FERC-725V 60-day (published)

FERC-725V 60-day (published).pdf

FERC-725V, (Renewal) Mandatory Reliability Standards: COM Reliability Standards

FERC-725V 60-day (published)

OMB: 1902-0277

Document [pdf]
Download: pdf | pdf
amozie on DSK30RV082PROD with NOTICES

10466

Federal Register / Vol. 83, No. 47 / Friday, March 9, 2018 / Notices

Comments Due: 5 p.m. ET 3/13/18.
Docket Numbers: RP18–528–000.
Applicants: Cimarron River Pipeline,
LLC.
Description: § 4(d) Rate Filing: Fuel
Tracker 2018—Summer Season Rates to
be effective 4/1/2018.
Filed Date: 3/1/18.
Accession Number: 20180301–5179.
Comments Due: 5 p.m. ET 3/13/18.
Docket Numbers: RP18–529–000.
Applicants: Cheniere Creole Trail
Pipeline, L.P.
Description: Transportation Retainage
Adjustment Informational Filing of
Cheniere Creole Trail Pipeline, L.P.
Filed Date: 3/1/18.
Accession Number: 20180301–5181.
Comments Due: 5 p.m. ET 3/13/18.
Docket Numbers: RP18–530–000.
Applicants: Chesapeake Energy
Marketing, L.L.C., BCE–MACH LLC.
Description: Joint Petition of
Chesapeake Energy Marketing, L.L.C., et
al. for Limited Waiver and Request For
Expedited Action.
Filed Date: 3/1/18.
Accession Number: 20180301–5183.
Comments Due: 5 p.m. ET 3/8/18.
Docket Numbers: RP18–531–000.
Applicants: Tennessee Gas Pipeline
Company, L.L.C.
Description: § 4(d) Rate Filing: Fuel
Tracker 2018 to be effective 4/1/2018.
Filed Date: 3/1/18.
Accession Number: 20180301–5186.
Comments Due: 5 p.m. ET 3/13/18.
Docket Numbers: RP18–532–000.
Applicants: Enable Gas Transmission,
LLC.
Description: § 4(d) Rate Filing:
Negotiated Rate Filng—March, 2018—
Shell Newfield to be effective 3/1/2018.
Filed Date: 3/1/18.
Accession Number: 20180301–5199.
Comments Due: 5 p.m. ET 3/13/18.
Docket Numbers: RP18–533–000.
Applicants: Tallgrass Interstate Gas
Transmission, L.
Description: § 4(d) Rate Filing: FL&U
and EPCT Periodic Rate Adjustment to
be effective 4/1/2018.
Filed Date: 3/1/18.
Accession Number: 20180301–5241.
Comments Due: 5 p.m. ET 3/13/18.
Docket Numbers: RP18–534–000.
Applicants: Texas Eastern
Transmission, LP.
Description: § 4(d) Rate Filing:
Negotiated Rates—Rice Energy Release
to Wells Fargo to be effective 3/1/2018.
Filed Date: 3/1/18.
Accession Number: 20180301–5242.
Comments Due: 5 p.m. ET 3/13/18.
Docket Numbers: RP18–535–000.
Applicants: El Paso Natural Gas
Company, L.L.C.

VerDate Sep<11>2014

16:47 Mar 08, 2018

Jkt 244001

Description: § 4(d) Rate Filing: Letter
Agreement Filing (SWG March 18) to be
effective 4/1/2018.
Filed Date: 3/1/18
Accession Number: 20180301–5243.
Comments Due: 5 p.m. ET 3/13/18.
Docket Numbers: RP18–536–000.
Applicants: American Midstream
(Midla), LLC.
Description: § 4(d) Rate Filing: Annual
Fuel, Lost and Unaccounted-for Gas
Percentage Filing to be effective 4/1/
2018.
Filed Date: 3/1/18.
Accession Number: 20180301–5246.
Comments Due: 5 p.m. ET 3/13/18.
Docket Numbers: RP18–537–000.
Applicants: Algonquin Gas
Transmission, LLC.
Description: § 4(d) Rate Filing: AGT
FRQ Partial Settlement Filing—Docket
Nos. RP18–75–000, 001 to be effective
4/1/2018.
Filed Date: 3/1/18.
Accession Number: 20180301–5261.
Comments Due: 5 p.m. ET 3/13/18.
Docket Numbers: RP18–538–000.
Applicants: Dauphin Island Gathering
Partners.
Description: § 4(d) Rate Filing: Storm
Surcharge 2018 to be effective 4/1/2018.
Filed Date: 3/1/18.
Accession Number: 20180301–5266.
Comments Due: 5 p.m. ET 3/13/18.
Docket Numbers: RP18–539–000.
Applicants: UGI Sunbury, LLC.
Description: § 4(d) Rate Filing: Revise
Imbalance Management Section to be
effective 4/1/2018.
Filed Date: 3/1/18.
Accession Number: 20180301–5273.
Comments Due: 5 p.m. ET 3/13/18.
Docket Numbers: RP18–540–000.
Applicants: Transcontinental Gas
Pipe Line Company.
Description: § 4(d) Rate Filing:
Transco 2018 Annual Fuel Tracker to be
effective 4/1/2018.
Filed Date: 3/1/18.
Accession Number: 20180301–5276.
Comments Due: 5 p.m. ET 3/13/18.
Docket Numbers: RP18–541–000.
Applicants: Transcontinental Gas
Pipe Line Company.
Description: § 4(d) Rate Filing: Annual
Electric Power Tracker Filing Effective
April 1, 2018 to be effective 4/1/2018.
Filed Date: 3/1/18.
Accession Number: 20180301–5286.
Comments Due: 5 p.m. ET 3/13/18.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211

PO 00000

Frm 00044

Fmt 4703

Sfmt 4703

and 214 of the Commission’s
Regulations (18 CFR 385.211 and
§ 385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: http://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: March 5, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018–04739 Filed 3–8–18; 8:45 am]
BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. IC18–6–000]

Commission Information Collection
Activities; (FERC–65, FERC–65A,
FERC–65B, FERC–725V); Consolidated
Comment Request; Extension
Federal Energy Regulatory
Commission, DOE.
ACTION: Notice of information collection
and request for comments.
AGENCY:

In compliance with the
requirements of the Paperwork
Reduction Act of 1995, the Federal
Energy Regulatory Commission
(Commission or FERC) is soliciting
public comment on the information
collections, FERC–65 (Notice of Holding
Company Status), FERC–65A
(Exemption Notification of holding
Company Status), and FERC–65B
(Waiver Notification of Holding
Company Status), and FERC–725V
(Mandatory Reliability Standards: COM
Reliability Standards) which will be
submitted to the Office of Management
and Budget (OMB) for a review of the
information collection requirements.
DATES: Comments on the collection of
information are due May 8, 2018.
ADDRESSES: You may submit comments
(identified by Docket No. IC18–6–000)
by either of the following methods:
• eFiling at Commission’s Website:
http://www.ferc.gov/docs-filing/
efiling.asp
• Mail/Hand Delivery/Courier:
Federal Energy Regulatory Commission,
Secretary of the Commission, 888 First
Street NE, Washington, DC 20426.
Instructions: All submissions must be
formatted and filed in accordance with
SUMMARY:

E:\FR\FM\09MRN1.SGM

09MRN1

10467

Federal Register / Vol. 83, No. 47 / Friday, March 9, 2018 / Notices
submission guidelines at: http://
www.ferc.gov/help/submissionguide.asp. For user assistance contact
FERC Online Support by email at
[email protected], or by phone
at: (866) 208–3676 (toll-free), or (202)
502–8659 for TTY.
Docket: Users interested in receiving
automatic notification of activity in this
docket or in viewing/downloading
comments and issuances in this docket
may do so at http://www.ferc.gov/docsfiling/docs-filing.asp.
FOR FURTHER INFORMATION CONTACT:
Ellen Brown may be reached by email
at [email protected], telephone
at (202) 502–8663, and fax at (202) 273–
0873.
SUPPLEMENTARY INFORMATION:
Title: FERC–65 (Notice of Holding
Company Status), FERC–65A
(Exemption Notification of Holding
Company Status), and FERC–65B
(Waiver Notification of Holding
Company Status).
OMB Control No.: 1902–0218.
Type of Request: Three-year extension
of the FERC–65, FERC–65A and FERC–
65B information collection requirements
with no changes to the current reporting
requirements.
Abstract: The Pursuant to section
366.4 of the Commission’s rules and
regulations, persons who meet the
definition of a holding company shall
provide the Commission notification of
holding company status.
The FERC–65 is a one-time
informational filing outlined in the

Commission’s regulations at 18 Code of
Federal Regulations (CFR) 366.4. The
FERC–65 must be submitted within 30
days of becoming a holding company.1
While the Commission does not require
the information to be reported in a
specific format, the filing needs to
consist of the name of the holding
company, the name of public utilities,
the name of natural gas companies in
the holding company system, and the
names of service companies. In
addition, the Commission requires the
filing to include the names of specialpurpose subsidiaries (which provide
non-power goods and services) and the
names of all affiliates and subsidiaries
(and their corporate interrelationship) to
each other. Filings may be submitted in
hardcopy or electronically through the
Commission’s eFiling system.
FERC–65A (Exemption Notification of
Holding Company Status)
While noting the previously outlined
requirements of the FERC–65, the
Commission has allowed for an
exemption from the requirement of
providing the Commission with a
FERC–65 if the books, accounts,
memoranda, and other records of any
person are not relevant to the
jurisdictional rates of a public utility or
natural gas company; or if any class of
transactions is not relevant to the
jurisdictional rates of a public utility or
natural gas company. Persons seeking
this exemption file the FERC–65A,
which must include a form of notice

suitable for publication in the Federal
Register. Those who file a FERC–65A in
good faith will have a temporary
exemption upon filing, after 60 days if
the Commission has taken no action, the
exemption will be deemed granted.
Commission regulations within 18 CFR
366.3 describe the criteria in more
specificity.
1. FERC–65B (Waiver Notification of
Holding Company Status)
If an entity meets the requirements in
18 CFR 366.3(c), they may file a FERC–
65B waiver notification pursuant to the
procedures outlined in 18 CFR 366.4.
Specifically, the Commission waives the
requirement of providing it with a
FERC–65 for any holding company with
respect to one or more of the following:
(1) Single-state holding company
systems; (2) holding companies that
own generating facilities that total 100
MW or less in size and are used
fundamentally for their own load or for
sales to affiliated end-users; or (3)
investors in independent transmissiononly companies. Filings may be made in
hardcopy or electronically through the
Commission’s website.
Type of Respondent: Public utility
companies, natural gas companies,
electric wholesale generators, foreign
utility holding companies.
Estimate of Annual Burden: 2 The
Commission estimates the annual public
reporting burden for the information
collection as:

FERC–65 (NOTIFICATION OF HOLDING COMPANY STATUS), FERC–65A (EXEMPTION NOTIFICATION OF HOLDING
COMPANY STATUS), AND FERC–65B (WAIVER NOTIFICATION OF HOLDING COMPANY STATUS)
Number of
respondents

Annual
number of
responses per
respondent

Total
number of
responses

Average
burden and
cost per
response 3

Total annual
burden hours
and total
annual cost

Cost per
respondent
($)

(1)

(2)

(1) * (2) = (3)

(4)

(3) * (4) = (5)

(5) ÷ (1)

FERC–65 .................................................
FERC–65A ...............................................
FERC–65B ...............................................

12
4
4

1
1.25
1.75

12
5
7

3, $229.50
1, $76.50
1, $76.50

36, $2,754
5, $382.50
7, $535.50

$229.50
95.63
133.88

Total ..................................................

........................

........................

24

........................

48, $3,672

........................

Title: FERC–725V, Mandatory
Reliability Standards: COM Reliability
Standards.
amozie on DSK30RV082PROD with NOTICES

OMB Control No.: 1902–0277.
1 Persons that meet the definition of a holding
company as provided by § 366.1 as of February 8,
2006 shall notify the Commission of their status as
a holding company no later than June 15, 2006.
Holding companies formed after February 8, 2006
shall notify the Commission of their status as a
holding company, no later than the latter of June

VerDate Sep<11>2014

16:47 Mar 08, 2018

Jkt 244001

Type of Request: Three-year extension
of the FERC–725V information
collection requirements with no changes
to the current reporting requirements.

Abstract: On August 15, 2016, the
North American Electric Reliability
Corporation (NERC) filed a petition for
Commission approval, pursuant to
section 215(d)(1) of the Federal Power

15, 2006 or 30 days after they become holding
companies.
2 Burden is defined as the total time, effort, or
financial resources expended by persons to
generate, maintain, retain, or disclose or provide
information to or for a Federal agency. Refer to 5
CFR 1320.3 for additional information.

3 The estimates for cost per response are derived
using the following formula: 2017 Average Burden
Hours per Response * $76.50 per Hour = Average
Cost per Response. The hourly cost figure of $76.50
is the average FERC employee wage plus benefits.
We assume for FERC–65, FERC–65A and FERC–65B
that respondents earn at a similar rate.

PO 00000

Frm 00045

Fmt 4703

Sfmt 4703

E:\FR\FM\09MRN1.SGM

09MRN1

10468

Federal Register / Vol. 83, No. 47 / Friday, March 9, 2018 / Notices

Act (‘‘FPA’’) 4 and Section 39.5 5 of the
Federal Energy Regulatory
Commission’s regulations, for
Reliability Standard COM–001–3
(Communications), the associated
Implementation Plan, retirement of
currently-effective Reliability Standard
COM–001–2.1, and Violation Risk
Factors (‘‘VRFs’’) and Violation Severity
Levels (‘‘VSLs’’) associated with new
Requirements R12 and R13 in
Reliability Standard COM–001–3.
Reliability Standard COM–001–3
reflects revisions developed under
Project 2015–07 Internal
Communications Capabilities, in
compliance with the Commission’s
directive in Order No. 888 that NERC
‘‘develop modifications to COM–001–2,
or develop a new standard, to address

the Commission’s concerns regarding
ensuring the adequacy of internal
communications capability whenever
internal communications could directly
affect the reliability opera.
Reliability Standards COM–001–2 and
COM–002–4 do not require responsible
entities to file information with the
Commission. COM–001–2 requires that
transmission operators, balancing
authorities, reliability coordinators,
distribution providers, and generator
operators must maintain documentation
of Interpersonal Communication
capability and designation of Alternate
Interpersonal Communication, as well
as evidence of testing of the Alternate
Interpersonal Communication facilities.
COM–002–4 requires balancing
authorities, distribution providers,

reliability coordinators, transmission
operators, and generator operators to
develop and maintain documented
communication protocols, and to be
able to provide evidence of training on
the protocols and of their annual
assessment of the protocols.
Additionally, all applicable entities
(balancing authorities, reliability
coordinators, transmission operators,
generator operators, and distribution
providers) must be able to provide
evidence of three-part communication
when issuing or receiving an Operating
Instruction during an Emergency.
Type of Respondents: Public utilities.
Estimate of Annual Burden: 6 The
Commission estimates the annual public
reporting burden for the information
collection as:

FERC–725V, MANDATORY RELIABILITY STANDARDS: COM RELIABILITY STANDARDS

(One-time) 8 Development of
Communication Protocols
[COM–002–4 R1].
(On-going) 9 Maintain evidence of Interpersonal
Communication capability
[COM–001–2 R7 and R8].
(On-going) Maintain evidence
of training and assessments [COM–002–4 R2,
R4, R5 and R6].
(On-going) Maintain evidence
of training [COM–002–4 R3
and R6].
Total ................................

Number of
respondents

Annual
number of
responses per
respondent

Total
number of
responses

Average
burden and
cost per
response 7

Total annual
burden hours
and total
annual cost

Cost per
respondent
($)

(1)

(2)

(1) * (2) = (3)

(4)

(3) * (4) = (5)

(5) ÷ (1)

201 (BA, RC &
TOP).

1

201

8 hrs. & $288

1,608 hrs. & $57,888 .....

$288

1,180 (DP & GOP)

1

1,180

4 hrs. & $144

4,720 hrs. & $169,920 ...

144

201 (BA, RC &
TOP).

1

201

8 hrs. & $288

1,608 hrs. & $57,888 .....

288

1,880 (DP & GOP)

1

1,180

8 hrs. & $288

15,040 hrs. & $541,440

288

........................

2,762

........................

22,976 hrs. & $827,136

....................

...............................

amozie on DSK30RV082PROD with NOTICES

Comments: Comments are invited on:
(1) Whether the collection of
information is necessary for the proper
performance of the functions of the
Commission, including whether the
information will have practical utility;
(2) the accuracy of the agency’s estimate
of the burden and cost of the collection
of information, including the validity of
the methodology and assumptions used;
(3) ways to enhance the quality, utility
and clarity of the information collection;
and (4) ways to minimize the burden of
the collection of information on those
who are to respond, including the use
4 16

U.S.C. 824o (2012).
CFR 39.5 (2015).
6 The Commission defines burden as the total
time, effort, or financial resources expended by
persons to generate, maintain, retain, or disclose or
provide information to or for a Federal agency. For
further explanation of what is included in the
5 18

VerDate Sep<11>2014

16:47 Mar 08, 2018

Jkt 244001

of automated collection techniques or
other forms of information technology.
Dated: March 5, 2018.
Kimberly D. Bose,
Secretary.

DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP18–84–000]

[FR Doc. 2018–04779 Filed 3–8–18; 8:45 am]
BILLING CODE 6717–01–P

Dominion Energy Transmission, Inc.;
Tennessee Gas Pipeline Company,
L.L.C.; National Fuel Gas Supply
Corporation; Notice of Application
Take notice that on February 13, 2018,
Dominion Energy Transmission, Inc.
(Dominion Energy), 120 Tredegar Street,
Richmond, VA 23219, Tennessee Gas
Pipeline Company, L.L.C. (Tennessee),

information collection burden, reference 5 Code of
Federal Regulations 1320.3.
7 The loaded hourly wage figure (includes
benefits) is based on the occupational categories for
2016 found on the Bureau of Labor Statistics
website (http://www.bls.gov/oes/current/naics2_
22.htm):

PO 00000

Frm 00046

Fmt 4703

Sfmt 4703

Electrical Engineer (Occupation Code: 17–2071):
$68.12 (review and documentation).
Office and Administrative Support (Occupation
Code: 43–0000): $40.89 ($68.12 + 40.89 = 109.01 ÷
3 = $36.34. This figure is rounded to $36.00 for use
in collection FERC–725V for calculating wage
figures in this renewal calculation.

E:\FR\FM\09MRN1.SGM

09MRN1


File Typeapplication/pdf
File Modified2018-03-09
File Created2018-03-09

© 2024 OMB.report | Privacy Policy