Exhibit A.1
Facility Cost and Burden Estimates for NPDES Permit Application Activities
Exhibit A.1a
Start-up Activities
Facilities (Respondents)

Activity
Read and Understand Rule
Mobilization/Planning
Training
Other Direct Costs
Totals

Year 1 Year 2 Year 3 Total
A
6
6
6 18
6
6
6 18
6
6
6 18
6
6
6 18
6
6
6 18

Exhibit A.1b
Permit Application Activities
Facilities (Respondents)

Facility
Junior
CAD
Contracted
Biological
Manager Technical Operator Manager
Biologist Statistician Technician Clerical
Assumed Loaded Hourly Rate $
$110

$45

$42

12
4
2
0

12
8
2
0

0
0
0
0

$134
$69
Level of Effort (hrs)
0
0
0
0
0
0
0
0

$90

$48

$27

0
0
0
0

0
0
0
0

1
1
1
0

Activity
Gather Information Characterizing Flow
Perform Engineering Calculations
Submit Data and Analysis for Review
Recordkeeping
Other Direct Costs
Totals

Year 1 Year 2 Year 3 Total
A
6
6
6 18
6
6
6 18
6
6
6 18
6
6
6 18
6
6
6 18
6
6
6 18

Facility
Junior
CAD
Contracted
Biological
Manager Technical Operator Manager
Biologist Statistician Technician Clerical
Assumed Loaded Hourly Rate $

Exhibit A.1d
Source Water Baseline Biological Characterization Data
Facilities (Respondents)

Activity

December 2015

Year 1 Year 2 Year 3 Total
A

Facility
Junior
CAD
Contracted
Biological
Manager Technical Operator Manager
Biologist Statistician Technician Clerical
Assumed Loaded Hourly Rate $
$110

$45
0
8
0
0
0

$42
32
32
0
8
0

0
0
0
0
0

$134
$69
Level of Effort (hrs)
0
0
0
0
0
0
0
0
0
0

$90

$48

$27

$45

$42

$134
$69
Level of Effort (hrs)

C
$1,883
$825
$336
$0
$3,044

0
0
0
0
0

$90

$48

O&M Costs

Total Costs**

D

E

C+D+E

$0
$0
$0
$0
$0

$0
$0
$0
$55
$55

$3,099

Total Burden
Total Initial Cost
(hrs.)
A*B
450
234
90
774

A*(C+D+E)
$33,896
$14,852
$6,050
$990
$55,787

Totals Per Facility for the ICR Approval Period
Labor Cost

Capital Costs

O&M Costs

Total Costs**

B

C

D

E

C+D+E

58
15
3
56
6
8
0
146

$2,610
$779
$197
$3,553
$160
$446
$0
$7,744

$0
$0
$0
$0
$0
$0
$0
$0

$0
$0
$0
$0
$0
$0
$575
$575

$8,319

Total Burden
Total Initial Cost
(hrs.)
A*B
1,044
270
54
1,008
108
144
2,628

A*(C+D+E)
$46,980
$14,013
$3,537
$63,950
$2,884
$8,035
$10,350
$149,749

Totals Per Facility for the ICR Approval Period
Burden
(hrs)

0
0
16
8
0

$27

Capital Costs

Burden
(hrs)

Labor Cost

B
0
0
0
0
0

Facility
Junior
CAD
Contracted
Biological
Manager Technical Operator Manager
Biologist Statistician Technician Clerical
Assumed Loaded Hourly Rate $
$110

Labor Cost

25
13
5
0
43

$110
$45
$42
$134
$69
$90
$48
$27
Year 1 Year 2 Year 3 Total
A
Level of Effort (hrs)
6
6
6 18
Detailed Source Water Body Characterization
2
16
40
0
0
0
0
0
6
6
6 18
2
5
8
0
0
0
0
0
Description of CWIS Configuration and Location
6
6
6 18
1
1
1
0
0
0
0
0
Facility Water Balance Diagram
6
6
6 18
16
40
0
0
0
0
0
0
Operational Characteristics Narrative
6
6
6 18
0
0
0
0
0
0
0
6
Submit Materials for Review by State
6
6
6
18
2
2
2
0
0
0
0
2
Recordkeeping
6
6
6
18
0
0
0
0
0
0
0
0
Other Direct Costs
6
6
6
18
Totals
Water balance diagram is assumed to be taken from the facility design report. The hours reported here are for incorporation of the diagram(s) in the permit.

Facilities (Respondents)

Burden
(hrs)
B

Activity

Exhibit A.1c
Source Waterbody Flow Information

Totals Per Facility for the ICR Approval Period

C
$1,437
$2,315
$427
$573
$0
$4,752

32
40
16
16
0
104

Capital Costs

O&M Costs

Total Costs**

D

E

C+D+E

$0
$0
$0
$0
$0
$0

$0
$0
$0
$0
$115
$115

$4,867

Total Burden
Total Initial Cost
(hrs.)
A*B
576
720
288
288
1,872

A*(C+D+E)
$25,862
$41,674
$7,690
$10,310
$2,070
$87,606

Totals Per Facility for the ICR Approval Period
Burden
(hrs)

Labor Cost

Capital Costs

O&M Costs

Total Costs**

B

C

D

E

C+D+E

Renewal of New Facility Rule Information Collection Request

Total Burden
Total Initial Cost
(hrs.)
A*B

A*(C+D+E)

A.-1

Identify Available Data and Document Efforts
Compile and Analyze Existing Data
Submit Data for Review by State
Recordkeeping
Other Direct Costs
Totals

6
6
6
6
6
6

6
6
6
6
6
6

6
6
6
6
6
6

18
18
18
18
18
18

Exhibit A.1e
CWIS Flow Reduction Requirements (Track 1)
Facilities (Respondents)

Activity
Develop Narrative
Perform Engineering Calculations
Document Minimization of Blow Down and Flows Not
Submit Data and Analysis forRecycled
Review
Recordkeeping
Other Direct Costs
Totals

Year 1 Year 2 Year 3 Total
A
5
4
5 14
5
4
5 14
5
4
5 14
5
4
5 14
5
4
5 14
5
4
5 14
5
4
5 14

40
32
0
2
0

80
60
0
4
0

0
20
0
1
0

0
0
0
0
0

0
0
0
0
0

0
0
0
0
0

0
0
0
0
0

8
4
8
6
0

Facility
Junior
CAD
Contracted
Biological
Manager Technical Operator Manager
Biologist Statistician Technician Clerical
Assumed Loaded Hourly Rate $
$110

$45
8
4
0
0
2
0

$42
16
12
40
0
4
0

0
0
0
0
0
0

$134
$69
Level of Effort (hrs)
0
0
0
0
0
0
0
0
0
0
0
0

$90

$48

$27

128
116
8
13
0
265

$8,198
$7,150
$214
$601
$0
$16,163

0
0
0
0
0
0

$0
$0
$0
$0
$860
$860

$17,023

2,304
2,088
144
234
4,770

$147,557
$128,707
$3,845
$10,822
$15,480
$306,410

Totals Per Facility for the ICR Approval Period
Burden
(hrs)

Labor Cost

B
0
0
0
0
0
0

$0
$0
$0
$0
$0
$0

0
0
6
8
8
0

C
$1,597
$978
$1,956
$214
$613
$0
$5,357

24
16
46
8
14
0
108

Capital Costs

O&M Costs

Total Costs**

D

E

C+D+E

$0
$0
$0
$0
$0
$0
$0

$0
$0
$0
$0
$0
$460
$460

$5,817

Total Burden
Total Initial Cost
(hrs.)
A*B
336
224
644
112
196
1,512

A*(C+D+E)
$22,355
$13,692
$27,387
$2,990
$8,579
$6,440
$81,444

Exhibit A.1f
CWIS Velocity Requirements (Track 1)

Facilities (Respondents)

Activity
Develop Narrative
Perform Engineering Calculations
Submit Data and Analysis for Review
Revise Based on State review
Recordkeeping
Other Direct Costs
Totals

Year 1 Year 2 Year 3 Total
A
5
4
5 14
5
4
5 14
5
4
5 14
5
4
5 14
5
4
5 14
5
4
5 14
5
4
5 14

Exhibit A.1g
Design and Construction Technology Plan (Track 1)
Facilities (Respondents)

Activity
Delineate Hydraulic Zone of Influence
Develop Narrative Description
Perform Engineering Calculations
Submit Data and Analysis for Review
Recordkeeping
Other Direct Costs
Totals

Year 1 Year 2 Year 3 Total
A
5
4
5 14
5
4
5 14
5
4
5 14
5
4
5 14
5
4
5 14
5
4
5 14
5
4
5 14

Facility
Junior
CAD
Contracted
Biological
Manager Technical Operator Manager
Biologist Statistician Technician Clerical
Assumed Loaded Hourly Rate $
$110

$45
16
8
0
4
2
0

$42
32
32
0
16
4
0

0
0
0
0
0
0

$134
$69
Level of Effort (hrs)
0
0
0
0
0
0
0
0
0
0
0
0

$90

$48

$27

$45
2
16
6
0
1
0

$42
5
32
24
0
2
0

8
0
0
0
0
0

$134
$69
Level of Effort (hrs)
0
0
0
0
0
0
0
0
0
0
0
0

Burden
(hrs)

Total Burden
Total Initial Cost
(hrs.)
Labor Cost

B
0
0
0
0
0
0

0
0
0
0
0
0

0
0
16
0
8
0

Facility
Junior
CAD
Contracted
Biological
Manager Technical Operator Manager
Biologist Statistician Technician Clerical
Assumed Loaded Hourly Rate $
$110

Totals Per Facility for the ICR Approval Period

$90

$48
0
0
0
0
0
0

$27
0
0
0
0
0
0

0
0
0
6
6
0

C
$3,194
$2,315
$427
$1,158
$613
$0
$7,706

48
40
16
20
14
0
138

Capital Costs

O&M Costs

Total Costs**

D

E

C+D+E

$0
$0
$0
$0
$0
$0
$0

$0
$0
$0
$0
$0
$1,150
$1,150

$8,856

A*B
672
560
224
280
196
1,932

A*(C+D+E)
$44,710
$32,413
$5,981
$16,206
$8,579
$16,100
$123,990

Totals Per Facility for the ICR Approval Period
Burden
(hrs)

Labor Cost

Capital Costs

O&M Costs

Total Costs**

B

C

D

E

C+D+E

15
48
30
6
9
0
108

$779
$3,194
$1,736
$160
$360
$0
$6,229

$0
$0
$0
$0
$0
$0
$0

$0
$0
$0
$0
$0
$55
$55

$6,284

Total Burden
Total Initial Cost
(hrs.)
A*B
210
672
420
84
126
1,512

A*(C+D+E)
$10,899
$44,710
$24,310
$2,243
$5,037
$770
$87,969

Exhibit A.1h

December 2015

Renewal of New Facility Rule Information Collection Request

A.-2

Comprehensive Demonstration Study Plan (Track 2)
Facilities (Respondents)
Year 1 Year 2 Year 3 Total
A
1
2
1 4
Description of Historical Studies that will be Used
Description of Proposed and/or Implemented Technologies
1
2
1 4
1
2
1 4
Develop Baseline Biological Characterization Sampling Plan
1
2
1 4
Submit Data and Plans for Review
1
2
1 4
Revise Based on State Review
1
2
1 4
Recordkeeping
1
2
1 4
Other Direct Costs
1
2
1 4
Totals

Facility
Junior
CAD
Contracted
Biological
Manager Technical Operator Manager
Biologist Statistician Technician Clerical
Assumed Loaded Hourly Rate $
$110

$45

$42

Activity

20

40

0

8
40
0
8
2
0

20
60
0
16
4
0

0
8
0
4
2
0

$134
$69
Level of Effort (hrs)
0
0
0
8
0
0
1
0

$90

$48

$27

Totals Per Facility for the ICR Approval Period
Burden
(hrs)

Labor Cost

B

0
0
0
0
0
0

0

0

2

62

C
$4,045

0
0
0
0
0
0

0
0
0
0
0
0

0
4
12
4
8
0

28
120
12
32
17
0
271

$1,776
$8,602
$320
$1,871
$831
$0
$17,446

Capital Costs

O&M Costs

Total Costs**

D

E

C+D+E

Total Burden
Total Initial Cost
(hrs.)

$0

$0

A*B
248

A*(C+D+E)
$16,182

$0
$0
$0
$0
$0
$0
$0

$0
$0
$0
$0
$0
$860
$860

112
480
48
128
68
1,084

$7,106
$34,410
$1,282
$7,483
$3,323
$3,440
$73,225

$18,306

Exhibit A.1i
Source Water Baseline Biological Characterization Study (Track 2)
Facilities (Respondents)

Activity
Implement Freshwater Sampling
Other Direct Costs for Implement Freshwater Sampling
Implement Estuary Sampling
Other Direct Costs for Implement Estuary Sampling
Biological Study Laboratory Analysis (Freshwater)
Biological Study Laboratory Analysis (Estuary)
Profile of Source Water Biota
Identification of Critical Species
Description of Additional Stresses
Write Study based on Results and Submit for Review by
State
Recordkeeping
Finalize study based on State review
Freshwater Totals
Marine Totals

Year 1 Year 2 Year 3 Total
A
2
2
2 4
2
2
2 4
0
1
1 1
0
1
1 1
2
2
2 4
0
1
1 1
1
2
1 4
1
2
1 4
1
2
1 4
1
1
1 3
1
1
1 3
1
1
1 3
4
1

Exhibit A.1j
Evaluation of Potential CWIS Effects (Track 2)
Facilities (Respondents)

Activity
Calculate Reduction in Impingement Mortality and
Entrainment
Perform Engineering Calculations for Efficacy Projections
Perform Impingement Pilot Study (Freshwater)
Perform Entrainment Pilot Study (Freshwater)
Pilot Study Entrainment Laboratory Analysis (Freshwater)
Perform Impingement Pilot Study (Estuary)
Perform Entrainment Pilot Study (Estuary)
Pilot Study Entrainment Laboratory Analysis (Estuary)
Purchase & Installation of Pilot Study Technology
Operation & Maintenance of Pilot Technology
Submit Data and Analysis for Review
Recordkeeping

December 2015

Year 1 Year 2 Year 3 Total
A
1
1
1
1
1
0
0
0
1
1
1
1

1
1
1
1
1
0
0
0
1
1
1
1

1
1
1
1
1
0
0
0
1
1
1
1

3
3
3
3
3
0
0
0
3
3
3
3

Facility
Junior
CAD
Contracted
Biological
Manager Technical Operator Manager
Biologist Statistician Technician Clerical
Assumed Loaded Hourly Rate $
$110

$45
6
0
10
0
0
0
32
32
16
80
6
16

$42

52
0
101
0
0
0
20
20
10
160
12
32

0
0
0
0
0
0
0
0
0
0
0
0

$134
$69
Level of Effort (hrs)
120
2080
0
0
160
4095
0
0
0
0
0
0
32
60
20
40
16
30
16
8
6
0
0
0

$90

$48
67
0
100
0
0
0
0
0
0
8
0
0

2080
0
4095
0
0
0
20
0
10
0
0
0

$27
34
0
50
0
0
0
8
3
4
8
24
8

Facility
Junior
CAD
Contracted
Biological
Manager Technical Operator Manager
Biologist Statistician Technician Clerical
Assumed Loaded Hourly Rate $
$110

$45

80
40
16
16
0
16
16
0
0
0
8
4

$42

80
32
25
25
0
33
33
0
0
0
10
8

$134
$69
Level of Effort (hrs)
8
0
0
0
0
0
0
0
0
0
0
0

0
0
80
80
0
80
80
0
0
0
8
4

0
0
240
180
0
312
234
0
0
0
6
8

$90

$48

0
0
40
40
0
52
52
0
0
0
4
2

0
0
240
250
0
312
325
0
0
0
0
0

$27

12
4
20
20
0
26
26
0
0
0
16
20

Totals Per Facility for the ICR Approval Period
Burden
(hrs)

Labor Cost

B
4439
0
8611
0
0
0
172
115
86
280
48
56
5,196
9,368

C
$269,446
$0
$516,627
$0
$0
$0
$14,042
$9,956
$7,021
$19,610
$2,645
$3,407
$326,127
$573,308

Capital Costs

O&M Costs

Total Costs**

D

E

C+D+E

$0
$0
$0
$0
0
0
$0
$0
$0
$0
$0
$0
$0
$0

0
$6,000
0
$14,900
$89,600
$174,800
$0
$0
$0
$0
$0
$0
$95,600
$189,700

Total Burden
Total Initial Cost
(hrs.)
A*B
13,317
5,741

$421,727
$763,008

688
460
344
840
144
168
16,356
6,114

A*(C+D+E)
$808,339
$18,000
$344,418
$9,933
$268,800
$116,533
$56,168
$39,823
$28,084
$58,831
$7,934
$10,222
$1,265,182
$501,903

Totals Per Facility for the ICR Approval Period
Burden
(hrs)

Labor Cost

Capital Costs

O&M Costs

Total Costs**

B

C

D

E

C+D+E

180
76
661
611
0
831
766
0
0
0
52
46

Renewal of New Facility Rule Information Collection Request

$13,031
$5,936
$45,861
$42,173
$0
$55,867
$51,073
$0
$0
$0
$3,608
$2,606

$0
$0
$0
$0
$0
$0
$0
$0
$303,000
$0
$0
$0

$0
$0
$0
$0
$6,900
$0
$0
$9,000
$0
$34,500
$0
$0

Total Burden
Total Initial Cost
(hrs.)
A*B
540
228
1,983
1,833
156
138

A*(C+D+E)
$39,092
$17,807
$137,584
$126,520
$20,700
$0
$0
$0
$909,000
$103,500
$10,823
$7,818

A.-3

Other Direct Costs
Freshwater Totals
Marine Totals

1
1
0

1
1
0

1
1
0

3
3
0

Exhibit A.1k
Verification Monitoring Plan (Track 2)
Facilities (Respondents)

Activity
Develop Verification Monitoring Plan
Submit Data and Analysis for Review
Revise Based on State Review
Recordkeeping
Other Direct Costs
Totals

Year 1 Year 2 Year 3 Total
A
1
2
1 4
1
2
1 4
1
2
1 4
1
2
1 4
1
2
1 4
1
2
1 4

Exhibit A.1l
Remote Monitoring
Facilities (Respondents)

Activity
Purchase and Installation of Remote Monitoring Device
Other Direct Costs

Year 1 Year 2 Year 3 Total
A
5
4
5 14
5
4
5 14
14

0

0

0

0

0

0

0

0

Facility
Junior
CAD
Contracted
Biological
Manager Technical Operator Manager
Biologist Statistician Technician Clerical
Assumed Loaded Hourly Rate $
$110

$45
40
0
2
1
0

$42
60
0
4
1
0

8
0
1
1
0

$134
$69
Level of Effort (hrs)
0
0
0
0
0
0
1
0
0
0

$90

$48

$27

0
0

$45

$42

0
0

0
0

$134
$69
Level of Effort (hrs)
0
0
0
0

$0
$113,215
$132,120

0
0
0
0
0

4
2
1
2
0

$90

$48

$27

0
0

0
0

0
0

Burden
(hrs)

Labor Cost
C
$7,527
$53
$468
$384
$0
$8,433

112
2
8
6
0
128

$1,100
$42,500
$44,600

$458,715
$479,720

4,878
-

$3,300
$1,376,144
$0

Capital Costs

O&M Costs

Total Costs**

D

E

C+D+E

$0
$0
$0
$0
$0
$0

$0
$0
$0
$0
$460
$460

$8,893

Total Burden
Total Initial Cost
(hrs.)
A*B
448
8
32
24
512

A*(C+D+E)
$30,109
$214
$1,871
$1,537
$1,840
$35,570

Totals Per Facility for the ICR Approval Period
Burden
(hrs)

Labor Cost

B

C
0
0
-

Total Burden and Costs for All NPDES Application Activities
Totals
* The ODC estimate was not estimated for each activity, but rather as a lump sum for each provision of the rule.

December 2015

$0
$303,000
$303,000

Totals Per Facility for the ICR Approval Period

B
0
0
0
0
0

Facility
Junior
CAD
Contracted
Biological
Manager Technical Operator Manager
Biologist Statistician Technician Clerical
Assumed Loaded Hourly Rate $
$110

0
1626
1,950

Renewal of New Facility Rule Information Collection Request

$0
$0
$0

Capital Costs
D
$62,000
$0
$62,000

O&M Costs

Total Costs**

E

C+D+E

$0
$1,100
$1,100

Total Burden
Total Initial Cost
(hrs.)
A*B
-

$63,100

-

A*(C+D+E)
$868,000
$15,400
$883,400

Total Burden
Total Initial Cost
(hrs.)
43,944
$5,028,380

A.-4

Exhibit A.2
Facility Cost and Burden Estimates for Annual Activities
Exhibit A.2a
Freshwater Verification Study (Track 2)
Facility
Manager

Activity
Perform Statistical Analysis
Submit Monitoring Results & Study Analysis
Record Keeping
Totals

Facilities (Respondents)
Year 1 Year 2 Year 3 Total
A
4
1
2
7
4
1
2
7
4
1
2
7
7

$110
20
0
1
21

Junior Contracted
Biological
Technical Manager Biologist Statistician Technician Clerical
Assumed Loaded Hourly Rate $
$45
$134
$69
$90
$48
$27
Level of Effort (hrs)
20
10
10
20
0
1
0
0
0
0
0
4
2
0
0
0
0
4
22
10
10
20
0
9

Totals Per Facility for the ICR Approval Period
Burden
(hrs)
B
81
4
7
92

Labor Cost
C
$6,967
$107
$306
$7,380

ODCs lump
sum*
D

$575

Total for AllFacilities in the ICR
Approval Period

Total Costs

Burden (hrs.)

C+D

A*B
567
28
49
644

$7,955

Annual Cost
A*(C+D)
$48,767
$748
$2,145
$55,684

Exhibit A.2b
Estuary Verification Study (Track 2)
Facility
Manager

Activity
Perform Statistical Analysis
Submit Monitoring Results & Study Analysis
Record Keeping
Totals

Facilities (Respondents)
Year 1 Year 2 Year 3 Total
A
0
0
1
1
0
0
1
1
0
0
1
1
1

$110
25
0
1
26

Junior Contracted
Biological
Technical Manager Biologist Statistician Technician Clerical
Assumed Loaded Hourly Rate $
$45
$134
$69
$90
$48
$27
Level of Effort (hrs)
30
15
15
25
0
1
0
0
0
0
0
4
2
0
0
0
0
4
32
15
15
25
0
9

Totals Per Facility for the ICR Approval Period
Burden
(hrs)
B
111
4
7
122

Labor Cost
C
$9,436
$107
$306
$9,849

ODCs lump
sum*
D

$575

Total for AllFacilities in the ICR
Approval Period

Total Costs

Burden (hrs.)

C+D

A*B

$10,424

111
4
7
122

Annual Cost
A*(C+D)
$9,436
$107
$306
$10,424

Exhibit A.2c.1
Initial Biological Monitoring for Impingement (Freshwater)
Facility
Manager

Activity
Monthly Sample Collection
Onsite Analysis of Samples
Perform Statistical Analysis
Record Keeping
Totals

Facilities (Respondents)
Year 1 Year 2 Year 3 Total
A
11
10
10
31
11
10
10
31
11
10
10
31
11
10
10
31
31

$110
2
4
8
2
16

Junior Contracted
Biological
Technical Manager Biologist Statistician Technician Clerical
Assumed Loaded Hourly Rate $
$45
$134
$69
$90
$48
$27
Level of Effort (hrs)
0
4
72
0
72
0
0
12
72
0
72
0
4
0
0
32
0
0
1
1
4
1
0
16
5
17
148
33
144
16

Totals Per Facility for the ICR Approval Period
Burden
(hrs)
B
150
160
44
25
379

Labor Cost
C
$9,181
$10,476
$3,951
$1,194
$24,802

ODCs lump
sum*
D

$575

Total Costs
C+D

$25,377

Total for AllFacilities in the ICR
Approval Period
Burden (hrs.)
A*B
4,650
4,960
1,364
775
11,749

Annual Cost
A*(C+D)
$284,617
$324,756
$122,475
$37,017
$786,690

Exhibit A.2c.2
Reduced Biological Monitoring for Impingement (Freshwater)
Facility
Manager

Activity
Reduced Sample Collection
Onsite Analysis of Samples
Perform Statistical Analysis
Record Keeping
Totals

December 2015

Facilities (Respondents)
Year 1 Year 2 Year 3 Total
A
62
68
73
203
62
68
73
203
62
68
73
203
62
68
73
203
203

$110
1
2
4
1
8

Junior Contracted
Biological
Technical Manager Biologist Statistician Technician Clerical
Assumed Loaded Hourly Rate $
$45
$134
$69
$90
$48
$27
Level of Effort (hrs)
0
2
36
0
36
0
0
6
36
0
36
0
2
0
0
16
0
0
1
1
2
1
0
8
3
9
74
17
72
8

Totals Per Facility for the ICR Approval Period
Burden
(hrs)
B
75
80
22
14
191

Labor Cost
C
$4,591
$5,238
$1,975
$732
$12,536

ODCs lump
sum*
D

Renewal of New Facility Rule Information Collection Request

$288

Total Costs
C+D

$12,823

Total for AllFacilities in the ICR
Approval Period
Burden (hrs.)
A*B
15,225
16,240
4,466
2,842
38,773

Annual Cost
A*(C+D)
$931,892
$1,063,314
$401,006
$148,576
$2,603,150

A.-5

Exhibit A.2d.1
Initial Biological Monitoring for Impingement (Estuary)
Facility
Manager

Activity
Monthly Sample Collection
Handling and Preparation of Samples
Perform Statistical Analysis
Record Keeping
Totals

Facilities (Respondents)
Year 1 Year 2 Year 3 Total
A
1
2
1
4
1
2
1
4
1
2
1
4
1
2
1
4
4

$110
2
4
8
2
16

Junior Contracted
Biological
Technical Manager Biologist Statistician Technician Clerical
Assumed Loaded Hourly Rate $
$45
$134
$69
$90
$48
$27
Level of Effort (hrs)
0
5
94
0
94
0
0
16
94
0
94
0
4
0
0
42
0
0
1
1
5
1
0
16
5
22
192
43
187
16

Totals Per Facility for the ICR Approval Period
Burden
(hrs)
B
194
207
54
27
482

Labor Cost
C
$11,870
$13,487
$4,819
$1,345
$31,520

ODCs lump
sum*
D

$745

Total for AllFacilities in the ICR
Approval Period

Total Costs

Burden (hrs.)

C+D

A*B

$32,265

778
827
214
107
1,926

Annual Cost
A*(C+D)
$47,479
$53,948
$19,275
$5,379
$129,061

Exhibit A.2d.2
Reduced Biological Monitoring for Impingement (Estuary)
Facility
Manager

Activity
Reduced Sample Collection
Handling and Preparation of Samples
Perform Statistical Analysis
Record Keeping
Totals

Facilities (Respondents)
Year 1 Year 2 Year 3 Total
A
11
11
12
34
11
11
12
34
11
11
12
34
11
11
12
34
34

1
2
4
1
8

Junior Contracted
Biological
Technical Manager Biologist Statistician Technician Clerical
Assumed Loaded Hourly Rate $
$45
$134
$69
$90
$48
$27
Level of Effort (hrs)
0
3
47
0
47
0
0
8
47
0
47
0
2
0
0
21
0
0
1
1
3
1
0
8
3
12
97
22
94
8

4
4
16
2
26

Junior Contracted
Biological
Technical Manager Biologist Statistician Technician Clerical
Assumed Loaded Hourly Rate $
$45
$134
$69
$90
$48
$27
Level of Effort (hrs)
0
12
156
0
156
0
0
12
78
0
78
0
4
0
0
64
0
0
1
1
8
2
0
16
5
25
242
66
234
16

$110

Totals Per Facility for the ICR Approval Period
Burden
(hrs)
B
98
104
27
15
244

Labor Cost
C
$6,012
$6,794
$2,427
$801
$16,035

ODCs lump
sum*
D

$373

Total Costs
C+D

$16,407

Total for AllFacilities in the ICR
Approval Period
Burden (hrs.)
A*B
3,332
3,536
918
510
8,296

Annual Cost
A*(C+D)
$204,408
$230,989
$82,532
$27,244
$557,838

Exhibit A.2e.1
Initial Biological Monitoring for Entrainment (Freshwater)
Facility
Manager

Activity
Biweekly Sample Collection
Handling and Preparation of Samples
Perform Statistical Analysis
Recordkeeping
Totals

Facilities (Respondents)
Year 1 Year 2 Year 3 Total
A
11
10
10
31
11
10
10
31
11
10
10
31
11
10
10
31
31

$110

Totals Per Facility for the ICR Approval Period
Burden
(hrs)
B
328
172
84
30
614

Labor Cost
C
$20,304
$11,178
$7,722
$1,562
$40,766

ODCs lump
sum*
D

$1,150

Total Costs
C+D

$41,916

Total for AllFacilities in the ICR
Approval Period
Burden (hrs.)
A*B
10,168
5,332
2,604
930
19,034

Annual Cost
A*(C+D)
$629,424
$346,518
$239,382
$48,425
$1,299,399

Exhibit A.2e.2
Reduced Biological Monitoring for Entrainment (Freshwater)
Facility
Manager

Activity
Reduced Sample Collection
Handling and Preparation of Samples
Perform Statistical Analysis
Recordkeeping
Totals

December 2015

Facilities (Respondents)
Year 1 Year 2 Year 3 Total
A
62
68
73
203
62
68
73
203
62
68
73
203
62
68
73
203
203

$110
2
2
8
1
13

Junior Contracted
Biological
Technical Manager Biologist Statistician Technician Clerical
Assumed Loaded Hourly Rate $
$45
$134
$69
$90
$48
$27
Level of Effort (hrs)
0
6
78
0
78
0
0
6
39
0
39
0
2
0
0
32
0
0
1
1
4
1
0
8
3
13
121
33
117
8

Totals Per Facility for the ICR Approval Period
Burden
(hrs)
B
164
86
42
16
308

Labor Cost
C
$10,152
$5,589
$3,861
$871
$20,473

ODCs lump
sum*
D

Renewal of New Facility Rule Information Collection Request

$575

Total Costs
C+D

$21,048

Total for AllFacilities in the ICR
Approval Period
Burden (hrs.)
A*B
33,292
17,458
8,526
3,248
62,524

Annual Cost
A*(C+D)
$2,060,856
$1,134,567
$783,783
$176,752
$4,272,683

A.-6

Exhibit A.2f.1
Initial Biological Monitoring for Entrainment (Estuary)
Facility
Manager

Activity
Biweekly Sample Collection
Handling and Preparation of Samples
Perform Statistical Analysis
Recordkeeping
Totals

Facilities (Respondents)
Year 1 Year 2 Year 3 Total
A
1
2
1
4
1
2
1
4
1
2
1
4
1
2
1
4
4

$110
4
4
16
2
26

Junior Contracted
Biological
Technical Manager Biologist Statistician Technician Clerical
Assumed Loaded Hourly Rate $
$45
$134
$69
$90
$48
$27
Level of Effort (hrs)
0
12
203
0
203
0
0
12
101
0
101
0
4
0
0
83
0
0
1
1
10
3
0
16
5
25
314
86
304
16

Totals Per Facility for the ICR Approval Period
Burden
(hrs)
B
422
218
103
33
776

Labor Cost
C
$25,803
$13,869
$9,440
$1,791
$50,903

ODCs lump
sum*
D

$1,320

Total Costs
C+D

$52,223

Total for AllFacilities in the ICR
Approval Period
Burden (hrs.)
A*B
1,688
872
412
132
3,104

Annual Cost
A*(C+D)
$103,212
$55,476
$37,758
$7,165
$208,892

Exhibit A.2f.2
Reduced Biological Monitoring for Entrainment (Estuary)
Facility
Manager

Activity
Reduced Sample Collection
Handling and Preparation of Samples
Perform Statistical Analysis
Recordkeeping
Totals

Facilities (Respondents)
Year 1 Year 2 Year 3 Total
A
11
11
12
34
11
11
12
34
11
11
12
34
11
11
12
34
34

$110
2
2
8
1
13

Junior Contracted
Biological
Technical Manager Biologist Statistician Technician Clerical
Assumed Loaded Hourly Rate $
$45
$134
$69
$90
$48
$27
Level of Effort (hrs)
0
6
102
0
102
0
0
6
51
0
51
0
2
0
0
42
0
0
1
1
5
2
0
8
3
13
158
44
153
8

Totals Per Facility for the ICR Approval Period
Burden
(hrs)
B
212
110
52
18
392

Labor Cost
C
$12,960
$6,993
$4,765
$1,031
$25,749

ODCs lump
sum*
D

$660

Total Costs
C+D

$26,409

Total for AllFacilities in the ICR
Approval Period
Burden (hrs.)
A*B
7,208
3,740
1,768
612
13,328

Annual Cost
A*(C+D)
$440,640
$237,762
$162,010
$35,037
$897,889

Exhibit A.2g
Velocity Monitoring
Facility
Manager

Activity
Monitor Average Through Technology
Analyze Data
Recordkeeping
Totals

Facilities (Respondents)
Year 1 Year 2 Year 3 Total
A
85
91
96
272
85
91
96
272
85
91
96
272
272

$110
2
4
1
7

Junior Contracted
Biological
Technical Manager Biologist Statistician Technician Clerical
Assumed Loaded Hourly Rate $
$45
$134
$69
$90
$48
$27
Level of Effort (hrs)
100
0
0
0
0
0
40
0
0
0
0
0
8
0
0
0
0
8
148
0
0
0
0
8

Totals Per Facility for the ICR Approval Period
Burden
(hrs)
B
102
44
17
163

Labor Cost
C
$4,710
$2,235
$683
$7,627

ODCs lump
sum*
D

$115

Total Costs
C+D

$7,742

Total for AllFacilities in the ICR
Approval Period
Burden (hrs.)
A*B
27,744
11,968
4,624
44,336

Annual Cost
A*(C+D)
$1,281,011
$607,974
$185,667
$2,105,933

Exhibit A.2h
Inspection of Installed Technologies
Facility
Manager
Facilities (Respondents)
Year 1 Year 2 Year 3 Total
A
Activity
Visually Inspect All InstalledTechnologies
31
32
33
96
Recordkeeping
31
32
33
96
Totals
96

December 2015

Junior Contracted
Biological
Technical Manager Biologist Statistician Technician Clerical
Assumed Loaded Hourly Rate $
$110
$45
$134
$69
$90
$48
$27
Level of Effort (hrs)
24
208
0
0
0
0
0
3
16
0
0
0
0
2
27
224
0
0
0
0
2

Totals Per Facility for the ICR Approval Period
Burden
(hrs)
B
232
21
253

Labor Cost
C
$11,974
$1,101
$13,076

ODCs lump
sum*
D

Renewal of New Facility Rule Information Collection Request

$115

Total Costs
C+D

$13,191

Total for AllFacilities in the ICR
Approval Period
Burden (hrs.)
A*B
22,272
2,016
24,288

Annual Cost
A*(C+D)
$1,149,542
$105,715
$1,266,298

A.-7

Exhibit A.2i
Yearly Status Report Activities
Facility
Manager

Activity
Report on Inspection and Maintenance
Detail Velocity Monitoring Results
Detail Biological Monitoring Results
Compile and Submit Report
Recordkeeping
Totals

Facilities (Respondents)
Year 1 Year 2 Year 3 Total
A
85
91
96
272
85
91
96
272
85
91
96
272
85
91
96
272
85
91
96
272
272

$110
16
8
24
80
8
136

Junior Contracted
Biological
Technical Manager Biologist Statistician Technician Clerical
Assumed Loaded Hourly Rate $
$45
$134
$69
$90
$48
$27
Level of Effort (hrs)
16
0
0
0
0
0
16
0
0
0
0
0
32
4
4
24
0
0
80
0
0
0
0
16
12
0
0
0
0
8
156
4
4
24
0
24

Totals Per Facility for the ICR Approval Period
Burden
(hrs)
B
32
24
88
176
28
348

Labor Cost
C
$2,475
$1,597
$7,057
$12,803
$1,631
$25,563

ODCs lump
sum*
D

Total Costs

Burden (hrs.)

Annual Cost

$26,423

A*B
8,704
6,528
23,936
47,872
7,616
94,656

ODCs lump Total Cost per
sum*
Facility

Total Burden
(hrs.)

Total Annual Cost

322,780

21,380,943

$860

C+D

Total for All Facilities in the ICR
Approval Period

A*(C+D)
$673,254
$434,330
$1,919,450
$3,482,470
$443,578
$7,187,002

Total Burden and Cost for All Annual Activities
Burden
Per Facility
1,757
1,263
2,022
1,400
1,849
1,355
2,144
1,522

Track 1 Freshwater
Track 1 Freshwater - Reduced
Track 1 Estuary
Track 1 Estuary - Reduced
Track 2 Freshwater
Track 2 Freshwater - Reduced
Track 2 Estuary
Track 2 Estuary - Reduced

Cost per
Facility
111,834
79,274
128,689
88,049
119,214
86,654
138,538
97,898

2,815
1,953
3,155
2,123
3,390
2,528
3,730
2,698

Totals

114,649
81,227
131,844
90,171
122,604
89,182
142,268
100,595

Exhibit A.2j
Facility Annual O&M Costs

Activity
Operation of Remote Sensing Device
Identify & Enumerate Entrained Freshwater Biota
Identify & Enumerate Entrained Estuary Biota

Facilities (Responses)
54
59
63
176
73
78
83
234
12
13
13
38

Contracted Laboratory
Analysis Cost

Operation and
Maintenance Costs
$230

ODCs lump
sum*
$55

$9,000
$11,700
$55

Cost ($)
$50,160
$2,106,000
$444,600
$2,600,760

Total Cost for All NPDES Application Activities
Total Cost ($)
$23,981,703

Totals

December 2015

Renewal of New Facility Rule Information Collection Request

A.-8

Exhibit A.3
Director Burden and Cost Estimates for Activities
Exhibit A.3a
Director Start-up Activities
12/201111/2012
A

Activity
Read and Understand Rule
Mobilization/Planning
Training
Totals

-

12/201212/2013Burden
Labor
ODCs
Total
Total
Total
11/2013
11/2014 Clerical
Per
Cost per lump Cost Per Burden
Assumed Loaded Hourly Rate $
Initial Cost
Director
Director
sum*
Director
(hrs.)
75
35
29
B
C
D
C+D
A*B
A*(C+D)
Level of Effort (hrs)
12
12
0
24
$1,313
$0
24
16
0
40
$2,348
$0
4
32
0
36
$1,409
$0
40
60
0
100
$5,070
$50
$5,120
$0

Exhibit A.3a
Director Permit Issuance Activities
Senior
Junior
Burden
Technical Technical Clerical
Directors
Per
(Responses) Assumed Loaded Hourly Rate $
Permit
75
35
29
A
B
Level of Effort (hrs)
Activity
Reviewing CWIS location and design data
18
6
18
0
24
Determine Compliance with Source Waterbody Flow Information
18
2
6
0
8
Review Source Water Baseline Biological Characterization Data
Review Design and Construction Technology Plan (Track 1)
Determine Compliance with CWIS Velocity Requirements (Track
1)
Determine Compliance with CWIS Flow Reduction Requirements
(Track 1)
Review Comprehensive Demonstration Study Plan (Track 2)
Review Source Water Baseline Biological Characterization Study
(Track 2)
Review Evaluation of Potential CWIS Effects (Track 2)
Determine Monitoring Frequency
Determine Record keeping and Reporting Frequency
Considering Public Comments
Issuing Permit
Permit Record Keeping
Totals
Track 1 Totals
Track 2 Totals

December 2015

Labor
ODCs
Total
Total
Cost per lump Cost Per Burden
Permit
sum*
Permit
(hrs.)
C
$1,073
$358

D

C+D

Total
Initial
Cost*

A*B
432
144

A*(C+D)
$19,310
$6,437

18
14

20
24

20
8

0
0

40
32

$2,188
$2,070

720
448

$39,384
$28,986

14

2

6

0

8

$358

112

$5,006

14
4

8
16

8
16

0
0

16
32

$875
$1,750

224
128

$12,253
$7,002

3
3
17
17
17
17
17
18

400
16
2
2
16
1
1
516

50
16
6
6
16
6
1
183

0
0
0
0
0
1
2
3

450
32
8
8
32
8
4
702
188
646

$31,615
$1,750
$358
$358
$1,750
$312
$167
$44,982
$9,866
$41,679

1,350
96
136
136
544
136
68
4,674

$94,845
$5,251
$6,079
$6,079
$29,757
$5,301
$2,842
$274,742

$345
$345
$345

$45,327
$10,211
$42,024

Renewal of New Facility Rule Information Collection Request

A.-9

Exhibit A.3b
Verification Study Review

Activity
Review of Verification Studies
Permit Modification due to Unfavorable Results
Record Keeping
Totals

Senior
Junior
Labor
ODCs
Total
Total
Technical Technical Clerical Burden
Directors
Total
Per
Cost per lump Cost Per Burden
(Responses) Assumed Loaded Hourly Rate $
Initial Cost
Permit
Permit
sum*
Permit
(hrs.)
75
35
29
A
B
C
D
C+D
A*B
A*(C+D)
Level of Effort (hrs)
8
2
4
0
6
$288
48
$2,306
8
4
10
0
14
$646
112
$5,166
8
0
0
1
1
$29
8
$231
8
6
14
1
21
$963
$55
$1,018
168
$8,000

Exhibit A.3c
Annual Director Activities

Activity
Review of Yearly Report
Compliance Tracking
Determination on Monitoring Scope Reduction
Record Keeping
Totals

Senior
Junior
Labor
ODCs
Total
Total
Technical Technical Clerical Burden
Directors
Per
Cost per lump Cost Per Burden
(Responses) Assumed Loaded Hourly Rate $
Permit
Permit
sum*
Permit
(hrs.)
75
35
29
A
B
C
D
C+D
A*B
Level of Effort (hrs)
272
6
12
0
18
$865
4,896
272
4
12
0
16
$715
4,352
272
4
8
0
12
$576
3,264
272
1
2
1
4
$173
1,088
272
15
34
1
50
$2,329
$55
$2,384 13,600

Total
Annual
Cost
A*(C+D)
$235,171
$194,534
$156,781
$47,056
$649,000

Total Burden and Cost for All Director Activities

Totals

December 2015

Total
Total
Burden
Initial Cost
(hrs.)
18,274
$931,742

Renewal of New Facility Rule Information Collection Request

A.-10

Exhibit A.4
Federal Burden and Cost Estimates for Activities
Exhibit A.4a
Federal Permit Program Oversight Activities

Activity
Reviewing CWIS location and design data
Determine Compliance with Source Waterbody Flow Information
Review Source Water Baseline Biological Characterization Data
Review Design and Construction Technology Plan (Track 1)
Determine Compliance with CWIS Velocity Requirements (Track 1)
Determine Compliance with CWIS Flow Reduction Requirements (Track
1)
Review Comprehensive Demonstration Study Plan (Track 2)
Review Source Water Baseline Biological Characterization Study (Track
2)
Review Evaluation of Potential CWIS Effects (Track 2)
Determine Monitoring Frequency
Permit Record Keeping
Totals
Track 1 Totals
Track 2 Totals

December 2015

Federal
(Responses)
Over Three
Years
A
18
18
18
14
14

Senior
Junior
Technical
Technical
Clerical
Assumed Loaded Hourly Rate $
75
35
29
Level of Effort (hrs)
1
2
1
3
1
2
1
3
1
2

0
0
0
0
0

Burden
per
permit
Review
B
3
4
3
4
3

Labor
Cost per
Permit
Review
C
$144
$179
$144
$179
$144

14
4

1
1

2
2

0
0

3
3

3
3
17
17
18

6
1
1
1
16

12
2
3
1
34

0
0
0
2
2

18
3
4
4
30
28
42

ODCs
lump
sum*
D

Total Cost Total
per Permit Burden
Review
(hrs.)
C+D

Total Initial
Cost *

A*B
54
72
54
56
42

A*(C+D)
$2,594
$3,218
$2,594
$2,503
$2,017

$144
$144

42
12

$2,017
$576

$865
$144
$179
$167
1,184
$1,280
$1,966

54
9
68
68
531

$2,594
$432
$3,040
$2,842
$25,364

$55
$55
$55

$1,239
$1,335
$2,021

Renewal of New Facility Rule Information Collection Request

A.-11

Exhibit A.5
Respondents for the ICR Approval Period Year by Year by Activity
Facilities [1]
Year 1
12/201411/2015

Year 2
12/201511/2016

Year 3
12/201611/2017

Annual
Average

Initial NPDES Permit Application Activities
Start-up Activities
Permit Application Activities
Source Waterbody Flow Information
Use Existing Data- Source Water Baseline Biological Characterization Data
CWIS Flow Reduction Requirements (Track 1)
CWIS Velocity Requirements (Track 1)
Design and Construction Technology Plan (Track 1)
Comprehensive Demonstration Study Plan (Track 2)
Freshwater Source Water Baseline Biological Characterization Study (Track 2)
Estuary Source Water Baseline Biological Characterization Study (Track 2)
Profile of Source Water Biota for Characterization Study (Track 2)
Submit Characterization Study (Track 2)
Freshwater Evaluation of Potential CWIS Effects (Track 2)
Estuary Evaluation of Potential CWIS Effects (Track 2)
Verification Monitoring Plan (Track 2)
NPDES Repermitting Activities
Start-up Activities
Permit Application Activities
Source Waterbody Flow Information
Source Water Baseline Biological Characterization Data
CWIS Flow Reduction Requirements (Track 1)
CWIS Velocity Requirements (Track 1)
Design and Construction Technology Plan (Track 1)
Comprehensive Demonstration Study Plan (Track 2)
Freshwater Source Water Baseline Biological Characterization Study (Track 2)
Estuary Source Water Baseline Biological Characterization Study (Track 2)
Profile of Source Water Biota for Characterization Study (Track 2)
Submit Characterization Study (Track 2)
Annual
Freshwater Verification Study (Track 2)
Estuary Verification Study (Track 2)
Initial Biological Monitoring for Impingement (Freshwater)
Reduced Biological Monitoring for Impingement (Freshwater)
Initial Biological Monitoring for Impingement (Estuary)
Reduced Biological Monitoring for Impingement (Estuary)
Initial Biological Monitoring for Entrainment (Freshwater)
Reduced Biological Monitoring for Entrainment (Freshwater)
Initial Biological Monitoring for Entrainment (Estuary)
Reduced Biological Monitoring for Entrainment (Estuary)
Velocity Monitoring
Visual Inspection of Installed Technologies
Yearly Status Report Activities
Respondents

December 2015

6
6
6
6
5
5
5
1
2
0
1
1
1
0
1

6
6
6
6
4
4
4
2
2
1
2
1
1
0
2

6
6
6
6
5
5
5
1
2
1
1
1
1
0
1

6
6
6
6
5
5
5
1
2
1
1
1
1
0
1

9
9
9
9
6
6
6
3
5
3
3
4

13
13
13
13
8
8
8
5
5
4
5
2

20
20
20
20
9
9
9
11
13
5
11
6

14
14
14
14
8
8
8
6
8
4
6
4

4
0
11
62
1
11
11
62
1
11
85
31
85
92

1
0
10
68
2
11
10
68
2
11
91
32
91
98

2
1
10
73
1
12
10
73
1
12
96
33
96
104

2
0
10
68
1
11
10
68
1
11
91
32
91
98

Renewal of New Facility Rule Information Collection Request

A.-12

Directors [2]
Year 1
12/201411/2015
Director Permit Issuance Activities
Reviewing Facility General Permit Application Information
Review Source Water Baseline Biological Characterization Data
Determine Compliance with Source Waterbody Flow Information
Review Design and Construction Technology Plan (Track 1)
Determine Compliance with CWIS Velocity Requirements (Track 1)
Determine Compliance with CWIS Flow Reduction Requirements (Track 1)
Review Comprehensive Demonstration Study Plan (Track 2)
Review Source Water Baseline Biological Characterization Study (Track 2)
Review Evaluation of Potential CWIS Effects (Track 2)
Determining Facility Requirements and Issuing Permit
Verification Study Review
Director Permit Reissuance Activities
Reviewing Facility General Permit Application Information
Review Source Water Baseline Biological Characterization Data
Determine Compliance with Source Waterbody Flow Information
Review Design and Construction Technology Plan (Track 1)
Determine Compliance with CWIS Velocity Requirements (Track 1)
Determine Compliance with CWIS Flow Reduction Requirements (Track 1)
Review Comprehensive Demonstration Study Plan (Track 2)
Review Source Water Baseline Biological Characterization Study (Track 2)
Determining Facility Requirements and Issuing Permit
Annual Director Activities
Review of Yearly Report
Compliance Tracking
Determination on Monitoring Scope Reduction
Record Keeping
Respondents

Year 2
12/201511/2016

Year 3
12/201611/2017

Annual
Average

6
6
6
5
5
5
1
1
1
6
4

6
6
6
4
4
4
2
1
1
5
1

6
6
6
5
5
5
1
1
1
6
3

6
6
6
5
5
5
1
1
1
6
3

9
9
9
6
6
6
3
4
6

13
13
13
8
8
8
5
2
13

20
20
20
9
9
9
11
6
17

14
14
14
8
8
8
6
4
12

85
85
85
85
92

91
91
91
91
98

96
96
96
96
104

91
91
91
91
98

92
92
184

Year 2
12/201511/2016
98
98
196

Year 3
12/201611/2017
104
104
208

Annual
Average
98
98
196

Sum for Facilities and Directors
Year 1
12/201411/2015
Facilities
Directors
Yearly Total*

[1] Each facility is one respondent. One respondent may be involved in more than one activity;
however, in order to avoid double-counting, the maximum number of respondents expected to be involved
in the rule activities annually is assumed to be the number of respondents for that year.
[2] Each Director is one respondent.

* Total does not add due to rounding.

December 2015

Renewal of New Facility Rule Information Collection Request

A.-13

Exhibit A.6
Responses for the ICR Approval Period Year by Year by Activity

Facilities
Year 1
12/201411/2015

Year 2
12/201511/2016

Year 3
12/201611/2017

Annual
Average

Initial Permitting
Start-up Activities
Permit Application Activities
Source Waterbody Flow Information
Use Existing Data- Source Water Baseline Biological Characterization Data
CWIS Flow Reduction Requirements (Track 1)
CWIS Velocity Requirements (Track 1)
Design and Construction Technology Plan (Track 1)
Comprehensive Demonstration Study Plan (Track 2)
Freshwater Source Water Baseline Biological Characterization Study (Track 2)
Estuary Source Water Baseline Biological Characterization Study (Track 2)
Profile of Source Water Biota for Characterization Study (Track 2)
Submit Characterization Study (Track 2)
Freshwater Evaluation of Potential CWIS Effects (Track 2)
Estuary Evaluation of Potential CWIS Effects (Track 2)
Verification Monitoring Plan (Track 2)
NPDES Repermitting Activities
Start-up Activities
Permit Application Activities
Source Waterbody Flow Information
Source Water Baseline Biological Characterization Data
CWIS Flow Reduction Requirements (Track 1)
CWIS Velocity Requirements (Track 1)
Design and Construction Technology Plan (Track 1)
Comprehensive Demonstration Study Plan (Track 2)
Freshwater Source Water Baseline Biological Characterization Study (Track 2)
Estuary Source Water Baseline Biological Characterization Study (Track 2)
Profile of Source Water Biota for Characterization Study (Track 2)
Submit Characterization Study (Track 2)
Annual
Freshwater Verification Study (Track 2)
Estuary Verification Study (Track 2)
Initial Biological Monitoring for Impingement (Freshwater)
Reduced Biological Monitoring for Impingement (Freshwater)
Initial Biological Monitoring for Impingement (Estuary)
Reduced Biological Monitoring for Impingement (Estuary)
Initial Biological Monitoring for Entrainment (Freshwater)
Reduced Biological Monitoring for Entrainment (Freshwater)
Initial Biological Monitoring for Entrainment (Estuary)
Reduced Biological Monitoring for Entrainment (Estuary)
Velocity Monitoring
Visual Inspection of Installed Technologies
Yearly Status Report Activities
Responses

December 2015

6
6
6
6
5
5
5
1
2
0
1
1
1
0
1
0
9
9
9
9
6
6
6
3
5
3
3
4
0
4
0
11
62
1
11
11
62
1
11
85
31
85
493

6
6
6
6
4
4
4
2
2
1
2
1
1
0
2
0
13
13
13
13
8
8
8
5
5
4
5
2
0
1
0
10
68
2
11
10
68
2
11
91
32
91
541

6
6
6
6
5
5
5
1
2
1
1
1
1
0
1
0
20
20
20
20
9
9
9
11
13
5
11
6
0
2
1
10
73
1
12
10
73
1
12
96
33
96
620

6
6
6
6
5
5
5
1
2
1
1
1
1
0
1
0
14
14
14
14
8
8
8
6
8
4
6
4
0
2
0
10
68
1
11
10
68
1
11
91
32
91
551

Renewal of New Facility Rule Information Collection Request

A.-14

Directors
Year 1
12/201411/2015
Director Permit Issuance Activities
Reviewing Facility General Permit Application Information
Review Source Water Baseline Biological Characterization Data
Determine Compliance with Source Waterbody Flow Information
Review Design and Construction Technology Plan (Track 1)
Determine Compliance with CWIS Velocity Requirements (Track 1)
Determine Compliance with CWIS Flow Reduction Requirements (Track 1)
Review Comprehensive Demonstration Study Plan (Track 2)
Review Source Water Baseline Biological Characterization Study (Track 2)
Review Evaluation of Potential CWIS Effects (Track 2)
Determining Facility Requirements and Issuing Permit
Verification Study Review
Director Permit Reissuance Activities
Reviewing Facility General Permit Application Information
Review Source Water Baseline Biological Characterization Data
Determine Compliance with Source Waterbody Flow Information
Review Design and Construction Technology Plan (Track 1)
Determine Compliance with CWIS Velocity Requirements (Track 1)
Determine Compliance with CWIS Flow Reduction Requirements (Track 1)
Review Comprehensive Demonstration Study Plan (Track 2)
Review Source Water Baseline Biological Characterization Study (Track 2)
Determining Facility Requirements and Issuing Permit
Annual Director Activities
Review of Yearly Report
Compliance Tracking
Determination on Monitoring Scope Reduction
Record Keeping
Responses

Year 2
12/201511/2016

Year 3
12/201611/2017

Annual
Average

6
6
6
5
5
5
1
1
1
6
4

6
6
6
4
4
4
2
1
1
5
1

6
6
6
5
5
5
1
1
1
6
3

6
6
6
5
5
5
1
1
1
6
3

9
9
9
6
6
6
3
4
6

13
13
13
8
8
8
5
2
13

20
20
20
9
9
9
11
6
17

14
14
14
8
8
8
6
4
12

85
85
85
85
444

91
91
91
91
487

96
96
96
96
550

91
91
91
91
494

Year 1
12/201411/2015
493
444
937

Year 2
12/201511/2016
541
487
1,028

Year 3
12/201611/2017
620
550
1,170

Annual
Average
551
494
1,045

Sum for Facilities and Directors

Facilities
Directors
Yearly Total*

December 2015

Renewal of New Facility Rule Information Collection Request

A.-15

Exhibit A.7
Hourly Burden for the ICR Approval Period Year by Year
for Facilities
Facility Activities
Source
(Exhibit)

Year 1
12/201411/2015

Year 2
12/201511/2016

Year 3
12/201611/2017

Annual
Average

NPDES Permit Application Activities
Start-up Activities
Permit Application Activities
Source Waterbody Flow Information
Use Existing Data- Source Water Baseline Biological Characterization Data
CWIS Flow Reduction Requirements (Track 1)
CWIS Velocity Requirements (Track 1)
Design and Construction Technology Plan (Track 1)
Comprehensive Demonstration Study Plan (Track 2)
Freshwater Source Water Baseline Biological Characterization Study (Track 2)
Estuary Source Water Baseline Biological Characterization Study (Track 2)
Profile of Source Water Biota for Characterization Study (Track 2)
Submit Characterization Study (Track 2)
Freshwater Evaluation of Potential CWIS Effects (Track 2)
Estuary Evaluation of Potential CWIS Effects (Track 2)
Verification Monitoring Plan (Track 2)
NPDES Permit Application Activity Total
NPDES Repermitting Activities
Start-up Activities
Permit Application Activities
Source Waterbody Flow Information
Source Water Baseline Biological Characterization Data
CWIS Flow Reduction Requirements (Track 1)
CWIS Velocity Requirements (Track 1)
Design and Construction Technology Plan (Track 1)
Comprehensive Demonstration Study Plan (Track 2)
Freshwater Source Water Baseline Biological Characterization Study (Track 2)
Estuary Source Water Baseline Biological Characterization Study (Track 2)
Profile of Source Water Biota for Characterization Study (Track 2)
Submit Characterization Study (Track 2)
NPDES Repermitting Activity Total
Annual Activities
Freshwater Verification Study (Track 2)
Estuary Verification Study (Track 2)
Initial Biological Monitoring for Impingement (Freshwater)
Reduced Biological Monitoring for Impingement (Freshwater)
Initial Biological Monitoring for Impingement (Estuary)
Reduced Biological Monitoring for Impingement (Estuary)
Initial Biological Monitoring for Entrainment (Freshwater)
Reduced Biological Monitoring for Entrainment (Freshwater)
Initial Biological Monitoring for Entrainment (Estuary)
Reduced Biological Monitoring for Entrainment (Estuary)
Velocity Monitoring
Visual Inspection of Installed Technologies
Yearly Status Report Activities
Annual Activity Yearly Labor Total
Yearly Labor Total

December 2015

A1a
A1b
A1c
A1d
A1e
A1f
A1g
A1h
A1i
A1i
A1i
A1i
A1j
A1j
A1k

258
876
624
1,590
540
690
540
271
4,439
0
373
384
1,626
0
128
12,211

258
876
624
1,590
432
552
432
542
4,439
2,870
746
384
1,626
0
256
15,371

258
876
624
1,590
540
690
540
271
4,439
2,870
373
384
1,626
0
128
15,081

258
876
624
1,590
504
644
504
361
4,439
1,914
497
384
1,626
0
171
14,221

A12a
A12b
A12c
A12d
A12e
A12f
A12g
A12h
A12i
A12i
A12i
A12i

117
648
279
711
648
450
258
240
6,450
5,040
339
460
15,640

169
936
403
1,027
864
600
344
400
6,450
6,720
565
230
18,708

260
1,440
620
1,580
972
675
387
880
16,770
8,400
1,243
690
33,917

182
1,008
434
1,106
828
575
330
507
9,890
6,720
716
460
22,755

A2a
A2b
A2c1
A2c2
A2d1
A2d2
A2e1
A2e2
A2f1
A2f2
A2g
A2h
A2i

368
0
4,169
11,842
482
2,684
6,754
19,096
776
4,312
13,855
7,843
29,580
101,761

92
0
3,790
12,988
963
2,684
6,140
20,944
1,552
4,312
14,833
8,096
31,668
108,062

184
122
3,790
13,943
482
2,928
6,140
22,484
776
4,704
15,648
8,349
33,408
112,958

215
41
3,916
12,924
642
2,765
6,345
20,841
1,035
4,443
14,779
8,096
31,552
107,593

129,612

142,142

161,956

144,570

Renewal of New Facility Rule Information Collection Request

A.-16

Exhibit A.8
Hourly Burden for the ICR Approval Period Year by Year
for Directors and Federal Government
Director Activities

Director Permit Issuance Activities
Verification Study Review
Director Permit Reissuance Activities
Annual Director Activities
Yearly Total

Source
(Exhibit)
A3a
A3b
A13
A3c

Year 1
12/201411/2015
1,586
84
803
4,250
6,723

Year 2
12/201511/2016
1,502
21
870
4,550
6,943

Year 3
12/201611/2017
1,586
63
1,542
4,800
7,991

Annual
Average
1,558
56
1,072
4,533
7,219

Year 1
12/201411/2015
182
182

Year 2
12/201511/2016
167
167

Year 3
12/201611/2017
182
182

Annual
Average
177
177

Federal Activities
Source
(Exhibit)
Federal Permit Program Oversight Activities
A4a
Yearly Total

December 2015

Renewal of New Facility Rule Information Collection Request

A.-17

Exhibit A.9
Costs for the ICR Approval Period Year by Year for Facilities
Facility Activities
Source
(Exhibit)

Year 1
12/201411/2015

Year 2
12/201511/2016

Year 3
12/201611/2017

Annual
Average

NPDES Permit Application Activities
Start-up Activities
Permit Application Activities
Source Waterbody Flow Information
Use Existing Data- Source Water Baseline Biological Characterization
Data
CWIS Flow Reduction Requirements (Track 1)
CWIS Velocity Requirements (Track 1)
Design and Construction Technology Plan (Track 1)
Comprehensive Demonstration Study Plan (Track 2)
Freshwater Source Water Baseline Biological Characterization Study
(Track 2)
Estuary Source Water Baseline Biological Characterization Study
(Track 2)
Profile of Source Water Biota for Characterization Study (Track 2)
Submit Characterization Study (Track 2)
Freshwater Evaluation of Potential CWIS Effects (Track 2)
Estuary Evaluation of Potential CWIS Effects (Track 2)
Verification Monitoring Plan (Track 2)
NPDES Permit Application Activity Total
NPDES Repermitting Activities
Start-up Activities
Permit Application Activities
Source Waterbody Flow Information
Source Water Baseline Biological Characterization Data
CWIS Flow Reduction Requirements (Track 1)
CWIS Velocity Requirements (Track 1)
Design and Construction Technology Plan (Track 1)
Comprehensive Demonstration Study Plan (Track 2)
Freshwater Source Water Baseline Biological Characterization Study
(Track 2)
Estuary Source Water Baseline Biological Characterization Study
(Track 2)
Profile of Source Water Biota for Characterization Study (Track 2)
Submit Characterization Study (Track 2)
NPDES Repermitting Activity Total
Annual Activities
Freshwater Verification Study (Track 2)
Estuary Verification Study (Track 2)
Initial Biological Monitoring for Impingement (Freshwater)
Reduced Biological Monitoring for Impingement (Freshwater)
Initial Biological Monitoring for Impingement (Estuary)
Reduced Biological Monitoring for Impingement (Estuary)
Initial Biological Monitoring for Entrainment (Freshwater)
Reduced Biological Monitoring for Entrainment (Freshwater)
Initial Biological Monitoring for Entrainment (Estuary)
Reduced Biological Monitoring for Entrainment (Estuary)
Velocity Monitoring
Visual Inspection of Installed Technologies
Yearly Status Report Activities
Annual Activity Yearly Labor Total
Yearly Labor Total

December 2015

A1a
A1b
A1c

$18,266
$46,466
$28,512

$18,266
$46,466
$28,512

$18,266
$46,466
$28,512

$18,266
$46,466
$28,512

A1d
A1e
A1f
A1g
A1h

$96,977
$26,787
$38,532
$31,143
$17,446

$96,977
$21,430
$30,826
$24,914
$34,892

$96,977
$26,787
$38,532
$31,143
$17,446

$96,977
$25,001
$35,963
$29,066
$23,262

A1i

$269,446

$269,446

$269,446

$269,446

A1i
A1i
A1i
A1j
A1j
A1k

$0
$31,019
$25,662
$113,215
$0
$8,433
$751,903

$172,209
$62,037
$25,662
$113,215
$0
$16,865
$961,718

$172,209
$31,019
$25,662
$113,215
$0
$8,433
$924,112

$114,806
$41,358
$25,662
$113,215
$0
$11,243
$879,244

A12a
A12b
A12c
A12d
A12e
A12f
A12g
A12h

$8,758
$36,783
$12,549
$44,044
$32,144
$24,736
$14,786
$15,263

$12,650
$53,131
$18,126
$63,619
$42,859
$32,981
$19,714
$25,438

$19,462
$81,740
$27,886
$97,876
$48,217
$37,103
$22,179
$55,963

$13,623
$57,218
$19,520
$68,513
$41,073
$31,607
$18,893
$32,221

A12i

$384,669

$384,669

$1,000,138

$589,825

A12i
A12i
A12i

$298,709
$28,448
$30,967
$931,855

$398,279
$47,414
$15,483
$1,114,363

$497,849
$104,310
$46,450
$2,039,172

$398,279
$60,057
$30,967
$1,361,796

A2a
A2b
A2c1
A2c2
A2d1
A2d2
A2e1
A2e2
A2f1
A2f2
A2g
A2h
A2i

$29,520
$0
$272,823
$777,226
$31,520
$176,380
$448,427
$1,269,307
$50,903
$283,234
$648,329
$405,344
$2,172,838
$6,565,850

$7,380
$0
$248,021
$852,441
$63,040
$176,380
$407,661
$1,392,144
$101,806
$283,234
$694,093
$418,419
$2,326,215
$6,970,833

$14,760
$9,849
$248,021
$915,121
$31,520
$192,414
$407,661
$1,494,507
$50,903
$308,982
$732,230
$431,495
$2,454,029
$7,291,492

$17,220
$3,283
$256,288
$848,263
$42,027
$181,724
$421,250
$1,385,319
$67,871
$291,816
$691,551
$418,419
$2,317,694
$6,942,725

$8,249,608

$9,046,914 $10,254,776

$9,183,766

Renewal of New Facility Rule Information Collection Request

A.-18

Facility O&M

Source
(Exhibit)
NPDES Application
Purchase and Installation of Remote Monitoring Device
Purchase & Installation of Pilot Study Technology
Operation & Maintenance of Pilot Technology
Biological Study Laboratory Analysis (Freshwater)
Biological Study Laboratory Analysis (Estuary)
Pilot Study Entrainment Laboratory Analysis (Freshwater)
Pilot Study Entrainment Laboratory Analysis (Estuary)
Other Direct Costs
Repermitting
Biological Study Laboratory Analysis (Freshwater)
Biological Study Laboratory Analysis (Estuary)
Other Direct Costs

Year 1
12/201411/2015

Year 2
12/201511/2016

Year 3
12/201611/2017

Annual
Average

A.1k
A.1j
A.1j
A.1i
A.1i
A.1j
A.1j
A.1a-k

$310,000
$303,000
$34,500
$89,600
$0
$6,900
$0
$31,875

$248,000
$303,000
$34,500
$89,600
$58,267
$6,900
$0
$35,397

$310,000
$303,000
$34,500
$89,600
$58,267
$6,900
$0
$36,842

$289,333
$303,000
$34,500
$89,600
$38,844
$6,900
$0
$34,704

A.12i
A.12i
A.12a-i

$134,500
$104,900
$45,015

$134,500
$139,867
$59,485

$349,700
$174,833
$94,945

$206,233
$139,867
$66,482

A.2f
A.2f
A.2f
A.2a-f

$12,420
$657,000
$140,400
$177,583
$625,420
$34,500
$1,133,300
$254,473
$2,047,693

$13,570
$702,000
$152,100
$187,613
$564,570
$34,500
$1,283,233
$282,494
$2,164,798

$14,490
$747,000
$152,100
$197,253
$627,490
$34,500
$1,578,400
$329,039
$2,569,429

$13,493
$702,000
$148,200
$187,483
$605,827
$34,500
$1,331,644
$288,669
$2,260,640

Annual
Operation of Remote Sensing Device
Identify & Enumerate Entrained Freshwater Biota
Identify & Enumerate Entrained Estuary Biota
Other Direct Costs
Equipment Capital Cost Subtotal
Equipment O&M Cost Subtotal
Laboratory Analysis Subtotal
Other Direct Costs Subtotal
Yearly O&M Total

December 2015

Renewal of New Facility Rule Information Collection Request

A.-19

Exhibit A.10
Costs for the ICR Approval Period Year by Year
for Directors and Federal Government
Director Activities

Director Permit Issuance Activities
Verification Study Review
Director Permit Reissuance Activities
Annual Director Activities
Yearly Total

Source
(Exhibit)
A3a
A3b
A13
A3c

Year 1
12/201411/2015
$91,010
$3,852
$48,577
$197,982
$341,420

Year 2
12/201511/2016
$86,512
$963
$49,142
$211,957
$348,574

Year 3
12/201611/2017
$91,010
$2,889
$90,402
$223,603
$407,904

Annual
Average
$89,511
$2,568
$62,707
$211,181
$365,966

Year 1
12/201411/2015

Year 2
12/201511/2016

Year 3
12/201611/2017

Annual
Average

Director O&M
Source
(Exhibit)
Start-Up & NPDES Application
Other Direct Costs
Annual
Other Direct Costs
Yearly O&M Cost Total

A3a-b

$2,290

$1,780

$2,235

$2,102

A3c

$4,675
$6,965

$5,005
$6,785

$5,280
$7,515

$4,987
$7,088

Year 1
12/201411/2015
8,366
$8,366

Year 2
12/201511/2016
7,697
$7,697

Year 3
12/201611/2017
8,366
$8,366

Annual
Average
$8,143
$8,143

Year 1
12/201411/2015
$330
$330

Year 2
12/201511/2016
$275
$275

Year 3
12/201611/2017
$330
$330

Annual
Average
$312
$312

Federal Labor Activities
Source
(Exhibit)
Federal Permit Program Oversight Activities
A4b
Yearly Total

Federal O&M
Source
(Exhibit)
Federal Permit Program Oversight ODCs
A4a
Yearly Total

December 2015

Renewal of New Facility Rule Information Collection Request

A.-20

Exhibit A.11
Summary of the Burden, Respondents, Responses, and
Costs for the ICR Approval Period by Year and Annual Averages
Facilities
Source
(Exhibit)*

Year 1

Year 2

Year 3

12/201411/2015

12/201511/2016

12/201611/2017

Annual
Average

Three Year
Total

Burden (hours)

A7

129,612

142,142

161,956

144,570

433,709

Respondents (number)

A5

92

98

104

98

104

Responses (number)

A6

493

541

620

551

1,654

Costs (labor)

A9

$8,249,608

$9,046,914

$10,254,776

$9,183,766

$27,551,297

Costs (capital)

A9

$625,420

$564,570

$627,490

$605,827

$1,817,480

Costs (equipment O&M)

A9

$34,500

$34,500

$34,500

$34,500

$103,500

Costs (lab analysis)

A9

$1,133,300

$1,283,233

$1,578,400

$1,331,644

$3,994,933

Costs (other direct costs)
Total Costs
Non-labor Total

A9

$329,039
$288,669
$12,824,205 $11,444,405
$2,260,640

$866,006
$34,333,216

$254,473
$282,494
$10,297,300 $11,211,711

Directors
Source
(Exhibit)*

Year 1
12/201411/2015

Year 2
12/201511/2016

Year 3
12/201611/2017

Annual
Average

Three Year
Total

Burden (hours)

A8

6,723

6,943

7,991

7,219

21,657

Respondents (number)

A5

47

47

47

47

47

Responses (number)

A6

444

487

550

494

1,481

Costs(labor)

A10

$341,420

$348,574

$407,904

$365,966

$1,097,898

Costs (other direct costs)
Total Costs

A10

$6,965
$348,385

$6,785
$355,359

$7,515
$415,419

$7,088
$373,054

$21,265
$1,119,163

Federal Government
Source
(Exhibit)

Year 1
12/201411/2015
182

Year 2
12/201511/2016

Year 3
12/201611/2017

167

182

Annual
Average
177

Three Year
Total

Burden (hours)

A8

531

Costs(labor)

A10

$8,366

$7,697

$8,366

$8,143

$24,429

Costs (O&M)
Total Costs

A10

$330
$8,696

$275
$7,972

$330
$8,696

$312
$8,455

$935
$25,364

Annual
Average
151,789
145
$9,549,732
$2,267,728
$11,817,460

Three Year
Total
455,366
151
$28,649,195
$6,699,684
$35,452,380

Totals for Respondents (Facilities and Directors)*

Total Respondent Burden (hours)
Total Respondents (number)
Total Respondent Labor Costs
Total Respondent Capital and O&M Costs
Total Respondent Cost for All Activities
* Totals for annual averages may not match exactly due to rounding discrepancies

December 2015

Renewal of New Facility Rule Information Collection Request

A.-21

Exhibit A.12
Facility Cost and Burden Estimates for NPDES Permit Renewal Activities
Exhibit A.12a
Start-up Activities
Facilities (Respondents)

Activity
Read and Understand Rule
Mobilization/Planning
Training
Other Direct Costs
Totals

Exhibit A.12b
Permit Application Activities

Year 1 Year 2 Year 3 Total
A
9
13
20 42
9
13
20 42
9
13
20 42
9
13
20 42
9
13
20 42

Facility
Junior
CAD Contracted
Biological
Manager Technical Operator Manager Biologist Statistician Technician Clerical
Assumed Loaded Hourly Rate $
$110

$45

$42

4
1
1
0

4
2
1
0

0
0
0
0

$134
$69
Level of Effort (hrs)
0
0
0
0
0
0
0
0

$90

$48

$27

0
0
0
0

0
0
0
0

0
0
0
0

Facility
Junior
CAD Contracted
Biological
Manager Technical Operator Manager Biologist Statistician Technician Clerical
Facilities (Respondents)
Assumed Loaded Hourly Rate $

$110
$45
$42
$134
$69
$90
$48
$27
Year 1 Year 2 Year 3 Total
A
Level of Effort (hrs)
Activity
Detailed Source Water Body Characterization
9
13
20 42
1
5
12
0
0
0
0
0
9
13
20 42
0
1
1
0
0
0
0
0
Description of CWIS Configuration and Location
9
13
20 42
1
1
1
0
0
0
0
0
Facility Water Balance Diagram
9
13
20 42
12
30
0
0
0
0
0
0
Operational Characteristics Narrative
9
13
20 42
0
0
0
0
0
0
0
3
Submit Materials for Review by State
9
13
20 42
1
1
1
0
0
0
0
1
Recordkeeping
9
13
20 42
0
0
0
0
0
0
0
0
Other Direct Costs
9
13
20 42
Totals
Water balance diagram is assumed to be taken from the facility design report. The hours reported here are for incorporation of the diagram(s) in the permit.

Exhibit A.12c
Source Waterbody Flow Information
Facilities (Respondents)

Activity
Gather Information Characterizing Flow
Perform Engineering Calculations
Submit Data and Analysis for Review
Recordkeeping
Other Direct Costs
Totals

December 2015

Year 1 Year 2 Year 3 Total
A
9
13
20 42
9
13
20 42
9
13
20 42
9
13
20 42
9
13
20 42
9
13
20 42

Facility
Junior
CAD Contracted
Biological
Manager Technical Operator Manager Biologist Statistician Technician Clerical
Assumed Loaded Hourly Rate $
$110

$45

$42

0
2
0
0
0

10
10
0
2
0

0
0
0
0
0

$134
$69
Level of Effort (hrs)
0
0
0
0
0
0
0
0
0
0

$90

$48

$27

0
0
0
0
0

0
0
0
0
0

0
0
5
2
0

Totals Per Facility for the ICR Approval Period
Burden
(hrs)

Labor Cost

B

C
8
3
2
0
13

Capital Costs O&M Costs Total Costs**
D

$619
$200
$155
$0
$973

E
$0
$0
$0
$0
$0

C+D+E
$0
$0
$0
$55
$55

$1,028

Total Burden
(hrs.)
A*B
336
126
84
546

Total Initial Cost

A*(C+D+E)
$25,990
$8,383
$6,497
$2,310
$43,180

Totals Per Facility for the ICR Approval Period
Burden
(hrs)

Labor Cost

B

C
18
2
3
42
3
4
0
72

Capital Costs O&M Costs Total Costs**
D

$836
$87
$197
$2,665
$80
$223
$0
$4,087

E
$0
$0
$0
$0
$0
$0
$0
$0

$0
$0
$0
$0
$0
$0
$575
$575

C+D+E

$4,662

Total Burden
(hrs.)

Total Initial Cost

A*B

A*(C+D+E)

756
84
126
1,764
126
168
3,024

$35,108
$3,641
$8,253
$111,913
$3,364
$9,374
$24,150
$195,804

Totals Per Facility for the ICR Approval Period
Burden
(hrs)

Labor Cost

B

C
10
12
5
4
0
31

$449
$669
$134
$143
$0
$1,394

Renewal of New Facility Rule Information Collection Request

Capital Costs O&M Costs Total Costs**
D

E
$0
$0
$0
$0
$0
$0

$0
$0
$0
$0
$115
$115

C+D+E

$1,509

Total Burden
(hrs.)
A*B
420
504
210
168
1,302

Total Initial Cost
A*(C+D+E)
$18,858
$28,081
$5,607
$6,014
$4,830
$63,391

A.-22

Exhibit A.12d
Source Water Baseline Biological Characterization Data

Facility
Junior
CAD Contracted
Biological
Manager Technical Operator Manager Biologist Statistician Technician Clerical
Facilities (Respondents)
Assumed Loaded Hourly Rate $

Activity
Identify Available Data and Document Efforts
Compile and Analyze Existing Data
Submit Data for Review by State
Recordkeeping
Other Direct Costs
Totals

Year 1 Year 2 Year 3 Total
A
9
13
20 42
9
13
20 42
9
13
20 42
9
13
20 42
9
13
20 42
9
13
20 42

$110

$45

$42

12
10
0
1
0

24
18
0
1
0

0
6
0
0
0

$134
$69
Level of Effort (hrs)
0
0
0
0
0
0
0
0
0
0

$90

$48

$27

0
0
0
0
0

0
0
0
0
0

2
1
2
2
0

Totals Per Facility for the ICR Approval Period
Burden
(hrs)
B
38
35
2
4
0
79

Labor Cost
C
$2,449
$2,184
$53
$208
$0
$4,894

Capital Costs O&M Costs Total Costs**
D

E
$0
$0
$0
$0
$0
$0

$0
$0
$0
$0
$860
$860

C+D+E

$5,754

Total Burden
(hrs.)
A*B
1,596
1,470
84
168
3,318

Total Initial Cost
A*(C+D+E)
$102,841
$91,715
$2,243
$8,740
$36,120
$241,660

Exhibit A.12e
CWIS Flow Reduction Requirements (Track 1)

Facility
Junior
CAD Contracted
Biological
Manager Technical Operator Manager Biologist Statistician Technician Clerical
Facilities (Respondents)
Assumed Loaded Hourly Rate $

Activity
Develop Narrative
Perform Engineering Calculations
Document Minimization of Blow Down and Flows Not
Submit Data and Analysis forRecycled
Review
Recordkeeping
Other Direct Costs
Totals

Exhibit A.12f
CWIS Velocity Requirements (Track 1)

Activity
Develop Narrative
Perform Engineering Calculations
Submit Data and Analysis for Review
Revise Based on State review
Recordkeeping
Other Direct Costs
Totals

December 2015

Year 1 Year 2 Year 3 Total
A
6
8
9 23
6
8
9 23
6
8
9 23
6
8
9 23
6
8
9 23
6
8
9 23
6
8
9 23

$110

$45
8
4
0
0
2
0

$42
16
12
40
0
4
0

0
0
0
0
0
0

$134
$69
Level of Effort (hrs)
0
0
0
0
0
0
0
0
0
0
0
0

$90

$48

$27

B
0
0
0
0
0
0

0
0
0
0
0
0

0
0
6
8
8
0

Facility
Junior
CAD Contracted
Biological
Manager Technical Operator Manager Biologist Statistician Technician Clerical
Facilities (Respondents)
Assumed Loaded Hourly Rate $
Year 1 Year 2 Year 3 Total
A
6
8
9 23
6
8
9 23
6
8
9 23
6
8
9 23
6
8
9 23
6
8
9 23
6
8
9 23

$110

$45

$42

5
8
0
1
1
0

10
32
0
5
1
0

0
0
0
0
0
0

$134
$69
Level of Effort (hrs)
0
0
0
0
0
0
0
0
0
0
0
0

Totals Per Facility for the ICR Approval Period
Burden
(hrs)

$90

$48

$27

0
0
0
0
0
0

0
0
0
0
0
0

0
0
8
0
4
0

24
16
46
8
14
0
108

Labor Cost
C
$1,597
$978
$1,956
$214
$613
$0
$5,357

Capital Costs O&M Costs Total Costs**
D

E
$0
$0
$0
$0
$0
$0
$0

$0
$0
$0
$0
$0
$460
$460

C+D+E

$5,817

Total Burden
(hrs.)
A*B
552
368
1,058
184
322
2,484

Total Initial Cost
A*(C+D+E)
$36,726
$22,494
$44,993
$4,913
$14,094
$10,580
$133,800

Totals Per Facility for the ICR Approval Period
Burden
(hrs)

Labor Cost

B

C
15
40
8
6
6
0
75

$998
$2,315
$214
$334
$262
$0
$4,123

Renewal of New Facility Rule Information Collection Request

Capital Costs O&M Costs Total Costs**
D

E
$0
$0
$0
$0
$0
$0
$0

$0
$0
$0
$0
$0
$1,150
$1,150

C+D+E

$5,273

Total Burden
(hrs.)
A*B
345
920
184
138
138
1,725

Total Initial Cost
A*(C+D+E)
$22,954
$53,250
$4,913
$7,689
$6,015
$26,450
$121,270

A.-23

Exhibit A.12g
Design and Construction Technology Plan (Track 1)

Facility
Junior
CAD Contracted
Biological
Manager Technical Operator Manager Biologist Statistician Technician Clerical
Facilities (Respondents)
Assumed Loaded Hourly Rate $

Activity
Delineate Hydraulic Zone of Influence
Develop Narrative Description
Perform Engineering Calculations
Submit Data and Analysis for Review
Recordkeeping
Other Direct Costs
Totals

Year 1 Year 2 Year 3 Total
A
6
8
9 23
6
8
9 23
6
8
9 23
6
8
9 23
6
8
9 23
6
8
9 23
6
8
9 23

$110

$45

$42

1
5
3
0
1
0

2
10
12
0
1
0

2
0
0
0
0
0

$134
$69
Level of Effort (hrs)
0
0
0
0
0
0
0
0
0
0
0
0

$90

$48

$27

0
0
0
0
0
0

0
0
0
0
0
0

0
0
0
3
3
0

Totals Per Facility for the ICR Approval Period
Burden
(hrs)

Labor Cost

B

C
5
15
15
3
5
0
43

Capital Costs O&M Costs Total Costs**
D

$283
$998
$868
$80
$235
$0
$2,464

E
$0
$0
$0
$0
$0
$0
$0

C+D+E
$0
$0
$0
$0
$0
$55
$55

$2,519

Total Burden
(hrs.)

Total Initial Cost

A*B

A*(C+D+E)

115
345
345
69
115
989

$6,514
$22,954
$19,969
$1,842
$5,400
$1,265
$57,944

Exhibit A.12h
Comprehensive Demonstration Study Plan (Track 2)

Facility
Junior
CAD Contracted
Biological
Manager Technical Operator Manager Biologist Statistician Technician Clerical
Facilities (Respondents)
Assumed Loaded Hourly Rate $

Year 1 Year 2 Year 3 Total
A
Activity
Description of Historical Studies that will be Used
3
5
11 19
Description of Proposed and/or Implemented Technologies
3
5
11 19
3
5
11 19
Develop Baseline Biological Characterization Sampling Plan
3
5
11 19
Submit Data and Plans for Review
3
5
11 19
Revise Based on State Review
Recordkeeping
3
5
11 19
3
5
11 19
Other Direct Costs
3
5
11 19
Totals

$110

$45

$42

6

12

0

2
12
0
2
1
0

6
18
0
5
1
0

0
2
0
1
1
0

$134
$69
Level of Effort (hrs)
0
0
0
2
0
0
0
0

0
0
0
0
0
0

Totals Per Facility for the ICR Approval Period
Burden
(hrs)

Labor Cost

$90

$48

$27

0

0

1

19

C
$1,224

0
0
0
0
0
0

0
0
0
0
0
0

0
1
4
1
2
0

8
35
4
9
5
0
80

$489
$2,505
$107
$513
$250
$0
$5,088

B

Capital Costs O&M Costs Total Costs**
D

E

C+D+E

Total Burden
(hrs.)

Total Initial Cost

$0

$0

A*B
361

A*(C+D+E)
$23,262

$0
$0
$0
$0
$0
$0
$0

$0
$0
$0
$0
$0
$860
$860

152
665
76
171
95
1,520

$9,291
$47,593
$2,029
$9,739
$4,748
$16,340
$113,003

$5,948

Exhibit A.12i
Source Water Baseline Biological Characterization Study (Track 2)

Facility
Junior
CAD Contracted
Biological
Manager Technical Operator Manager Biologist Statistician Technician Clerical
Facilities (Respondents)
Assumed Loaded Hourly Rate $

Activity
Implement Freshwater Sampling
Other Direct Costs for Implement Freshwater Sampling
Implement Estuary Sampling
Other Direct Costs for Implement Estuary Sampling
Biological Study Laboratory Analysis (Freshwater)
Biological Study Laboratory Analysis (Estuary)
Profile of Source Water Biota
Identification of Critical Species
Description of Additional Stresses
Write Study based on Results and Submit for Review by
State
Recordkeeping
Finalize study based on State review
Freshwater Totals
Marine Totals

Year 1 Year 2 Year 3 Total
A
5
5
13 13
5
5
13 13
3
4
5 5
3
4
5 5
5
5
13 13
3
4
5 5
3
5
11 19
3
5
11 19
3
5
11 19
4
2
6 12
4
2
6 12
4
2
6 12
13
5

$110

$45

$42

2
0
3
0
0
0
10
10
5
24
2
5

16
0
30
0
0
0
6
6
3
48
4
10

0
0
0
0
0
0
0
0
0
0
0
0

$134
$69
Level of Effort (hrs)
36
1248
0
0
48
2457
0
0
0
0
0
0
10
18
6
12
5
9
5
2
2
0
0
0

$90

$48

$27

20
0
30
0
0
0
0
0
0
2
0
0

1248
0
2457
0
0
0
6
0
3
0
0
0

10
0
15
0
0
0
2
1
1
2
7
2

Totals Per Facility for the ICR Approval Period
Burden
(hrs)
B
2580
0
5040
0
0
0
52
35
26
83
15
17
2,808
5,268

Labor Cost
C
$153,867
$0
$298,709
$0
$0
$0
$4,300
$3,033
$2,150
$5,835
$855
$1,051
$171,092
$315,934

Total Burden and Costs for All NPDES Application Activities
Totals
* The ODC estimate was not estimated for each activity, but rather as a lump sum for each provision of the rule.

December 2015

Renewal of New Facility Rule Information Collection Request

Capital Costs O&M Costs Total Costs**
D

E
$0
0
$0
$3,600
$0
0
$0
$9,000
0 $53,800
0 $104,900
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$53,800
$3,600
$104,900
$9,000

C+D+E

Total Burden
(hrs.)
A*B
29,670
20,160

$228,492
$429,834

988
665
494
996
180
204
32,287
21,070

Total Burden
(hrs.)
68,265

Total Initial Cost
A*(C+D+E)
$1,769,475
$41,400
$1,194,836
$36,000
$618,700
$419,600
$81,692
$57,633
$40,846
$70,025
$10,259
$12,617
$2,632,008
$1,721,075

Total Initial Cost
$5,323,134

A.-24

Exhibit A.13
Director Burden and Cost Estimates for Permit Renewal

Exhibit A.13
Director Permit Reissuance Activities

Activity
Reviewing CWIS location and design data
Determine Compliance with Source Waterbody Flow Information
Review Source Water Baseline Biological Characterization Data
Review Design and Construction Technology Plan (Track 1)
Determine Compliance with CWIS Velocity Requirements (Track 1)
Determine Compliance with CWIS Flow Reduction Requirements (Track 1)
Review Comprehensive Demonstration Study Plan (Track 2)
Review Source Water Baseline Biological Characterization Study (Track 2)
Determine Monitoring Frequency
Determine Record keeping and Reporting Frequency
Considering Public Comments
Issuing Permit
Permit Record Keeping
Totals
Track 1 Totals
Track 2 Totals

December 2015

Senior
Junior
Technical Technical Clerical
Assumed Loaded Hourly Rate $
75
35
29
Level of Effort (hrs)
2
5
0
1
2
0
6
6
0
7
2
0
1
2
0
2
2
0
5
5
0
80
15
0
1
2
0
1
2
0
5
5
0
0
2
0
0
0
1
110
50
0

Burden
Per
Permit
B
7
2
12
10
2
5
10
95
2
2
10
2
1
160
55
143

Labor
Cost per
Permit
C
$322
$107
$656
$621
$107
$263
$525
$6,497
$107
$107
$525
$94
$50
$9,981
$2,960
$8,991

ODCs
lump
sum*

Total
Cost Per
Permit

D

C+D

$345
$345
$345

$10,326
$3,305
$9,336

Renewal of New Facility Rule Information Collection Request

A.-25


File Typeapplication/pdf
File TitleICR for 316b PhaseI_12-7-15.xlsx
AuthorJohn.Sunda
File Modified2015-12-18
File Created2015-12-07

© 2024 OMB.report | Privacy Policy