: [1] See Exhibit 29, column D.
DDBP/Chem/Rads ICR - Lead and Copper Rule
H-98
December 2015
Exhibit 33a - CWS Public Education Requirements from the LCR STR
Size
Category
A
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
Notes:
Assumptions:
Total CWSs
B
12,182
15,495
5,451
8,063
4,943
2,289
1,041
362
177
366
40
22
Total
Population
Served
C
733,993
3,924,113
4,031,218
15,372,493
28,787,912
36,249,684
36,616,560
21,925,548
15,275,305
68,881,675
28,065,535
42,731,781
Public Education
Required [1]
D
142
176
46
65
37
15
7
4
1
2
1
-
50,431
302,595,817
495
Avg. Pop.
Per
System
E
60
253
740
1,907
5,824
15,836
35,174
60,568
86,301
188,201
701,638
1,942,354
Burden to Prepare
Additional
Brochure
Language
F
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
Burden for
Self
Certification
Letters to
State
G
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
Burden for
Consulting
with State
H
2
2
2
2
2
2
2
2
2
2
2
2
O&M Cost
for
Certification
Letters [2]
I
$
0.55
$
0.55
$
0.55
$
0.55
$
0.55
$
0.55
$
0.55
$
0.55
$
0.55
$
0.55
$
0.55
$
0.55
Average
Additional
Burden for
Customer
Additional
Average O&M Cost
Education
Customer
for Additional
Education
Customer Education Activities per
System [4]
Activities [3]
Activities [3]
J
K
L
$
45
1
1.22
$
52
1
1.23
$
87
1
1.63
$
128
1
1.68
$
486
3
4.74
$
720
3
13.23
$
982
3
14.14
$
3
20.81
1,921
$
2,170
3
22.01
$
1,549
3
43.24
$
2,132
3
67.22
$
3,541
3
125.16
Burden to
Post on
Total Burden
Website
Hours
M
N
0.0
969
0.0
1,203
0.0
333
0.0
475
0.0
728
0.0
680
0.0
336
0.0
272
0.0
72
3.5
324
3.5
141
3.5
-
$
$
$
$
$
$
$
$
$
$
$
$
5,533
$
Total Labor
Cost
O
33,527
41,629
11,534
16,420
25,167
23,516
11,630
9,414
2,478
11,206
4,861
-
Total O&M
Cost
P
$
$
$
$
$
$
$
$
$
$
$
$
6,417.80
9,169.28
4,007.64
8,372.89
53,499.61
32,402.62
20,625.83
23,054.31
6,511.14
10,844.36
4,264.29
-
191,382 $
179,170
Burden estimates take into account the results of the May 2015 consultation with water industry representatives.
[1] See Exhibit 29, column D.
[2] Based on $0.49 for stamp, $0.03 for envelope, and $0.01 for paper, updated to 2013$.
[3] Derived from STR updated to 2013$.
[4] From Exhibit H.6 of the STR EA.
DDBP/Chem/Rads ICR - Lead and Copper Rule
H-99
December 2015
Exhibit 33b - NTNCWS Public Education Requirements from the LCR STR
Size
Category
A
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
NTNCWSs
B
8,593
6,537
1,631
874
145
7
8
1
1
-
Total
Population
Served
C
476,708
1,639,996
1,172,829
1,495,302
815,831
91,800
294,593
71,963
203,375
-
Public Education
Required [1]
D
161
122
25
19
2
1
-
17,797
6,262,397
329
Total
Notes:
Assumptions:
Avg. Pop.
Per
System
E
55
251
719
1,711
5,626
13,114
36,824
71,963
203,375
N/A
N/A
Burden to Prepare
Additional
Brochure
Language
F
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
Total
Burden
Hours
H
Burden for
Consulting
with State
G
2
2
2
2
2
2
2
2
2
2
2
2
Total Labor
Cost
I
884
669
138
105
11
6
-
$
$
$
$
$
$
$
$
$
$
$
$
30,568
23,148
4,756
3,615
381
190
-
1,811
$
62,658
Burden estimates based on STR EA and take into account the results of the May 2015 consultation with water industry representatives.
[1] See Exhibit 29, column D.
DDBP/Chem/Rads ICR - Lead and Copper Rule
H-100
December 2015
Exhibit 34 - Summary of Public Education Burden and Costs
Size
Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
DDBP/Chem/Rads ICR - Lead and Copper Rule
Total
Systems
21,077
22,329
7,153
9,021
5,127
2,312
1,056
367
178
369
41
22
69,052
$
$
$
$
$
$
$
$
$
$
$
$
Total
Annual
O&M Cost
30,891
71,831
43,267
135,475
261,134
258,916
253,365
251,257
87,832
423,994
443,855
29
Total Annual
System
Burden
9,046
8,810
2,735
3,123
6,136
3,522
2,179
1,655
540
2,326
2,022
6
$
$
$
$
$
$
$
$
$
$
$
$
Total Annual
Labor Cost
312,919
304,748
94,623
108,027
212,266
121,834
75,391
57,246
18,686
80,466
69,943
204
$
2,261,849
42,101
$
1,456,353
H-101
December 2015
Exhibit 35 - SYSTEM REPORTING - BURDEN AND COST ASSUMPTIONS
Reporting Burden per Event
Explain
Treatment or
Move Tap
Monitoring
WQP
Source Water
Tap
Tap
Source
Monitoring
Waiver
Reporting
Monitoring
Sample
Sample
Change
Location
Application
(Annual)
Letter
Letter
Calcs
≤100
1.5
1.0
3.0
8.0
1.0
5.0
0.5
101-500
1.5
1.0
3.0
8.0
1.0
5.0
0.5
501-1,000
1.5
1.0
3.0
8.0
1.0
5.0
0.5
1,001-3,300
1.5
1.0
3.0
8.0
1.0
5.0
0.5
3,301-10,000
1.5
1.0
3.0
8.0
N/A
5.0
0.5
10,001-25,000
1.5
1.25
3.0
8.0
N/A
5.0
0.5
25,001-50,000
1.5
1.25
3.0
8.0
N/A
5.0
0.5
50,001-75,000
1.5
1.25
3.0
8.0
N/A
5.0
0.5
75,001-100,000
1.5
1.25
3.0
8.0
N/A
5.0
0.5
100,001-500,000
1.5
1.5
3.0
8.0
N/A
5.0
0.5
500,001-1,000,000
1.5
1.5
3.0
8.0
N/A
5.0
0.5
> 1,000,000
1.5
1.5
3.0
8.0
N/A
5.0
0.5
Note: Burden estimates take into account the results of the May 2015 consultation with water industry representatives.
Size
Category
DDBP/Chem/Rads ICR - Lead and Copper Rule
H-102
Public
Education
Letter
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
Partial
LSL Letter
(Annual) LSL Letter
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
$
$
$
$
$
$
$
$
$
$
$
$
Labor
Rate
34.59
34.59
34.59
34.59
34.59
34.59
34.59
34.59
34.59
34.59
34.59
34.59
O&M Cost
Per Event
(Postage,
Paper,
Envelope)
$
0.55
$
0.55
$
0.55
$
0.55
$
0.55
$
0.55
$
0.55
$
0.55
$
0.55
$
0.55
$
0.55
$
0.55
Self
Certification
Letter for
Customer
Notification
(burden)
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
0.12
December 2015
Exhibit 36 - LABOR RATES
State Labor Rate
$45.60
Base (Hourly)
System Labor Rates
$21.62
PWS Labor Rate
2013$ National Occupational Employment and Wage Estimates, United States, BLS SOC Code 51-8031, "Local
Government - Water and Liquid Waste Treatment Plant and System Operators". May 2013 data
(published in April 2014). http://www.bls.gov/oes/2013/may/oes518031.htm
Load Factor
1.6
≤100
$34.59
Inflation Factor
1.0
1 ECI New
101-500
$34.59
Total
$34.59
1 ECI Base
501-1,000
$34.59
1,001-3,300
$34.59
3,301-10,000
$34.59
Base (Hourly)
10,001-25,000
$34.59
Load Factor
1.6
25,001-50,000
$34.59
Inflation Factor
1.0
1 ECI New
Total
$45.60
1 ECI Base
50,001-75,000
$34.59
75,001-100,000
$34.59
100,001-500,000
$34.59
500,001-1,000,000
$34.59
> 1,000,000
$34.59
$28.50
State Labor Rate
2013$ National Occupational Employment and Wage Estimates, United States, BLS SOC Code 19-2041, "State
Government - Environmental Scientists and Specialists, Including Health". May 2013 data (published in
April 2013). http://www.bls.gov/oes/2013/may/oes192041.htm
CPI All Urban Consumers (CPI-U): U.S. City Average, by Expenditure Category and Commodity and Service
233.0 Group. All urban consumers, All items, Not seasonally adjusted. 2013 Annual Average.
Postage
Paper and Envelope (O&M)
$
$
DDBP/Chem/Rads ICR - Lead and Copper Rule
0.49
0.06
166.6 CPI-U Base Year
1.40 Inflation factor
H-103
December 2015
Exhibit 37 - TAP MONITORING - REPORTING BURDEN AND COST
Reduced Monitoring - System Performing Calculations
Summary of Burden and Cost for ICR Period
(2016-2018)
Monitoring Events by Year
(Representing 9-Year Cycle)
Number of
Size Category
Systems
≤100
10,388
101-500
11,016
501-1,000
3,541
1,001-3,300
4,469
3,301-10,000
2,544
10,001-25,000
1,148
25,001-50,000
525
50,001-75,000
182
75,001-100,000
89
100,001-500,000
184
500,001-1,000,000
20
> 1,000,000
11
Total
34,114
2014
7,721
8,462
2,670
3,360
446
197
91
8
2
2
22,958
2015
2,081
2,488
757
945
200
86
39
189
91
186
20
11
7,090
2016
1,340
1,699
500
621
2,108
947
433
8
2
2
7,658
2017
6,683
7,361
2,316
2,912
446
197
91
8
2
2
20,017
2018
2,081
2,488
757
945
200
86
39
189
91
186
20
11
7,090
2019
1,340
1,699
500
621
2,108
947
433
8
2
2
7,658
2020
6,683
7,361
2,316
2,912
446
197
91
8
2
2
20,017
2021
2,081
2,488
757
945
200
86
39
189
91
186
20
11
7,090
2022
1,340
1,699
500
621
2,108
947
433
8
2
2
7,658
Total
Monitoring
Events
10,104
11,548
3,572
4,478
2,753
1,229
562
205
95
190
20
11
34,765
Annual
Monitoring
Events
3,368
3,849
1,191
1,493
918
410
187
68
32
63
7
4
11,588
Total
Burden
25,259
28,869
8,929
11,195
6,883
3,380
1,546
564
260
569
60
33
87,544
Annual
Burden
8,420
9,623
2,976
3,732
2,294
1,127
515
188
87
190
20
11
29,181
Total
Labor Cost
$
873,751
$
998,628
$
308,863
$
387,257
$
238,079
$
116,912
$
53,462
$
19,501
$
8,990
$
19,666
$
2,076
$
1,142
$ 3,028,326
Annual Labor
Cost
$
291,250
$
332,876
$
102,954
$
129,086
$
79,360
$
38,971
$
17,821
$
6,500
$
2,997
$
6,555
$
692
$
381
$ 1,009,442
Total
O&M Cost
$
5,516
$
6,304
$
1,950
$
2,445
$
1,503
$
671
$
307
$
112
$
52
$
103
$
11
$
6
$ 18,979
Annual
O&M Cost
$
1,839
$
2,101
$
650
$
815
$
501
$
224
$
102
$
37
$
17
$
34
$
4
$
2
$
6,326
Total
O&M Cost
$
5,516
$
6,304
$
1,950
$
2,445
$
1,503
$
671
$
307
$
112
$
52
$
103
$
11
$
6
$ 18,979
Annual
O&M Cost
$
1,839
$
2,101
$
650
$
815
$
501
$
224
$
102
$
37
$
17
$
34
$
4
$
2
$
6,326
Reduced Monitoring - State Performing Calculations
Summary of Burden and Cost for ICR Period
(2016-2018)
Monitoring Events by Year
(Representing 9-Year Cycle)
Number of
Size Category
Systems
≤100
10,388
101-500
11,016
501-1,000
3,541
2. An old version of
4,469
3,301-10,000
2,544
10,001-25,000
1,148
25,001-50,000
525
50,001-75,000
182
75,001-100,000
89
100,001-500,000
184
500,001-1,000,000
20
> 1,000,000
11
Total
34,114
2014
7,721
8,462
2,670
3,360
446
197
91
8
2
2
22,958
2015
2,081
2,488
757
945
200
86
39
189
91
186
20
11
7,090
2016
1,340
1,699
500
621
2,108
947
433
8
2
2
7,658
2017
6,683
7,361
2,316
2,912
446
197
91
8
2
2
20,017
2018
2,081
2,488
757
945
200
86
39
189
91
186
20
11
7,090
2019
1,340
1,699
500
621
2,108
947
433
8
2
2
7,658
2020
6,683
7,361
2,316
2,912
446
197
91
8
2
2
20,017
2021
2,081
2,488
757
945
200
86
39
189
91
186
20
11
7,090
2022
1,340
1,699
500
621
2,108
947
433
8
2
2
7,658
Total
Monitoring
Events
10,104
11,548
3,572
4,478
2,753
1,229
562
205
95
190
20
11
34,765
Annual
Monitoring
Events
3,368
3,849
1,191
1,493
918
410
187
68
32
63
7
4
11,588
Total
Burden
15,155
17,321
5,357
6,717
4,130
1,844
843
308
142
284
30
17
52,147
Annual
Burden
5,052
5,774
1,786
2,239
1,377
615
281
103
47
95
10
6
17,382
Total
Labor Cost
$
524,250
$
599,177
$
185,318
$
232,354
$
142,848
$
63,770
$
29,161
$
10,637
$
4,903
$
9,833
$
1,038
$
571
$ 1,803,860
Annual Labor
Cost
$
174,750
$
199,726
$
61,773
$
77,451
$
47,616
$
21,257
$
9,720
$
3,546
$
1,634
$
3,278
$
346
$
190
$
601,287
Totals
Summary of Burden and Cost for ICR Period
(2016-2018)
Monitoring Events by Year
(Representing 9-Year Cycle)
Total
Annual
Number of
Monitoring
Monitoring
Total
Annual
Annual
Total
Annual Labor
Total
2014
2015
2016
2017
2018
2019
2020
2021
2022
Size Category
Systems
Events
Events
Burden
Burden
Labor Cost
Cost
O&M Cost O&M Cost
4,162
2,680
13,365
4,162
2,680
20,207
6,736
40,414
13,471 $ 1,398,001 $
466,000 $ 11,032 $
3,677
≤100
20,775
15,442
4,162
2,680
13,365
101-500
22,032
16,924
4,975
3,398
14,722
4,975
3,398
14,722
4,975
3,398
23,095
7,698
46,190
15,397 $ 1,597,804 $
532,601 $ 12,608 $
4,203
501-1,000
7,082
5,339
1,513
999
4,631
1,513
999
4,631
1,513
999
7,143
2,381
14,286
4,762 $
494,181 $
164,727 $
3,900 $
1,300
1,001-3,300
8,937
6,719
1,890
1,242
5,824
1,890
1,242
5,824
1,890
1,242
8,956
2,985
17,912
5,971 $
619,612 $
206,537 $
4,889 $
1,630
3,301-10,000
5,088
892
399
4,215
892
399
4,215
892
399
4,215
5,506
1,835
11,012
3,671 $
380,927 $
126,976 $
3,006 $
1,002
819
5,223
1,741 $
180,683 $
60,228 $
1,342 $
447
10,001-25,000
2,296
394
171
1,893
394
171
1,893
394
171
1,893
2,458
25,001-50,000
1,049
181
78
865
181
78
865
181
78
865
1,124
375
2,389
796 $
82,623 $
27,541 $
614 $
205
50,001-75,000
363
16
378
16
16
378
16
16
378
16
410
137
871
290 $
30,138 $
10,046 $
224 $
75
75,001-100,000
177
4
181
4
4
181
4
4
181
4
189
63
402
134 $
13,893 $
4,631 $
103 $
34
100,001-500,000
367
4
371
4
4
371
4
4
371
4
379
126
853
284 $
29,498 $
9,833 $
207 $
69
7
500,001-1,000,000
40
40
40
40
40
13
90
30 $
3,113 $
1,038 $
22 $
> 1,000,000
22
22
22
22
22
7
50
17 $
1,712 $
571 $
12 $
4
Total
68,228
45,915 14,180
15,316
40,033
14,180
15,316
40,033
14,180
15,316
69,529
23,176
139,691
46,564 $ 4,832,187 $ 1,610,729 $ 37,958 $ 12,653
Note: Half of systems conducting tap monitoring are assumed to calculate compliance with the lead and copper action levels themselves. States are assumed to perform this calculation for the other half of systems. These systems will still incur burden to
submit results and describe the sampling locations used.
DDBP/Chem/Rads ICR - Lead and Copper Rule
H-104
December 2015
Exhibit 38 - CERTIFYING CUSTOMER NOTIFICATION OF SAMPLING - REPORTING BURDEN AND COST - CWSs
Totals
Summary of Burden and Cost for ICR Period
(2016-2018)
Reporting Events by Year
(Representing 9-Year Cycle)
Number
of
Size Category
Systems
≤100
12,182
101-500
15,495
501-1,000
5,451
1,001-3,300
8,063
3,301-10,000
4,943
10,001-25,000
2,289
25,001-50,000
1,041
50,001-75,000
362
75,001-100,000
177
100,001-500,000
366
500,001-1,000,000
40
> 1,000,000
22
Total
50,431
2014
5,888
7,489
2,635
3,897
2,389
1,106
503
175
86
177
19
11
24,375
2015
5,888
7,489
2,635
3,897
2,389
1,106
503
175
86
177
19
11
24,375
2016
5,888
7,489
2,635
3,897
2,389
1,106
503
175
86
177
19
11
24,375
2017
5,888
7,489
2,635
3,897
2,389
1,106
503
175
86
177
19
11
24,375
2018
5,888
7,489
2,635
3,897
2,389
1,106
503
175
86
177
19
11
24,375
2019
5,888
7,489
2,635
3,897
2,389
1,106
503
175
86
177
19
11
24,375
2020
5,888
7,489
2,635
3,897
2,389
1,106
503
175
86
177
19
11
24,375
2021
5,888
7,489
2,635
3,897
2,389
1,106
503
175
86
177
19
11
24,375
2022
5,888
7,489
2,635
3,897
2,389
1,106
503
175
86
177
19
11
24,375
Total
Annual
Reporting Reporting
Events
Events
17,664
5,888
22,468
7,489
7,904
2,635
11,691
3,897
7,167
2,389
3,319
1,106
1,509
503
525
175
257
86
531
177
58
19
32
11
73,125
24,375
Total
Burden
2,120
2,696
948
1,403
860
398
181
63
31
64
7
4
8,775
Annual
Burden
707
899
316
468
287
133
60
21
10
21
2
1
2,925
Annual
Total
Labor
Total
Labor Cost
Cost
O&M Cost
$ 73,324 $ 24,441 $ 9,643
$ 93,265 $ 31,088 $ 12,266
$ 32,810 $ 10,937 $ 4,315
$ 48,531 $ 16,177 $ 6,383
$ 29,752 $ 9,917 $ 3,913
$ 13,778 $ 4,593 $ 1,812
$
6,266 $ 2,089 $
824
$
2,179 $
726 $
287
$
1,065 $
355 $
140
$
2,203 $
734 $
290
$
241 $
80 $
32
$
132 $
44 $
17
$ 303,545 $ 101,182 $ 39,921
Annual
O&M Cost
$ 3,214
$ 4,089
$ 1,438
$ 2,128
$ 1,304
$
604
$
275
$
96
$
47
$
97
$
11
$
6
$ 13,307
CERTIFYING CUSTOMER NOTIFICATION OF SAMPLING - REPORTING BURDEN AND COST - NTNCWSs
Totals
Summary of Burden and Cost for ICR Period
(2016-2018)
Reporting Events by Year
(Representing 9-Year Cycle)
Annual
Total
Annual
Number
Total
Labor
Reporting Reporting
of
Total
Annual
Total
Annual
2014
2015
2016
2017
2018
2019
2020
2021
2022
Size Category
Cost
Events
Events
Systems
O&M Cost O&M Cost
Burden
Burden Labor Cost
≤100
8,593
4,153
4,153
4,153
4,153
4,153
4,153
4,153
4,153
4,153
12,460
4,153
1,495
498 $ 51,721 $ 17,240 $ 6,802 $ 2,267
101-500
6,537
3,160
3,160
3,160
3,160
3,160
3,160
3,160
3,160
3,160
9,479
3,160
1,137
379 $ 39,346 $ 13,115 $ 5,175 $ 1,725
501-1,000
1,631
788
788
788
788
788
788
788
788
788
2,365
788
284
95 $
9,817 $ 3,272 $ 1,291 $
430
1,001-3,300
874
422
422
422
422
422
422
422
422
422
1,267
422
152
51 $
5,261 $ 1,754 $
692 $
231
3,301-10,000
145
70
70
70
70
70
70
70
70
70
210
70
25
8 $
873 $
291 $
115 $
38
10,001-25,000
7
3
3
3
3
3
3
3
3
3
10
3
1
0 $
42 $
14 $
6 $
2
25,001-50,000
8
4
4
4
4
4
4
4
4
4
12
4
1
0 $
48 $
16 $
6 $
2
50,001-75,000
1
0
0
0
0
0
0
0
0
0
1
0
0
0 $
6 $
2 $
1 $
0
75,001-100,000
$
$
$
$
100,001-500,000
1
0
0
0
0
0
0
0
0
0
1
0
0
0 $
6 $
2 $
1 $
0
500,001-1,000,000
$
$
$
$
> 1,000,000
$
$
$
$
Total
17,797
8,602
8,602
8,602
8,602
8,602
8,602
8,602
8,602
8,602
25,806
8,602
3,097
1,032 $ 107,120 $ 35,707 $ 14,088 $ 4,696
Note: Burden for customer notification certification is shown in this section because this activity is part of the requirements for reporting to the state. However, the total burden for this activity is included in the burden for public
education in Exhibits 33a and 34 in the public education model for the LCR rather than in the total for system reporting.
DDBP/Chem/Rads ICR - Lead and Copper Rule
H-105
December 2015
Exhibit 39 - MOVING TAP MONITORING LOCATION - REPORTING BURDEN AND COST
Totals
Summary of Burden and Cost for ICR Period
(2016-2018)
Reporting Events by Year
(Representing 9-Year Cycle)
Number of
Size Category
Systems
≤100
12,182
101-500
15,495
501-1,000
5,451
1,001-3,300
8,063
3,301-10,000
4,943
10,001-25,000
2,289
25,001-50,000
1,041
50,001-75,000
362
75,001-100,000
177
100,001-500,000
366
500,001-1,000,000
40
> 1,000,000
22
Total
50,431
2014
4,494
5,887
2,038
3,011
432
197
90
8
2
2
16,159
2015
1,196
1,694
567
836
192
86
39
189
91
185
20
11
5,104
2016
757
1,135
368
542
2,046
944
430
8
2
2
6,233
2017
3,885
5,112
1,765
2,608
432
197
90
8
2
2
14,100
2018
1,196
1,694
567
836
192
86
39
189
91
185
20
11
5,104
2019
757
1,135
368
542
2,046
944
430
8
2
2
6,233
2020
3,885
5,112
1,765
2,608
432
197
90
8
2
2
14,100
2021
1,196
1,694
567
836
192
86
39
189
91
185
20
11
5,104
2022
757
1,135
368
542
2,046
944
430
8
2
2
6,233
Total
Reporting
Events
5,838
7,941
2,700
3,986
2,669
1,227
559
205
95
189
20
11
25,437
Annual
Reporting
Events
1,946
2,647
900
1,329
890
409
186
68
32
63
7
4
8,479
Total
Burden
17,513
23,822
8,100
11,957
8,007
3,680
1,676
614
284
567
60
33
76,310
Annual
Burden
5,838
7,941
2,700
3,986
2,669
1,227
559
205
95
189
20
11
25,437
Total
Labor Cost
$
605,792
$
824,033
$
280,195
$
413,599
$
276,978
$
127,281
$
57,959
$
21,222
$
9,807
$
19,614
$
2,076
$
1,142
$ 2,639,698
Annual
Labor Cost
$
201,931
$
274,678
$
93,398
$
137,866
$
92,326
$
42,427
$
19,320
$
7,074
$
3,269
$
6,538
$
692
$
381
$
879,899
Total
O&M Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
Annual
O&M Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
Total
O&M Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
Annual
O&M Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
Exhibit 40 - EXPLANATION OF CHANGES IN TREATMENT TYPE OR ADDITION OF A NEW SOURCE - REPORTING BURDEN AND COST
Totals
Summary of Burden and Cost for ICR Period
(2016-2018)
Reporting Events by Year
(Representing 9-Year Cycle)
Number of
2014
2015
2016
2017
2018
2019
2020
Size Category
Systems
≤100
416
309
83
54
267
83
54
267
101-500
441
338
100
68
294
100
68
294
501-1,000
142
107
30
20
93
30
20
93
1,001-3,300
179
134
38
25
116
38
25
116
3,301-10,000
102
18
8
84
18
8
84
18
10,001-25,000
46
8
3
38
8
3
38
8
25,001-50,000
21
4
2
17
4
2
17
4
50,001-75,000
7
8
8
4
4
75,001-100,000
4
100,001-500,000
7
7
7
500,001-1,000,000
1
1
1
> 1,000,000
Total
1,366
918
284
306
800
284
306
800
Note: Assumes 2 percent of systems conducting monitoring will change treatment or add a new source.
DDBP/Chem/Rads ICR - Lead and Copper Rule
2021
83
100
30
38
8
3
2
8
4
7
1
284
2022
54
68
20
25
84
38
17
306
H-106
Total
Reporting
Events
404
462
143
179
110
49
23
8
4
7
1
1,390
Annual
Reporting
Events
135
154
48
60
37
16
8
3
1
2
0
463
Total
Burden
3,232
3,696
1,144
1,432
880
392
184
64
32
56
8
11,120
Annual
Burden
1,077
1,232
381
477
293
131
61
21
11
19
3
3,707
Total
Labor Cost
$
111,801
$
127,852
$
39,573
$
49,536
$
30,441
$
13,560
$
6,365
$
2,214
$
1,107
$
1,937
$
277
$
$
384,663
Annual
Labor Cost
$
37,267
$
42,617
$
13,191
$
16,512
$
10,147
$
4,520
$
2,122
$
738
$
369
$
646
$
92
$
$
128,221
December 2015
Exhibit 41 - WAIVER REQUESTS - REPORTING BURDEN AND COST
Totals
Summary of Burden and Cost for ICR Period
(2016-2018)
Requests by Year
(Representing 9-Year Cycle)
Number of
2014
2015
2016
2017
2018
Size Category
Systems
≤100
2,078
101-500
2,203
501-1,000
708
1,001-3,300
894
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
5,883
Note: Assumes 10 percent of small systems will apply for waivers/waiver renewals.
2019
-
2020
-
2021
-
2022
2,078
2,203
708
894
5,883
Total
Reporting
Events
-
Annual
Reporting
Events
-
Total
Burden
-
Annual Burden
-
Total
Labor Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
Annual
Labor Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
Total
O&M Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
Annual
O&M Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
Total
O&M Cost
$
989
$
973
$
229
$
272
$
124
$
49
$
23
$
13
$
3
$
3
$
$
$
2,679
Annual
O&M Cost
$
330
$
324
$
76
$
91
$
41
$
16
$
8
$
4
$
1
$
1
$
$
$
893
Exhibit 42 - WQP MONITORING - REPORTING BURDEN AND COST
Totals
Summary of Burden and Cost for ICR Period
(2016-2018)
Reporting Events by Year
(Representing 9-Year Cycle)
Number of
2014
2015
2016
Size Category
Systems
≤100
604
604
604
604
101-500
594
594
594
594
501-1,000
140
140
140
140
1,001-3,300
166
166
166
166
3,301-10,000
76
76
76
76
10,001-25,000
30
30
30
30
25,001-50,000
14
14
14
14
50,001-75,000
8
8
8
8
75,001-100,000
2
2
2
2
100,001-500,000
2
2
2
2
500,001-1,000,000
> 1,000,000
Total
1,636
1,636
1,636
1,636
Note: Applies to all systems conducting WQP monitoring.
DDBP/Chem/Rads ICR - Lead and Copper Rule
2017
604
594
140
166
76
30
14
8
2
2
1,636
2018
604
594
140
166
76
30
14
8
2
2
1,636
2019
604
594
140
166
76
30
14
8
2
2
1,636
2020
604
594
140
166
76
30
14
8
2
2
1,636
2021
604
594
140
166
76
30
14
8
2
2
1,636
2022
604
594
140
166
76
30
14
8
2
2
1,636
H-107
Total
Reporting
Events
1,812
1,782
420
498
228
90
42
24
6
6
4,908
Annual
Reporting
Events
604
594
140
166
76
30
14
8
2
2
1,636
Total
Total
Burden Annual Burden Labor Cost
9,060
3,020 $
313,404
8,910
2,970 $
308,215
2,100
700 $
72,643
2,490
830 $
86,134
1,140
380 $
39,435
450
150 $
15,566
210
70 $
7,264
120
40 $
4,151
30
10 $
1,038
30
10 $
1,038
$
$
24,540
8,180 $
848,888
Annual
Labor Cost
$
104,468
$
102,738
$
24,214
$
28,711
$
13,145
$
5,189
$
2,421
$
1,384
$
346
$
346
$
$
$
282,963
December 2015
Exhibit 43 - SOURCE WATER MONITORING - REPORTING BURDEN AND COST
CWS - Ground Water Systems
Summary of Burden and Cost for ICR Period
(2016-2018)
Monitoring Events by Year
(Representing 9-Year Cycle)
Number of
Size Category
Systems
≤100
130
101-500
152
501-1,000
36
1,001-3,300
44
3,301-10,000
21
10,001-25,000
6
25,001-50,000
2
50,001-75,000
23
75,001-100,000
10
100,001-500,000
22
500,001-1,000,000
1
> 1,000,000
Total
447
2014
-
2015
22
10
22
1
55
2016
-
2017
1
1
2018
20
6
2
22
10
22
1
83
2019
-
2020
4
5
1
1
1
-
-
1
11
2021
22
10
22
1
55
2022
-
Total
Monitoring
Events
20
6
2
23
10
22
1
84
Annual
Monitoring
Events
7
2
1
8
3
7
0
28
Total
Burden
10
3
1
12
5
11
1
42
Annual
Burden
3
1
0
4
2
4
0
14
Total
Labor Cost
$
$
$
$
$
346
$
104
$
35
$
398
$
173
$
381
$
17
$
$
1,453
Annual Labor
Cost
$
$
$
$
$
115
$
35
$
12
$
133
$
58
$
127
$
6
$
$
484
Total
O&M Cost
$
$
$
$
$
11
$
3
$
1
$
13
$
5
$
12
$
1
$
$
46
Annual
O&M Cost
$
$
$
$
$
4
$
1
$
0
$
4
$
2
$
4
$
0
$
$
15
Total
O&M Cost
$
$
$
$
$
1
$
1
$
$
$
$
$
$
$
1
Annual
O&M Cost
$
$
$
$
$
0
$
0
$
$
$
$
$
$
$
0
NTNCWS - Ground Water Systems
Summary of Burden and Cost for ICR Period
(2016-2018)
Monitoring Events by Year
(Representing 9-Year Cycle)
Number of
Size Category
Systems
≤100
155
101-500
117
501-1,000
24
2. An old version of
18
3,301-10,000
1
10,001-25,000
1
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
316
2014
-
DDBP/Chem/Rads ICR - Lead and Copper Rule
2015
1
1
2
2016
-
2017
-
2018
1
1
2
2019
-
2020
5
4
1
1
11
2021
-
2022
-
H-108
Annual
Monitoring
Events
-
Total
Monitoring
Events
1
1
-
0
0
-
2
1
Total
Burden
1
1
1
Annual
Burden
0
0
0
Total
Labor Cost
$
$
$
$
$
17
$
17
$
$
$
$
$
$
$
35
Annual
Labor Cost
$
$
$
$
$
6
$
6
$
$
$
$
$
$
$
12
December 2015
Exhibit 43 - SOURCE WATER MONITORING - REPORTING BURDEN AND COST (cont.)
CWS - Surface Water Systems
Summary of Burden and Cost for ICR Period
(2016-2018)
Monitoring Events by Year
(Representing 9-Year Cycle)
Number of
Size Category
Systems
≤100
11
101-500
24
501-1,000
9
1,001-3,300
20
3,301-10,000
17
10,001-25,000
8
25,001-50,000
4
50,001-75,000
41
75,001-100,000
17
100,001-500,000
59
500,001-1,000,000
4
> 1,000,000
2
Total
216
2014
11
23
9
19
16
8
4
3
1
2
1
97
2015
38
16
57
3
2
116
2016
-
2017
-
2018
38
16
57
3
2
116
2019
-
2020
-
2021
38
16
57
3
2
116
2022
1
1
Total
Monitoring
Events
38
16
57
3
2
116
Annual
Monitoring
Events
13
5
19
1
1
39
Total
Burden
19
8
29
2
1
58
Annual
Burden
6
3
10
1
0
19
Total
Labor Cost
$
$
$
$
$
$
$
$
657
$
277
$
986
$
52
$
35
$
2,006
Annual Labor
Cost
$
$
$
$
$
$
$
$
219
$
92
$
329
$
17
$
12
$
669
Total
O&M Cost
$
$
$
$
$
$
$
$
21
$
9
$
31
$
2
$
1
$
63
Annual
O&M Cost
$
$
$
$
$
$
$
$
7
$
3
$
10
$
1
$
0
$
21
Total
O&M Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
Annual
O&M Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
NTNCWS - Surface Water Systems
Summary of Burden and Cost for ICR Period
(2016-2018)
Monitoring Events by Year
(Representing 9-Year Cycle)
Number of
Size Category
Systems
≤100
6
101-500
5
501-1,000
1
1,001-3,300
2
3,301-10,000
1
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
15
2014
6
5
1
2
1
15
DDBP/Chem/Rads ICR - Lead and Copper Rule
2015
-
2016
-
2017
-
2018
-
2019
-
2020
-
2021
-
2022
-
H-109
Total
Monitoring
Events
-
Annual
Monitoring
Events
-
Total
Burden
-
Annual
Burden
-
Total
Labor Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
Annual
Labor Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
December 2015
Exhibit 43 - SOURCE WATER MONITORING - REPORTING BURDEN AND COST (cont.)
Totals
Summary of Burden and Cost for ICR Period
(2016-2018)
Monitoring Events by Year
(Representing 9-Year Cycle)
Number of
Size Category
Systems
≤100
302
101-500
298
501-1,000
70
1,001-3,300
84
3,301-10,000
40
10,001-25,000
15
25,001-50,000
6
50,001-75,000
64
75,001-100,000
27
100,001-500,000
81
500,001-1,000,000
5
> 1,000,000
2
Total
994
2014
17
28
10
21
17
8
4
3
1
2
1
112
DDBP/Chem/Rads ICR - Lead and Copper Rule
2015
1
1
60
26
79
4
2
173
2016
-
2017
1
1
2018
21
7
2
60
26
79
4
2
201
2019
-
2020
9
9
2
2
1
1
22
2021
60
26
79
4
2
171
2022
1
1
H-110
Total
Monitoring
Events
21
7
2
61
26
79
4
2
202
Annual
Monitoring
Events
7
2
1
20
9
26
1
1
67
Total
Burden
11
4
1
31
13
40
2
1
101
Annual
Burden
4
1
0
10
4
13
1
0
34
Total
Labor Cost
363
121
35
1,055
450
1,366
69
35
3,494
Annual Labor
Cost
121
40
12
352
150
455
23
12
1,165
Total
O&M Cost
11
4
1
33
14
43
2
1
110
Annual
O&M Cost
4
1
0
11
5
14
1
0
37
December 2015
Exhibit 44 - ANNUAL LEAD SERVICE LINE REPLACEMENT LETTER - REPORTING BURDEN AND COST
Totals
Summary of Burden and Cost for ICR Period
(2016-2018)
Reporting Events by Year
(Representing 9-Year Cycle)
Number of
Size Category
Systems
≤100
142
101-500
176
501-1,000
45
1,001-3,300
65
3,301-10,000
36
10,001-25,000
15
25,001-50,000
7
50,001-75,000
4
75,001-100,000
1
100,001-500,000
1
500,001-1,000,000
> 1,000,000
Total
492
2014
142
176
45
65
36
15
7
4
1
1
492
2015
142
176
45
65
36
15
7
4
1
1
492
2016
142
176
45
65
36
15
7
4
1
1
492
2017
142
176
45
65
36
15
7
4
1
1
492
2018
142
176
45
65
36
15
7
4
1
1
492
2019
142
176
45
65
36
15
7
4
1
1
492
2020
142
176
45
65
36
15
7
4
1
1
492
2021
142
176
45
65
36
15
7
4
1
1
492
2022
142
176
45
65
36
15
7
4
1
1
492
Total
Reporting
Events
426
528
135
195
108
45
21
12
3
3
1,476
Annual
Reporting
Events
142
176
45
65
36
15
7
4
1
1
492
Total
Burden
213
264
68
98
54
23
11
6
2
2
738
Annual
Burden
71
88
23
33
18
8
4
2
1
1
246
Total
Labor Cost
$
7,368
$
9,132
$
2,335
$
3,373
$
1,868
$
778
$
363
$
208
$
52
$
52
$
$
$
25,529
Annual
Labor Cost
$
2,456
$
3,044
$
778
$
1,124
$
623
$
259
$
121
$
69
$
17
$
17
$
$
$
8,510
Total
O&M Cost
$
233
$
288
$
74
$
106
$
59
$
25
$
11
$
7
$
2
$
2
$
$
$
806
Annual
O&M Cost
$
78
$
96
$
25
$
35
$
20
$
8
$
4
$
2
$
1
$
1
$
$
$
269
Total
O&M Cost
$
1,570
$
1,946
$
497
$
719
$
398
$
166
$
77
$
44
$
11
$
11
$
$
$
5,439
Annual
O&M Cost
$
523
$
649
$
166
$
240
$
133
$
55
$
26
$
15
$
4
$
4
$
$
$
1,813
Exhibit 45 - PARTIAL LEAD SERVICE LINE REPLACEMENT LETTER - REPORTING BURDEN AND COST
Totals
Summary of Burden and Cost for ICR Period
(2016-2018)
Reporting Events by Year
(Representing 9-Year Cycle)
Number of
Size Category
Systems
≤100
107
101-500
132
501-1,000
34
1,001-3,300
49
3,301-10,000
27
10,001-25,000
11
25,001-50,000
5
50,001-75,000
3
75,001-100,000
1
100,001-500,000
1
500,001-1,000,000
> 1,000,000
Total
369
2014
959
1,188
304
439
243
101
47
27
7
7
3,321
DDBP/Chem/Rads ICR - Lead and Copper Rule
2015
959
1,188
304
439
243
101
47
27
7
7
3,321
2016
959
1,188
304
439
243
101
47
27
7
7
3,321
2017
959
1,188
304
439
243
101
47
27
7
7
3,321
2018
959
1,188
304
439
243
101
47
27
7
7
3,321
2019
959
1,188
304
439
243
101
47
27
7
7
3,321
2020
959
1,188
304
439
243
101
47
27
7
7
3,321
2021
959
1,188
304
439
243
101
47
27
7
7
3,321
H-111
2022
959
1,188
304
439
243
101
47
27
7
7
3,321
Total
Reporting
Events
2,876
3,564
911
1,316
729
304
142
81
20
20
9,963
Annual
Reporting
Events
959
1,188
304
439
243
101
47
27
7
7
3,321
Total
Burden
1,438
1,782
456
658
365
152
71
41
10
10
4,982
Annual
Burden
479
594
152
219
122
51
24
14
3
3
1,661
Total
Labor Cost
$
49,735
$
61,643
$
15,761
$
22,766
$
12,609
$
5,254
$
2,452
$
1,401
$
350
$
350
$
$
$ 172,320
Annual
Labor Cost
$
16,578
$
20,548
$
5,254
$
7,589
$
4,203
$
1,751
$
817
$
467
$
117
$
117
$
$
$
57,440
December 2015
Exhibit 46 - PUBLIC EDUCATION - REPORTING BURDEN AND COST
Totals
Summary of Burden and Cost for ICR Period
(2016-2018)
Reporting Events by Year
(Representing 9-Year Cycle)
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
Number of
Systems
302
297
71
84
39
16
7
4
1
2
1
824
2014
302
297
71
84
39
16
7
4
1
2
1
824
2015
302
297
71
84
39
16
7
4
1
2
1
824
2016
302
297
71
84
39
16
7
4
1
2
1
824
2017
302
297
71
84
39
16
7
4
1
2
1
824
2018
302
297
71
84
39
16
7
4
1
2
1
824
2019
302
297
71
84
39
16
7
4
1
2
1
824
2020
302
297
71
84
39
16
7
4
1
2
1
824
2021
302
297
71
84
39
16
7
4
1
2
1
824
2022
302
297
71
84
39
16
7
4
1
2
1
824
Total
Reporting
Events
907
892
213
252
116
48
21
12
3
7
2
2,473
Annual
Reporting
Events
302
297
71
84
39
16
7
4
1
2
1
824
Total
Total Burden Annual Burden Labor Cost
907
302 $
31,375
892
297 $
30,856
213
71 $
7,368
252
84 $
8,717
116
39 $
4,013
48
16 $
1,660
21
7 $
726
12
4 $
415
3
1 $
104
7
2 $
242
2
1 $
69
$
2,473
824 $
85,546
Annual
Labor Cost
$
10,458
$
10,285
$
2,456
$
2,906
$
1,338
$
553
$
242
$
138
$
35
$
81
$
23
$
$
28,515
Total
O&M Cost
$
495
$
487
$
116
$
138
$
63
$
26
$
11
$
7
$
2
$
4
$
1
$
$
1,350
Annual O&M
Cost
$
165
$
162
$
39
$
46
$
21
$
9
$
4
$
2
$
1
$
1
$
0
$
$
450
Exhibit 47 - REPORTING BURDEN AND COST SUMMARY (Excluding Customer Notification Certification)
Totals
Summary of Burden and Cost for ICR Period
(2016-2018)
Reporting Events by Year
(Representing 9-Year Cycle)
Total
Annual
Number of
Total
Reporting
Annual
Reporting
Total
Annual O&M
2014
2015
2016
2017
2018
2019
2020
2021
2022
O&M Cost
Systems
Events
Total Burden Annual Burden Labor Cost
Labor Cost
Events
Size Category
Cost
≤100
20,775
22,268
7,448
5,498
19,523
7,448
5,498
19,532
7,448
7,575
32,469
10,823
57,621
19,207 $ 2,517,476 $
839,159 $
14,318 $
4,773
101-500
22,032
25,432
9,024
6,856
22,383
9,024
6,856
22,392
9,024
9,060
38,264
12,755
68,234
22,745 $ 2,959,536 $
986,512 $
16,302 $
5,434
501-1,000
7,082
8,053
2,670
1,947
7,049
2,670
1,947
7,051
2,670
2,655
11,665
3,888
21,009
7,003 $
912,057 $
304,019 $
4,816 $
1,605
1,001-3,300
8,937
10,639
3,518
2,563
9,301
3,518
2,563
9,303
3,518
3,456
15,382
5,127
28,081
9,360 $ 1,203,737 $
401,246 $
6,124 $
2,041
3,301-10,000
5,088
1,752
994
6,738
1,735
1,014
6,739
1,735
993
6,739
9,487
3,162
17,455
5,818 $
746,634 $
248,878 $
3,662 $
1,221
10,001-25,000
2,296
769
423
3,037
761
429
3,037
761
422
3,037
4,227
1,409
8,127
2,709 $
344,904 $
114,968 $
1,611 $
537
25,001-50,000
1,049
354
194
1,387
350
196
1,387
350
194
1,387
1,933
644
3,718
1,239 $
157,787 $
52,596 $
738 $
246
50,001-75,000
363
70
678
67
68
678
67
67
678
67
813
271
1,450
483 $
60,804 $
20,268 $
328 $
109
75,001-100,000
177
18
312
17
17
312
17
17
312
17
346
115
633
211 $
26,800 $
8,933 $
135 $
45
100,001-500,000
367
20
654
18
18
654
18
18
654
18
690
230
1,280
427 $
54,098 $
18,033 $
270 $
90
500,001-1,000,000
40
2
66
1
1
66
1
1
66
1
67
22
132
44 $
5,604 $
1,868 $
25 $
8
> 1,000,000
22
35
35
35
35
12
67
22 $
2,888 $
963 $
13 $
4
Total
68,228
69,377
26,014
28,128
61,207
26,042
28,129
61,228
26,012
34,012
115,378
38,459
207,807
69,269 $ 8,992,324 $ 2,997,441 $
48,343 $
16,114
Note: Burden for customer notification certification is shown in Exhibit 38 because this activity is part of the requirements for reporting to the state. However, the total burden for this activity is included in the burden for public education in Exhibits 33a and 34 in the public education model for the LCR
rather than in the total for system reporting.
DDBP/Chem/Rads ICR - Lead and Copper Rule
H-112
December 2015
Exhibit 48 - STATE REVIEW - BURDEN AND COST ASSUMPTIONS
Review Burden per Event
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Tap
Sample
Letter
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
Tap
Sample
Calcs.
0.25
0.25
0.25
0.25
0.5
0.75
0.75
0.75
0.75
1.0
1.0
1.0
Explain
Move Tap
Treatment or
Monitoring
Source
Location
Change
1.0
8.0
1.0
8.0
1.0
8.0
1.0
8.0
1.0
8.0
1.0
8.0
1.0
8.0
1.0
8.0
1.0
8.0
1.0
8.0
1.0
8.0
1.0
8.0
Monitoring
Waiver
Application
0.5
0.5
0.5
0.5
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
WQP
Monitoring
(Annual)
6.83
6.83
6.83
6.83
6.83
6.83
6.83
6.83
6.83
6.83
6.83
6.83
Source Water
Monitoring
Letter
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
Public
Education
Letter
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
LSL Letter
(Annual)
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
Partial
LSL
Letter
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
Labor
Rate
$ 45.60
$ 45.60
$ 45.60
$ 45.60
$ 45.60
$ 45.60
$ 45.60
$ 45.60
$ 45.60
$ 45.60
$ 45.60
$ 45.60
Review of
O&M Cost Self
Per Event Certification
(Postage) Letter
$
0.49
1.0
$
0.49
1.0
$
0.49
1.0
$
0.49
1.0
$
0.49
1.0
$
0.49
1.0
$
0.49
1.0
$
1.0
0.49
$
0.49
1.0
$
0.49
1.0
$
0.49
1.0
$
0.49
1.0
Burden for
Consulting on
Public Education
and Reviewing
Notification
Letters
2.3
2.3
2.3
2.3
2.3
2.3
2.3
2.3
2.3
2.3
2.3
2.3
Note: Burden estimates take into account the results of the May 2015 consultation with water industry representatives.
DDBP/Chem/Rads ICR - Lead and Copper Rule
H-113
December 2015
Exhibit 49 - Labor Rates
State Labor Rate
$45.60
Base (Hourly)
System Labor Rates
PWS Labor Rate
2013$ National Occupational Employment and Wage Estimates, United States, BLS SOC
Code 51-8031, "Local Government - Water and Liquid Waste Treatment Plant and
System Operators". May 2013 data (published in April 2014).
$21.62
Load Factor
1.6
$34.59
Inflation Factor
1.0
1 ECI New
101-500
$34.59
Total
$34.59
1 ECI Base
501-1,000
$34.59
$28.50
≤100
1,001-3,300
$34.59
3,301-10,000
$34.59
Base (Hourly)
10,001-25,000
$34.59
Load Factor
25,001-50,000
$34.59
Inflation Factor
50,001-75,000
$34.59
Total
75,001-100,000
$34.59
100,001-500,000
$34.59
500,001-1,000,000
$34.59
> 1,000,000
$34.59
Postage
DDBP/Chem/Rads ICR - Lead and Copper Rule
$
State Labor Rate
2013$ National Occupational Employment and Wage Estimates, United States, BLS SOC
Code 19-2041, "State Government - Environmental Scientists and Specialists,
Including Health". May 2013 data (published in April 2014).
1.6
1.0
1 ECI New
$45.60
1 ECI Base
0.49
H-114
December 2015
Exhibit 50 - Review of System Certification of Customer Notice - Burden and Cost
Review of Self Certification Letters - CWS
Summary of Burden and Cost for ICR Period
(2016-2018)
Monitoring Event Reviews by Year
(Representing 9-Year Cycle)
Number of
Size Category
Systems
≤100
12,182
101-500
15,495
501-1,000
5,451
1,001-3,300
8,063
3,301-10,000
4,943
10,001-25,000
2,289
25,001-50,000
1,041
50,001-75,000
362
75,001-100,000
177
100,001-500,000
366
500,001-1,000,000
40
> 1,000,000
22
Total
50,431
2014
5,888
7,489
2,635
3,897
2,389
1,106
503
175
86
177
19
11
24,375
2015
5,888
7,489
2,635
3,897
2,389
1,106
503
175
86
177
19
11
24,375
2016
5,888
7,489
2,635
3,897
2,389
1,106
503
175
86
177
19
11
24,375
2017
5,888
7,489
2,635
3,897
2,389
1,106
503
175
86
177
19
11
24,375
2018
5,888
7,489
2,635
3,897
2,389
1,106
503
175
86
177
19
11
24,375
2019
5,888
7,489
2,635
3,897
2,389
1,106
503
175
86
177
19
11
24,375
2020
5,888
7,489
2,635
3,897
2,389
1,106
503
175
86
177
19
11
24,375
2021
5,888
7,489
2,635
3,897
2,389
1,106
503
175
86
177
19
11
24,375
2022
5,888
7,489
2,635
3,897
2,389
1,106
503
175
86
177
19
11
24,375
Total
Monitoring
Events
17,664
22,468
7,904
11,691
7,167
3,319
1,509
525
257
531
58
32
73,125
Annual
Monitoring
Events
5,888
7,489
2,635
3,897
2,389
1,106
503
175
86
177
19
11
24,375
Total
Burden
17,664
22,468
7,904
11,691
7,167
3,319
1,509
525
257
531
58
32
73,125
Annual
Burden
5,888
7,489
2,635
3,897
2,389
1,106
503
175
86
177
19
11
24,375
Total
Annual Labor
Labor Cost
Cost
$
805,474 $
268,491
$ 1,024,529 $
341,510
$
360,420 $
120,140
$
533,126 $
177,709
$
326,831 $
108,944
$
151,349 $
50,450
$
68,831 $
22,944
$
23,935 $
7,978
$
11,703 $
3,901
$
24,200 $
8,067
$
2,645 $
882
$
1,455 $
485
$ 3,334,498 $ 1,111,499
Total
O&M Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
Annual
O&M Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
Total
O&M Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
Annual
O&M Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
Total
O&M Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
Annual
O&M Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
Review of Self Certification Letters NTNCWSs
Summary of Burden and Cost for ICR Period
(2016-2018)
Monitoring Event Reviews by Year
(Representing 9-Year Cycle)
Number of
Size Category
Systems
≤100
8,593
101-500
6,537
501-1,000
1,631
1,001-3,300
874
3,301-10,000
145
10,001-25,000
7
25,001-50,000
8
50,001-75,000
1
75,001-100,000
100,001-500,000
1
500,001-1,000,000
> 1,000,000
Total
17,797
2014
4,153
3,160
788
422
70
3
4
0
0
8,602
2015
4,153
3,160
788
422
70
3
4
0
0
8,602
2016
4,153
3,160
788
422
70
3
4
0
0
8,602
2017
4,153
3,160
788
422
70
3
4
0
0
8,602
2018
4,153
3,160
788
422
70
3
4
0
0
8,602
2019
4,153
3,160
788
422
70
3
4
0
0
8,602
2020
4,153
3,160
788
422
70
3
4
0
0
8,602
2021
4,153
3,160
788
422
70
3
4
0
0
8,602
2022
4,153
3,160
788
422
70
3
4
0
0
8,602
Total
Monitoring
Events
12,460
9,479
2,365
1,267
210
10
12
1
1
25,806
Annual
Monitoring
Events
4,153
3,160
788
422
70
3
4
0
0
8,602
Total
Burden
12,460
9,479
2,365
1,267
210
10
12
1
1
25,806
Annual
Burden
4,153
3,160
788
422
70
3
4
0
0
8,602
Total
Annual Labor
Labor Cost
Cost
$
568,169 $
189,390
$
432,226 $
144,075
$
107,842 $
35,947
$
57,789 $
19,263
$
9,587 $
3,196
$
463 $
154
$
529 $
176
$
66 $
22
$
$
$
66 $
22
$
$
$
$
$ 1,176,738 $
392,246
Totals
Summary of Burden and Cost for ICR Period
(2016-2018)
Monitoring Event Reviews by Year
(Representing 9-Year Cycle)
Number of
Size Category
Systems
≤100
20,775
101-500
22,032
501-1,000
7,082
1,001-3,300
8,937
3,301-10,000
5,088
10,001-25,000
2,296
25,001-50,000
1,049
50,001-75,000
363
75,001-100,000
177
100,001-500,000
367
500,001-1,000,000
40
> 1,000,000
22
Total
68,228
2014
10,041
10,649
3,423
4,320
2,459
1,110
507
175
86
177
19
11
32,977
DDBP/Chem/Rads ICR - Lead and Copper Rule
2015
10,041
10,649
3,423
4,320
2,459
1,110
507
175
86
177
19
11
32,977
2016
10,041
10,649
3,423
4,320
2,459
1,110
507
175
86
177
19
11
32,977
2017
10,041
10,649
3,423
4,320
2,459
1,110
507
175
86
177
19
11
32,977
2018
10,041
10,649
3,423
4,320
2,459
1,110
507
175
86
177
19
11
32,977
2019
10,041
10,649
3,423
4,320
2,459
1,110
507
175
86
177
19
11
32,977
2020
10,041
10,649
3,423
4,320
2,459
1,110
507
175
86
177
19
11
32,977
2021
10,041
10,649
3,423
4,320
2,459
1,110
507
175
86
177
19
11
32,977
2022
10,041
10,649
3,423
4,320
2,459
1,110
507
175
86
177
19
11
32,977
H-115
Total
Monitoring
Events
30,124
31,946
10,269
12,959
7,378
3,329
1,521
526
257
532
58
32
98,931
Annual
Monitoring
Events
10,041
10,649
3,423
4,320
2,459
1,110
507
175
86
177
19
11
32,977
Total
Burden
30,124
31,946
10,269
12,959
7,378
3,329
1,521
526
257
532
58
32
98,931
Annual
Burden
10,041
10,649
3,423
4,320
2,459
1,110
507
175
86
177
19
11
32,977
Total
Annual Labor
Labor Cost
Cost
$ 1,373,643 $
457,881
$ 1,456,756 $
485,585
$
468,262 $
156,087
$
590,914 $
196,971
$
336,419 $
112,140
$
151,812 $
50,604
$
69,360 $
23,120
$
24,002 $
8,001
$
11,703 $
3,901
$
24,266 $
8,089
$
2,645 $
882
$
1,455 $
485
$ 4,511,235 $ 1,503,745
December 2015
Exhibit 51 - Review of Tap Monitoring Reports - Burden and Cost
Reduced Monitoring - State Performing Calculations
Summary of Burden and Cost for ICR Period
(2016-2018)
Monitoring Event Reviews by Year
(Representing 9-Year Cycle)
Number of
Size Category
Systems
≤100
10,388
101-500
11,016
501-1,000
3,541
1,001-3,300
4,469
3,301-10,000
2,544
10,001-25,000
1,148
25,001-50,000
525
50,001-75,000
182
75,001-100,000
89
100,001-500,000
184
500,001-1,000,000
20
> 1,000,000
11
Total
34,114
2014
7,721
8,462
2,670
3,360
446
197
91
8
2
2
22,958
2015
2,081
2,488
757
945
200
86
39
189
91
186
20
11
7,090
2016
1,340
1,699
500
621
2,108
947
433
8
2
2
7,658
2017
6,683
7,361
2,316
2,912
446
197
91
8
2
2
20,017
2018
2,081
2,488
757
945
200
86
39
189
91
186
20
11
7,090
2019
1,340
1,699
500
621
2,108
947
433
8
2
2
7,658
2020
6,683
7,361
2,316
2,912
446
197
91
8
2
2
20,017
2021
2,081
2,488
757
945
200
86
39
189
91
186
20
11
7,090
2022
1,340
1,699
500
621
2,108
947
433
8
2
2
7,658
Total
Monitoring
Events
10,104
11,548
3,572
4,478
2,753
1,229
562
205
95
190
20
11
34,765
Annual
Monitoring
Events
3,368
3,849
1,191
1,493
918
410
187
68
32
63
7
4
11,588
Total
Burden
12,629
14,434
4,464
5,598
4,130
2,151
984
359
165
379
40
22
45,355
Annual
Burden
4,210
4,811
1,488
1,866
1,377
717
328
120
55
126
13
7
15,118
Total
Annual Labor
Labor Cost
Cost
$
575,900 $
191,967
$
658,208 $
219,403
$
203,576 $
67,859
$
255,246 $
85,082
$
188,305 $
62,768
$
98,074 $
32,691
$
44,848 $
14,949
$
16,359 $
5,453
$
7,541 $
2,514
$
17,282 $
5,761
$
1,824 $
608
$
1,003 $
334
$ 2,068,165 $
689,388
Total
O&M Cost
$
4,951
$
5,658
$
1,750
$
2,194
$
1,349
$
602
$
275
$
100
$
46
$
93
$
10
$
5
$ 17,035
Annual
O&M Cost
$
1,650
$
1,886
$
583
$
731
$
450
$
201
$
92
$
33
$
15
$
31
$
3
$
2
$
5,678
Total
O&M Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
Annual
O&M Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
Total
O&M Cost
$
4,951
$
5,658
$
1,750
$
2,194
$
1,349
$
602
$
275
$
100
$
46
$
93
$
10
$
5
$ 17,035
Annual
O&M Cost
$
1,650
$
1,886
$
583
$
731
$
450
$
201
$
92
$
33
$
15
$
31
$
3
$
2
$
5,678
Reduced Monitoring - System Performing Calculations
Summary of Burden and Cost for ICR Period
(2016-2018)
Monitoring Event Reviews by Year
(Representing 9-Year Cycle)
Number of
Size Category
Systems
≤100
10,388
101-500
11,016
501-1,000
3,541
1,001-3,300
4,469
3,301-10,000
2,544
10,001-25,000
1,148
25,001-50,000
525
50,001-75,000
182
75,001-100,000
89
100,001-500,000
184
500,001-1,000,000
20
> 1,000,000
11
Total
34,114
2014
7,721
8,462
2,670
3,360
446
197
91
8
2
2
22,958
2015
2,081
2,488
757
945
200
86
39
189
91
186
20
11
7,090
2016
1,340
1,699
500
621
2,108
947
433
8
2
2
7,658
2017
6,683
7,361
2,316
2,912
446
197
91
8
2
2
20,017
2018
2,081
2,488
757
945
200
86
39
189
91
186
20
11
7,090
2019
1,340
1,699
500
621
2,108
947
433
8
2
2
7,658
2020
6,683
7,361
2,316
2,912
446
197
91
8
2
2
20,017
2021
2,081
2,488
757
945
200
86
39
189
91
186
20
11
7,090
2022
1,340
1,699
500
621
2,108
947
433
8
2
2
7,658
Total
Monitoring
Events
10,104
11,548
3,572
4,478
2,753
1,229
562
205
95
190
20
11
34,765
Annual
Monitoring
Events
3,368
3,849
1,191
1,493
918
410
187
68
32
63
7
4
11,588
Total
Burden
10,104
11,548
3,572
4,478
2,753
1,229
562
205
95
190
20
11
34,765
Annual
Burden
3,368
3,849
1,191
1,493
918
410
187
68
32
63
7
4
11,588
Annual Labor
Total
Cost
Labor Cost
$
460,720 $
153,573
$
526,566 $
175,522
$
162,860 $
54,287
$
204,197 $
68,066
$
125,537 $
41,846
$
56,042 $
18,681
$
25,627 $
8,542
$
9,348 $
3,116
$
4,309 $
1,436
$
8,641 $
2,880
$
912 $
304
$
502 $
167
$ 1,585,261 $
528,420
Totals
Summary of Burden and Cost for ICR Period
(2016-2018)
Monitoring Event Reviews by Year
(Representing 9-Year Cycle)
Number of
Size Category
Systems
≤100
20,775
101-500
22,032
501-1,000
7,082
1,001-3,300
8,937
3,301-10,000
5,088
10,001-25,000
2,296
25,001-50,000
1,049
50,001-75,000
363
75,001-100,000
177
100,001-500,000
367
500,001-1,000,000
40
> 1,000,000
22
Total
68,228
2014
15,442
16,924
5,339
6,719
892
394
181
16
4
4
45,915
DDBP/Chem/Rads ICR - Lead and Copper Rule
2015
4,162
4,975
1,513
1,890
399
171
78
378
181
371
40
22
14,180
2016
2,680
3,398
999
1,242
4,215
1,893
865
16
4
4
15,316
2017
13,365
14,722
4,631
5,824
892
394
181
16
4
4
40,033
2018
4,162
4,975
1,513
1,890
399
171
78
378
181
371
40
22
14,180
2019
2,680
3,398
999
1,242
4,215
1,893
865
16
4
4
15,316
2020
13,365
14,722
4,631
5,824
892
394
181
16
4
4
40,033
2021
4,162
4,975
1,513
1,890
399
171
78
378
181
371
40
22
14,180
2022
2,680
3,398
999
1,242
4,215
1,893
865
16
4
4
15,316
H-116
Total
Monitoring
Events
20,207
23,095
7,143
8,956
5,506
2,458
1,124
410
189
379
40
22
69,529
Annual
Monitoring
Events
6,736
7,698
2,381
2,985
1,835
819
375
137
63
126
13
7
23,176
Total
Burden
22,733
25,982
8,036
10,076
6,883
3,380
1,546
564
260
569
60
33
80,119
Annual
Burden
7,578
8,661
2,679
3,359
2,294
1,127
515
188
87
190
20
11
26,706
Total
Annual Labor
Labor Cost
Cost
$ 1,036,619 $
345,540
$ 1,184,774 $
394,925
$
366,436 $
122,145
$
459,443 $
153,148
$
313,842 $
104,614
$
154,117 $
51,372
$
70,475 $
23,492
$
25,707 $
8,569
$
11,850 $
3,950
$
25,924 $
8,641
$
2,736 $
912
$
1,505 $
502
$ 3,653,426 $ 1,217,809
December 2015
Exhibit 52 - Review of Tap Monitoring Location Change Letters - Burden and Cost
Totals
Summary of Burden and Cost for ICR Period
(2016-2018)
Reviews by Year
(Representing 9-Year Cycle)
Number of
2014
Size Category
Systems
≤100
12,182
4,494
101-500
15,495
5,887
501-1,000
5,451
2,038
1,001-3,300
8,063
3,011
3,301-10,000
4,943
432
10,001-25,000
2,289
197
25,001-50,000
1,041
90
50,001-75,000
362
8
75,001-100,000
177
2
100,001-500,000
366
2
500,001-1,000,000
40
> 1,000,000
22
Total
50,431 16,159
2015
1,196
1,694
567
836
192
86
39
189
91
185
20
11
5,104
2016
757
1,135
368
542
2,046
944
430
8
2
2
6,233
2017
3,885
5,112
1,765
2,608
432
197
90
8
2
2
14,100
2018
1,196
1,694
567
836
192
86
39
189
91
185
20
11
5,104
2019
757
1,135
368
542
2,046
944
430
8
2
2
6,233
2020
3,885
5,112
1,765
2,608
432
197
90
8
2
2
14,100
2021
1,196
1,694
567
836
192
86
39
189
91
185
20
11
5,104
2022
757
1,135
368
542
2,046
944
430
8
2
2
6,233
Total
Reviews
5,838
7,941
2,700
3,986
2,669
1,227
559
205
95
189
20
11
25,437
Annual
Reviews
1,946
2,647
900
1,329
890
409
186
68
32
63
7
4
8,479
Total
Burden
5,838
7,941
2,700
3,986
2,669
1,227
559
205
95
189
20
11
25,437
Annual
Burden
1,946
2,647
900
1,329
890
409
186
68
32
63
7
4
8,479
Total
Labor Cost
$
266,190
$
362,087
$
123,120
$
181,739
$
121,706
$
55,928
$
25,468
$
9,325
$
4,309
$
8,618
$
912
$
502
$ 1,159,904
Annual
Labor Cost
$
88,730
$
120,696
$
41,040
$
60,580
$
40,569
$
18,643
$
8,489
$
3,108
$
1,436
$
2,873
$
304
$
167
$
386,635
Total
O&M Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
Annual
O&M Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
Total
O&M Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
Annual
O&M Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
Exhibit 53 - Review of Explanation of Changes in Treatment Type or Addition of a New Source - Burden and Cost
Totals
Summary of Burden and Cost for ICR Period
(2016-2018)
Reviews by Year
(Representing 9-Year Cycle)
Number of
Size Category
Systems
≤100
416
101-500
441
501-1,000
142
1,001-3,300
179
3,301-10,000
102
10,001-25,000
46
25,001-50,000
21
50,001-75,000
7
75,001-100,000
4
100,001-500,000
7
500,001-1,000,000
1
> 1,000,000
0
Total
1,365
DDBP/Chem/Rads ICR - Lead and Copper Rule
2014
309
338
107
134
18
8
4
0
0
0
918
2015
83
100
30
38
8
3
2
8
4
7
1
0
284
2016
54
68
20
25
84
38
17
0
0
0
306
2017
267
294
93
116
18
8
4
0
0
0
801
2018
83
100
30
38
8
3
2
8
4
7
1
0
284
2019
54
68
20
25
84
38
17
0
0
0
306
2020
267
294
93
116
18
8
4
0
0
0
801
2021
83
100
30
38
8
3
2
8
4
7
1
0
284
2022
54
68
20
25
84
38
17
0
0
0
306
H-117
Total
Reviews
404
462
143
179
110
49
22
8
4
8
1
0
1,391
Annual
Reviews
135
154
48
60
37
16
7
3
1
3
0
0
464
Total
Burden
3,233
3,695
1,143
1,433
881
393
180
66
30
61
6
4
11,125
Annual
Burden
1,078
1,232
381
478
294
131
60
22
10
20
2
1
3,708
Total
Labor Cost
$
147,430
$
168,501
$
52,115
$
65,343
$
40,172
$
17,934
$
8,201
$
2,991
$
1,379
$
2,765
$
292
$
161
$
507,284
Annual
Labor Cost
$
49,143
$
56,167
$
17,372
$
21,781
$
13,391
$
5,978
$
2,734
$
997
$
460
$
922
$
97
$
54
$
169,095
December 2015
Exhibit 54 - Review of Monitoring Waiver Requests - Burden and Cost
Totals
Summary of Burden and Cost for ICR Period
(2016-2018)
Reviews by Year
(Representing 9-Year Cycle)
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
Number of
Systems
2,078
2,203
708
894
5,883
2014
-
2015
-
2016
-
2017
-
2018
-
2019
-
2020
-
2021
-
2022
2,078
2,203
708
894
5,883
Total
Reviews
-
Annual
Reviews
-
Total
Burden
-
Annual
Burden
-
Total
Labor Cost
$
$
$
$
$
-
Annual
Labor Cost
$
$
$
$
$
-
Total
O&M Cost
$
$
$
$
$
-
Annual
O&M Cost
$
$
$
$
$
-
Total
O&M Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
Annual
O&M Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
Exhibit 55 - Review of WQP Monitoring Reports - Burden and Cost
Totals
Summary of Burden and Cost for ICR Period
(2016-2018)
Reviews by Year
(Representing 9-Year Cycle)
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
Number of
Systems
604
594
140
166
76
30
14
8
2
2
1,636
DDBP/Chem/Rads ICR - Lead and Copper Rule
2014
604
594
140
166
76
30
14
8
2
2
1,636
2015
604
594
140
166
76
30
14
8
2
2
1,636
2016
604
594
140
166
76
30
14
8
2
2
1,636
2017
604
594
140
166
76
30
14
8
2
2
1,636
2018
604
594
140
166
76
30
14
8
2
2
1,636
2019
604
594
140
166
76
30
14
8
2
2
1,636
2020
604
594
140
166
76
30
14
8
2
2
1,636
2021
604
594
140
166
76
30
14
8
2
2
1,636
2022
604
594
140
166
76
30
14
8
2
2
1,636
H-118
Total
Reviews
1,812
1,782
420
498
228
90
42
24
6
6
4,908
Annual
Reviews
604
594
140
166
76
30
14
8
2
2
1,636
Total
Burden
12,376
12,171
2,869
3,401
1,557
615
287
164
41
41
33,522
Annual
Burden
4,125
4,057
956
1,134
519
205
96
55
14
14
11,174
Total
Labor Cost
$
564,344
$
555,000
$
130,808
$
155,101
$
71,010
$
28,030
$
13,081
$
7,475
$
1,869
$
1,869
$
$
$ 1,528,587
Annual
Labor Cost
$
188,115
$
185,000
$
43,603
$
51,700
$
23,670
$
9,343
$
4,360
$
2,492
$
623
$
623
$
$
$
509,529
December 2015
Exhibit 56 - Review of Source Water Monitoring Reports - Burden and Cost
CWS - Ground Water Systems
Summary of Burden and Cost for ICR Period
(2016-2018)
Monitoring Events by Year
(Representing 9-Year Cycle)
Number of
Size Category
Systems
≤100
130
101-500
152
501-1,000
36
1,001-3,300
44
3,301-10,000
21
10,001-25,000
6
25,001-50,000
2
50,001-75,000
23
75,001-100,000
10
100,001-500,000
22
500,001-1,000,000
1
> 1,000,000
Total
447
2014
-
2015
22
10
22
1
55
2016
-
2017
1
1
2018
20
6
2
22
10
22
1
83
2019
-
2020
4
5
1
1
1
-
-
1
11
2021
22
10
22
1
55
2022
-
Total
Monitoring
Events
20
6
2
23
10
22
1
84
Annual
Monitoring
Events
7
2
1
8
3
7
0
28
Total
Burden
10
3
1
12
5
11
1
42
Annual
Burden
3
1
0
4
2
4
0
14
Total
Annual Labor
Labor Cost
Cost
$
$
$
$
$
$
$
$
$
456 $
152
$
137 $
46
$
46 $
15
$
524 $
175
$
228 $
76
$
502 $
167
$
23 $
8
$
$
$
1,915 $
638
Total
O&M Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
Annual
O&M Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
Total
O&M Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
Annual
O&M Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
NTNCWS - Ground Water Systems
Summary of Burden and Cost for ICR Period
(2016-2018)
Monitoring Events by Year
(Representing 9-Year Cycle)
Number of
Size Category
Systems
≤100
155
101-500
117
501-1,000
24
1,001-3,300
18
3,301-10,000
1
10,001-25,000
1
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
316
2014
-
DDBP/Chem/Rads ICR - Lead and Copper Rule
2015
1
1
2
2016
-
2017
-
2018
1
1
2
2019
-
2020
5
4
1
1
11
2021
-
2022
-
H-119
Annual
Monitoring
Events
-
Total
Monitoring
Events
1
1
-
0
0
-
2
1
Total
Burden
1
1
1
Annual
Burden
0
0
0
Total
Labor Cost
$
$
$
$
$
23
$
23
$
$
$
$
$
$
$
46
Annual
Labor Cost
$
$
$
$
$
8
$
8
$
$
$
$
$
$
$
15
December 2015
Exhibit 56 - Review Source Water Monitoring Reports - Burden and Cost (cont.)
CWS - Surface Water Systems
Summary of Burden and Cost for ICR Period
(2016-2018)
Monitoring Events by Year
(Representing 9-Year Cycle)
Number of
Size Category
Systems
≤100
11
101-500
24
501-1,000
9
1,001-3,300
20
3,301-10,000
17
10,001-25,000
8
25,001-50,000
4
50,001-75,000
41
75,001-100,000
17
100,001-500,000
59
500,001-1,000,000
4
> 1,000,000
2
Total
216
2014
11
23
9
19
16
8
4
3
1
2
1
97
2015
38
16
57
3
2
116
2016
-
2017
-
2018
38
16
57
3
2
116
2019
-
2020
-
2021
38
16
57
3
2
116
2022
1
1
Total
Monitoring
Events
38
16
57
3
2
116
Annual
Monitoring
Events
13
5
19
1
1
39
Total
Burden
19
8
29
2
1
58
Annual
Burden
6
3
10
1
0
19
Total
Annual Labor
Labor Cost
Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
866 $
289
$
365 $
122
$
1,300 $
433
$
68 $
23
$
46 $
15
$
2,645 $
882
Total
O&M Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
Annual
O&M Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
Total
O&M Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
Annual
O&M Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
Total
O&M Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
Annual
O&M Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
NTNCWS - Surface Water Systems
Summary of Burden and Cost for ICR Period
(2016-2018)
Monitoring Events by Year
(Representing 9-Year Cycle)
Number of
Size Category
Systems
≤100
6
101-500
5
501-1,000
1
1,001-3,300
2
3,301-10,000
1
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
15
2014
6
5
1
2
1
15
2015
-
2016
-
2017
-
2018
-
2019
-
2020
-
2021
-
Total
Monitoring
Events
-
2022
-
Annual
Monitoring
Events
-
Total
Burden
-
Annual
Burden
-
Total
Labor Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
Annual
Labor Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
Grand Total
Summary of Burden and Cost for ICR Period
(2016-2018)
Monitoring Events by Year
(Representing 9-Year Cycle)
Number of
Size Category
Systems
≤100
302
101-500
298
501-1,000
70
1,001-3,300
84
3,301-10,000
40
10,001-25,000
15
25,001-50,000
6
50,001-75,000
64
75,001-100,000
27
100,001-500,000
81
500,001-1,000,000
5
> 1,000,000
2
Total
994
2014
17
28
10
21
17
8
4
3
1
2
1
112
DDBP/Chem/Rads ICR - Lead and Copper Rule
2015
1
1
60
26
79
4
2
173
2016
-
2017
1
1
2018
21
7
2
60
26
79
4
2
201
2019
-
2020
9
9
2
2
1
1
22
2021
60
26
79
4
2
171
2022
1
1
H-120
Total
Monitoring
Events
21
7
2
61
26
79
4
2
202
Annual
Monitoring
Events
7
2
1
20
9
26
1
1
67
Total
Burden
11
4
1
31
13
40
2
1
101
Annual
Burden
4
1
0
10
4
13
1
0
34
Total
Annual Labor
Labor Cost
Cost
$
$
$
$
$
$
$
$
$
479 $
160
$
160 $
53
$
46 $
15
$
1,391 $
464
$
593 $
198
$
1,801 $
600
$
91 $
30
$
46 $
15
$
4,606 $
1,535
December 2015
Exhibit 57 - Review of Annual Lead Service Line Replacement Letter - Burden and Cost
Totals
Number
of
Size Category
Systems
≤100
142
101-500
176
501-1,000
45
1,001-3,300
65
3,301-10,000
36
10,001-25,000
15
25,001-50,000
7
50,001-75,000
4
75,001-100,000
1
100,001-500,000
1
500,001-1,000,000
> 1,000,000
Total
492
Summary of Burden and Cost for ICR Period
(2016-2018)
Reviews by Year
(Representing 9-Year Cycle)
2014
142
176
45
65
36
15
7
4
1
1
492
2015
142
176
45
65
36
15
7
4
1
1
492
2016
142
176
45
65
36
15
7
4
1
1
492
2017
142
176
45
65
36
15
7
4
1
1
492
2018
142
176
45
65
36
15
7
4
1
1
492
2019
142
176
45
65
36
15
7
4
1
1
492
2020
142
176
45
65
36
15
7
4
1
1
492
2021
142
176
45
65
36
15
7
4
1
1
492
2022
142
176
45
65
36
15
7
4
1
1
492
Total
Reviews
426
528
135
195
108
45
21
12
3
3
1,476
Annual
Reviews
142
176
45
65
36
15
7
4
1
1
492
Total
Burden
213
264
68
98
54
23
11
6
2
2
738
Annual
Burden
71
88
23
33
18
8
4
2
1
1
246
Total
Labor Cost
$
9,713
$
12,038
$
3,078
$
4,446
$
2,462
$
1,026
$
479
$
274
$
68
$
68
$
$
$
33,653
Annual
Labor Cost
$
3,238
$
4,013
$
1,026
$
1,482
$
821
$
342
$
160
$
91
$
23
$
23
$
$
$
11,218
Total
O&M Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
Annual
O&M Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
Total
O&M Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
Annual
O&M Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
Exhibit 58 - Review Partial Lead Service Line Replacement Letter - Burden and Cost
Totals
Number
of
Size Category
Systems
≤100
107
101-500
132
501-1,000
34
1,001-3,300
49
3,301-10,000
27
10,001-25,000
11
25,001-50,000
5
50,001-75,000
3
75,001-100,000
1
100,001-500,000
1
500,001-1,000,000
> 1,000,000
Total
369
Summary of Burden and Cost for ICR Period
(2016-2018)
Reviews by Year
(Representing 9-Year Cycle)
2014
959
1,188
304
439
243
101
47
27
7
7
3,321
DDBP/Chem/Rads ICR - Lead and Copper Rule
2015
959
1,188
304
439
243
101
47
27
7
7
3,321
2016
959
1,188
304
439
243
101
47
27
7
7
3,321
2017
959
1,188
304
439
243
101
47
27
7
7
3,321
2018
959
1,188
304
439
243
101
47
27
7
7
3,321
2019
959
1,188
304
439
243
101
47
27
7
7
3,321
2020
959
1,188
304
439
243
101
47
27
7
7
3,321
2021
959
1,188
304
439
243
101
47
27
7
7
3,321
H-121
2022
959
1,188
304
439
243
101
47
27
7
7
3,321
Total
Reviews
2,876
3,564
911
1,316
729
304
142
81
20
20
9,963
Annual
Reviews
959
1,188
304
439
243
101
47
27
7
7
3,321
Total
Burden
1,438
1,782
456
658
365
152
71
41
10
10
4,982
Annual
Burden
479
594
152
219
122
51
24
14
3
3
1,661
Total
Labor Cost
$
65,561
$
81,259
$
20,777
$
30,011
$
16,621
$
6,926
$
3,232
$
1,847
$
462
$
462
$
$
$
227,156
Annual
Labor Cost
$
21,854
$
27,086
$
6,926
$
10,004
$
5,540
$
2,309
$
1,077
$
616
$
154
$
154
$
$
$
75,719
December 2015
Exhibit 59 - Review of Public Education Compliance Letter - Burden and Cos
Totals
Summary of Burden and Cost for ICR Period
(2016-2018)
Reviews by Year
(Representing 9-Year Cycle)
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
Number of
Systems
302
297
71
84
39
16
7
4
1
2
1
824
2014
302
297
71
84
39
16
7
4
1
2
1
824
2015
302
297
71
84
39
16
7
4
1
2
1
824
2016
302
297
71
84
39
16
7
4
1
2
1
824
2017
302
297
71
84
39
16
7
4
1
2
1
824
2018
302
297
71
84
39
16
7
4
1
2
1
824
2019
302
297
71
84
39
16
7
4
1
2
1
824
2020
302
297
71
84
39
16
7
4
1
2
1
824
2021
302
297
71
84
39
16
7
4
1
2
1
824
2022
302
297
71
84
39
16
7
4
1
2
1
824
Total
Reviews
907
892
213
252
116
48
21
12
3
7
2
2,473
Annual
Reviews
302
297
71
84
39
16
7
4
1
2
1
824
Total Burden Annual Burden
454
151
446
149
107
36
126
42
58
19
24
8
11
4
6
2
2
1
4
1
1
0
1,237
412
Total
Labor Cost
$
20,680
$
20,338
$
4,856
$
5,746
$
2,645
$
1,094
$
479
$
274
$
68
$
160
$
46
$
$
56,384
Annual
Labor Cost
$
6,893
$
6,779
$
1,619
$
1,915
$
882
$
365
$
160
$
91
$
23
$
53
$
15
$
$
18,795
Total
O&M Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
Annual
O&M Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
Exhibit 60 - Employ Corrosion Control Expert - Burden and Cost
Totals
Summary of Burden and Cost for ICR Period
(2016-2018)
Hours by Year
(Representing 9-Year Cycle)
FTEs
0.5
Number of
States
32
2014
33,280
2015
33,280
2016
33,280
2017
33,280
2018
33,280
2019
33,280
2020
33,280
2021
33,280
2022
33,280
Total
Burden
99,840
Annual
Burden
33,280
Total
Labor Cost
$
4,552,704
Annual
Labor Cost
$
1,517,568
Total
O&M Cost
$
-
Annual O&M
Cost
$
-
1.0
14
29,120
29,120
29,120
29,120
29,120
29,120
29,120
29,120
29,120
87,360
29,120
$
3,983,616
$
1,327,872
$
-
$
-
1.5
11
34,320
34,320
34,320
34,320
34,320
34,320
34,320
34,320
34,320
102,960
34,320
$
4,694,976
$
1,564,992
$
-
$
-
Total
57
96,720
96,720
96,720
96,720
96,720
96,720
96,720
96,720
96,720
290,160
96,720
$ 13,231,296 $
4,410,432
$
-
$
-
DDBP/Chem/Rads ICR - Lead and Copper Rule
H-122
December 2015
Exhibit 61 - Review of Public Education and Notification Activities Due to STR - Burden and Cost
Totals
Summary of Burden and Cost for ICR Period
(2016-2018)
Reviews by Year
(Representing 9-Year Cycle)
Size Category
≤100
101-500
501-1,000
1,001-3,300
3,301-10,000
10,001-25,000
25,001-50,000
50,001-75,000
75,001-100,000
100,001-500,000
500,001-1,000,000
> 1,000,000
Total
Number of
Systems
302
297
71
84
39
16
7
4
1
2
1
824
DDBP/Chem/Rads ICR - Lead and Copper Rule
2014
302
297
71
84
39
16
7
4
1
2
1
824
2015
302
297
71
84
39
16
7
4
1
2
1
824
2016
302
297
71
84
39
16
7
4
1
2
1
824
2017
302
297
71
84
39
16
7
4
1
2
1
824
2018
302
297
71
84
39
16
7
4
1
2
1
824
2019
302
297
71
84
39
16
7
4
1
2
1
824
2020
302
297
71
84
39
16
7
4
1
2
1
824
2021
302
297
71
84
39
16
7
4
1
2
1
824
H-123
2022
302
297
71
84
39
16
7
4
1
2
1
824
Total
Reviews
907
892
213
252
116
48
21
12
3
7
2
2,473
Annual
Reviews
Total Burden
302
2,113
297
2,078
71
496
84
587
39
270
16
112
7
49
4
28
1
7
2
16
1
5
824
5,762
Annual
Burden
704
693
165
196
90
37
16
9
2
5
2
1,921
Total
Labor Cost
$
96,367
$
94,773
$
22,631
$
26,774
$
12,325
$
5,100
$
2,231
$
1,275
$
319
$
744
$
212
$
$
262,751
Annual
Labor Cost
$
32,122
$
31,591
$
7,544
$
8,925
$
4,108
$
1,700
$
744
$
425
$
106
$
248
$
71
$
$
87,584
Total
O&M Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
Annual
O&M Cost
$
$
$
$
$
$
$
$
$
$
$
$
$
-
December 2015
Exhibit 62 - State Burden and Cost Summary
Review Totals
Summary of Burden and Cost for ICR Period
(2016-2018)
Reporting Events by Year
(Representing 9-Year Cycle)
Number of
Size Category
Systems
≤100
20,775
101-500
22,032
501-1,000
7,082
1,001-3,300
8,937
3,301-10,000
5,088
10,001-25,000
2,296
25,001-50,000
1,049
50,001-75,000
363
75,001-100,000
177
100,001-500,000
367
500,001-1,000,000
40
> 1,000,000
22
Total
68,228
2014
32,595
36,350
11,537
15,022
4,233
1,887
864
247
103
198
21
11
103,067
2015
17,792
19,969
6,164
7,921
3,491
1,548
708
819
382
777
82
44
59,697
2016
15,841
17,802
5,441
6,966
9,236
4,163
1,901
247
103
198
21
11
61,930
2017
29,867
33,330
10,542
13,705
4,233
1,887
864
248
103
198
21
11
95,009
2018
17,792
19,969
6,164
7,921
3,511
1,554
710
819
382
777
82
44
59,725
2019
15,841
17,802
5,441
6,966
9,237
4,163
1,901
247
103
198
21
11
61,931
2020
29,871
33,335
10,543
13,706
4,233
1,887
864
247
103
198
21
11
95,019
2021
17,792
19,969
6,164
7,921
3,491
1,548
708
819
382
777
82
44
59,697
2022
17,919
20,006
6,149
7,860
9,236
4,163
1,901
247
103
198
21
11
67,812
Total
Reporting
Events
63,500
71,102
22,147
28,593
16,981
7,605
3,475
1,351
605
1,230
127
67
216,782
Annual
Reporting
Events
21,167
23,701
7,382
9,531
5,660
2,535
1,158
450
202
410
42
22
72,261
Annual
Burden
26,174
28,768
8,714
11,108
6,708
3,086
1,411
545
238
487
51
27
87,317
Total Burden
78,521
86,305
26,142
33,323
20,125
9,257
4,234
1,635
715
1,462
152
80
261,951
Total
Labor Cost
$
3,580,547
$
3,935,526
$
1,192,083
$
1,519,517
$
917,681
$
422,126
$
193,050
$
74,560
$
32,620
$
66,677
$
6,934
$
3,667
$
11,944,987
Annual
Labor Cost
$ 1,193,516
$ 1,311,842
$
397,361
$
506,506
$
305,894
$
140,709
$
64,350
$
24,853
$
10,873
$
22,226
$
2,311
$
1,222
$ 3,981,662
Total
O&M Cost
$
4,951
$
5,658
$
1,750
$
2,194
$
1,349
$
602
$
275
$
100
$
46
$
93
$
10
$
5
$ 17,035
Annual
O&M Cost
$
1,650
$
1,886
$
583
$
731
$
450
$
201
$
92
$
33
$
15
$
31
$
3
$
2
$
5,678
Employ Corrosion Control Expert Totals
Summary of Burden and Cost for ICR Period
(2016-2018)
Hours by Year
(Representing 9-Year Cycle)
FTEs
Number of
States
2014
2015
2016
2017
2018
2019
2020
2021
2022
0.5
32
33,280
33,280
33,280
33,280
33,280
33,280
33,280
33,280
33,280
1.0
14
29,120
29,120
29,120
29,120
29,120
29,120
29,120
29,120
1.5
11
34,320
34,320
34,320
34,320
34,320
34,320
34,320
34,320
Total
57
96,720
96,720
96,720
96,720
96,720
96,720
96,720
96,720
DDBP/Chem/Rads ICR - Lead and Copper Rule
Total Burden
Annual
Burden
Total
Labor Cost
Annual
Labor Cost
Total
O&M Cost
Annual O&M
Cost
99,840
33,280
$
4,552,704
$
1,517,568
$
-
$
-
29,120
87,360
29,120
$
3,983,616
$
1,327,872
$
-
$
-
34,320
102,960
34,320
$
4,694,976
$
1,564,992
$
-
$
-
96,720
290,160
96,720
$
13,231,296
$
4,410,432
$
-
$
-
H-124
December 2015
PWS
State
Exhibit 63a - Summary of Monitoring, Burden, and Cost for ICR Period
(Jan. 2016 - Dec. 2018)
Rule Component
Lead Service Lines
State Review and
Recordkeeping
State - Corrosion
Control Experts
Public Education
Reporting
Source Water
Tap Sampling
Water Quality
Parameter Sampling
Total LCR
Total
Responses
276,528
Annual
Responses
92,176
Total
Burden
(Hours)
382,168
Annual Burden
(Hours)
127,389
Exhibit 63b - Summary of Burden and Cost for ICR Period
(Jan. 2016 - Dec. 2018)
Total Labor
Total Capital
Annual
Total O&M
Cost
Annual Labor Cost
Cost
Capital Cost
Cost
13,219,965
4,406,655
$
571,043
Total Burden
Annual O&M
Annual
(Hours)
Cost
Total Responses Responses
190,348
216,782
2,473
115,378
202
69,529
824
38,459
67
23,176
126,303
207,807
1,445
2,540,400
42,101
69,269
482
846,800
65,774
529,883
21,925
176,628
68,648
3,326,772
22,883
1,108,924
DDBP/Chem/Rads ICR - Lead and Copper Rule
$
$
$
4,369,058 $
8,992,324
50,001 $
87,877,517 $
$
2,374,681
$ 116,883,545
$
$
1,456,353
2,997,441
16,667
29,292,506
791,560
38,961,182
$
Annual Burden
(Hours)
Total
Labor Cost
Annual
Labor Cost
Total Capital
Annual
Total
Cost
Capital Cost O&M Cost
Annual O&M Cost
$
$
$
6,785,546
48,343
7,089
4,672,456
$
$
$
2,261,849
16,114
2,363
1,557,485
$
$
2,727,181
14,811,657
$
$
909,060
4,937,219
H-125
216,782
72,261
72,261
261,951
87,317
290,160
96,720
552,111
$
184,037 $
11,944,987
3,981,662
$
17,035
$
5,678
13,231,296
$
4,410,432
$
-
$
-
25,176,283 $
8,392,094
$
17,035 $
5,678
December 2015
Exhibit 64 - Lead and Copper Rule - Summary of Original and Revised
Burden Estimates
No changes in burden estimates based on May 2015 consultations.
DDBP/Chem/Rads ICR - Lead and Copper Rule
H-126
December 2015
File Type | application/pdf |
File Title | Document |
Subject | Extracted Pages |
Author | U.S. Government Printing Office |
File Modified | 2015-12-04 |
File Created | 2015-02-13 |