NSPS for Hot Mix Asphalt Facilities (40 CFR Part 60, Subpart I) (Renewal)

ICR 201810-2060-010

OMB: 2060-0083

Federal Form Document

Forms and Documents
Document
Name
Status
Supplementary Document
2018-11-01
Supporting Statement A
2018-10-22
IC Document Collections
ICR Details
2060-0083 201810-2060-010
Active 201505-2060-003
EPA/OAR 1127.12
NSPS for Hot Mix Asphalt Facilities (40 CFR Part 60, Subpart I) (Renewal)
Extension without change of a currently approved collection   No
Regular
Approved without change 12/17/2018
Retrieve Notice of Action (NOA) 11/01/2018
n accordance with 5 CFR 1320, the information collection is approved for three years.
  Inventory as of this Action Requested Previously Approved
12/31/2021 36 Months From Approved 12/31/2018
5,893 0 5,158
24,999 0 19,000
0 0 0

The New Source Performance Standards (NSPS) for Hot Mix Asphalt Facilities (40 CFR Part 60, Subpart I) apply to hot mix asphalt facilities that commenced construction or modification after June 11, 1973. A hot mix asphalt facility is comprised only of any combination of the following: dryers; systems for screening, handling, storing, and weighing hot aggregate; systems for loading, transferring, and storing mineral filler; systems for mixing hot mix asphalt; and the loading, transfer, and storage systems associated with emission control systems. In general, all NSPS standards require initial notifications, performance tests, and periodic reports by the owners/operators of the affected facilities. They are also required to maintain records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility, or any period during which the monitoring system is inoperative. These notifications, reports, and records are essential in determining compliance with 40 CFR Part 60, Subpart I.

None
None

Not associated with rulemaking

  82 FR 29552 06/29/2017
83 FR 54747 10/31/2018
No

1
IC Title Form No. Form Name
NSPS for Hot Mix Asphalt Facilities (40 CFR Part 60, Subpart I) (Renewal)

  Total Approved Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 5,893 5,158 0 0 735 0
Annual Time Burden (Hours) 24,999 19,000 0 0 5,999 0
Annual Cost Burden (Dollars) 0 0 0 0 0 0
No
No
There is an adjustment increase in the estimated burden and number of responses as currently identified in the OMB Inventory of Approved Burdens. The increase is not due to any program changes. The change in burden occurred because the number of respondents, subject to these standards, has increased since the last ICR renewal period. In addition, this ICR assumes all existing respondents will have to familiarize with the regulatory requirements each year.

$196,000
No
    No
    No
No
No
No
Uncollected
Patrick Yellin 202 564-2970 [email protected]

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.