Download:
pdf |
pdfDUE DATE:
C-404
FORM
(8-16-2018)
OMB No. 0607-0094: Approval Expires 02/28/2019
U.S. DEPARTMENT OF COMMERCE
Economics and Statistics Administration
U.S. CENSUS BUREAU
REPORT OF BUILDING OR ZONING
PERMITS ISSUED FOR NEW
PRIVATELY-OWNED
HOUSING UNITS
Title 13, United States Code, Sections 131 and 182, authorizes the Census Bureau to conduct this collection and to request your
voluntary assistance. These data are subject to provisions of Title 13, United States Code, Section 9(b) exempting data that are
customarily provided in public records from rules of confidentiality. This collection has been approved by the Office of Management
and Budget (OMB). The eight-digit OMB approval number is 0607-0094 and appears at the upper right of this page. Without this
approval we could notconduct this survey. We estimate this survey will take an average of 8 minutes per response for those that
report monthly and 23 minutes for those that report annually to complete. More information about this estimate and an address
where you may write with comments is on the back of this form.
IMPORTANT:
Please see the back of this form for more
information and instructions for completing
the survey.
For further assistance, call 1–800–845–8244, or
e-mail us at [email protected]
How can I report?
Via Fax: 1–877–273–9501
Via Mail:
U.S. Census Bureau
1201 East 10th Street
Jeffersonville, IN 47132 0001
Via Internet or to get Help:
(Please correct any errors in name, address, and ZIP Code)
econhelp.census.gov/bps
Use your unique username and original password.
Username:
Password:
1. PERIOD IN WHICH PERMITS WERE ISSUED
2. GEOGRAPHIC COVERAGE (For our latest information on your office’s coverage, see www.census.gov/construction/bps/pdf/footnote.pdf)
Did your permit system have a geographic coverage change?
Yes, continue.
No, skip to Section 3.
Mark an (X) in the appropriate box and enter the requested information. If more space is needed continue in Section 5.
051
Permits no longer required to build new residential buildings . . . . Effective Date
052
Permit office has merged with another permit jurisdiction . . . . . . Effective Date
Name of permit jurisdiction with which your office has merged
053
Permit office has split into two or more jurisdictions . . . . . . . . . Effective Date
Name of additional jurisdiction(s) now issuing permit(s)
054
Extraterritorial jurisdiction(ETJ)/Annexation . . . . . . . . . . . . . Effective Date
Define ETJ or annexation
3. NEW HOUSING UNITS
a. Were there any building permits issued for new housing units during this period?
Yes, enter data below.
No, stop and return this form. Your report is important even if no permits were issued.
Total Valuation
Total Number of
of Construction
Type of Structure
Buildings Housing Units
($ value omit cents)
(1)
101
b. Single-family houses, detached and attached (must meet the following criteria:
no unit above or below the other; wall extends from ground to roof; and,
separate utilities for each unit) [Exclude manufactured HUD-inspected homes.]
103
c. Two-unit buildings
104
d. Three- and four-unit buildings
105
e. Five-or-more unit buildings
(2)
(3)
4. ADDITIONAL INFORMATION ON INDIVIDUAL RESIDENTIAL PERMITS, FROM SECTION 3, VALUED AT $1,000,000 OR MORE
(If more space is needed, please attach a separate sheet.)
Description and Site Address
Number of
Owner or Builder
(1)
(2)
Kind of building
Name
Site address
Address
City, State, ZIP Code
City, State, ZIP Code
Kind of building
Name
Site address
Address
City, State, ZIP Code
City, State, ZIP Code
Buildings
Housing Units
(3)
(4)
Valuation of Construction
($ value omit cents)
(5)
5. COMMENTS (Continue on a separate sheet)
6. PERSON TO CONTACT REGARDING THIS REPORT
E-mail address
Name
Internet web address
Telephone
Fax
See instructions on reverse side.
INSTRUCTIONS FOR COMPLETING FORM C-404,
"REPORT OF BUILDING OR ZONING PERMITS ISSUED
FOR NEW PRIVATELY-OWNED HOUSING UNITS"
We estimate this survey will take an average of 8 minutes per response for
those that report monthly and 23 minutes for those that report annually to
complete, including the time for reviewing instructions, searching existing
data sources, gathering and maintaining the data needed, and completing
and reviewing the collection of information.
Send comments regarding this burden estimate or any other aspect of this
collection of information, including suggestions for reducing this burden,
to: EID Survey Comments 0607-0094, U.S. Census Bureau, 4600 Silver
Hill Road, Room EID-7K181, Washington, DC 20233. You may e-mail
comments to [email protected]; use EID Survey
Comments 0607-0094 as the subject.
GENERAL INSTRUCTIONS FOR EACH SECTION
(Use your unique username and password provided to report via Internet:
econhelp.census.gov/bps)
(Answers to Frequently Asked Questions can be found at www.census.gov/permitsfaq)
1.
2.
PERIOD IN WHICH PERMITS WERE ISSUED – Include all
privately-owned residential permits which were authorized during the
month or year shown.
GEOGRAPHIC COVERAGE – If there has been a change in the
area covered by your office, enter explanations in space provided next
to selections 051–054 as applicable. If more space is needed,
continue in Section 5. To review our latest information on your office’s
coverage, see
www.census.gov/construction/bps/pdf/footnote.pdf.
Report discrepancies by either entering in Section 5, calling
1–800–845–8244 with the information or e-mailing us at
[email protected].
051 (Discontinued) – Permits are no longer required, by law, to
build new residential buildings (i.e., new homes, new apartments).
3.
052 (Merged) – Another jurisdiction has taken over the
responsibility of issuing permits for your office; OR your office has
taken over the responsibility of issuing permits for another office.
053 (Split) – Permit office no longer covers a particular jurisdiction
because: (1) that area now issues its own building permits; (2)
another jurisdiction issues the permits for that area; or (3) that area no
longer requires permits.
054 (Extraterritorial jurisdiction (ETJ)/Annexation) –
Permit office is now responsible for additional land area outside of its
original boundaries.
Also report in Section 5, if your permit office officially changed its
name, had a spelling correction, or political description change (i.e.,
from town to city, city to village, etc.)
NEW HOUSING UNITS – Summarize information for number of
buildings, number of housing units, and valuation of construction as
shown on the building or zoning permit. Enter the valuation as shown
on the permit. If no valuation is listed, enter your best estimated value.
If no value is required, annotate in Section 5. When the acronym
"NVR" (No Value Required) appears in the address label area,
comments referencing value are no longer necessary.
3a. No permits issued – Return your form even if no permits were
issued, after marking the box next to "No" in this section.
3b. Single-family houses, detached and attached – Include all new
privately-owned detached and attached single-family houses. Include
attached single-family houses, known commonly as townhouses or
row houses, where: (1) each unit is separated from adjoining units by
a wall that extends from ground to roof, (2) no unit is above or below
another unit, and (3) each unit has separate heating and separate
utility meters.
3c. Two-unit buildings – Include all new privately-owned residential
buildings that contain two housing units, and do not meet
all criteria of attached single-family as shown under
Section 3b.
3d. Three- and four-unit buildings – Include all new privately-owned
residential buildings that contain three or four housing units, and do
not meet all criteria of attached single-family as shown under
Section 3b.
3e. Five-or-more unit buildings – Include all new privately-owned
residential buildings that contain five or more housing units, and
do not meet all criteria of attached single-family as shown under
Section 3b.
4. ADDITIONAL INFORMATION ON INDIVIDUAL
RESIDENTIAL PERMITS, FROM SECTION 3, VALUED AT
$1,000,000 OR MORE – Enter additional data from individual
permits valued at $1,000,000 or more included in Section 3. If more
than two such permits were issued, attach a separate sheet.
5. COMMENTS – Enter any explanations, miscellaneous notes or
questions. Include any revisions to data entered on previous forms,
identifying the applicable survey period, the type of structure
(Section 3b–e) and corrected entries.
6. PERSON TO CONTACT REGARDING THIS REPORT – Please
fill in any blank areas or make any corrections to information already
entered in these fields.
INSTRUCTIONS FOR CLASSIFYING RESIDENTIAL BUILDINGS
RESIDENTIAL BUILDINGS
Residential buildings are buildings containing one or more housing units. A
housing unit is a house, an apartment, a group of rooms or a
single room intended for occupancy as separate living
quarters. Separate living quarters are those in which the occupants live
separately from any other individuals in the building and which have a
direct access from the outside of the building or through a common hall.
Some jurisdictions issue separate permits for individual units of a multifamily building. In this case, report the total number of units expected in a
multifamily building when the first units are authorized. If the total number
of buildings, units and valuation for the entire project is unknown, indicate
in Section 5 or call our staff. Do NOT report permits for individual units in
multifamily buildings separately.
Some jurisdictions issue building permits for residential
construction in phases: foundation, shell or superstructure, and
interior finishing. In this case, include the number of buildings,
housing units and valuation for the intended building when the shell or
superstructure permit is issued. Include foundation and interior finishing
permits only when issued separately and a valuation of construction is
available. In these two cases, enter the valuation in
Section 3b–e, depending on the number of housing units in the intended
superstructure, and zero for the buildings and units.
PERMITS TO INCLUDE
● privately-owned residential buildings, which include all residential
buildings owned or partially owned by a private company or an
individual during the period of construction
● housing for the elderly, such as assisted living facilities, that do not have
24-hour skilled nursing care
● "turnkey" housing, which is housing that will be sold to a local public
housing authority when completed
● all housing built by nonprofit organizations
● buildings manufactured partially off-site and transported and assembled
at the construction site, such as prefabricated, panelized, precut,
sectional and modular (these do not include manufactured (mobile)
HUD-inspected homes)
● residential permits issued in phases, as described above
● permits for multifamily housing units issued as commercial
● reissued expired permits with significant changes to construction
plans
FORM C-404 (8-16-2018)
PERMITS TO EXCLUDE
● publicly-owned buildings
● nonresidential buildings
● moved or relocated buildings
● farm buildings, such as silos, barns, etc.
● manufactured (mobile) HUD-inspected homes including related
foundations and placement pads
● group quarters, such as dormitories, jails, nursing homes, etc.
● hotels/motels
● other structures on residential property, such as sheds, garages,
pools, etc., when permitted separately
● landscaping
● demolitions
● maintenance and repair, which are expenses to keep a
property in ordinary working condition
● residential additions, alterations, renovations and conversions
● inspections
● certificates of occupancy for residential construction
● separate permits issued for mechanical, electrical or plumbing
work
● reissued expired permits if construction plans have not
changed
MISCELLANEOUS CLASSIFICATION INSTRUCTIONS
● Enter a building in only one category in Section 3. If you cannot
determine a category, please call our staff.
● If a building has mixed residential and nonresidential use, enter the
housing units based on the residential portion of the building.
Please estimate the valuation based on the residential portion of
the building only.
● Classify all buildings that are being totally rebuilt on an existing
foundation as new construction.
● Type of ownership (e.g. condominium, cooperative, timeshare, etc.)
is NOT considered when classifying a building.
File Type | application/pdf |
File Title | Report of Building or Zoning |
Author | U.S. Census Bureau |
File Modified | 2018-09-04 |
File Created | 2018-08-16 |