Table 1: Annual Respondent Burden and Cost – NESHAP for Mercury Cell Chlor-Alkali Plants (40 CFR Part 63, Subpart IIIII) (Renewal) | ||||||||
103.97 | 129.93 | 51.79 | ||||||
Burden Item | (A) Technical person-hours per occurrence |
(B) No. of occurrences per respondent per year |
(C) Technical person-hours per respondent per year (C=AxB) |
(D) Respondents per year a |
(E) Technical hours per year (E=CxD) |
(F) Management hours per year (F=Ex0.05) |
(G) Clerical hours per year (G=Ex0.10) |
(H) Total cost per year ($) b |
1. Reporting requirements | ||||||||
a. Familiarize with regulatory requirements c | 32 | 1 | 32 | 2 | 64 | 3.2 | 6.4 | $7,401.31 |
b. Prepare startup/shutdown/ malfunction plan d | 32 | 1 | 32 | 0 | 0 | 0 | 0 | $0 |
c. Prepare washdown plan d | 16 | 1 | 16 | 0 | 0 | 0 | 0 | $0 |
d. Prepare site-specific monitoring plan d | 32 | 1 | 32 | 0 | 0 | 0 | 0 | $0 |
e. Record date/time of washdowns e | 0.1 | 365 | 36.5 | 2 | 73 | 3.65 | 7.3 | $8,442.12 |
f. Measure cell room mercury vapor level and record data e | 0.5 | 365 | 182.5 | 2 | 365 | 18.25 | 36.5 | $42,210.61 |
g. Monitor vent mercury concentration and record CMS data, daily averages, and deviations e | 0.5 | 365 | 182.5 | 2 | 365 | 18.25 | 36.5 | $42,210.61 |
h. Perform vent mercury concentration CMS inspections and calibration checks and record results | 8 | 2 | 16 | 2 | 32 | 1.6 | 3.2 | $3,700.66 |
i. Perform twice daily inspections (for vessels and process equipment problems, hydrogen and/or mercury vapor leaks at decomposers and hydrogen piping up to the hydrogen header) and record information f | 0.75 | 730 | 547.5 | 2 | 1,095 | 54.75 | 109.5 | $126,631.82 |
j. Inspect cell room floors for cracks, spalling, or other deficiencies and record information g | 2 | 12 | 24 | 2 | 48 | 2.4 | 4.8 | $5,550.98 |
k. Inspect pillars and beams for cracks, spalling, and other deficiencies and record information | 8 | 2 | 16 | 2 | 32 | 1.6 | 3.2 | $3,700.66 |
l. Perform daily cell room inspections (for caustic leaks in caustic system equipment and piping, liquid mercury spills or accumulations on floors and surfaces, for liquid mercury leaks from vessels, piping, and equipment in liquid mercury service) and record information e | 1.25 | 365 | 456.25 | 2 | 912.5 | 45.63 | 91.25 | $105,526.52 |
m. Inspect equipment and piping in the hydrogen system from the header to the last control device for hydrogen and/or mercury vapor leaks and record information on these leaks | 4 | 4 | 16 | 2 | 32 | 1.6 | 3.2 | $3,700.66 |
n. Record information on handling and storage of mercury-containing waste e | 0.25 | 365 | 91.25 | 2 | 182.5 | 9.13 | 18.25 | $21,105.30 |
o. Record the mass of virgin mercury added to cells i | 0.25 | 2 | 0.5 | 2 | 1 | 0.05 | 0.1 | $115.65 |
Subtotal for Reporting Requirements | 3,682 | $370,297 | ||||||
2. Recordkeeping requirements | ||||||||
a. Familiarize with regulatory requirements c | See 1A | |||||||
b. Initial notifications d | 6 | 1 | 6 | 0 | 0 | 0 | 0 | $0 |
c. Notification of intent to conduct a performance test d | 3 | 1 | 3 | 0 | 0 | 0 | 0 | $0 |
d. Notification of compliance status d | 16 | 1 | 16 | 0 | 0 | 0 | 0 | $0 |
e. Startup, shutdown, and malfunction | 16 | 0 | 0 | 0 | 0 | 0 | 0 | $0 |
f. Semiannual compliance reports i | 16 | 2 | 32 | 2 | 64 | 3.2 | 6.4 | $7,401.31 |
Subtotal for Recordkeeping Requirements | 74 | $7,401 | ||||||
TOTAL ANNUAL BURDEN AND COST (rounded) j | 3,760 | $378,000 | ||||||
TOTAL CAPITAL AND O&M COSTS (rounded) j | $16,400 | |||||||
GRAND TOTAL (rounded) j | $394,000 | |||||||
Assumptions: | ||||||||
a We have assumed that there are approximately 2 respondents subject to the rule, with no new sources expected over the next three-years of this ICR. | ||||||||
b This ICR uses the following labor rates: Technical $103.97 ($49.51 + 110%); Managerial $129.93 ($61.87 + 110%); and Clerical $51.79 ($24.66 + 110%). These rates are from the United States Department of Labor, Bureau of Labor Statistics, June 2014, “Table 2. Civilian Workers, by occupational and industry group.” The rates are from column 1, “Total compensation.” The rates have been increased by 110 percent to account for the benefit packages available to those employed by private industry. This ICR assumes that Managerial hours are 5 percent of Technical hours, and Clerical hours are 10 percent of Technical hours. | ||||||||
c We assume all respondents will have to familiarize themselves with regulatory requirements each year. | ||||||||
d We assume that this is a one-time only activity for new facilities. | ||||||||
e We have assume that information should be recorded 365 days per year. | ||||||||
f We have assumed that inspection should be performed two times per day for a total of 730 times per year. | ||||||||
g We have assumed that inspection should be done and recorded once per month. | ||||||||
h We have assumed that it will take 0.25 hours two times per year to record information. | ||||||||
i We have assumed that it will take each respondent 16 hours to two times per year to complete semiannual compliance reports. | ||||||||
j Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding. |
Table 2: Average Annual EPA Burden and Cost – NESHAP for Mercury Cell Chlor-Alkali Plants (40 CFR Part 63, Subpart IIIII) (Renewal) | ||||||||
46.67 | 62.9 | 25.25 | ||||||
Burden Item | (A) Technical person-hours per occurrence |
(B) No. of occurrences per respondent per year |
(C) Technical person-hours per respondent per year (C=AxB) |
(D) Respondents per year a |
(E) Technical hours per year (E=CxD) |
(F) Management hours per year (F=Ex0.05) |
(G) Clerical hours per year (G=Ex0.10) |
(H) Total cost per year ($) b |
a. Review Initial Notification | 4 | 1 | 4 | 0 | 0 | 0 | 0 | $0 |
b. Review Notification of intent to conduct a performance test | 4 | 3 | 12 | 0 | 0 | 0 | 0 | $0 |
c. Observe performance tests | 16 | 3 | 48 | 0 | 0 | 0 | 0 | $0 |
d. Review Notification of Compliance Status (including site-specific monitoring plans and operation & maintenance plans) c | 32 | 1 | 32 | 0 | 0 | 0 | 0 | $0 |
e. Review performance test reports c | 8 | 1 | 8 | 0 | 0 | 0 | 0 | $0 |
f. Review semiannual compliance reports d | 12 | 2 | 24 | 2 | 48 | 2.4 | 4.8 | $2,512.32 |
TOTAL ANNUAL BURDEN AND COST (rounded) e | 55 | $2,510 | ||||||
Assumptions: | ||||||||
a We have assumed that there are approximately 2 respondents subject to the rule, with no new sources expected over the next three-years of this ICR. Facilities subject to the NESHAP rules are located in 13 States. | ||||||||
b This cost is based on the average hourly labor rate as follows: Technical $46.67 (GS-12, Step 1, $29.17 + 60%); Managerial $62.90 (GS-13, Step 5, $39.31 + 60%); and Clerical $25.25 (GS-6, Step 3, $15.78 + 60%). This ICR assumes that Managerial hours are 5 percent of Technical hours, and Clerical hours are 10 percent of Technical hours. These rates are from the OPM, 2014 General Schedule, which excludes locality rates of pay. The rates have been increased by 60 percent to account for the benefit packages available to government employees. | ||||||||
c We assume that this is a one-time only cost. | ||||||||
d We assume that it will take 12 hours two times per year to review the semiannual compliance reports. | ||||||||
e Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding. |