The affected entities are subject to
the General Provisions of the NESHAP at 40 CFR part 63, subpart A,
and any changes, or additions to the Provisions specified at 40 CFR
part 63, subparts AA and BB. Owners or operators of the affected
facilities must submit initial notification, performance tests, and
periodic reports and results. Owners or operators are also required
to maintain records of the occurrence and duration of any startup,
shutdown, or malfunction in the operation of an affected facility,
or any period during which the monitoring system is inoperative.
Reports, at a minimum, are required semiannually.
There is an adjustment increase
in the total estimated cost, burden, number of responses, and
capital and O&M costs as currently identified in the OMB
Inventory of Approved Burdens. The change in burden for the new and
existing facilities is due primarily to a program change in the
regulation requiring: 1) mercury testing and total fluoride (TF)
testing of phosphate rock calciners; and 2) TF testing of oxidation
reactors. The Residual Risk and Technology Review (RTR) associated
with this program change estimated 12 phosphoric acid units and 11
phosphate fertilizer units (a total of 23 process units) located at
13 facilities.
On behalf of this Federal agency, I certify that
the collection of information encompassed by this request complies
with 5 CFR 1320.9 and the related provisions of 5 CFR
1320.8(b)(3).
The following is a summary of the topics, regarding
the proposed collection of information, that the certification
covers:
(i) Why the information is being collected;
(ii) Use of information;
(iii) Burden estimate;
(iv) Nature of response (voluntary, required for a
benefit, or mandatory);
(v) Nature and extent of confidentiality; and
(vi) Need to display currently valid OMB control
number;
If you are unable to certify compliance with any of
these provisions, identify the item by leaving the box unchecked
and explain the reason in the Supporting Statement.