Download:
pdf |
pdfRegulatory Analysis for Final Rule:
Amendments to Medical Use of Byproduct Material
Regulations (10 CFR Parts 30, 32, and 35)
U.S. Nuclear Regulatory Commission
Office of Nuclear Materials Safety and Safeguards
Division of Materials Safety, State, Tribal, and Rulemaking
Programs
June 2016
Regulatory Analysis
Page i
Table of Contents
Executive Summary ...................................................................................................................... ii
Acronyms ..................................................................................................................................... iv
1.
Statement of the Problem and Objective of the Rulemaking....................................... 1
2.
Identification and Preliminary Analysis of Alternative Approaches .............................. 2
2.1
Option 1: No Action .................................................................................................... 2
2.2
Option 2: Amend 10 CFR Parts 30, 32, and 35.......................................................... 2
3.
Estimation and Evaluation of Benefits and Costs ........................................................ 8
3.1
Identification of Affected Attributes .............................................................................. 8
3.2
Analytical Methodology ............................................................................................... 9
3.3
Detailed Results ........................................................................................................ 14
4.
Presentation of Results ............................................................................................. 40
4.1
Benefits and Costs .................................................................................................... 40
4.2
Backfitting .................................................................................................................. 41
5.
Decision Rationale .................................................................................................... 41
6.
Implementation .......................................................................................................... 42
7.
References ................................................................................................................ 43
Appendix A: Regulatory Flexibility Analysis ............................................................................... 44
Appendix B: Assumptions by section determining impacted NRC licensees. ............................ 47
Regulatory Analysis
Page ii
Executive Summary
The U.S. Nuclear Regulatory Commission (NRC) is amending Parts 30, 32, and 35 of Title 10 of
the Code of Federal Regulations (10 CFR) related to medical use of byproduct material. In this
action the NRC addresses three ongoing rulemaking projects and several other related topics.
First, this rule amends the reporting and notification requirements for a medical event (ME) for
permanent implant brachytherapy. Second, the rule: (1) amends requirements in multiple
sections to remove the requirement to obtain a written attestation for an individual who is
certified by a specialty board whose certification process has been recognized by the NRC or an
Agreement State; (2) amends requirements for measuring molybdenum contamination and
reporting of failed technetium and rubidium generators; and (3) allows Associate Radiation
Safety Officers (ARSOs) to be named on a medical license. Third, the rule amends the
regulations to address a request filed in a petition for rulemaking (PRM), PRM-35-20, to exempt
certain board-certified individuals from certain T&E requirements (i.e., “grandfather” these
individuals) so that they may be identified on a license or permit for materials and uses that they
performed on or before October 24, 2005, the expiration date of the former Subpart J of Part 35
which contained the prior T&E requirements. Currently there are 1,029 NRC and 6,074
Agreement State medical use licensees that will be affected by this rulemaking. Existing
guidance documents (NUREG-1556, Volumes 9 and 13) were revised to reflect these changes.
This regulatory analysis examines the benefits and costs of the changes to these regulations.
The analysis makes the following key findings:
•
Cost to Industry. The rule will result in a total one-time cost to the Industry of
approximately $7.8 million followed by total annual costs of approximately $660,000.
This results in costs of approximately $1,100 per licensee in one-time cost and
approximately $100 per licensee in annual cost.
•
Costs to the NRC. The rule will result in a one-time cost to the NRC of approximately
$65,000 followed by an annual savings of approximately $75,000.
•
Cost to the Agreement States. The rule will result in a one-time cost to the Agreement
States of approximately $5.1 million followed by an annual savings of approximately
$325,000.
•
Decision Rationale. The NRC has determined that the rule is cost-justified because the
regulatory initiatives potentially will reduce unnecessary radiation exposure to patients.
Additionally, the rule will update, clarify, and strengthen the existing regulatory
requirements, and thereby promote public health and safety. Cost savings will be
realized by removing attestation requirements for certain board certified individuals, by
modifying ME reporting criteria to ensure only significant events need to be reported,
and by other modifications to the regulations.
•
The NRC evaluated the impact that a small entity will be expected to incur as a result of
the rule. The rule will have an average implementation cost of approximately $1,100 per
licensee and an annual cost impact of an estimated $100 per licensee. Therefore, even
Regulatory Analysis
Page iii
though the rule will affect a substantial number of licensees that are small entities, it will
not have a significant economic impact on these entities.
Regulatory Analysis
Acronyms
ACMUI
ADAMS
AMP
ANP
ARSO
AU
CFR
FR
FTE
ME
Mo-99
NRC
OMB
PRM
Rb-82
RSO
SRM
SSDR
Sr-82
Sr-85
Tc-99m
T&E
WD
Advisory Committee on the Medical Uses of Isotopes
Agencywide Documents Access and Management System
Authorized medical physicist
Authorized nuclear pharmacist
Associate Radiation Safety Officer
Authorized user
Code of Federal Regulations
Federal Register
full-time equivalent
medical event
molybdenum-99
U.S. Nuclear Regulatory Commission
Office of Management and Budget
petition for rulemaking
rubidium-82
Radiation Safety Officer
Staff Requirements Memorandum
Sealed Source and Device Registry
strontium-82
strontium-85
technetium-99m
training and experience
written directive
Page iv
Regulatory Analysis
1.
Page 1
Statement of the Problem and Objective of the Rulemaking
The NRC is amending 10 CFR Parts 30, 32, and 35 related to the medical use of byproduct
material. Medical use regulations in 10 CFR Part 35 were revised in their entirety in April 2002
(67 FR 20250). The T&E requirements in Part 35 were further revised through an additional
rulemaking published in the Federal Register (70 FR 16336) on March 30, 2005.
In implementing the regulations, the NRC staff, stakeholders, and the Advisory Committee on
the Medical Uses of Isotopes (ACMUI) have identified numerous issues that need to be
addressed through the rulemaking process.
In Staff Requirements Memorandum (SRM) dated May 15, 2008, entitled “Meeting with Advisory
Committee on the Medical Uses of Isotopes (ACMUI), 1:30 p.m., Tuesday April 29, 2008,”
(Agencywide Documents Access and Management System (ADAMS) Accession No.
ML081360319), the Commission directed the staff to work with the ACMUI and the Agreement
States to provide recommendations to the Commission with regard to amending the NRC’s
requirements for preceptor attestation for both board certified individuals and for individuals
seeking authorization via an alternate pathway. The staff was also directed to consider
additional methods, such as the attestation being provided by consensus of an authoritative
group.
Additionally, the Commission directed the staff in SRM-SECY-10-0062, dated August 10, 2010
(ADAMS Accession No. ML102220233), to work closely with the ACMUI and the medical
community to develop event definitions for permanent implant brachytherapy that will protect the
interests of patients, and allow physicians the flexibility to take actions that they deem medically
necessary while preserving the NRC’s ability to detect misapplications of radioactive material
and failures in processes, procedures and training.
The amendment establishes separate ME criteria for permanent implant brachytherapy in terms
of the total source strength administered (activity-based) rather than the dose delivered (dosebased). The ME criteria do not include absorbed doses to normal tissues located outside of the
treatment site and those located within the treatment site as was proposed in the proposed rule,
published on July 21, 2014 (79 FR 42410). Other changes include amending preceptor
attestation requirements, allowing ARSOs to be named on a medical use license, changing the
requirements for measuring molybdenum contamination and reporting of failed technetium and
rubidium generators, extending the 5-year inspection frequency for a gamma stereotactic
radiosurgery unit to 7 years, and several clarifying amendments.
The rulemaking also considers issues that were raised in a petition for rulemaking
(PRM-35-20, ADAMS Accession No. ML062620129) filed by E. Russell Ritenour, Ph.D., on
behalf of the American Association of Physicists in Medicine on September 13, 2006. The
petition requested that the training requirements for experienced RSOs and medical physicists
in 10 CFR 35.57 be amended to recognize board certified physicists and RSOs as
“grandfathered” for the modalities that they practiced as of October 24, 2005.
The rulemaking addresses the petition and Commission direction to clarify the current
regulations, provides greater flexibilities to licensees, and revises medical event criteria for
permanent implant brachytherapy without compromising patient, worker, and public health and
safety.
Regulatory Analysis
Page 2
This analysis presents background material, rulemaking objectives, alternatives considered,
input assumptions, analysis of the costs and benefits of the rule, and decision rationale. It
describes the consequences of the rule language and alternative approaches necessary to
accomplish the regulatory objectives.
2.
Identification and Preliminary Analysis of Alternative Approaches
The following sections describe the two regulatory options that the NRC considered to meet the
rulemaking objective identified in Section 1.1. Section 3 presents a detailed cost and benefit
analysis.
2.1
Option 1: No Action
Under Option 1, the no-action alternative, the NRC would not amend the current regulations in
10 CFR Parts 30, 32, and 35.
Option 1 would avoid costs and savings that the rule would impose; however, the benefits from
updating, clarifying, and consolidating the current requirements to enhance the current level of
protection for public health and safety would not be realized. Also, there would be no changes
made to improve regulatory efficiency and the resulting benefits to the medical use of byproduct
material. Option 1, which is the no-action alternative, is the baseline for this regulatory analysis.
2.2
Option 2: Amend 10 CFR Parts 30, 32, and 35
The changes listed below are consistent with Option 2 to revise 10 CFR Parts 30, 32, and 35
and will result in incremental increases or decreases in costs or benefits.
Note that there are other amendments in this rulemaking, but for the purpose of this regulatory
analysis only the sections that have any cost impacts are considered in this analysis.
Section 30.34(g). This new requirement requires licensees to report to the NRC the results of
any test of generator elutions for molybdenum-99 (Mo-99) breakthrough or strontium-82 (Sr-82)
and strontium-85 (Sr-85) contamination that exceeds the permissible concentration listed in
§ 35.204(a). Reporting will be in accordance with the reporting and notifications in § 35.3204.
While this reporting requirement as well as testing every elution is new, the requirement for
licensees to test the first elution to ensure that it does not exceed the permissible concentration
listed in § 35.204(a), and recording the results of these tests, is already in current regulations.
On several occasions in 2006, 2007, and 2008, medical licensees voluntarily reported to the
NRC that generators had failed the Mo-99 breakthrough tests. In 2011, contamination issues
were reported with Sr-82 rubidium-82 (Rb-82) generators. Because the reporting was voluntary,
the NRC had difficultly determining the extent of the issues and the underlying cause.
Breakthrough of Mo-99 and contamination of Sr-85 may lead to unnecessary exposure to
radiation for patients. The change will allow the NRC to assess the situation quickly and
efficiently when issues occur with generators that may cause unwarranted radiation exposure to
patients.
Section 35.12 (b)(1). This paragraph is amended to remove the requirement to submit a copy
of NRC Form 313 when applying for a license. The change will relieve cost to the licensees by
requiring less paperwork to be submitted. This paragraph also adds a requirement to submit
Regulatory Analysis
Page 3
information on an individual seeking to be identified on a license as an ARSO or as an
ophthalmic physicist.
Section 35.12 (c). This paragraph is amended to remove the requirement to submit a copy of
NRC Form 313 or a letter containing information required by NRC Form 313 for license
amendments or renewals. This change will relieve cost to the licensees by requiring less
paperwork to be submitted.
Section 35.13(d). This new paragraph requires a licensee to apply for and receive a license
amendment prior to permitting an individual to work as an ARSO or before the RSO assigns
different tasks and duties to an ARSO who is authorized on the license. The NRC determined
that allowing ARSOs to be named on a license will increase the number of individuals who will
be available to serve as preceptors for individuals seeking to be appointed as RSOs or ARSOs.
Also, by being named on a license, ARSOs could more easily become RSOs on other licenses
for the types of uses for which they qualify.
Section 35.13(i). This new paragraph allows licensees who are authorized for manual
brachytherapy to receive certain sealed sources without seeking a license amendment.
Specifically, a licensee will be able to receive sealed sources from a new manufacturer or a new
model number for a sealed source listed in the Sealed Source and Device Registry (SSDR)
used for manual brachytherapy for quantities and isotopes already authorized by its license.
The purpose of this change is to make it easier for the licensee to obtain the appropriate sealed
sources necessary for patient treatments in a timely manner.
Section 35.14(a). This paragraph is amended to remove the requirement to obtain a written
attestation for those individuals who are certified by a specialty board whose certification
process has been recognized by the NRC or an Agreement State when using the notification
process.
Section 35.14(b)(1). This paragraph is amended to require a licensee to notify the Commission
within 30 days after an ARSO or ophthalmic physicist has a name change or discontinues
performance of their duties under the license.
Section 35.14(b)(6). This new paragraph requires a licensee to notify the NRC no later than 30
days after receiving a sealed source from a new manufacturer or a new model number listed in
the SSDR for manual brachytherapy for quantities and isotopes already authorized by the
license.
Section 35.24(b). This paragraph is modified to allow the licensee’s management to appoint
one or more qualified individuals to serve as ARSOs. These appointed ARSOs will have to be
currently identified on a medical license or permit for the types of use of byproduct material for
which the RSO will assign tasks and duties.
Section 35.41(a). Although this section is not being amended it is impacted due to the added
procedures required in § 35.41(b)(5) and (6).
Section 35.41(b)(5). This new paragraph requires licensees to add procedures for any
administrations requiring a written directive (WD) to determine if an ME as defined in § 35.3045
has occurred.
Regulatory Analysis
Page 4
Section 35.41(b)(6). This new paragraph requires the licensee to develop specific procedures
for permanent implant brachytherapy programs. At a minimum, the procedures will include
determining post-implant source position within 60 calendar days from the date the implant was
performed. If the licensee cannot make these determinations within the 60 calendar days
because the patient is not available, then the licensee would have to provide written justification
that this determination could not be made due to patient unavailability. The determination that
will be required includes the total source strength administered outside of the treatment site
compared to the total source strength documented in the post-implantation portion of the WD.
Section 35.50(a). For individuals seeking to be named as an RSO or an ARSO, this paragraph
is amended to remove the requirement to obtain a written attestation for those individuals who
are certified by a specialty board whose certification process has been recognized by the NRC
or an Agreement State.
Section 35.50(c)(3). This new paragraph allows an individual who is qualified to be an AU, but
is not named as an AU on a medical license or permit, to be named simultaneously as the RSO
and the AU on the same new medical license. Under current § 35.50(c)(2), an AU identified on
a medical license or permit can be named as the RSO for the same byproduct material for
which the AU is authorized. This new provision expands this principle and allow an individual
who is qualified to be the AU, but is not named on a medical license or permit, to be named
simultaneously as both the AU and the RSO for the same uses on a new medical license. The
provision will make it easier for an individual qualified to be an AU to commence licensed
activities at a physician’s office or a clinic and thus make medical procedures more widely
available, especially in rural areas.
Section 35.51(a). This paragraph is amended to remove the requirement for individuals
seeking to be named as an authorized medical physicist (AMP) to obtain a written attestation for
those individuals who are certified by a specialty board whose certification process has been
recognized by the NRC or an Agreement State.
Section 35.55(a). This paragraph is amended to remove the requirement for individuals
seeking to be named as an authorized nuclear pharmacist (ANP) to obtain a written attestation
for those individuals who are certified by a specialty board whose certification process has been
recognized by the NRC or an Agreement State.
Section 35.57(a)(1). This paragraph is modified to add AMPs and ANPs identified on a
Commission or an Agreement State license or a permit issued by a Commission or an
Agreement State broad scope licensee or master material license permit or by a master material
license permittee of broad scope on or before 180 days after the date the rule is published in the
Federal Register, as individuals that will not need to comply with the training requirements of
§§ 35.50, 35.51, or 35.55, respectively.
Section 35.57(a)(2). This paragraph is modified to recognize individuals certified by the named
boards in the now removed Subpart J of Part 35 on or before October 24, 2005, who will not
need to comply with the training requirements of § 35.50 to be identified as a RSO on a
Commission or an Agreement State license or Commission master material license permit for
those materials and uses that these individuals performed on or before October 24, 2005.
Removal of Subpart J from 10 CFR Part 35 was effective on October 24, 2005. Training
Regulatory Analysis
Page 5
requirements excepted under this paragraph are limited to those materials and uses these
individuals performed on or before October, 24, 2005. Individuals excepted by this paragraph
will still need to meet the recentness of training requirements in § 35.59 and, for new materials
and uses, the training requirements in § 35.50(d).
Section 35.57(a)(3). This paragraph is modified to recognize individuals certified by the named
boards in the now removed Subpart J of 10 CFR Part 35 on or before October 24, 2005, who
will not need to comply with the training requirements of § 35.51 to be identified as an AMP on a
Commission or an Agreement State license or Commission master material license permit for
those materials and uses that these individuals performed on or before October 24, 2005.
Removal of Subpart J from 10 CFR Part 35 was effective on October 24, 2005. Training
requirements excepted under this paragraph are limited to those materials and uses these
individuals performed on or before October, 24, 2005. Individuals excepted by this paragraph
will still need to meet the recentness of training requirements in § 35.59 and, for new materials
and uses, the training requirements in § 35.51(c).
Section 35.57(b)(1). This paragraph is amended to state that individuals authorized on or
before 180 days after the date the rule is published in the Federal Register will not be required
to comply with the T&E requirements in Subparts D through H of 10 CFR Part 35 for those
materials and uses that they performed on or before that date.
Section 35.57(b)(2). This paragraph is restructured and expanded to recognize physicians,
dentists, or podiatrists who were certified by the named boards in the now-removed Subpart J of
Part 35 on or before October 24, 2005, who will not need to comply with the training
requirements of Subparts D through H of 10 CFR Part 35 to be identified as an AU on a
Commission or an Agreement State license or Commission master material license permit for
those materials and uses that these individuals performed on or before October 24, 2005.
Section 35.65(b)(2). This new paragraph prohibits the bundling or aggregating of single sealed
sources to create a sealed source with an activity greater than the maximum activity authorized
by § 35.65. Such bundled or aggregated sources will be treated as one single source and the
licensee will have to meet all the regulatory requirements for that single source including, if
appropriate, listing the source on a specific medical license, leak testing, and satisfying security
requirements.
Section 35.190(a). This paragraph is amended to remove the written attestation requirement
for a physician who is certified by a specialty board whose certification process has been
recognized by the NRC or an Agreement State and is seeking to be named as an AU for
byproduct material authorized under § 35.100.
Section 35.204(b). This paragraph has been modified to require licensees to measure the
Mo-99 concentration after each eluate from a Mo-99/Tc-99m generator. Generator
manufacturers recommend testing each elution prior to use in humans. Mo-99 breakthrough
measurements that exceed the permissible concentration listed in § 35.204(a) may cause
unnecessary radiation exposures to patients.
Section 35.204(e). This new paragraph will require medical use licensees to report any
measurement that exceeded the limits specified in § 35.204(a) for Mo-99/Tc-99m and
Regulatory Analysis
Page 6
Sr-82 Rb-82 generators. Although current regulations require licensees to measure Mo-99, Sr82, and Sr-85 concentrations and record the results, there is no provision to report when a result
exceeds the regulatory limits. Reporting will be in accordance with the new reporting and
notification requirement in § 35.3204. The new reporting requirement will provide information
that will allow the NRC to respond to the potential patient safety issue in a timely manner.
Section 35.290(a). This paragraph is amended to remove the written attestation requirement
for a physician who is certified by a specialty board whose certification process has been
recognized by the NRC or an Agreement State and is seeking to be named as an AU for
byproduct material authorized under § 35.200.
Section 35.390(a). This paragraph is amended to remove the written attestation requirement
for a physician who is certified by a specialty board whose certification process has been
recognized by the NRC or an Agreement State and is seeking to be named as an AU for
byproduct material authorized under § 35.300.
Section 35.392(a). This paragraph is amended to remove the written attestation requirement
for a physician who is certified by a specialty board whose certification process has been
recognized by the NRC or an Agreement State and is seeking to be named as an AU for the
oral administration of sodium iodide I-131 requiring a WD in quantities less than or equal to 1.22
gigabecquerels (33 millicuries).
Section 35.394(a). This paragraph is amended to remove the written attestation requirement
for a physician who is certified by a specialty board whose certification process has been
recognized by the NRC or an Agreement State and is seeking to be named as an AU for the
oral administration of sodium iodide I-131 in quantities greater than 1.22 gigabecquerels (33
millicuries) requiring a WD.
Section 35.433(a)(2). This paragraph is amended to add the T&E requirements for an
ophthalmic physicist who is not an AMP, but who could be involved with ophthalmic treatments
using strontium-90 sealed sources. These requirements are similar to the T&E requirements for
an AMP, but will include only the requirements related to brachytherapy programs. The
ophthalmic physicist will not need an attestation. This change will increase the number of
qualified individuals available to support the use of strontium-90 sources for ophthalmic
treatments. Often, AUs who work in remote areas do not have ready access to an AMP to
perform the necessary calculations to support ophthalmic treatments. This change will make
the procedure involving use of strontium-90 sources for ophthalmic treatments available to more
patients located in remote areas.
Section 35.490(a). This paragraph is amended to remove the written attestation requirement
for a physician who is certified by a specialty board whose certification process has been
recognized by the NRC or an Agreement State and is seeking to be named as an AU for
byproduct material authorized under § 35.400.
Section 35.610(d)(1). This paragraph is amended and restructured to add a new training
requirement for use of remote afterloader units, teletherapy units, and gamma stereotactic
radiosurgery units. This amendment will require all individuals who will operate these units to
receive vendor operational and safety instructions prior to the first use for patient treatment of a
Regulatory Analysis
Page 7
new unit or an existing unit with a manufacturer upgrade that affects the operation and safety of
the unit.
Section 35.655(a). This paragraph is amended to extend the time interval for fully inspecting
and servicing a gamma stereotactic radiosurgery unit from 5 years to 7 years.
Section 35.690(a). This paragraph is amended to remove the written attestation requirement
for a physician who is certified by a specialty board whose certification process has been
recognized by the NRC or an Agreement State and is seeking to be named as an AU for
byproduct material authorized under § 35.600.
Section 35.2024(c). This new paragraph requires the licensee to keep records of each ARSO
assigned under § 35.24(b) for 5 years after the ARSO is removed from the license. These
records will have to include the written document appointing the ARSO and signed by the
licensee’s management.
Section 35.2041. This section is affected by the recordkeeping requirements of the added
procedures required in § 35.41(b)(5) and (6).
Section 35.3045(a)(2). In this amended section, separate criteria for reporting an ME for
permanent implant brachytherapy procedures are established. The new criteria are expected to
capture events that are clinically significant and will reduce the number of reportable MEs
related to permanent implant brachytherapy resulting in cost savings in § 35.3045(c), (d), and
(e) related to event notification and follow-up reports.
Section 35.3045(c). The telephone reporting costs to the Agreement States and the NRC will
be reduced because the requirements for reporting an ME for permanent implant brachytherapy
are changed in § 35.3045(a)(2). The new requirements will not capture events that are not of
significance and thus will reduce the number of reportable MEs related to permanent implant
brachytherapy.
Section 35.3045(d). The written reporting costs to the Agreement States and the NRC will be
reduced because the requirements for reporting an ME for permanent implant brachytherapy
are changed in § 35.3045(a)(2). The new requirements will not capture events that are not
significant and thus will reduce the number of reportable MEs related to permanent implant
brachytherapy.
Section 35.3045(e). The licensee reporting costs to the physician and patients will be reduced
because the requirements for reporting an ME for permanent implant brachytherapy are
changed in § 35.3045(a)(2). The new requirements will not capture events that are not
significant and thus will reduce the number of reportable MEs related to permanent implant
brachytherapy.
Section 35.3204. This new section is added to establish the reporting requirements for
radiopharmacy licensees and medical use licensees to report to the NRC the results of any test
of generator elutions for Mo-99 breakthrough or Sr-82 and Sr-85 contamination that exceeds the
permissible concentration listed in § 35.204(a).
Regulatory Analysis
Page 8
The NRC has estimated the benefits and costs of implementing the final rule, which are
described in Sections 3 and 4 of this regulatory analysis, and has pursued Option 2 for the
reasons discussed in Section 5.
3.
Estimation and Evaluation of Benefits and Costs
This section describes the analysis that the NRC conducted to identify and evaluate the benefits
and costs of the two regulatory options. Section 3.1 identifies the attributes that the staff
expects the rulemaking to affect. Section 3.2 describes how the benefits and costs have been
analyzed. Finally, Section 3.3 presents the detailed results of the projected benefits and costs.
3.1
Identification of Affected Attributes
This section identifies the factors within the public and private sectors that the final rule is
expected to affect, using the list of potential attributes in Chapter 5 of NUREG/BR-0184,
“Regulatory Analysis Technical Evaluation Handbook,” issued January 1997, and in Chapter 4
of NUREG/BR-0058, “Regulatory Analysis Guidelines of the U.S. Nuclear Regulatory
Commission,” Revision 4, issued September 2004. This evaluation considered each attribute
listed in Chapter 5 of NUREG/BR-0184. The basis for selecting those attributes is presented
below.
Affected attributes include the following:
•
Industry Implementation - Under the action, the industry will incur a one-time cost to
implement the rule.
•
NRC Implementation - The changes will require the NRC to process and review the
initial submittals of license amendments and reports as required.
•
Industry Operations - The changes to 10 CFR Parts 30, 32, and 35 require licensees to
meet the new and amended requirements discussed in Section 2.2.
•
NRC Operations - The changes require the NRC to process and review submitted
licensing amendments and reports.
•
Other Government - The Agreement States will incur an implementation cost to issue
compatible regulatory requirements and guidance. The Agreement States will incur
annual operational cost as well.
•
Regulatory Efficiency - The action will result in enhanced regulatory efficiency through
regulatory and compliance improvements.
•
Public Health (routine) - Several amendments will reduce the potential radiation
exposure to patients.
Attributes that the rulemaking options will not affect include the following: occupational health
(routine), occupational health (accidents), public health (accidents), environmental
considerations, general public (i.e., direct, out-of-pocket costs paid by members of the general
public as a result of implementation of the rule), safeguards and security considerations,
Regulatory Analysis
Page 9
improvements in knowledge, offsite property, onsite property, antitrust considerations, and other
considerations.
3.2
Analytical Methodology
This section describes the methodology used to analyze the benefits and costs associated with
the rule. The benefits include any desirable changes in the affected attributes. The costs
include any undesirable changes in the affected attributes.
As described in Section 3.1, the attributes expected to be affected include the following:
•
•
•
•
•
•
•
Industry Implementation
Industry Operation
NRC Implementation
NRC Operations
Regulatory Efficiency
Other Government
Public Health (routine)
The analysis evaluates several attributes on a quantitative basis. Quantitative analysis requires
a baseline characterization, including factors such as the number of licensees affected, the
nature of activities being conducted, and the types of new activities that licensees will implement
as a result of the rule. The analysis proceeds quantitatively for these attributes by making
general assumptions. Sections 3.2.1 – 3.3 describe the most significant analytical data and
assumptions used in the quantitative analyses of these attributes.
The rule includes changes that affect attributes in a positive but not easily quantifiable manner.
For example, the attribute of Regulatory Efficiency will be enhanced by the changes made in
requirements for submitting an application for a license such as in § 35.50. In this section, the
regulations are changed to make it easier for a physician to open an office by allowing this
individual to be the AU and the RSO on the same license application.
One way public health (routine) will be positively affected is by reducing the potential for
unnecessary radiation exposure to patients with the changes to § 35.204. This section will
require licensees to test each eluate from a generator rather than just the first eluate. In the
past several years, generators have had breakthrough issues that have resulted in unnecessary
radiation exposure to patients.
The NRC’s input assumptions used data and information from NRC workgroups, staff
experience, inspection reports or other programmatic analysis and the NRC’s databases to
estimate the costs associated with implementation, and the costs associated with annual
operations of industry and the NRC.
In accordance with guidance from the Office of Management and Budget (OMB) and
NUREG/BR-0058, Revision 4, this regulatory analysis presents the results of the analysis using
both 3 percent and 7 percent real discount rates. The real discounted rates or present-worth
calculation simply determines how much society would need to invest today to ensure that the
designated dollar amount is available in a given year in the future. By using present-worth,
costs and benefits, regardless of when averted in time, are valued equally. Based on OMB
Regulatory Analysis
Page 10
guidance (OMB Circular No. A-4, September 17, 2003), present-worth calculations are
presented using both 3 percent and 7 percent real discount rates. The 3 percent rate
approximates the real rate of return on long-term government debt which serves as a proxy for
the real rate of return on savings. This rate is appropriate when the primary effect of the
regulation is on private consumption. Alternatively, the 7 percent rate approximates the
marginal pretax real rate of return on an average investment in the private sector, and is the
appropriate discount rate whenever the main effect of a regulation is to displace or alter the use
of capital in the private sector. The NRC sought public comments on the accuracy of these
regulatory analysis assumptions and on the validity of the rule’s value and impact estimation
methods in the 2014 publication of the proposed rule (79 FR 42410). The NRC received no
comments on the regulatory analysis.
3.2.1
Data and Assumptions
The analysis assumes that one-time implementation costs for Industry, the Agreement States,
and NRC due to changes to §§ 35.13(d) and 35.65(b)(1) will be incurred in calendar year 2017.
The analysis assumes that one-time implementation costs associated with rule development
and guidance documents for the Agreement States are incurred in year 2017. The analysis
assumes that ongoing costs related to revised and consolidated requirements in 10 CFR Parts
30, 32, and 35 will begin in 2017 and will be modeled on an annual cost basis. The analysis
calculated cost and savings over a 10-year time horizon with each year’s costs or savings
discounted back at a 7 percent and 3 percent discount rate in accordance with
NUREG/BR-0058, Revision 4. Costs and savings are expressed in 2016 dollars.
Data/Affected Entities
The analysis assumes that the following entities will be affected by this rule:
•
•
•
•
•
•
•
•
•
•
•
NRC
NRC licensees
Agreement States
Agreement State licensees
Manufacturers and/or distribution licensees
Radiopharmacy licensees
Authorized users
Radiation Safety Officers
Authorized medical physicists
Authorized nuclear pharmacists
Medical patients
Number and Type of Licensees
Licensees regulated by the NRC (those licensed by the NRC to use radioactive materials
including NRC Master Material Licensees) and the Agreement States (states who have
assumed regulatory authority over the use of certain radioactive materials in their states) are
equally impacted by the rule. Table 1 provides data from NRC's License Tracking System on
the number of NRC licensees, by category, as of July 2015. The number of Agreement State
licensees is estimated at 5.9 times the number of NRC licensees, based on historical data
Regulatory Analysis
Page 11
obtained from NRC databases. This regulatory analysis is based on the assumption that all the
Agreement States will adopt all of the regulatory changes.
Regulatory Analysis
Page 12
Table 1 Number and Type of Licenses
License Title
Program NRC
codes
21
230
Master
Materials
License
44
81
Total
NRC
Licensees
65
311
Medical Institution-Broad
Medical Institution-Written
Directive Required
Medical Institution-Written
Directive Not Required
Medical Private PracticeWritten Directive Required
Medical Private PracticeWritten Directive Not Required
Eye Applicators Strontium-90
Mobile Medicine Service –
Written Directive Not Required
High Dose-Rate Remote
Afterloader
Mobile Medical Service –
Written Directive Required
Medical Therapy – Other
Emerging Technology
Teletherapy
Gamma Stereotactic
Radiosurgery
Nuclear Pharmacy (part 30)
Sub Totals*
TOTAL*
2110
2120
Agreement Total
States
Licensees
384
1835
449
2146
2121
148
13
161
950
1111
2200
43
0
43
254
297
2201
232
0
232
1369
1601
2210
2220
11
33
0
0
11
33
65
195
76
228
2230
90
4
94
555
649
2231
2
0
2
12
14
2240
35
0
35
207
242
2300
2310
1
8
0
0
1
8
6
47
7
55
2500
33
887
0
142
33
1029
195
6074
228
1 NRC Material License Program Codes, July 2015.
2 Data from NRC License Tracking System (LTS), July 2015.
3 Estimated, based on 1 to 5.9 ratio of NRC licensees to Agreement States licensees.
4 Master Material Licenses (MMLs, such as Army, Navy, VA)
*totals are rounded to nearest round number
7103
Regulatory Analysis
Page 13
Assumptions
The analysis makes the following other assumptions:
•
The NRC estimates that each licensee who elutes generators will have to perform and
record the results for an additional 15 breakthrough tests each week.
•
The NRC estimates that, on average, all licensees will have added 1 ARSO on their
licenses.
•
The NRC estimates that, on average, license amendments will take 0.5 hour of
NRC/Agreement State time to review/process. To review the entire NRC Form
313/Application will take 4 hours.
•
The NRC estimates that, on average, licensee application/NRC Form 313 submitted in its
entirety will take 1 hour of physician time and 3 hours of clerical time to prepare and submit.
To complete the required amendments, portions of NRC Form 313 will need to be
completed. The NRC estimates that it takes 0.5 hour to complete each section of the form.
•
The NRC’s labor rates are determined using the methodology in Abstract 5.2, “NRC Labor
Rates,” of NUREG/CR-4627, “Generic Cost Estimates, Abstracts from Generic Studies for
Use in Preparing Regulatory Impact Analyses.” This methodology considers only variable
costs (including salary and benefits) that are directly related to the implementation,
operation, and maintenance of the amendments. Currently, the NRC’s Office of Nuclear
Materials Safety and Safeguards hourly labor rate is $126. The estimation of costs for
rulemaking is based on professional NRC staff full-time equivalent (FTE). Based on actual
data from the NRC’s time and labor system, the number of hours in 1 year that directly
relates to implementation of assigned duties is 1,375 (1,375 was derived by taking the
annual number of hours (2,080) and accounting for leave, training, and completing
administrative tasks). Therefore, an NRC professional staff FTE hourly rate is based on
1,375 hours.
•
Agreement State labor rates were determined from the National Wage Data available on the
Bureau of Labor Statistics Web site (www.bls.gov). Because exact hourly rates would be
difficult to obtain for each of the 37 Agreement States and may not be sufficiently recent,
nationwide mean hourly rates were used. For all Agreement State labor rates, $60.80/hour
is used, which is from the Bureau of Labor Statistics Employer Costs for Employee
Compensation data set, under the category “Lawyers.” The rate was then increased using a
multiplier of 1.5 to account for benefits (pension, insurance premiums, and legally required
benefits) that resulted in an hourly rate of $91.20.
•
Licensee labor rates were obtained from the National Wage Data available on the Bureau of
Labor Statistics Web site (www.bls.gov). Depending on the industry and the occupation
(e.g., manufacturing, health and safety, etc.), an appropriate mean hourly labor rate was
selected. The rate was then increased using a multiplier of 1.5 to account for benefits
(pension, insurance premiums, and legally required benefits). Because exact hourly rates
would be difficult to obtain and may not be sufficiently recent, nationwide mean hourly rates
were used. The bases for the labor rates are as follows. For licensee labor rates, three
labor rates are used. For clerical recordkeeping labor cost, $29.54/hour is used ($19.69 X
Regulatory Analysis
Page 14
1.5), which is from the Compensation data set “Miscellaneous healthcare practitioner and
technical workers. For physician labor cost, $128.51/hour is used ($85.67 X 1.5), which is
from the data set “Physician.” For nuclear technician labor cost, $72.54/hour is used
($48.36 X 1.5), which is from the data set “Nuclear technician.” As described in OMB
Circular A-76, “Performance of Commercial Activities,” the number of productive hours in
one year is 1,776. As this actual value is likely to vary from state to state and no specific
data was available, the FTE costs for the Agreement States are based on the number of
hours estimated in OMB Circular A-76.
•
Licensee turnover rates were obtained from Job Openings and Labor Turnover Survey Data
available on the Bureau of Labor Statistics Web site (www.bls.gov). Based on this data, the
NRC estimates the licensee turnover rate to be 3.0 percent annually. For the purpose of
this analysis, the NRC estimates the total number of licensees to be constant over the
10-year analysis period.
•
The analysis assumes that the final rule will be published by the end of 2016 and would be
effective 180 days later.
•
The NRC estimates that 30 percent of the applicants and AMPs, AUs, and RSOs currently
listed on NRC and Agreement State medical licenses are board certified. For ANPs, this
estimate is 10 percent.
•
For the purpose of this analysis the NRC assumes that the 10-year timeframe will cover the
average license cycle timeframe for the impacted licensees.
•
The NRC estimates that 10 percent of licensees will submit an amendment annually to
change tasks/duties of ARSOs on their licenses.
•
The analysis calculated cost over a 10-year timeframe with each year’s costs or savings
discounted back at a 7 percent and 3 percent discount rate, in accordance with
NUREG/BR-0058, “Regulatory Analysis Guidelines of the U.S. Nuclear Regulatory
Commission,” Revision 4.
•
To the extent practical, quantitative information (e.g., costs and savings) and qualitative
information (e.g., the nature and magnitude of impacts) on attributes affected by the rule
were obtained from, or developed in consultation with, the NRC staff.
3.3
Detailed Results
This section presents a detailed estimate of the impacts by attribute for the rulemaking (Option
2). Some benefits and costs are addressed qualitatively for reasons discussed in Section 3.2.
Exhibit 4-1 summarizes these results.
Regulatory Analysis
Page 15
Option 1: No Action
By definition, this option does not result in any benefits or costs. The baseline for Option 2 is
the No-Action Alternative. The baseline assumes full compliance with existing NRC
requirements. This baseline is consistent with NUREG/BR-0058, which states that, “in
evaluating a new requirement...the staff should assume that all existing NRC requirements have
been implemented.”
Option 2: Amend Regulations to Revise 10 CFR Parts 30, 32, and 35
For details of how the NRC determined the number of licensees and individuals affected by
Option 2, see Appendix B.
Industry Implementation
Amendment for ARSO
Section 35.13(d) will require a licensee to apply for and receive a license amendment prior to
permitting an individual to work as an ARSO or before the RSO assigns different tasks and
duties to an ARSO currently authorized on the license. The NRC estimates that all 7,103
licensees will add an ARSO. Some of the larger medical licensees will have several ARSOs,
while other smaller licensees will have none, but on average there will be 1 ARSO per licensee.
The NRC determined that allowing ARSOs to be named on a license will increase the number of
individuals who will be available to serve as preceptors for individuals seeking to be appointed
as RSOs or ARSOs. Also, by being named on a license, ARSOs could more easily become
RSOs on other licenses for the types of uses for which they qualify. This will be a 0.5 labor hour
cost per licensee for processing an amendment.
Recordkeeping
Section 35.24(b) will require the written documentation of the RSO-delegated duties to an
ARSO, management’s appointment of an ARSO. This paragraph is modified to allow the
licensee’s management to appoint one or more qualified individuals to serve as ARSOs. The
NRC estimates this to be a 1 labor hour cost for all 7,103 impacted licensees.
Adding requirements to current procedures
Section 35.41(b)(5) will require that affected licensees add procedures for any administration
requiring a WD to include procedures for determining if an ME, as defined in § 35.3045, has
occurred. The NRC estimates that 4,140 licensees will add procedures to include this
requirement and the associated cost will be 8 hours physician labor and 1 hour clerical labor.
Section 35.41(b)(6) will require the affected licensee to develop specific procedures for
permanent implant brachytherapy programs. At a minimum, the procedures will include
determining post-implant source position within 60 calendar days from the date the implant was
performed. If the licensee cannot make these determinations within the 60 calendar days
because the patient is not available, then the licensee would have to provide written justification
that this determination could not be made due to patient unavailability. The
Regulatory Analysis
Page 16
NRC estimates that 3,373 licensees will add procedures to include this requirement and the
associated cost will be 8 physician labor hours and 1 clerical labor hour.
Licensee cost to meet additional requirements.
Section 35.65(b)(2) is modified to require licensees that possess bundled or aggregated single
sealed sources with greater than a specified activity to treat them as one single source. These
sources with activities greater than authorized by § 35.65 will have to meet all the regulatory
requirements for that of a single source including, if appropriate, listing on a specific medical
license, leak testing, and security requirements. This requirement is necessary so the NRC can
ensure that adequate controls for security and radiation safety are applied to these larger
sources. The cost for licensees will encompass recordkeeping of new leak test and security
requirements under regulations, if appropriate. In addition, if bundled source activity is treated
as a single source, an amendment to the license will be required. The NRC estimates the
recordkeeping to be 2 labor hours and 0.5 labor hour for the required amendment. The NRC
estimates this to impact 1% of all licensees or 75 licensees.
Recordkeeping
Section 35.2041 will add a one-time recordkeeping cost for the added procedures now required
in § 35.41(b)(5) and (6). The NRC estimates the cost for this recordkeeping requirement to be
0.10 labor hour for each of the 7,103 impacted licensees.
Table 2 Summary of Industry Implementation Cost
Description
# of Licensees
One-time cost
Notes
35.13(d)
7,103
$104,911
Amend license to add ARSO
35.24(b)
7,103
$209,823
RSO delegates duties to ARSO, and
management appoints ARSO
35.41(b)(5)
3,935
$4,161,735
Add requirements to existing procedures
35.41(b)(6)
3,134
$3,314,581
Add new procedures
35.65(b)(2)
74
$4,372
Recordkeeping for security and leak test
requirements
35.65(b)(2)
74
$4,755
Amend license for select bundled single
sources
35.2041
7,103
$20,982
Recordkeeping cost for § 35.41(b)(5) and (6)
Total
7,821,159
Regulatory Analysis
Page 17
NRC Implementation
Processing amendment for ARSO
Section 35.13(d) will require the NRC to process the licensee amendment prior to permitting an
individual to work as an ARSO or before the RSO assigns different tasks and duties to an
ARSO currently authorized on the license.
The NRC estimates that on average all 1,029 NRC licensees will add an ARSO. Some of the
larger medical licensees will have several ARSOs while other smaller licensees will have none,
but on average there will be 1 ARSO per licensee. This will be a 0.5 labor hour cost to the NRC
per licensee for processing an amendment.
Processing amendment for bundled sources
Section 35.65(b)(2) will require licensees that possess bundled or aggregated single sealed
sources with greater than a specified activity to treat them as one single source. These sources
with activities greater than authorized by § 35.65 will have to meet all the regulatory
requirements for that single source including, if appropriate, listing on a specific medical license,
leak testing, and security requirements. This requirement is necessary so the NRC can ensure
adequate controls for security and radiation safety are applied to these larger sources. If
bundled source activity is treated as a single source an amendment to the license is required.
The NRC estimates 0.5 labor hours to process the required amendments, and this will impact
10 licensees.
The NRC will publish implementing guidance concurrently with the rule. The implementing
guidance will provide revisions to the following NUREG guidance documents.
•
NUREG-1556 Volume 9, Program-Specific Guidance About Medical Use Licenses
(Revision 2).
•
NUREG-1556 Volume 13, Program-Specific Guidance About Commercial
Radiopharmacy Licenses (Revision 1).
The NRC will also revise Inspection Procedure 87132 after publication of the rule. The cost
incurred to undertake all rulemaking activities, including revising these documents, are
considered sunk cost and not included in this analysis.
Regulatory Analysis
Page 18
Table 3 Summary of NRC Implementation Cost
Section
35.13(d)
35.65(b)(2)
Description
Process
amendment
Process
amendment
Total
One time
cost in
year
2017
Undisco
unted
cost
Total 3 Yr
3% NPV
Total 3 Yr 7%
NPV
$64,827
$64827
$64,827
$64827
$630
$630
$630
$630
$65,457
$65,457
$65,457
$65,457
Other Governments Implementation (Agreement States)
Amendment for ARSO
Section 35.13(d) will require a licensee to apply for and receive a license amendment prior to
permitting an individual to work as an ARSO or before the RSO assigns different tasks and
duties to an ARSO authorized on the license.
The NRC estimates that on average all 6,074 Agreement State licensees will add an ARSO.
Some of the larger medical licensees will have several ARSOs, while other smaller licensees
will have none, but on average there will be 1 ARSO per licensee. This will be a 0.5 hour cost
per licensee for processing an amendment.
Processing amendment for bundled sources
Section 35.65(b)(2) will require licensees that possess bundled or aggregated single sealed
sources with greater than a specified activity to treat them as one single source. These sources
with activities greater than authorized by § 35.65 will have to meet all the regulatory
requirements for that single source including, if appropriate, listing on a specific medical license,
leak testing, and security requirements. This requirement is necessary so the NRC can ensure
adequate controls for security and radiation safety are applied to these larger sources. If
bundled source activity is treated as a single source an amendment to the license is required.
The NRC estimates 0.5 labor hour to process the required amendments, and this will impact 56
licensees.
Develop rule package and revise guidance documents
The Agreement State staffs will develop the rule packages to accommodate the requirements
that will be added or modified by the rulemaking process. Revised guidance and inspection
procedures may or may not be required depending on each state’s process. Some Agreement
States adopt the NRC’s guidance and inspection procedures without change. The rulemaking
effort will require 0.5 of an FTE (888 hours) on average for each of the 37 Agreement States.
To revise and update the guidance documents and inspection procedures will take 0.25 FTE
(444 hours). This is an estimated $121,500 one-time cost to each of the 37 Agreement States.
Regulatory Analysis
Page 19
Table 4 Summary of Agreement State Implementation Costs
Section
35.13(d)
35.65(b)(2)
N/A
N/A
Description
Process
amendment
Process
amendment
Update
regulations
Guidance
documents
One-time cost
$553,949
Total
$5,053,757
$5,107
$2,996,467
$1,498,234
Industry Operation
Reporting requirement
Section 30.34(g) will require licensees to report to the NRC/Agreement States the results of any
test of generator elutions for Mo-99 breakthrough or Sr-82 and Sr-85 contamination that
exceeds the permissible concentration listed in § 35.204(a). While this reporting requirement as
well as testing every elution is new, the requirement for licensees to test the first elution to
ensure that it does not exceed the permissible concentration listed in § 35.204(a), and record
the results of these tests, is already in current regulations. Issues have occurred with
generators that may cause unwarranted radiation exposure to patients. This reporting
requirement is included in § 35.204(e).
The NRC estimates that 359 licensees will be impacted by this change for a total of 13 hours
annually. The NRC estimates each test will take 30 seconds.
Section 35.12 (b)(1) will be amended to remove the requirement to submit a copy of the NRC
Form 313 when applying for a license.
The NRC estimates the licensees averaged 0.25 hour to make and submit a copy of their
application. The NRC estimates that there will be 225 new applications submitted annually.
Cost for licensees to submit information on an ARSO
Section 35.12(b)(1) also will add a requirement to submit information on an individual seeking to
be identified as an ARSO.
The NRC estimates that there will be 225 new applications submitted annually requiring
applicants to submit information on an ARSO with a 0.5 hour cost per applicant.
Savings on copies of amendments or renewals of applications
Regulatory Analysis
Page 20
Section 35.12(c)(1) will remove the requirement to submit a copy of NRC Form 313 or a letter
containing information required by NRC Form 313 for license amendments or renewals.
The NRC estimates the licensees will save 0.25 hours to copy and submit a copy of NRC Form
313 for renewals. The renewal timeframe is 10 years. The NRC estimates that there will be on
average 749 renewals submitted annually.
For copies of amendments which are submitted on NRC Form 313, the NRC estimates there
will be 1 amendment per licensee for a total of 7,103 submitted annually.
Licensing amendments for new ARSOs
Section 35.13(d) will require a licensee to apply for and receive a license amendment prior to
permitting an individual to work as an ARSO or before the RSO assigns different tasks and
duties to an ARSO authorized on the license. For the purpose of this analysis, the NRC
assumes a 3 percent licensee turnover rate. This will represent 225 total licensees. In addition,
approximately10 percent (estimated at 747) of all ARSOs will have their duties and tasks
amended annually. This will be a 0.5 hour cost per licensee.
Allow licensees to receive certain sealed sources without first seeking a license amendment
Section 35.13(i) will be added to this section to allow licensees to receive certain sealed sources
without first seeking a license amendment. This change is to make it easier for the licensee to
obtain the sealed sources necessary for patient treatments in a timely manner. The NRC
assumes that each affected licensee will receive 2 new sealed sources annually. This
amendment will allow licensees to save on submittals of 2 amendments/NRC Form 313s for a
1.0 labor hour savings annually. The NRC estimates this to affect 3,498 licensees annually.
Cost to licensee to process notification
Section 35.14(b)(1) will require a licensee to notify the NRC/Agreement States within 30 days
after the ARSO or ophthalmic physicist is removed from the list of individuals that the licensee is
required to report when the ARSO or ophthalmic physicist discontinues performance of duties
under the license or has a name change.
The NRC estimates that 225 new ARSOs will be named annually due to turnover and 37
(0.5 percent of total) due to a name change. The NRC estimates this to be a 0.25 labor hour
cost. The number of new ophthalmic physicists is too low to establish an estimated labor cost.
Costs for licensee to process notification
Section 35.14(b)(6) will require the licensee to notify the NRC if it receives certain sealed
sources without first obtaining a license amendment. Specifically, a licensee will have to notify
the NRC no later than 30 days after receiving a sealed source from a new manufacturer or a
new model number for a sealed source listed in the SSDR used for manual brachytherapy for
quantities and isotopes already authorized by the license. The notification is used in lieu of a
license amendment which is being removed under § 35.13(i). This notification is required for
the NRC to have an accurate record of sealed sources possessed by a licensee.
Regulatory Analysis
Page 21
The NRC estimates that 3.498 licensees will be impacted twice annually, and each notification
will take 0.25 hour to process.
Recordkeeping for new ARSOs
Section 35.24(b) will require written documentation for managing appointments of ARSOs, and
the RSO assignment of tasks and duties. This paragraph will be modified to allow the licensee’s
management to appoint one or more qualified individuals to serve as ARSOs. The NRC
estimates this to be a 1 hour cost for the 225 licensees impacted with turnover.
Adding new procedures
Section 35.41(b)(5) will require licensees to add procedures for any administration requiring a
WD to include procedures for determining if an ME, as defined in § 35.3045, has occurred.
The NRC estimates that 124 licensees, due to turnover, will add procedures to meet this
requirement and the associated cost will be 8 physician labor hours and 1 clerical labor hour.
Adding new procedures
Section 35.41(b)(6) will require a licensee to develop specific procedures for permanent implant
brachytherapy programs. At a minimum, the procedures will include determining post-implant
source position verification within 60 calendar days from the date the implant was performed. If
the licensee cannot make these determinations within the 60 calendar days because the patient
is not available, then the licensee would have to provide written justification that this
determination could not be made due to patient unavailability.
The NRC estimates that 101 licensees, due to turnover, will add procedures to include this
requirement and the associated cost will be 8 physician labor hours and 1 clerical labor hour.
Savings for removing attestation requirement for some individuals
Section 35.14(a) will remove the requirement to obtain a written attestation for those individuals
who are certified by a specialty board whose certification process has been recognized by the
NRC or an Agreement State when using the notification process. The number of ophthalmic
physicists is too low to establish an estimated labor savings.
Section 35.50(a) will remove the requirement for individuals seeking to be named as an RSO or
ARSO (including medical physicists identified in § 35.50(c)(1)) to obtain a written attestation for
those individuals who are certified by a specialty board whose certification process has been
recognized by the NRC or an Agreement State. The NRC estimates that approximately 225
individuals will seek to become RSOs and ARSOs under § 35.50 annually. Of these, the NRC
estimates that 30 percent, or 67, are individuals who are certified by a specialty board whose
certification process has been recognized by the NRC or an Agreement State. The NRC
estimates a savings of 0.5 labor hour per licensee for no longer requiring the submittal of an
amendment.
Licensee savings for processing only one application
Regulatory Analysis
Page 22
Section 35.50(c)(3) will allow an individual who is qualified to be the AU, but is not named on a
medical license or permit, to be named simultaneously as both the AU and RSO for the same
uses on a new medical license. This new provision saves the applicant from submitting an
amendment to the initial AU application to be named as an RSO. The NRC estimates this to
affect 3 applicants annually at a savings of 0.5 hour per application.
Savings for removing the attestation requirement for some individuals
Section 35.51(a) will remove the requirement for individuals seeking to be named as an AMP to
obtain a written attestation for those individuals who are certified by a specialty board whose
certification process has been recognized by the NRC or an Agreement State. The NRC
estimates that approximately 37 individuals annually will seek to become AMPs under § 35.51
with a savings of 0.5 labor hour per licensee for no longer requiring the submittal of an
amendment.
Section 35.55(a) will remove the requirement for individuals seeking to be named as an ANP to
obtain a written attestation for those individuals who are certified by a specialty board whose
certification process has been recognized by the NRC or an Agreement State. The NRC
estimates this to impact 7 licensees annually with a savings of 0.5 labor hour per licensee for no
longer requiring the submittal of an amendment.
Savings for removing training requirements for certain AMPS and ANPs
Section 35.57(a)(1) will remove the requirement for AMPs and ANPs who are identified on a
Commission or an Agreement State license or a permit issued by a Commission or an
Agreement State broad scope licensee or master material license permit or by a master material
license permittee of broad scope on or before 180 days after the date the rule is published in the
Federal Register, to comply with the training requirements of §§ 35.50, 35.51, or 35.55,
respectively. The NRC estimates that 41 licensees will be impacted annually, and there will be
a savings of 0.5 hour associated with the submittal of an amendment on NRC Form 313.
Regulatory Analysis
Page 23
Savings for removing training requirement for certain RSOs
Section 35.57(a)(2) will recognize individuals certified by the named boards in the now removed
Subpart J of Part 35 on or before October 24, 2005, who will not need to comply with the
training requirements of § 35.50 to be identified as a RSO on a Commission or an Agreement
State license or Commission master material license permit for those materials and uses that
these individuals performed on or before October 24, 2005. The NRC estimates that 75
licensees will be impacted annually, and there will be a savings of 0.5 hour associated with the
submittal of an amendment on NRC Form 313.
Savings for removing training requirements for certain individuals
Section 35.57(a)(3) is modified to remove the requirement for individuals certified by the named
boards in the now removed Subpart J of Part 35 on or before October 24, 2005, to comply with
the training requirements of § 35.51 to be identified as a AMP on a Commission or an
Agreement State license or Commission master material license permit for those materials and
uses that these individuals performed on or before October 24, 2005. The NRC estimates that
41 licensees will be impacted annually, and there will be a savings of 0.5 hour associated with
the submittal of an amendment on NRC Form 313.
Savings for removing T&E requirements for certain individuals
Section 35.57(b)(1) is amended to clarify that individuals authorized on or before 180 days after
the date the rule is published in the Federal Register will not be required to comply with the T&E
requirements in Subparts D through H of 10 CFR Part 35 for those materials and uses that they
performed on or before that date. The NRC estimates that 2,246 or approximately 30 percent of
all licensees, will be impacted on an annual basis. The 0.5 labor hour savings will be
associated with each submittal of amendment on NRC Form 313.
Section 35.57(b)(2) is restructured and expanded to recognize physicians, dentists, or
podiatrists who were certified by the named boards in the now removed Subpart J of Part 35 on
or before October 24, 2005, who will not need to comply with the T&E requirements of Subparts
D through H of 10 CFR Part 35 to be identified as an AU on a Commission or an Agreement
State license or Commission master material license permit for those materials and uses that
these individuals performed on or before October 24, 2005. The NRC estimates that 187, or
approximately 2.5 percent of all licensees, will be impacted on an annual basis. The 0.5 labor
hour savings will be associated with each submittal of amendment on NRC Form 313.
Cost to possess certain bundled sources
Section 35.65(b)(2) is modified to require licensees that possess bundled or aggregated single
sealed sources with greater than a specified activity to treat them as one single source. These
sources with activities greater than authorized by § 35.65 will have to meet all the regulatory
requirements for that single source including, if appropriate, listing on a specific medical license,
leak testing, and security requirements. This requirement is necessary so the NRC can ensure
that adequate controls for security and radiation safety are applied to these larger sources. The
cost for licensees will encompass recordkeeping of new leak tests and security requirements
under regulations, if appropriate. In addition, if bundled source activity is treated as a single
source, an amendment to the license is required. The NRC estimates this to impact 10
Regulatory Analysis
Page 24
licensees annually, for 2 hours of recordkeeping cost and 0.5 hour for submitting an
amendment.
Savings for removing attestation requirement for some individuals
Section 35.190(a) will remove the written attestation requirement for a physician who is certified
by a specialty board whose certification process has been recognized by the NRC or an
Agreement State and is seeking to be named as an AU for byproduct material authorized under
§ 35.100. The NRC estimates that this will impact 59 licensees on an annual basis with a
savings of 0.5 labor hour for no longer requiring the submittal of a written attestation with the
amendment request.
Recordkeeping cost
Section 35.204(b) is modified to require licensees to measure the Mo-99 concentration after
each eluate from a Mo-99/Tc-99m generator. Generator manufacturers recommended testing
each elution prior to use in humans. Mo-99 breakthrough measurements which exceed the
permissible concentration listed in § 35.204(a) may cause unnecessary radiation exposure to
patients. The NRC assumes that each test will be conducted by a nuclear technician who is
under the supervision of an ANP. The NRC estimates this to impact 331 medical use licensees
and 359 radiopharmacy licensees who have the generators. The new requirements will require
the affected licensees to keep records of their test measurements. The NRC estimates this to
require 13 medical technician labor hours annually for each affected licensee.
Reporting requirement
Section 35.204(e) will require licensees to report any measurement that exceeded the limits
specified in § 35.204(a) for Mo-99/Tc-99m and Sr-82/Rb-82 generators. Generator
manufacturers recommend testing each elution prior to use in humans. Mo-99 breakthrough
measurements which exceed the permissible concentration listed in § 35.204(a) may cause
unnecessary radiation exposure to patients. The NRC estimates the affected licensees to
report 7 occurrences on average annually. The reporting requirement includes an initial phone
notification within 7 calendar days from occurrence, followed up with a written report due in 30
days. The NRC estimates this to be a 2.25 physician labor hour cost (0.25 hour for the phone
call and 2 hours for the written report).
Savings for removing the attestation requirement for some individuals
Section 35.290(a) will remove the requirement for physicians seeking to be named as an AU of
unsealed byproduct material for uses authorized under § 35.200 to obtain a written attestation
for those individuals who are certified by a specialty board whose certification process has been
recognized by the NRC or an Agreement State. The NRC estimates that this will impact 59
licensees on an annual basis with a savings of 0.5 physician labor hour per licensee for no
longer requiring the submittal of a written attestation with the amendment request.
Regulatory Analysis
Page 25
Savings for removing the attestation requirement for some individuals
Section 35.390(a) will remove the requirement for physicians seeking to be named as an AU of
unsealed byproduct material which requires a WD for uses authorized under § 35.300 to obtain
a written attestation for those individuals who are certified by a specialty board whose
certification process has been recognized by the NRC or an Agreement State. The NRC
estimates that this will impact 29 licensees on an annual basis with a savings of 0.5 physician
labor hour per licensee for no longer requiring the submittal of a written attestation with the
amendment request.
Savings for removing the attestation requirement for some individuals
Section 35.392(a) will remove the requirement for physicians seeking to be named as an AU for
the oral administration of sodium iodide I-131 requiring a WD in quantities less than or equal to
1.22 gigabecquerels (33 millicuries) to obtain a written attestation for those individuals who are
certified by a specialty board whose certification process has been recognized by the NRC or an
Agreement State. The NRC estimates that this will impact 29 licensees on an annual basis with
a savings of 0.5 physician labor hour per licensee for no longer requiring the submittal of a
written attestation with the amendment request.
Savings for removing attestation requirement for some individuals
Section 35.394(a) will remove the requirement for physicians seeking to be named as an AU for
the oral administration of sodium iodide I-131 requiring a WD in quantities greater than 1.22
Gigabecquerels (33 millicuries) to obtain a written attestation for those individuals who are
certified by a specialty board whose certification process has been recognized by the NRC or an
Agreement State. The NRC estimates that this will impact 29 licensees on an annual basis with
a savings of 0.5 physician labor hour per licensee for no longer requiring the submittal of a
written attestation with the amendment request.
Flexibility for AMP turnover
Section 35.433 is amended and expanded to allow certain individuals who are not AMPs to
calculate the activity of strontium-90 sources that is used to determine the treatment times for
ophthalmic treatments. These individuals who are not AMPs will have to meet the T&E
requirements detailed in the new paragraph (a)(2) of this section to perform the specified
activities. These requirements are similar to the T&E requirements for an AMP, but include only
the requirements related to brachytherapy programs. The NRC determined that this will
increase the number of qualified individuals available to support the use of ophthalmic
treatments. This will expand the pool of qualified individuals and provide the licensees greater
flexibility with no associated cost.
Savings for removing attestation requirement for some individuals
Section 35.490(a) will remove the requirement for physicians seeking to be named as an AU of
a manual brachytherapy source for the uses authorized under § 35.400 to obtain a written
attestation for those individuals who are certified by a specialty board whose certification
process has been recognized by the NRC or an Agreement State. The NRC estimates that this
will impact 31 licensees on an annual basis with a savings of 0.5 physician labor hour per
Regulatory Analysis
Page 26
licensee for no longer requiring the submittal of a written attestation with the amendment
request.
Cost for training
Section 35.610(d)(1) is restructured to add a new training requirement for use of remote
afterloader units, teletherapy units, and gamma stereotactic radiosurgery units. This
amendment requires all individuals who operate these units to receive vendor operational and
safety training prior to the first use for patient treatment of a new unit or an existing unit with a
manufacturer upgrade that affects the operation and safety of the unit. The NRC assumes this
will impact 172 licensees on an annual basis who will add a new unit or modify an existing unit.
The NRC assumes this training to take 1 physician labor hour.
Change to inspections and servicing intervals
Section 35.655(a) is amended to change the requirement for intervals for full inspection and
servicing for gamma stereotactic radiosurgery units from 5 years to 7 years. The cost to replace
the sources in a gamma stereotactic radiosurgery unit can be exorbitant. Licensees have
routinely requested, and the NRC has granted, extensions for the full inspection service for
these units beyond 5 years. The NRC does not anticipate any savings or cost to the licensees
for this change.
Savings for removing attestation requirement for some individuals
Section 35.690(a) will remove the requirement for physicians seeking to be named as an AU for
sealed sources for uses authorized under § 35.600 to obtain a written attestation for those
individuals who are certified by a specialty board whose certification process has been
recognized by the NRC or an Agreement State. The NRC estimates this to impact 10 licensees
annually with a savings of 0.5 physician labor hour per licensee for no longer requiring the
submittal of a written attestation with the amendment request.
Recordkeeping
Section 35.2024(c) will require licensees to keep records of each ARSO assigned under
§ 35.24(b) for 5 years after the ARSO is removed from the license. These records will have to
include the written document appointing the ARSO signed by the licensee’s management. The
NRC estimates that due to turnover, 225 ARSOs will be removed from licenses annually with a
cost of 1 clerical labor hour.
Savings on phone notifications of MEs
Section 35.3045(c) will reduce telephone reporting costs to the NRC because the requirements
for reporting an ME for permanent implant brachytherapy are changed in § 35.3045(a)(2). The
new requirements will not capture events that are not of significance and will reduce the number
of reportable MEs related to permanent implant brachytherapy. The NRC estimates 7 licensees
will be impacted annually with a saving of 0.5 medical technician labor hour on each notification.
Savings on written follow-up reports on MEs
Regulatory Analysis
Page 27
Section 35.3045(d) will reduce written reporting costs to the NRC because the requirements for
reporting an ME for permanent implant brachytherapy are changed in § 35.3045(a)(2). The new
requirements will not capture events that are not of significance and will reduce the number of
reportable MEs related to permanent implant brachytherapy. The NRC estimates 7 licensees
will be impacted annually with a savings of 2 physician labor hours and 6 clerical labor hours on
each report.
Savings for the licensee on reporting MEs
Section 35.3045(e) will reduce licensee reporting costs to the referring physician, and to the
patient or patient’s guardian, because the requirements for reporting an ME for permanent
implant brachytherapy are changed in § 35.3045(a)(2). The new requirements will not capture
events that are not of significance and will reduce the number of reportable MEs related to
permanent implant brachytherapy. The NRC estimates 18 fewer reports will be made annually
with a total savings of 5 physician labor hours for each licensee.
Increased flexibility for AUs for use of sealed sources and devices for manual brachytherapy
Sections 35.400, 35.500, and 35.600 are amended to allow AUs to use sealed sources and
devices listed in SSDRs for manual brachytherapy for other medical uses that are not explicitly
listed in the SSDR provided that these sources are used in accordance with the radiation safety
conditions and limitations described in the SSDR. This increased flexibility is not quantifiable.
Regulatory Analysis
Page 28
Table 5 Summary of Industry Annual Costs
Citation
Description
30.34(g)
30.34(g)
35.12(b)(1)
35.12(b)(1)
35.12 (c )(1)
35.12 (c )(1)
35.13(d)
Reporting requirement (also in § 35.204(e))
Cost to check generators for each elution
Savings for no longer requiring copy of application
Cost for licensees to submit information on ARSO
Savings on copy of renewals
Savings on copy of amendments
Licensing amendments for new ARSOs
Licensing amendments for new tasks/duties for
existing ARSO
Savings exemption for need for amendment for
sealed source
Cost for notification for when ARSO or ophthalmic
physicist leaves or changes name
Notification costs for reporting
Recordkeeping for new ARSOs
Adding new procedures
Adding new procedures
Savings for some RSO for attestation
Savings for processing only one application
Savings for removing attestations for some
individuals
Savings for removing attestations for some
individuals
Savings for individuals who want to be ANPs and
AMPs
Savings for individuals certain RSOs
Savings for individuals who want to be identified
as AMPs
Savings for AU on T&E from 10/24/02 to 10/24/05
Savings for individuals who want to be AUs
Recordkeeping requirements for leak tests and
security
Cost requiring a licensee to submit an
amendment
Savings for removing attestations for some
individuals
Cost to check generators for each elution
Reporting requirement (cost in § 35.3204)
Savings for removing attestations for some
individuals
35.13(d)
35.13(i)
35.14(b)(1)
35.14(b)(6)
35.24(b)
35.41(b)(5)
35.41(b)(6)
35.50(a)
35.50(c)(3)
35.51(a)
35.55(a)
35.57(a)(1)
35.57(a)(2)
35.57(a)(3)
35.57(b)(1)
35.57(b)(2)
35.65(b)(2)
35.65(b)(2)
35.190(a)
35.204(b)
35.204(e)
35.290(a)
No. of
Licensees
Affected
7
359
225
225
749
7103
225
Annual Costs
$2,024
$338,638
-$1,662
$3,323
-$5,531
-$52,456
$3,323
747
$11,033
3498
-$51,665
262
$1,935
3498
225
124
101
67
3
$25,833
$6,647
$131,145
$106,820
-$4,305
-$193
37
-$2,377
7
-$450
41
-$2,634
75
-$4,819
41
-$2,634
2246
187
-$144,317
-$12,016
10
$591
10
$148
59
-$3,791
331
7
$312,226
$2,024
59
-$3,791
Regulatory Analysis
Savings for removing attestations for some
individuals
Savings for removing attestations for some
35.392(a)
individuals
Savings for removing attestations for some
35.394(a)
individuals
35.433(a)(2) No additional cost
Savings for removing attestations for some
35.490(a)
individuals
35.610(d)(1) Cost for training for operations and safety
Savings for removing attestations for some
35.690(a)
individuals
35.390(a)
Page 29
29
-$1,863
29
-$1,863
29
-$1,863
0
$0
31
-$1,992
172
$22,104
10
-$643
35.2024( c) Recordkeeping cost (Removing ARSO)
225
$2,213
35.2024(c)
35.3045(c)
35.3045(d)
35.3045(e)
Total
225
7
7
18
$2,213
-$254
-$3,040
-$4,626
$663,452
Recordkeeping cost (ARSO appointment)
Phone notifications reduced
Written reports reduced
Physician notifications reduced
NRC Operation
Processing reports
Section 30.34(g) will require the NRC to process licensee reports of any test that exceeds the
permissible concentration listed in § 35.204(a). This requirement is also included in
§ 35.204(e). The NRC estimates it will receive 1 new applications annually, and that it will take
1 hour to process each application
Processing licensee application due to turnover of ARSOs
Section 35.12(b)(1) will require an applicant to include T&E qualifications for each ARSO as part
of its license application. The NRC estimates it will receive 29 new applications annually, and
that it will take 0.25 hour to process each application.
Amendment processing due to turnover of ARSOs
Section 35.13(d) will require a licensee to apply for and receive a license amendment prior to
permitting an individual to work as an ARSO or before the RSO assigns different tasks and
duties to an ARSO currently authorized on the license. The NRC estimates it will receive
33 amendments annually and each amendment will take 0.5 hour to process.
Savings for processing amendments for sealed sources
Section 35.13(i) will allow licensees who are authorized for brachytherapy sources to receive
certain sealed sources without first seeking a license amendment. This change is to make it
easier for the licensee to obtain the sealed sources necessary for patient treatments in a timely
manner. The NRC will no longer need to review and process the license amendments, and
Regulatory Analysis
Page 30
estimates it will receive 1,014 fewer amendments annually with each amendment saving 0.5
hour to process.
Processing of notifications of ARSOs
Section 35.14(b)(1) will require a licensee to notify the Commission within 30 days of removal of
the ARSO or ophthalmic physicist from the list of individuals that the licensee is required to
report when the ARSO discontinues performance of duties under the license or has a name
change.
The NRC estimates that 37 notifications will be made annually due to turnover or name
changes, and it will take 0.25 hour to process each notification. The number of ophthalmic
physicist is too low to establish an estimated labor cost.
Processing of notifications of sealed sources
Section 35.14(b)(6) will require licensees to notify the NRC if it receives certain sealed sources
without first obtaining a license amendment. Specifically, a licensee will have to notify the NRC
no later than 30 days after receiving a sealed source from a new manufacturer or a new model
number for a sealed source listed in the SSDR used for manual brachytherapy for quantities
and isotopes already authorized by the license. The notification is used in lieu of a license
amendment, which is being removed under § 35.13(i). The NRC estimates this to impact 507
licensees each year, and each licensee will submit 2 notifications on average per year with an
associated processing cost of 5 minutes. This cost is offset by the savings from not requiring an
amendment in § 35.13(i).
Savings for processing attestations
Section 35.14(a) will remove the requirement to obtain a written attestation for those individuals
who are certified by a specialty board whose certification process has been recognized by the
NRC or an Agreement State when using the notification process. The number of ophthalmic
physicists is too low to establish an estimated labor savings.
Section 35.50(a) will remove the requirement for individuals seeking to be named as an RSO or
ARSO to obtain a written attestation for those individuals who are certified by a specialty board
whose certification process has been recognized by the NRC or an Agreement State. The NRC
estimates that approximately 33 individuals will seek to become RSOs under § 35.50 annually.
Of these, the NRC estimates that 30 percent, or 10, are individuals who are certified by a
specialty board whose certification process has been recognized by the NRC or an Agreement
State. The NRC estimates that approximately 0.5 hour of the cost associated with processing
the amendment will be saved for each applicant.
Savings for processing and reviewing applications
Section 35.50(c)(3) will allow an individual who is qualified to be the AU, but is not named on a
medical license or permit, to be named simultaneously as both the AU and RSO for the same
uses on a new medical license. This new provision saves the NRC from processing the license
amendment for adding an RSO. The NRC estimates this to affect 1 applicant annually at a
savings of 0.5 hour for processing the amendment.
Regulatory Analysis
Page 31
Savings for processing attestations
Section 35.51(a) will remove the requirement to obtain a written attestation, for those individuals
who are certified by a specialty board whose certification process has been recognized by the
NRC or an Agreement State, for individuals seeking to be named as an AMP.
The NRC estimates that approximately 5 individuals will seek to become AMPs under § 35.51
annually. NRC estimates that approximately 0.5 hour cost associated with reviewing the
amendment will be saved for each applicant.
Section 35.55(a) will remove the requirement to obtain a written attestation, for those individuals
who are certified by a specialty board whose certification process has been recognized by the
NRC or an Agreement State, for individuals seeking to be named as an ANP. The NRC
estimates this to impact 1 licensee annually with 0.5 hour of the cost associated with processing
a written attestation with the amendment request.
Savings for processing amendments
Section 35.57(a)(1) removes the requirement for an RSO, an AMP and an ANP identified on a
NRC license or a permit issued by the NRC broad scope licensee or master material license
permit or by a master material license permittee of broad scope on or before 180 days after the
date the rule is published in the Federal Register, to comply with the training requirements of
§§ 35.50, 35.51, or 35.55, respectively. The NRC estimates that 6 licensees will be impacted
with a savings of 0.5 hour associated with the processing of each amendment.
Section 35.57(a)(2) recognizes individuals certified by the named boards in the now removed
Subpart J of Part 35 on or before October 24, 2005, who will not need to comply with the
training requirements of § 35.50 to be identified as an RSO on a Commission or an Agreement
State license or Commission master material license permit for those materials and uses that
these individuals performed on or before October 24, 2005. The NRC estimates that 11
licensees will be impacted with a savings of 0.5 hour associated with the processing of each
amendment.
Section 35.57(a)(3) is modified to remove the requirement for individuals certified by the named
boards in the now removed Subpart J of Part 35 on or before October 24, 2005, to comply with
the training requirements of § 35.51 to be identified as a AMP on a Commission or an
Agreement State license or Commission master material license permit for those materials and
uses that these individuals performed on or before October 24, 2005. The NRC estimates that
6 licensees will be impacted with a savings of 0.5 hour associated with the processing of each
amendment.
Section 35.57(b)(1) is amended to clarify that individuals authorized on or before 180 days after
the date the rule is published in the Federal Register, will not be required to comply with the
T&E requirements in Subparts D through H of 10 CFR Part 35 for those materials and uses that
they performed on or before that date. The NRC estimates that 325 licensees will be impacted
on an annual basis with a savings of 0.5 hour associated with the processing of each
amendment.
Regulatory Analysis
Page 32
Section 35.57(b)(2) is restructured and expanded to recognize physicians, dentists, or
podiatrists who were certified by the named boards in the now removed Subpart J of part 35 on
or before October 24, 2005, who will not need to comply with the training requirements of
Subparts D through H of 10 CFR part 35 to be identified as an AU on an NRC license or an
NRC master material license permit for those materials and uses that these individuals
performed on or before October 24, 2005. The NRC estimates that 27 licensees will be
impacted on an annual basis with a savings of 0.5 hour associated with the processing of each
amendment.
Processing amendments for bundled sources
Section 35.65(b)(2) is modified to require licensees that possess bundled or aggregated single
sealed sources with greater than a specified activity to treat them as one single source. These
sources with activities greater than authorized by § 35.65 will have to meet all the regulatory
requirements for that single source including, if appropriate, listing on a specific medical license,
leak testing, and security requirements. This requirement is necessary so the NRC can ensure
that adequate controls for security and radiation safety are applied to these larger sources. The
NRC estimates this to impact 1 licensee annually with the amendment requiring 0.5 hour to
process.
Savings for processing attestations
Section 35.190(a) will remove the requirement to obtain a written attestation for those
individuals who are certified by a specialty board whose certification process has been
recognized by the NRC and for physicians seeking to be named as an AU of unsealed
byproduct material for uses authorized under § 35.100. The NRC estimates that this will impact
8 NRC licensees on an annual basis with a savings of 0.5 labor hour for no longer requiring the
submittal of a written attestation with the amendment request.
Cost to process new reporting requirement
Section 35.204(e) will require licensees to report any measurement that exceeded the limits
specified in § 35.204(a) for Mo-99/Tc-99m and Sr-82/Rb-82 generators. Generator
manufacturers recommended testing each elution prior to use in humans. Mo-99 breakthrough
measurements which exceed the permissible concentration listed in § 35.204(a) may cause
unnecessary radiation exposure to patients. The NRC estimates that this will impact 1 medical
use licensee and 1 radiopharmacy licensee to report 1 occurrence each on average annually.
The reporting requirement includes an initial phone notification to NRC within 7 calendar days
from occurrence and followed up with a written report due in 30 calendar days. The NRC
estimates this to be a 2.25 labor hour cost (0.25 hour to process the phone call and 2 hours to
review the written report).
Savings for processing attestations
Section 35.290(a) removes the requirement for physicians seeking to be named as an AU of
unsealed byproduct material for uses authorized under § 35.200 to obtain a written attestation
for those individuals who are certified by a specialty board whose certification process has been
recognized by the NRC. The NRC estimates that this will impact 8 licensees on an annual basis
Regulatory Analysis
Page 33
with a savings of 0.5 labor hour for no longer requiring the submittal of a written attestation with
the amendment request.
Savings for removing attestation requirement for some individuals
Section 35.390(a) removes the requirement for physicians seeking to be named as an AU of
unsealed byproduct material which requires a WD for uses authorized under § 35.300 to obtain
a written attestation for those individuals who are certified by a specialty board whose
certification process has been recognized by the NRC or an Agreement State. The NRC
estimates that this will impact 4 licensees on an annual basis with a savings of 0.5 labor hour
per licensee for no longer requiring the submittal of a written attestation with the amendment
request.
Savings for processing attestations
Section 35.392(a) removes the requirement to obtain a written attestation, for those individuals
who are certified by a specialty board whose certification process has been recognized by the
NRC, for physicians seeking to be named as an AU for the oral administration of sodium iodide
I-131 requiring a WD in quantities less than or equal to 1.22 gigabecquerels (33 millicuries).
The NRC estimates that this will impact 4 licensees on an annual basis with a savings of 0.5
labor hour for no longer requiring the submittal of a written attestation with the amendment
request.
Savings for processing attestation
Section 35.394(a) removes the requirement to obtain a written attestation, for those individuals
who are certified by a specialty board whose certification process has been recognized by the
NRC, for physicians seeking to be named as an AU for the oral administration of sodium iodide
I-131 requiring a WD in quantities greater than 1.22 gigabecquerels (33 millicuries). The NRC
estimates that this will impact 4 licensees on an annual basis with a savings of 0.5 labor hour for
no longer requiring the submittal of a written attestation with the amendment request.
Savings for processing attestation
Section 35.490(a) removes the requirement to obtain a written attestation, for those individuals
who are certified by a specialty board whose certification process has been recognized by the
NRC, for physicians seeking to be named as an AU of a manual brachytherapy source for the
uses authorized under § 35.400. The NRC estimates that this will impact 5 licensees on an
annual basis with a savings of 0.5 labor hour for no longer requiring the submittal of a written
attestation with the amendment request.
Savings for processing attestations
Section 35.690(a) will remove the requirement to obtain a written attestation, for those
individuals who are certified by a specialty board whose certification process has been
recognized by the NRC, for physicians seeking to be named as an AU for sealed sources for
uses authorized under § 35.600. The NRC estimates this to impact 2 licensees annually with a
savings of 0.5 labor hour for no longer requiring the submittal of a written attestation with the
amendment request.
Regulatory Analysis
Page 34
Savings on phone notifications
Section 35.3045(c) will reduce telephone reporting cost to the NRC because the requirements
for reporting an ME for permanent implant brachytherapy are changed in § 35.3045(a)(2). The
new requirements will not capture events that are not of significance and will reduce the number
of reportable MEs related to permanent implant brachytherapy. The NRC estimates this to
impact 1 licensee annually with a savings of 2.5 NRC labor hours to process the ME notification.
Savings on written follow-up report to the NRC
Section 35.3045(d) will reduce written reporting costs to the NRC because the requirements for
reporting an ME for permanent implant brachytherapy will be changed in § 35.3045(a)(2). The
new requirements will not capture events that are not of significance and will reduce the number
of reportable MEs related to permanent implant brachytherapy. The NRC estimates this to
impact 1 licensee annually with a savings of 3 NRC labor hours to process the written report.
Other Governments Operation (Agreement States)
The Agreement States are required to adopt the NRC regulations within 3 years after they go
into effect. Although each state has its own regulations with unique sections and numbering
systems, for the purpose of this regulatory analysis, the NRC section and numbering system is
used.
Processing reports
Section 30.34(g) will require the Agreement States to process licensee reports of any test that
exceeds the permissible concentration listed in § 35.204(a). This requirement is included in
§ 35.204(e).
Licensee application request processing
Section 35.12(b)(1) will require a licensee to apply for and receive a license amendment prior to
permitting an individual to work as an ARSO or before the RSO assigns different tasks and
duties to an ARSO currently authorized on the license. The NRC estimates the Agreement
States will receive 192 amendment requests annually and that each will take 0.25 hours to
process.
Licensee amendment processing
Section 35.13(d) will require a licensee to apply for and receive a license amendment prior to
permitting an individual to work as an ARSO or before the RSO assigns different tasks and
duties to an ARSO currently authorized on the license. The NRC estimates the Agreement
States will receive 192 amendments annually and each amendment will take 0.5 hour to
process.
Savings for processing amendments for sealed sources
Regulatory Analysis
Page 35
Section 35.13(i) will allow licensees to receive certain sealed sources without first seeking a
license amendment. This change is to make it easier for the licensee to obtain the sealed
sources necessary for patient treatments in a timely manner. The Agreement States will no
longer need to review and process the license amendments. The NRC estimates that the
Agreement States will receive 5,982 fewer amendments annually, with each amendment saving
0.5 hour to process.
Processing of notifications
Section 35.14(b)(1) will require a licensee to notify the Agreement States within 30 days of when
the ARSO or the ophthalmic physicist is removed from the list of individuals that the licensee is
required to report or when the ARSO or the ophthalmic physicist discontinues performance of
duties under the license or has a name change.
The NRC estimates that 225 ARSOs will be named annually due to turnover or changing their
names, and it will take 0.25 labor hour for the Agreement States to process each notification.
The number of ophthalmic physicist is too low to establish an estimated labor cost.
Section 35.14(b)(6) will require licensees to notify the Agreement States if they receive certain
sealed sources without first obtaining a license amendment. Specifically, a licensee will have to
notify the Agreement State no later than 30 days after receiving a sealed source from a new
manufacturer or a new model number for a sealed source listed in the SSDR used for manual
brachytherapy for quantities and isotopes already authorized by the license. The notification is
used in lieu of a license amendment which will be removed under § 35.13(i). This notification is
required for the Agreement States to have an accurate record of sealed sources possessed by
a licensee.
The NRC estimates this to impact 2,991 licensees each year; each licensee will submit 2
notifications on average per year. The NRC estimates that the associated Agreement State
cost to process each notification is 0.08 labor hours. This cost will be offset by the savings
outlined § 35.13(i).
Savings for processing attestations
Section 35.14(a) removes the requirement to obtain a written attestation for those individuals
who are certified by a specialty board whose certification process has been recognized by the
NRC or an Agreement State when using the notification process. The number of ophthalmic
physicists is too low to establish an estimated labor savings.
Section 35.50(a) removes the requirement for individuals seeking to be named as an RSO or
ARSO to obtain a written attestation for those individuals who are certified by a specialty board
whose certification process has been recognized by an Agreement State. The NRC estimates
that approximately 192 individuals will seek to become RSOs under § 35.50 annually. Of these,
the NRC estimates that 30 percent, or 57, are individuals who are certified by a specialty board
whose certification process has been recognized by the NRC or an Agreement State. The NRC
estimates that approximately 0.5 labor hour of the cost associated with processing each
amendment will be saved by the Agreement States for each applicant.
Savings for processing and reviewing applications
Regulatory Analysis
Page 36
Section 35.50(c)(3) will allow an individual who is qualified to be the AU, but is not named on a
medical license or permit, to be named simultaneously as both the AU and RSO for the same
uses on a new medical license. This new provision saves the Agreement States from
processing the license amendment. The NRC estimates this to affect 2 applicants annually at a
savings of 0.5 labor hour per application.
Savings for processing the attestations
Section 35.51(a) will remove the requirement to obtain a written attestation for those individuals
who are certified by a specialty board whose certification process has been recognized by the
NRC or an Agreement State, for individuals seeking to be named as an AMP. The NRC
estimates that approximately 32 individuals will seek to become AMPs annually and that 0.5
hour associated with reviewing the amendment will be saved for each applicant.
Savings for processing attestations
Section 35.55(a) will remove the requirement to obtain a written attestation for those individuals
who are certified by a specialty board whose certification process has been recognized by the
NRC or an Agreement State, for individuals seeking to be named as an ANP. The NRC
estimates this to impact 6 licensees annually, and 0.5 hour of the labor cost associated with
processing a written attestation with the amendment request amendment will be saved.
Section 35.57(a)(1) will remove the requirement for an RSO, an AMP, and an ANP identified on
an Agreement State license or a permit issued by an Agreement State broad scope licensee or
master material license permit or by a master material license permittee of broad scope on or
before 180 days after the date the rule is published in the Federal Register, to comply with the
training requirements of §§ 35.50, 35.51, or 35.55, respectively. The NRC estimates that 35
licensees will be impacted with a savings of 0.5 hour associated with the processing of a written
attestation with the amendment request.
Savings for processing amendments
Section 35.57(a)(2) will recognize individuals certified by the named boards in the now removed
Subpart J of Part 35 on or before October 24, 2005, who will not need to comply with the
training requirements of § 35.50 to be identified as a RSO on a Commission or an Agreement
State license or Commission master material license permit for those materials and uses that
these individuals performed on or before October 24, 2005. The NRC estimates that 64
licensees will be impacted with a savings of 0.5 hour associated with the processing of each
amendment.
Section 35.57(a)(3) is modified to remove the requirement for individuals certified by the named
boards in the now removed Subpart J of Part 35 on or before October 24, 2005, to comply with
the training requirements of § 35.51 to be identified as a AMP on a Commission or an
Agreement State license or Commission master material license permit for those materials and
uses that these individuals performed on or before October 24, 2005. The NRC estimates that
35 licensees will be impacted with a savings of 0.5 hour associated with the processing of each
amendment.
Regulatory Analysis
Page 37
Section 35.57(b)(1) is amended to clarify that individuals authorized on or before 180 days after
the date the rule is published in the Federal Register, will not be required to comply with the
T&E requirements in Subparts D through H of 10 CFR Part 35 for those materials and uses that
they performed on or before that date. The NRC estimates that 1,917 licensees will be
impacted on an annual basis with a savings of 0.5 hour associated with the processing of each
amendment.
Section 35.57(b)(2) is restructured and expanded to recognize physicians, dentists, or
podiatrists who were certified by the named boards in the now removed Subpart J of Part 35 on
or before October 24, 2005, who will not need to comply with the training requirements of
Subparts D through H of 10 CFR Part 35 to be identified as an AU on an NRC license or an
NRC master material license permit for those materials and uses that these individuals
performed on or before October 24, 2005. The NRC estimates that 160 licensees will be
impacted on an annual basis with a savings of 0.5 hour associated with the processing of each
amendment.
Cost for processing amendments
Section 35.65(b)(2) is modified to require licensees that possess bundled or aggregated single
sealed sources with greater than a specified activity to treat them as one single source. These
sources with activities greater than authorized by § 35.65 will have to meet all the regulatory
requirements for that single source including, if appropriate, listing on a specific medical license,
leak testing, and security requirements. This requirement is necessary so the Agreement
States can ensure that adequate controls for security and radiation safety are applied to these
larger sources. The NRC estimates this to impact 9 licensees annually with the amendment
requiring 0.5 hour to process.
Savings for processing attestations
Section 35.190(a) will remove the requirement to obtain a written attestation for those
individuals who are certified by a specialty board whose certification process has been
recognized by the NRC or an Agreement State, for physicians seeking to be named as an AU of
unsealed byproduct material for uses authorized under § 35.100. The NRC estimates that this
will impact 51 Agreement State licensees on an annual basis with a savings of 0.5 labor hour for
no longer requiring the submittal of a written attestation with the amendment request.
Cost for processing new reporting requirement
Section 35.204(e) will require licensees to report any measurement that exceeded the limits
specified in § 35.204(a) for Mo-99/Tc-99m and Sr-82/Rb-82 generators. Generator
manufacturers recommended testing each elution prior to use in humans. Mo-99 breakthrough
measurements which exceed the permissible concentration listed in § 35.204(a) may cause
unnecessary radiation exposure to patients. The NRC estimates that this will impact 6 medical
use licensees and 6 radiopharmacy licensees to report 1 occurrence each on average annually.
The reporting requirement includes an initial phone notification to the Agreement State within 7
calendar days from occurrence and followed up with a written report due in 30 days. The NRC
estimates this to be a 2.25 labor hour cost (0.25 hours to process the phone call and 2 hours to
review the written report).
Regulatory Analysis
Page 38
Savings for processing attestations
Section 35.290(a) will remove the requirement to obtain a written attestation for those
individuals who are certified by a specialty board whose certification process has been
recognized by the NRC or an Agreement State, for physicians seeking to be named as an AU of
unsealed byproduct material. The NRC estimates that this will impact 51 licensees on an
annual basis with a savings of 0.5 labor hour for no longer requiring the submittal of a written
attestation with the amendment request.
Savings for removing attestation requirement for some individuals
Section 35.390(a) will remove the requirement to obtain a written attestation for those
individuals who are certified by a specialty board whose certification process has been
recognized by the NRC or an Agreement State, for physicians seeking to be named as an AU of
unsealed byproduct material which requires a WD for uses authorized under § 35.300. The
NRC estimates that this will impact 25 licensees on an annual basis with a savings of 0.5 labor
hour per licensee for no longer requiring the submittal of a written attestation with the
amendment request.
Savings for processing attestations
Section 35.392(a) will remove the requirement to obtain a written attestation for those
individuals who are certified by a specialty board whose certification process has been
recognized by the NRC or an Agreement State, for physicians seeking to be named as an AU
for the oral administration of sodium iodide I-131 requiring a WD in quantities less than or equal
to 1.22 gigabecquerels (33 millicuries). The NRC estimates that this will impact 25 licensees on
an annual basis with a savings of 0.5 labor hour for no longer requiring the submittal of a written
attestation with the amendment request.
Section 35.394(a) will remove the requirement to obtain a written attestation for those
individuals who are certified by a specialty board whose certification process has been
recognized by the Agreement State, for physicians seeking to be named as an AU for the oral
administration of sodium iodide I-131 requiring a WD in quantities greater than 1.22
Gigabecquerels (33 millicuries). The NRC estimates that this will impact 25 licensees on an
annual basis with a savings of 0.5 labor hour for no longer requiring the submittal of a written
attestation with the amendment request.
Section 35.490(a) will remove the requirement to obtain a written attestation for those
individuals who are certified by a specialty board whose certification process has been
recognized by an Agreement State, for physicians seeking to be named as an AU of a manual
brachytherapy source for the uses authorized under § 35.400. The NRC estimates that this will
impact 26 licensees on an annual basis, with a savings of 0.5 labor hour for no longer requiring
the submittal of a written attestation with the amendment request.
Section 35.690(a) will remove the requirement to obtain a written attestation for those
individuals who are certified by a specialty board whose certification process has been
recognized by the Agreement State, for physicians seeking to be named as an AU for sealed
sources for uses authorized. The NRC estimates this to impact 8 licensees annually with a
Regulatory Analysis
Page 39
savings of 0.5 labor hour for no longer requiring the submittal of a written attestation with the
amendment request.
Saving on phone notifications
Section 35.3045(c) will reduce telephone reporting cost to the Agreement State because the
requirements for reporting an ME for permanent implant brachytherapy will be changed in
§ 35.3045(a)(2). The new requirements will not capture events that are not of significance and
will reduce the number of reportable MEs related to permanent implant brachytherapy. The
NRC estimates this to impact 6 licensees annually with a savings of 2.5 labor hours to process
the ME notification.
Saving on written follow-up report to the Agreement State
Section 35.3045(d) will reduce written reporting costs to the Agreement State because the
requirements for reporting an ME for permanent implant brachytherapy will be changed in
§ 35.3045(a)(2). The new requirements will not capture events that are not of significance and
will reduce the number of reportable MEs related to permanent implant brachytherapy. The
NRC estimates this to impact 6 licensees annually with a savings of 3 hours to process the
written report.
Regulatory Efficiency
The rule includes changes that will affect regulatory efficiency in a positive, but not easily
quantifiable, manner. For example, regulatory efficiency will be enhanced by the changes made
in requirements for submitting an application for a license, such as in § 35.50. In this section,
the regulations will be changed to make it easier for a physician to open an office by allowing
the physician to be the AU and RSO on the same license application. Additionally, the rule will
update, clarify, and strengthen the existing regulatory requirements. Cost savings will be
realized by removing attestation requirements for certain board certified individuals, modifying
ME reporting criteria to ensure that only significant events will be reported, and by other
modifications to the regulations.
Public Health (routine)
Several amendments will result in reducing the potential for radiation exposure to patients, but it
is difficult to quantify the actual number in rems reduced. An example is the change to
§ 35.204(b) and (e) which will require licensees to measure the Mo-99 concentration after each
eluate from a Mo-99/Tc-99m generator and to report any measurement to the NRC that
exceeds the limits specified in § 35.204(a). From October 2006 through February 2007, and
again in January 2008, medical licensees reported to the NRC that numerous generators had
failed the Mo-99 breakthrough tests. One generator manufacturer voluntarily reported 116 total
elution test failures in 2008. The administration of higher levels of Mo-99 provides no benefit
and could increase the radiation exposure to the patient, as well as have an adverse effect on
nuclear medicine image quality and medical diagnosis.
Another example is the requirement in § 35.41(b)(5) for licenses to have procedures for any
administration requiring a WD to include procedures for determining if an ME, as defined in
§ 35.3045, has occurred. An ME could have occurred because the patient received more or
Regulatory Analysis
Page 40
less radiation dose than was planned, with possible detrimental effect to the patient. The timely
review and identification of an ME may result in prompt corrective actions.
4.
Presentation of Results
4.1
Benefits and Costs
This section summarizes the benefits and costs estimated for these regulatory options. To the
extent that the affected attributes could be analyzed quantitatively, the net effect of each option
has been calculated and is presented below. However, some benefits and costs could be
evaluated only on a qualitative basis.
The benefits of this rule are associated with the potential reduction in unnecessary radiation
exposure to patients. Additionally, the rule will update, clarify, and strengthen the existing
regulatory requirements, and thereby promote public health and safety. Cost savings will be
realized by removing attestation requirements for certain board certified individuals, modifying
ME reporting criteria to ensure that only significant events will be reported, and modifying other
requirements.
Exhibit 4-1 summarizes the results of the analysis by attribute. Relative to the no-action
alternative (Option 1), Option 2 will result in a net quantitative impact estimation over the
10-year analysis period of approximately $15.2 million at a 3 percent discount rate and $14.8
million at a 7 percent discount rate.
Regulatory Analysis
Page 41
Exhibit 4-1
Summary Results by Attribute
at Discount Rates of 3 Percent and 10 Percent for a 10-Year Period
Total combined
Total combined
Implementation
Implementation
One-time
Annual
and Annual Cost
and Annual Cost
Quantitative Attribute
Implementation Operating
for 10-year period for 10-year period
Costs
Costs
at 3% discount
at 7% discount
rate
rate
Industry Costs Option 1
$0
$0
$0
$0
Industry Costs Option 2
$7,821,159
$663,452
$13,480,538
$12,480,967
$0
$0
$0
$0
$5,053,757
-$323,600
$2,293,385
$2,780,927
NRC Costs Option 1
$0
$0
$0
$0
NRC Costs Option 2
$65,457
-$75,958
-$582,477
-$468,037
Total Option 1
$0
$0
$0
$0
Total Option 2
$12,940,373
$263,894
$15,191,446
$14,793,857
Agreement States Option
1
Agreement States Option
2
4.2
Backfitting
The backfit rule (which is found in the regulations at §§ 50.109, 70.76, 72.62, 76.76, and in
10 CFR Part 52) does not apply to this final rule. Parts 30, 32, and 35 of Title 10 of CFR do not
contain a backfit requirement. Therefore, a backfit analysis is not required.
5.
Decision Rationale
Several amendments will reduce the potential radiation exposure to patients; for example, the
changes to § 30.34(g) and § 35.204(b) and (e) which will require licensees to measure the Mo99 concentration after each eluate from a Mo-99/Tc-99m generator and to report any
measurement that exceeds the limits specified in § 35.204(a). From October 2006 through
February 2007, and again in January 2008, medical licensees reported to the NRC that
numerous generators had failed the Mo-99 breakthrough tests. One generator manufacturer
voluntarily reported 116 total elution test failures in 2008. The administration of higher levels of
Mo-99 provides no benefit and could increase the radiation exposure to the patient as well as
have an adverse effect on nuclear medicine image quality and medical diagnosis.
Another example is the requirement in § 35.41(b)(5) for licensees to have procedures for
determining if an ME, as defined in § 35.3045, has occurred. An ME could have occurred
Regulatory Analysis
Page 42
because the patient received more or less radiation dose than was planned for, with possible
detrimental effect to the patient.
Additional benefits of the rule include allowing ARSOs to be named on a license, which will
increase the number of individuals who will be available to serve as preceptors for individuals
seeking to be appointed as RSOs or ARSOs. Also, by being named on a license, ARSOs could
more easily become RSOs on other licenses for the types of uses for which they qualify.
Another benefit is the increased flexibility for AUs to use sealed sources and devices for manual
brachytherapy for other medical uses that are not explicitly listed in the SSDR, provided that
these sources are used in accordance with the radiation safety conditions and limitations
described in the SSDR. Providing this flexibility will allow AUs to use medical judgment in
determining the medical uses of these sealed sources and devices.
The decision rationale is based on how the benefits and costs have been analyzed. Relative to
the no-action alternative, Option 2 will result in a one-time implementation cost to the industry of
approximately $7.8 million and a net annual cost to the industry of approximately $660,000.
Offsetting the net cost, the NRC determined that Option 2 will result in substantial nonquantifiable benefits related to regulatory efficiency and public health (routine). Although costs
will be incurred as a result of the rule, the qualitative benefits associated with the rule will
outweigh its cost. The NRC determined that the rule is cost-justified because the regulatory
initiatives will promote public health and safety.
6.
Implementation
Generally, the NRC allows an adequate time for a final rule to become effective. The time
depends on the scope of the rulemaking, the availability of the conforming guidance, and the
complexity of the final rule. The final rule will become effective 180 days from its publication in
the Federal Register. For this analysis, the final rule effective date is mid-year 2017.
Regulatory Analysis
7.
Page 43
References
•
NUREG/BR-0184, “Regulatory Analysis Technical Evaluation Handbook, Final Report,”
U.S. Nuclear Regulatory Commission, Washington, DC, January 1997.
•
NUREG/BR-0058, “Regulatory Analysis Guidelines of the U.S. Nuclear Regulatory
Commission,” Revision 4, U.S. Nuclear Regulatory Commission, Washington, DC,
September 2004.
•
NUREG/CR-4627, “Generic Cost Estimates, Abstracts from Generic Studies for Use in
Preparing Regulatory Impact Analyses.”
•
OMB Circular No. A-4, September, 17, 2003.
•
Department of Labor (U.S.), Bureau of Labor Statistics. Occupational Employment
Statistics, Occupational Employment and Wages.
•
2014-2015 Information Digest, NUREG-1350, Volume 24.
•
NUREG-1556, Vol. 20, Appendix G: LTS Program Code Descriptions.
Regulatory Analysis
Page 44
Appendix A: Regulatory Flexibility Analysis
1. Steps Taken to Mitigate Economic Impacts on Small Entities
The NRC is required by the Regulatory Flexibility Act (RFA) (5 U.S.C. 601 et seq.) as amended
by the Small Business Regulatory Enforcement Fairness Act, to consider the impact of its
rulemakings on small entities and evaluate alternatives that will accomplish regulatory
objectives without unduly burdening small entities or erecting barriers to competition. This
section describes the assessment of the small entity impacts expected to be incurred by
10 CFR Parts 30, 32, and 35 licensees as a result of the rule. This analysis describes
(1) the NRC's definition of “small entities,” including “small businesses,” “small governmental
jurisdictions,” ”small educational institutions,” and “small organizations;” (2) what number
constitutes a "substantial number" of these entities; (3) whether “significant impacts” will be
incurred by licensees under the rule; and (4) the measures that NRC has adopted in the rule to
mitigate impacts on small entities.
1.1 Defining “Small Entities” Affected by the Rule
The NRC established its size standards for small entities on December 9, 1985 (50 FR 50241).
On November 6, 1991 (56 FR 56671), the NRC conformed its format for size standards to mirror
the definitions of small entities in the Regulatory Flexibility Act of 1980, as amended. In a direct
final rule published in the Federal Register on August 10, 2007 (72 FR 44951), the NRC
adjusted its receipts-based small business size standard to conform to the Small Business Act
(SBA) size standard for nonmanufacturing industries. This size standard reflects the most
commonly used SBA size standard for nonmanufacturing industries. On July 3, 2012, the NRC
increased its receipts-based, small business size standard from $6.5 million to $7 million to
conform to the standard set by the SBA.
The NRC uses the size standards contained in 10 CFR 2.810 to determine whether a licensee
qualifies as a small entity in its regulatory programs.
The size standards pertinent to Parts 30, 32, and 35 licensees impacted by this rule under 10
CFR 2.810 are:
A small business is a for-profit concern and is a:
(1) Concern that provides a service or a concern not engaged in manufacturing with
average gross receipts of $7 million or less over its last 3 completed fiscal years; or
(2) Manufacturing concern with an average number of 500 or fewer employees based
upon employment during each pay period for the preceding 12 calendar months.
A small organization is a not-for-profit organization which is independently owned and operated
and has annual gross receipts of $7 million or less.
A small governmental jurisdiction is a government of a city, county, town, township, village,
school district, or special district with a population of less than 50,000.
Regulatory Analysis
Page 45
A small educational institution is one that is supported by a qualifying small governmental
jurisdiction or is not state or publicly supported and has 500 or fewer employees.
The rule will affect 7,103 NRC/Agreement State licensees. The licenses are issued principally
to medical institutions and individual private medical practitioners.
Because NRC licensees with annual gross receipts below $7 million pay reduced fees, the NRC
has data on the number of affected licensees who certified that they qualified as small entities
for reduced fee purposes. Based on data from the NRC Financial Accounting and Integrated
Management Information System in December 2012, 294 affected licensees reported that their
annual gross receipts were below $7 million. Using the ratio explained in Section 3.2.1 of this
document, the NRC estimates that 1,735 NRC/Agreement State licensees are classified as
small entities.
In total, therefore, the proportion of impacted licensees that are small entities is estimated to be
23 percent.
1.2 Determining What Number Constitutes a Substantial Number
The NRC has not established a quantitative definition of the number or proportion of licensees
that constitutes a substantial number. However, for the purpose of this rulemaking, the NRC
assumes that 23 percent of all licensees constitutes a “substantial number” of small entities
likely to be impacted by this rule. A substantial number of each of the two categories of
licensees considered, medical institutions and individual private medical practitioners, will be
impacted by the rule.
1.3 Measuring “Significant Impacts”
To evaluate the impact that a small entity will be expected to incur as a result of the rule, the
ratio of annualized costs was calculated as a percentage of estimated gross receipts. The NRC
has not established a quantitative cutoff for “significant impact.” For the purpose of this
rulemaking, the NRC assumes “significant’ impact if the ratio of annualized costs to estimated
annual gross receipts for a licensee exceeds 1 percent.
The rule will have an estimated $7.8 million implementation cost impact on the industry. This
cost will be spread over the 7,103 impacted licensees or an average implementation cost of
approximately $1,100 per licensee. The rule will have an annual cost impact on the industry as
well of an estimated $660,000 or an average cost of an estimated $100 per licensee.
The NRC assumes that all affected licensees have annual revenues greater than $110,000;
therefore the estimated cost impacts do not exceed the 1 percent criterion for “significant
impacts.” Therefore, even though the rule will affect a substantial number of licensees that are
small entities it will not have a significant economic impact on these entities.
1.4 Steps Taken to Mitigate Economic Impacts on Small Entities
The NRC has taken a number of actions in this rule to ensure that the selected alternative is the
least costly alternative that adequately protects workers and patients from radiation exposure.
As the Regulatory Analysis prepared for this rule demonstrates, many of the amendments
Regulatory Analysis
Page 46
eliminate existing costs, and the remaining amendments that will add cost will not have a
significant economic impact on small entities.
Regulatory Analysis
Page 47
Appendix B: Assumptions by section determining impacted NRC licensees.
The below tables outlines by section the assumptions that determined the number of impacted
NRC licensees. To obtain the number of licensees impacted in the Agreement States, use a
multiplier of 5.9, which is the ratio of NRC licensees to Agreement State licensees from
Table 1 - Number and Type of Licenses.
Part 30 Licensees
Section
30.34(g)
30.34(g)
Annual Totals
Recordkeeping burden covered under 35.2204 for 2500 = 33
Reporting burden covered under 25.3204 for 2500 1% estimated to
report (33 X 1%) = 1
Part 35 Licensees
Section
35.12(b) Add ARSOs
35.12(b) Remove
copy
35.12(c)(1) Renewals
35.12(c)(1)
Amendments
35.13(d) (Turnover)
35.13(d)
(Amendments)
35.13(i)
35.14(b)(1)
35.14(b)(6)
35.24(b)
35.41(a)
35.41(b)(5)
35.41(b)(6)
35.50(a)
35.50(c)(1)
35.50(c)(3)
35.51(a)
35.55(a)
Annual Totals
3% of all licensees (1029) = 31
3% of all licensees (1029) = 31
10% of all licensees (1029) = 103
1 response from all licensees = 1029
3% of all licensees (1029 X 3%) = 31
10 % of all licensees (1029 X 10%) = 103
2 responses from each licensee in 2120, 2200, 2230, 2240 (483 X 2)
= 966
Turnover – 3% of all licensees (1029 X 3% = 31) + Name changes 0.5% of all licensees (1029 X 0.5% =5) = 36 for ARSOs The number
of ophthalmic physicists is estimated to be low to calculate.
2 responses from 2120, 2200, 2230, 2240 (483 X 2) = 966
Cost covered in 35.2024(c)
Cost covered in 35.2041 35.41(b)(5) and 35.41(b)(6) = 31
Turnover – 3% of 2110, 2120, 2200, 2210, 2230, 2231, 2240, 2300,
2310 (570 X 3% = 17
Turnover – 3% of 2110, 2120, 2200, 2240 (454 X 3% = 14)
30% of all applicants will be board certified. Turnover - 3% of all
licensees (1029) =31 X 30% = 10 (rounded)
Subset of 35.50(a)
1 responded from 2201 (232) = 1
30% of all applicants will be board certified. Turnover – 3% of 2110,
2120, 2200, 2210, 2230, 2231, 2240, 2300, 2310 (666) =20 X 30% =
6 (rounded)
10% of all applicants are board certified. 15% of 2110 and 2120
have ANP (375 X 10% = 38 X 15%) = 6 Turnover – 3% X 6 = 1
Regulatory Analysis
35.57(a)(1)
35.57(a)(2)
35.57(a)(3)
35.57(b)(1)
35.57(b)(2)
35.65(b)(2)
35.190(a)
35.204(b)
35.204(e)
35.290(a)
35.390(a)
35.392(a)
35.394(a)
35.433
35.490(a)
35.610(d)
35.655(a)
35.690(a)
35.2024(c)
35.2041
35.2204
35.2310
35.3045(a)(2)
35.3045(c)
35.3045(d)
35.3045(e)
35.3204(a)
35.3204(b)
Page 48
1% of 2210, 2120, 2200, 2210, 2230, 2231, 2240, 2300, 2310 (570)=
6 rounded
1% of all licensees (1029) = 10
1% of 2210, 2120, 2200, 2210, 2230, 2231, 2240,2300, 2310 (570) =
6 rounded
30% of all licensees (1029) = 309
2.5% of all licensees (1029) = 26
One time cost -1% of 2110, 2120, 2121, 2200, 2201, 2220, 2231
847) = 8
Annual cost - 0.15% of 2110, 2120, 2121, 2200, 2201, 2220, 2231
847) = 1.5
30% of all applicants will be board certified. Turnover – 3% of 2110,
2120, 2121, 2200, 2201, 2220 (845) = 25 X 30% = 8 (rounded)
Covered under 35.2204 for 5% of 2110, 2120, 2121,2200, 2201,
2220, 2231 (847) have generators= 42
5% of 2110, 2120, 2121,2200, 2201, 2220, 2231 (847) have
generators = 42 X 1% estimated to report = 1 (rounded)
30% of all applicants will be board certified. Turnover – 3% of 2110,
2120, 2121, 2200, 2201, 2220 (847) = 25 X 30% = 8 (rounded)
30% of all applicants will be board certified. Turnover – 3% of 2110,
2120, 2200, 2231 (421 = 13 X 30% = 4 (rounded)
30% of all applicants will be board certified. Turnover – 3% of 2110,
2120, 2200, 2231 (465) = 13 X 30% = 4
30% of all applicants will be board certified. Turnover – 3% of 2110,
2120, 2200, 2231 (465) = 13 X 30% = 4
No Additional Cost
30% of all applicants will be board certified. Turnover - 3% of 2110,
2120, 2200, 2210, 2240 (465) = 14 X 30% = 4
Cost in 35.2310 for 2110, 2120, 2230, 2300, 2310 = 479
No change in cost
30% of all applicants will be board certified. Turnover - 3% of 2110,
2230, 2300, 2310 (168 = 5 X 30% = 2 (rounded)
Turnover – 3% of all licensees = 31
From 35.41(a) = 31
From 30.34(g) (33) +35.204(b) (42) = 75
From 35.610(d) = 479 X 5% = 24
Cost in 35.3045(c), (d), and (e)
Avg number of ME’s each year for permanent implant brachytherapy
= 14 X 50% reduction from new criterion = 7 (1 NRC and 6
Agreement States)
Avg number of MEs each year for permanent implant brachytherapy
= 14 X 50% reduction from new criterion = 7 (1 NRC and 6
Agreement States)
Avg number of MEs each year reported to patients = 48 X 35%
reduction from new criterion = 18 (3 NRC and 15 Agreement States)
From 30.34(g) (1) + 35.204(e) (1) = 2
From 30.34(g) (1) + 35.204(e) (1) = 2
File Type | application/pdf |
File Modified | 2016-07-06 |
File Created | 2016-07-06 |