Federal Register / Vol. 81, No. 92 / Thursday, May 12, 2016 / Notices
Cogeneration Co., Fountain Valley
Power, LLC.
Description: Amendment to March 17,
2016 Notice of Change in Status of the
Southwest Generation Operating
Company, LLC public utility
subsidiaries, et al.
Filed Date: 5/4/16.
Accession Number: 20160504–5219.
Comments Due: 5 p.m. ET 5/25/16.
Docket Numbers: ER12–1587–002.
Applicants: Northeastern Power
Company.
Description: Compliance filing:
Informational Filing Regarding Planned
Transfer to be effective N/A.
Filed Date: 5/5/16.
Accession Number: 20160505–5216.
Comments Due: 5 p.m. ET 5/26/16.
Docket Numbers: ER14–1218–001.
Applicants: Armstrong Power, LLC.
Description: Compliance filing:
Informational Filing Regarding Planned
Transfer to be effective N/A.
Filed Date: 5/5/16.
Accession Number: 20160505–5217.
Comments Due: 5 p.m. ET 5/26/16.
Docket Numbers: ER16–1051–000;
ER16–1051–001.
Applicants: Graphic Packaging
International Inc.
Description: Supplement to March 1,
2016 and April 28, 2016 Graphic
Packaging International Inc. tariff filing.
Filed Date: 5/5/16.
Accession Number: 20160505–5278.
Comments Due: 5 p.m. ET 5/26/16.
Docket Numbers: ER16–1454–001.
Applicants: Southern California
Edison Company.
Description: Tariff Amendment:
Resubmit Amended DSA w/SCE’s
Power Production Department to be
effective 1/1/2016.
Filed Date: 5/5/16.
Accession Number: 20160505–5162.
Comments Due: 5 p.m. ET 5/26/16.
Docket Numbers: ER16–1628–000.
Applicants: Monongahela Power
Company, Trans-Allegheny Interstate
Line Company, The Potomac Edison
Company, American Transmission
Systems, Incorporation, PJM
Interconnection, L.L.C.
Description: § 205(d) Rate Filing:
ATSI et al submits Service Agreement
Nos. 4090, 4441, 4442, 4443 to be
effective 7/4/2016.
Filed Date: 5/5/16.
Accession Number: 20160505–5205.
Comments Due: 5 p.m. ET 5/26/16.
Docket Numbers: ER16–1629–000.
Applicants: Arizona Public Service
Company.
Description: § 205(d) Rate Filing:
Service Agreement No. 209—Four
Corners Acquisition to be effective
7/6/2016.

VerDate Sep<11>2014

17:02 May 11, 2016

Jkt 238001

Filed Date: 5/5/16.
Accession Number: 20160505–5225.
Comments Due: 5 p.m. ET 5/26/16.
Docket Numbers: ER16–1630–000.
Applicants: Arizona Public Service
Company.
Description: § 205(d) Rate Filing: Rate
Schedule Nos. 44, 98, 211—Four
Corners Acquisition to be effective
7/6/2016.
Filed Date: 5/5/16.
Accession Number: 20160505–5226.
Comments Due: 5 p.m. ET 5/26/16.
Docket Numbers: ER16–1631–000.
Applicants: Armstrong Power, LLC,
Calumet Energy Team, LLC,
Northeastern Power Company, Pleasants
Energy, LLC, Troy Energy, LLC.
Description: Joint Request for Waiver
of Armstrong Power, LLC, et. al.
Filed Date: 5/4/16.
Accession Number: 20160504–5223.
Comments Due: 5 p.m. ET 5/25/16.
Docket Numbers: ER16–1632–000.
Applicants: Calumet Energy Team,
LLC.
Description: Compliance filing:
Informational Filing Regarding Planned
Transfer to be effective N/A.
Filed Date: 5/6/16.
Accession Number: 20160506–5091.
Comments Due: 5 p.m. ET 5/27/16.
Docket Numbers: ER16–1633–000.
Applicants: Pleasants Energy, LLC.
Description: Compliance filing:
Informational Filing Regarding Planned
Transfer to be effective N/A.
Filed Date: 5/6/16.
Accession Number: 20160506–5093.
Comments Due: 5 p.m. ET 5/27/16.
Docket Numbers: ER16–1634–000.
Applicants: Troy Energy, LLC.
Description: Compliance filing:
Informational Filing Regarding Planned
Transfer to be effective N/A.
Filed Date: 5/6/16.
Accession Number: 20160506–5094.
Comments Due: 5 p.m. ET 5/27/16.
Docket Numbers: ER16–1635–000.
Applicants: Arizona Public Service
Company.
Description: § 205(d) Rate Filing: Rate
Schedule No. 281 to be effective
7/6/2016.
Filed Date: 5/6/16.
Accession Number: 20160506–5101.
Comments Due: 5 p.m. ET 5/27/16.
Docket Numbers: ER16–1636–000.
Applicants: Southern California
Edison Company.
Description: § 205(d) Rate Filing:
Ekdorado-Moenkopi 500kV
Transmission Line IA with APS to be
effective 7/7/2016.
Filed Date: 5/6/16.
Accession Number: 20160506–5124.
Comments Due: 5 p.m. ET 5/27/16.

PO 00000

Frm 00040

Fmt 4703

Sfmt 4703

29561

Docket Numbers: ER16–1637–000.
Applicants: UIL Distributed
Resources, LLC.
Description: Baseline eTariff Filing:
Application for MBR Authority &
Request for Related Waivers & Blanket
Approval to be effective 5/7/2016.
Filed Date: 5/6/16.
Accession Number: 20160506–5174.
Comments Due: 5 p.m. ET 5/27/16.
Docket Numbers: ER16–1638–000.
Applicants: 4C Acquisition, LLC.
Description: Baseline eTariff Filing:
Baseline FERC Electric Tariff to be
effective 7/6/2016.
Filed Date: 5/6/16.
Accession Number: 20160506–5181.
Comments Due: 5 p.m. ET 5/27/16.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: http://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: May 6, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–11190 Filed 5–11–16; 8:45 am]
BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. IC16–6–000]

Commission Information Collection
Activities (FERC–725J); Comment
Request
Federal Energy Regulatory
Commission, Department of Energy.
ACTION: Comment request.
AGENCY:

In compliance with the
requirements of the Paperwork
Reduction Act of 1995, 44 U.S.C.
3507(a)(1)(D), the Federal Energy
Regulatory Commission (Commission or
FERC) is submitting its information
collection FERC–725J (Definition of the

SUMMARY:

E:\FR\FM\12MYN1.SGM

12MYN1

29562

Federal Register / Vol. 81, No. 92 / Thursday, May 12, 2016 / Notices

Bulk Electric System) to the Office of
Management and Budget (OMB) for
review of the information collection
requirements. Any interested person
may file comments directly with OMB
and should address a copy of those
comments to the Commission as
explained below. The Commission
previously issued a Notice in the
Federal Register (81 FR 9179, 2/24/
2016) requesting public comments. The
Commission received no comments on
the FERC–725J and is making this
notation in its submittal to OMB.
NOTE: Commission staff has revised
the burden table, added an information
collection requirement, and revised the
burden estimate.
Comments on the collection of
information are due by June 13, 2016.

DATES:

Comments filed with OMB,
identified by the OMB Control No.
1902–0259, should be sent via email to
the Office of Information and Regulatory
Affairs: [email protected].
Attention: Federal Energy Regulatory
Commission Desk Officer. The Desk
Officer may also be reached via
telephone at 202–395–0710.
A copy of the comments should also
be sent to the Commission, in Docket
No. IC16–6–000, by either of the
following methods:

ADDRESSES:

• eFiling at Commission’s Web site:
http://www.ferc.gov/docs-filing/
efiling.asp.
• Mail/Hand Delivery/Courier:
Federal Energy Regulatory Commission,
Secretary of the Commission, 888 First
Street NE., Washington, DC 20426.
Instructions: All submissions must be
formatted and filed in accordance with
submission guidelines at: http://
www.ferc.gov/help/submissionguide.asp. For user assistance contact
FERC Online Support by email at
[email protected], or by phone
at: (866) 208–3676 (toll-free), or (202)
502–8659 for TTY.
Docket: Users interested in receiving
automatic notification of activity in this
docket or in viewing/downloading
comments and issuances in this docket
may do so at http://www.ferc.gov/docsfiling/docs-filing.asp.
FOR FURTHER INFORMATION CONTACT:
Ellen Brown may be reached by email
at [email protected], by
telephone at (202) 502–8663, and by fax
at (202) 273–0873.
SUPPLEMENTARY INFORMATION:
Title: FERC–725J, Definition of the
Bulk Electric System.
OMB Control No.: 1902–0259.
Type of Request: Three-year extension
of the FERC–725J information collection

requirements with no changes to the
reporting requirements.
Abstract: On December 20, 2012, the
Commission issued Order No. 773, a
Final Rule approving NERC’s
modifications to the definition of ‘‘bulk
electric system’’ and the Rules of
Procedure exception process to be
effective July 1, 2013. On April 18,
2013, in Order No. 773–A, the
Commission largely affirmed its
findings in Order No. 773. In Order Nos.
773 and 773–A, the Commission
directed NERC to modify the definition
of bulk electric system in two respects:
(1) Modify the local network exclusion
(exclusion E3) to remove the 100 kV
minimum operating voltage to allow
systems that include one or more looped
configurations connected below 100 kV
to be eligible for the local network
exclusion; and (2) modify the exclusions
to ensure that generator interconnection
facilities at or above 100 kV connected
to bulk electric system generators
identified in inclusion I2 are not
excluded from the bulk electric system.
Type of Respondents: Generator
owners, distribution providers, other
NERC-registered entities.
Estimate of Annual Burden: 1 The
Commission estimates the annual public
reporting burden 2 for the information
collection as:

FERC–725J
[Definition of the bulk electric system]

Number of
respondents

Annual
number of
responses
per
respondent

Total number
of responses

Average burden
and cost per
response

Total annual
burden hours
and total
annual cost

Cost per
respondent
($)

(1)

(2)

(1) * (2) = (3)

(4)

(3) * (4) = (5)

(5) ÷ (1)

20

1

20

94 hrs.; $4,978 3

1,880 hrs.;
$99,560.

$4,978

186

1

186

1

8

65,100 hrs.;
$4,060,938.
736 hrs.; $56,688

21,833

8

350 hrs.;
$21,833 4.
92 hrs.; 7,086 5 ..

........................

........................

214

............................

67,716 hrs.;
$4,217,186.

Generator Owners, Distribution Providers, and Transmission Owners
(Exception Request).
All Registered Entities (Implementation Plans and Compliance).
Local Distribution Determinations ...

asabaliauskas on DSK3SPTVN1PROD with NOTICES

Total .........................................

1 The Commission defines burden as the total
time, effort, or financial resources expended by
persons to generate, maintain, retain, or disclose or
provide information to or for a Federal agency. For
further explanation of what is included in the
information collection burden, reference 5 Code of
Federal Regulations 1320.3.
2 The FERC–725J information collection no longer
includes reporting burden for ‘‘System Review and
List Creation’’ and ‘‘Regional and ERO Handling of
Exception Requests’’. These two response categories
were part of the reporting burden in Years 1 and
2 of the FERC–725J implementation and have been
completed.

VerDate Sep<11>2014

17:02 May 11, 2016

Jkt 238001

3 The hourly cost figure (wages plus benefits)
comes from the Bureau of Labor Statistics (http://
www.bls.gov/oes/current/naics2_22.htm). The
figure is for an electric engineer ($62.38,
Occupational Code: 17–2071), file clerk ($30.53,
Occupational Code: 43–4071), and a lawyer (129.12,
Occupational Code: 23–0000); the calculation is as
follows: 60 hours of burden * $62.38 = $3,743; 32
hours * $30.53 = $977; 2 hours * $129.12 = $258.
$3,743 + $977 + $258 = $4,978.
4 The hourly cost figure of $62.38 (wages plus
benefits) comes from the Bureau of Labor Statistics
(http://www.bls.gov/oes/current/naics2_22.htm).

PO 00000

Frm 00041

Fmt 4703

Sfmt 4703

7,086
........................

The figure is for an electric engineer (Occupational
Code: 17–2071).
5 The hourly cost figure (wages plus benefits)
comes from the Bureau of Labor Statistics (http://
www.bls.gov/oes/current/naics2_22.htm). The
figure is a weighted average comprised of hourly
figures for an electric engineer ($62.38,
Occupational Code: 17–2071), file clerk ($30.53,
Occupational Code: 43–4071), and a lawyer (129.12,
Occupational Code: 23–0000); the calculation is as
follows: 60 hours of burden * $62.38 = $3,743; 8
hours * $30.53 = $244; 24 hours * $129.12 = $3,099.
$3,743 + $244 + $3,099 = $7,086.

E:\FR\FM\12MYN1.SGM

12MYN1

Federal Register / Vol. 81, No. 92 / Thursday, May 12, 2016 / Notices
Comments: Comments are invited on:
(1) Whether the collection of
information is necessary for the proper
performance of the functions of the
Commission, including whether the
information will have practical utility;
(2) the accuracy of the agency’s estimate
of the burden and cost of the collection
of information, including the validity of
the methodology and assumptions used;
(3) ways to enhance the quality, utility
and clarity of the information collection;
and (4) ways to minimize the burden of
the collection of information on those
who are to respond, including the use
of automated collection techniques or
other forms of information technology.
Dated: May 5, 2016.
Kimberly D. Bose,
Secretary.
[FR Doc. 2016–11228 Filed 5–11–16; 8:45 am]
BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14772–000]

asabaliauskas on DSK3SPTVN1PROD with NOTICES

Black Mountain Hydro, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On March 24, 2016, Black Mountain
Hydro, LLC, filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act (FPA),
proposing to study the feasibility of the
Southern Intertie Pumped Storage
Project (Southern Intertie Project or
project) to be located on Black
Mountain, near Yerington, in Mineral
and Lyon Counties, Nevada. The sole
purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The proposed closed-loop pumped
storage project would consist of the
following: (1) An upper reservoir in a
natural depression having a total storage
capacity of 4,460 acre-feet at a normal
maximum operating elevation of 7,410
feet mean sea level (msl); (2) a 105-foottall, 1,500-foot-long lower dam of
indeterminate construction; (3) a lower
reservoir having a total storage capacity
of 4,384 acre-feet at a normal maximum
operating elevation of 5,500 feet msl; (4)
a 2,200-foot-long, 16.5-foot-diameter,

VerDate Sep<11>2014

17:02 May 11, 2016

Jkt 238001

concrete low pressure tunnel; (5) a
7,850-foot-long 16.5-foot-diameter
concrete and steel lined high pressure
tunnel; (6) a 2,200-foot-long, 20-footdiameter concrete lined tailrace; (7) a
300-foot-long, 80-foot-wide, 50-feet-high
underground powerhouse containing
three 200–MW pump-turbine generator
units; (8) a 4.6-mile-long 230-kV
transmission line; (9) a 230/500 kV
substation; and (10) appurtenant
facilities. The estimated annual
generation of the Southern Intertie
Project would be 1,577 gigawatt-hours.
Applicant Contact: Mr. Mathew
Schapiro, Chief Executive Officer,
Gridflex Energy, LLC, 1210 W. Franklin
St., Ste. 2, Boise, Idaho 83702; phone:
(208) 246–9925.
FERC Contact: Joseph Hassell; phone:
(202) 502–8079.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at http://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at http://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
[email protected], (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–14772–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at http://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–14772) in
the docket number field to access the
document. For assistance, contact FERC
Online Support.
Dated: May 6, 2016.
Kimberly D. Bose,
Secretary.

EQUAL EMPLOYMENT OPPORTUNITY
COMMISSION
Sunshine Act Meeting Notice
Equal Employment
Opportunity Commission.

AGENCY:

Wednesday, May 18,
2016, 1:00 p.m. Eastern Time.

DATE AND TIME:

Jacqueline A. Berrien
Conference Room on the First Floor of
the EEOC Office Building, 131 ‘‘M’’
Street NE., Washington, DC 20507.

PLACE:

STATUS:

The meeting will be open to the

public.
MATTERS TO BE CONSIDERED:

Open Session
1. Announcement of Notation Votes,
and
2. Innovation Opportunity: Examining
Strategies to Promote Diverse and
Inclusive Workplaces in the Tech
Industry.
Note: In accordance with the
Sunshine Act, the meeting will be open
to public observation of the
Commission’s deliberations and voting.
Seating is limited and it is suggested
that visitors arrive 30 minutes before the
meeting in order to be processed
through security and escorted to the
meeting room. (In addition to
publishing notices on EEOC
Commission meetings in the Federal
Register, the Commission also provides
information about Commission meetings
on its Web site, www.eeoc.gov, and
provides a recorded announcement a
week in advance on future Commission
sessions.)
Please telephone (202) 663–7100
(voice) and (202) 663–4074 (TTY) at any
time for information on these meetings.
The EEOC provides sign language
interpretation and Communication
Access Realtime Translation (CART)
services at Commission meetings for the
hearing impaired. Requests for other
reasonable accommodations may be
made by using the voice and TTY
numbers listed above.
CONTACT PERSON FOR MORE INFORMATION:

Bernadette B. Wilson, Acting Executive
Officer on (202) 663–4077.
Dated: May 10, 2016.
Bernadette B. Wilson,
Acting Executive Officer, Executive
Secretariat.
[FR Doc. 2016–11344 Filed 5–10–16; 4:15 pm]

[FR Doc. 2016–11227 Filed 5–11–16; 8:45 am]

BILLING CODE 6570–01–P

BILLING CODE 6717–01–P

PO 00000

Frm 00042

Fmt 4703

29563

Sfmt 9990

E:\FR\FM\12MYN1.SGM

12MYN1


File Typeapplication/pdf
File Modified2016-05-12
File Created2016-05-12

© 2024 OMB.report | Privacy Policy