May 10,2018, 60-Day Federal Register Notice

May 10, 2018, FR Notice (60-Day).pdf

Postive Train Control

May 10,2018, 60-Day Federal Register Notice

OMB: 2130-0553

Document [pdf]
Download: pdf | pdf
Federal Register / Vol. 83, No. 91 / Thursday, May 10, 2018 / Notices
6. Information regarding the
sponsoring entity or organization,
including the control of the entity or
organization to be represented and the
entity’s or organization’s size and
ownership, product or service line, and
trade activities.
7. You can find information on the
additional requirements for consultants
and legal advisors, which vary
depending on the nature of the entity or
organization and the interests the
individual will represent, on the
International Trade Administration
website at www.trade.gov/itac or by
contacting the Industry Trade Advisory
Center at [email protected].
The Secretary and the Trade
Representative will consider applicants
who meet the eligibility criteria based
on the following factors: Ability to
represent the sponsoring U.S. entity’s or
U.S. organization’s and its subsector’s
interests on trade matters; knowledge of
and experience in trade matters relevant
to the work of the ITAC; and ensuring
that the ITAC is balanced in terms of
points of view, demographics,
geography, and entity or organization
size.
Gregory Walters,
Assistant United States Trade Representative
for Intergovernmental Affairs and Public
Engagement, Office of the United States Trade
Representative.
[FR Doc. 2018–09966 Filed 5–9–18; 8:45 am]

Secretariat, 1150 18th Street NW, Suite
910, Washington, DC, 20036, or by
telephone at (202) 833–9339, fax at (202)
833–9434, or website at http://
www.rtca.org.
Pursuant
to section 10(a)(2) of the Federal
Advisory Committee Act (Pub. L. 92–
463, 5 U.S.C., App.), notice is hereby
given for a meeting of the Fifty First
RTCA SC–206 Aeronautical Information
and Meteorological Data Link Services
(AIS) Plenary. The agenda will include
the following:

SUPPLEMENTARY INFORMATION:

11 June: Monday

Federal Aviation Administration
Fifty First RTCA SC–206 Aeronautical
Information and Meteorological Data
Link Services (AIS) Plenary
Federal Aviation
Administration (FAA), U.S. Department
of Transportation (DOT).
ACTION: Fifty First RTCA SC–206
Aeronautical Information and
Meteorological Data Link Services (AIS)
Plenary.
AGENCY:

The FAA is issuing this notice
to advise the public of a meeting of Fifty
First RTCA SC–206 Aeronautical
Information and Meteorological Data
Link Services (AIS) Plenary.
DATES: The meeting will be held June
11–15, 2018 8:30 a.m.–5:00 p.m.
ADDRESSES: The meeting will be held at:
AOPA HQ, 411 Aviation Way,
Frederick, MD 21701.
FOR FURTHER INFORMATION CONTACT:
Karan Hofmann at [email protected]
or 202–330–0680, or The RTCA

daltland on DSKBBV9HB2PROD with NOTICES

SUMMARY:

VerDate Sep<11>2014

16:29 May 09, 2018

Jkt 244001

Issued in Washington, DC, on May 12,
2018.
Michelle Swearingen,
Systems and Equipment Standards Branch,
AIR–6B0, Policy and Innovation Division,
AIR–600, Federal Aviation Administration.
[FR Doc. 2018–09967 Filed 5–9–18; 8:45 am]
BILLING CODE 4910–13–P

DEPARTMENT OF TRANSPORTATION
Federal Railroad Administration
[Docket No. FRA–2018–0008–N–4]

Opening Plenary
1. Opening Remarks: DFO, RTCA,
Chairman, And Host
2. Attendees’ Introductions
3. Discussion On Results From Meeting
With WG–76
2:00 p.m.–5:00 p.m.
Sub-Group Meetings
08:30 a.m.–5:00 p.m.
Sub-Group Meetings
13 June: Wednesday
08:30 a.m.–5:00 p.m.
Sub-Group Meetings

Closing Plenary
1. Opening Remarks: DFO, RTCA,
Chairman, And Host
2. Attendees’ Introductions
3. Review and Approval Of Meeting
Agenda
4. Approval of Previous Meeting
Minutes (Melbourne, FL)
5. Sub-Groups Reports
a. SG1: CSC And Other SC
Coordination (ISRAs)
b. SG5: FIS–B MOPS
6. Industry Coordination
a. CDM
7. Decision on Tor Changes/Rejoining
WG–76
8. Future Meetings Plans and Dates
9. Action Item Review
10. Other Business
11. Adjourn Plenary
Attendance is open to the interested
public but limited to space availability.
With the approval of the chairman,
members of the public may present oral
statements at the meeting. Persons
wishing to present statements or obtain
information should contact the person
listed in the FOR FURTHER INFORMATION
CONTACT section. Members of the public

PO 00000

Frm 00054

Fmt 4703

Proposed Agency Information
Collection Activities; Comment
Request
Federal Railroad
Administration (FRA), U.S. Department
of Transportation (DOT).
ACTION: Notice of information collection
and request for comment.
AGENCY:

Under the Paperwork
Reduction Act of 1995 (PRA) and its
implementing regulations, FRA is
informing the public that FRA has made
five proposed revisions to the Quarterly
Positive Train Control (PTC) Progress
Report Form (Form FRA F 6180.165)
and Annual PTC Progress Report Form
(Form FRA F 6180.166), which the
Office of Management and Budget
(OMB) previously approved on August
15, 2017, under its regular processing
procedures. Before submitting this
revised information collection request
(ICR) to OMB for regular clearance and
approval, FRA is soliciting public
comment on specific aspects of the
proposed ICR.
DATES: Interested persons are invited to
submit comments on or before July 9,
2018.
SUMMARY:

12 June: Tuesday

08:30 a.m.–12:00 p.m.
DEPARTMENT OF TRANSPORTATION

may present a written statement to the
committee at any time.

1:00 p.m.–2:00 p.m.

14 June: Thursday

BILLING CODE 3290–F8–P

21815

Sfmt 4703

Submit written comments
on the ICR activities by mail to either:
Mr. Robert Brogan, Information
Collection Clearance Officer, Office of
Railroad Safety, Regulatory Analysis
Division, RRS–21, Federal Railroad
Administration, 1200 New Jersey
Avenue SE, Room W33–497,
Washington, DC 20590; or Ms. Kim
Toone, Information Collection Clearance
Officer, Office of Information
Technology, RAD–20, Federal Railroad
Administration, 1200 New Jersey
Avenue SE, Room W34–212,
Washington, DC 20590. Commenters
requesting FRA to acknowledge receipt
of their respective comments must
include a self-addressed stamped
postcard stating, ‘‘Comments on OMB
Control Number 2130–0553,’’ and

ADDRESSES:

E:\FR\FM\10MYN1.SGM

10MYN1

21816

Federal Register / Vol. 83, No. 91 / Thursday, May 10, 2018 / Notices

should also include the title of the ICR.
Alternatively, comments may be faxed
to (202) 493–6216 or (202) 493–6497, or
emailed to Mr. Brogan at
[email protected], or Ms. Toone at
[email protected]. Please refer to the
assigned OMB control number in any
correspondence submitted. FRA will
summarize comments received in
response to this notice in a subsequent
notice and include them in its
information collection submission to
OMB for approval.
FOR FURTHER INFORMATION CONTACT: Mr.
Robert Brogan, Information Collection
Clearance Officer, Office of Railroad
Safety, Regulatory Analysis Division,
RRS–21, Federal Railroad
Administration, 1200 New Jersey
Avenue SE, Room W33–497,
Washington, DC 20590 (telephone: (202)
493–6292); or Ms. Kim Toone,
Information Collection Clearance
Officer, Office of Information
Technology, RAD–20, Federal Railroad
Administration, 1200 New Jersey
Avenue SE, Room W34–212,
Washington, DC 20590 (telephone: (202)
493–6132).
SUPPLEMENTARY INFORMATION: The PRA,
44 U.S.C. 3501–3520, and its
implementing regulations, 5 CFR part
1320, require Federal agencies to
provide 60-days’ notice to the public to
allow comment on information
collection activities before seeking OMB
approval of the activities. See 44 U.S.C.
3506, 3507; 5 CFR 1320.8–12.
Specifically, FRA invites interested
parties to comment on the following ICR
regarding: (1) Whether the information

collection activities are necessary for
FRA to properly execute its functions,
including whether the activities will
have practical utility; (2) the accuracy of
FRA’s estimates of the burden of the
information collection activities,
including the validity of the
methodology and assumptions used to
determine the estimates; (3) ways for
FRA to enhance the quality, utility, and
clarity of the information being
collected; and (4) ways for FRA to
minimize the burden of information
collection activities on the public,
including the use of automated
collection techniques or other forms of
information technology. See 44 U.S.C.
3506(c)(2)(A); 5 CFR 1320.8(d)(1).
FRA believes that soliciting public
comment will promote its efforts to
reduce the administrative and
paperwork burdens associated with the
collection of information that Federal
regulations mandate. In summary, FRA
reasons that comments received will
advance three objectives: (1) Reduce
reporting burdens; (2) organize
information collection requirements in a
‘‘user-friendly’’ format to improve the
use of such information; and (3)
accurately assess the resources
expended to retrieve and produce
information requested. See 44 U.S.C.
3501.
II. Background on the Quarterly and
Annual PTC Reporting Requirements
Under the Positive Train Control
Enforcement and Implementation Act of
2015 (PTCEI Act), each railroad subject
to 49 U.S.C. 20157(a) must submit an
annual progress report to FRA by March

31, 2016, and annually thereafter, until
PTC system implementation is
completed. 49 U.S.C. 20157(c)(1). The
PTCEI Act specifically requires each
railroad to provide certain information
in the annual reports regarding its
progress toward implementing a PTC
system, in addition to any other
information FRA requests. See id. In
addition, 49 U.S.C. 20157(c)(2) requires
FRA to conduct compliance reviews at
least annually to ensure each railroad is
complying with its revised PTC
Implementation Plan (PTCIP), including
any FRA-approved amendments. The
PTCEI Act requires railroads to provide
information to FRA that FRA
determines is necessary to adequately
conduct such compliance reviews. 49
U.S.C. 20157(c)(2).
Under its statutory and regulatory
investigative authorities, FRA currently
requires, and seeks to continue
requiring, each subject railroad to
submit Quarterly PTC Progress Reports
(Form FRA F 6180.165) and Annual
PTC Progress Reports (Form FRA F
6180.166) on its PTC system
implementation progress. See 49 U.S.C.
20157(c)(1)–(2); see also 49 U.S.C.
20107; 49 CFR 236.1009(h).
Specifically, in addition to the
Annual PTC Progress Report (Form FRA
F 6180.166) due each March 31 under
49 U.S.C. 20157(c)(1), railroads must
provide quarterly progress reports
covering the preceding three-month
period and submit the forms to FRA on
the dates in the following table until full
PTC system implementation is
completed:
Due dates for
quarterly reports

Coverage period
Q1
Q2
Q3
Q4

.............................................................
.............................................................
.............................................................
.............................................................

January 1–March 31 ..................................................................................................
April 1–June 30 .........................................................................................................
July 1–September 30 ................................................................................................
October 1–December 31 ...........................................................................................

Each railroad must submit its
Quarterly PTC Progress Reports on Form
FRA F 6180.165 and its Annual PTC
Progress Reports on Form FRA F
6180.166 on FRA’s Secure Information
Repository at https://sir.fra.dot.gov.

daltland on DSKBBV9HB2PROD with NOTICES

II. Proposed Revisions to the Quarterly
and Annual PTC Progress Report Forms
On August 15, 2017, OMB approved
the Quarterly PTC Progress Report
(Form FRA F 6180.165) and Annual
PTC Progress Report (Form FRA F
6180.166) for a period of one year,
expiring on August 31, 2018. The
current Quarterly PTC Progress Report
Form and Annual PTC Progress Report

VerDate Sep<11>2014

16:29 May 09, 2018

Jkt 244001

Form, as approved through August 31,
2018, can be accessed and downloaded
in FRA’s eLibrary at: https://
www.fra.dot.gov/eLib/details/L17365
and https://www.fra.dot.gov/eLib/
details/L17366, respectively. These
versions of the forms took into account
the Association of American Railroads’
written comments on behalf of itself and
its member railroads; the American
Public Transportation Association’s
written comments on behalf of
Northeast Illinois Commuter Rail
System, the Utah Transit Authority, the
Tri-County Metropolitan Transportation
District of Oregon, and the Fort Worth
Transportation Authority; and industry

PO 00000

Frm 00055

Fmt 4703

Sfmt 4703

April 30.
July 31.
October 31.
January 31.

stakeholders’ comments during FRA’s
public meeting on April 19, 2016. FRA
published minutes from the meeting on
www.regulations.gov under Docket No.
FRA–2016–0002. For a summary of the
oral and written comments and FRA’s
responses to the comments, please see
81 FR 28140, May 9, 2016.
Following the 60-day public comment
period after this notice is published,
FRA will request OMB’s re-approval of
the forms, with the five changes
described below. First, in Section 1 of
the Quarterly PTC Progress Report Form
(FRA F 6180.165), FRA proposes
revising the row ‘‘Territories Where
Revenue Service Demonstration Has

E:\FR\FM\10MYN1.SGM

10MYN1

21817

Federal Register / Vol. 83, No. 91 / Thursday, May 10, 2018 / Notices

daltland on DSKBBV9HB2PROD with NOTICES

Been Initiated’’ to state ‘‘Territories in
Revenue Service Demonstration or in
PTC Operation’’ for clarity, based on
additional feedback from the industry
following OMB’s approval of the form
on August 15, 2017. FRA intended this
row to include any and all territories
where a railroad had initiated revenue
service demonstration (RSD), even if a
railroad subsequently obtained PTC
System Certification from FRA and is
operating its PTC system in revenue
service. The purpose of this row is to
collect information regarding a
railroad’s progress toward meeting the
statutory criteria under 49 U.S.C.
20157(a)(3)(B)(vi)–(vii), if applicable.
Based on feedback from the industry,
FRA proposes clarifying the language in
this row in Section 1 so railroads
understand that a railroad can include
in this row the number of territories
where its PTC system is in RSD or in
operation. This proposed change does
not result in any additional reporting
burden as it is only a clarifying change.
Second, in footnotes 4 and 6 of the
Quarterly PTC Progress Report Form
(FRA F 6180.165), FRA proposes adding
a hyperlink to Appendix A. The
footnotes currently state: ‘‘If a particular
category listed in this table does not
apply to the railroad’s technology,
please indicate ‘N/A.’ A railroad may
add categories or subcategories if it
wants to provide more detail.’’ FRA
proposes adding the phrase ‘‘in
Appendix A’’ to the second sentence
with a hyperlink to that appendix to the
form, as it will help direct railroads to
the available section of the PDF where
they can provide additional
information. A hyperlink to Appendix A
was in the corresponding footnotes in
the prior version of the Quarterly PTC
Progress Report Form that OMB
approved through June 30, 2017, but the
hyperlink was omitted in error from the
current version of the form. This
proposed change (i.e., adding a

hyperlink to an existing appendix) does
not result in any additional reporting
burden as it is only a formatting change.
Third, in Section 4 (entitled
‘‘Installation/Track Segment Progress—
Current Status’’) of both the quarterly
form and the annual form, FRA
proposes replacing the ‘‘Testing’’ option
in the drop-down menu with two more
precise options—i.e., ‘‘Field Testing’’
and ‘‘Revenue Service Demonstration.’’
This modification will help ensure
clearer and more accurate reporting,
without imposing an additional
reporting burden.
Fourth, with respect to only the
Annual PTC Progress Report Form (FRA
F 6180.166), FRA proposes to delete a
now inapplicable instruction from
footnote 7 in Section 4, which stated,
Please note: For the Annual PTC Progress
Report due by March 31, 2017, this
mandatory geographic requirement (that
must be satisfied by either completing
Column 5 in Section 4 or submitting a GIS
shapefile as described above) is due to FRA
by April 30, 2017. Every other part of this
form must be completed and submitted to
FRA by March 31, 2017. This limited
extension applies only in 2017.

FRA delayed the due date for
submitting that specific information in
2017 only, per OMB’s request, to ensure
railroads had sufficient time to compile
and provide the information. FRA
proposes removing that note from
footnote 7 as it is no longer applicable
or necessary. By statute, a railroad’s
Annual PTC Progress Report is due by
March 31st each year. 49 U.S.C.
20157(c)(1).
Fifth, with respect to both the
quarterly form and the annual form,
FRA proposes making certain changes to
Section 6 (entitled ‘‘Update on
Interoperability Progress’’). FRA
proposes removing the portion of the
instruction that states a host railroad
must provide information about the
status of each tenant railroad’s rolling

stock ‘‘if the tenant does not have a
separate PTCIP on file.’’ FRA proposes
removing this limiting instruction
because FRA needs to know the PTC
implementation status of any tenant
railroad that operates on the host
railroad’s property, except any tenant
railroad that is subject to an exception
under 49 CFR 236.1006(b). In addition,
before the final column in the table in
Section 6, FRA proposes adding a
column entitled, ‘‘Scheduled
Completion Date for Interoperability
Testing.’’ This information is necessary
for FRA to understand the progress a
host railroad and each of its required
tenant railroads are jointly making
toward testing and achieving PTC
system interoperability, consistent with
host railroad’s PTC Implementation
Plan and/or PTC Safety Plan. FRA
estimates the additional burden for a
host railroad to complete this new
reporting requirement would be, on
average, approximately 2.5 hours for
Class I railroads and large passenger
railroads; 1.25 hours for Class II and
medium passenger railroads; and thirty
minutes for Class III, terminal, and
small passenger railroads.
III. Overview of Information Collection
The associated collection of
information is summarized below. FRA
will submit this information collection
request to OMB for regular clearance as
required by the PRA.
Titles: Quarterly Positive Train
Control Progress Report and Annual
Positive Train Control Progress Report.
OMB Control Number: 2130–0553.
Form Number(s): FRA F 6180.165 and
FRA F 6180.166.
Affected Public: Businesses.
Frequency of Submission: On
occasion.
Respondent Universe: 41 Railroad
Carriers.
Reporting Burden:
Average time
per response
(hours)

Quarterly PTC progress
report

Respondent universe

Total annual
responses

Form FRA F 6180.165 ..............................................

41 Railroads ....................

164 Reports/Forms ............

FRA notes that the 22.84-hour
estimate is an average for all railroads.
FRA estimated the quarterly reporting
burden is approximately 43 hours for

the 11 Class I and large passenger
railroads per quarterly form,
approximately 28.75 hours for the 11
Class II and medium passenger railroads

Average time
per response
(hours)

Respondent universe

Total annual
responses

Form FRA F 6180.166 ..............................................

41 Railroads ....................

41 Reports/Forms ..............

16:29 May 09, 2018

Jkt 244001

PO 00000

Frm 00056

Fmt 4703

Sfmt 4703

3,746

per quarterly form, and approximately
7.75 hours for the 19 Class III, terminal,
and small passenger railroads per
quarterly form.

Annual PTC progress report

VerDate Sep<11>2014

22.84

Total annual
burden hours

E:\FR\FM\10MYN1.SGM

10MYN1

39.65

Total annual
burden hours
1,626

21818

Federal Register / Vol. 83, No. 91 / Thursday, May 10, 2018 / Notices

daltland on DSKBBV9HB2PROD with NOTICES

FRA notes that the 39.65-hour
estimate is an average for all railroads.
FRA estimated the annual reporting
burden is approximately 62.5 hours for
the 11 Class I and large passenger
railroads per annual form,
approximately 41.25 hours for the 11
Class II and medium passenger railroads

per annual form, and approximately
25.5 hours for the 19 Class III, terminal,
and small passenger railroads per
annual form.
Total Estimated Annual Responses for
Form FRA F 6180.165: 164.
Total Estimated Annual Burden for
Form FRA F 6180.165: 3,746 hours.

Total Estimated Annual Responses for
Form FRA F 6180.166: 41.
Total Estimated Annual Burden for
Form FRA F 6180.166: 1,625.75.
Respondent Universe: 41 Railroads.
Frequency of Submission: On
occasion; quarterly; annually.
Reporting Burden:
Total annual
burden hours

CFR section

Respondent universe

Total annual responses

Average time per response

Form FRA F 6180.166—Annual PTC Progress Report
Form.
Form FRA F 6180.165—Quarterly PTC Progress Report
Form.
234.275—Processor-based systems—Railroad letter explaining deviations of a product from requirements.
235.6—Expedited application for approval of certain signal system changes described in this section.
—Copy of expedited application to labor union ........
—Railroad rescindment letter of request for expedited application of certain signal system changes.
—Revised application for certain signal system
changes.
—Copy of railroad revised application to labor union
236.15—Designation of automatic block, traffic control,
train stop, train control, cab signal, or PTC territory in
timetable instructions.
236.18—Software Management Control Plan, New Railroads.
—Subsequent years: Updated plans .........................
236.905—Railroad Safety Program Plan (RSPP), New
Railroads.
—FRA request for additional information ..................
—Railroad request to modify RSPP ..........................
236.907–909—Railroad petition for review and approval
of Product Safety Plan (PSP).
—Railroad sensitivity analysis supporting railroad
risk assessment.
236.913—Filing and approval of joint PSP ......................
—Informational filing/petition for special approval .....
—FRA request for further data after informational filing.
—FRA request for further information within 15 days
after receipt of Notice of Product Development.
—Technical consultation by FRA with railroad on
design and planned development of product.
—Railroad Petition to FRA for final approval ............
—Comments to FRA on railroad informational filing
or special approval petition.
—Railroad amendment to PSP .................................
—Railroad field testing/informational filing document
236.917—Railroad retention of records: results of tests
& inspections specified in PSP.
—Railroad report that frequency of safety relevant
hazards exceeds threshold set forth in PSP.
236.919—Railroad Operations and Maintenance Manual
(OMM).
—Plans for proper maintenance, repair, inspection,
and testing of safety critical products.
—Documented hardware, software, & firmware revisions in OMM.
236.921—Training & qualification program ......................
—Trained signalmen & dispatchers ..........................

41 railroads .........................

41 reports/forms ..................

39.65 hours .........................

1,626

41 railroads .........................

164 reports/forms ................

22.84 hours .........................

3,746

38 railroads .........................

25 letters .............................

4 hours ................................

100

38 railroads .........................

500 expedited applications

5 hours ................................

2,500

38 railroads .........................
38 railroads .........................

500 copies ...........................
25 letters .............................

30 minutes ..........................
6 hours ................................

250
150

38 railroads .........................

13 applications ....................

5 hours ................................

65

38 railroads .........................
38 railroads .........................

13 copies .............................
13 timetable instructions .....

30 minutes ..........................
60 minutes ..........................

7
7

5 railroads ...........................

1 plan ..................................

2,150 hours .........................

2,150

90 railroads .........................
5 railroads ...........................

20 updated plans ................
1 RSPP ...............................

1.50 hours ...........................
135 hours ............................

30
135

78 railroads .........................
78 railroads .........................
5 railroads ...........................

1 document .........................
1 request for amendment ....
2 petitions/reviews ...............

135 hours ............................
400 hours ............................
19,200 hours .......................

135
400
19,200

5 railroads ...........................

5 analyses ...........................

160 hours ............................

800

6 railroads ...........................
6 railroads ...........................
6 railroads ...........................

1 joint plan ...........................
6 filings/approval petitions ...
2 data calls/documents .......

25,600 hours .......................
1,928 hours .........................
800 hours ............................

25,600
11,568
1,600

6 railroads ...........................

6 data calls/documents .......

16 hours ..............................

96

6 railroads ...........................

6 consultations ....................

120 hours ............................

720

6 railroads ...........................
Public/railroad community ..

6 petitions ............................
7 comments/letters ..............

16 hours ..............................
240 hours ............................

96
1,680

6 railroads ...........................
6 railroads ...........................
6 railroads ...........................

15 amendments ..................
6 field tests/documents .......
3 procedures .......................

2,400
19,200
360,000

6 railroads ...........................

1 report ................................

160 hours ............................
3,200 hours .........................
160,000 hours/160,000
hours/40,000 hours.
104 hours ............................

6 railroads ...........................

6 OMM updates ..................

40 hours ..............................

240

6 railroads ...........................

6 plans .................................

53,335 hours .......................

320,010

6 railroads ...........................

6 revisions ...........................

6,440 hours .........................

38,640

6 railroads ...........................
6 railroads ...........................

400 hours ............................
40 hours + 20 hours ...........

2,400
12,400

6 railroads ...........................
6 railroads ...........................

6 programs ..........................
300 trained signalmen + 20
tr. dispatchers.
6 analyses/documents ........
350 records .........................

720 hours ............................
10 minutes ..........................

4,320
58

38 railroads .........................

3 rules or instructions ..........

80 hours ..............................

240

38 railroads .........................

3 relief requests ..................

64 hours ..............................

192

38 railroads .........................

47 requests .........................

8 hours ................................

376

38 railroads .........................

47 written or telephonic notices.

2 hours ................................

94

38 railroads .........................

720 requests .......................

8 hours ................................

5,760

236.923—Railroad Task analysis .....................................
—Railroad records designating other qualified persons.
236.1001—Railroad additional or more stringent PTC
rules and other special instructions than prescribed
under this section.
236.1005—Railroad request for relief in PTCIP or RFA
to implement PTC system based on minimal quantity
of PIH materials traffic.
—Railroad request to temporarily reroute trains
equipped with PTC onto tracks not equipped with
PTC systems and vice versa.
—Written or telephonic notice to FRA Regional Administrator of conditions necessitating emergency
rerouting.
—Planned maintenance: temporary rerouting requests.

VerDate Sep<11>2014

16:29 May 09, 2018

Jkt 244001

PO 00000

Frm 00057

Fmt 4703

Sfmt 4703

E:\FR\FM\10MYN1.SGM

10MYN1

104

daltland on DSKBBV9HB2PROD with NOTICES

Federal Register / Vol. 83, No. 91 / Thursday, May 10, 2018 / Notices

21819
Total annual
burden hours

CFR section

Respondent universe

Total annual responses

Average time per response

—Request to FRA for temporary rerouting exceeding 30 days.
236.1006—Equipping locomotives operating in PTC territory—Class II or III railroad progress reports for
equipping locomotives with onboard apparatus for
movements exceeding 20 mph.
236.1007—HSR–125 document accompanying railroad
PTC Safety Plan (PTCSP) for host railroads conducting freight or passenger operations at more than
125 mph.
—Railroad request to use foreign service data before submittal of PTCSP.
—Submission of PTCSP with HSR–125 document
by host railroad conducting freight or passenger
operations at more than 150 mph.
—Railroad request in PTCSP that FRA excuse
compliance with one or more of this section’s requirements.
236.1009—Railroad filing PTCIP with FRA for a main
line track segment requiring PTC system implementation or request for amendment (RFA) to its PTCIP for
initiating a new category of service or materially modifying one or more railroad lines requiring a PTC system.
—Host railroad filing unmodified Type Approval with
FRA.
—PTC Development Plan (PTCDP) requesting Type
Approval for PTC system or request to modify
previous Type Approval with one or more
variances.
—PTCSP or PTCDP translated from foreign language into English.
—Railroad request for confidentiality for a filing .......

38 railroads .........................

361 requests .......................

8 hours ................................

2,888

38 railroads .........................

35 reports ............................

16 hours ..............................

560

38 railroads .........................

3 HSR–125 documents .......

3,200 hours .........................

9,600

38 railroads .........................

2 data requests ...................

8,000 hours .........................

16,000

38 railroads .........................

3 PTCSPs with HSR–125
documents.

3,200 hours .........................

9,600

38 railroads .........................

1 request .............................

1,000 hours .........................

1,000

38 railroads .........................

1 PTCIP + 20 RFAs ............

535 hours + 320 hours .......

6,935

38 railroads .........................

2 documents ........................

8 hours ................................

16

38 railroads .........................

20 cover letters + 20 modified Type Approvals + 2
PTCDPs.

8 hours + 1,600 hours +
6,400 hours.

38 railroads .........................

1 document .........................

8,000 hours .........................

8,000

38 railroads .........................

38 cover letters + 38 confidentiality requests.
190 field tests + 2 assessments.

8 hours + 800 hours ...........

30,704

800 hours ............................

153,600

38 railroads .........................

76 interviews .......................

30 minutes ..........................

38

38 railroads .........................

8 documents ........................

400 hours ............................

3,200

38 railroads .........................

143 hours + 8 hours ...........

400

16,000 hours .......................
22,400 hours .......................
32,000 hours .......................
32 hours ..............................
28,800 hours .......................
3,200 hours .........................

48,000
627,200
32,000
96
28,800
60,800

—Railroad field testing or independent assessment
undertaken at FRA request for Type Approval or
PTC System Certification.
—Access interviews with railroad personnel associated with Type Approval or PTC System Certification and to determine compliance with this subpart.
—Additional information to FRA on PTCDP and
PTCSP.
236.1011—PTCIP and public comment on PTCIPs,
PTCDPs, and PTCSPs.
236.1015—PTCSPs—Non-vital overlay ...........................
—Vital overlay ............................................................
—Stand-alone ............................................................
—Railroad conference with FRA on mixed systems
—PTCSP for Mixed System ......................................
—Railroad provision of additional information to
FRA upon request.
—PTCSP replacing existing certified PTC system ...
—Non-quantitative risk assessment to FRA .............
236.1017—Third Party Assessment .................................
—Host railroad written request to FRA to confirm
whether a specific entity is independent.
—Further information provided to FRA upon request ......
—Waiver request regarding production of documents required for third party assessment.
—Request for FRA to accept certified information
from a foreign railroad regulatory entity.
236.1019—Main line track exception addendum .............
—Intercity commuter or passenger line track exception addendum.
—Limited operation exception: railroad risk mitigation plan.
—Limited operation exception: railroad collision hazard analysis to FRA.
—Temporal separation procedures ...........................
236.1021—Request for amendment (RFA) to railroad
PTCIP/PTCDP/PTCSP.
—Review and comment on RFA by interested parties.
236.1023—Railroad PTC Product Vendor List .................
—Railroad procedures for action to applicable vendor upon notification of a safety-critical failure, upgrade, patch, revision, replacement, or modification to PTC system.
—Railroad notification to vendor and FRA of failure,
malfunction, or defective condition that decreased
or eliminated safety functionality of PTC product.
—Notification updates ................................................

VerDate Sep<11>2014

16:29 May 09, 2018

Jkt 244001

38 railroads .........................

44,960

38
38
38
38
38
38

railroads
railroads
railroads
railroads
railroads
railroads

.........................
.........................
.........................
.........................
.........................
.........................

1 PTCIP + 40 public comments.
3 PTCSPs ...........................
28 PTCSPs .........................
1 PTCSP .............................
3 conferences ......................
1 PTCSP .............................
19 documents ......................

38
38
38
38

railroads
railroads
railroads
railroads

.........................
.........................
.........................
.........................

19 PTCSPs .........................
19 assessments ..................
1 assessment ......................
1 written request .................

3,200 hours .........................
3,200 hours .........................
8,000 hours .........................
8 hours ................................

60,800
60,800
8,000
8

38 railroads .........................
38 railroads .........................

1 additional document .........
1 waiver request ..................

160 hours ............................
160 hours ............................

160
160

38 railroads .........................

1 request .............................

32 hours ..............................

32

38 railroads .........................
38 railroads .........................

36 MTEAs ...........................
19 MTEAs ...........................

160 hours ............................
160 hours ............................

5,760
3,040

38 railroads .........................

19 plans ...............................

160 hours ............................

3,040

38 railroads .........................

12 analyses .........................

1,600 hours .........................

19,200

38 railroads .........................
38 railroads .........................

11 procedures .....................
19 RFAs ..............................

160 hours ............................
160 hours ............................

1,760
3,040

7 Interested parties .............

3 hours + 16 hours .............

341

38 railroads .........................
38 railroads .........................

7 reviews + 20 public comments.
38 lists .................................
38 procedures .....................

8 hours ................................
16 hours ..............................

304
608

38 railroads .........................

142 notifications ..................

16 hours ..............................

2,272

38 railroads .........................

142 notice updates ..............

16 hours ..............................

2,272

PO 00000

Frm 00058

Fmt 4703

Sfmt 4703

E:\FR\FM\10MYN1.SGM

10MYN1

21820

Federal Register / Vol. 83, No. 91 / Thursday, May 10, 2018 / Notices
Respondent universe

Total annual responses

Average time per response

—Railroad and vendor report to FRA of results of
investigation of accident or service difficulty related to PTC system or product because of a
manufacturing or design defect.
—PTC supplier or vendor report of PTC system or
product safety-relevant failures, defective conditions, previously unidentified hazards, and recommended mitigation actions.
236.1029—PTC System Use: Report of en route failure
—Railroad submission to FRA of Order of Particular
Applicability for approval.
—Railroad notice to FRA regional office of planned
disabling of PTC system at least 7 days in advance and a contemporaneous notice of unplanned temporary disabling.
236.1031—Railroad Request for Expedited Certification
(REC).
—Railroad PTC system request to FRA for
grandfathering of previously approved train control system.
236.1035—Railroad request for approval to conduct field
testing of uncertified PTC system with provision of required documents.
—Railroad request to FRA for regulatory relief from
certain requirements of 49 part 236.
236.1037—Records Retention—Results of inspections
and tests specified in PTCSP and PTCDP.
—Records on testing, maintenance, or operation of
PTC system.
—Railroad report of frequency of safety-relevant
hazards exceeding threshold set forth in PTCSP
or PTCDP.
—Railroad final report to FRA on results of analysis
and countermeasures to reduce the frequency of
safety-related hazards.
236.1039—Railroad development and/or update of PTC
Operations and Maintenance Manual (OMM).
—Railroad identification of PTC safety-critical components.
—OMM-designated PTC officer responsible for
scheduled service interruptions.
236.1041—PTC Training & Qualification Program ...........
236.1043—Regular & periodic evaluations of PTC training program.
—Training records .....................................................
236.1045—PTC Training of Office Control Personnel .....
236.1047—PTC Training of Operating Personnel ............

38 railroads .........................

5 reports ..............................

400 hours ............................

2,000

38 railroads .........................

142 reports + 142 report
copies.

16 hours + 8 hours .............

3,408

38 railroads .........................
38 railroads .........................

836 reports ..........................
1 order .................................

96 hours ..............................
3,200 hours .........................

80,256
3,200

38 railroads .........................

76 notices + 114 unplanned
notices.

10 hours ..............................

1,900

38 railroads .........................

3 REC letters .......................

160 hours ............................

480

38 railroads .........................

3 requests ...........................

1,600 hours .........................

4,800

38 railroads .........................

190 requests .......................

800 hours ............................

152,000

38 railroads .........................

38 requests .........................

320 hours ............................

12,160

38 railroads .........................

836 records .........................

4 hours ................................

3,344

38 railroads .........................

18,240 records ....................

30 minutes ..........................

9,120

38 railroads .........................

4 reports ..............................

8 hours ................................

32

38 railroads .........................

4 final reports ......................

160 hours ............................

640

38 railroads .........................

38 OMM updates ................

250 hours ............................

9,500

38 railroads .........................

114,000 I.D.s .......................

1 hour .................................

114,000

38 railroads .........................

76 designated officers .........

2 hours ................................

152

38 railroads .........................
38 railroads .........................

38 programs ........................
38 regular & periodic evaluations.
560 records .........................
32 trained personnel ...........
7,600 trained personnel ......

400 hours ............................
720 hours ............................

15,200
27,360

10 minutes ..........................
20 hours ..............................
3 hours ................................

93
640
22,800

Total Estimated Annual Responses:
147,526.
Total Estimated Annual Burden:
2,728,528 hours.
Under 44 U.S.C. 3507(a) and 5 CFR
1320.5(b), 1320.8(b)(3)(vi), FRA informs
all interested parties that it may not
conduct or sponsor, and a respondent is
not required to respond to, a collection
of information unless it displays a
currently valid OMB control number.
Authority: 44 U.S.C. 3501–3520.
Brett Andrew Jortland,
Acting Deputy Chief Counsel.
[FR Doc. 2018–09909 Filed 5–9–18; 8:45 am]
BILLING CODE 4910–06–P
daltland on DSKBBV9HB2PROD with NOTICES

Total annual
burden hours

CFR section

VerDate Sep<11>2014

16:29 May 09, 2018

Jkt 244001

38 railroads .........................
38 railroads .........................
38 railroads .........................

DEPARTMENT OF TRANSPORTATION
Pipeline and Hazardous Materials
Safety Administration
Hazardous Materials: Notice of
Applications for Special Permits
Pipeline and Hazardous
Materials Safety Administration
(PHMSA), DOT.
ACTION: List of applications for
modification of special permits.
AGENCY:

In accordance with the
procedures governing the application
for, and the processing of, special
permits from the Department of
Transportation’s Hazardous Material
Regulations, notice is hereby given that
the Office of Hazardous Materials Safety
has received the application described
herein. Each mode of transportation for
which a particular special permit is
requested is indicated by a number in
the ‘‘Nature of Application’’ portion of
the table below as follows: 1—Motor

SUMMARY:

PO 00000

Frm 00059

Fmt 4703

Sfmt 4703

vehicle, 2—Rail freight, 3—Cargo vessel,
4—Cargo aircraft only, 5—Passengercarrying aircraft.
DATES: Comments must be received on
or before May 25, 2018.
ADDRESSES: Record Center, Pipeline and
Hazardous Materials Safety
Administration, U.S. Department of
Transportation, Washington, DC 20590.
Comments should refer to the
application number and be submitted in
triplicate. If confirmation of receipt of
comments is desired, include a selfaddressed stamped postcard showing
the special permit number.
FOR FURTHER INFORMATION CONTACT:
Ryan Paquet, Director, Office of
Hazardous Materials Approvals and
Permits Division, Pipeline and
Hazardous Materials Safety
Administration, U.S. Department of
Transportation, East Building, PHH–30,
1200 New Jersey Avenue Southeast,
Washington, DC 20590–0001, (202) 366–
4535.

E:\FR\FM\10MYN1.SGM

10MYN1


File Typeapplication/pdf
File Modified2018-05-10
File Created2018-05-10

© 2024 OMB.report | Privacy Policy