In accoradance
with 5 CFR 1320, the information collection is approved for three
years. Note that FERC-516B is a temporary information collection
number, to facilitate a timely submission to OMB of the proposed
revisions in RM16-1. These changes related to Docket RM16-1
(described here) would normally be included in FERC-516 (OMB
Control No. 1902-0096), however an unrelated Final Policy Statement
(in Docket No. PL15-3; ICR No. 201604-1902-003 ) was pending OMB
review when this ICR (201606-1902-004) in RM16-1 was submitted to
OMB on 6/23/2016. (Only one item per OMB Control No. may be pending
OMB review at a time.) FERC plans to move the requirements and
related burden in Docket RM16-1 to FERC-516 within three
years.
Inventory as of this Action
Requested
Previously Approved
09/30/2019
36 Months From Approved
250
0
0
1,875
0
0
0
0
0
The reforms approved in this Final
Rule would amend the Commission’s standard generator
interconnection agreements in accordance with section 35.28(f)(1)
of the Commission’s regulations to require that each public utility
transmission provider amend its pro forma LGIA and pro forma SGIA
to: (1) eliminate the exemptions for wind generators from the
requirement to provide reactive power; and (2) require that all
newly interconnecting non-synchronous generators, as well as all
existing non-synchronous generators making upgrades to their
generation facilities that require new interconnection requests,
provide reactive power as a condition of interconnection, as of the
effective date of the final revision. The reforms approved are
necessary to ensure that rates are just and reasonable and not
unduly discriminatory or preferential. The Final Rule would require
filings of pro forma LGIAs and pro forma SGIAs with the Commission.
The Commission anticipates the reforms approved in this Final Rule,
once implemented, would not significantly change currently existing
burdens on an ongoing basis. With regard to those public utility
transmission providers that believe that they already comply with
the reforms approved in this Final Rule, they could demonstrate
their compliance in the filing required 90 days after the effective
date of the final rule in this proceeding.
FERC-516B is a new reporting
requirement. (The FERC-516B is a temporary information collection
number, to facilitate a timely submission to OMB of the proposed
revisions in Docket RM16-1. These changes related to Docket RM16-1
(described here) would normally be included in FERC-516 (OMB
Control No. 1902-0096), however an unrelated Final Policy Statement
(in Docket No. PL15-3; ICR No. 201604-1902-003 ) was pending OMB
review when this ICR (201606-1902-004) in RM16-1 was submitted to
OMB on 6/23/2016. (Only one item per OMB Control No. may be pending
OMB review at a time.) Long-term, we plan to move the requirements
and related burden in Docket RM16-1 to FERC-516.) The final rule in
Docket RM16-1-000 would require filings of pro forma LGIAs and pro
forma SGIAs with the Commission. Commission staff anticipates the
reforms approved here, once implemented, would not significantly
change currently existing burdens on an ongoing basis.
$79,938
No
No
No
No
No
Uncollected
Brian Bak 202 502-6574
No
On behalf of this Federal agency, I certify that
the collection of information encompassed by this request complies
with 5 CFR 1320.9 and the related provisions of 5 CFR
1320.8(b)(3).
The following is a summary of the topics, regarding
the proposed collection of information, that the certification
covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a
benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control
number;
If you are unable to certify compliance with any of
these provisions, identify the item by leaving the box unchecked
and explain the reason in the Supporting Statement.