FCC Form 601, Sche Schedule for Waiver Request for Extension of Time for Wi

FCC Application for Radio Service Authorization Wireless Telecommunications Bureau; Public Safety and Homeland Security Bureau

0798_FCC601_ScheduleL_052313

FCC Application for Radio Service Authorization: WTB and PSHSB

OMB: 3060-0798

Document [doc]
Download: doc | pdf

FCC 601 FEDERAL COMMUNICATIONS COMMISSION Approved by OMB

Schedule L 3060 - 0798

See 601 Main Form Instructions

Information and Instructions for public burden estimate


Schedule for Waiver Request for Extension of Time

for Wireless Services


Form FCC 601, Schedule L, is a supplementary schedule for use with the FCC Application for Radio Service Authorization: Wireless Telecommunications Bureau and/or Public Safety and Homeland Security Bureau, FCC 601 Main Form. Complete this schedule to request a waiver of FCC rules for additional time to satisfy buildout/coverage or construction requirements. The FCC 601 Main Form must be filed in conjunction with this schedule.


Note: Requests for a waiver fee must accompany waiver of FCC rules for additional time to construct and place a station in operation (if applicable).


Item 1 - Purpose


Enter the one‑letter abbreviation that indicates the purpose for which the application is being filed (1, 2, 3, 4, T or S).


Note: Only one Extension of Time Request purpose code may be selected per FCC 601 Main Form/Schedule L filing.


Note: Cellular Radiotelephone Services (CL) should use the Construction Requirements portion of this schedule.


Buildout/Coverage Requirements (Market-based services and State License Radio Service (SL) only)


Purpose code 1, 2, 3, 4 or T- Choose one of these codes if this is a request for an extension of time to complete buildout/coverage requirements. Typically, buildout/coverage requirements apply when a specific portion of a geographic area and a specific portion of the population contained within that geographic area must be provided service by a specific date. Not all radio services use all buildout/coverage requirements. Refer to the Commission’s Rules for more information on buildout/coverage requirements and how they may apply to your service.


Enter one of the following Extension Request Purpose Codes in Item 1:


Enter ‘1' if an extension is being requested for 1st buildout/coverage requirements.


Enter ‘2' if an extension is being requested for 2nd buildout/coverage requirements.


Enter ‘3' if an extension is being requested for 3rd buildout/coverage requirements.


Enter ‘4' if an extension is being requested for 4th buildout/coverage requirements.


Enter ‘T’ if an extension is being requested for the tribal lands buildout/coverage requirements. A ‘T’ in this field indicates that the extension request is for all tribal lands in the market for which a bidding credit was awarded.



Construction Requirements (Site-licensed services only)


Note: Do not use FCC 601 Schedule L to request an extended implementation period for Private Land Mobile Radio Services. To modify a license for an extended implementation period file FCC 601 Main Form with the purpose of MD - Modification and, enter ‘Y’ for Item 8 of FCC 601 Schedule H, and attach supporting documentation.


Purpose code ‘S’- Choose this purpose code if this is a request for an extension of time to complete construction requirements. Typically, construction requirements apply when specific authorized components of a license must be constructed and service commenced by a specific date. Refer to the Commission’s Rules for more information on construction requirements and how they may apply to your service.


Enter ‘S’ in Item 1 to request an extension to meet construction requirements for a site-licensed service. An extension of time may be requested for the entire license or specific portions of the license.

Item 2 - Buildout/Coverage/Construction Requirements


Enter the new buildout/coverage/construction expiration date you are requesting in Item 2. You must also attach an exhibit describing the circumstances and justification for the waiver request.


Item 3 - Call Signs/Locations or Paths/Frequencies


IMPORTANT INFORMATION REGARDING LOCATION AND PATH NUMBERS: To identify existing locations or paths, you must use the location or path numbers assigned by the Universal Licensing System (ULS). These numbers may not be identical to the location or path numbers on your current authorization if that authorization was not issued by the Universal Licensing System. If you are unsure of the location or path number that corresponds to a particular location or path, you can query the ULS for the most up-to-date information regarding your authorization. To query the ULS license database for your call sign, point your web browser to http://wireless.fcc.gov/uls and click on Search - Licenses. Alternatively, you may call (877) 480‑3201 (TTY 717-338-2824) for assistance.


To request an extension of time to meet buildout/coverage requirements (purpose codes 1,2,3,4 or T), complete only Item 3a.


To request an extension of time to meet construction requirements (purpose code S), complete Items 3a through 3e, as required. Only complete those items necessary to describe the extension of time requested. For example, to request an extension of time to construct a location under a call sign, only complete Items 3a and 3b.


Item 3a In this item list the call signs where an extension of time to meet buildout/coverage or construction requirements has been requested. Call signs are located on FCC Authorizations.


Item 3b In this item list the location numbers where an extension of time to meet construction requirements has been requested. Location numbers are listed on FCC Authorizations and are used in the following radio services: Aviation Ground, Maritime Coast, Cellular, Land Mobile, and Paging Services.


Item 3c In this item list the path numbers where an extension of time to meet construction requirements has been requested. Path numbers are located on FCC Authorizations and are only used in the Microwave Radio Services.


Items 3d and 3e In this item list the frequencies, in Megahertz (MHz), where an extension of time to meet construction requirements has been requested. Enter the center (assigned) frequency, or the lower frequency of a frequency band, in Item 3d. If applicable, enter the upper frequency of a frequency band in Item 3e. Authorized frequencies are located on FCC Authorizations.



FCC 601 Schedule for Waiver Request for Extension of Time Approved by OMB

Schedule L for Wireless Services 3060 - 0798

See 601 Main Form Instructions

for public burden estimate 1) Purpose


The purpose of this submission: Enter one purpose only - 1, 2, 3, 4, T, or S ( ) See below and refer to instructions.


Buildout/Coverage Requirements (Market-based services and State License Radio Service (SL) only)


1 Extension of Time to meet 1st buildout/coverage requirements. (List call signs in 3a)


2 Extension of Time to meet 2nd buildout/coverage requirements. (List call signs in 3a)


3 Extension of Time to meet 3rd buildout/coverage requirements. (List call signs in 3a)


4 Extension of Time to meet 4th buildout/coverage requirements. (List call signs in 3a)


T Extension of Time to meet tribal lands buildout/coverage requirements. (List call signs in 3a)

Construction Requirements (Site-licensed services only)


S Extension of Time to meet construction requirements (List, as applicable, call signs, locations or paths, and frequencies in Item 3.)


2) New Buildout/Coverage/Construction Expiration Date

Enter date (mm/dd/yy) requested: Attach exhibit describing circumstances/justification.



3) Call Signs/Locations or Paths/Frequencies

3a)

Call Sign

3b)

Location Number

3c)

Path Number

(Microwave only)

3d)

Center (Assigned) or Lower

Frequency (MHz)

3e)

Upper Frequency (MHz)
















































FCC 601 Schedule L - Instructions

April 2013 - Page 2

File Typeapplication/msword
File TitleFCC 601
AuthorSheila Blankenship
Last Modified Byjudith
File Modified2013-05-23
File Created2013-05-23

© 2024 OMB.report | Privacy Policy