FERC-567 60-day (Published)

FERC-567 60-day Fed Reg.pdf

FERC-567, Gas Pipeline Certificates: Annual Reports of System Flow Diagrams

FERC-567 60-day (Published)

OMB: 1902-0005

Document [pdf]
Download: pdf | pdf
Federal Register / Vol. 83, No. 133 / Wednesday, July 11, 2018 / Notices
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an eSubscription link on
the website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
[email protected]. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: July 2, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–14775 Filed 7–10–18; 8:45 am]
BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2246–065—California]

Notice of Revised Environmental Site
Review; Yuba County Water Agency
The start time for the July 11, 2018
environmental site review of the Yuba
River Development Project, outlined in
the June 18, 2018 Notice of
Environmental Site Review, has been
changed to 8:30 a.m. from 10:00 a.m.
(PDT). If you have any questions, please
contact Alan Mitchnick at (202) 502–
6074 or [email protected].
Dated: July 3, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–14762 Filed 7–10–18; 8:45 am]
BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL18–173–000]

daltland on DSKBBV9HB2PROD with NOTICES

Notice of Institution of Section 206
Proceeding and Refund Effective Date
Monongahela Power Company
Potomac Edison Company
West Penn Power Company
AEP Indiana Michigan Transmission
Company, Inc.
AEP Kentucky Transmission Company, Inc.
AEP Ohio Transmission Company, Inc.
AEP West Virginia Transmission Company,
Inc.
Appalachian Power Company
Indiana Michigan Power Company
Kentucky Power Company
Kingsport Power Company
Ohio Power Company
Wheeling Power Company
Commonwealth Edison Company
Commonwealth Edison Company of Indiana,
Inc.

VerDate Sep<11>2014

16:26 Jul 10, 2018

Jkt 244001

Dayton Power and Light Company
Virginia Electric and Power Company
Public Service Electric and Gas Company
PECO Energy Company
PPL Electric Utilities Corporation
Baltimore Gas and Electric Company
Jersey Central Power & Light Company
Potomac Electric Power Company
Atlantic City Electric Company
Delmarva Power & Light Company
UGI Utilities Inc.
Allegheny Electric Cooperative, Inc.
CED Rock Springs, LLC
Old Dominion Electric Cooperative
Rockland Electric Company
Duquesne Light Company
Neptune Regional Transmission System, LLC
Trans-Allegheny Interstate Line Company
Linden VFT, LLC
American Transmission Systems,
Incorporated
City of Cleveland, Department of Public
Utilities, Division of Cleveland Public
Power
Duke Energy Ohio, Inc.
Duke Energy Kentucky, Inc.
City of Hamilton, OH
Hudson Transmission Partners, LLC
East Kentucky Power Cooperative, Inc.
City of Rochelle
ITC Interconnection LLC
Mid-Atlantic Interstate Transmission, LLC
Southern Maryland Electric Cooperative, Inc.
Ohio Valley Electric Corporation

On July 2, 2018, the Commission
issued an order in Docket No. EL18–
173–000, pursuant to section 206 of the
Federal Power Act (FPA), 16 U.S.C.
824e (2012), instituting an investigation
to require the above-captioned PJM
Interconnection, L.L.C. Transmission
Owners to refile Schedule 12 of the PJM
Tariff to clearly specify its Open Access
Transmission Tariff or show cause why
Schedule 12 should not be revised.
Monongahela Power Company, et al.,
164 FERC ¶ 61,002 (2018).
The refund effective date in Docket
No. EL18–173–000, established
pursuant to section 206(b) of the FPA,
will be the date of publication of this
notice in the Federal Register.
Any interested person desiring to be
heard in Docket No. EL18–173–000
must file a notice of intervention or
motion to intervene, as appropriate,
with the Federal Energy Regulatory
Commission, 888 First Street NE,
Washington, DC 20426, in accordance
with Rule 214 of the Commission’s
Rules of Practice and Procedure, 18 CFR
385.214, within 21 days of the date of
issuance of the order.
Dated: July 2, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–14771 Filed 7–10–18; 8:45 am]
BILLING CODE 6717–01–P

PO 00000

Frm 00048

Fmt 4703

Sfmt 4703

32119

DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. IC18–16–000]

Commission Information Collection
Activities (FERC–567); Comment
Request; Extension
Federal Energy Regulatory
Commission, Department of Energy.
ACTION: Notice of information collection
and request for comments.
AGENCY:

In compliance with the
requirements of the Paperwork
Reduction Act of 1995, the Federal
Energy Regulatory Commission
(Commission or FERC) is soliciting
public comment on the currently
approved information collection, FERC–
567 [Gas Pipeline Certificates: Annual
Reports of System Flow Diagrams and
System Capacity].
DATES: Comments on the collection of
information are due September 10,
2018.
ADDRESSES: You may submit comments
(identified by Docket No. IC18–16–000)
by either of the following methods:
• eFiling at Commission’s Website:
http://www.ferc.gov/docs-filing/
efiling.asp.
• Mail/Hand Delivery/Courier:
Federal Energy Regulatory Commission,
Secretary of the Commission, 888 First
Street NE, Washington, DC 20426.
Instructions: All submissions must be
formatted and filed in accordance with
submission guidelines at: http://
www.ferc.gov/help/submissionguide.asp. For user assistance contact
FERC Online Support by email at
[email protected], or by phone
at: (866) 208–3676 (toll-free), or (202)
502–8659 for TTY.
Docket: Users interested in receiving
automatic notification of activity in this
docket or in viewing/downloading
comments and issuances in this docket
may do so at http://www.ferc.gov/docsfiling/docs-filing.asp.
FOR FURTHER INFORMATION CONTACT:
Ellen Brown may be reached by email
at [email protected], telephone
at (202) 502–8663, and fax at (202) 273–
0873.
SUPPLEMENTARY INFORMATION:
Title: FERC–567, Gas Pipeline
Certificates: Annual Reports of System
Flow Diagrams and System Capacity.
OMB Control No.: 1902–0005.
Type of Request: Three-year extension
of the FERC–567 information collection
requirements with no changes to the
current reporting requirements.
Abstract: The Commission uses the
information from the FERC–567 to
SUMMARY:

E:\FR\FM\11JYN1.SGM

11JYN1

32120

Federal Register / Vol. 83, No. 133 / Wednesday, July 11, 2018 / Notices

obtain accurate data on pipeline
facilities and the peak capacity of these
facilities. Additionally, the Commission
validates the need for new facilities
proposed by pipelines in certificate
applications. By modeling an
applicant’s pipeline system,
Commission staff utilizes the FERC–567
data to determine configuration and
location of installed pipeline facilities;
verify and determine the receipt and
delivery points between shippers,
producers and pipeline companies;
determine the location of receipt and
delivery points and emergency
interconnections on a pipeline system;
determine the location of pipeline

segments, laterals and compressor
stations on a pipeline system; verify
pipeline segment lengths and pipeline
diameters; justify the maximum
allowable operating pressures and
suction and discharge pressures at
compressor stations; verify the installed
horsepower and volumes compressed at
each compressor station; determine the
existing shippers and producers
currently using each pipeline company;
verify peak capacity on the system; and
develop and evaluate alternatives to the
proposed facilities as a means to
mitigate environmental impact of new
pipeline construction.
18 Code of Federal Regulations (CFR)
260.8(a) requires each major natural gas

pipeline with a system delivery capacity
exceeding 100,000 Mcf per day to
submit by June 1 of each year, diagrams
reflecting operating conditions on the
pipeline’s main transmission system
during the previous 12 months ended
December 31. These physical/
engineering data are not included as
part of any other data collection
requirement.
Type of Respondents: Applicants with
a system delivery capacity in excess of
100,000 Mcf 1 per day.
Estimate of Annual Burden: 2 The
Commission estimates the annual public
reporting burden for the information
collection as:

FERC–567—GAS PIPELINE CERTIFICATES: ANNUAL REPORTS OF SYSTEM FLOW DIAGRAMS AND SYSTEM CAPACITY
Number of
respondents

Annual number of
responses per
respondent

Total number of
responses

Average burden
and cost per
response 3

Total annual
burden hours
and total
annual cost

Cost per
respondent
($)

(1)

(2)

(1) * (2) = (3)

(4)

(3) * (4) = (5)

(5) ÷ (1)

Natural Gas Pipelines ..................

121

1

Comments: Comments are invited on:
(1) Whether the collection of
information is necessary for the proper
performance of the functions of the
Commission, including whether the
information will have practical utility;
(2) the accuracy of the agency’s estimate
of the burden and cost of the collection
of information, including the validity of
the methodology and assumptions used;
(3) ways to enhance the quality, utility
and clarity of the information collection;
and (4) ways to minimize the burden of
the collection of information on those
who are to respond, including the use
of automated collection techniques or
other forms of information technology.
Dated: July 5, 2018.
Kimberly D. Bose,
Secretary.
[FR Doc. 2018–14815 Filed 7–10–18; 8:45 am]

daltland on DSKBBV9HB2PROD with NOTICES

BILLING CODE 6717–01–P

1 Mcf

= Thousand cubic feet.
is defined as the total time, effort, or
financial resources expended by persons to
generate, maintain, retain, or disclose or provide
information to or for a Federal agency. For further
2 Burden

VerDate Sep<11>2014

16:26 Jul 10, 2018

Jkt 244001

121

3
$237

363
$28,677

$237

Take notice that on July 3, 2018,
pursuant to Rule 207(a)(2) of the Federal
Energy Regulatory Commission’s
(Commission) Rules of Practice and
Procedure, 18 CFR 385.207(a)(2) (2017),
Shell Pipeline Company LP (SPLC or
Petitioner), filed a petition for a
declaratory order seeking approval of
SPLC’s proposed rate structures, service
priority rights, and prorationing
provisions for shippers and various
aspects of the Transportation Service
Agreement for the Falcon Ethane
Pipeline System, all as more fully
explained in the petition.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will

not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Petitioner.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at http://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE, Washington, DC
20426
This filing is accessible on-line at
http://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
website that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
[email protected], or call

explanation of what is included in the information
collection burden, reference 5 Code of Federal
Regulations 1320.3.
3 The estimates for cost per response are derived
using the following formula: 2018 Average Burden

Hours per Response * $79 per Hour = Average Cost
per Response. The hourly cost figure of $79 is the
2018 average FERC hourly cost for wages plus
benefits. We assume for FERC–567 that respondents
earn at a similar rate.

DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. OR18–28–000]

Shell Pipeline Company LP; Notice of
Petition for Declaratory Order

PO 00000

Frm 00049

Fmt 4703

Sfmt 4703

E:\FR\FM\11JYN1.SGM

11JYN1


File Typeapplication/pdf
File Modified2018-07-10
File Created2018-07-10

© 2024 OMB.report | Privacy Policy