FERC-523 30-day notice published FR

FERC-523 30-day published FR.pdf

FERC-523, Application for Authorization for the Issuance of Securities or the Assumption of Liabilities

FERC-523 30-day notice published FR

OMB: 1902-0043

Document [pdf]
Download: pdf | pdf
Federal Register / Vol. 82, No. 142 / Wednesday, July 26, 2017 / Notices
Applicants: Colorado Interstate Gas
Company, L.L.C.
Description: Colorado Interstate Gas
Company, L.L.C. submits tariff filing per
154.204: Non-Conforming Negotiated
Rate Agreement (AESC #213006–
TF1CIG) to be effective 9/1/2017.
Filed Date: 07/18/2017.
Accession Number: 20170718–5061.
Comment Date: 5:00 p.m. Eastern
Time on Monday, July 31, 2017.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: http://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: July 19, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–15607 Filed 7–25–17; 8:45 am]
BILLING CODE 6717–01–P

Dated: July 20, 2017.
Kimberly D. Bose,
Secretary.

DEPARTMENT OF ENERGY

[FR Doc. 2017–15647 Filed 7–25–17; 8:45 am]

Federal Energy Regulatory
Commission

BILLING CODE 6717–01–P

mstockstill on DSK30JT082PROD with NOTICES

Combined Notice of Filings #1

DEPARTMENT OF ENERGY

Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER17–437–005.
Applicants: Marcus Hook 50, L.P.
Description: Compliance filing:
Settlement rate implementation to be
effective 12/28/2016.
Filed Date: 7/19/17.
Accession Number: 20170719–5086.
Comments Due: 5 p.m. ET 8/9/17.
Docket Numbers: ER17–1320–001.
Applicants: Odyssey Solar, LLC.
Description: Report Filing:
Supplement to 4 to be effective N/A.
Filed Date: 7/19/17.
Accession Number: 20170719–5090.
Comments Due: 5 p.m. ET 8/9/17.
Docket Numbers: ER17–2112–000.
Applicants: Midcontinent
Independent System Operator, Inc.

VerDate Sep<11>2014

17:49 Jul 25, 2017

Description: § 205(d) Rate Filing:
2017–07–19_Planning Resource Auction
Offer Window Filing to be effective 9/
18/2017.
Filed Date: 7/19/17.
Accession Number: 20170719–5148.
Comments Due: 5 p.m. ET 8/9/17.
Docket Numbers: ER17–2113–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Request for Waiver of
Midcontinent Independent System
Operator, Inc.
Filed Date: 7/19/17.
Accession Number: 20170719–5179.
Comments Due: 5 p.m. ET 8/9/17.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: http://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.

Jkt 241001

Federal Energy Regulatory
Commission
[Docket No. IC17–12–000]

Commission Information Collection
Activities (FERC–523); Comment
Request; Revision and Extension
Federal Energy Regulatory
Commission, Department of Energy.
ACTION: Comment request.
AGENCY:

In compliance with the
requirements of the Paperwork
Reduction Act of 1995, the Federal
Energy Regulatory Commission
(Commission or FERC) is submitting its
information collection FERC–523,
(Application for Authorization for the
Issuance of Securities or the
Assumption of Liabilities) to the Office

SUMMARY:

PO 00000

Frm 00031

Fmt 4703

Sfmt 4703

34653

of Management and Budget (OMB) for
review of the information collection
requirements. Any interested person
may file comments directly with OMB
and should address a copy of those
comments to the Commission as
explained below. The Commission
previously issued a Notice in the
Federal Register (82 FR 20475, 5/2/
2017) requesting public comments. The
Commission received no comments on
FERC–523 and is making this notation
in its submittal to OMB.
DATES: Comments on the collection of
information are due by August 25, 2017.
ADDRESSES: Comments filed with OMB,
identified by the OMB Control No.
1902–0043, should be sent via email to
the Office of Information and Regulatory
Affairs: [email protected].
Attention: Federal Energy Regulatory
Commission Desk Officer. The Desk
Officer may also be reached via
telephone at 202–395–4718.
A copy of the comments should also
be sent to the Commission, in Docket
No. IC17–12–000, by either of the
following methods:
• eFiling at Commission’s Web site:
http://www.ferc.gov/docs-filing/
efiling.asp.
• Mail/Hand Delivery/Courier:
Federal Energy Regulatory Commission,
Secretary of the Commission, 888 First
Street NE., Washington, DC 20426.
Instructions: All submissions must be
formatted and filed in accordance with
submission guidelines at: http://
www.ferc.gov/help/submissionguide.asp. For user assistance contact
FERC Online Support by email at
[email protected], or by phone
at: (866) 208–3676 (toll-free), or (202)
502–8659 for TTY.
Docket: Users interested in receiving
automatic notification of activity in this
docket or in viewing/downloading
comments and issuances in this docket
may do so at http://www.ferc.gov/docsfiling/docs-filing.asp.
FOR FURTHER INFORMATION CONTACT:
Ellen Brown may be reached by email
at [email protected], by
telephone at (202) 502–8663, and by fax
at (202) 273–0873.
SUPPLEMENTARY INFORMATION:
Title: FERC–523, Application for
Authorization for the Issuance of
Securities or the Assumption of
Liabilities.
OMB Control No.: 1902–0043.
Type of Request: Three-year approval
of the FERC–523 information collection
requirements with no changes to the
current reporting requirements.
Abstract: The information collected
by FERC–523 is required to implement
the statutory provisions of section 204

E:\FR\FM\26JYN1.SGM

26JYN1

34654

Federal Register / Vol. 82, No. 142 / Wednesday, July 26, 2017 / Notices

of the Federal Power Act (FPA) (16
U.S.C. 824c). Under section 204 of the
FPA no public utility or licensee shall
issue any security, or assume any
obligation or liability as guarantor,
endorser, surety, or otherwise in respect
of any security of another person, until
the public utility applies for and
receives Commission approval by order
authorizing the issue or assumption of
the liability. The Commission issues an
order if it finds that such issue or
assumption (a) is for lawful object,

within the corporate purposes of the
applicant and compatible with the
public interest, which is necessary or
appropriate for or consistent with the
proper performance by the applicant as
a public utility, and which will not
impair its ability to perform that service,
and (b) is reasonably necessary or
appropriate for such purposes.
The Commission uses the information
contained in filings to determine its
acceptance and/or rejection of
applications for authorization to either
issue securities or to assume an

obligation or liability by the public
utilities and their licensees who submit
these applications.
The specific application requirements
and filing format are found at 18 CFR
part 34; and 18 CFR 131.43 and 131.50.
This information is filed electronically.
Type of Respondents: Public utilities
subject to the Federal Power Act.
Estimate of Annual Burden 1: The
Commission estimates the reduction in
the annual public reporting burden for
the FERC–523, as follows:

FERC–523, APPLICATIONS FOR AUTHORIZATION FOR ISSUANCE OF SECURITIES OR ASSUMPTION OF LIABILITY
Information collection requirements

Number of
respondents 2

Annual
number of
responses per
respondent

Total number
of responses

Average
burden hours
and cost per
response 3

Total annual
burden hours
and total
annual cost

(1)

(2)

(1) * (2) = (3)

(4)

(3) * (4) = (5)

FERC–523 ...................................................................

Comments: Comments are invited on:
(1) Whether the collection of
information is necessary for the proper
performance of the functions of the
Commission, including whether the
information will have practical utility;
(2) the accuracy of the agency’s estimate
of the burden and cost of the collection
of information, including the validity of
the methodology and assumptions used;
(3) ways to enhance the quality, utility
and clarity of the information collection;
and (4) ways to minimize the burden of
the collection of information on those
who are to respond, including the use
of automated collection techniques or
other forms of information technology.
Dated: July 20, 2017.
Kimberly D. Bose,
Secretary.
[FR Doc. 2017–15646 Filed 7–25–17; 8:45 am]
BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission

mstockstill on DSK30JT082PROD with NOTICES

Combined Notice of Filings #2
Take notice that the Commission
received the following electric rate
filings:
1 Burden is defined as the total time, effort, or
financial resources expended by persons to
generate, maintain, retain, or disclose or provide
information to or for a Federal agency. For further
explanation of what is included in the information

VerDate Sep<11>2014

17:49 Jul 25, 2017

Jkt 241001

145

1

145

70
$5,355

10,150 $776,475

Docket Numbers: ER12–2205–010;
ER10–1821–015; ER12–2159–009;
ER12–919–008.
Applicants: Meadow Creek Project
Company LLC, Goshen Phase II LLC,
Canadian Hills Wind, LLC, Rockland
Wind Farm LLC.
Description: Notice of Change in
Status of Meadow Creek Project
Company LLC, et al.
Filed Date: 7/20/17.
Accession Number: 20170720–5130.
Comments Due: 5 p.m. ET 8/10/17.
Docket Numbers: ER17–814–001;
ER17–816–001; ER17–815–001; ER10–
2543–004; ER10–2606–012.
Applicants: Verso Energy Services
LLC, Verso Luke LLC, Verso Escanaba
LLC, Verso Androscoggin LLC,
Consolidated Water Power Company.
Description: Notice of Change in
Status of the Verso MBR Sellers.
Filed Date: 7/20/17.
Accession Number: 20170720–5077.
Comments Due: 5 p.m. ET 8/10/17.
Docket Numbers: ER17–1778–001.
Applicants: HD Project One LLC.
Description: Tariff Amendment:
MBRA Application Amendment to be
effective 7/21/2017.
Filed Date: 7/20/17.
Accession Number: 20170720–5040.
Comments Due: 5 p.m. ET 8/10/17.
Docket Numbers: ER17–2044–001.
Applicants: Southwest Power Pool,
Inc.

Description: Tariff Amendment:
3215R2 People’s Electric Cooperative
NITSA NOA to be effective 6/1/2017.
Filed Date: 7/20/17.
Accession Number: 20170720–5062.
Comments Due: 5 p.m. ET 8/10/17.
Docket Numbers: ER17–2114–000.
Applicants: The Dayton Power and
Light Company, Ohio Power Company,
PJM Interconnection, L.L.C.
Description: § 205(d) Rate Filing:
Interconnection Agreement SA No. 1461
between Dayton and Ohio Power to be
effective 7/21/2017.
Filed Date: 7/20/17.
Accession Number: 20170720–5059.
Comments Due: 5 p.m. ET 8/10/17.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: http://www.ferc.gov/

collection burden, refer to 5 Code of Federal
Regulations 1320.3.
2 The number of respondents is derived from the
actual number of applications processed.

3 The Commission staff thinks that the average
respondent for this collection is similarly situated
to the Commission, in terms of salary plus benefits.
Based upon FERC’s 2017 annual average of
$158,754 (for salary plus benefits), the average
hourly cost is $76.50/hour.

PO 00000

Frm 00032

Fmt 4703

Sfmt 4703

E:\FR\FM\26JYN1.SGM

26JYN1


File Typeapplication/pdf
File Modified2017-07-26
File Created2017-07-26

© 2024 OMB.report | Privacy Policy