Table 1: Annual Respondent Burden and Cost – NSPS for Metal Furniture Coating (40 CFR Part 60, Subpart EE) (Renewal)














BURDEN ITEM Hours/
Occurrence
(A)
Occurences/Year
(b)
Hours/Year
(C=AxB)
(C)
Respondents/
Year b
(D)
Technical Person Hours
(E=CxD)
(E)
Managerial Person Hours
(Ex0.05)
Clerical Person Hours
(Ex0.10)
Total Costs/Year a
(F)

Managerial
(per hour)
Technical
(per hour)
Clerical
(per hour)
1. APPLICATIONS N/A







$129.93 $103.97 $51.79
2. SURVEY AND STUDIES N/A










3. REPORTING REQUIREMENTS





a. Familiarize with rule requirement 1 1 1 400 400 20 40 $46,258.20




b. Required Activities














Initial Performance Tests 60 1 60 0 0 0 0 $0.00






Repeat Performance Tests 60 0.2 12 0 0 0 0 $0.00




c. Gather Existing Information See 3b











d. Write Report














Notification of Construction/ Reconstruction 2 1 2 0 0 0 0 $0.00






Notification of Initial Performance Test 2 1 2 0 0 0 0 $0.00






Notification of Actual Startup 2 1 2 0 0 0 0 $0.00






Report of Performance Test See 3b













Semiannual Report c 8 2 16 400 6,400 320 640 $740,131.20






Excess Emissions Report d 16 2 32 80 2,560 128 256 $296,052.48



Subtotal for Reporting Requirements 10,764 $1,082,442



4. RECORDKEEPING REQUIREMENTS





a. Familiarize with rule requirement See 3b











b. Plan Activities See 3b











c. Implement Activities (Monthly Performance Test) e 1 12 12 400 4,800 240 480 $555,098.40




d. Develop Record System N/A













Records of Operating Parameter f 0.25 350 87.5 400 35,000 1,750 3,500 $4,047,592.50



Subtotal for Recordkeeping Requirements 45,770 $4,602,691



TOTAL LABOR BURDEN AND COST



56,500 $5,690,000



Total Capital/O&M Costs (rounded†) $840,000



Grand Total (Labor and Capital/O&M Costs) (rounded†) $6,530,000
59 hr/resp
















Assumptions:



a This ICR uses the following labor rates: $129.44 per hour for Executive, Administrative, and Managerial labor; $103.97 per hour for Technical labor, and $51.79 per hour for Clerical labor. These rates are from the United States Department of Labor, Bureau of Labor Statistics, June 2014, “Table 2. Civilian Workers, by Occupational and Industry group.” The rates are from “column 1, Total Compensation. “ The rates have been increased by 110% to account for the benefit packages available to those employed by private industry.



b We have assumed that there are approximately 400 respondents, with no additional new or reconstructed sources becoming subject to the rule over the next three years.



c We have assumed that each respondent will take eight hours twice per year to complete the semiannual report.



d We have assumed that 20 percent of respondent will each take 16 hours twice per year to complete the excess emissions reports.



DWang: Changed from: "We have assumed that each respondent will take one hour once per year to record monthly performance test." e We have assumed that each respondent will take one hour once per month to record monthly performance test.



f We have assumed that each respondent will take 0.25 hours per day over 350 days per year to keep record of operating parameters.



† Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.




Sheet 2: 0649ss12 - Table 2

Table 2: Average Annual EPA Burden and Cost – NSPS for Metal Furniture Coating (40 CFR Part 60, Subpart EE) (Renewal)











REPORTING/RECORDKEEPING REQUIREMENT EPA Hours/Occurrence
(a)
Occurences/
Plant/Year
(B)
EPA Hours/Year
(C=A*B)
(C)
Plants/Year
(D)
Technical Person Hours
(E=CxD)
(E)
Managerial Person Hours
(Ex0.05)
Clerical Person Hours
(Ex0.10)
Total Costs/Year a
(F)

Managerial
(per hour)
Technical
(per hour)
Clerical
(per hour)
INITIAL PERFORMANCE TESTS








$62.90 $46.67 $25.25
New Plant 24 1 24 0 0 0 0 $0.00



REPEAT PERFORMANCE TEST











New Plant 24 0.2 4.8 0 0 0 0 $0.00



REPORT REVIEW











New Plants











Notification of Construction 2 1 2 0 0 0 0 $0.00



Notification of Initial Startup 0.5 1 0.5 0 0 0 0 $0.00



Notification of Actual Startup 0.5 1 0.5 0 0 0 0 $0.00



Notification of Initial Test 0.5 1.2 0.6 0 0 0 0 $0.00



Review Test Results 8 1.2 9.6 0 0 0 0 $0.00



Existing Plants











Semiannual Reports 2 2 4 400 1600 80 160 $83,744.00



Excess Emissions Report c 2 2 4 80 320 16 32 $16,748.80



TOTAL ANNUAL BURDEN AND COST (rounded) d



2,210 $100,000
















Assumptions











a This cost is based on the following labor rates: Managerial rate of $62.90 (GS-13, Step 5, $39.31 + 60%), Technical rate of $46.67 (GS-12, Step 1, $29.17 + 60%), and Clerical rate of $25.25 (GS-6, Step 3, $15.78 + 60%). The rates have been increased by 60 percent to account for the benefit packages available to government employees. These rates are from the Office of Personnel Management (OPM), 2014 General Schedule, which excludes locality rates of pay.



b We have assumed that it will take two hours twice per year to review the semiannual report.











DWang: Changed from: "We have assumed that 20 percent of existing plants will each take two hours twice per year to review the excess emissions reports." c We have assumed that EPA will take two hours twice per year to review each excess emissions reports. We also assumed that 20 percent of existing plants will submit excess emissions reports.











d Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.


























































































Sheet 3: 0649ss12 - Capital_O&M

Capital/Startup vs. Operation and Maintenance (O&M) Costs
(A)
Continuous Monitoring Device
(B)
Capital/Startup Cost for One Respondent
(C)
Number of New Respondents
(D)
Total Capital/Startup Cost
(B x C)
(E)
Annual O&M Costs for One Respondent
(F)
Number of Respondents with O&M
(G)
Total O&M
(E x F)
Temperature 4,400 0 $0 $2,100 400 $840,000