Download:
pdf |
pdf§ 131.80
18 CFR Ch. I (4–1–15 Edition)
§ 131.80 FERC Form No. 556, Certification of qualifying facility (QF)
status for a small power production
or cogeneration facility.
(a) Who must file. Any person seeking
to certify a facility as a qualifying facility pursuant to sections 3(17) or 3(18)
of the Federal Power Act, 16 U.S.C.
796(3)(17), (3)(18), unless otherwise exempted or granted a waiver by Commission rule or order pursuant to
§ 292.203(d), must complete and file the
Form of Certification of Qualifying Facility (QF) Status for a Small Power
Production or Cogeneration Facility,
FERC Form No. 556. Every Form of
Certification of Qualifying Status must
be submitted on the FERC Form No.
556 then in effect and must be prepared
in accordance with the instructions incorporated in that form.
(b) Availability of FERC Form No. 556.
The currently effective FERC Form
No. 556 shall be made available for
download from the Commission’s Web
site.
(c) How to file a FERC Form No. 556.
All applicants must file their FERC
Forms No. 556 electronically via the
Commission’s eFiling Web site.
[Order 732, 75 FR 15965, Mar. 30, 2010]
lpowell on DSK54DXVN1OFR with $$_JOB
PART 141—STATEMENTS AND
REPORTS (SCHEDULES)
Sec.
141.1 FERC Form No. 1, Annual report of
Major electric utilities, licensees and
others.
141.2 FERC Form No. 1–F, Annual report for
Nonmajor public utilities and licensees.
141.14 Form No. 80, Licensed Hydropower
Development Recreation Report.
141.15 Annual Conveyance Report.
141.51 FERC Form No. 714, Annual Electric
Balancing Authority Area and Planning
Area Report.
141.61 [Reserved]
141.100 Original cost statement of utility
property.
141.300 FERC Form No. 715, Annual Transmission Planning and Evaluation Report.
141.400 FERC Form No. 3–Q, Quarterly financial report of electric utilities, licensees, and natural gas companies.
141.500 Cash management programs.
§ 141.1 FERC Form No. 1, Annual report of Major electric utilities, licensees and others.
(a) Prescription. The Form of Annual
Report for Major electric utilities, licensees and others, designated herein
as FERC Form No. 1, is prescribed for
the reporting year 1981 and each year
thereafter.
(b) Filing requirements—(1) Who must
file—(i) Generally. Each Major and each
Nonoperating (formerly designated as
Major) electric utility (as defined in
part 101 of Subchapter C of this chapter) and each licensee as defined in section 3 of the Federal Power Act (16
U.S.C. 796), including any agency, authority or other legal entity or instrumentality engaged in generation,
transmission, distribution, or sale of
electric energy, however produced,
throughout the United States and its
possessions, having sales or transmission service equal to Major as defined above, must prepare and file electronically with the Commission the
FERC Form 1 pursuant to the General
Instructions as provided in that form.
(ii) Exceptions. This report form is
not prescribed for any agency, authority or instrumentality of the United
States, nor is it prescribed for municipalities as defined in section 3 of the
Federal Power Act; (i.e., a city, county,
irrigation district, drainage district, or
other political subdivision or agency of
a State competent under the laws
thereof to carry on the business of developing, transmitting, utilizing, or
distributing power).
(2) When to file and what to file. (i)
The annual report for the year ending
December 31, 2004, must be filed on
April 25, 2005.
(ii) The annual report for each year
thereafter must be filed on April 18.
(iii) This report must be filed with
the Federal Energy Regulatory Commission as prescribed in § 385.2011 of
this chapter and as indicated in the
General Instructions set out in this
form, and must be properly completed
and verified. Filing on electronic media
AUTHORITY: 15 U.S.C. 79; 15 U.S.C. 717–717z;
16 U.S.C. 791a–828c, 2601–2645; 31 U.S.C. 9701;
42 U.S.C. 7101–7352.
536
VerDate Sep<11>2014
16:47 May 07, 2015
Jkt 235061
PO 00000
Frm 00546
Fmt 8010
Sfmt 8010
Q:\18\18V1.TXT
31
File Type | application/pdf |
File Modified | 2015-06-23 |
File Created | 2015-06-23 |