Table 1
Table 2


Sheet 1: Table 1

Table 1: Annual Respondent Burden and Cost – NSPS for Secondary Lead Smelters (40 CFR Part 60, Subpart L) (Renewal)












103.97 129.93 51.79
Burden Item (A)
Person Hours per Occurrence
(B)
No. of Occurrences per Respondent
(C)
Person-hours per respondent
(C=AxB)
(D)
Respondents per year a
(E)
Technical person-hours per year
(E=CxD)
(F)
Management person-hours per year
(F= Ex0.05)
(G)
Clerical person-hours per year
(G= Ex0.1)
(H)
Costb, $
1. Applications N/A






2. Survey and studies N/A






3. Reporting Requirements







All Sources







a. Familiarize with Regulatory Requirements 1 1 1 25 25 1.25 2.5 $2,891.14
New Sources







b. Required activities







Initial performance tests 21 1 21 0 0 0 0 $0
Repeat of performance tests c 21 0.2 4.2 0 0 0 0 $0
Method 5 or 9 Testing 3 1.2 3.6 0 0 0 0 $0
c. Create information See 3b






d. Gather existing information See 3b






e. Write Report







Notification of construction/ reconstruction d 2 1 2 0 0 0 0 $0
Notification of initial performance test e 2 1 2 0 0 0 0 $0
Report of initial performance test See 3b






Subtotal Reporting Requirements
29 $2,891
4. Recordkeeping Requirements







a. Familiarize with Regulatory Requirements See 3a






b. Plan activities See 3b






c. Implement activities See 3b






d. Develop record system N/A






e. Time to enter information







Records of startup, shutdown, and malfunctions (SSM) f 1.3 1 1.3 25 32.5 1.625 3.25 $3,758.48
f. Audits N/A






Subtotal Recordkeeping Requirements



37 $3,758
TOTAL ANNUAL LABOR BURDEN AND COST (roundedg)



66 $6,650
Capital and O&M Cost






$0
Grand TOTAL






$6,650









Assumptions







a We have assumed that the average number of respondents that will be subject to the rule will be 25. There will be no additional new source that will become subject to the rule over the three-year period of this ICR.
b This ICR uses the following labor rates: $129.93 per hour for Executive, Administrative, and Managerial labor; $103.97 per hour for Technical labor, and $51.79 per hour for Clerical labor. These rates are from the United States Department of Labor, Bureau of Labor Statistics, June 2014 “Table 2. Civilian Workers, by Occupational and Industry Group.” The rates are from column 1, “Total compensation.” The rates have been increased by 110% to account for the benefit packages available to those employed by private industry.
c We have assumed that 20 percent of respondents will have to repeat initial performance tests.







d We have assumed that each respondent will take two hours once per year to write construction/reconstruction report.







e We have assumed that each respondent will take two hours once per year to write the initial performance test report.







f We have assumed that each respondent will be required to enter SSM information.







g Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.








Sheet 2: Table 2

Table 2: Average Annual EPA Burden and Cost – NSPS for Secondary Lead Smelters (40 CFR Part 60, Subpart L) (Renewal)












46.67 62.9 25.25
Burden Item (A)
EPA person-hours per activity
(B)
No. of occurences per plant per year
(C)
EPA person-hours per plant per year
(C=AxB)
(D)
Plants per yeara
(E)
Technical person-hours per year
(E=CxD)
(F)
Management person-hours per year
(F= Ex0.05)
(G)
Clerical person-hours per year
(G= Ex0.1)
(H)
Annual costs ($)b
Initial Performance Test







New Sources 21 1 21 0 0 0 0 $0
Repeat Performance Test







New Sources 21 0.2 4.2 0 0 0 0 $0
Report Review







New Sources







Notification of construction c 2 1 2 0 0 0 0 $0
Notification of initial startup d 0.4 1 0.4 0 0 0 0 $0
Notification of actual startup d 0.4 1 0.4 0 0 0 0 $0
Notification of initial test d 0.4 1 0.4 0 0 0 0 $0
Review Test results f 7 1 7 0 0 0 0 $0
TOTAL ANNUAL BURDEN and COST (roundedg)



0 $0









Assumptions







a We have assumed that the average number of respondents will be subject to the rule will be 25. There will be no additional new source that will become subject to the rule over the three years of this ICR.
b This cost is based on the following labor rates which incorporates a 1.6 benefits multiplication factor to account for government overhead expenses: Managerial rate of $62.90 (GS-13, Step 5, $39.31 x 1.6), Technical rate of $46.67 (GS-12, Step 1, $29.17 x 1.6), and Clerical rate of $25.25 (GS-6, Step 3, $15.78 x 1.6). These rates are from the Office of Personnel Management (OPM), “2014 General Schedule” which excludes locality rates of pay.
c We assumed that it will take two hours once per year to review construction report.







d We assume that it will take 0.4 hours once per year to review report.







e We assume that it will take seven hours once per year to review results.







g Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding