18CFR Part 40, from eCFR 8/28/2017

18cfr40_8-28-19.docx

FERC-725G6, (NOPR in RM16-22) Mandatory Reliability Standard PRC-027-1

18CFR Part 40, from eCFR 8/28/2017

OMB: 1902-0300

Document [docx]
Download: docx | pdf

e-CFR data is current as of August 24, 2017



Title 18: Conservation of Power and Water Resources

Shape1

PART 40—MANDATORY RELIABILITY STANDARDS FOR THE BULK-POWER SYSTEM

Shape2

Contents
§40.1   Applicability.
§40.2   Mandatory Reliability Standards.
§40.3   Availability of Reliability Standards.

Shape3

Authority: 16 U.S.C. 824o.

Source: Order 693, 72 FR 16598, Apr. 4, 2007, unless otherwise noted.

§40.1   Applicability.

(a) This part applies to all users, owners and operators of the Bulk-Power System within the United States (other than Alaska or Hawaii), including, but not limited to, entities described in section 201(f) of the Federal Power Act.

(b) Each Reliability Standard made effective by §40.2 must identify the subset of users, owners and operators of the Bulk-Power System to which a particular Reliability Standard applies.

§40.2   Mandatory Reliability Standards.

(a) Each applicable user, owner or operator of the Bulk-Power System must comply with Commission-approved Reliability Standards developed by the Electric Reliability Organization.

(b) A proposed modification to a Reliability Standard proposed to become effective pursuant to §39.5 of this Chapter will not be effective until approved by the Commission.

§40.3   Availability of Reliability Standards.

The Electric Reliability Organization must post on its Web site the currently effective Reliability Standards as approved and enforceable by the Commission. The effective date of the Reliability Standards must be included in the posting.

File Typeapplication/vnd.openxmlformats-officedocument.wordprocessingml.document
AuthorEllen Brown
File Modified0000-00-00
File Created2021-01-22

© 2024 OMB.report | Privacy Policy