Facility Cost and Burden Estimates for NPDES Permit Application Activities
Exhibit A.1a
Start-up Activities
Facilities (Respondents)
Activity
Read and Understand Rule
Mobilization/Planning
Training
Other Direct Costs
Totals
Year 1 Year 2 Year 3 Total
A
6
6
6 18
6
6
6 18
6
6
6 18
6
6
6 18
6
6
6 18
Exhibit A.1b
Permit Application Activities
Facilities (Respondents)
Facility
Junior
CAD
Contracted
Biological
Manager Technical Operator Manager
Biologist Statistician Technician Clerical
Assumed Loaded Hourly Rate $
$110
$45
$42
12
4
2
0
12
8
2
0
0
0
0
0
$134
$69
Level of Effort (hrs)
0
0
0
0
0
0
0
0
$90
$48
$27
0
0
0
0
0
0
0
0
1
1
1
0
Activity
Gather Information Characterizing Flow
Perform Engineering Calculations
Submit Data and Analysis for Review
Recordkeeping
Other Direct Costs
Totals
Year 1 Year 2 Year 3 Total
A
6
6
6 18
6
6
6 18
6
6
6 18
6
6
6 18
6
6
6 18
6
6
6 18
Facility
Junior
CAD
Contracted
Biological
Manager Technical Operator Manager
Biologist Statistician Technician Clerical
Assumed Loaded Hourly Rate $
Exhibit A.1d
Source Water Baseline Biological Characterization Data
Facilities (Respondents)
Activity
December 2015
Year 1 Year 2 Year 3 Total
A
Facility
Junior
CAD
Contracted
Biological
Manager Technical Operator Manager
Biologist Statistician Technician Clerical
Assumed Loaded Hourly Rate $
$110
$45
0
8
0
0
0
$42
32
32
0
8
0
0
0
0
0
0
$134
$69
Level of Effort (hrs)
0
0
0
0
0
0
0
0
0
0
$90
$48
$27
$45
$42
$134
$69
Level of Effort (hrs)
C
$1,883
$825
$336
$0
$3,044
0
0
0
0
0
$90
$48
O&M Costs
Total Costs**
D
E
C+D+E
$0
$0
$0
$0
$0
$0
$0
$0
$55
$55
$3,099
Total Burden
Total Initial Cost
(hrs.)
A*B
450
234
90
774
A*(C+D+E)
$33,896
$14,852
$6,050
$990
$55,787
Totals Per Facility for the ICR Approval Period
Labor Cost
Capital Costs
O&M Costs
Total Costs**
B
C
D
E
C+D+E
58
15
3
56
6
8
0
146
$2,610
$779
$197
$3,553
$160
$446
$0
$7,744
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$575
$575
$8,319
Total Burden
Total Initial Cost
(hrs.)
A*B
1,044
270
54
1,008
108
144
2,628
A*(C+D+E)
$46,980
$14,013
$3,537
$63,950
$2,884
$8,035
$10,350
$149,749
Totals Per Facility for the ICR Approval Period
Burden
(hrs)
0
0
16
8
0
$27
Capital Costs
Burden
(hrs)
Labor Cost
B
0
0
0
0
0
Facility
Junior
CAD
Contracted
Biological
Manager Technical Operator Manager
Biologist Statistician Technician Clerical
Assumed Loaded Hourly Rate $
$110
Labor Cost
25
13
5
0
43
$110
$45
$42
$134
$69
$90
$48
$27
Year 1 Year 2 Year 3 Total
A
Level of Effort (hrs)
6
6
6 18
Detailed Source Water Body Characterization
2
16
40
0
0
0
0
0
6
6
6 18
2
5
8
0
0
0
0
0
Description of CWIS Configuration and Location
6
6
6 18
1
1
1
0
0
0
0
0
Facility Water Balance Diagram
6
6
6 18
16
40
0
0
0
0
0
0
Operational Characteristics Narrative
6
6
6 18
0
0
0
0
0
0
0
6
Submit Materials for Review by State
6
6
6
18
2
2
2
0
0
0
0
2
Recordkeeping
6
6
6
18
0
0
0
0
0
0
0
0
Other Direct Costs
6
6
6
18
Totals
Water balance diagram is assumed to be taken from the facility design report. The hours reported here are for incorporation of the diagram(s) in the permit.
Facilities (Respondents)
Burden
(hrs)
B
Activity
Exhibit A.1c
Source Waterbody Flow Information
Totals Per Facility for the ICR Approval Period
C
$1,437
$2,315
$427
$573
$0
$4,752
32
40
16
16
0
104
Capital Costs
O&M Costs
Total Costs**
D
E
C+D+E
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$115
$115
$4,867
Total Burden
Total Initial Cost
(hrs.)
A*B
576
720
288
288
1,872
A*(C+D+E)
$25,862
$41,674
$7,690
$10,310
$2,070
$87,606
Totals Per Facility for the ICR Approval Period
Burden
(hrs)
Labor Cost
Capital Costs
O&M Costs
Total Costs**
B
C
D
E
C+D+E
Renewal of New Facility Rule Information Collection Request
Total Burden
Total Initial Cost
(hrs.)
A*B
A*(C+D+E)
A.-1
Identify Available Data and Document Efforts
Compile and Analyze Existing Data
Submit Data for Review by State
Recordkeeping
Other Direct Costs
Totals
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
18
18
18
18
18
18
Exhibit A.1e
CWIS Flow Reduction Requirements (Track 1)
Facilities (Respondents)
Activity
Develop Narrative
Perform Engineering Calculations
Document Minimization of Blow Down and Flows Not
Submit Data and Analysis forRecycled
Review
Recordkeeping
Other Direct Costs
Totals
Year 1 Year 2 Year 3 Total
A
5
4
5 14
5
4
5 14
5
4
5 14
5
4
5 14
5
4
5 14
5
4
5 14
5
4
5 14
40
32
0
2
0
80
60
0
4
0
0
20
0
1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
8
4
8
6
0
Facility
Junior
CAD
Contracted
Biological
Manager Technical Operator Manager
Biologist Statistician Technician Clerical
Assumed Loaded Hourly Rate $
$110
$45
8
4
0
0
2
0
$42
16
12
40
0
4
0
0
0
0
0
0
0
$134
$69
Level of Effort (hrs)
0
0
0
0
0
0
0
0
0
0
0
0
$90
$48
$27
128
116
8
13
0
265
$8,198
$7,150
$214
$601
$0
$16,163
0
0
0
0
0
0
$0
$0
$0
$0
$860
$860
$17,023
2,304
2,088
144
234
4,770
$147,557
$128,707
$3,845
$10,822
$15,480
$306,410
Totals Per Facility for the ICR Approval Period
Burden
(hrs)
Labor Cost
B
0
0
0
0
0
0
$0
$0
$0
$0
$0
$0
0
0
6
8
8
0
C
$1,597
$978
$1,956
$214
$613
$0
$5,357
24
16
46
8
14
0
108
Capital Costs
O&M Costs
Total Costs**
D
E
C+D+E
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$460
$460
$5,817
Total Burden
Total Initial Cost
(hrs.)
A*B
336
224
644
112
196
1,512
A*(C+D+E)
$22,355
$13,692
$27,387
$2,990
$8,579
$6,440
$81,444
Exhibit A.1f
CWIS Velocity Requirements (Track 1)
Facilities (Respondents)
Activity
Develop Narrative
Perform Engineering Calculations
Submit Data and Analysis for Review
Revise Based on State review
Recordkeeping
Other Direct Costs
Totals
Year 1 Year 2 Year 3 Total
A
5
4
5 14
5
4
5 14
5
4
5 14
5
4
5 14
5
4
5 14
5
4
5 14
5
4
5 14
Exhibit A.1g
Design and Construction Technology Plan (Track 1)
Facilities (Respondents)
Activity
Delineate Hydraulic Zone of Influence
Develop Narrative Description
Perform Engineering Calculations
Submit Data and Analysis for Review
Recordkeeping
Other Direct Costs
Totals
Year 1 Year 2 Year 3 Total
A
5
4
5 14
5
4
5 14
5
4
5 14
5
4
5 14
5
4
5 14
5
4
5 14
5
4
5 14
Facility
Junior
CAD
Contracted
Biological
Manager Technical Operator Manager
Biologist Statistician Technician Clerical
Assumed Loaded Hourly Rate $
$110
$45
16
8
0
4
2
0
$42
32
32
0
16
4
0
0
0
0
0
0
0
$134
$69
Level of Effort (hrs)
0
0
0
0
0
0
0
0
0
0
0
0
$90
$48
$27
$45
2
16
6
0
1
0
$42
5
32
24
0
2
0
8
0
0
0
0
0
$134
$69
Level of Effort (hrs)
0
0
0
0
0
0
0
0
0
0
0
0
Burden
(hrs)
Total Burden
Total Initial Cost
(hrs.)
Labor Cost
B
0
0
0
0
0
0
0
0
0
0
0
0
0
0
16
0
8
0
Facility
Junior
CAD
Contracted
Biological
Manager Technical Operator Manager
Biologist Statistician Technician Clerical
Assumed Loaded Hourly Rate $
$110
Totals Per Facility for the ICR Approval Period
$90
$48
0
0
0
0
0
0
$27
0
0
0
0
0
0
0
0
0
6
6
0
C
$3,194
$2,315
$427
$1,158
$613
$0
$7,706
48
40
16
20
14
0
138
Capital Costs
O&M Costs
Total Costs**
D
E
C+D+E
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$1,150
$1,150
$8,856
A*B
672
560
224
280
196
1,932
A*(C+D+E)
$44,710
$32,413
$5,981
$16,206
$8,579
$16,100
$123,990
Totals Per Facility for the ICR Approval Period
Burden
(hrs)
Labor Cost
Capital Costs
O&M Costs
Total Costs**
B
C
D
E
C+D+E
15
48
30
6
9
0
108
$779
$3,194
$1,736
$160
$360
$0
$6,229
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$55
$55
$6,284
Total Burden
Total Initial Cost
(hrs.)
A*B
210
672
420
84
126
1,512
A*(C+D+E)
$10,899
$44,710
$24,310
$2,243
$5,037
$770
$87,969
Exhibit A.1h
December 2015
Renewal of New Facility Rule Information Collection Request
A.-2
Comprehensive Demonstration Study Plan (Track 2)
Facilities (Respondents)
Year 1 Year 2 Year 3 Total
A
1
2
1 4
Description of Historical Studies that will be Used
Description of Proposed and/or Implemented Technologies
1
2
1 4
1
2
1 4
Develop Baseline Biological Characterization Sampling Plan
1
2
1 4
Submit Data and Plans for Review
1
2
1 4
Revise Based on State Review
1
2
1 4
Recordkeeping
1
2
1 4
Other Direct Costs
1
2
1 4
Totals
Facility
Junior
CAD
Contracted
Biological
Manager Technical Operator Manager
Biologist Statistician Technician Clerical
Assumed Loaded Hourly Rate $
$110
$45
$42
Activity
20
40
0
8
40
0
8
2
0
20
60
0
16
4
0
0
8
0
4
2
0
$134
$69
Level of Effort (hrs)
0
0
0
8
0
0
1
0
$90
$48
$27
Totals Per Facility for the ICR Approval Period
Burden
(hrs)
Labor Cost
B
0
0
0
0
0
0
0
0
2
62
C
$4,045
0
0
0
0
0
0
0
0
0
0
0
0
0
4
12
4
8
0
28
120
12
32
17
0
271
$1,776
$8,602
$320
$1,871
$831
$0
$17,446
Capital Costs
O&M Costs
Total Costs**
D
E
C+D+E
Total Burden
Total Initial Cost
(hrs.)
$0
$0
A*B
248
A*(C+D+E)
$16,182
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$860
$860
112
480
48
128
68
1,084
$7,106
$34,410
$1,282
$7,483
$3,323
$3,440
$73,225
$18,306
Exhibit A.1i
Source Water Baseline Biological Characterization Study (Track 2)
Facilities (Respondents)
Activity
Implement Freshwater Sampling
Other Direct Costs for Implement Freshwater Sampling
Implement Estuary Sampling
Other Direct Costs for Implement Estuary Sampling
Biological Study Laboratory Analysis (Freshwater)
Biological Study Laboratory Analysis (Estuary)
Profile of Source Water Biota
Identification of Critical Species
Description of Additional Stresses
Write Study based on Results and Submit for Review by
State
Recordkeeping
Finalize study based on State review
Freshwater Totals
Marine Totals
Year 1 Year 2 Year 3 Total
A
2
2
2 4
2
2
2 4
0
1
1 1
0
1
1 1
2
2
2 4
0
1
1 1
1
2
1 4
1
2
1 4
1
2
1 4
1
1
1 3
1
1
1 3
1
1
1 3
4
1
Exhibit A.1j
Evaluation of Potential CWIS Effects (Track 2)
Facilities (Respondents)
Activity
Calculate Reduction in Impingement Mortality and
Entrainment
Perform Engineering Calculations for Efficacy Projections
Perform Impingement Pilot Study (Freshwater)
Perform Entrainment Pilot Study (Freshwater)
Pilot Study Entrainment Laboratory Analysis (Freshwater)
Perform Impingement Pilot Study (Estuary)
Perform Entrainment Pilot Study (Estuary)
Pilot Study Entrainment Laboratory Analysis (Estuary)
Purchase & Installation of Pilot Study Technology
Operation & Maintenance of Pilot Technology
Submit Data and Analysis for Review
Recordkeeping
December 2015
Year 1 Year 2 Year 3 Total
A
1
1
1
1
1
0
0
0
1
1
1
1
1
1
1
1
1
0
0
0
1
1
1
1
1
1
1
1
1
0
0
0
1
1
1
1
3
3
3
3
3
0
0
0
3
3
3
3
Facility
Junior
CAD
Contracted
Biological
Manager Technical Operator Manager
Biologist Statistician Technician Clerical
Assumed Loaded Hourly Rate $
$110
$45
6
0
10
0
0
0
32
32
16
80
6
16
$42
52
0
101
0
0
0
20
20
10
160
12
32
0
0
0
0
0
0
0
0
0
0
0
0
$134
$69
Level of Effort (hrs)
120
2080
0
0
160
4095
0
0
0
0
0
0
32
60
20
40
16
30
16
8
6
0
0
0
$90
$48
67
0
100
0
0
0
0
0
0
8
0
0
2080
0
4095
0
0
0
20
0
10
0
0
0
$27
34
0
50
0
0
0
8
3
4
8
24
8
Facility
Junior
CAD
Contracted
Biological
Manager Technical Operator Manager
Biologist Statistician Technician Clerical
Assumed Loaded Hourly Rate $
$110
$45
80
40
16
16
0
16
16
0
0
0
8
4
$42
80
32
25
25
0
33
33
0
0
0
10
8
$134
$69
Level of Effort (hrs)
8
0
0
0
0
0
0
0
0
0
0
0
0
0
80
80
0
80
80
0
0
0
8
4
0
0
240
180
0
312
234
0
0
0
6
8
$90
$48
0
0
40
40
0
52
52
0
0
0
4
2
0
0
240
250
0
312
325
0
0
0
0
0
$27
12
4
20
20
0
26
26
0
0
0
16
20
Totals Per Facility for the ICR Approval Period
Burden
(hrs)
Labor Cost
B
4439
0
8611
0
0
0
172
115
86
280
48
56
5,196
9,368
C
$269,446
$0
$516,627
$0
$0
$0
$14,042
$9,956
$7,021
$19,610
$2,645
$3,407
$326,127
$573,308
Capital Costs
O&M Costs
Total Costs**
D
E
C+D+E
$0
$0
$0
$0
0
0
$0
$0
$0
$0
$0
$0
$0
$0
0
$6,000
0
$14,900
$89,600
$174,800
$0
$0
$0
$0
$0
$0
$95,600
$189,700
Total Burden
Total Initial Cost
(hrs.)
A*B
13,317
5,741
$421,727
$763,008
688
460
344
840
144
168
16,356
6,114
A*(C+D+E)
$808,339
$18,000
$344,418
$9,933
$268,800
$116,533
$56,168
$39,823
$28,084
$58,831
$7,934
$10,222
$1,265,182
$501,903
Totals Per Facility for the ICR Approval Period
Burden
(hrs)
Labor Cost
Capital Costs
O&M Costs
Total Costs**
B
C
D
E
C+D+E
180
76
661
611
0
831
766
0
0
0
52
46
Renewal of New Facility Rule Information Collection Request
$13,031
$5,936
$45,861
$42,173
$0
$55,867
$51,073
$0
$0
$0
$3,608
$2,606
$0
$0
$0
$0
$0
$0
$0
$0
$303,000
$0
$0
$0
$0
$0
$0
$0
$6,900
$0
$0
$9,000
$0
$34,500
$0
$0
Total Burden
Total Initial Cost
(hrs.)
A*B
540
228
1,983
1,833
156
138
A*(C+D+E)
$39,092
$17,807
$137,584
$126,520
$20,700
$0
$0
$0
$909,000
$103,500
$10,823
$7,818
A.-3
Other Direct Costs
Freshwater Totals
Marine Totals
1
1
0
1
1
0
1
1
0
3
3
0
Exhibit A.1k
Verification Monitoring Plan (Track 2)
Facilities (Respondents)
Activity
Develop Verification Monitoring Plan
Submit Data and Analysis for Review
Revise Based on State Review
Recordkeeping
Other Direct Costs
Totals
Year 1 Year 2 Year 3 Total
A
1
2
1 4
1
2
1 4
1
2
1 4
1
2
1 4
1
2
1 4
1
2
1 4
Exhibit A.1l
Remote Monitoring
Facilities (Respondents)
Activity
Purchase and Installation of Remote Monitoring Device
Other Direct Costs
Year 1 Year 2 Year 3 Total
A
5
4
5 14
5
4
5 14
14
0
0
0
0
0
0
0
0
Facility
Junior
CAD
Contracted
Biological
Manager Technical Operator Manager
Biologist Statistician Technician Clerical
Assumed Loaded Hourly Rate $
$110
$45
40
0
2
1
0
$42
60
0
4
1
0
8
0
1
1
0
$134
$69
Level of Effort (hrs)
0
0
0
0
0
0
1
0
0
0
$90
$48
$27
0
0
$45
$42
0
0
0
0
$134
$69
Level of Effort (hrs)
0
0
0
0
$0
$113,215
$132,120
0
0
0
0
0
4
2
1
2
0
$90
$48
$27
0
0
0
0
0
0
Burden
(hrs)
Labor Cost
C
$7,527
$53
$468
$384
$0
$8,433
112
2
8
6
0
128
$1,100
$42,500
$44,600
$458,715
$479,720
4,878
-
$3,300
$1,376,144
$0
Capital Costs
O&M Costs
Total Costs**
D
E
C+D+E
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$460
$460
$8,893
Total Burden
Total Initial Cost
(hrs.)
A*B
448
8
32
24
512
A*(C+D+E)
$30,109
$214
$1,871
$1,537
$1,840
$35,570
Totals Per Facility for the ICR Approval Period
Burden
(hrs)
Labor Cost
B
C
0
0
-
Total Burden and Costs for All NPDES Application Activities
Totals
* The ODC estimate was not estimated for each activity, but rather as a lump sum for each provision of the rule.
December 2015
$0
$303,000
$303,000
Totals Per Facility for the ICR Approval Period
B
0
0
0
0
0
Facility
Junior
CAD
Contracted
Biological
Manager Technical Operator Manager
Biologist Statistician Technician Clerical
Assumed Loaded Hourly Rate $
$110
0
1626
1,950
Renewal of New Facility Rule Information Collection Request
$0
$0
$0
Capital Costs
D
$62,000
$0
$62,000
O&M Costs
Total Costs**
E
C+D+E
$0
$1,100
$1,100
Total Burden
Total Initial Cost
(hrs.)
A*B
-
$63,100
-
A*(C+D+E)
$868,000
$15,400
$883,400
Total Burden
Total Initial Cost
(hrs.)
43,944
$5,028,380
A.-4
Exhibit A.2
Facility Cost and Burden Estimates for Annual Activities
Exhibit A.2a
Freshwater Verification Study (Track 2)
Facility
Manager
Activity
Perform Statistical Analysis
Submit Monitoring Results & Study Analysis
Record Keeping
Totals
Facilities (Respondents)
Year 1 Year 2 Year 3 Total
A
4
1
2
7
4
1
2
7
4
1
2
7
7
$110
20
0
1
21
Junior Contracted
Biological
Technical Manager Biologist Statistician Technician Clerical
Assumed Loaded Hourly Rate $
$45
$134
$69
$90
$48
$27
Level of Effort (hrs)
20
10
10
20
0
1
0
0
0
0
0
4
2
0
0
0
0
4
22
10
10
20
0
9
Totals Per Facility for the ICR Approval Period
Burden
(hrs)
B
81
4
7
92
Labor Cost
C
$6,967
$107
$306
$7,380
ODCs lump
sum*
D
$575
Total for AllFacilities in the ICR
Approval Period
Total Costs
Burden (hrs.)
C+D
A*B
567
28
49
644
$7,955
Annual Cost
A*(C+D)
$48,767
$748
$2,145
$55,684
Exhibit A.2b
Estuary Verification Study (Track 2)
Facility
Manager
Activity
Perform Statistical Analysis
Submit Monitoring Results & Study Analysis
Record Keeping
Totals
Facilities (Respondents)
Year 1 Year 2 Year 3 Total
A
0
0
1
1
0
0
1
1
0
0
1
1
1
$110
25
0
1
26
Junior Contracted
Biological
Technical Manager Biologist Statistician Technician Clerical
Assumed Loaded Hourly Rate $
$45
$134
$69
$90
$48
$27
Level of Effort (hrs)
30
15
15
25
0
1
0
0
0
0
0
4
2
0
0
0
0
4
32
15
15
25
0
9
Totals Per Facility for the ICR Approval Period
Burden
(hrs)
B
111
4
7
122
Labor Cost
C
$9,436
$107
$306
$9,849
ODCs lump
sum*
D
$575
Total for AllFacilities in the ICR
Approval Period
Total Costs
Burden (hrs.)
C+D
A*B
$10,424
111
4
7
122
Annual Cost
A*(C+D)
$9,436
$107
$306
$10,424
Exhibit A.2c.1
Initial Biological Monitoring for Impingement (Freshwater)
Facility
Manager
Activity
Monthly Sample Collection
Onsite Analysis of Samples
Perform Statistical Analysis
Record Keeping
Totals
Facilities (Respondents)
Year 1 Year 2 Year 3 Total
A
11
10
10
31
11
10
10
31
11
10
10
31
11
10
10
31
31
$110
2
4
8
2
16
Junior Contracted
Biological
Technical Manager Biologist Statistician Technician Clerical
Assumed Loaded Hourly Rate $
$45
$134
$69
$90
$48
$27
Level of Effort (hrs)
0
4
72
0
72
0
0
12
72
0
72
0
4
0
0
32
0
0
1
1
4
1
0
16
5
17
148
33
144
16
Totals Per Facility for the ICR Approval Period
Burden
(hrs)
B
150
160
44
25
379
Labor Cost
C
$9,181
$10,476
$3,951
$1,194
$24,802
ODCs lump
sum*
D
$575
Total Costs
C+D
$25,377
Total for AllFacilities in the ICR
Approval Period
Burden (hrs.)
A*B
4,650
4,960
1,364
775
11,749
Annual Cost
A*(C+D)
$284,617
$324,756
$122,475
$37,017
$786,690
Exhibit A.2c.2
Reduced Biological Monitoring for Impingement (Freshwater)
Facility
Manager
Activity
Reduced Sample Collection
Onsite Analysis of Samples
Perform Statistical Analysis
Record Keeping
Totals
December 2015
Facilities (Respondents)
Year 1 Year 2 Year 3 Total
A
62
68
73
203
62
68
73
203
62
68
73
203
62
68
73
203
203
$110
1
2
4
1
8
Junior Contracted
Biological
Technical Manager Biologist Statistician Technician Clerical
Assumed Loaded Hourly Rate $
$45
$134
$69
$90
$48
$27
Level of Effort (hrs)
0
2
36
0
36
0
0
6
36
0
36
0
2
0
0
16
0
0
1
1
2
1
0
8
3
9
74
17
72
8
Totals Per Facility for the ICR Approval Period
Burden
(hrs)
B
75
80
22
14
191
Labor Cost
C
$4,591
$5,238
$1,975
$732
$12,536
ODCs lump
sum*
D
Renewal of New Facility Rule Information Collection Request
$288
Total Costs
C+D
$12,823
Total for AllFacilities in the ICR
Approval Period
Burden (hrs.)
A*B
15,225
16,240
4,466
2,842
38,773
Annual Cost
A*(C+D)
$931,892
$1,063,314
$401,006
$148,576
$2,603,150
A.-5
Exhibit A.2d.1
Initial Biological Monitoring for Impingement (Estuary)
Facility
Manager
Activity
Monthly Sample Collection
Handling and Preparation of Samples
Perform Statistical Analysis
Record Keeping
Totals
Facilities (Respondents)
Year 1 Year 2 Year 3 Total
A
1
2
1
4
1
2
1
4
1
2
1
4
1
2
1
4
4
$110
2
4
8
2
16
Junior Contracted
Biological
Technical Manager Biologist Statistician Technician Clerical
Assumed Loaded Hourly Rate $
$45
$134
$69
$90
$48
$27
Level of Effort (hrs)
0
5
94
0
94
0
0
16
94
0
94
0
4
0
0
42
0
0
1
1
5
1
0
16
5
22
192
43
187
16
Totals Per Facility for the ICR Approval Period
Burden
(hrs)
B
194
207
54
27
482
Labor Cost
C
$11,870
$13,487
$4,819
$1,345
$31,520
ODCs lump
sum*
D
$745
Total for AllFacilities in the ICR
Approval Period
Total Costs
Burden (hrs.)
C+D
A*B
$32,265
778
827
214
107
1,926
Annual Cost
A*(C+D)
$47,479
$53,948
$19,275
$5,379
$129,061
Exhibit A.2d.2
Reduced Biological Monitoring for Impingement (Estuary)
Facility
Manager
Activity
Reduced Sample Collection
Handling and Preparation of Samples
Perform Statistical Analysis
Record Keeping
Totals
Facilities (Respondents)
Year 1 Year 2 Year 3 Total
A
11
11
12
34
11
11
12
34
11
11
12
34
11
11
12
34
34
1
2
4
1
8
Junior Contracted
Biological
Technical Manager Biologist Statistician Technician Clerical
Assumed Loaded Hourly Rate $
$45
$134
$69
$90
$48
$27
Level of Effort (hrs)
0
3
47
0
47
0
0
8
47
0
47
0
2
0
0
21
0
0
1
1
3
1
0
8
3
12
97
22
94
8
4
4
16
2
26
Junior Contracted
Biological
Technical Manager Biologist Statistician Technician Clerical
Assumed Loaded Hourly Rate $
$45
$134
$69
$90
$48
$27
Level of Effort (hrs)
0
12
156
0
156
0
0
12
78
0
78
0
4
0
0
64
0
0
1
1
8
2
0
16
5
25
242
66
234
16
$110
Totals Per Facility for the ICR Approval Period
Burden
(hrs)
B
98
104
27
15
244
Labor Cost
C
$6,012
$6,794
$2,427
$801
$16,035
ODCs lump
sum*
D
$373
Total Costs
C+D
$16,407
Total for AllFacilities in the ICR
Approval Period
Burden (hrs.)
A*B
3,332
3,536
918
510
8,296
Annual Cost
A*(C+D)
$204,408
$230,989
$82,532
$27,244
$557,838
Exhibit A.2e.1
Initial Biological Monitoring for Entrainment (Freshwater)
Facility
Manager
Activity
Biweekly Sample Collection
Handling and Preparation of Samples
Perform Statistical Analysis
Recordkeeping
Totals
Facilities (Respondents)
Year 1 Year 2 Year 3 Total
A
11
10
10
31
11
10
10
31
11
10
10
31
11
10
10
31
31
$110
Totals Per Facility for the ICR Approval Period
Burden
(hrs)
B
328
172
84
30
614
Labor Cost
C
$20,304
$11,178
$7,722
$1,562
$40,766
ODCs lump
sum*
D
$1,150
Total Costs
C+D
$41,916
Total for AllFacilities in the ICR
Approval Period
Burden (hrs.)
A*B
10,168
5,332
2,604
930
19,034
Annual Cost
A*(C+D)
$629,424
$346,518
$239,382
$48,425
$1,299,399
Exhibit A.2e.2
Reduced Biological Monitoring for Entrainment (Freshwater)
Facility
Manager
Activity
Reduced Sample Collection
Handling and Preparation of Samples
Perform Statistical Analysis
Recordkeeping
Totals
December 2015
Facilities (Respondents)
Year 1 Year 2 Year 3 Total
A
62
68
73
203
62
68
73
203
62
68
73
203
62
68
73
203
203
$110
2
2
8
1
13
Junior Contracted
Biological
Technical Manager Biologist Statistician Technician Clerical
Assumed Loaded Hourly Rate $
$45
$134
$69
$90
$48
$27
Level of Effort (hrs)
0
6
78
0
78
0
0
6
39
0
39
0
2
0
0
32
0
0
1
1
4
1
0
8
3
13
121
33
117
8
Totals Per Facility for the ICR Approval Period
Burden
(hrs)
B
164
86
42
16
308
Labor Cost
C
$10,152
$5,589
$3,861
$871
$20,473
ODCs lump
sum*
D
Renewal of New Facility Rule Information Collection Request
$575
Total Costs
C+D
$21,048
Total for AllFacilities in the ICR
Approval Period
Burden (hrs.)
A*B
33,292
17,458
8,526
3,248
62,524
Annual Cost
A*(C+D)
$2,060,856
$1,134,567
$783,783
$176,752
$4,272,683
A.-6
Exhibit A.2f.1
Initial Biological Monitoring for Entrainment (Estuary)
Facility
Manager
Activity
Biweekly Sample Collection
Handling and Preparation of Samples
Perform Statistical Analysis
Recordkeeping
Totals
Facilities (Respondents)
Year 1 Year 2 Year 3 Total
A
1
2
1
4
1
2
1
4
1
2
1
4
1
2
1
4
4
$110
4
4
16
2
26
Junior Contracted
Biological
Technical Manager Biologist Statistician Technician Clerical
Assumed Loaded Hourly Rate $
$45
$134
$69
$90
$48
$27
Level of Effort (hrs)
0
12
203
0
203
0
0
12
101
0
101
0
4
0
0
83
0
0
1
1
10
3
0
16
5
25
314
86
304
16
Totals Per Facility for the ICR Approval Period
Burden
(hrs)
B
422
218
103
33
776
Labor Cost
C
$25,803
$13,869
$9,440
$1,791
$50,903
ODCs lump
sum*
D
$1,320
Total Costs
C+D
$52,223
Total for AllFacilities in the ICR
Approval Period
Burden (hrs.)
A*B
1,688
872
412
132
3,104
Annual Cost
A*(C+D)
$103,212
$55,476
$37,758
$7,165
$208,892
Exhibit A.2f.2
Reduced Biological Monitoring for Entrainment (Estuary)
Facility
Manager
Activity
Reduced Sample Collection
Handling and Preparation of Samples
Perform Statistical Analysis
Recordkeeping
Totals
Facilities (Respondents)
Year 1 Year 2 Year 3 Total
A
11
11
12
34
11
11
12
34
11
11
12
34
11
11
12
34
34
$110
2
2
8
1
13
Junior Contracted
Biological
Technical Manager Biologist Statistician Technician Clerical
Assumed Loaded Hourly Rate $
$45
$134
$69
$90
$48
$27
Level of Effort (hrs)
0
6
102
0
102
0
0
6
51
0
51
0
2
0
0
42
0
0
1
1
5
2
0
8
3
13
158
44
153
8
Totals Per Facility for the ICR Approval Period
Burden
(hrs)
B
212
110
52
18
392
Labor Cost
C
$12,960
$6,993
$4,765
$1,031
$25,749
ODCs lump
sum*
D
$660
Total Costs
C+D
$26,409
Total for AllFacilities in the ICR
Approval Period
Burden (hrs.)
A*B
7,208
3,740
1,768
612
13,328
Annual Cost
A*(C+D)
$440,640
$237,762
$162,010
$35,037
$897,889
Exhibit A.2g
Velocity Monitoring
Facility
Manager
Activity
Monitor Average Through Technology
Analyze Data
Recordkeeping
Totals
Facilities (Respondents)
Year 1 Year 2 Year 3 Total
A
85
91
96
272
85
91
96
272
85
91
96
272
272
$110
2
4
1
7
Junior Contracted
Biological
Technical Manager Biologist Statistician Technician Clerical
Assumed Loaded Hourly Rate $
$45
$134
$69
$90
$48
$27
Level of Effort (hrs)
100
0
0
0
0
0
40
0
0
0
0
0
8
0
0
0
0
8
148
0
0
0
0
8
Totals Per Facility for the ICR Approval Period
Burden
(hrs)
B
102
44
17
163
Labor Cost
C
$4,710
$2,235
$683
$7,627
ODCs lump
sum*
D
$115
Total Costs
C+D
$7,742
Total for AllFacilities in the ICR
Approval Period
Burden (hrs.)
A*B
27,744
11,968
4,624
44,336
Annual Cost
A*(C+D)
$1,281,011
$607,974
$185,667
$2,105,933
Exhibit A.2h
Inspection of Installed Technologies
Facility
Manager
Facilities (Respondents)
Year 1 Year 2 Year 3 Total
A
Activity
Visually Inspect All InstalledTechnologies
31
32
33
96
Recordkeeping
31
32
33
96
Totals
96
December 2015
Junior Contracted
Biological
Technical Manager Biologist Statistician Technician Clerical
Assumed Loaded Hourly Rate $
$110
$45
$134
$69
$90
$48
$27
Level of Effort (hrs)
24
208
0
0
0
0
0
3
16
0
0
0
0
2
27
224
0
0
0
0
2
Totals Per Facility for the ICR Approval Period
Burden
(hrs)
B
232
21
253
Labor Cost
C
$11,974
$1,101
$13,076
ODCs lump
sum*
D
Renewal of New Facility Rule Information Collection Request
$115
Total Costs
C+D
$13,191
Total for AllFacilities in the ICR
Approval Period
Burden (hrs.)
A*B
22,272
2,016
24,288
Annual Cost
A*(C+D)
$1,149,542
$105,715
$1,266,298
A.-7
Exhibit A.2i
Yearly Status Report Activities
Facility
Manager
Activity
Report on Inspection and Maintenance
Detail Velocity Monitoring Results
Detail Biological Monitoring Results
Compile and Submit Report
Recordkeeping
Totals
Facilities (Respondents)
Year 1 Year 2 Year 3 Total
A
85
91
96
272
85
91
96
272
85
91
96
272
85
91
96
272
85
91
96
272
272
$110
16
8
24
80
8
136
Junior Contracted
Biological
Technical Manager Biologist Statistician Technician Clerical
Assumed Loaded Hourly Rate $
$45
$134
$69
$90
$48
$27
Level of Effort (hrs)
16
0
0
0
0
0
16
0
0
0
0
0
32
4
4
24
0
0
80
0
0
0
0
16
12
0
0
0
0
8
156
4
4
24
0
24
Totals Per Facility for the ICR Approval Period
Burden
(hrs)
B
32
24
88
176
28
348
Labor Cost
C
$2,475
$1,597
$7,057
$12,803
$1,631
$25,563
ODCs lump
sum*
D
Total Costs
Burden (hrs.)
Annual Cost
$26,423
A*B
8,704
6,528
23,936
47,872
7,616
94,656
ODCs lump Total Cost per
sum*
Facility
Total Burden
(hrs.)
Total Annual Cost
322,780
21,380,943
$860
C+D
Total for All Facilities in the ICR
Approval Period
A*(C+D)
$673,254
$434,330
$1,919,450
$3,482,470
$443,578
$7,187,002
Total Burden and Cost for All Annual Activities
Burden
Per Facility
1,757
1,263
2,022
1,400
1,849
1,355
2,144
1,522
Track 1 Freshwater
Track 1 Freshwater - Reduced
Track 1 Estuary
Track 1 Estuary - Reduced
Track 2 Freshwater
Track 2 Freshwater - Reduced
Track 2 Estuary
Track 2 Estuary - Reduced
Cost per
Facility
111,834
79,274
128,689
88,049
119,214
86,654
138,538
97,898
2,815
1,953
3,155
2,123
3,390
2,528
3,730
2,698
Totals
114,649
81,227
131,844
90,171
122,604
89,182
142,268
100,595
Exhibit A.2j
Facility Annual O&M Costs
Activity
Operation of Remote Sensing Device
Identify & Enumerate Entrained Freshwater Biota
Identify & Enumerate Entrained Estuary Biota
Facilities (Responses)
54
59
63
176
73
78
83
234
12
13
13
38
Contracted Laboratory
Analysis Cost
Operation and
Maintenance Costs
$230
ODCs lump
sum*
$55
$9,000
$11,700
$55
Cost ($)
$50,160
$2,106,000
$444,600
$2,600,760
Total Cost for All NPDES Application Activities
Total Cost ($)
$23,981,703
Totals
December 2015
Renewal of New Facility Rule Information Collection Request
A.-8
Exhibit A.3
Director Burden and Cost Estimates for Activities
Exhibit A.3a
Director Start-up Activities
12/201111/2012
A
Activity
Read and Understand Rule
Mobilization/Planning
Training
Totals
-
12/201212/2013Burden
Labor
ODCs
Total
Total
Total
11/2013
11/2014 Clerical
Per
Cost per lump Cost Per Burden
Assumed Loaded Hourly Rate $
Initial Cost
Director
Director
sum*
Director
(hrs.)
75
35
29
B
C
D
C+D
A*B
A*(C+D)
Level of Effort (hrs)
12
12
0
24
$1,313
$0
24
16
0
40
$2,348
$0
4
32
0
36
$1,409
$0
40
60
0
100
$5,070
$50
$5,120
$0
Exhibit A.3a
Director Permit Issuance Activities
Senior
Junior
Burden
Technical Technical Clerical
Directors
Per
(Responses) Assumed Loaded Hourly Rate $
Permit
75
35
29
A
B
Level of Effort (hrs)
Activity
Reviewing CWIS location and design data
18
6
18
0
24
Determine Compliance with Source Waterbody Flow Information
18
2
6
0
8
Review Source Water Baseline Biological Characterization Data
Review Design and Construction Technology Plan (Track 1)
Determine Compliance with CWIS Velocity Requirements (Track
1)
Determine Compliance with CWIS Flow Reduction Requirements
(Track 1)
Review Comprehensive Demonstration Study Plan (Track 2)
Review Source Water Baseline Biological Characterization Study
(Track 2)
Review Evaluation of Potential CWIS Effects (Track 2)
Determine Monitoring Frequency
Determine Record keeping and Reporting Frequency
Considering Public Comments
Issuing Permit
Permit Record Keeping
Totals
Track 1 Totals
Track 2 Totals
December 2015
Labor
ODCs
Total
Total
Cost per lump Cost Per Burden
Permit
sum*
Permit
(hrs.)
C
$1,073
$358
D
C+D
Total
Initial
Cost*
A*B
432
144
A*(C+D)
$19,310
$6,437
18
14
20
24
20
8
0
0
40
32
$2,188
$2,070
720
448
$39,384
$28,986
14
2
6
0
8
$358
112
$5,006
14
4
8
16
8
16
0
0
16
32
$875
$1,750
224
128
$12,253
$7,002
3
3
17
17
17
17
17
18
400
16
2
2
16
1
1
516
50
16
6
6
16
6
1
183
0
0
0
0
0
1
2
3
450
32
8
8
32
8
4
702
188
646
$31,615
$1,750
$358
$358
$1,750
$312
$167
$44,982
$9,866
$41,679
1,350
96
136
136
544
136
68
4,674
$94,845
$5,251
$6,079
$6,079
$29,757
$5,301
$2,842
$274,742
$345
$345
$345
$45,327
$10,211
$42,024
Renewal of New Facility Rule Information Collection Request
A.-9
Exhibit A.3b
Verification Study Review
Activity
Review of Verification Studies
Permit Modification due to Unfavorable Results
Record Keeping
Totals
Senior
Junior
Labor
ODCs
Total
Total
Technical Technical Clerical Burden
Directors
Total
Per
Cost per lump Cost Per Burden
(Responses) Assumed Loaded Hourly Rate $
Initial Cost
Permit
Permit
sum*
Permit
(hrs.)
75
35
29
A
B
C
D
C+D
A*B
A*(C+D)
Level of Effort (hrs)
8
2
4
0
6
$288
48
$2,306
8
4
10
0
14
$646
112
$5,166
8
0
0
1
1
$29
8
$231
8
6
14
1
21
$963
$55
$1,018
168
$8,000
Exhibit A.3c
Annual Director Activities
Activity
Review of Yearly Report
Compliance Tracking
Determination on Monitoring Scope Reduction
Record Keeping
Totals
Senior
Junior
Labor
ODCs
Total
Total
Technical Technical Clerical Burden
Directors
Per
Cost per lump Cost Per Burden
(Responses) Assumed Loaded Hourly Rate $
Permit
Permit
sum*
Permit
(hrs.)
75
35
29
A
B
C
D
C+D
A*B
Level of Effort (hrs)
272
6
12
0
18
$865
4,896
272
4
12
0
16
$715
4,352
272
4
8
0
12
$576
3,264
272
1
2
1
4
$173
1,088
272
15
34
1
50
$2,329
$55
$2,384 13,600
Total
Annual
Cost
A*(C+D)
$235,171
$194,534
$156,781
$47,056
$649,000
Total Burden and Cost for All Director Activities
Totals
December 2015
Total
Total
Burden
Initial Cost
(hrs.)
18,274
$931,742
Renewal of New Facility Rule Information Collection Request
A.-10
Exhibit A.4
Federal Burden and Cost Estimates for Activities
Exhibit A.4a
Federal Permit Program Oversight Activities
Activity
Reviewing CWIS location and design data
Determine Compliance with Source Waterbody Flow Information
Review Source Water Baseline Biological Characterization Data
Review Design and Construction Technology Plan (Track 1)
Determine Compliance with CWIS Velocity Requirements (Track 1)
Determine Compliance with CWIS Flow Reduction Requirements (Track
1)
Review Comprehensive Demonstration Study Plan (Track 2)
Review Source Water Baseline Biological Characterization Study (Track
2)
Review Evaluation of Potential CWIS Effects (Track 2)
Determine Monitoring Frequency
Permit Record Keeping
Totals
Track 1 Totals
Track 2 Totals
December 2015
Federal
(Responses)
Over Three
Years
A
18
18
18
14
14
Senior
Junior
Technical
Technical
Clerical
Assumed Loaded Hourly Rate $
75
35
29
Level of Effort (hrs)
1
2
1
3
1
2
1
3
1
2
0
0
0
0
0
Burden
per
permit
Review
B
3
4
3
4
3
Labor
Cost per
Permit
Review
C
$144
$179
$144
$179
$144
14
4
1
1
2
2
0
0
3
3
3
3
17
17
18
6
1
1
1
16
12
2
3
1
34
0
0
0
2
2
18
3
4
4
30
28
42
ODCs
lump
sum*
D
Total Cost Total
per Permit Burden
Review
(hrs.)
C+D
Total Initial
Cost *
A*B
54
72
54
56
42
A*(C+D)
$2,594
$3,218
$2,594
$2,503
$2,017
$144
$144
42
12
$2,017
$576
$865
$144
$179
$167
1,184
$1,280
$1,966
54
9
68
68
531
$2,594
$432
$3,040
$2,842
$25,364
$55
$55
$55
$1,239
$1,335
$2,021
Renewal of New Facility Rule Information Collection Request
A.-11
Exhibit A.5
Respondents for the ICR Approval Period Year by Year by Activity
Facilities [1]
Year 1
12/201411/2015
Year 2
12/201511/2016
Year 3
12/201611/2017
Annual
Average
Initial NPDES Permit Application Activities
Start-up Activities
Permit Application Activities
Source Waterbody Flow Information
Use Existing Data- Source Water Baseline Biological Characterization Data
CWIS Flow Reduction Requirements (Track 1)
CWIS Velocity Requirements (Track 1)
Design and Construction Technology Plan (Track 1)
Comprehensive Demonstration Study Plan (Track 2)
Freshwater Source Water Baseline Biological Characterization Study (Track 2)
Estuary Source Water Baseline Biological Characterization Study (Track 2)
Profile of Source Water Biota for Characterization Study (Track 2)
Submit Characterization Study (Track 2)
Freshwater Evaluation of Potential CWIS Effects (Track 2)
Estuary Evaluation of Potential CWIS Effects (Track 2)
Verification Monitoring Plan (Track 2)
NPDES Repermitting Activities
Start-up Activities
Permit Application Activities
Source Waterbody Flow Information
Source Water Baseline Biological Characterization Data
CWIS Flow Reduction Requirements (Track 1)
CWIS Velocity Requirements (Track 1)
Design and Construction Technology Plan (Track 1)
Comprehensive Demonstration Study Plan (Track 2)
Freshwater Source Water Baseline Biological Characterization Study (Track 2)
Estuary Source Water Baseline Biological Characterization Study (Track 2)
Profile of Source Water Biota for Characterization Study (Track 2)
Submit Characterization Study (Track 2)
Annual
Freshwater Verification Study (Track 2)
Estuary Verification Study (Track 2)
Initial Biological Monitoring for Impingement (Freshwater)
Reduced Biological Monitoring for Impingement (Freshwater)
Initial Biological Monitoring for Impingement (Estuary)
Reduced Biological Monitoring for Impingement (Estuary)
Initial Biological Monitoring for Entrainment (Freshwater)
Reduced Biological Monitoring for Entrainment (Freshwater)
Initial Biological Monitoring for Entrainment (Estuary)
Reduced Biological Monitoring for Entrainment (Estuary)
Velocity Monitoring
Visual Inspection of Installed Technologies
Yearly Status Report Activities
Respondents
December 2015
6
6
6
6
5
5
5
1
2
0
1
1
1
0
1
6
6
6
6
4
4
4
2
2
1
2
1
1
0
2
6
6
6
6
5
5
5
1
2
1
1
1
1
0
1
6
6
6
6
5
5
5
1
2
1
1
1
1
0
1
9
9
9
9
6
6
6
3
5
3
3
4
13
13
13
13
8
8
8
5
5
4
5
2
20
20
20
20
9
9
9
11
13
5
11
6
14
14
14
14
8
8
8
6
8
4
6
4
4
0
11
62
1
11
11
62
1
11
85
31
85
92
1
0
10
68
2
11
10
68
2
11
91
32
91
98
2
1
10
73
1
12
10
73
1
12
96
33
96
104
2
0
10
68
1
11
10
68
1
11
91
32
91
98
Renewal of New Facility Rule Information Collection Request
A.-12
Directors [2]
Year 1
12/201411/2015
Director Permit Issuance Activities
Reviewing Facility General Permit Application Information
Review Source Water Baseline Biological Characterization Data
Determine Compliance with Source Waterbody Flow Information
Review Design and Construction Technology Plan (Track 1)
Determine Compliance with CWIS Velocity Requirements (Track 1)
Determine Compliance with CWIS Flow Reduction Requirements (Track 1)
Review Comprehensive Demonstration Study Plan (Track 2)
Review Source Water Baseline Biological Characterization Study (Track 2)
Review Evaluation of Potential CWIS Effects (Track 2)
Determining Facility Requirements and Issuing Permit
Verification Study Review
Director Permit Reissuance Activities
Reviewing Facility General Permit Application Information
Review Source Water Baseline Biological Characterization Data
Determine Compliance with Source Waterbody Flow Information
Review Design and Construction Technology Plan (Track 1)
Determine Compliance with CWIS Velocity Requirements (Track 1)
Determine Compliance with CWIS Flow Reduction Requirements (Track 1)
Review Comprehensive Demonstration Study Plan (Track 2)
Review Source Water Baseline Biological Characterization Study (Track 2)
Determining Facility Requirements and Issuing Permit
Annual Director Activities
Review of Yearly Report
Compliance Tracking
Determination on Monitoring Scope Reduction
Record Keeping
Respondents
Year 2
12/201511/2016
Year 3
12/201611/2017
Annual
Average
6
6
6
5
5
5
1
1
1
6
4
6
6
6
4
4
4
2
1
1
5
1
6
6
6
5
5
5
1
1
1
6
3
6
6
6
5
5
5
1
1
1
6
3
9
9
9
6
6
6
3
4
6
13
13
13
8
8
8
5
2
13
20
20
20
9
9
9
11
6
17
14
14
14
8
8
8
6
4
12
85
85
85
85
92
91
91
91
91
98
96
96
96
96
104
91
91
91
91
98
92
92
184
Year 2
12/201511/2016
98
98
196
Year 3
12/201611/2017
104
104
208
Annual
Average
98
98
196
Sum for Facilities and Directors
Year 1
12/201411/2015
Facilities
Directors
Yearly Total*
[1] Each facility is one respondent. One respondent may be involved in more than one activity;
however, in order to avoid double-counting, the maximum number of respondents expected to be involved
in the rule activities annually is assumed to be the number of respondents for that year.
[2] Each Director is one respondent.
* Total does not add due to rounding.
December 2015
Renewal of New Facility Rule Information Collection Request
A.-13
Exhibit A.6
Responses for the ICR Approval Period Year by Year by Activity
Facilities
Year 1
12/201411/2015
Year 2
12/201511/2016
Year 3
12/201611/2017
Annual
Average
Initial Permitting
Start-up Activities
Permit Application Activities
Source Waterbody Flow Information
Use Existing Data- Source Water Baseline Biological Characterization Data
CWIS Flow Reduction Requirements (Track 1)
CWIS Velocity Requirements (Track 1)
Design and Construction Technology Plan (Track 1)
Comprehensive Demonstration Study Plan (Track 2)
Freshwater Source Water Baseline Biological Characterization Study (Track 2)
Estuary Source Water Baseline Biological Characterization Study (Track 2)
Profile of Source Water Biota for Characterization Study (Track 2)
Submit Characterization Study (Track 2)
Freshwater Evaluation of Potential CWIS Effects (Track 2)
Estuary Evaluation of Potential CWIS Effects (Track 2)
Verification Monitoring Plan (Track 2)
NPDES Repermitting Activities
Start-up Activities
Permit Application Activities
Source Waterbody Flow Information
Source Water Baseline Biological Characterization Data
CWIS Flow Reduction Requirements (Track 1)
CWIS Velocity Requirements (Track 1)
Design and Construction Technology Plan (Track 1)
Comprehensive Demonstration Study Plan (Track 2)
Freshwater Source Water Baseline Biological Characterization Study (Track 2)
Estuary Source Water Baseline Biological Characterization Study (Track 2)
Profile of Source Water Biota for Characterization Study (Track 2)
Submit Characterization Study (Track 2)
Annual
Freshwater Verification Study (Track 2)
Estuary Verification Study (Track 2)
Initial Biological Monitoring for Impingement (Freshwater)
Reduced Biological Monitoring for Impingement (Freshwater)
Initial Biological Monitoring for Impingement (Estuary)
Reduced Biological Monitoring for Impingement (Estuary)
Initial Biological Monitoring for Entrainment (Freshwater)
Reduced Biological Monitoring for Entrainment (Freshwater)
Initial Biological Monitoring for Entrainment (Estuary)
Reduced Biological Monitoring for Entrainment (Estuary)
Velocity Monitoring
Visual Inspection of Installed Technologies
Yearly Status Report Activities
Responses
December 2015
6
6
6
6
5
5
5
1
2
0
1
1
1
0
1
0
9
9
9
9
6
6
6
3
5
3
3
4
0
4
0
11
62
1
11
11
62
1
11
85
31
85
493
6
6
6
6
4
4
4
2
2
1
2
1
1
0
2
0
13
13
13
13
8
8
8
5
5
4
5
2
0
1
0
10
68
2
11
10
68
2
11
91
32
91
541
6
6
6
6
5
5
5
1
2
1
1
1
1
0
1
0
20
20
20
20
9
9
9
11
13
5
11
6
0
2
1
10
73
1
12
10
73
1
12
96
33
96
620
6
6
6
6
5
5
5
1
2
1
1
1
1
0
1
0
14
14
14
14
8
8
8
6
8
4
6
4
0
2
0
10
68
1
11
10
68
1
11
91
32
91
551
Renewal of New Facility Rule Information Collection Request
A.-14
Directors
Year 1
12/201411/2015
Director Permit Issuance Activities
Reviewing Facility General Permit Application Information
Review Source Water Baseline Biological Characterization Data
Determine Compliance with Source Waterbody Flow Information
Review Design and Construction Technology Plan (Track 1)
Determine Compliance with CWIS Velocity Requirements (Track 1)
Determine Compliance with CWIS Flow Reduction Requirements (Track 1)
Review Comprehensive Demonstration Study Plan (Track 2)
Review Source Water Baseline Biological Characterization Study (Track 2)
Review Evaluation of Potential CWIS Effects (Track 2)
Determining Facility Requirements and Issuing Permit
Verification Study Review
Director Permit Reissuance Activities
Reviewing Facility General Permit Application Information
Review Source Water Baseline Biological Characterization Data
Determine Compliance with Source Waterbody Flow Information
Review Design and Construction Technology Plan (Track 1)
Determine Compliance with CWIS Velocity Requirements (Track 1)
Determine Compliance with CWIS Flow Reduction Requirements (Track 1)
Review Comprehensive Demonstration Study Plan (Track 2)
Review Source Water Baseline Biological Characterization Study (Track 2)
Determining Facility Requirements and Issuing Permit
Annual Director Activities
Review of Yearly Report
Compliance Tracking
Determination on Monitoring Scope Reduction
Record Keeping
Responses
Year 2
12/201511/2016
Year 3
12/201611/2017
Annual
Average
6
6
6
5
5
5
1
1
1
6
4
6
6
6
4
4
4
2
1
1
5
1
6
6
6
5
5
5
1
1
1
6
3
6
6
6
5
5
5
1
1
1
6
3
9
9
9
6
6
6
3
4
6
13
13
13
8
8
8
5
2
13
20
20
20
9
9
9
11
6
17
14
14
14
8
8
8
6
4
12
85
85
85
85
444
91
91
91
91
487
96
96
96
96
550
91
91
91
91
494
Year 1
12/201411/2015
493
444
937
Year 2
12/201511/2016
541
487
1,028
Year 3
12/201611/2017
620
550
1,170
Annual
Average
551
494
1,045
Sum for Facilities and Directors
Facilities
Directors
Yearly Total*
December 2015
Renewal of New Facility Rule Information Collection Request
A.-15
Exhibit A.7
Hourly Burden for the ICR Approval Period Year by Year
for Facilities
Facility Activities
Source
(Exhibit)
Year 1
12/201411/2015
Year 2
12/201511/2016
Year 3
12/201611/2017
Annual
Average
NPDES Permit Application Activities
Start-up Activities
Permit Application Activities
Source Waterbody Flow Information
Use Existing Data- Source Water Baseline Biological Characterization Data
CWIS Flow Reduction Requirements (Track 1)
CWIS Velocity Requirements (Track 1)
Design and Construction Technology Plan (Track 1)
Comprehensive Demonstration Study Plan (Track 2)
Freshwater Source Water Baseline Biological Characterization Study (Track 2)
Estuary Source Water Baseline Biological Characterization Study (Track 2)
Profile of Source Water Biota for Characterization Study (Track 2)
Submit Characterization Study (Track 2)
Freshwater Evaluation of Potential CWIS Effects (Track 2)
Estuary Evaluation of Potential CWIS Effects (Track 2)
Verification Monitoring Plan (Track 2)
NPDES Permit Application Activity Total
NPDES Repermitting Activities
Start-up Activities
Permit Application Activities
Source Waterbody Flow Information
Source Water Baseline Biological Characterization Data
CWIS Flow Reduction Requirements (Track 1)
CWIS Velocity Requirements (Track 1)
Design and Construction Technology Plan (Track 1)
Comprehensive Demonstration Study Plan (Track 2)
Freshwater Source Water Baseline Biological Characterization Study (Track 2)
Estuary Source Water Baseline Biological Characterization Study (Track 2)
Profile of Source Water Biota for Characterization Study (Track 2)
Submit Characterization Study (Track 2)
NPDES Repermitting Activity Total
Annual Activities
Freshwater Verification Study (Track 2)
Estuary Verification Study (Track 2)
Initial Biological Monitoring for Impingement (Freshwater)
Reduced Biological Monitoring for Impingement (Freshwater)
Initial Biological Monitoring for Impingement (Estuary)
Reduced Biological Monitoring for Impingement (Estuary)
Initial Biological Monitoring for Entrainment (Freshwater)
Reduced Biological Monitoring for Entrainment (Freshwater)
Initial Biological Monitoring for Entrainment (Estuary)
Reduced Biological Monitoring for Entrainment (Estuary)
Velocity Monitoring
Visual Inspection of Installed Technologies
Yearly Status Report Activities
Annual Activity Yearly Labor Total
Yearly Labor Total
December 2015
A1a
A1b
A1c
A1d
A1e
A1f
A1g
A1h
A1i
A1i
A1i
A1i
A1j
A1j
A1k
258
876
624
1,590
540
690
540
271
4,439
0
373
384
1,626
0
128
12,211
258
876
624
1,590
432
552
432
542
4,439
2,870
746
384
1,626
0
256
15,371
258
876
624
1,590
540
690
540
271
4,439
2,870
373
384
1,626
0
128
15,081
258
876
624
1,590
504
644
504
361
4,439
1,914
497
384
1,626
0
171
14,221
A12a
A12b
A12c
A12d
A12e
A12f
A12g
A12h
A12i
A12i
A12i
A12i
117
648
279
711
648
450
258
240
6,450
5,040
339
460
15,640
169
936
403
1,027
864
600
344
400
6,450
6,720
565
230
18,708
260
1,440
620
1,580
972
675
387
880
16,770
8,400
1,243
690
33,917
182
1,008
434
1,106
828
575
330
507
9,890
6,720
716
460
22,755
A2a
A2b
A2c1
A2c2
A2d1
A2d2
A2e1
A2e2
A2f1
A2f2
A2g
A2h
A2i
368
0
4,169
11,842
482
2,684
6,754
19,096
776
4,312
13,855
7,843
29,580
101,761
92
0
3,790
12,988
963
2,684
6,140
20,944
1,552
4,312
14,833
8,096
31,668
108,062
184
122
3,790
13,943
482
2,928
6,140
22,484
776
4,704
15,648
8,349
33,408
112,958
215
41
3,916
12,924
642
2,765
6,345
20,841
1,035
4,443
14,779
8,096
31,552
107,593
129,612
142,142
161,956
144,570
Renewal of New Facility Rule Information Collection Request
A.-16
Exhibit A.8
Hourly Burden for the ICR Approval Period Year by Year
for Directors and Federal Government
Director Activities
Director Permit Issuance Activities
Verification Study Review
Director Permit Reissuance Activities
Annual Director Activities
Yearly Total
Source
(Exhibit)
A3a
A3b
A13
A3c
Year 1
12/201411/2015
1,586
84
803
4,250
6,723
Year 2
12/201511/2016
1,502
21
870
4,550
6,943
Year 3
12/201611/2017
1,586
63
1,542
4,800
7,991
Annual
Average
1,558
56
1,072
4,533
7,219
Year 1
12/201411/2015
182
182
Year 2
12/201511/2016
167
167
Year 3
12/201611/2017
182
182
Annual
Average
177
177
Federal Activities
Source
(Exhibit)
Federal Permit Program Oversight Activities
A4a
Yearly Total
December 2015
Renewal of New Facility Rule Information Collection Request
A.-17
Exhibit A.9
Costs for the ICR Approval Period Year by Year for Facilities
Facility Activities
Source
(Exhibit)
Year 1
12/201411/2015
Year 2
12/201511/2016
Year 3
12/201611/2017
Annual
Average
NPDES Permit Application Activities
Start-up Activities
Permit Application Activities
Source Waterbody Flow Information
Use Existing Data- Source Water Baseline Biological Characterization
Data
CWIS Flow Reduction Requirements (Track 1)
CWIS Velocity Requirements (Track 1)
Design and Construction Technology Plan (Track 1)
Comprehensive Demonstration Study Plan (Track 2)
Freshwater Source Water Baseline Biological Characterization Study
(Track 2)
Estuary Source Water Baseline Biological Characterization Study
(Track 2)
Profile of Source Water Biota for Characterization Study (Track 2)
Submit Characterization Study (Track 2)
Freshwater Evaluation of Potential CWIS Effects (Track 2)
Estuary Evaluation of Potential CWIS Effects (Track 2)
Verification Monitoring Plan (Track 2)
NPDES Permit Application Activity Total
NPDES Repermitting Activities
Start-up Activities
Permit Application Activities
Source Waterbody Flow Information
Source Water Baseline Biological Characterization Data
CWIS Flow Reduction Requirements (Track 1)
CWIS Velocity Requirements (Track 1)
Design and Construction Technology Plan (Track 1)
Comprehensive Demonstration Study Plan (Track 2)
Freshwater Source Water Baseline Biological Characterization Study
(Track 2)
Estuary Source Water Baseline Biological Characterization Study
(Track 2)
Profile of Source Water Biota for Characterization Study (Track 2)
Submit Characterization Study (Track 2)
NPDES Repermitting Activity Total
Annual Activities
Freshwater Verification Study (Track 2)
Estuary Verification Study (Track 2)
Initial Biological Monitoring for Impingement (Freshwater)
Reduced Biological Monitoring for Impingement (Freshwater)
Initial Biological Monitoring for Impingement (Estuary)
Reduced Biological Monitoring for Impingement (Estuary)
Initial Biological Monitoring for Entrainment (Freshwater)
Reduced Biological Monitoring for Entrainment (Freshwater)
Initial Biological Monitoring for Entrainment (Estuary)
Reduced Biological Monitoring for Entrainment (Estuary)
Velocity Monitoring
Visual Inspection of Installed Technologies
Yearly Status Report Activities
Annual Activity Yearly Labor Total
Yearly Labor Total
December 2015
A1a
A1b
A1c
$18,266
$46,466
$28,512
$18,266
$46,466
$28,512
$18,266
$46,466
$28,512
$18,266
$46,466
$28,512
A1d
A1e
A1f
A1g
A1h
$96,977
$26,787
$38,532
$31,143
$17,446
$96,977
$21,430
$30,826
$24,914
$34,892
$96,977
$26,787
$38,532
$31,143
$17,446
$96,977
$25,001
$35,963
$29,066
$23,262
A1i
$269,446
$269,446
$269,446
$269,446
A1i
A1i
A1i
A1j
A1j
A1k
$0
$31,019
$25,662
$113,215
$0
$8,433
$751,903
$172,209
$62,037
$25,662
$113,215
$0
$16,865
$961,718
$172,209
$31,019
$25,662
$113,215
$0
$8,433
$924,112
$114,806
$41,358
$25,662
$113,215
$0
$11,243
$879,244
A12a
A12b
A12c
A12d
A12e
A12f
A12g
A12h
$8,758
$36,783
$12,549
$44,044
$32,144
$24,736
$14,786
$15,263
$12,650
$53,131
$18,126
$63,619
$42,859
$32,981
$19,714
$25,438
$19,462
$81,740
$27,886
$97,876
$48,217
$37,103
$22,179
$55,963
$13,623
$57,218
$19,520
$68,513
$41,073
$31,607
$18,893
$32,221
A12i
$384,669
$384,669
$1,000,138
$589,825
A12i
A12i
A12i
$298,709
$28,448
$30,967
$931,855
$398,279
$47,414
$15,483
$1,114,363
$497,849
$104,310
$46,450
$2,039,172
$398,279
$60,057
$30,967
$1,361,796
A2a
A2b
A2c1
A2c2
A2d1
A2d2
A2e1
A2e2
A2f1
A2f2
A2g
A2h
A2i
$29,520
$0
$272,823
$777,226
$31,520
$176,380
$448,427
$1,269,307
$50,903
$283,234
$648,329
$405,344
$2,172,838
$6,565,850
$7,380
$0
$248,021
$852,441
$63,040
$176,380
$407,661
$1,392,144
$101,806
$283,234
$694,093
$418,419
$2,326,215
$6,970,833
$14,760
$9,849
$248,021
$915,121
$31,520
$192,414
$407,661
$1,494,507
$50,903
$308,982
$732,230
$431,495
$2,454,029
$7,291,492
$17,220
$3,283
$256,288
$848,263
$42,027
$181,724
$421,250
$1,385,319
$67,871
$291,816
$691,551
$418,419
$2,317,694
$6,942,725
$8,249,608
$9,046,914 $10,254,776
$9,183,766
Renewal of New Facility Rule Information Collection Request
A.-18
Facility O&M
Source
(Exhibit)
NPDES Application
Purchase and Installation of Remote Monitoring Device
Purchase & Installation of Pilot Study Technology
Operation & Maintenance of Pilot Technology
Biological Study Laboratory Analysis (Freshwater)
Biological Study Laboratory Analysis (Estuary)
Pilot Study Entrainment Laboratory Analysis (Freshwater)
Pilot Study Entrainment Laboratory Analysis (Estuary)
Other Direct Costs
Repermitting
Biological Study Laboratory Analysis (Freshwater)
Biological Study Laboratory Analysis (Estuary)
Other Direct Costs
Year 1
12/201411/2015
Year 2
12/201511/2016
Year 3
12/201611/2017
Annual
Average
A.1k
A.1j
A.1j
A.1i
A.1i
A.1j
A.1j
A.1a-k
$310,000
$303,000
$34,500
$89,600
$0
$6,900
$0
$31,875
$248,000
$303,000
$34,500
$89,600
$58,267
$6,900
$0
$35,397
$310,000
$303,000
$34,500
$89,600
$58,267
$6,900
$0
$36,842
$289,333
$303,000
$34,500
$89,600
$38,844
$6,900
$0
$34,704
A.12i
A.12i
A.12a-i
$134,500
$104,900
$45,015
$134,500
$139,867
$59,485
$349,700
$174,833
$94,945
$206,233
$139,867
$66,482
A.2f
A.2f
A.2f
A.2a-f
$12,420
$657,000
$140,400
$177,583
$625,420
$34,500
$1,133,300
$254,473
$2,047,693
$13,570
$702,000
$152,100
$187,613
$564,570
$34,500
$1,283,233
$282,494
$2,164,798
$14,490
$747,000
$152,100
$197,253
$627,490
$34,500
$1,578,400
$329,039
$2,569,429
$13,493
$702,000
$148,200
$187,483
$605,827
$34,500
$1,331,644
$288,669
$2,260,640
Annual
Operation of Remote Sensing Device
Identify & Enumerate Entrained Freshwater Biota
Identify & Enumerate Entrained Estuary Biota
Other Direct Costs
Equipment Capital Cost Subtotal
Equipment O&M Cost Subtotal
Laboratory Analysis Subtotal
Other Direct Costs Subtotal
Yearly O&M Total
December 2015
Renewal of New Facility Rule Information Collection Request
A.-19
Exhibit A.10
Costs for the ICR Approval Period Year by Year
for Directors and Federal Government
Director Activities
Director Permit Issuance Activities
Verification Study Review
Director Permit Reissuance Activities
Annual Director Activities
Yearly Total
Source
(Exhibit)
A3a
A3b
A13
A3c
Year 1
12/201411/2015
$91,010
$3,852
$48,577
$197,982
$341,420
Year 2
12/201511/2016
$86,512
$963
$49,142
$211,957
$348,574
Year 3
12/201611/2017
$91,010
$2,889
$90,402
$223,603
$407,904
Annual
Average
$89,511
$2,568
$62,707
$211,181
$365,966
Year 1
12/201411/2015
Year 2
12/201511/2016
Year 3
12/201611/2017
Annual
Average
Director O&M
Source
(Exhibit)
Start-Up & NPDES Application
Other Direct Costs
Annual
Other Direct Costs
Yearly O&M Cost Total
A3a-b
$2,290
$1,780
$2,235
$2,102
A3c
$4,675
$6,965
$5,005
$6,785
$5,280
$7,515
$4,987
$7,088
Year 1
12/201411/2015
8,366
$8,366
Year 2
12/201511/2016
7,697
$7,697
Year 3
12/201611/2017
8,366
$8,366
Annual
Average
$8,143
$8,143
Year 1
12/201411/2015
$330
$330
Year 2
12/201511/2016
$275
$275
Year 3
12/201611/2017
$330
$330
Annual
Average
$312
$312
Federal Labor Activities
Source
(Exhibit)
Federal Permit Program Oversight Activities
A4b
Yearly Total
Federal O&M
Source
(Exhibit)
Federal Permit Program Oversight ODCs
A4a
Yearly Total
December 2015
Renewal of New Facility Rule Information Collection Request
A.-20
Exhibit A.11
Summary of the Burden, Respondents, Responses, and
Costs for the ICR Approval Period by Year and Annual Averages
Facilities
Source
(Exhibit)*
Year 1
Year 2
Year 3
12/201411/2015
12/201511/2016
12/201611/2017
Annual
Average
Three Year
Total
Burden (hours)
A7
129,612
142,142
161,956
144,570
433,709
Respondents (number)
A5
92
98
104
98
104
Responses (number)
A6
493
541
620
551
1,654
Costs (labor)
A9
$8,249,608
$9,046,914
$10,254,776
$9,183,766
$27,551,297
Costs (capital)
A9
$625,420
$564,570
$627,490
$605,827
$1,817,480
Costs (equipment O&M)
A9
$34,500
$34,500
$34,500
$34,500
$103,500
Costs (lab analysis)
A9
$1,133,300
$1,283,233
$1,578,400
$1,331,644
$3,994,933
Costs (other direct costs)
Total Costs
Non-labor Total
A9
$329,039
$288,669
$12,824,205 $11,444,405
$2,260,640
$866,006
$34,333,216
$254,473
$282,494
$10,297,300 $11,211,711
Directors
Source
(Exhibit)*
Year 1
12/201411/2015
Year 2
12/201511/2016
Year 3
12/201611/2017
Annual
Average
Three Year
Total
Burden (hours)
A8
6,723
6,943
7,991
7,219
21,657
Respondents (number)
A5
47
47
47
47
47
Responses (number)
A6
444
487
550
494
1,481
Costs(labor)
A10
$341,420
$348,574
$407,904
$365,966
$1,097,898
Costs (other direct costs)
Total Costs
A10
$6,965
$348,385
$6,785
$355,359
$7,515
$415,419
$7,088
$373,054
$21,265
$1,119,163
Federal Government
Source
(Exhibit)
Year 1
12/201411/2015
182
Year 2
12/201511/2016
Year 3
12/201611/2017
167
182
Annual
Average
177
Three Year
Total
Burden (hours)
A8
531
Costs(labor)
A10
$8,366
$7,697
$8,366
$8,143
$24,429
Costs (O&M)
Total Costs
A10
$330
$8,696
$275
$7,972
$330
$8,696
$312
$8,455
$935
$25,364
Annual
Average
151,789
145
$9,549,732
$2,267,728
$11,817,460
Three Year
Total
455,366
151
$28,649,195
$6,699,684
$35,452,380
Totals for Respondents (Facilities and Directors)*
Total Respondent Burden (hours)
Total Respondents (number)
Total Respondent Labor Costs
Total Respondent Capital and O&M Costs
Total Respondent Cost for All Activities
* Totals for annual averages may not match exactly due to rounding discrepancies
December 2015
Renewal of New Facility Rule Information Collection Request
A.-21
Exhibit A.12
Facility Cost and Burden Estimates for NPDES Permit Renewal Activities
Exhibit A.12a
Start-up Activities
Facilities (Respondents)
Activity
Read and Understand Rule
Mobilization/Planning
Training
Other Direct Costs
Totals
Exhibit A.12b
Permit Application Activities
Year 1 Year 2 Year 3 Total
A
9
13
20 42
9
13
20 42
9
13
20 42
9
13
20 42
9
13
20 42
Facility
Junior
CAD Contracted
Biological
Manager Technical Operator Manager Biologist Statistician Technician Clerical
Assumed Loaded Hourly Rate $
$110
$45
$42
4
1
1
0
4
2
1
0
0
0
0
0
$134
$69
Level of Effort (hrs)
0
0
0
0
0
0
0
0
$90
$48
$27
0
0
0
0
0
0
0
0
0
0
0
0
Facility
Junior
CAD Contracted
Biological
Manager Technical Operator Manager Biologist Statistician Technician Clerical
Facilities (Respondents)
Assumed Loaded Hourly Rate $
$110
$45
$42
$134
$69
$90
$48
$27
Year 1 Year 2 Year 3 Total
A
Level of Effort (hrs)
Activity
Detailed Source Water Body Characterization
9
13
20 42
1
5
12
0
0
0
0
0
9
13
20 42
0
1
1
0
0
0
0
0
Description of CWIS Configuration and Location
9
13
20 42
1
1
1
0
0
0
0
0
Facility Water Balance Diagram
9
13
20 42
12
30
0
0
0
0
0
0
Operational Characteristics Narrative
9
13
20 42
0
0
0
0
0
0
0
3
Submit Materials for Review by State
9
13
20 42
1
1
1
0
0
0
0
1
Recordkeeping
9
13
20 42
0
0
0
0
0
0
0
0
Other Direct Costs
9
13
20 42
Totals
Water balance diagram is assumed to be taken from the facility design report. The hours reported here are for incorporation of the diagram(s) in the permit.
Exhibit A.12c
Source Waterbody Flow Information
Facilities (Respondents)
Activity
Gather Information Characterizing Flow
Perform Engineering Calculations
Submit Data and Analysis for Review
Recordkeeping
Other Direct Costs
Totals
December 2015
Year 1 Year 2 Year 3 Total
A
9
13
20 42
9
13
20 42
9
13
20 42
9
13
20 42
9
13
20 42
9
13
20 42
Facility
Junior
CAD Contracted
Biological
Manager Technical Operator Manager Biologist Statistician Technician Clerical
Assumed Loaded Hourly Rate $
$110
$45
$42
0
2
0
0
0
10
10
0
2
0
0
0
0
0
0
$134
$69
Level of Effort (hrs)
0
0
0
0
0
0
0
0
0
0
$90
$48
$27
0
0
0
0
0
0
0
0
0
0
0
0
5
2
0
Totals Per Facility for the ICR Approval Period
Burden
(hrs)
Labor Cost
B
C
8
3
2
0
13
Capital Costs O&M Costs Total Costs**
D
$619
$200
$155
$0
$973
E
$0
$0
$0
$0
$0
C+D+E
$0
$0
$0
$55
$55
$1,028
Total Burden
(hrs.)
A*B
336
126
84
546
Total Initial Cost
A*(C+D+E)
$25,990
$8,383
$6,497
$2,310
$43,180
Totals Per Facility for the ICR Approval Period
Burden
(hrs)
Labor Cost
B
C
18
2
3
42
3
4
0
72
Capital Costs O&M Costs Total Costs**
D
$836
$87
$197
$2,665
$80
$223
$0
$4,087
E
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$575
$575
C+D+E
$4,662
Total Burden
(hrs.)
Total Initial Cost
A*B
A*(C+D+E)
756
84
126
1,764
126
168
3,024
$35,108
$3,641
$8,253
$111,913
$3,364
$9,374
$24,150
$195,804
Totals Per Facility for the ICR Approval Period
Burden
(hrs)
Labor Cost
B
C
10
12
5
4
0
31
$449
$669
$134
$143
$0
$1,394
Renewal of New Facility Rule Information Collection Request
Capital Costs O&M Costs Total Costs**
D
E
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$115
$115
C+D+E
$1,509
Total Burden
(hrs.)
A*B
420
504
210
168
1,302
Total Initial Cost
A*(C+D+E)
$18,858
$28,081
$5,607
$6,014
$4,830
$63,391
A.-22
Exhibit A.12d
Source Water Baseline Biological Characterization Data
Facility
Junior
CAD Contracted
Biological
Manager Technical Operator Manager Biologist Statistician Technician Clerical
Facilities (Respondents)
Assumed Loaded Hourly Rate $
Activity
Identify Available Data and Document Efforts
Compile and Analyze Existing Data
Submit Data for Review by State
Recordkeeping
Other Direct Costs
Totals
Year 1 Year 2 Year 3 Total
A
9
13
20 42
9
13
20 42
9
13
20 42
9
13
20 42
9
13
20 42
9
13
20 42
$110
$45
$42
12
10
0
1
0
24
18
0
1
0
0
6
0
0
0
$134
$69
Level of Effort (hrs)
0
0
0
0
0
0
0
0
0
0
$90
$48
$27
0
0
0
0
0
0
0
0
0
0
2
1
2
2
0
Totals Per Facility for the ICR Approval Period
Burden
(hrs)
B
38
35
2
4
0
79
Labor Cost
C
$2,449
$2,184
$53
$208
$0
$4,894
Capital Costs O&M Costs Total Costs**
D
E
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$860
$860
C+D+E
$5,754
Total Burden
(hrs.)
A*B
1,596
1,470
84
168
3,318
Total Initial Cost
A*(C+D+E)
$102,841
$91,715
$2,243
$8,740
$36,120
$241,660
Exhibit A.12e
CWIS Flow Reduction Requirements (Track 1)
Facility
Junior
CAD Contracted
Biological
Manager Technical Operator Manager Biologist Statistician Technician Clerical
Facilities (Respondents)
Assumed Loaded Hourly Rate $
Activity
Develop Narrative
Perform Engineering Calculations
Document Minimization of Blow Down and Flows Not
Submit Data and Analysis forRecycled
Review
Recordkeeping
Other Direct Costs
Totals
Exhibit A.12f
CWIS Velocity Requirements (Track 1)
Activity
Develop Narrative
Perform Engineering Calculations
Submit Data and Analysis for Review
Revise Based on State review
Recordkeeping
Other Direct Costs
Totals
December 2015
Year 1 Year 2 Year 3 Total
A
6
8
9 23
6
8
9 23
6
8
9 23
6
8
9 23
6
8
9 23
6
8
9 23
6
8
9 23
$110
$45
8
4
0
0
2
0
$42
16
12
40
0
4
0
0
0
0
0
0
0
$134
$69
Level of Effort (hrs)
0
0
0
0
0
0
0
0
0
0
0
0
$90
$48
$27
B
0
0
0
0
0
0
0
0
0
0
0
0
0
0
6
8
8
0
Facility
Junior
CAD Contracted
Biological
Manager Technical Operator Manager Biologist Statistician Technician Clerical
Facilities (Respondents)
Assumed Loaded Hourly Rate $
Year 1 Year 2 Year 3 Total
A
6
8
9 23
6
8
9 23
6
8
9 23
6
8
9 23
6
8
9 23
6
8
9 23
6
8
9 23
$110
$45
$42
5
8
0
1
1
0
10
32
0
5
1
0
0
0
0
0
0
0
$134
$69
Level of Effort (hrs)
0
0
0
0
0
0
0
0
0
0
0
0
Totals Per Facility for the ICR Approval Period
Burden
(hrs)
$90
$48
$27
0
0
0
0
0
0
0
0
0
0
0
0
0
0
8
0
4
0
24
16
46
8
14
0
108
Labor Cost
C
$1,597
$978
$1,956
$214
$613
$0
$5,357
Capital Costs O&M Costs Total Costs**
D
E
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$460
$460
C+D+E
$5,817
Total Burden
(hrs.)
A*B
552
368
1,058
184
322
2,484
Total Initial Cost
A*(C+D+E)
$36,726
$22,494
$44,993
$4,913
$14,094
$10,580
$133,800
Totals Per Facility for the ICR Approval Period
Burden
(hrs)
Labor Cost
B
C
15
40
8
6
6
0
75
$998
$2,315
$214
$334
$262
$0
$4,123
Renewal of New Facility Rule Information Collection Request
Capital Costs O&M Costs Total Costs**
D
E
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$1,150
$1,150
C+D+E
$5,273
Total Burden
(hrs.)
A*B
345
920
184
138
138
1,725
Total Initial Cost
A*(C+D+E)
$22,954
$53,250
$4,913
$7,689
$6,015
$26,450
$121,270
A.-23
Exhibit A.12g
Design and Construction Technology Plan (Track 1)
Facility
Junior
CAD Contracted
Biological
Manager Technical Operator Manager Biologist Statistician Technician Clerical
Facilities (Respondents)
Assumed Loaded Hourly Rate $
Activity
Delineate Hydraulic Zone of Influence
Develop Narrative Description
Perform Engineering Calculations
Submit Data and Analysis for Review
Recordkeeping
Other Direct Costs
Totals
Year 1 Year 2 Year 3 Total
A
6
8
9 23
6
8
9 23
6
8
9 23
6
8
9 23
6
8
9 23
6
8
9 23
6
8
9 23
$110
$45
$42
1
5
3
0
1
0
2
10
12
0
1
0
2
0
0
0
0
0
$134
$69
Level of Effort (hrs)
0
0
0
0
0
0
0
0
0
0
0
0
$90
$48
$27
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
3
3
0
Totals Per Facility for the ICR Approval Period
Burden
(hrs)
Labor Cost
B
C
5
15
15
3
5
0
43
Capital Costs O&M Costs Total Costs**
D
$283
$998
$868
$80
$235
$0
$2,464
E
$0
$0
$0
$0
$0
$0
$0
C+D+E
$0
$0
$0
$0
$0
$55
$55
$2,519
Total Burden
(hrs.)
Total Initial Cost
A*B
A*(C+D+E)
115
345
345
69
115
989
$6,514
$22,954
$19,969
$1,842
$5,400
$1,265
$57,944
Exhibit A.12h
Comprehensive Demonstration Study Plan (Track 2)
Facility
Junior
CAD Contracted
Biological
Manager Technical Operator Manager Biologist Statistician Technician Clerical
Facilities (Respondents)
Assumed Loaded Hourly Rate $
Year 1 Year 2 Year 3 Total
A
Activity
Description of Historical Studies that will be Used
3
5
11 19
Description of Proposed and/or Implemented Technologies
3
5
11 19
3
5
11 19
Develop Baseline Biological Characterization Sampling Plan
3
5
11 19
Submit Data and Plans for Review
3
5
11 19
Revise Based on State Review
Recordkeeping
3
5
11 19
3
5
11 19
Other Direct Costs
3
5
11 19
Totals
$110
$45
$42
6
12
0
2
12
0
2
1
0
6
18
0
5
1
0
0
2
0
1
1
0
$134
$69
Level of Effort (hrs)
0
0
0
2
0
0
0
0
0
0
0
0
0
0
Totals Per Facility for the ICR Approval Period
Burden
(hrs)
Labor Cost
$90
$48
$27
0
0
1
19
C
$1,224
0
0
0
0
0
0
0
0
0
0
0
0
0
1
4
1
2
0
8
35
4
9
5
0
80
$489
$2,505
$107
$513
$250
$0
$5,088
B
Capital Costs O&M Costs Total Costs**
D
E
C+D+E
Total Burden
(hrs.)
Total Initial Cost
$0
$0
A*B
361
A*(C+D+E)
$23,262
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$860
$860
152
665
76
171
95
1,520
$9,291
$47,593
$2,029
$9,739
$4,748
$16,340
$113,003
$5,948
Exhibit A.12i
Source Water Baseline Biological Characterization Study (Track 2)
Facility
Junior
CAD Contracted
Biological
Manager Technical Operator Manager Biologist Statistician Technician Clerical
Facilities (Respondents)
Assumed Loaded Hourly Rate $
Activity
Implement Freshwater Sampling
Other Direct Costs for Implement Freshwater Sampling
Implement Estuary Sampling
Other Direct Costs for Implement Estuary Sampling
Biological Study Laboratory Analysis (Freshwater)
Biological Study Laboratory Analysis (Estuary)
Profile of Source Water Biota
Identification of Critical Species
Description of Additional Stresses
Write Study based on Results and Submit for Review by
State
Recordkeeping
Finalize study based on State review
Freshwater Totals
Marine Totals
Year 1 Year 2 Year 3 Total
A
5
5
13 13
5
5
13 13
3
4
5 5
3
4
5 5
5
5
13 13
3
4
5 5
3
5
11 19
3
5
11 19
3
5
11 19
4
2
6 12
4
2
6 12
4
2
6 12
13
5
$110
$45
$42
2
0
3
0
0
0
10
10
5
24
2
5
16
0
30
0
0
0
6
6
3
48
4
10
0
0
0
0
0
0
0
0
0
0
0
0
$134
$69
Level of Effort (hrs)
36
1248
0
0
48
2457
0
0
0
0
0
0
10
18
6
12
5
9
5
2
2
0
0
0
$90
$48
$27
20
0
30
0
0
0
0
0
0
2
0
0
1248
0
2457
0
0
0
6
0
3
0
0
0
10
0
15
0
0
0
2
1
1
2
7
2
Totals Per Facility for the ICR Approval Period
Burden
(hrs)
B
2580
0
5040
0
0
0
52
35
26
83
15
17
2,808
5,268
Labor Cost
C
$153,867
$0
$298,709
$0
$0
$0
$4,300
$3,033
$2,150
$5,835
$855
$1,051
$171,092
$315,934
Total Burden and Costs for All NPDES Application Activities
Totals
* The ODC estimate was not estimated for each activity, but rather as a lump sum for each provision of the rule.
December 2015
Renewal of New Facility Rule Information Collection Request
Capital Costs O&M Costs Total Costs**
D
E
$0
0
$0
$3,600
$0
0
$0
$9,000
0 $53,800
0 $104,900
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$53,800
$3,600
$104,900
$9,000
C+D+E
Total Burden
(hrs.)
A*B
29,670
20,160
$228,492
$429,834
988
665
494
996
180
204
32,287
21,070
Total Burden
(hrs.)
68,265
Total Initial Cost
A*(C+D+E)
$1,769,475
$41,400
$1,194,836
$36,000
$618,700
$419,600
$81,692
$57,633
$40,846
$70,025
$10,259
$12,617
$2,632,008
$1,721,075
Total Initial Cost
$5,323,134
A.-24
Exhibit A.13
Director Burden and Cost Estimates for Permit Renewal
Exhibit A.13
Director Permit Reissuance Activities
Activity
Reviewing CWIS location and design data
Determine Compliance with Source Waterbody Flow Information
Review Source Water Baseline Biological Characterization Data
Review Design and Construction Technology Plan (Track 1)
Determine Compliance with CWIS Velocity Requirements (Track 1)
Determine Compliance with CWIS Flow Reduction Requirements (Track 1)
Review Comprehensive Demonstration Study Plan (Track 2)
Review Source Water Baseline Biological Characterization Study (Track 2)
Determine Monitoring Frequency
Determine Record keeping and Reporting Frequency
Considering Public Comments
Issuing Permit
Permit Record Keeping
Totals
Track 1 Totals
Track 2 Totals
December 2015
Senior
Junior
Technical Technical Clerical
Assumed Loaded Hourly Rate $
75
35
29
Level of Effort (hrs)
2
5
0
1
2
0
6
6
0
7
2
0
1
2
0
2
2
0
5
5
0
80
15
0
1
2
0
1
2
0
5
5
0
0
2
0
0
0
1
110
50
0
Burden
Per
Permit
B
7
2
12
10
2
5
10
95
2
2
10
2
1
160
55
143
Labor
Cost per
Permit
C
$322
$107
$656
$621
$107
$263
$525
$6,497
$107
$107
$525
$94
$50
$9,981
$2,960
$8,991
ODCs
lump
sum*
Total
Cost Per
Permit
D
C+D
$345
$345
$345
$10,326
$3,305
$9,336
Renewal of New Facility Rule Information Collection Request
A.-25
File Type | application/pdf |
File Title | ICR for 316b PhaseI_12-7-15.xlsx |
Author | John.Sunda |
File Modified | 2015-12-18 |
File Created | 2015-12-07 |