NESHAP for Carbon Black, Ethylene, Cyanide, and Spandex (40 CFR Part 63, Subpart YY) (Renewal)

1983t08.xlsx

NESHAP for Carbon Black, Ethylene, Cyanide, and Spandex (40 CFR Part 63, Subpart YY) (Renewal)

NESHAP for Carbon Black, Ethylene, Cyanide, and Spandex (40 CFR Part 63, Subpart YY) (Renewal)

OMB: 2060-0489

Document [xlsx]
Download: xlsx | pdf

Overview

Table 1
Table 2
O&M


Sheet 1: Table 1

Table 1: Annual Respondent Burden and Cost - NESHAP for Carbon Black, Ethylene, Cyanide, and Spandex (40 CFR Part 63, Subpart YY) (Renewal)









REPORTING / RECORDKEEPING REQUIREMENT (A)
Person-hours per occurrence
(B)
No. of occurrences per respondent per year
(C)
Person-hours per respondent
(C=AxB)
(D)
Respondents per yeara
(E)
Technical person-hours
(E=CxD)
(F)
Managerial person-hours
(Ex0.05)
(G)
Clerical person-hours
(Ex0.10)
(H)
Cost, $b


1. APPLICATIONS N/A

2. SURVEY AND STUDIES N/A

3. REPORTING REQUIREMENTS









a. Familiarization with Regulatory Requirements 1 1 1 61 61 3.05 6.1 $7,681.64

b. Required Activities









Initial Performance Tests 57 1 57 0 0 0 0 $0

Repeat of Performance Testsc 57 0.1 5.7 0 0 0 0 $0

Startup, Shutdown and Malfunction Plan 40 1 40 61 2,440 122 244 $307,265.54

c. Create Information See 3b








d. Gather Existing Information See 3b








e. Write Report









Initial Notification of Applicability 2 1 2 0 0 0 0 $0

Notification of Construction/Reconstruction 2 1 2 0 0 0 0 $0

Notification of anticipated startup 2 1 2 0 0 0 0 $0

Notification of Actual Startup 2 1 2 0 0 0 0 $0

Notification of Performance Test Dates 2 1.1 2.2 0 0 0 0 $0

Notification of Operating Parameter Value and Rationale Selection 2 1 2 0 0 0 0 $0

Notification of Compliance Status 2 1 2 0 0 0 0 $0

Report of Initial Performance Test Results 8 1.1 8.8 0 0 0 0 $0

Reporting Results of Continuous Monitoring System Performance Report and Summary Report See 3b








Periodic and Semiannual Reports 8 2 16 61 976 48.8 97.6 $122,906.22

Excess Emissions and Continuous Monitoring System Performance Report and Summary Reportd 8 2 16 61 976 48.8 97.6 $122,906.22

Immediate Startup, Shutdown, Malfunction Reportse 4 1 4 3 12 0.6 1.2 $1,511.14

Request for Waiver of Reporting and Recordkeeping 4 1 4 0 0 0 0 $0

Reporting Subtotal
5,135 $562,270.75

4. RECORDKEEPING REQUIREMENTS









a. Familiarization with Regulatory Requirements See 3b








b. Plan Activities See 3b








c. Implement Activities See 3b








d. Develop Record System N/A








e. Time to Enter Information









Records of SS&M 1.5 52 78 61 4,758 237.9 475.8 $599,167.80

Records of CMS 1 365 365 61 22,265 1,113.25 2,226.5 $2,803,798.05

Collect and compile data 24 2 48 61 2,928 146.4 292.8 $368,718.65

Enter / verify information for semiannual reports 16 2 32 61 1,952 97.6 195.2 $245,812.43

f. Train Personnel N/A








g. Audits N/A








Recordkeeping Subtotal



36,688 $4,017,496.94

TOTAL LABOR BURDEN AND COSTS (rounded)f



41,800 $4,580,000

TOTAL CAPITAL AND O&M COST (rounded)f






$351,000

GRAND TOTAL (rounded)f






$4,930,000










No. responses 247









hr/response 169











Assumptions:









a We have assumed that there are approximately 61 respondents, consisting of 18 manufacturing carbon black, 14 manufacturing cyanide, 26 manufacturing ethylene, and 3 manufacturing spandex, with no additional new or reconstructed sources becoming subject to the rule over the next three years.

b This ICR uses the following labor rates: $112.98 (technical), $149.35 (managerial), and $54.81 (clerical). These rates are from the United States Department of Labor, Bureau of Labor Statistics, June 2017, “Table 2. Civilian workers, by occupational and industry group.” The rates are from column 1, “Total compensation.” They have been increased by 110 percent to account for the benefit packages available to those employed by private industry.

c We have assumed that the rate of failed performance tests is 10%.









d Includes periodic startup, shutdown and malfunction report.









e We have assumed that only 5% (3) respondents per year will need to submit an immediate SSM report.









fTotals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.










Sheet 2: Table 2

Table 2: Annual Agency Burden and Cost - NESHAP for Carbon Black, Ethylene, Cyanide, and Spandex (40 CFR Part 63, Subpart YY) (Renewal)







REPORTING/RECORDKEEPING REQUIREMENT (A)
Person-hours per occurrence
(B)
No. of occurrences per respondent per year
(C)
Person-hours per respondent
(C=AxB)
(D)
Respondents per yeara
(E)
Technical person-hours
(E=CxD)
(F)
Managerial person-hours
(Ex0.05)
(G)
Clerical person-hours
(Ex0.10)
(H)
Cost, $b



(A) x (B)
(C) x (D) (E) x 0.05 (E) x 0.10
INITIAL PERFORMANCE TESTS







New or Modified Facility 5 1 5 0 0 0 0 $0
Repeat of Performance Tests 5 0.1 0.5 0 0 0 0 $0
REPORT REVIEW







Notification of Applicability 2 1 2 0 0 0 0 $0
Notification of Construction/Reconstruction 2 1 2 0 0 0 0 $0
Notification of Anticipated Startup 2 1 2 0 0 0 0 $0
Notification of Actual Startup 2 1 2 0 0 0 0 $0
Request for Extension of Compliance 2 1 2 0 0 0 0 $0
Notification of Special Compliance Requirements 2 1 2 0 0 0 0 $0
Notification of Performance Test Dates 2 1.1 2.2 0 0 0 0 $0
Notification of Operating Parameter Value and Rationale Selection 2 1 2 0 0 0 0 $0
Notification of Compliance Status 2 1 2 0 0 0 0 $0
Review Report of Initial Performance Test 5 1.1 5.5 0 0 0 0 $0
Review Reporting Results of Continuous Monitoring System Performance Report and Summary Report Included in Review of Performance Test Report






Review Periodic & Semiannual Reports 5 2 10 61 610 30.5 61 $32,892.42
Review Excess Emission Report and Continuous Monitoring System Performance Report and Summary Reportc 20 2 40 61 2,440 122 244 $131,569.68
Review Immediate Startup, Shutdown, Malfunction Report 8 1 8 3 24 1.2 2.4 $1,294.13
Review Request for Waiver of Reporting and Recordkeeping 2 1 2 0 0 0 0 $0









Subtotal



3,074 153.7 307.4 $165,756.23
TOTAL ANNUAL BURDEN AND COST (rounded)c



3,540 $166,000


















a We have assumed that there are approximately 61 respondents, consisting of 18 manufacturing carbon black, 14 manufacturing cyanide, 26 manufacturing ethylene, and 3 manufacturing spandex, with no additional new or reconstructed sources becoming subject to the rule over the next three years.
b This ICR uses the following labor rates: $48.08 (technical), $64.80 (managerial), and $26.02 (clerical). These rates are from the Office of Personnel Management (OPM), 2017 General Schedule, which excludes locality rates of pay. The rates have been increased by 60 percent to account for the benefit packages available to government employees.
c Includes review of periodic startup, shutdown and malfunction report.







d We have assumed that only 5% (3) respondents per year will need to submit an immediate SSM report.







e Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.








Sheet 3: O&M

Capital/Startup vs. Operation and Maintenance (O&M) Costs







(A) (B) (C) (D) (E) (F) (G)
Source Category with Continuous Monitoring Device Capital/Startup Cost for One Respondent Number of New Respondents Total Capital/Startup Cost, (B X C) Annual O&M Costs for One Respondent Number of Respondents with O&M Total O&M,
(E X F)
CB N/A 0 $0 $9,545 18 $171,810
CY N/A 0 $0 $9,545 14 $133,630
ET N/A 0 $0 $734 26 $19,084
SP N/A 0 $0 $8,811 3 $26,433
TOTAL - 0 $0 - 61 $351,000
File Typeapplication/vnd.openxmlformats-officedocument.spreadsheetml.sheet
File Modified0000-00-00
File Created0000-00-00

© 2024 OMB.report | Privacy Policy