RD16-8 60-day notice (published)

RD16-8 60-day notice (published).pdf

FERC-725I (Order in RD16-8-000), Mandatory Reliability Standards for the Northeast Power Coordinating Council

RD16-8 60-day notice (published)

OMB: 1902-0258

Document [pdf]
Download: pdf | pdf
Federal Register / Vol. 81, No. 158 / Tuesday, August 16, 2016 / Notices
Dated: August 10, 2016.

Federal Energy Regulatory
Commission

docket or in viewing/downloading
comments and issuances in this docket
may do so at http://www.ferc.gov/docsfiling/docs-filing.asp.

BILLING CODE 6717–01–P

[Docket No. RD16–8–000]

FOR FURTHER INFORMATION CONTACT:

DEPARTMENT OF ENERGY

Commission Information Collection
Activities (FERC–725I); Comment
Request; Extension

Ellen Brown may be reached by email
at [email protected], telephone
at (202) 502–8663, and fax at (202) 273–
0873.

Federal Energy Regulatory
Commission

AGENCY:

DEPARTMENT OF ENERGY

Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–19471 Filed 8–15–16; 8:45 am]

Federal Energy Regulatory
Commission, COE.
ACTION: Notice of information collection
and request for comments.

[Docket No. EL16–103–000]

Panda Patriot LLC; Notice of Institution
of Section 206 Proceeding and Refund
Effective Date
On August 10, 2016, the Commission
issued an order in Docket No. EL16–
103–000, pursuant to section 206 of the
Federal Power Act (FPA), 16 U.S.C.
824e (2012), instituting an investigation
into the justness and reasonableness of
the Panda Patriot LLC’s Reactive Service
rates. Panda Patriot LLC, 156 FERC
¶ 61,103 (2016).

Any interested person desiring to be
heard in Docket No. EL16–103–000
must file a notice of intervention or
motion to intervene, as appropriate,
with the Federal Energy Regulatory
Commission, 888 First Street NE.,
Washington, DC 20426, in accordance
with Rule 214 of the Commission’s
Rules of Practice and Procedure, 18 CFR
385.214, within 21 days of the date of
issuance of the order.
Dated: August 10, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–19470 Filed 8–15–16; 8:45 am]
BILLING CODE 6717–01–P

VerDate Sep<11>2014

18:36 Aug 15, 2016

Jkt 238001

In compliance with the
requirements of the Paperwork
Reduction Act of 1995, 44 U.S.C.
3506(c)(2)(A), the Federal Energy
Regulatory Commission (Commission or
FERC) is soliciting public comment on
the information collection, FERC–725I
(Mandatory Reliability Standards for the
Northeast Power Coordinating Council)
which will be submitted to the Office of
Management and Budget (OMB) for a
review of the information collection
requirements.

SUMMARY:

Comments on the collection of
information are due October 17, 2016.
ADDRESSES: You may submit comments
(identified by Docket No. RD16–8–000)
by either of the following methods:
• eFiling at Commission’s Web site:
http://www.ferc.gov/docs-filing/
efiling.asp.
• Mail/Hand Delivery/Courier:
Federal Energy Regulatory Commission,
Secretary of the Commission, 888 First
Street NE., Washington, DC 20426.
Instructions: All submissions must be
formatted and filed in accordance with
submission guidelines at: http://
www.ferc.gov/help/submissionguide.asp. For user assistance contact
FERC Online Support by email at
[email protected], or by phone
at: (866) 208–3676 (toll-free), or (202)
502–8659 for TTY.
Docket: Users interested in receiving
automatic notification of activity in this
DATES:

The refund effective date in Docket
No. EL16–103–000, established
pursuant to section 206(b) of the FPA,
will be the date of publication of this
notice in the Federal Register.

asabaliauskas on DSK3SPTVN1PROD with NOTICES

54571

PO 00000

Frm 00022

Fmt 4703

Sfmt 4703

SUPPLEMENTARY INFORMATION:

Title: FERC–725I, Mandatory
Reliability Standards for the Northeast
Power Coordinating Council.
OMB Control No.: 1902–0258.
Type of Request: Three-year approval
of the FERC–725I information collection
requirements, as modified.
Abstract: On June 9, 2016, the North
American Electric Reliability
Corporation (NERC) and the Northeast
Power Coordination Council, Inc.
(‘‘NPCC’’) filed a petition for
Commission approval, pursuant to
section 215(d)(1) of the Federal Power
Act (‘‘FPA’’) 1 and Section 39.5 2 of the
Federal Energy Regulatory
Commission’s regulations, of the
retirement of NPCC Regional Reliability
Standard PRC–002–NPCC–01
(Disturbance Monitoring) and the two
related NPCC regional definitions,
Current Zero Time and Generating
Plant.
Type of Respondents: Public utilities.
Estimate of Annual Burden: 3 The
Commission estimates the reduction
(due to the retirement of Reliability
Standard PRC–002–NPCC–01) in the
annual public reporting burden for the
information collection as follows:
1 16

U.S.C. 824o (2012).
CFR 39.5 (2015).
3 The Commission defines burden as the total
time, effort, or financial resources expended by
persons to generate, maintain, retain, or disclose or
provide information to or for a Federal agency. For
further explanation of what is included in the
information collection burden, reference 5 Code of
Federal Regulations 1320.3.
2 18

E:\FR\FM\16AUN1.SGM

16AUN1

54572

Federal Register / Vol. 81, No. 158 / Tuesday, August 16, 2016 / Notices

Information collection requirements

Number of
respondents

Annual
number of
responses per
respondent

Total number
of responses

Average
burden
(hours)

Total annual
burden
(hours)

(1)

(2)

(1)*(2)=(3)

(4)

(3)*(4)=(5)

R13: GO 4 and TO to have evidence it acquired and installed dynamic disturbance recorders and a mutually
agreed upon implementation schedule with the RC
(record retention) ..............................................................
R14.5: GO and TO to have evidence of a maintenance
and testing program for stand-alone disturbance monitoring equipment including monthly verification of active
analog quantities ..............................................................
R14.7: GO and TO to record efforts to return failed units
to service if it takes longer than 90 days 5 .......................
R14.7: GO and TO record retention ....................................
R17: RC provide certain disturbance monitoring equipment
data to the Regional Entity upon request ........................
R17: RC record retention .....................................................
Total Reductions ...........................................................

1

1

1

10

10

169

12

2028

5

10,140

33
33

1
1

33
33

10
10

330
330

5
5

1
1

5
5

5
10

25
50

........................

........................

2,105

........................

10,885

4 For

purposes of these charts, generation owner is abbreviated to GO, transmission owner is abbreviated to TO, reliability coordinator is abbreviated to RC, and planning coordinator is abbreviated to PC.
5 We estimate that an entity will experience a unit failure greater than 90 days once every five years. Therefore, 20 percent of NPCC’s 169
generator owners and transmission owners will experience a unit failure of this duration each year.

Comments: Comments are invited on:
(1) Whether the collection of
information is necessary for the proper
performance of the functions of the
Commission, including whether the
information will have practical utility;
(2) the accuracy of the agency’s estimate
of the burden and cost of the collection
of information, including the validity of
the methodology and assumptions used;
(3) ways to enhance the quality, utility
and clarity of the information collection;
and (4) ways to minimize the burden of
the collection of information on those
who are to respond, including the use
of automated collection techniques or
other forms of information technology.
Dated: August 10, 2016.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2016–19474 Filed 8–15–16; 8:45 am]
BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission

asabaliauskas on DSK3SPTVN1PROD with NOTICES

[Project No. 3452–016]

Erie Boulevard Hydropower, L.P;
Notice of Intent To File License
Application, Filing of Pre-Application
Document, Approving Use of the
Traditional Licensing Process
a. Type of Application: Notice of
Intent To File License Application and
Request To Use the Traditional
Licensing Process.
b. Project No.: P–3452–016.
c. Date filed: June 28, 2016.

VerDate Sep<11>2014

19:42 Aug 15, 2016

Jkt 238001

d. Submitted by: Erie Boulevard
Hydropower, L.P.
e. Name of Project: Oak Orchard
Hydroelectric Project.
f. Location: on the New York State
Barge Canal and Oak Orchard Creek in
the village of Medina in the town of
Ridgeway, Orleans County, New York.
No federal lands are occupied by the
project works or located within the
project boundary.
g. Filed Pursuant to: 18 CFR 5.3 of the
Commission’s regulations.
h. Potential Applicant Contact: Steven
Murphy, Manager, Licensing, Brookfield
Renewable, 33 West 1st Street South,
Fulton, New York 13069, Phone: (315)
598–6130; Email: steven.murphy@
brookfieldrenewable.com or Jon Elmer,
Director of Operations, Brookfield
Renewable, 800 Starbuck Ave., Suite
201, Watertown, New York 13601,
Phone: (315) 779–2401, Email:
[email protected].
i. FERC Contact: Brandi Sangunett,
Phone: (202) 502–8393, Email:
[email protected].
j. Erie Boulevard Hydropower, L.P
filed its request to use the Traditional
Licensing Process on June 28, 2016. Erie
Boulevard Hydropower, L.P provided
public notice of its request on June 26,
2016. In a letter dated August 10, 2016,
the Director of the Division of
Hydropower Licensing approved Erie
Boulevard Hydropower, L.P.’s request to
use the Traditional Licensing Process.
k. With this notice, we are initiating
informal consultation with the U.S. Fish
and Wildlife Service and/or NOAA
Fisheries under section 7 of the
Endangered Species Act and the joint
agency regulations thereunder at 50

PO 00000

Frm 00023

Fmt 4703

Sfmt 4703

CFR, Part 402; and NOAA Fisheries
under section 305(b) of the MagnusonStevens Fishery Conservation and
Management Act and implementing
regulations at 50 CFR 600.920. We are
also initiating consultation with the
New York State Historic Preservation
Officer, as required by section 106,
National Historic Preservation Act, and
the implementing regulations of the
Advisory Council on Historic
Preservation at 36 CFR 800.2.
l. With this notice, we are designating
Erie Boulevard Hydropower, L.P as the
Commission’s non-federal
representative for carrying out informal
consultation pursuant to section 7 of the
Endangered Species Act and section
305(b) of the Magnuson-Stevens Fishery
Conservation and Management Act; and
consultation pursuant to section 106 of
the National Historic Preservation Act.
m. Erie Boulevard Hydropower, L.P
filed a Pre-Application Document (PAD;
including a proposed process plan and
schedule) that also serves as the draft
license application, with the
Commission, pursuant to 18 CFR 5.6 of
the Commission’s regulations.
n. A copy of the PAD/DLA is available
for review at the Commission in the
Public Reference Room or may be
viewed on the Commission’s Web site
(http://www.ferc.gov), using the
‘‘eLibrary’’ link. Enter the docket
number, excluding the last three digits
in the docket number field to access the
document. For assistance, contact FERC
Online Support at
[email protected], (866)
208–3676 (toll free), or (202) 502–8659
(TTY). A copy is also available for

E:\FR\FM\16AUN1.SGM

16AUN1


File Typeapplication/pdf
File Modified2016-08-16
File Created2016-08-16

© 2024 OMB.report | Privacy Policy