Download:
pdf |
pdfAPPROVED BY OMB: NO. 3150-0056
CONFIDENTIAL
WHEN COMPLETED
EXPIRES: (MM/DD/YYYY)
Estimated burden per response to comply with this mandatory collection request: 360 hours. NRC
is required to collect this information for reporting to IAEA from facility licensees appearing on the
U.S. Eligible List. Send comments regarding burden estimate to the FOIA, Privacy, and
Information Collections Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC
20555-0001, or by internet e-mail to [email protected], and to the Desk Officer,
Office of Information and Regulatory Affairs, NEOB-10202, (3150-0056), Office of Management
and Budget, Washington, DC 20503. If a means used to impose an information collection does
not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a
person is not required to respond to, the information collection.
INTERNATIONAL ATOMIC ENERGY AGENCY
DEPARTMENT OF SAFEGUARDS AND INSPECTION
DESIGN INFORMATION
QUESTIONNAIRE *
IAEA USE ONLY
The purpose of this document is to obtain the
facility design information required by the
Agency in order to discharge its safeguards
responsibilities. It will also serve as a check list
for examination of design information by Agency
inspector(s). If, in any area, insufficient space is
available, add additional sheets to the extent
necessary.
The "Confidential" marking on this form is for
IAEA purposes only. It indicates that the IAEA
considers the information in the completed form
to be 'safeguards confidential' and is not to be
confused with any U.S. security classification.
IAEA USE ONLY
COUNTRY
COUNTRY
OFFICER
TYPE
DATE OF
INITIAL DATA
VERIFICATION
* Questions which are not applicable may be left
unanswered.
CONFIDENTIAL
WHEN COMPLETED
N-71 (MM-YYYY)
LAST REVIEWING
AND UPDATING
ALL FACILITIES
DATE:
GENERAL INFORMATION
1. NAME OF THE FACILITY
(Include usual abbreviation)
2. LOCATION AND POSTAL ADDRESS
3. OWNER (legally responsible)
4. OPERATOR (legally responsible)
5. DESCRIPTION (main features only)
6. PURPOSE
7. STATUS
(planned; under construction; in operation)
8. CONSTRUCTION SCHEDULE DATES
(if not in operation)
Start of Construction
Commissioning
Operation
9. NORMAL OPERATING MODE
(days only, two-shift, three-shift; number of
days/annum, etc.)
10. FACILITY LAYOUT
(structural containment, fences, access,
nuclear material storage areas,
laboratories, waste disposal areas, routes
followed by nuclear material, experimental,
and test areas, etc.)
DRAWING(S) ATTACHED UNDER REF. NOS.
DRAWING(S) AND/OR MAPS ATTACHED UNDER REF. NOS.
11. SITE LAYOUT
(site plan showing in sufficient detail; location,
premises and perimeter of facility, other
buildings, roads, railways, rivers, etc.
12. NAMES AND/OR TITLE AND ADDRESS OF
RESPONSIBLE OFFICERS
(for nuclear material accountancy and
control and contact with the Agency. If
possible, attach organization charts
showing position of officers)
N-71 (MM-YYYY)
CONFIDENTIAL
2
File Type | application/pdf |
File Title | o:\informs\fixforms\ia_n71_2.wpf |
Author | dah1 |
File Modified | 2014-02-27 |
File Created | 2014-02-27 |