Updated Crossing Inventory Guide

Updated Crossing Inventory Guide final 1-6-15.pdf

U.S. DOT Crossing Inventory Form

Updated Crossing Inventory Guide

OMB: 2130-0017

Document [pdf]
Download: pdf | pdf
FEDERAL RAILROAD ADMINISTRATION
GUIDE FOR PREPARING
U.S. DOT CROSSING INVENTORY FORMS

U.S. Department of Transportation
Federal Railroad Administration
Office of Railroad Safety

January 2015

DOT/FRA/RRS-23
Published: January 6, 2015
Effective: March 7, 2015

This page intentionally left blank

Table of Contents
I. INTRODUCTION ..............................................................................................................1 
II. INSTRUCTIONS FOR COMPLETING THE U.S. DOT CROSSING INVENTORY
FORM .................................................................................................................................3 
1.  Header Information ........................................................................................................3 
2.  Part I – Location and Classification Information ...........................................................8 
3.  Part II – Railroad Information......................................................................................23 
4.  Part III – Highway or Pathway Traffic Control Device Information...........................28 
5.  Part IV – Physical Characteristics................................................................................40 
6.  Part V – Public Highway Information .........................................................................46 
APPENDIX A – U.S. DOT Crossing Inventory Form ...................................................... A-1 
APPENDIX B – Responsibility Table for Periodic Updates to the Crossing Inventory ....B-1 
APPENDIX C – Reporting Crossings That Have Multiple Operating Railroads ..............C-1 
APPENDIX D – Definitions .............................................................................................. D-1 
APPENDIX E – Frequently Asked Questions (FAQs) ...................................................... E-1 
APPENDIX F – High-Speed Rail ID Corridor Designations and Codes ........................... F-1 

Highway-Rail Crossing Inventory Instruction and Procedures Manual

I. INTRODUCTION
This Guide for Preparing U.S. DOT Crossing Inventory Forms (Guide) is intended to
provide guidance to operating railroads and States on completing the U.S. DOT
Crossing Inventory Form (Inventory Form) for highway-rail and pathway crossings.
The type of crossing will dictate which parts of the Inventory Form must be completed
by operating railroads for the initial reporting of new and previously unreported highwayrail and pathway crossings. The Inventory Form will be considered “completed” if the
following parts are completed:


Public Highway-Rail Grade Crossing: Complete entire Inventory Form (with the
exception of I.20 and III.2.K.);



Private Highway-Rail Grade Crossing: Complete Header, plus Parts I, II, and
III.2.K. of the Inventory Form and the Submission Information section;



Public Pathway Grade Crossing: Complete Header, plus Parts I and II of the
Inventory Form (with the exception of I.20) and the Submission Information
section;



Private Pathway Grade Crossing: Complete Header, plus Parts I, II, and III.2.K.
of the Inventory Form and Submission Information section;



Pedestrian Station Grade Crossing (pedestrian station.): Complete Header, plus
Parts I and II of the Inventory Form (with the exception of I.20) and Submission
Information section;



Grade-separated Crossing (highway-rail, pathway, and pedestrian station):
Complete Header, plus Part I of the Inventory Form (with the exception of I.20)
and the Submission Information section.
Please refer to the Crossing Inventory Responsibility Table in Appendix B for
detailed instructions regarding which data fields must be verified or updated at
least every 3 years by the primary operating railroad, as part of the periodic
updating process.
When there has been a change in crossing characteristics (such as a change in
the crossing surface or a change in the crossing warning devices) at a public
highway-rail grade crossing, as required by Title 49 Code of Federal Regulations
(CFR) Section 234.411(c), complete all of the data fields in the Header of the
Inventory Form, check the “Change in Data” box in “Reason for Update” field and
update all data fields in Parts II and III on the Inventory Form. If a hardcopy

1
Instructions for Completing the U.S. DOT Crossing Inventory Form

Highway-Rail Crossing Inventory Instruction and Procedures Manual
Inventory Form update will be submitted to the Crossing Inventory, complete the
Submission Information section of the Inventory Form as well.
Hardcopy Submission
Please see FRA’s Web site for the correct mailing address for hardcopy
U.S. DOT Crossing Inventory (Crossing Inventory) Submissions.
Electronic Submission
Completed Inventory Forms may also be submitted electronically to the
Crossing Inventory. Detailed instructions for the electronic submission of
Inventory Forms can be found in the Electronic Submission Instructions, which is
a separate document.
Updates to this Guide
Please refer to FRA’s Web site for updates to this Guide.

2
Instructions for Completing the U.S. DOT Crossing Inventory Form

Highway-Rail Crossing Inventory Instruction and Procedures Manual

II. INSTRUCTIONS FOR COMPLETING THE U.S. DOT CROSSING
INVENTORY FORM
1. Header Information
All Header data must be entered by the reporting agency

Figure 2-1: U.S. DOT-FRA Crossing Inventory Form Heading

Instructions
A brief set of instructions is provided at the top of the form.
A.

Revision Date:

Figure 2-2: U.S. DOT-FRA Crossing Inventory Form Heading, Item A

Enter the date that the revision is being submitted in MM/DD/YYYY format.
Example: July 23, 2010, would be entered as 07/23/2010.
For hardcopy Inventory Form submissions, the revision date should be the certified
mailing date.
B.

Reporting Agency:

Figure 2-3: U.S. DOT-FRA Crossing Inventory Form Heading, Item B

Enter a check in the appropriate box to indicate the type of agency that is submitting the
update or the establishment of a new crossing.

3
Instructions for Completing the U.S. DOT Crossing Inventory Form

Highway-Rail Crossing Inventory Instruction and Procedures Manual
The “Transit” box should be checked by urban rapid transit operators who submit
crossing data to the Crossing Inventory, including:


Urban rapid transit operators who operate through highway-rail grade crossings
and pathway grade crossings located on the same track used by railroads that
are part of the general railroad system of transportation.



Urban rapid transit operators who operate through highway-rail grade crossings
and pathway grade crossings that are located within a shared corridor or right-ofway, and shared crossing warning devices, with railroads that are part of the
general railroad system of transportation.



Urban rapid transit operators who do not have one of the above-listed
connections to the general railroad system of transportation, yet operate through
highway-rail crossings and pathway crossings. (Urban rapid transit operators in
this last category are encouraged, but not required, to submit crossing data to the
Crossing Inventory.)

The “Other” box should be checked by public authorities who submit crossing data to
the Crossing Inventory for quiet zone-related purposes. The “Other” box should not be
checked by delegated users or third-party entities who are submitting crossing data on
behalf of a railroad or State user. Delegated users are instructed to check the box that
applies to the entity on whose behalf the crossing data is being submitted.
Public authorities who submit crossing data to the Crossing Inventory have been
instructed to use hardcopy Inventory Forms for this purpose. Therefore, crossing data
submitted electronically will not be accepted by the Grade Crossing Inventory System
(GCIS) if the “Other” box has been checked.
C.

Reason for Update:

Figure 2-4: U.S. DOT-FRA Crossing Inventory Form Heading, Item C

Check only one box to indicate the primary reason for the change.
The nine checkbox selections account for the various reasons for submitting an update.
These include the following:


Change in Data – Submission of crossing data associated with an actual change
in crossing characteristics that is not reflected by any of the other box selections
below.

4
Instructions for Completing the U.S. DOT Crossing Inventory Form

Highway-Rail Crossing Inventory Instruction and Procedures Manual
This includes cases where crossing type is changed from “Private” to “Public” for
a highway-rail grade crossing; the entire Inventory Form (or its electronic
equivalent) must be completed. Please reference Part I, Box 17.


New Crossing – An open crossing that is not currently in the Crossing Inventory.
This could be either a new crossing or one that was previously unreported.



Closed – A location where a previous crossing no longer exists because either
the railroad tracks have been physically removed, or each pathway or roadway
approach to the crossing has been physically removed, leaving behind no
intersection of railroad tracks with either a pathway or roadway. A gradeseparated highway-rail or pathway crossing that has been physically removed is
also considered a closed crossing.

 No Train Traffic – A crossing through which trains no longer operate.
Note: The primary operating railroad is responsible for updating the Crossing
Inventory to reflect that a highway-rail grade crossing or pathway grade crossing
is no longer subject to train traffic. This update should be made as soon as
possible, but must be made no later than the next required periodic update.
When the Crossing Inventory is updated to reflect a change to No Train Traffic
status, Parts II.1 and II.3 must be changed to reflect all zeros and the Part II.2
must reflect the current year the update is made.
 Re-Open – A closed crossing or crossing that was not previously subject to train
traffic which has been placed into active service.
Note: The primary operating railroad is responsible for updating the Crossing
Inventory to reflect that a highway-rail grade crossing or pathway grade crossing
has been placed into active service. This update should be made as soon as
possible, but must be made no later than the next required periodic update.
 Date Change Only – An update to indicate that crossing data has not changed
since the last update to the Crossing Inventory. If this box is checked, the GCIS
will not allow changes to be made to any other data fields in the Crossing
Inventory prior to submission.
 Change in Primary Operating RR – A change in primary operating railroad.
 Admin. Correction – A correction to data that is currently contained in the
Crossing Inventory. This box should be checked for corrections of data
previously submitted in error. (This box should not be checked to report a
previously unreported crossing.)

5
Instructions for Completing the U.S. DOT Crossing Inventory Form

Highway-Rail Crossing Inventory Instruction and Procedures Manual
 Quiet Zone Update – Any change to the quiet zone status for that crossing.
Note: This box is reserved for FRA use only.
Depending on the reporting agency, only certain values apply. New Crossing, No
Traffic, Re-Open, and Change in Primary Operating RR are limited to railroads. Closed,
Change in Data, Date Change Only, and Admin. Correction may apply to all reporting
entities. As noted above, Quiet Zone Update will only apply to FRA use
(Part I, Box 25).
D.

DOT Crossing Inventory Number

Figure 2-5: U.S. DOT-FRA Crossing Inventory Form Heading, Item D

Enter a valid Inventory Number (6-digits followed by an alpha character). Please refer
to Appendix A for an explanation about how to obtain Inventory Numbers for new and
previously unreported crossings.
For new or previously unreported crossings, the assignment of an Inventory Number
occurs when the number is placed on a completed Inventory Form by the responsible
railroad and the completed Inventory Form is submitted for inclusion in the U.S. DOT
National Highway-Rail Crossing Inventory. More than one crossing number may be
assigned to multiple pathway crossings within a station or yard facility.
Note: Once assigned, the Inventory Number stays with that location forever. If the
crossing is eventually closed, the Inventory Number and data at the time of closure
remains in the file. If the crossing is reopened at the same location, the same Inventory
Number must be used again.
Inventory Number Assignment: Only one Inventory Number may be assigned to a
crossing even if the individual tracks belong to more than one Railroad Company or
track owner.
Crossing on Multi-lane Roads: A crossing on a multi-lane roadway shall be reported
as a single crossing and there shall only be one Inventory Number assigned even if a
railroad track moves diagonally across a highway-highway intersection.
Crossings on Private Company or Railroad Property: Where there is more than one
crossing in a railroad yard or an area belonging to a private company, a port, or a dock,
one Inventory Number may be assigned to include all crossings within the private
property limits. In addition, one Inventory Number may be used for multiple pathway
crossings contained within a railway station. When one Inventory Number has been
6
Instructions for Completing the U.S. DOT Crossing Inventory Form

Highway-Rail Crossing Inventory Instruction and Procedures Manual
assigned to multiple crossings, the primary operating railroad may determine the best
method for selecting latitude and longitude coordinates for the purpose of submitting
data to the Crossing Inventory. However, when more than one railroad owns track that
leads into a private company, port, or dock area, each railroad will be considered to be
a primary operating railroad and must assign its own Inventory Number to the
crossing(s) within the private company.
If the railroad would like to extract one or more crossings that have been grouped
together under the same Inventory Number, the railroad may request a new Inventory
Number for each extracted crossing. However, the original Inventory Number must
continue to be assigned to at least one of the crossings that were previously grouped
together. In order to maintain a link between the new Inventory Number and the original
Inventory Number, the primary operating railroad must also include a note in the
“Narrative (Railroad Use)” data field in Part I of the Inventory Form that references the
original Inventory Number for each crossing that has been assigned a new Inventory
Number.
Diagonal Crossing through a Highway-Highway Intersection: When the railroad
tracks run diagonally through a highway-highway intersection, thus bisecting the two
roadways, only one Crossing Inventory Number is to be assigned and the names of
both roadways are to be identified in the Street/Road Name data field.
Highway Bridge Grade-Separated Crossings: When roadways have highway bridge
structures that are grade-separated crossings (usually two separate bridges each used
for highway traffic in opposite directions), assign one number to each structure if the
bridge structures are separated by 100 feet or more. If the bridge structures are less
than 100 feet apart, one or two numbers may be assigned in accordance with State
policy. Assign only one Crossing Inventory Number for bridge structures that are
connected or considered to be one structure for both directions of highway traffic.
Conversion of an At-Grade Crossing to a Grade-Separated Crossing: When an atgrade crossing is replaced with a grade separation, the at-grade crossing shall be
closed and a new crossing inventory number assigned to the grade separation. In the
Narrative, it is advisable to indicate something like “replaces at-grade crossing with DOT
Number ######X.”

7
Instructions for Completing the U.S. DOT Crossing Inventory Form

Highway-Rail Crossing Inventory Instruction and Procedures Manual

2. Part I – Location and Classification Information

Figure 2-6: U.S. DOT-FRA Crossing Inventory Form Part I, Location and Classification Information

1.

Primary Operating Railroad

Figure 2-7: U.S. DOT-FRA Crossing Inventory Form Part I, Item 1

Enter the valid, railroad code (up to four letters) for the “Primary Operating Railroad”
company.

8
Instructions for Completing the U.S. DOT Crossing Inventory Form

Highway-Rail Crossing Inventory Instruction and Procedures Manual
The primary operating railroad may or may not own and maintain the roadbed, tracks,
and signal system controlling the crossing. If the primary operating railroad company is
not the owner of the track, enter the owner's name in Item 16, “Crossing Owner.”
However, an operating railroad that contracts out its train operations, such as some
commuter railroads, should identify itself as the primary operating railroad, if the
operating railroad qualifies for primary operating railroad status. The contract railroad
operator should not be identified as the primary operating railroad.
Entities who are not subject to the reporting and updating requirements contained in
Title 49 Code of Federal Regulations (CFR) Part 234, Subpart F, such as plant railroads
and urban rapid transit operators who do not operate through highway-rail or pathway
crossings located on track shared with general system railroads or crossings located
within a common right-of-way or corridor with a general system railroad, are invited to
submit crossing data to the Crossing Inventory on a voluntary basis. For this limited
purpose, any railroad-related entity that submits crossing data to the Crossing Inventory
should identify itself as the primary operating railroad when submitting crossing data to
the Crossing Inventory.
Where multiple railroads or urban rapid transit operators operate trains on separate
tracks through the same crossing, each railroad or urban rapid transit operator must
submit crossing data to the Crossing Inventory (see Part I, Item 7 below), and each
must place its name in the field titled “Primary Operating Railroad” (this links each
railroad to the data it has submitted).
Note: FRA assigns valid railroad codes. If the valid railroad or company code is not
known, the initiator should contact FRA to obtain the correct code, or to have a new
code assigned for a new railroad or company. In the latter case, the complete railroad
company name, address, telephone number, and a contact person are required. To
contact FRA about railroad or company codes, send an email to:
[email protected].
2.

State

Figure 2-8: U.S. DOT-FRA Crossing Inventory Form Part I, Item 2

Enter the two-character U.S. Postal Service (USPS) abbreviation for the State where
the crossing is located.
If the crossing is on a State boundary so that parts of the crossing lie in two or more
States, the agreement must be made between the two States as to which will claim the
crossing for inventory record purposes and that State’s abbreviation must be shown.
When a crossing is located on a State line, it is suggested that the crossing be
inventoried by, and shown as in, the State that is geographically south or east of the
9
Instructions for Completing the U.S. DOT Crossing Inventory Form

Highway-Rail Crossing Inventory Instruction and Procedures Manual
crossing. FRA suggests that when a crossing lies on the border of a State that this be
noted in the appropriate comment boxes at the end of Part I, giving the name of the
other entity.
3.

County

Figure 2-9: U.S. DOT-FRA Crossing Inventory Form Part I, Item 3

Enter the name of the county (or parish) where the crossing is located. The county
must be in the State identified in Part I, Item 2.
If the crossing is on a county line so that parts of the crossing lie in two or more
counties, a decision must be made to place it in only one county. When a crossing is
located on a county line, it is suggested that the crossing be shown as in the county that
is geographically south or east of the crossing. FRA suggests that when a crossing lies
on the border of a county that this be noted in the appropriate comment boxes at the
end of Part I, giving the name of the other entity.
4.

City/Municipality

Figure 2-10: U.S. DOT-FRA Crossing Inventory Form Part I, Item 4

Enter a check to indicate if the crossing is located “In” or “Near” the specified
“City/Municipality.”
If the crossing is not within the boundaries of a city, town, or village, enter a check in the
box for “Near.” If “Near” is checked, enter the name of the city or municipality along the
rail line that is closest to the crossing. The city must be in the State identified in Item 2,
but it does not have to be in the county identified in Item 3, “County.”
If the crossing is located within the boundaries of a city, town, or village, enter a check
in the box for “In” and enter the name of the city, town, or village in which the crossing is
located. The city must be in the county identified in Part I, Item 3.
If parts of the crossing lie in two or more cities, towns, or villages, identify only one city
or municipality. FRA suggests that when a crossing lies on the border of two or more
cities, towns, or villages that this be noted in the appropriate comment boxes at the end
of Part I, giving the name of the other cities or municipalities.
5.

Street/Road Name & Block Number

Figure 2-11: U.S. DOT-FRA Crossing Inventory Form Part I, Item 5

10
Instructions for Completing the U.S. DOT Crossing Inventory Form

Highway-Rail Crossing Inventory Instruction and Procedures Manual

Enter the street or road name. Street name aliases should not be used.
The block number field is optional. In order to complete this field, enter the block
number (up to 6 characters) of the street or road where the crossing is located in the
right side of the box. For example, if the closest building has an address of “4285,” then
the block number is “4200.”
For new crossings and future updates, enter the full street name without abbreviations
(e.g., N. Canal St. should be North Canal Street, 4th Oak Ave should be Fourth Oak
Avenue).
If the roadway is private and it has a name, enter the name of the road or the owner's
name. Otherwise, if such information is unknown, enter “private“.
When the railroad tracks run diagonally through a highway-highway intersection, thus
bisecting the two roadways, only one Inventory Number is to be assigned and the
names of both roadways are to be identified in the Street/Road Name data field.
Therefore, when entering both roadways in this block, separate with “ / ,” for example
“Elm Street/Main Avenue.”
6.

Highway Type and Number

Figure 2-12: U.S. DOT-FRA Crossing Inventory Form Part I, Item 6

Enter the type and number of highway or roadway designated by the State, such as
Interstate (I), U.S. numbered routes (US), State roadways (SR, ST or SH), county roads
(C) or (CR), local city streets (L or LS), local roads (LR), toll roads (TL), State loop/spur
(SL), farm to market (FM) etc., and the number, e.g., I-95, US-1, SR-234, C-2096, etc.
The number of the highway should be posted on the highway and found on State or
county maps. If there is more than one number, enter the most important route, or all
the numbers separated by a comma.
7.

Do Other Railroads Operate a Separate Track at Crossing?

Figure 2-13: U.S. DOT-FRA Crossing Inventory Form Part I, Item 7

Enter a check in the appropriate box to indicate if another operating railroad operates
over a separate track at the crossing. If “Yes,” enter the FRA railroad code for all
operating railroads that operate over a separate track within the same pair of warning
devices at the crossing. A total of four railroad codes may be entered with up to four
11
Instructions for Completing the U.S. DOT Crossing Inventory Form

Highway-Rail Crossing Inventory Instruction and Procedures Manual
characters each in this field.
IMPORTANT– If the “Yes” box is checked and one or more FRA railroad codes have
been entered, each individual operating railroad identified must provide the following
data to the Crossing Inventory: header information; Part I, Box 1, Boxes 9–12, Box 22;
and Part II, Boxes 1–3; and the submission information. The name of the operating
railroad submitting the data should be listed in Part I, Box 1, whether or not the
individual operating railroad is the primary operating railroad.
The primary operating railroad, in addition to providing the above information, must
complete all of the remaining fields on the Inventory Form, in accordance with the
Instructions at the top of the Form.
Note: Please refer to Appendix C for a detailed explanation of how each operating
railroad is required to submit its own inventory record and future updates.
8.

Do Other Railroads Operate Over Your Track at Crossing?

Figure 2-14: U.S. DOT-FRA Crossing Inventory Form Part I, Item 8

Enter a check in the appropriate box to indicate if another operating railroad operates
over the reporting railroad’s track at the crossing. If “Yes,” enter the FRA railroad code
for all operating railroads that operate trains over the track at the crossing. A total of four
railroad codes may be entered with up to four characters each in this field.
9.

Railroad Division or Region

Figure 2-15: U.S. DOT-FRA Crossing Inventory Form Part I, Item 9

Enter the name of the division, region, or major district, if the railroad system is divided
into such groups. Otherwise, check the “None” box.
10.

Railroad Subdivision or District

Figure 2-16: U.S. DOT-FRA Crossing Inventory Form Part I, Item 10

Enter the name of the subdivision or other classification, if the railroad system is divided
into such groups. Otherwise, check the “None” box.

12
Instructions for Completing the U.S. DOT Crossing Inventory Form

Highway-Rail Crossing Inventory Instruction and Procedures Manual
11.

Branch or Line Name

Figure 2-17: U.S. DOT-FRA Crossing Inventory Form Part I, Item 11

Enter the name of the branch or line used by the railroad to describe this segment of
track. For example, if the track is an industry lead, industry spur, yard lead, or wye,
enter the name of the track or the name of the industry. If the branch or line does not
have a specific name, then check the “None” box .
12.

RR Milepost

Figure 2-18: U.S. DOT-FRA Crossing Inventory Form Part I, Item 12

Enter the railroad milepost number in miles and thousandths of miles (5.3 feet is
approximately 1/1000 mile). Enter the number with the decimal point in the following
format: (nnnn.nnn). If this accuracy is not attainable, then enter the milepost in miles
and hundredths of miles (53 feet is approximately 1/100 mile). Enter the prefix or suffix
identified with the milepost if it has one or both.
13.

Line Segment ID

Figure 2-19: U.S. DOT-FRA Crossing Inventory Form Part I, Item 13

Enter the railroad identification number for the line segments if the railroad has such a
system. If the crossing has an identification number other than the DOT number, such
as a State agency number (e.g., a Public Utility Commission (PUC) assigned number),
that number may be entered here or in one of the “State Use” fields (Items 31. A–D).
This field is optional.
14.

Nearest RR Timetable Station

Figure 2-20: U.S. DOT-FRA Crossing Inventory Form Part I, Item 14

Enter the name of the nearest timetable station for the primary operating railroad
company. This field is optional.
15.

Parent RR

13
Instructions for Completing the U.S. DOT Crossing Inventory Form

Highway-Rail Crossing Inventory Instruction and Procedures Manual
Figure 2-21: U.S. DOT-FRA Crossing Inventory Form Part I, Item 15

If applicable, enter the code for the parent railroad or the company that is parent to the
operating railroad entered in Part I, Item 1, “Primary Operating Railroad.” The entry
must be a valid railroad or company code, which can be obtained from FRA. Otherwise,
check the “N/A” box.
16.

Crossing Owner

Figure 2-22: U.S. DOT-FRA Crossing Inventory Form Part I, Item 16

If applicable, enter the code for the crossing owner (maximum of four characters) of the
entity that actually owns the property. The entry must be a valid railroad, company, or
agency code. If unknown, it can be obtained from FRA. Otherwise, check the “N/A”
box.
17.

Crossing Type

Figure 2-23: U.S. DOT-FRA Crossing Inventory Form Part I, Item 17

Check the “Public” box if:


The crossing is located where a public highway, road, or street crosses one or
more railroad tracks either at grade or grade-separated.



The crossing is a public pathway explicitly authorized by a public authority that is
dedicated for the use of non-vehicular traffic, including pedestrians, bicyclists,
and others, which is not associated with a public highway, road, or street.



The crossing is a pathway explicitly authorized by a public authority or a railroad
carrier that is dedicated for the use of non-vehicular traffic and is located within a
railway station.

Check the “Private” box if:


The crossing is a location where a private roadway crosses one or more railroad
tracks either at grade or grade-separated.



The crossing is a private pathway, either at grade or grade-separated, explicitly
authorized by a railroad carrier that is dedicated for the use of non-vehicular

14
Instructions for Completing the U.S. DOT Crossing Inventory Form

Highway-Rail Crossing Inventory Instruction and Procedures Manual
traffic, including pedestrians, bicyclists, and others, which is not associated with a
private roadway.
If Crossing Type is changed from “Private” to “Public” for a highway-rail grade crossing,
the entire Inventory Form (or its electronic equivalent) must be completed.
18.

Crossing Purpose

Figure 2-24: U.S. DOT-FRA Crossing Inventory Form Part I, Item 18

If the crossing is primarily intended for highway users, including crossings equipped with
vehicular and pedestrian warning devices, check the “Highway” box.
If the crossing is a pathway crossing not within a passenger station, check the
“Pathway, Ped.” box. A pathway crossing is: 1) explicitly authorized by a public
authority or a railroad, 2) dedicated for the use of non-vehicular traffic, including
pedestrians, bicyclists, and others, and 3) not associated with a public or private
highway, road, or street.
If the crossing is a pathway crossing located within a passenger station, check the
“Station, Ped.” box.
19.

Crossing Position

Figure 2-25: U.S. DOT-FRA Crossing Inventory Form Part I, Item 19

If the crossing is at the same level as the road or pathway, check the “At Grade” box. If
the railroad passes under the roadway or pathway, check the “RR Under” box. If the
railroad passes over the roadway or pathway, check the “RR Over” box.
20.

Public Access at Private Crossing

Figure 2-26: U.S. DOT-FRA Crossing Inventory Form Part I, Item 20

Public access means that the crossing is a location where the railroad tracks intersect
with a private toll road or privately owned road or pathway where the public is allowed to
travel without access restrictions. Examples of such locations include, but are not
limited to, shopping centers, fairgrounds, parks, schools, residential housing
15
Instructions for Completing the U.S. DOT Crossing Inventory Form

Highway-Rail Crossing Inventory Instruction and Procedures Manual
developments (of at least five dwellings), libraries, hospitals, clinics, airports, bus
terminals, beaches, piers, boat launching ramps, and recreational areas.
Enter a checkmark in the box to indicate “Yes” if there is public access at the private
crossing or “No” if there is not. There should be no entry made if the crossing is public.
21.

Type of Train

Figure 2-27: U.S. DOT-FRA Crossing Inventory Form Part I, Item 21

Check each box that describes the type of rail service that uses the crossing. Check all
that apply. The types included are:

22.



Freight



Intercity Passenger



Commuter – a local or regional rail system providing passenger service mostly
during the morning and evening peak periods on the general rail system.



Transit – a local rail system providing passenger service within an urban area
that is not connected to the general railroad system of transportation.



Shared Use Transit – a local rail system providing passenger service and
having some connection to the general railroad system of transportation. This
category includes urban rapid transit operations through highway-rail or pathway
crossings located on the same track used by railroads that operate on the
general railroad system of transportation (e.g., temporal separation or
simultaneous joint use). This category also includes urban rapid transit
operations through highway-rail or pathway crossings that are located within a
shared right-of way or corridor, and share the same crossing warning devices,
with a railroad which operates on the general railroad system of transportation.



Tourist/Other – tourist, scenic, historic, or excursion operations that carry
passengers with the conveyance of the passengers to a particular destination not
being the principal purpose
Average Passenger Train Count Per Day

Figure 2-28: U.S. DOT-FRA Crossing Inventory Form Part I, Item 22

16
Instructions for Completing the U.S. DOT Crossing Inventory Form

Highway-Rail Crossing Inventory Instruction and Procedures Manual
Enter the average number of total passenger trains using this crossing, per day, on a
typical operating day. Intercity passenger, commuter, and urban rapid transit
operations, are all included in determining the average number for this field. The value
may not exceed the sum of the total train count in Part II, Item 1, “Estimated Number of
Daily Train Movements.” If the average passenger train count is less than one per day
(for example, “three per week”) check the “Less than one per day” box. If “Freight” is
the only type of train service that is checked in Part I, Item 21, “Type of Train Service,”
then the average passenger train count per day must be 0.
23.

Type of Land Use

Figure 2-29: U.S. DOT-FRA Crossing Inventory Form Part I, Item 23

Check the box that best describes the predominant type of land development in the
vicinity (a distance of up to 1,000 feet) of the crossing based on the following
categories:
 “Open Space” – area that is sparsely or undeveloped, lightly populated.
 “Farm” – agricultural area, including wineries and other types of nontraditional
agricultural enterprises.
 “Residential” – built-up residential area.
 “Commercial” – area with retail stores and businesses, offices, and personal
service buildings.
 “Industrial” – area for manufacturing, construction, heavy products, factories, and
warehouses.
 “Institutional” – e.g., schools, churches, hospitals, military, educational, religious,
health.
 “Recreational” – e.g., Playgrounds, parks, or swim or golf clubs.
 “RR Yard” – area used exclusively for railroad activity such as switching railcars.
24.

Is there an Adjacent Crossing with a Separate Number?

Figure 2-30: U.S. DOT-FRA Crossing Inventory Form Part I, Item 24

Enter a check in the “Yes” box to indicate that there is an adjacent crossing with a
separate number. If there is, enter the valid crossing number. If there is not an adjacent
crossing, then enter a check in the “No” box. Adjacent Crossings are grade crossings
with separate Crossing Inventory Numbers, with their own separate warning devices, on
17
Instructions for Completing the U.S. DOT Crossing Inventory Form

Highway-Rail Crossing Inventory Instruction and Procedures Manual
the same vehicular highway or pathway, where the distance between the inside rail of
each crossing, as measured along the highway, does not exceed 100 feet.
25.

Quiet Zone

Figure 2-31: U.S. DOT-FRA Crossing Inventory Form Part I, Item 25

Leave this field blank because FRA will populate this field with information from Notices
of Quiet Zone Establishment that have been received. This item will indicate whether a
quiet zone is in effect for the crossing. If a quiet zone is in effect, this item will indicate if
it is for 24 hours per day or only a partial day (usually 10 p.m. to 7 a.m.)
If the crossing is not located in a Quiet Zone, the “No” box will be checked. If it is
located in a 24-hour quiet zone, the “24 hr” box will be checked. If it is located in a
partial quiet zone, the “Partial” box will be checked. If it is in a Chicago-excused area
(those crossings in the Chicago area that are currently excused from the Train Horn
Rule), the “Chicago Excused” box will be checked. The effective date that was provided
in the Notice of Establishment will be the “Date Established.” (Note: “Chicago Excused”
crossings will not have an entry in the “Date Established”).
26.

HSR Corridor ID

Figure 2-32: U.S. DOT-FRA Crossing Inventory Form Part I, Item 26

If this is a high-speed rail (HSR) crossing, enter the four-character “HSR Corridor ID” as
defined in Appendix F to this manual.
Note: This field is used to identify the “Section 1010” or “Section 1103” HSR corridor on
which the crossing is located. If the crossing is located on such a corridor, enter the
“HSR Corridor ID,” a four character code (ABC#) as defined in Appendix F to this
manual. The corridor may be divided into logical sections by including a numeric
number (1–9) for the “#” character. If a numeric number is not used, replace “#” with “X.”
FRA will assign an HSR Corridor ID for any corridor, or portion thereof that is not
currently defined in the Appendix. If “HSR Corridor ID” is not applicable, then check the
N/A box.
27.

Latitude

Figure 2-33: U.S. DOT-FRA Crossing Inventory Form Part I, Item 27

18
Instructions for Completing the U.S. DOT Crossing Inventory Form

Highway-Rail Crossing Inventory Instruction and Procedures Manual
Enter the latitudinal coordinate as measured at the center of the crossing. This field,
along with “Longitude,” is used to identify the crossing location using a standardized
Global Positioning System (GPS) location point. The “Latitude” must be entered in
decimal form as (nn.nnnnnnn), with at least five digits to the right of the decimal point
(which is accurate to 4 feet). We will accept up to seven places to the right of the
decimal point.
Actual latitude measurements can be obtained either with a GPS device at the crossing
location or by using an Internet mapping program, such as Google Maps or Bing Maps.
To find latitude and longitude on Google Maps, zoom in on the location of the crossing,
right click on the crossing, and select “What’s Here?” The coordinates will appear in the
search bar above the map, with the latitude measurement listed first. In Bing Maps,
right click on the crossing and select the gray box that either says “location” or identifies
the closest street address. The coordinates will appear under the address to the left of
the map, with the latitude listed first.
To convert latitude values from degrees, minutes, and seconds to decimal form:
Latitude in decimal format = degrees + (minutes divided by 60) + (seconds divided by
3,600).
Latitude coordinate ranges within the continental United States are from 24 to 49
degrees. Alaska latitude values range from 50 to 71 degrees.
Note: The FRA Office of Railroad Safety uses the World Geodetic System 1984
(WGS-84) datum standard. (A datum is the measurement [shape] of the earth's
ellipsoid.)
28.

Longitude

Figure 2-34: U.S. DOT-FRA Crossing Inventory Form Part I, Item 28

Enter the longitudinal coordinate as measured at the center of the crossing. This field,
along with “Latitude,” is used to identify the crossing location using a standardized GPS
location point. The “Longitude” must be entered in decimal form as (-nnn.nnnnnnn),
with at least five digits to the right of the decimal point (which is accurate to 4 feet).
FRA will accept up to seven places to the right of the decimal point.
Actual longitude measurements can be obtained either with a GPS device at the
crossing location, or by using an Internet mapping program, such as Google Maps or
Bing Maps. To find latitude and longitude on Google Maps, zoom in on the location of
the crossing, right click on the crossing and select “What’s Here?” The coordinates will
appear in the search bar above the map, with the longitude measurement listed second.
In Bing Maps, right click on the crossing and select the gray box that either says
19
Instructions for Completing the U.S. DOT Crossing Inventory Form

Highway-Rail Crossing Inventory Instruction and Procedures Manual
“location” or identifies the closest street address. The coordinates will appear under the
address to the left of the map, with the longitude listed second.
To convert longitude values from degrees, minutes, and seconds to decimal form:
Longitude in decimal format = degrees + (minutes divided by 60) + (seconds divided by
3,600).
Longitude coordinate ranges within the continental United States are from -66 to -124
degrees. Alaska longitude values range from -165 to -132 degrees.
Note: The FRA Office of Railroad Safety uses the WGS-84 datum standard.
29.

Lat/Long Source

Figure 2-35: U.S. DOT-FRA Crossing Inventory Form Part I, Item 29

Enter a check in the appropriate box to indicate the source, “Actual” or “Estimated,” for
the latitude and longitude coordinate values being provided.
Actual values are those where GPS measurements are taken at the crossing or
determined by a positive identification method. Latitude and longitude values, in
general, should be taken in the field at the intersection of the centerline of the roadway
or pathway with the centerline of the railroad tracks with a horizontal accuracy of
1 meter or better. Mapping software, such as Google or Bing maps, may be used to
obtain “Actual” values.
Otherwise, the values are indicated as “Estimated.” Any values provided after March 7,
2015 must be actual values.
30.

Railroad Use

Figure 2-36: U.S. DOT-FRA Crossing Inventory Form Part I, Item 30

Only the railroad may enter any text or data of its choice in these fields. For example,
the railroad may note whether monitoring is being conducted at a passive crossing. No
editing will be performed on these fields. These fields are optional.

20
Instructions for Completing the U.S. DOT Crossing Inventory Form

Highway-Rail Crossing Inventory Instruction and Procedures Manual
31.

State Use

Figure 2-37: U.S. DOT-FRA Crossing Inventory Form Part I, Item 31

Only the State may enter any text or data of its choice in these fields. For example, the
State may note whether monitoring is being conducted at a passive crossing. No
editing will be performed on these fields. If a State has a separate PUC number for a
crossing, the State may wish to use one of these fields for this purpose. (For those
States that have used the “RR ID” field for this in the past, FRA will move that data to
Item 31.A. if requested.) These fields are optional.
32.A. Narrative (Railroad Use)
Figure 2-38: U.S. DOT-FRA Crossing Inventory Form Part I, Item 32.A.

Enter any narrative comments desired in this field. Only the railroad may use this field
and no editing will be performed on this field. This field is optional.
32.B. Narrative (State Use)
Figure 2-39: U.S. DOT-FRA Crossing Inventory Form Part I, Item 32.B.

Enter any narrative comments desired in this field. Only the State may use this field
and no editing will be performed on this field. This field is optional.
33.

Emergency Notification Telephone No. (posted)

Figure 2-40: U.S. DOT-FRA Crossing Inventory Form Part I, Item 33

Enter the telephone number (area code and phone number using only numeric values)
for the Emergency Notification System (ENS) contact (e.g., usually railroad police,
dispatch center, or other railroad emergency contact) associated with the crossing. This
will be the ENS telephone number used by the railroad, posted at the crossing, and
publicized for the reporting of emergencies, malfunctions, and problems at crossings, in
accordance with Subpart E to 49 CFR Part 234. Please note that “911” cannot be used
as the “Emergency Notification Telephone No.”
21
Instructions for Completing the U.S. DOT Crossing Inventory Form

Highway-Rail Crossing Inventory Instruction and Procedures Manual
34.

Railroad Contact (Telephone No.)

Figure 2-41: U.S. DOT-FRA Crossing Inventory Form Part I, Item 34

Enter the telephone number (area code and phone number using only numeric values)
of the primary operating railroad’s point of contact for data associated with the crossing.
35.

State Contact (Telephone No.)

Figure 2-42: U.S. DOT-FRA Crossing Inventory Form Part I, Item 35

Enter the telephone number (area code and phone number using only numeric values)
of the State highway contact associated with the crossing. This would normally be the
State inventory contact or the State DOT engineering contact (such as the Section 130
State Contact) responsible for crossing improvement projects.

22
Instructions for Completing the U.S. DOT Crossing Inventory Form

Highway-Rail Crossing Inventory Instruction and Procedures Manual

3. Part II – Railroad Information

Figure 2-43: U.S. DOT-FRA Crossing Inventory Form Part II, Railroad Information

1.

Estimated Number of Daily Train Movements

Figure 2-44: U.S. DOT-FRA Crossing Inventory Form Part II, Items 1.A.-1.E.

Note: In the event that there is a significant change in data, FRA recommends
that these fields be updated at that time rather than waiting for the next required
3-year periodic update.
Important: The primary operating railroad must report the data for Items 1–3 in
Part II for all railroads that are operating through the crossing unless multiple
railroads or urban rapid transit operators operate trains on separate tracks
through the same crossing as indicated in Part I.7. If this is the case, then each
railroad or urban rapid transit operator must report the data for Items 1–3 in Part
II.
1.A. Total Day Thru Trains (6 AM to 6 PM)
Enter the total number of through (thru) trains that operate through the crossing from
6 am–6 pm per day during normal railroad operating periods. Thru trains are trains
whose primary responsibility is to operate over a route with defined beginning and end
points. Local freight thru train movements and passenger and commuter rail train
movements are considered to be thru train movements for purposes of the Crossing
Inventory.
1.B. Total Night Thru Trains (6 PM to 6AM)
Enter the total number of thru trains that operate through the crossing from 6 pm–6 am
per day during normal railroad operating periods. Thru trains are trains whose primary
responsibility is to operate over a route with defined beginning and end points. Local
23
Instructions for Completing the U.S. DOT Crossing Inventory Form

Highway-Rail Crossing Inventory Instruction and Procedures Manual
freight thru train movements and passenger and commuter rail train movements are
considered to be Thru Train movements for purposes of the Crossing Inventory.
1.C. Total Switching Trains
Enter the total number switching train movements through the crossing per day.
“Switching Trains” are those trains whose movements primarily involve the pickup and
set-out of cars for various industries and/or rail yards.
Each movement in one direction counts as one train movement. All locals, industrial
runs and switch engines would be classified as switching movements. However, do not
include such trains when they travel over the crossing like a thru train to get to their
destination to perform their switching operations. Those trains are to be considered as
thru trains.
1.D. Total Transit Trains
Enter the total number of urban rapid transit train movements (either light rail or heavy
rail) through the crossing per day during normal railroad operating periods. If a railroad
does not operate urban rapid transit train movements through the crossing then that
railroad should enter zero. Note: commuter train operations that are regulated by FRA
are not considered to be urban rapid transit train movements.
1.E. Check if Less Than One Movement Per Day
Check the check box if this crossing averages less than one train movement per day.
Enter a count or estimate of the number of trains using this crossing per week. If the
operation is seasonal in nature (e.g., fall foliage excursion train), enter an estimated
count of the number of trains using this crossing per week during the normal operating
season. Note: If the sum of train counts for 1.A through 1.D is greater than 0, the box
should not be checked.
2.

Year of Train Count Data

Figure 2-45: U.S. DOT-FRA Crossing Inventory Form Part II, Item 2

Note: In the event that there is a significant change in data, FRA recommends
that this field be updated at that time rather than waiting for the next required
3-year periodic update.
Enter the year that the train count data was collected or last verified. If any train count
data changes, the data field must be updated at time of submission.

24
Instructions for Completing the U.S. DOT Crossing Inventory Form

Highway-Rail Crossing Inventory Instruction and Procedures Manual
3.

Speed Of Train At Crossing

Figure 2-46: U.S. DOT-FRA Crossing Inventory Form Part II, Items 3.A. – 3.B.

Note: In the event that there is a significant change in data, FRA recommends
that this item be updated at that time rather than waiting for the next required
3-year periodic update.
3.A. Maximum Timetable Speed (mph)
Enter the highest maximum timetable speed in miles per hour for any type of train
movement over the crossing. If there are both freight and passenger train movements
over the crossing, enter the highest maximum authorized speed (which will generally be
the maximum authorized speed for passenger train movements). Permanent timetable
speed restrictions should be entered, if applicable. This field must be greater than or
equal to the maximum value in Item 3B, Typical Speed Range Over Crossing.
3.B. Typical Speed Range Over Crossing (mph)
Enter the typical minimum speed (“from”) through the crossing in miles per hour (mph).
(This should be the typical minimum speed for normal operations through the crossing,
not the minimum speed possible.) Enter the typical maximum speed (“to”) through the
crossing. Neither value can be greater than the maximum timetable speed in Item 3.A.
4.

Type and Count of Tracks

Figure 2-47: U.S. DOT-FRA Crossing Inventory Form Part II, Item 4



Enter the number of “Main” line tracks. A mainline track is defined as a track
extending through yards or between stations, upon which trains are operated by
timetable or train order or both, or the use of which is governed by a signal
system.

 Enter the number of “Siding” tracks. A siding track is defined as a track auxiliary
to the main track used for meeting or passing trains.
 Enter the number of “Yard” tracks. A yard is defined as a system of tracks within
defined limits used for the making up or breaking up of trains, for the storage of
cars, and for other purposes over which movements not authorized by timetable
or by train order may be made, subject to prescribed signals, rules or other
special instructions. Spur track and lead track are included in this definition for
purposes of this Inventory Form. Sidings and industry track are not included, nor
is mainline track within yard limits.


Enter the number of “Transit” tracks. A urban rapid transit track is defined as a
track, on which a light-rail train, trolley, or streetcar moves passengers from
25
Instructions for Completing the U.S. DOT Crossing Inventory Form

Highway-Rail Crossing Inventory Instruction and Procedures Manual
station to station typically within an urban area (and its suburbs), that is not
connected with the general railroad system of transportation.
Enter the number of “Industry” tracks. An industry track is defined as a switching
track, or series of tracks, serving the needs of a commercial industry other than a
railroad. Note: Enter “0” for each track type specified that is not present at the
crossing.
5.

Train Detection (Main Track Only)

Figure 2-48: U.S. DOT-FRA Crossing Inventory Form Part II, Item 5

Enter a check to indicate the type of train detection equipment used to activate the
warning system at the crossing for movements on the main track(s). More than one
checkbox can be selected. If the crossing warning devices are not activated upon the
arrival of a train, “None” should be checked.
The types of train detection equipment are:







6.

Constant Warning Time
Motion Detection
DC – Direct Current
AFO – Audio Frequency Overlay
PTC – Positive Train Control (please refer to 49 CFR § 236.1005 for a
description of Positive Train Control systems)
Other – for example when signals are activated manually by a watchman, or by
means of other technologies
None
Is Track Signaled?

Figure 2-49: U.S. DOT-FRA Crossing Inventory Form Part II, Item 6

Enter a check in the appropriate box to indicate whether or not the track is equipped
with a block signal, cab signal, or train control system to govern train operations.
7.

Monitoring Devices

Figure 2-50: U.S. DOT-FRA Crossing Inventory Form Part II, Items 7.A – 7.B

Enter a check in the appropriate box to indicate whether an event recorder and/or a
remote health monitoring system is installed at the crossing.
26
Instructions for Completing the U.S. DOT Crossing Inventory Form

Highway-Rail Crossing Inventory Instruction and Procedures Manual

These fields are required when the warning devices at the crossing include any of the
following: four-quadrant gates, three-quadrant gates, or two-quadrant gates; or
flashing lights.
Event Recorder means a device designed to resist tampering that monitors and
records data on information at the grade crossing location such as (but not limited to)
train speed, direction of motion, time, and distance over the most recent timeframe (e.g.
last 24 or 48 hours) of the grade crossing warning system operation.
Remote Health Monitoring means an electronic system designed to remotely notify
the railroad (typically the railroad signal maintainer or a trouble desk) that components
of the automatic warning system are not functioning as intended.

27
Instructions for Completing the U.S. DOT Crossing Inventory Form

Highway-Rail Crossing Inventory Instruction and Procedures Manual

4. Part III – Highway or Pathway Traffic Control Device Information

Figure 2-51: U.S. DOT-FRA Crossing Inventory Form Part III, Highway or Pathway Traffic Control Sign and
Device Information

1.

Are there Signs or Signals?

Figure 2-52: U.S. DOT-FRA Crossing Inventory Form Part III, Item 1

Enter a check in the appropriate box to indicate whether signs or signals are installed at
the crossing.
2.

Type of Passive Traffic Control Devices Associated With the Crossing

Figure 2-53: U.S. DOT-FRA Crossing Inventory Form Part III, Items 2.A. – 2.D.

2.A. Crossbuck Assemblies
Enter a count of the number of masts or posts with mounted crossbucks, not a count of
the number of crossbuck signs. Two or more crossbucks mounted on a single post are
28
Instructions for Completing the U.S. DOT Crossing Inventory Form

Highway-Rail Crossing Inventory Instruction and Procedures Manual
counted as one unit. Include all masts with crossbucks without distinction as to the
reflectivity type.
If the crossing has a train-activated warning device (flashing lights [cantilevered or mast
mounted] and/or gates), do not count the individual number of crossbucks mounted on
these devices.
As a matter of information, FHWA (via the MUTCD) requires that crossbuck assemblies
be installed by December 31, 2019, or when adjustments are made to the individual
highway-rail grade crossing and/or corridor, whichever comes first.

Note: A crossbuck assembly consists
of a crossbuck sign and a “YIELD”
sign, unless study indicates a “STOP”
sign is necessary.

Figure 2-54: Example of a Crossbuck Assembly

2.B. STOP Signs (R1-1)
Enter the count of posts or masts with stop signs, regardless of any other type of
warning devices. If there are two posts securing one sign, count them as one post.
Note: Do not include “STOP” signs from adjacent streets or roadways.
2.C. YIELD Signs (R1-2)
Enter the count of posts or masts with yield signs (MUTCD R1-2) at this crossing
regardless of any other type of warning devices. If there are two posts securing one
sign, count them as one post.
Note: Do not include “YIELD” signs from adjacent streets or roadways.
2.D. Advance Warning Signs (Check all that apply; include count)
Enter a check in the box for each type of advance warning sign at the crossing and
enter a count for each type of sign. For each sign that is checked, it must correspond
with a count value of “1” or greater. If there are no advance warning signs, check
“None.”

29
Instructions for Completing the U.S. DOT Crossing Inventory Form

Highway-Rail Crossing Inventory Instruction and Procedures Manual

Figure 2-55: Sample Advance Warning Sign

2.E. Low Ground Clearance Sign (W10-5)

Figure 2-56: U.S. DOT-FRA Crossing Inventory Form Part III, Item 2.E.

Check the “Yes” box to indicate that low ground clearance signs are present at the
crossing. Then, enter the number of signs present. The standard warning sign for low
ground clearance crossings is identified in the MUTCD as W10-5. Check “No” box if
there are none.

Figure 2-57: Sample Low Ground Clearance Warning Sign

2.F. Pavement Markings

30
Instructions for Completing the U.S. DOT Crossing Inventory Form

Highway-Rail Crossing Inventory Instruction and Procedures Manual
Figure 2-58: U.S. DOT-FRA Crossing Inventory Form Part III, Item 2.F.

Enter a check in the appropriate box for each type of pavement marking present that
conforms to the MUTCD. If there are no stop lines, railroad crossing symbols, or
dynamic envelope marking present, check “None.”
2.G. Channelization Devices/Medians

Figure 2-59: U.S. DOT-FRA Crossing Inventory Form Part III, Item 2.G.

Check the appropriate box(s) to reflect the location of a channelization or median
structure present at the crossing, or check “None” if there are no such devices. If
channelization devices are present at the crossing select either “All Approaches” or
“One Approach” and leave “Median” blank. If a median is present at the crossing, also
select either “All approaches” or “One approach” and select the “Median” box.
“Channelization Devices” mean a traffic separation system made up of a raised
longitudinal channelizer, with vertical panels or tubular delineators, that is placed
between opposing highway lanes designed to alert or guide traffic around an obstacle or
to direct traffic in a particular direction.
“Median” means a non-traversable portion of a divided highway separating the travel
ways for traffic in opposite directions.
2.H. EXEMPT Sign (R15-3)

Figure 2-60: U.S. DOT-FRA Crossing Inventory Form Part III, Item 2.H.

Check the “Yes” box if there is at least one EXEMPT sign displayed at the crossing and
“No” if none are displayed. An exempt crossing is one where drivers of highway
vehicles carrying passengers for hire, school buses carrying students, or highway
vehicles carrying hazardous materials are not required to stop, except when rail traffic is
approaching or occupying the grade crossing or the driver's view is blocked.
2.I. ENS Sign Displayed (I-13)

Figure 2-61: U.S. DOT-FRA Crossing Inventory Form Part III, Item 2.I.

Check the “Yes” box if there is at least one ENS sign displayed at the crossing, and
“No” if none are displayed.
31
Instructions for Completing the U.S. DOT Crossing Inventory Form

Highway-Rail Crossing Inventory Instruction and Procedures Manual

Signs or numbers on nearby signal bungalows are not considered to be ENS signs
since the general public may not clearly understand their meaning and are not in
compliance with FRA regulations (49 CFR Part 234, Subpart E).
2.J. Other MUTCD Signs

Figure 2-62: U.S. DOT-FRA Crossing Inventory Form Part III, Item 2.J.

Check the “Yes” box if there is at least one other MUTCD sign displayed at the crossing
and “No” if none are displayed.
Enter the MUTCD type and the count of signs for each MUTCD type installed at the
crossing.
Examples:
 Specify Type R15-8 Count 2
 Specify Type W10-9 Count 2

2.K. Private Crossing Signs (if Private)

Figure 2-63: U.S. DOT-FRA Crossing Inventory Form Part III, Item 2.K.

If the crossing is a private crossing, enter a check in the Yes box if there is a private
crossing sign installed. Check the “No” box if there are none. Note: This box should be
left blank for public crossings.
2.L. LED Enhanced Signs (List types)

Figure 2-64: U.S. DOT-FRA Crossing Inventory Form Part III, Item 2.L.

List the types of light-emitting diode (LED) enhanced signs in use, referencing to the
MUTCD coded signs. For example: Crossbuck R15-1.

32
Instructions for Completing the U.S. DOT Crossing Inventory Form

Highway-Rail Crossing Inventory Instruction and Procedures Manual
3. Type of Train Activated Warning Devices at the Grade Crossing (specify count
of each device for all that apply)

Figure 2-65: U.S. DOT-FRA Crossing Inventory Form Part III, Items 3.A. – 3.E.

3.A. Gate Arms (count)
Enter the number of Roadway and Pedestrian gates at the crossing. The total count for
each type of gate is required. If gates are not present, enter “0”.
Note: Pedestrian gate arms are only those that are part of the crossing signaling
system that are activated upon train detection.
Do not count:
 Pedestrian swing gates
 Post-mounted flashing light assemblies (3.D.)
 Crossbuck assemblies (2.A.)
3.B. Gate Configuration
Check the boxes for each type of gate configuration found at the crossing. A gate (for
purposes of the Crossing Inventory) is an automatically operated traffic control device
which, when activated into a horizontal position, is intended to physically impede users
such that they are discouraged from entering a particular grade crossing. Check only
one box on the left side of 3.B. (2 Quad, 3 Quad, or 4 Quad). On the right side, check
any applicable box. The choices are:


“2 Quad” (two-quadrant gates) – a gate configuration featuring gates only on
entrance lanes leading onto the crossing. If a crossing does not have any gates
on any exit lanes leading off the crossing, then it is to be considered a “Two
quadrant gate” crossing. Note: A gated crossing on a one-way street is to be
considered a “2 Quad” gate configuration.



“3 Quad” (three-quadrant gates) – a specific gate configuration featuring gates on
all entrance lanes leading on to the crossing, but with only one exit leading off the
crossing that is equipped with a gate.



“4 Quad” (four-quadrant gates) – a specific gate configuration that features gates
on all entrance and all exit lanes at the crossing. When four quadrant gates are
activated and fully lowered, all entrance lanes and all exit lanes are blocked by
gates.

33
Instructions for Completing the U.S. DOT Crossing Inventory Form

Highway-Rail Crossing Inventory Instruction and Procedures Manual


“Full (Barrier) Resistance” gates – a gate-like device that is specifically designed
to physically prevent a highway vehicle from entering the crossing area when the
resistance gate system is fully deployed.



“Median” gates (sometimes referred to as dual entrance gates) – a supplemental
gate installation located on a roadway’s median (to the left of the travel lanes)
that works in combination with a gate installed on the outside edge of the
roadway (to the right of the travel lanes) to jointly provide blockage of multiple
lanes on a single roadway approach to the crossing, with both gate arm tips
meeting (2-foot maximum gap) in the middle.
Note: This field is required if the number of gate arms in 3.A. is greater than 0.

3.C. Cantilevered (or Bridged) Flashing Light Structures (count)
Enter the count of cantilevered (or bridged) flashing light structures that are: (1) “Over
The Traffic Lanes,” and (2) “Not Over the Traffic Lanes.” Count the number of
structures, not the number of flashing light pairs. If cantilevered flashing light structures
are not present, enter “0”.
Check the appropriate box to indicate whether the flashing lights are Incandescent or
LED.
3.D. Mast-Mounted Flashing Lights (count of masts)
Enter the count of masts that have flashing lights. Count the number of masts, not the
number of flashing light pairs. The number of cantilevered structures are not included in
the count. If mast-mounted flashing lights are not present, enter “0”.
Check the appropriate boxes to indicate whether the flashing lights are Incandescent or
LED, and whether back lights and side lights are included.
When indicating the presence of mast-mounted flashing lights, do not enter the number
of crossbuck assemblies (2.A.) at the crossing.
Back Lights
Side Lights

34
Instructions for Completing the U.S. DOT Crossing Inventory Form

Highway-Rail Crossing Inventory Instruction and Procedures Manual

Figure 2-66: Examples of Back Lights and Side Lights

3.E. Total Count of Flashing Light Pairs
Enter the total number of flashing light pairs installed at the crossing, including back
lights, side lights, and where cantilever structures are present

Example of 3 pairs

Example of 4 pairs

Figure 2-67: Examples of 3 and 4 of flashing light pairs

3.F. Installation Date of Current Active Warning Devices

Figure 2-68: U.S. DOT-FRA Crossing Inventory Form Part III, Item 3.F.

This data field must be updated if train-activated warning devices are installed or
upgraded at a public highway-rail grade crossing after March 7, 2015. Using the list
below, enter the installation date for the first device encountered (moving from top to
bottom).
1. Four quad (or full barrier) gates
2. Three quad gates
3. Gates (normally two quadrant)
4. Flashing lights (standard and cantilever type units)
5. Highway traffic signals, wigwags, bells, or other activated devices
6. Special active warning devices (usually flagman)
Check the “Not Required” checkbox if the active warning devices were installed before
March 7, 2015 and the installation date is not provided. Completion of this data field is
not required for active warning devices installed prior March 7, 2015; however, if date is
known, it is recommended to enter it.

35
Instructions for Completing the U.S. DOT Crossing Inventory Form

Highway-Rail Crossing Inventory Instruction and Procedures Manual
3.G. Wayside Horn

Figure 2-69: U.S. DOT-FRA Crossing Inventory Form Part III, Item 3.G.

Check the “Yes” box if the crossing is equipped with a wayside horn and enter the
month and year that the horn or system was installed. Check “No” if the crossing is not
equipped with a wayside horn.
3.H. Highway Traffic Signals Controlling Crossing

Figure 2-70: U.S. DOT-FRA Crossing Inventory Form Part III, Item 3.H.

Enter a check in the “Yes” box to indicate that there are highway traffic signals that
control highway traffic over the crossing, exclusive of other types of warning devices.
For purposes of Item 3.H., “highway traffic signals” refers only to train-activated redamber-green signals that control street traffic over the crossing. Do not count highway
signals controlling a nearby intersection even if they are interconnected with the
crossing warning devices.
Enter a check in the “No” box if there are none.
3.I. Bells

Figure 2-71: U.S. DOT-FRA Crossing Inventory Form Part III, Item 3.I.

Enter the count of bells (either mechanical or electrical) present at the crossing as part
of the warning system. If there are none, enter “0.”
3.J. Non-Train Active Warning
Figure 2-72: U.S. DOT-FRA Crossing Inventory Form Part III, Items 3.J – 3.K

Check the appropriate box if there is “Flagging” or a “Flagman” (a member of the train
crew or other person who actively controls the flow of vehicular traffic using handsignaling devices or an Automated Flagger Assistance Device); “Manually Operated
Signals” (e.g., dual toned multi-frequency (DTMF)-controlled, push-button activated);
“Watchman” (a person assigned to provide warning that is not a member of the train
crew); or “Floodlighting” at the crossing. Only floodlighting—which is distinctive from
ordinary street lighting in intensity, light distribution, focus, or color—is to be reported.
Check “None” if applicable.

36
Instructions for Completing the U.S. DOT Crossing Inventory Form

Highway-Rail Crossing Inventory Instruction and Procedures Manual
3.K. Other Flashing Lights or Warning Devices
Enter the count and type of any other special warning devices at the crossing. For
example, this would include wigwags if present. If none are present, enter a count of
“0”.

Figure 2-73: U.S. DOT-FRA Crossing Inventory Form Part III, Items 4.A. – 4.C.

4.A. Does nearby Hwy Intersection have Traffic Signals?
Check either the “Yes” or “No” box to indicate whether or not a highway-highway
intersection within 500 feet has highway traffic signals.
Note: The distance (500 feet or less) is measured from the nearest rail, not from the
centerline of track.
4.B. Hwy Traffic Signal Interconnection
Check all that apply. If “Not Interconnected” is checked, do not check the other two
choices.


“Not Interconnected” – crossings equipped with active warning systems that do
not have an electrical connection between the railroad active warning system and
the traffic signal controller assembly for the purpose of preemption.



“For Traffic Signals” – crossings having an electrical connection between the
railroad active warning system and the traffic signal controller assembly for the
purpose of preemption.



“For Warning Signs” – signs that are electrically connected to a railroad crossing
control circuit that is designed to illuminate the signs upon the approach or
presence of a train.

Figure 2-54: Sample Advance Warning Sign
Figure 2-54: Sample Advance Warning Sign
Figure 2-66: U.S. DOT-FRA Crossing Inventory Form Part III, Items 4.A. – 4.C.

Figure 2-74: Examples of “For Warning Signs”

37
Instructions for Completing the U.S. DOT Crossing Inventory Form

Highway-Rail Crossing Inventory Instruction and Procedures Manual
4.C. Hwy Traffic Signal Preemption
Check the appropriate box for the type of preemption. This field is not applicable if “Not
Interconnected” is chosen in field 4.B. and should be left blank.
Preemption is defined in the MUTCD as the transfer of the normal operation of highway
traffic signals to a special control mode.
In this instance preemption occurs as a result of a signal received from the railroad
active warning device system
Simultaneous preemption is defined in the MUTCD as notification of approaching rail
traffic that is forwarded to the highway traffic signal controller unit or assembly and
railroad active warning devices at the same time.
Simultaneous preemption results in the initiation of the highway traffic signal cycle at the
same time the highway-rail grade crossing warning system is activated.
Advance preemption is defined in the MUTCD as notification of approaching rail traffic
that is forwarded to the highway traffic signal controller unit or assembly by the railroad
equipment in advance of the activation of the railroad warning devices.
Advance preemption results in the initiation of the highway traffic signal cycle before the
highway-rail grade crossing active warning system is activated.
5.

Highway Traffic Pre-Signals

Figure 2-75: U.S. DOT-FRA Crossing Inventory Form Part III, Item 5

Check the “Yes” box to indicate if highway traffic pre-signals are installed. Check the
“No” box if there are none. The “Storage Distance” and “Stop Line Distance” fields are
optional. Use feet as the measuring unit.
Pre-signals are used to control traffic approaching a grade crossing in conjunction with
the highway traffic control signal faces that control traffic approaching a highwayhighway intersection beyond the tracks. Pre-signals may be located on either the near
or far side of the railroad tracks, and may be mounted on the same cantilever structures
as the railroad’s flashing light warning devices.


“Storage Distance” (for pre-signals only) is the distance available for vehicle
storage as measured 6 feet from the rail nearest the intersection to the
intersection stop line or the normal stopping point on the roadway.

38
Instructions for Completing the U.S. DOT Crossing Inventory Form

Highway-Rail Crossing Inventory Instruction and Procedures Manual


6.

“Stop Line Distance” (for pre-signals only) is the distance between the stop line
and the crossing gates. This field should be left blank if the crossing is not
equipped with gates.
Highway Monitoring Devices

Figure 2-76: U.S. DOT-FRA Crossing Inventory Form Part III, Item 6

Check all boxes that apply. Note: The temporary installation of highway
monitoring devices (e.g., for research purposes) should not be reported to the
Crossing Inventory.


“Check the “Yes” box if “Photo/Video Recording” is present at the crossing.
Photo/Video Recording is the use of high-resolution cameras to photograph or
record motorists driving under or around railroad crossing gates. The camera
equipment is typically mounted in a 12-foot-high bullet-resistant cabinet. There
may be signs, installed on all street approaches to the crossing, that inform
motorists that photo citations are being issued to violators at the crossing. Note
– The temporary installation of photo/video recording devices (e.g., for research
purposes) are not to be reported.



Check the “Yes” box if “Vehicle Presence Detection” is present at the crossing.
Vehicle Presence Detection is system capable of detecting and reporting in real
time the presence of a vehicle on the crossing. An example includes a series of
looped wire, coils, or magnetometers that are placed below ground level within
the field side and gauge side of the railroad tracks, at a distance between the
approach gate and the exit gate. The loop detectors or magnetometers use a
magnetic effect caused by the presence of a roadway vehicle, which then sends
a signal to the exit gate to remain in the up position, or can send a signal to the
train operator that a vehicle is still occupying the restricted area of the grade
crossing.



Check the “None” box if neither Photo/Video Recording nor Vehicle Presence
Detection are at the crossing or if the crossing is passive.



Note: This field applies for crossings with train-activated warning devices. If
monitoring is conducted at passive crossings, it should be noted in Part I, Box 30
or 31, as appropriate.

39
Instructions for Completing the U.S. DOT Crossing Inventory Form

Highway-Rail Crossing Inventory Instruction and Procedures Manual

5. Part IV – Physical Characteristics

Figure 2-77: U.S. DOT-FRA Crossing Inventory Form Part IV, Physical Characteristics

1.

Traffic Lanes Crossing Railroad

Figure 2-78: U.S. DOT-FRA Crossing Inventory Form Part IV, Item 1

Enter the number of through traffic lanes crossing the track. Do not include shoulders
or lanes that are used for parking. Check the box that describes the type of roadway. If
channelization devices are present at the crossing, then it can only be classified as
“Two-way Traffic.”


“One-way Traffic” – Where highway motor vehicles travel in the same direction
over the same roadway.



“Two-way Traffic” – Where highway motor vehicles travel in two opposite
directions over the same roadway.



“Divided Traffic” – Where roadway traffic moving in opposite directions is
separated by a median sufficient to prevent movement across it into opposing
traffic.

Note: Divided traffic refers to the characteristics of the entire roadway, not simply at the
crossing.
2.

Is Roadway/Pathway Paved?

Figure 2-79: U.S. DOT-FRA Crossing Inventory Form Part IV, Item 2

Check “Yes” if the highway or pathway is paved with material on which pavement
markings can be effectively maintained. Check “No” if the highway or pathway surface
is gravel, dirt, or has a surface treatment on which pavement markings cannot be
maintained. If the entire road or pathway is not paved, the roadway or pathway
40
Instructions for Completing the U.S. DOT Crossing Inventory Form

Highway-Rail Crossing Inventory Instruction and Procedures Manual
pavement through the crossing must extend far enough beyond the railroad tracks to be
able to accept railroad pavement markings, nominally about 100 feet, to be considered
“Yes” for this Item. If pavement markings are indicated in Part III.2.F., then this item
must be checked “Yes.”
3.

Does the Track Run Down a Street?

Figure 2-80: U.S. DOT-FRA Crossing Inventory Form Part IV, Item 3

Figure 2-81: Example of a track that runs down a street.

Check “Yes” if the crossing involves a railroad track that is embedded within the
pavement of a roadway that crosses another roadway at grade, such that trains
operating on those tracks will cross the intersecting roadway. In addition, the “Yes” box
may be checked if the tracks run alongside the roadway in the same direction as
roadway vehicles, and if the tracks are located within or adjacent to the roadway rightof-way. In both cases, the crossing to be inventoried will be the crossing of the tracks
with the intersecting roadway, not the roadway within or adjacent to the street where the
tracks are running.
Check “No” if the tracks and crossties are in a semi-exclusive right-of-way with exposed
ballast, and are separated from the roadway pavement by a curb or other such border
or divider.

41
Instructions for Completing the U.S. DOT Crossing Inventory Form

Highway-Rail Crossing Inventory Instruction and Procedures Manual
4.

Is Crossing Illuminated? (street lights within approx. 50 feet from nearest
rail)

Figure 2-82: U.S. DOT-FRA Crossing Inventory Form Part IV, Item 4

Enter a check in the “Yes” box if the crossing is illuminated. Enter a check in the “No”
box if the crossing is not illuminated. An illuminated crossing is defined as having
overhead street lighting that provides reasonable illumination of trains present at the
crossing and is located within approximately 50 feet of the crossing. Since streetlamp
light intensity can vary, sufficient lighting may be provided by streetlights located up to
100 feet from the crossing, in which case, the “Yes” box may be checked.
5.

Crossing Surface (on Main Track, multiple types allowed)

Figure 2-83: U.S. DOT-FRA Crossing Inventory Form Part IV, Item 5

Enter a check in the box which most closely fits the following descriptions. If there are
multiple main line tracks that have different types of surfaces, indicate all types on the
Inventory Form.
1. “Timber” – Includes sectional treated timber and full wood plank.
 Sectional treated timber consists of prefabricated units approximately 8 feet in
length of treated timber individually installed and removable for maintenance
and replacement purposes.
 Full wood plank consists of a timber surface that covers the entire crossing
area above the crossties, made of ties, boards, bridge ties, etc.
2. “Asphalt” – Asphalt surface over the entire crossing area.
3. “Asphalt and Timber” – Asphalt surface in the area between flange timber planks
or other material forming flangeway openings that may include the use of rubber.
4. “Concrete” – Includes concrete slab and concrete pavement.
 Concrete slab consists of pre-cast concrete sections that are usually
individually installed and removable for maintenance and replacement
purposes.


Concrete pavement is a concrete surface that is continuous over the track
area and is not removable except by destruction of the surface.

5. “Concrete and Rubber” – An installed crossing surface that consists of both
concrete and rubber materials.
42
Instructions for Completing the U.S. DOT Crossing Inventory Form

Highway-Rail Crossing Inventory Instruction and Procedures Manual
6. “Rubber” – Preformed rubber sections that are usually individually installed and
removable for maintenance and replacement purposes.
7. “Metal” – Sections of steel or other metal that are usually individually installed
and removable for maintenance purposes and provide complete coverage of the
crossing area within the track.
8. “Unconsolidated” – Ballast or other unconsolidated material placed over
crossties, with or without planks, on one or both sides of the running rails.
9. “Composite” – An engineered material formed from two or more distinct materials
generally incorporating a polymer binder with reinforcing fibers and/or fillers to
contribute enhanced properties and/or other property modifiers in a polymer
matrix, typically post-consumer recycled high-density polyethylene, or HDPE,
that are usually individually installed and removable for maintenance and
replacement purposes .
10. “Other (Specify)” – Surfaces other than the previously described surfaces,
including structural foam, plastic, “high-tech,” etc.
Note: This data field has been assigned to the State for updating. However, if
the railroad installs a new crossing surface, the railroad must report that change.
Enter the month and year that the crossing surface was originally installed and opened
to vehicular traffic in “MM/YYYY” format. Also, enter the width of the crossing, and the
length of the crossing. For new and updated crossing surfaces, the date and
measurements are required. These are optional fields for existing crossings that are
already reported, but encouraged to be submitted by State entities.


“Width” – The width of the crossing surface is measured in feet perpendicular to
the railroad tracks and is the distance between the outermost edges of the
crossing surface (including multiple tracks if present). In the event that the
crossing surface is indistinguishable from the roadway approach, the width is the
distance between the outermost rails of the crossing plus 4 feet.



“Length” – The length of the crossing surface is measured in feet parallel to the
tracks, along the improved surface of the crossing, which may extend beyond the
edges of highway pavement and any sidewalks that may be present. In general,
the crossing surface material will extend approximately 3 feet on each side
beyond the roadway/pathway.
Refer to the width and length diagram below:

43
Instructions for Completing the U.S. DOT Crossing Inventory Form

Highway-Rail Crossing Inventory Instruction and Procedures Manual

Figure 2-84: Width and length measurement diagram

6.

Intersecting Roadway Within 500 Feet?

Figure 2-85: U.S. DOT-FRA Crossing Inventory Form Part IV, Item 6

Enter a check in the “Yes” box if the street or highway for this crossing is intersected by
another street or highway within 500 feet, and indicate the estimated distance from the
crossing. Check “No” when no intersection exists within 500 feet. If the street or
highway is intersected by another street or highway on both sides of the crossing,
indicated the estimated distance from the closest intersection.
7.

Smallest Crossing Angle

Figure 2-86: U.S. DOT-FRA Crossing Inventory Form Part IV, Item 7

Enter a check in the box that most closely describes the smallest angle between the
roadway and the track.
8.

Is Commercial Power Available?

44
Instructions for Completing the U.S. DOT Crossing Inventory Form

Highway-Rail Crossing Inventory Instruction and Procedures Manual
Figure 2-87: U.S. DOT-FRA Crossing Inventory Form Part IV, Item 8

Enter a check to indicate whether there is commercial electric power available within
500 feet of the crossing. This field is optional.

45
Instructions for Completing the U.S. DOT Crossing Inventory Form

Highway-Rail Crossing Inventory Instruction and Procedures Manual

6. Part V – Public Highway Information

Figure 2-88: U.S. DOT-FRA Crossing Inventory Form Part V, Public Highway Information, and Submission
Information

1.

Highway System

Figure 2-89: U.S. DOT-FRA Crossing Inventory Form Part V, Item 1

Check the box for the correct highway system code. See Table 2-1 below for the
correct code.
Table 2-1: Highway System Codes

Code

Definition

01

Interstate Highway System

02

Other National Highway System
(NHS)

03

Federal Aid Highway, Not NHS

08

Non-Federal Aid

Included
Interstate, rural, and urban; (note
that the Interstate is part of the
National Highway System)
Other urban and rural principal
arterial, Non-Interstate
Rural major collector and higher
category, or urban collector and
higher category, not part of NHS
Local rural roads, rural minor
collectors, and local urban city
streets or any other non-FederalAid roadway

46
Instructions for Completing the U.S. DOT Crossing Inventory Form

Highway-Rail Crossing Inventory Instruction and Procedures Manual
2.

Functional Classification of Road at Crossing

Figure 2-90: U.S. DOT-FRA Crossing Inventory Form Part V, Item 2

Check the box for the appropriate highway functional classification code for “Rural” or
“Urban” and then check the box for the roadway type in accordance with Federal-aid
highway program definitions. The “Urban” designation is based on the U.S. Census
Bureau urban boundaries and a population of more than or equal to 5,000 people.
Functional classification is the grouping of highways, roads, and streets by the character
of service they provide and can be applied in planning highway system development. It
defines the part that any particular route should play in serving the flow of traffic through
a highway network. The details and definitions for classifying systems can be found on
FHWA's Web site at www.fhwa.dot.gov under “Guidelines for Functional Highway
Classification System.”
3.

Is Crossing on State Highway System?

Figure 2-91: U.S. DOT-FRA Crossing Inventory Form Part V, Item 3

Check the appropriate box.
4.

Highway Speed Limit

Figure 2-92: U.S. DOT-FRA Crossing Inventory Form Part V, Item 4

Enter the highway speed limit at the crossing in miles per hour (the speed limit value
must be greater than zero). Check the appropriate box to indicate whether the speed
limit is posted or statutory.
5.

Linear Referencing System (LRS Route ID)

Figure 2-93: U.S. DOT-FRA Crossing Inventory Form Part V, Item 5

This is an optional field. Enter the “Linear Referencing System (LRS Route ID)” code.
The LRS is a set of procedures for determining and retaining a record of specific points
along a highway. Typical methods used are milepoint, milepost, reference point, and
link-node.

47
Instructions for Completing the U.S. DOT Crossing Inventory Form

Highway-Rail Crossing Inventory Instruction and Procedures Manual
It is recommended that this field use the Highway Performance Monitoring System
(HPMS) data reported to FHWA. If a State uses more than one LRS for their own
purposes, it is recommended that the information entered match the HPMS data. The
details for the HPMS can be found on FHWA’s Web site at: http://www.fhwa.dot.gov
under Highway Performance Monitoring System.
6.

LRS Milepost

Figure 2-94: U.S. DOT-FRA Crossing Inventory Form Part V, Item 6

This is an optional item. Enter the LRS milepost designation. Most at-grade highwayrail grade crossings are on highways without posted mileposts. Leave blank if none are
posted.
7.

Annual Average Daily Traffic (AADT)

Figure 2-95: U.S. DOT-FRA Crossing Inventory Form Part V, Item 7

Enter the calendar year when the AADT was determined and the estimated AADT count
through the crossing (total both directions) based on available traffic information. When
a crossing runs diagonally through a highway-highway intersection, the total AADT
should include both streets in both directions.
“Annual Average Daily Traffic (AADT)” – a figure that represents the amount of vehicles
traveling past a known location on a roadway for a year, divided by 365 days. In the
event that 365 consecutive days of traffic counts are not available, there are traffic
engineering calculations that can be used to develop a representative figure for AADT
based upon traffic counts of shorter duration.
8.

Estimated Percent Trucks

Figure 2-96: U.S. DOT-FRA Crossing Inventory Form Part V, Item 8

Enter the estimated percentage (0–99%) of trucks in the traffic stream. For the
purposes of this manual, trucks are considered as those vehicles having a
manufacturer’s gross vehicle weight (GVW) rating of 9,000 lbs. or more and having dual
tires on at least one rear axle. Also, buses, single-unit trucks, combination trucks, and
campers/recreational vehicles are classified as trucks. Do not include school buses.

48
Instructions for Completing the U.S. DOT Crossing Inventory Form

Highway-Rail Crossing Inventory Instruction and Procedures Manual
9.

Regularly Used by School Buses?

Figure 2-97: U.S. DOT-FRA Crossing Inventory Form Part V, Item 9

Check the “Yes” box if the crossing is regularly used by school buses. Check the “No”
box if the crossing is not regularly used by school buses. “Regularly” means that there
is at least one movement over the crossing, in either direction, by a school bus on a
normal school day.
If the “Yes” box is checked, enter the average total number of times that a school bus
crosses over the crossing, empty or full, on a normal school day. Back and forth
movements count as two passes through the crossing.
10.

Emergency Services Route

Figure 2-98: U.S. DOT-FRA Crossing Inventory Form Part V, Item 10

Check the “Yes” box if the crossing is routinely used by highway vehicles to obtain
access to facilities that provide emergency services, such as hospitals and police and
fire stations. Otherwise check the “No” box.

Submission Information – This information is used for administrative purposes
and is not available on the public website.

Figure 2-99: U.S. DOT-FRA Crossing Inventory Form Submission Information

Enter the name of the submitter, the organization represented by the submitter, the
telephone number of the submitter, and the date that the Form is being submitted. If the
crossing has multiple forms, the information provided in this section should relate to the
submitting railroad. This information, “Name,” “Organization,” “Phone,” and “Date” must
be provided on the hardcopy Inventory Form only (not electronically). Information
collected electronically will be captured through the user’s account information and the
time-stamped submittal action.

49
Instructions for Completing the U.S. DOT Crossing Inventory Form

APPENDIX A – U.S. DOT Crossing Inventory Form
Obtaining an Inventory Number
Highway-rail and pathway crossings in the United States (both at-grade and gradeseparated) must have an assigned U.S. DOT National Highway-Rail Crossing Inventory
Number (Inventory Number).
Valid Inventory Numbers can be obtained by submitting an email request to:
[email protected].
When submitting an email request for Inventory Numbers, please provide the total
number of Inventory Numbers needed and the name, title, company, mailing address,
phone number, and fax number of the requestor.
Submission of the Inventory Form
The “U.S. DOT Crossing Inventory Form” (Form), is a two-page, single-sheet, five-part
form that provides for easy photocopying and distribution to appropriate parties. The
five parts of the form include the following categories:
Part I.
Location and Classification Information
Part II.
Railroad Information
Part III.
Highway or Pathway Traffic Control Device Information
Part IV.
Physical Characteristics
Part V.
Public Highway Information
As reflected below, the type of crossing will dictate which parts of the Inventory Form
must be completed by railroads for the initial reporting of new and previously unreported
highway-rail grade and pathway crossings:


Public Highway-Rail Grade Crossing: Complete entire Inventory Form (with the
exception of I.20 and III.2.K);



Private Highway-Rail Grade Crossing: Complete Header, plus Parts I, II, and
III.2.K of the Inventory Form and the Submission Information section;



Public Pathway Grade Crossing: Complete Header, plus Parts I and II of the
Inventory Form (with the exception of I.20) and the Submission Information
section;



Private Pathway Grade Crossing: Complete Header, plus Parts I, II, and III.2.K
of the Inventory Form and the Submission Information section;

Appendix A-1



Pedestrian Station Grade Crossing (Station, Ped.): Complete Header, plus Parts
I and II of the Inventory Form (with the exception of I.20) and Submission
Information section;



Grade-Separated Crossing (highway-rail, pathway, and pedestrian station):
Complete Header, plus Part I of the Inventory Form (with the exception of I.20)
and the Submission Information section.

For periodic updates to the Crossing Inventory, refer to the Responsibility Table in
Appendix B for detailed instructions regarding which data fields must be updated at
least every 3 years by the primary operating railroad.
For a change from a private highway-rail grade crossing to a public highway-rail grade
crossing, railroads must complete the entire Inventory Form (with the exception of I.20
and III.2.K) with updated information.
For a change from a private pathway grade crossing to a public pathway grade
crossing, railroads must update the Header, Parts I, II, and III.2.K of the Inventory Form
and the Submission Information section.
For changes in the crossing surface or a change in the crossing warning devices at a
public highway-rail grade crossing, the primary operating railroad must complete all of
the data fields in the Header of the Inventory Form, check the “Change in Data” box in
“Reason for Update” field and update all data fields in Parts II and III on the Inventory
Form. If a hardcopy Inventory Form update will be submitted to the Crossing Inventory,
complete the Submission Information section of the Inventory Form as well.
Hardcopy Submission
Complete the Submission Information data field at the bottom of page 2 of the Inventory
Form for all hardcopy submissions.
Please refer to FRA’s Web site (www.fra.dot.gov) to obtain the mailing address for hardcopy Inventory Form submissions. To find the appropriate mailing address enter
“crossing inventory” in the search box of the FRA homepage.
Electronic Submission
Completed Inventory Forms may also be submitted electronically to the
U.S. DOT National Highway-Rail Crossing Inventory. Detailed instructions for the
electronic submission of Inventory Forms can be found in the Electronic Submission
Instructions, which is a separate document.

Appendix A-2

Appendix A-3

Appendix A-4

APPENDIX B – Responsibility Table for Periodic Updates to the
Crossing Inventory
 

This responsibility table only applies to periodic updates to the Crossing
Inventory. This table is intended to clarify which fields have been assigned to
primary operating railroads (i.e., railroad or urban rapid transit operator) for
updating and which fields have been assigned to State agencies for voluntary
updating.
For guidance on reporting new and previously unreported crossings, please
refer to the Introduction and Appendix A to this Guide.
Entities subject to FRA’s final rule on National Highway-Rail Crossing Inventory
Reporting Requirements should refer to the rule published in the Federal
Register, as well as the additional information provided in this Guide. Should
any portion of this table conflict with the final rule, the language of the final rule
shall govern.
O – Optional; R – Required; C – Conditionally Required;
(see Guide for instructions)

LLLLLL – Not Applicable

 
Box 

Field 

Header 
A. 
Revision Date 
B. 
Reporting Agency 
C. 
Reason for Update 
D. 
DOT Crossing Inventory Number 
Part I:  Location and Classification Information 
1. 
Primary Operating Railroad 
2. 
State 
3. 
County 
4. 
City/Municipality 
5. 
Street/Road Name & Block Number 
6. 
Highway Type & No. 
7. 
Do Other Railroads Operate a Separate Track 
8. 
Do Other Railroads Operate over Your Track 
9. 
Railroad Division or Region 
10. 
Railroad Subdivision or District 
11. 
Branch or Line Name 
12. 
RR Milepost 
13. 
Line Segment 
14. 
Nearest RR Timetable Station 
15. 
Parent RR 
16. 
Crossing Owner 

Appendix B-1

Update Provided 
by State 
Public 
Private 

Update Provided by 
Railroad or Transit 
Public 
Private 

R 
R 
R 
R 

 
 
 
 

R 
R 
R 
R 

R 
R 
R 
R 

 
R 
R 
R 
R 
R 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

R 
 
 
 
 
 
R 
R 
R 
R 
R 
R 
O 
O 
R 
R 

R 
R 
R 
R 
R 
R 
R 
R 
R 
R 
R 
R 
O 
O 
R 
R 

Update Provided 
by State 
Box 
Field 
Public 
Private 
17. 
Crossing Type 
R 
 
18. 
Crossing Purpose 
R 
 
19. 
Crossing Position 
R 
 
20. 
Public Access 
 
 
21. 
Type of Train Service 
 
 
22. 
Average Passenger Train Count Per Day 
 
 
23. 
Type of Land Use 
R 
 
24. 
Is There an Adjacent Crossing with a Separate  R 
 
Number? 
25. 
Quiet Zone 
 
 
26. 
HSR Corridor ID 
R 
 
27. 
Latitude in decimal degrees 
R 
 
28. 
Longitude in decimal degrees 
R 
 
29. 
Lat/Long Source 
R 
 
30.A.  Railroad Use 
O 
 
30.B.  Railroad Use 
O 
 
30.C.  Railroad Use 
O 
 
30.D.  Railroad Use 
O 
 
31.A.  State Use 
O 
 
31.B.  State Use 
O 
 
31.C.  State Use 
O 
 
31.D.  State Use 
O 
 
32.A.  Narrative (Railroad Use) 
O 
 
32.B.  Narrative (State Use) 
O 
 
33. 
Emergency Notification Telephone No. 
 
 
34. 
Railroad Contact (Telephone No.) 
 
 
35. 
State Contact (Telephone No.) 
R 
 
Part II:  Railroad Information 
1.A. 
Total Day Thru Trains (6AM to 6PM) 
 
 
1.B. 
Total Night Thru Trains (6AM to 6PM) 
 
 
1.C. 
Total Switching Trains 
 
 
1.D. 
Total Transit Trains 
 
 
1.E. 
Check If Less Than One Movement Per Day 
 
 
2 
Year of Train Count Data 
 
 
3.A 
Maximum Timetable Speed (mph)  
 
 
3.B 
Typical Speed Range Over Crossing (mph) 
 
 
4. 
Type and Count of Tracks 
 
 
5. 
Train Detection (Main Track Only) 
 
 
6. 
Is Track Signaled? 
 
 
7.A. 
Event Recorder 
 
 
7.B. 
Remote Health Monitoring 
 
 
Part III:  Highway or Pathway Traffic Control Device Information 
1 
Are There Signs or Signals? 
R 
 

Appendix B-2

Update Provided by 
Railroad or Transit 
Public 
Private 
 
R 
 
R 
 
R 
 
R 
R 
R 
R 
R 
 
R 
 
R 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
R 
R 
 

 
R 
R 
R 
R 
O 
O 
O 
O 
O 
O 
O 
O 
O 
O 
R 
R 
 

R 
R 
R 
R 
C 
R 
R 
R 
R 
R 
R 
C 
C 

R 
R 
R 
R 
C 
R 
R 
R 
R 
R 
R 
C 
C 

 

 

Box 

Field 

2.A. 
2.B. 
2.C. 
2.D. 
2.E. 
2.F. 
2.G. 
2.H. 
2.I. 
2.J. 
2.K. 
2.L. 
3.A. 
3.B. 
3.C. 

Crossbuck Assemblies 
STOP Signs (R1‐1) 
YIELD Signs (R1‐2) 
Advance Warning Signs  
Low Ground Clearance Sign (W10‐5) 
Pavement Markings 
Channelization Devices / Medians 
EXEMPT Sign (R15‐3) 
ENS Sign Displayed (I‐13) 
Other MUTCD Signs  
Private Crossing Signs (if Private) 
LED Enhanced Signs  
Gate Arms  
Gate Configuration 
Cantilevered (or Bridged) Flashing Light 
Structures  
3.D. 
Mast Mounted Flashing Lights  
3.E. 
Total Count of Flashing Light Pairs 
3.F. 
Original Installation Date of Current Active 
Warning Devices  
3.G. 
Wayside Horn 
3.H. 
Highway Traffic Signals Controlling Crossing 
3.I. 
Bells  
3.J. 
Non‐Train Active Warning  
3.K. 
Other Flashing Lights or Warning Devices 
4.A. 
Does nearby Highway Intersection Have 
Traffic Signals? 
4.B. 
Highway Traffic Signal Interconnection 
4.C. 
Highway Traffic Signal Preemption 
5. 
Highway Traffic Pre‐Signals 
6. 
Highway Monitoring Devices  
Part IV:  Physical Characteristics 
1. 
Traffic Lanes Crossing Railroad 
2. 
Is Roadway/Pathway Paved? 
3. 
Does Track Run Down a Street? 
4. 
Is Crossing Illuminated? 
5. 
Crossing Surface 
6. 
Intersecting Roadway Within 500 feet? 
7. 
Smallest Crossing Angle 
8. 
Is Commercial Power Available? 
Part V:  Public Highway Information 
1. 
Highway System 
2. 
Functional Classification of Road at Crossing 

Appendix B-3

Update Provided 
by State 
Public 
Private 
R 
 
R 
 
R 
 
R 
 
R 
 
R 
 
R 
 
R 
 
R 
 
R 
 
 
 
R 
 
R 
 
R 
 
R 
 

Update Provided by 
Railroad or Transit 
Public 
Private 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
R 
 
 
 
 
 
 
 
 

R 
R 
R 

 
 
 

 
 
 

 
 
 

R 
R 
R 
R 
R 
R 

 
 
 
 
 
 

 
 
 
 
 
 

 
 
 
 
 
 

R 
C 
R 
R 

 
 
 
 

 
 
 
 

 
 
 
 

R 
R 
R 
R 
R 
R 
R 
O 

 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 

R 
R 

 
 

 
 

 
 

Box 

Field 

3. 
Is Crossing on State Highway System? 
4. 
Highway Speed Limit 
5. 
Linear Referencing System (LRS Route ID) 
6. 
LRS Milepost 
7. 
Annual Average Daily Traffic (AADT) 
8. 
Estimated Percent Trucks 
9. 
Regularly Used by School Buses? 
10. 
Emergency Service Route 
Submission Information 
 
Name 
 
Organization 
 
Phone 
 
Date 

Update Provided 
by State 
Public 
Private 
R 
 
R 
 
O 
 
O 
 
R 
 
R 
 
R 
 
R 
 

Update Provided by 
Railroad or Transit 
Public 
Private 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

R 
R 
R 
R 

R 
R 
R 
R 

 
 
 
 

R 
R 
R 
R 

 

Note: Please refer to the individual sections of this Guide for exceptions to the Crossing
Inventory Responsibility Table above.

Appendix B-4

APPENDIX C – Reporting Crossings That Have Multiple Operating
Railroads
Except for situations where multiple railroads or urban rapid transit operators
operate trains on separate tracks through the same crossing, if more than one
operating railroad operates trains through a single highway-rail or pathway
crossing, the primary operating railroad is responsible for submitting and
updating crossing data on behalf of all the operating railroads that operate
through the crossing.
Note: The primary operating railroad is the operating railroad that either owns
or maintains the track through the highway-rail or pathway crossing, unless the
crossing is located within a private company, port, or dock area. If more than
one operating railroad either owns or maintains the track through the highwayrail or pathway crossing, or if no operating railroad owns or maintains the track
through the highway-rail or pathway crossing, then the operating railroad that
operates the highest number of trains through the crossing is the primary
operating railroad. In the event that there is only one operating railroad that
operates one or more trains through a highway-rail or pathway crossing, that
operating railroad is the primary operating railroad.
Where multiple railroads or urban rapid transit operators operate trains on
separate tracks through the same crossing, each railroad or urban rapid transit
operator must submit crossing data to the Crossing Inventory (see Part I, Item 7
above), and each must place its name in the field titled “Primary Operating
Railroad” (this links each railroad to the data it has submitted). The primary
operating railroad must submit the rest of the railroad-required data. Except for
the train counts, the National Crossing Inventory Record will reflect the data for
the primary operating railroad.
The FRA data management system will combine the critical data (such as train
counts) to produce a combined Crossing Inventory Record for the crossing for
analyzing the risk along with providing the individual records for each of the
operating railroads. Each railroad must place its name in the field titled
“Primary Operating Railroad” in Part 1, Box 1, in order to make clear which
record belongs to which railroad.
Each Inventory Form submitted by multiple operating railroads for the same
crossing will have the same crossing inventory number.
See the Figure below for an example of which fields must be completed and
Appendix C-1

updated by each railroad or urban rapid transit operator that operates trains on
separate tracks through the same crossing.

Appendix C-2

Areas highlighted in yellow are the fields required to be completed: 
 
 

 

Appendix C-3

APPENDIX D – Definitions
Adjacent Crossings – grade crossings with separate Crossing Inventory Numbers,
with their own separate warning devices, on the same vehicular highway or pathway,
where the distance between the inside rail of each crossing, as measured along the
highway or pathway, does not exceed 100 feet.
Annual Average Daily Traffic (AADT) – a figure that represents the amount of vehicles
traveling past a known location on a roadway for a year, divided by 365 days. In the
event that 365 consecutive days of traffic counts are not available, there are traffic
engineering calculations that can be used to develop a representative figure for AADT
based upon traffic counts of shorter duration.
Back Lights – a flashing light pair on the far side of the crossing, typically mounted 180
degrees on the signal mast or cantilever structure from the flashing light pair of the near
side of the crossing.
Channelization Device – a traffic separation system made up of a raised longitudinal
channelizer with vertical panels or tubular delineators that is placed between opposing
highway traffic lanes designed to alert or guide traffic around an obstacle or to direct
traffic in a particular direction.
Closed Crossing – a location where a previous crossing no longer exists because
either the railroad tracks have been physically removed, or each pathway or roadway
approach to the crossing has been physically removed, leaving behind no intersection
of railroad tracks with either a pathway or roadway. A grade-separated highway-rail or
pathway crossing that has been physically removed is also considered a closed
crossing.
Crossing Inventory – the U.S. DOT National Highway-Rail Crossing Inventory.
Diagonal Crossing – a highway-rail crossing where the railroad tracks run diagonally
through the highway-highway intersection, thus bisecting the two roadways. Only one
Crossing Inventory Number is to be assigned to such locations.
Event Recorder – a device designed to resist tampering that monitors and records data
on information at the grade crossing location such as (but not limited to) train speed,
direction of motion, time, and distance over the most recent timeframe (e.g. last 24 or
48 hours) of the grade crossing warning system operation.
Flashing Light Pairs – two red-colored light units that flash alternately at a rate of 45 to
65 times per minute. The main components of a flashing light pair are the hood,
background, roundel, lamp, lamp holder, reflector, and housing. The background is 20

Appendix D-1

or 24 inches in diameter and is painted a nonreflecting black to provide a contrast for
the red light. The hood is also painted black.
Gate – an automatically-operated traffic control device which, when activated into a
horizontal position, is intended to physically impede users such that they are
discouraged from entering a particular grade crossing.
Two Quadrant Gates – a gate configuration featuring gates only on entrance lanes
leading on to the crossing. If a crossing does not have any gates on any exit lanes
leading off the crossing, then it is to be considered a “two-quadrant gate” crossing.
Note: A gated crossing on a one-way street is to be considered a “2 Quad” gate
configuration.
Three Quadrant Gates – a specific gate configuration featuring gates on all
entrance lanes leading on to the crossing, but with only one exit leading off the
crossing that is equipped with a gate.
Four Quadrant Gates – a specific gate configuration that features gates on all
entrance and all exit lanes at the crossing. When four quadrant gates are activated
and fully lowered, all entrance lanes and all exit lanes are blocked by gates .
Full (Barrier) Resistance Gates – a gate-like device that is specifically designed to
physically prevent a highway vehicle from entering the crossing area when the
resistance gate system is fully deployed.
Median Gates (sometimes referred to as dual entrance gates) – a supplemental
gate installation located on a roadway’s median (to the left of the travel lanes) that
works in combination with a gate installed on the outside edge of the roadway (to the
right of the travel lanes) to jointly provide blockage of multiple lanes on a single
roadway approach to the crossing, with both gate arm tips meeting (2-foot maximum
gap) in the middle.
Grade Crossing – for purposes of the Inventory, either a highway-rail grade crossing,
pathway grade crossing or pedestrian station grade crossing.
Highway-Rail Crossing – for purposes of the Crossing Inventory, the location where
one or more railroad tracks intersect with a public highway, road, street, or private
roadway, either at-grade or grade-separated, including associated sidewalks.
A crossing includes those tracks that lie within the same pair of warning devices. Thus,
an intersection of a roadway with 3 tracks (2 mainline and 1 spur) where the mainline
tracks have flashing lights and the spur track has crossbucks would be considered two
crossings with two separate crossing inventory numbers. One crossing would consist of
the mainline tracks with the flashing lights and one crossing would consist of the spur
track that has crossbucks.
Appendix D-2

Highway-Rail Grade Crossing – for purposes of the Crossing Inventory, a highway-rail
crossing that is at the same grade level as the railroad tracks.
Inventory Form – the U.S. DOT Crossing Inventory Form (Form FRA F 6180.71).
Inventory Number – the number assigned to a highway-rail crossing or pathway
crossing in the Crossing Inventory.
Median – a non-traversable portion of a divided highway separating the travel ways for
traffic in opposite directions.
MUTCD – the Manual on Uniform Traffic Control Devices published by the Federal
Highway Administration.
Open Crossing – a highway-rail crossing or pathway crossing where both railroad
operations and highway or pathway traffic are possible.
Operating Railroad – any railroad or urban rapid transit operator that operates one or
more trains through a highway-rail crossing or pathway crossing on, or connected to,
the general railroad system of transportation.
Pathway – a path for authorized users, outside the traveled way and physically
separated from the roadway by an open space or barrier and either within the highway
right-of-way or within an independent alignment. Pathways include shared-use paths,
but do not include sidewalks.
Pathway Crossing – a pathway that: (1) is explicitly authorized by a public authority or
a railroad; (2) is dedicated for the use of non-vehicular traffic including pedestrians,
bicyclists, and others, (3) is not associated with a public highway, road, or street, or a
private roadway; and (4) crosses one or more railroad tracks either at grade or gradeseparated. However, an area where pedestrians trespass, even routinely, is not
considered to be a pathway crossing.
Pathways that are contiguous with, or separate but adjacent to, highway-rail crossings
are presumed to be part of the highway-rail crossing and are not considered separate
crossings. However, pathways that are located more than 25 feet from the location
where a highway, road, or street intersects with one or more railroad tracks are
generally considered to be separate pathway crossings.
Pathway Grade Crossing - for purposes of the Crossing Inventory, a pathway crossing
that is at the same grade level as the tracks.
Pedestrian Crossing - See Pathway Crossing.

Appendix D-3

Pedestrian Station Crossing (Station, Ped.) – a pathway crossing located within a
passenger station.
Pedestrian Station Grade Crossing – a pedestrian station crossing that is at the same
grade level as the tracks.
Plant Railroad – a plant or installation that owns or leases a locomotive, uses that
locomotive to switch cars throughout the plant or installation, and is moving goods
solely for use in the facility’s own industrial processes. The plant or installation could
include track immediately adjacent to the plant or installation if the plant railroad leases
the track from the general system railroad and the lease provides for (and actual
practice entails) the exclusive use of that trackage by the plant railroad and the general
system railroad for purposes of moving only cars shipped to or from the plant. A plant
or installation that operates a locomotive to switch or move cars for other entities, even
if solely within the confines of the plant or installation, rather than for its own purposes
or industrial practices, will not be considered a plant railroad because the performance
of such activity makes the operation part of the general railroad system of
transportation.
Primary Operating Railroad – the operating railroad that either owns or maintains the
track through the highway-rail or pathway crossing, unless the crossing is located within
a private company, port, or dock area. If more than one operating railroad either owns
or maintains the track through the highway-rail or pathway crossing, or if no operating
railroad owns or maintains the track through the highway-rail or pathway crossing, then
the operating railroad that operates the highest number of trains through the crossing is
the primary operating railroad. In the event that there is only one operating railroad that
operates one or more trains through a highway-rail or pathway crossing, that operating
railroad is the primary operating railroad.
For highway-rail and pathway crossings that are located within a private company, port,
or dock area, each railroad that owns track leading to the private company, port, or dock
area will be considered a primary operating railroad as applied to crossings within the
private company, port, or dock area.
Private Crossing – a highway-rail or pathway crossing that is not a public crossing.
Typical types of private crossings include farm crossings, industrial plant crossings, and
residential access crossings.
Public Authority – the public entity responsible for traffic control or law enforcement at
a highway-rail crossing or the public entity that authorized a pathway crossing.
Public Crossing – a highway-rail or pathway crossing where the approaches are under
the jurisdiction of and maintained by a public authority and open to public travel. All
approaches must be under the jurisdiction of the public authority and no approach may
be on private property, unless state law or regulation provides otherwise.
Appendix D-4

For purposes of this definition “open to public travel” means that the road or pathway
section is available (except during scheduled periods, extreme weather or emergency
conditions) and open to the general public for use without restrictive gates, prohibitive
signs, or regulation. Restrictions for highway-rail crossings that are based on size,
weight, or class of registration do not apply.
In situations where a State has empowered a public agency (such as a State
Department of Transportation, State Highway Department, Public Utility Commission,
State Commerce Commission, etc.) to make a determination as to whether crossings
are public or private, such determinations will govern for Inventory purposes.
Quiet Zone – a segment of a rail line, within which is situated one or a number of
consecutive public highway-rail crossings at which locomotive horns are not routinely
sounded.
Remote Health Monitoring – an electronic system designed to remotely notify the
railroad (typically the railroad signal maintainer or a trouble desk) that components of
the automatic warning system are not functioning as intended.
Side Lights – a flashing light pair, typically mounted on the signal mast or cantilever
structure, used to warn vehicular traffic and/or pedestrians approaching from side
streets, parking lots, driveways or pathways.
Sidewalk – that portion of a street between the curb line, or lateral line of a roadway,
and the adjacent property line. Sidewalks also include easements on private property
that are paved or improved and intended for use by pedestrians.
Temporary Crossing – a highway-rail or pathway crossing created to serve a specific
activity for a temporary time period not to exceed six months. Temporary crossings do
not need an inventory number and do not need to be reported to the Crossing Inventory.
Through (Thru) Trains – trains whose primary responsibility is to operate over a route
with defined beginning and end points.

Appendix D-5

APPENDIX E – Frequently Asked Questions (FAQs)
Q 1.

Which types of crossings must be reported to the Crossing Inventory?
All crossings, Highway-Rail, Pathway (formerly known as Pedestrian) and
Pedestrian Station, either at-grade and grade-separated, must be reported to the
Crossing Inventory, with the exception of temporary crossings. Temporary
crossings are crossings that are created to serve a specific activity for a
temporary time period not to exceed six months.
An Inventory Number must be assigned to each crossing that is reported to the
Crossing Inventory, except for certain crossings that are discussed in more detail
in the Inventory Guide.

Q 2.

If multiple operating railroads operate through a highway-rail or pathway
crossing, which operating railroad is responsible for getting the Inventory
number and filing the Inventory Forms?
With the exception of highway-rail and pathway crossings where multiple
railroads or urban rapid transit operators operate trains on separate tracks
through the same crossing, the primary operating railroad will be responsible for
requesting the Inventory Number and submitting crossing data (including periodic
updates) to the Crossing Inventory for a particular highway-rail or pathway
crossing.
The primary operating railroad either owns or maintains the track through the
highway-rail or pathway crossing, unless the crossing is located within a private
company, port, or dock area. If more than one operating railroad either owns or
maintains the track through the highway-rail or pathway crossing, or if no
operating railroad owns or maintains the track through the highway-rail or
pathway crossing, then the operating railroad that operates the highest number
of trains through the crossing is the primary operating railroad. In the event that
there is only one operating railroad that operates one or more trains through a
highway-rail or pathway crossing, that operating railroad is the primary operating
railroad. For highway-rail and pathway crossings that are located within a private
company, port, or dock area, each railroad that owns track leading to the private
company, port, or dock area will be considered a primary operating railroad as
applied to crossings within the private company, port, or dock area.
Please refer to Appendix C for detailed guidance on reporting to the Crossing
Inventory when multiple railroads or urban rapid transit operators operate trains
on separate tracks through the same highway-rail or pathway crossing.

Appendix E-1

Q 3.

Do I need to get an Inventory Number for a private crossing?
Yes. Railroads must obtain Inventory numbers for private crossings.
This includes crossings that are in a plant area owned by a private corporation, in
a port or dock area or in the rail yard of the operating railroad. The primary
operating railroad may decide whether to assign one Inventory Number for each
crossing on private property or for multiple crossings within the plant, port or dock
area or rail yard.

Q 4.

Where can I get valid Crossing Inventory Numbers?
To acquire crossing numbers from FRA, please send an e-mail to:
[email protected].

Q 5.

How do I update the Crossing Inventory for my Railroad or State?
Please refer to Appendix B of this Inventory Guide, the Crossing Inventory
Responsibility Table, for information related to which data fields on the Inventory
Forms need to be updated by railroads and/or the States.
With the exception of Class I railroads who must submit updates to the Crossing
Inventory electronically, all non-Class I railroads and States may choose to
submit updates to the Crossing Inventory electronically or by mailing updated
Inventory Forms.
Please see FRA’s Web site for the correct mailing address for hardcopy
U.S. DOT Crossing Inventory (Crossing Inventory) submissions.

Q 6.

Can I submit Inventory Forms electronically?
Yes. While Class I railroads are required to file Inventory data electronically, all
railroads and States are encouraged to file data electronically in accordance with
the instructions contained in this Inventory Guide.

Q 7.

Do I have to submit Inventory Forms electronically?
Class I railroads must file their Inventory Forms electronically. Therefore,
Inventory updates, as well as the submission of Inventory data for new and
previously unreported crossings, will need to be submitted electronically to the
Crossing Inventory by Class I railroads. All other operating railroads and the
States may choose to submit Inventory Forms electronically, but are not required
to do so.

Appendix E-2

Q 8.

Which parts of the Inventory Form must be completed for a new or
previously unreported crossing?
The type of crossing will dictate which parts of the Inventory Form must be
completed by railroads for the initial reporting of new and previously unreported
highway-rail and pathway crossings. The Inventory Form will be considered
“completed”, if the following parts of the Inventory Form are completed:









Q 9.

Public Highway-Rail Grade Crossing: Complete entire Inventory Form (with
the exception of I.20 and III.2.K);
Private Highway-Rail Grade Crossing: Complete Header, plus Parts I, II, and
III.2.K of the Inventory Form and the Submission Information section;
Public Pathway Grade Crossing: Complete Header, plus Parts I and II of the
Inventory Form (with the exception of I.20) and the Submission Information
section;
Private Pathway Grade Crossing: Complete Header, plus Parts I, II, and
III.2.K of the Inventory Form and the Submission Information section;
Pedestrian Station Grade Crossing (Station, Ped.): Complete Header, plus
Parts I and II of the Inventory Form (with the exception of I.20) and
Submission Information section;
Grade-separated Crossing (highway-rail, pathway and pedestrian station):
Complete Header, plus Part I of the Inventory Form (with the exception of
I.20) and the Submission Information section.

Where do I send hardcopies of completed Inventory Forms?
Please see FRA’s webpage for correct mailing address for hard copy Crossing
Inventory Submissions.

Q 10. If I only need to submit a few Inventory Forms, can I scan them
electronically and then submit them to the Crossing Inventory?
Scanning a document for transmittal to the Crossing Inventory is considered a
paper submission. This type of transmission does NOT constitute an electronic
submission; therefore, Class I railroads may not use this form of submission.
Non-Class I railroads may transmit scanned documents to:
[email protected]. This address goes to FRA’s data processing contractor
who will process the submittals in accordance with their workload.
Q 11. Can I update crossing records online?

Appendix E-3

Yes, FRA will provide a new secure web page to allow users to find and update
data for highway-rail and pathway crossings that have already been entered into
the Crossing Inventory.
Q 12. Will use of the GX32 software count as an electronic submission?
No, the GX32 software will be replaced with a secure web-based application that
will provide the state/railroad user with similar functionality. This will allow the
crossing data to be current and updates will be made instantaneously (with
business rules in place to ensure that only allowable data elements can be
changed). The new system will allow for more accurate record keeping and
timely submissions. Use of this new web-based application will constitute
electronic submission.
Q 13. What if there is no change in the data that currently exists in the Crossing
Inventory?
Even if the railroad has verified that there is no change in the existing data in the
Crossing Inventory, the railroad must submit an update to the Crossing Inventory,
electronically or by using Form FRA F 6180.71 at least once every 3 years. In
this instance, the Header on the Inventory Form will need to be completed. With
respect to item C, “Reason for Update”, in the Header, the box for “Date Change
Only” should be checked, in order to signify that the current data in the Crossing
Inventory is correct.
Q 14. Do we have to update crossings that have been closed or are gradeseparated?
A crossing that has been reported to the Crossing Inventory as closed does not
require further updating unless it is reopened. A grade-separated crossing that
has been reported to the Crossing Inventory does not require further updating
unless it is physically removed in which case it should be reported as closed.
Q 15. Do we have to use the paper Form FRA F 6180.71 for updating?
No, Class I railroads must submit updates to the Crossing Inventory
electronically. All other railroads, urban rapid transit operators and the States are
encouraged to submit updates to the Crossing Inventory electronically, but may
submit hard copy updates.
Q 16. How long will it take for Inventory updates to appear on FRA’s Web site?
Electronic submissions will be updated to the inventory immediately following a
successful submission (i.e., all required data is provided and passes all validation
rules). It generally takes between 1 to 3 months before updates will appear on
Appendix E-4

the Web site for hardcopy submissions. This is an estimate as the timeline is
dependent upon the number of hardcopy submissions received and the amount
of time to conduct manual data entry.
Q 17. What is the best way to get started updating records for a State or Railroad
that has thousands of crossings?
For States and Railroads with a large number of crossings, the best way to get
started updating the Crossing Inventory is to first determine which crossings have
been entered into the Crossing Inventory. This can be accomplished by
verification of the Inventory number in both the Crossing Inventory and the
respective State or Railroad File. Compare only the Inventory Numbers, and then
resolve the status of those that don’t match (Open or Closed, or non-existent in
either file). Next, carry the comparison further by verifying Public versus Private
crossing type, and then State or Operating Railroad. Once there is agreement
with regards to the existing number of crossings, Open or Closed status, Public
or Private crossing type, and in which State or on which Operating Railroad, then
the balance of the information can be checked, verified, and updated.
Q 18. How do I get the most current Crossing Inventory data for our State or
Railroad?
The most current Crossing Inventory data is available for download from FRA’s
Safetydata Web site.
Q 19. We are planning to develop our own database software for our own
crossing inventory file. Are there consultants that have done this before
that we can contact, and is there anything specific that we should know or
do before we get started?
There are several States and Railroads who have hired consulting firms to
develop electronic databases for their crossing inventory records and for
managing their crossing improvement program and contracts. You will need to
contact the individual States or Railroads to determine which firms have
performed in a satisfactory manner. However, if you decide to contract with a firm
directly, you should instruct them to develop their data file structure to be
compatible with the FRA data file so that data can be directly transferred to FRA
without conversion. The consultant should use the Electronic Submission
Instructions when developing the software. The Electronic Submission
Instructions can be found on the Grade Crossing Inventory System (GCIS)
secure site.
Q 20. Where can I find information regarding the Format and Description of the
Crossing Inventory Data Fields for electronic submissions?

Appendix E-5

Information regarding the Format and Description of the Crossing Inventory data
fields can be found in the Electronic Submission Instructions. The Electronic
Submission Instructions can be found on the GCIS secure site.
Q 21. How do I get crossing inventory data and information for my locale?
Crossing records can be accessed from FRA’s Safetydata Web site.
Q 22. Who is responsible for reporting a closed crossing in the Inventory and
how is it done?
The primary operating railroad must report the closure of a highway-rail or
pathway crossing to the Crossing Inventory, but the State may also report the
closure of a public crossing.
Reporting a closed a crossing in the Crossing Inventory is a very simple process.
A closed crossing can be reported by completing the Header information and
checking “closed” in section C, “Reason for Update”, in the Header of the
Inventory Form. The date of the closure, if known, may be shown in Part I.30 or
Part I.31, as appropriate.
A crossing that is closed remains in the Crossing Inventory forever. The
Inventory number remains with that location forever, and the number cannot be
reused at a different location. However, a crossing that has been closed can be
reopened in the Crossing Inventory at any time in the future by simply updating
the inventory record.
Q 23. How do I report a crossing that has previously been closed and is now reopened?
Complete all of the data fields in the Header and check the “Re-Open” box in
Item C of the Header of the Inventory Form. The reporting agency should
coordinate with the other agency to update all of the data fields on the Inventory
Form that have been assigned to the State and railroad for updating by Appendix
B to the Inventory Guide.
Finally, if a hardcopy Inventory Form update will be submitted to the Crossing
Inventory, the Submission Information section of the Inventory Form will also
need to be completed.
Q 24. How do I report the sale of a highway-rail or pathway crossing to the
Crossing Inventory?
First, complete all of the data fields in the Header of the Inventory Form. If the
sale of the highway-rail or pathway crossing will result in a new primary operating
Appendix E-6

railroad, check the “Change in Primary Operating RR” box in Item C of the
Header of the Inventory Form. However, if the sale of the Highway-Rail or
Pathway Crossing will not result in a new primary operating railroad, check
“Change in Data” box in item C of the Header of the Inventory Form.
In addition, if the sale of the crossing will result in a change to any of the
following data fields, update the changed field:


Item 1 in Part I of the Inventory Form (“Primary Operating Railroad”)



Item 15 in Part I of the Inventory Form (“Parent RR”)



Item 16 in Part I of the Inventory Form (“Crossing Owner”)

Finally, if a hard-copy Inventory Form update will be submitted to the Crossing
Inventory, complete the Submission Information section of the Inventory Form as
well.
Q 25. Who needs to provide Latitude / Longitude data and in what format?
For new or previously unreported crossings, the primary operating railroad is
required to obtain and provide this information when submitting the initial
Inventory Form to the Crossing Inventory. By design, data cannot be added to
the Crossing Inventory without all applicable information being provided for a new
or previously unreported crossing.
States are expected to provide updates for latitude and longitude data for public
highway-rail crossings, including those that are grade-separated, and all public
pathway crossings. Railroads are to provide updates for latitude and longitude
data for private highway-rail crossings, including those that are grade-separated,
and all private pathway crossings.
The FRA Office of Safety uses the WGS-84 (World Geodetic System 1984)
datum standard. The Crossing Inventory requires Latitude and Longitude to be
submitted in “Degrees.Digital Degrees” (DDD) format. The coordinates are to be
measured at the center of the crossing. The measurement values are to be
entered in decimal (DDD) format as (nn.nnnnnnn) for Latitude and as (nnn.nnnnnnn) for Longitude. The values need to be taken to at least five (5)
decimal places, but seven (7) decimal places are preferred. Please refer to the
previous Inventory Guide discussion of Part I, Fields 27 and 28 on the Inventory
Form, for additional information which includes conversion instructions from the
“Degrees.Minutes.Seconds” (DMS) format.
Q 26. How do you determine whether separate Inventory numbers should be
assigned to crossings that are located in close proximity to each other?
Appendix E-7

For purposes of the Crossing Inventory, a highway-rail crossing consists of those
railroad tracks that lie between a pair of warning devices. Therefore, each
crossing with its own pair of warning devices must have an Inventory number
assigned.
Q 27. Is a pathway ever considered to be a part of a highway-rail crossing?
Pathways that are contiguous with, or separate but adjacent to, highway-rail
crossings are presumed to be part of the highway-rail crossing and are not
considered separate crossings. However, pathways that are located more than
25 feet from the location where a highway, road, or street intersects with one or
more railroad tracks are generally considered to be separate pathway crossings.
Q 28. A crossing that was closed seven years ago is being reopened for highway
traffic. Does the crossing need a new inventory number?
No. Inventory numbers stay with the location to which they were originally
assigned. You must use the Inventory number that was previously assigned to
the crossing.
Q 29. A roadway is being modified which will result in the closure of an existing
crossing and the opening of a new crossing 100 feet down the track. Since
the crossing is essentially being relocated, can I use the Inventory number
that has already been assigned?
No. Inventory numbers stay with the location to which they were originally
assigned. A new, unused Crossing Inventory number must be assigned to the
new crossing.
Q 30. Can a railroad or State change all the fields in an existing Inventory
Record?
No. The Responsibility Table for Updating Crossing Inventory Data, in Appendix
B of this Guide, lists the data fields for which the railroads and States are
responsible for updating. Unless prior written notification has been provided to
FRA, if either party attempts to change fields that have not been assigned to it for
updating, those changes will be not be implemented.
Q 31. Can a railroad delegate to another railroad or state its responsibility to
update the inventory?
Yes, a railroad may allow a parent railroad or a State to update the inventory on
its behalf. However, the railroad will still be held responsible for timely and
accurate submission, regardless of any delegation. If the railroad would like to
delegate its responsibility to submit and crossing data to a State agency or a
Appendix E-8

parent corporation, prior notification must be provided jointly to FRA in writing.
Q 32. How often must the Inventory Record be updated?
With the exception of crossing inventory records for grade-separated crossings
and closed highway-rail and pathway crossings, the crossing inventory record
must be updated at least every 3 years even if nothing has changed at the
crossing. However, any crossing closure, change in crossing surface (e.g.,
timber to rubber) or change in the type of warning device (e.g., crossbuck to
flashing lights and gates) must be reported within three months. In addition, FRA
encourages updates as other crossing information changes.
Q 33. Would electronic submission allow a railroad or State to update fields for
which it is not responsible?
The Railroad only has the ability to update the data fields for which it is
responsible. Similarly, the State only has the ability to update the data fields for
which the State is responsible, regardless of the method used to provide the
update. The submitting entity should only submit updated data for processing for
which it is responsible. Exceptions to this policy are, however, permitted when
both entities have provided prior written notification to FRA.
Q 34. When a crossing is being changed from Private to Public, what data must
be provided by the submitting agency?
For a change from a private highway-rail grade crossing to a public highway-rail
grade crossing, railroads must complete the entire Inventory Form (with the
exception of I.20 and III.2.K) with updated information.
For a change from a private pathway grade crossing to a public pathway grade
crossing, railroads must update the Header, Parts I, II, and III.2.K of the
Inventory Form and the Submission Information section.
Q 35. If a private company, port or dock area, or a rail yard has multiple
crossings, is it possible to have more than one Inventory number assigned
to the facility?
A. Although one Inventory Number may be assigned for all of the crossings in
the facility, there are two reasons why a private company may have more
than one Inventory Number:
1. A railroad may assign Inventory Numbers to specific crossings while
assigning one Inventory Number to the remaining crossings.
2. If more than one operating railroad provides service to the private
company from its own track (e.g., one track off of railroad X’s track and
one track off of railroad Y’s track), each operating railroad must assign a
Appendix E-9

unique Inventory number for the private company. If a crossing accident
occurs, the railroad that is involved in the collision must use the Inventory
number that it assigned to the private company.
Q36. How do I report a change in crossing characteristics (such as a change in
the crossing surface or a change in the crossing warning devices) that is
required by 49 CFR 234.411(c) at a public highway-rail grade crossing to
the Crossing Inventory?
Complete all of the data fields in the Header of the Inventory Form, checking the
“Change in Data” box in Item C.
The primary operating railroad must update all data fields in Parts II and III on the
Inventory Form.
Finally, if a hardcopy Inventory Form update will be submitted to the Crossing
Inventory, the primary operating railroad must complete the Submission
Information section of the Inventory Form as well.

Appendix E-10

APPENDIX F – High-Speed Rail ID Corridor Designations and Codes
Key: “#” Use for Rail-Section Identifier (numeric 1 - 9) or use “X” if numeric not used.
For High Speed Rail Corridor Codes for any new corridors that are not listed above,
contact the FRA Crossing Inventory Program Manager.
High-Speed Rail Corridor Designations and Codes
Code

Corridor

Route

PNW#

Pacific
Northwest

Vancouver - Seattle - Portland - Eugene

CAV#
CAC#
CLL#

California

San Diego - Los Angeles - Stockton - Sacramento/Bay Area
Los Angeles - Bay Area - Sacramento
Los Angeles - Las Vegas

CMM#
CSK#
CIC#
CKD#
CTC#
CIL#

Chicago Hub

Chicago - Milwaukee - Minneapolis
Chicago - Springfield - St. Louis - Kansas City
Chicago - Indianapolis - Cincinnati
Chicago - Kalamazoo - Detroit
Chicago - Toledo - Cleveland
Indiana Extension: Indianapolis - Louisville

CCC#

Ohio 3 C’s

Cleveland - Columbus - Cincinnati

KEY#

Keystone

Philadelphia - Harrisburg - Pittsburgh

EMP#

Empire

New York - Albany - Buffalo

NHS#

Northern
New England
Northern
New England
New England
Southern
New England

New Haven - Hartford - Springfield

NEC#

Northeast
Corridor

Washington - Baltimore - Philadelphia - New York - New Haven Boston

NEP#
NEM#
NEW#

Boston - Portland
Boston - Montreal
Boston - Albany

Appendix F-1

High-Speed Rail Corridor Designations and Codes
Code
SER#
SES#

Corridor
Southeast

Route
Washington - Richmond - Raleigh
Raleigh - Columbia - Savannah - Jesup - Jacksonville
Raleigh - Durham - Greensboro - Charlotte - Greenville - Atlanta Macon
Virginia Extension: Richmond - Hampton Roads
Georgia Connection: Macon - Jesup

FLX#

Florida

Miami - Orlando - Tampa

GCA#
GCM#

Gulf Coast

Atlanta - Birmingham - Meridian - New Orleans
Mobile - Biloxi - New Orleans - Houston

SEC#
SEV#
SEG#

SCA#
SCT#
SCO#

South
Central

Dallas/Ft Worth - Austin - San Antonia
Dallas/Ft Worth - Texarkana - Little Rock
Dallas/Ft Worth - Oklahoma City - Tulsa

Appendix F-2


File Typeapplication/pdf
File TitleMicrosoft Word - Crossing Inventory Guide.final.docx
Authorkathryn.gresham
File Modified2015-01-06
File Created2015-01-05

© 2024 OMB.report | Privacy Policy