FERC-516B (Final Rule in RM16-1-000) Electric Rates Schedules and Tariff Filings

ICR 201606-1902-004

OMB: 1902-0286

Federal Form Document

Forms and Documents
Document
Name
Status
Supporting Statement A
2016-09-21
Supplementary Document
2016-06-23
Supplementary Document
2016-06-23
Supplementary Document
2016-06-23
Supplementary Document
2016-06-23
Supplementary Document
2016-06-23
Supplementary Document
2016-06-23
IC Document Collections
IC ID
Document
Title
Status
219513
Modified
ICR Details
1902-0286 201606-1902-004
Historical Active 201601-1902-002
FERC FERC-516B
FERC-516B (Final Rule in RM16-1-000) Electric Rates Schedules and Tariff Filings
New collection (Request for a new OMB Control Number)   No
Regular
Approved with change 09/21/2016
Retrieve Notice of Action (NOA) 06/29/2016
In accoradance with 5 CFR 1320, the information collection is approved for three years. Note that FERC-516B is a temporary information collection number, to facilitate a timely submission to OMB of the proposed revisions in RM16-1. These changes related to Docket RM16-1 (described here) would normally be included in FERC-516 (OMB Control No. 1902-0096), however an unrelated Final Policy Statement (in Docket No. PL15-3; ICR No. 201604-1902-003 ) was pending OMB review when this ICR (201606-1902-004) in RM16-1 was submitted to OMB on 6/23/2016. (Only one item per OMB Control No. may be pending OMB review at a time.) FERC plans to move the requirements and related burden in Docket RM16-1 to FERC-516 within three years.
  Inventory as of this Action Requested Previously Approved
09/30/2019 36 Months From Approved
250 0 0
1,875 0 0
0 0 0

The reforms approved in this Final Rule would amend the Commission’s standard generator interconnection agreements in accordance with section 35.28(f)(1) of the Commission’s regulations to require that each public utility transmission provider amend its pro forma LGIA and pro forma SGIA to: (1) eliminate the exemptions for wind generators from the requirement to provide reactive power; and (2) require that all newly interconnecting non-synchronous generators, as well as all existing non-synchronous generators making upgrades to their generation facilities that require new interconnection requests, provide reactive power as a condition of interconnection, as of the effective date of the final revision. The reforms approved are necessary to ensure that rates are just and reasonable and not unduly discriminatory or preferential. The Final Rule would require filings of pro forma LGIAs and pro forma SGIAs with the Commission. The Commission anticipates the reforms approved in this Final Rule, once implemented, would not significantly change currently existing burdens on an ongoing basis. With regard to those public utility transmission providers that believe that they already comply with the reforms approved in this Final Rule, they could demonstrate their compliance in the filing required 90 days after the effective date of the final rule in this proceeding.

US Code: 16 USC 824(d), 824(e) Name of Law: Federal Power Act
  
None

1902-AF15 Final or interim final rulemaking 81 FR 40793 06/23/2016

Yes

1
IC Title Form No. Form Name
Final Rule in RM16-1-000 (One-time)

  Total Approved Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 250 0 0 250 0 0
Annual Time Burden (Hours) 1,875 0 0 1,875 0 0
Annual Cost Burden (Dollars) 0 0 0 0 0 0
Yes
Miscellaneous Actions
No
FERC-516B is a new reporting requirement. (The FERC-516B is a temporary information collection number, to facilitate a timely submission to OMB of the proposed revisions in Docket RM16-1. These changes related to Docket RM16-1 (described here) would normally be included in FERC-516 (OMB Control No. 1902-0096), however an unrelated Final Policy Statement (in Docket No. PL15-3; ICR No. 201604-1902-003 ) was pending OMB review when this ICR (201606-1902-004) in RM16-1 was submitted to OMB on 6/23/2016. (Only one item per OMB Control No. may be pending OMB review at a time.) Long-term, we plan to move the requirements and related burden in Docket RM16-1 to FERC-516.) The final rule in Docket RM16-1-000 would require filings of pro forma LGIAs and pro forma SGIAs with the Commission. Commission staff anticipates the reforms approved here, once implemented, would not significantly change currently existing burdens on an ongoing basis.

$79,938
No
No
No
No
No
Uncollected
Brian Bak 202 502-6574

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
06/23/2016


© 2024 OMB.report | Privacy Policy