ACE-1(Cont.) Annual Capital Expenditures Survey (Continuation Page)

Annual Capital Expenditures Survey

A-2016 ACE-1 Continuation page

Annual Capital Expenditures Survey

OMB: 0607-0782

Document [pdf]
Download: pdf | pdf
ITEM 6

Industry Category Codes (Continued) – Listed below are additional industries (continued from page 1) we expected your company to
operate in during 2016. If necessary, correct the industry codes to reflect your 2016 operations. Report the data requested for each
industry in which the company made capital expenditures in 2016. Please return this continuation page with your survey form.

STRUCTURES + EQUIPMENT + OTHER = TOTAL
Structures
(Include major additions, alterations
and capitalized repairs to existing
structures as new structures)

Industry
Category
Code

New
(2)
Bil

Mil

Equipment

Used
(3)
Thou

Bil

Mil

New
(5)
Thou

Bil

Mil

Used
(6)
Thou

Bil

TOTAL
CAPITAL
EXPENDITURES

Other

Mil

Page 7a

New
(8)
Thou

Bil

Mil

Used
(9)
Thou

Bil

Mil

(0)
Thou

Bil

Mil

Thou

FORM ACE-1 (Cont) (8-4-2016)


File Typeapplication/pdf
File Titleace1cont_11.g
File Modified2016-08-08
File Created2012-01-27

© 2024 OMB.report | Privacy Policy