NESHAP for Phosphoric Acid Manufacturing and Phosphate Fertilizers Production (40 CFR part 63, subparts AA and BB) (Renewal)

ICR 201606-2060-007

OMB: 2060-0361

Federal Form Document

Forms and Documents
Document
Name
Status
Supplementary Document
2016-06-15
Supporting Statement A
2016-06-15
ICR Details
2060-0361 201606-2060-007
Historical Active 201306-2060-010
EPA/OAR 1790.08
NESHAP for Phosphoric Acid Manufacturing and Phosphate Fertilizers Production (40 CFR part 63, subparts AA and BB) (Renewal)
Extension without change of a currently approved collection   No
Regular
Approved without change 01/06/2017
Retrieve Notice of Action (NOA) 07/25/2016
  Inventory as of this Action Requested Previously Approved
01/31/2020 36 Months From Approved 01/31/2017
42 0 39
2,200 0 1,765
186,000 0 10,632

The affected entities are subject to the General Provisions of the NESHAP at 40 CFR part 63, subpart A, and any changes, or additions to the Provisions specified at 40 CFR part 63, subparts AA and BB. Owners or operators of the affected facilities must submit initial notification, performance tests, and periodic reports and results. Owners or operators are also required to maintain records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility, or any period during which the monitoring system is inoperative. Reports, at a minimum, are required semiannually.

US Code: 44 USC 3501. etseq Name of Law: Clean Air Act
  
None

Not associated with rulemaking

  80 FR 32116 06/05/2015
81 FR 47800 07/22/2016
No

1
IC Title Form No. Form Name
NESHAP for Phosphoric Acid Manufacturing and Phosphate Fertilizer Production Plants (40 CFR part 63, subparts AA and BB)

  Total Approved Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 42 39 0 0 3 0
Annual Time Burden (Hours) 2,200 1,765 0 0 435 0
Annual Cost Burden (Dollars) 186,000 10,632 0 0 175,368 0
No
No
There is an adjustment increase in the total estimated cost, burden, number of responses, and capital and O&M costs as currently identified in the OMB Inventory of Approved Burdens. The change in burden for the new and existing facilities is due primarily to a program change in the regulation requiring: 1) mercury testing and total fluoride (TF) testing of phosphate rock calciners; and 2) TF testing of oxidation reactors. The Residual Risk and Technology Review (RTR) associated with this program change estimated 12 phosphoric acid units and 11 phosphate fertilizer units (a total of 23 process units) located at 13 facilities.

$63,000
No
No
No
No
No
Uncollected
Patrick Yellin 202 564-2970 [email protected]

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
07/25/2016


© 2024 OMB.report | Privacy Policy