Center Director Structural Information Report - Data Collection Process & Materials

My DocumentsOMB Data Collection-MK.pptx

Grantee Reporting Requirements for Industry/University Cooperative Research Center (I/UCRC)

Center Director Structural Information Report - Data Collection Process & Materials

OMB: 3145-0088

Document [pptx]
Download: pptx | pdf

Center Director Structural Information Report

Data Collection Process & Materials

 

Overview

  • Data are collected on an annual basis from each center with an active IUCRC grant during the most recently completed fiscal year 

  • The workbook detailed in the following slides is sent electronically to the site directors of each eligible IUCRC 

  • The site director is responsible for entering the data into the form 

  • Data that does not typically change from one year to the next is pre-populated into the Excel workbook for sites that have completed the report in the previous data collection year 

  • Centers are given 1 month to complete the report, with extensions available to those with a scheduling conflict 

  • When data are submitted, the data is checked for completeness, accuracy, and consistency by NSF or an NSF authorized representative. 

  • Data are analyzed to create an annual report of current IUCRCs by NSF or an NSF authorized representative. 

  • The emailed letter accompanying the Excel workbook is available on slide 3 and screen captures from each tab of the Excel workbook are available on slides 4-13. 

 

Additional IUCRC data collection

<number>

<number>

 
File Typeapplication/vnd.openxmlformats-officedocument.presentationml.presentation
File Modified0000-00-00
File Created0000-00-00

© 2024 OMB.report | Privacy Policy