NESHAP for Cellulose Products Manufacturing (40 CFR part 63, subpart UUUU) (Renewal)

ICR 201801-2060-001

OMB: 2060-0488

Federal Form Document

Forms and Documents
Document
Name
Status
Supplementary Document
2018-02-06
Supporting Statement A
2018-01-11
IC Document Collections
ICR Details
2060-0488 201801-2060-001
Active 201412-2060-004
EPA/OAR 1974.08
NESHAP for Cellulose Products Manufacturing (40 CFR part 63, subpart UUUU) (Renewal)
Extension without change of a currently approved collection   No
Regular
Approved without change 04/09/2018
Retrieve Notice of Action (NOA) 02/27/2018
In accordance with 5 CFR 1320, the information collection is approved for three years.
  Inventory as of this Action Requested Previously Approved
04/30/2021 36 Months From Approved 04/30/2018
94 0 86
12,200 0 12,088
1,010 0 1,014

Owners and operators of affected facilities are required to comply with reporting and record keeping requirements for the General Provisions (40 CFR Part 63, Subpart A), as well as for the specific requirements at 40 CFR Part 63, Subpart UUUU. This includes submitting initial notifications, performance tests and periodic reports and results, and maintaining records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility, or any period during which the monitoring system is inoperative. These reports are used by EPA to determine compliance with these standards.

US Code: 44 USC 3501 et.seq Name of Law: Clean Air Act
  
None

Not associated with rulemaking

  82 FR 29552 06/29/2017
83 FR 8260 02/26/2018
No

1
IC Title Form No. Form Name
NESHAP for Cellulose Products Manufacturing (40 CFR part 63, subpart UUUU)(Renewal)

  Total Approved Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 94 86 0 0 8 0
Annual Time Burden (Hours) 12,200 12,088 0 0 112 0
Annual Cost Burden (Dollars) 1,010 1,014 0 0 -4 0
No
No
There is an adjustment increase in the total estimated burden and cost as currently identified in the OMB Inventory of Approved Burdens. This increase is not due to any program changes. The change in the respondent labor hour estimates occurred because of a change in assumption. This ICR assumes all existing respondents will have to familiarize with the regulatory requirements each year. The number of responses increased because this ICR accounts for semiannual wastewater reports in calculating the number of responses, correcting an inconsistency in the previous ICR.

$17,300
No
    No
    No
No
No
No
Uncollected
Patrick Yellin 202 564-2970 [email protected]

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
02/27/2018


© 2024 OMB.report | Privacy Policy