2066ss07

2066ss07.docx

NESHAP for Engine Test Cells/Stands (40 CFR part 63, subpart PPPPP) (Renewal)

OMB: 2060-0483

Document [docx]
Download: docx | pdf

SUPPORTING STATEMENT

ENVIRONMENTAL PROTECTION AGENCY

NESHAP for Engine Test Cells/Stands (40 CFR Part 63, Subpart PPPPP) (Renewal)


1. Identification of the Information Collection


1(a) Title of the Information Collection


NESHAP for Engine Test Cells/Stands (40 CFR Part 63, Subpart PPPPP) (Renewal), EPA ICR Number 2066.07, OMB Control Number 2060-0483.


1(b) Short Characterization/Abstract


The National Emission Standards for Hazardous Air Pollutants (NESHAP) for Engine Test Cells/Stands (40 CFR Part 63, Subpart PPPPP) were proposed on May 14, 2002, and promulgated on May 27, 2003. These regulations apply to either new or reconstructed engine test cells/stands located at major source facilities that are being used for testing internal combustion engines. An engine test cell/stand is any apparatus used for testing uninstalled stationary or uninstalled mobile (motive) engines. A plant site that is a major source of hazardous air pollutant (HAP) emissions emits or has the potential to emit any single HAP at a rate of 10 tons (9.07 megagrams) or more per year or any combination of HAPs at a rate of 25 tons (22.68 megagrams) or more per year. New facilities include those that commenced construction or reconstruction after the date of proposal. This information is being collected to assure compliance with 40 CFR Part 63, Subpart PPPPP.


In general, all NESHAP standards require initial notifications, performance tests, and periodic reports by the owners/operators of the affected facilities. They are also required to maintain records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility, or any period during which the monitoring system is inoperative. These notifications, reports, and records are essential in determining compliance, and are required of all affected facilities subject to NESHAP.


Any owner/operator subject to the provisions of this part shall maintain a file containing these documents, and retain the file for at least five years following the generation date of such maintenance reports and records. All reports are sent to the delegated state or local authority. If there is no such delegated authority, the reports are sent directly to the U.S. Environmental Protection Agency (EPA) regional office.


There are approximately 19 Engine Test Cells/Stands facilities. Three of the 19 facilities in the United States are owned by the Federal government1. The remaining are all owned and operated by privately-owned, for-profit businesses. The “burden” to the “Affected Public” may be found below in both Table 1a: Annual Respondent Burden and Cost for Private Facilities – NESHAP for Engine Test Cells/Stands (40 CFR Part 63, Subpart PPPPP) (Renewal) and Table 1b: Annual Respondent Burden and Cost for Federal Facilities – NESHAP for Engine Test Cells/Stands (40 CFR Part 63, Subpart PPPPP) (Renewal). The “burden” to the Federal government is attributed entirely to work performed by either Federal employees or government contractors and may be found below in Table 2: Average Annual EPA Burden and Cost – NESHAP for Engine Test Cells/Stands (40 CFR Part 63, Subpart PPPPP), (Renewal). We assume that they will all respond to EPA inquiries.


Based on our consultations with industry representatives, there is an average of one affected facility at each plant site and that each plant site has only one respondent (i.e., the owner/operator of the plant site).


Over the next three years, approximately 18 existing respondents per year will be subject to these standards, and one additional respondent (private facility) is expected to become subject to these same standards, over the three-year period for a total of 19 respondents.


The Office of Management and Budget (OMB) approved the currently active ICR without any “Terms of Clearance”.


2. Need for and Use of the Collection


2(a) Need/Authority for the Collection


The EPA is charged under Section 112 of the Clean Air Act, as amended, to establish standards of performance for each category or subcategory of major sources and area sources of hazardous air pollutants. These standards are applicable to new or existing sources of hazardous air pollutants and shall require the maximum degree of emission reduction. In addition, section 114(a) states that the Administrator may require any owner/operator subject to any requirement of this Act to:


(A) Establish and maintain such records; (B) make such reports; (C) install, use, and maintain such monitoring equipment, and use such audit procedures, or methods; (D) sample such emissions (in accordance with such procedures or methods, at such locations, at such intervals, during such periods, and in such manner as the Administrator shall prescribe); (E) keep records on control equipment parameters, production variables or other indirect data when direct monitoring of emissions is impractical; (F) submit compliance certifications in accordance with Section 114(a)(3); and (G) provide such other information as the Administrator may reasonably require.


In the Administrator’s judgment, HAP emissions from engine test cells/stands either cause or contribute to air pollution that may reasonably be anticipated to endanger public health and/or welfare. Therefore, the NESHAP were promulgated for this source category at 40 CFR Part 63, Subpart PPPPP.

2(b) Practical Utility/Users of the Data


The recordkeeping and reporting requirements in these standards ensure compliance with the applicable regulations, which were promulgated in accordance with the Clean Air Act. The collected information is also used for targeting inspections and as evidence in legal proceedings.


Performance tests are required in order to determine an affected facility’s initial capability to comply with the emission standards. Continuous emission monitors are used to ensure compliance with these standards at all times. During the performance test a record of the operating parameters under which compliance was achieved may be recorded and used to determine compliance in place of a continuous emission monitor.


The notifications required in these standards are used to inform the Agency or delegated authority when a source becomes subject to the requirements of the regulations. The reviewing authority may then inspect the source to check if the pollution control devices are properly installed and operated, leaks are being detected and repaired, and that the standards are being met. The performance test may also be observed.


The required semiannual reports are used to determine periods of excess emissions, identify problems at the facility, verify operation/maintenance procedures and for compliance determinations.


3. Non-duplication, Consultations, and Other Collection Criteria


The requested recordkeeping and reporting are required under 40 CFR Part 63, Subpart PPPPP.

3(a) Non-duplication


If the subject standards have not been delegated, the information is sent directly to the appropriate EPA regional office. Otherwise, the information is sent directly to the delegated state or local agency. If a state or local agency has adopted its own similar standards to implement the Federal standards, a copy of the report submitted to the state or local agency can be sent to the Administrator in lieu of the report required by the Federal standards. Therefore, duplication does not exist.


3(b) Public Notice Required Prior to ICR Submission to OMB


An announcement of a public comment period for the renewal of this ICR was published in the Federal Register (82 FR 29552) on June 29, 2017. No comments were received on the burden published in the Federal Register.


3(c) Consultations


The Agency has consulted industry experts and internal data sources to project the number of affected facilities and industry growth over the next three years. The primary source of information as reported by industry, in compliance with the recordkeeping and reporting provisions in these standards, is the Integrated Compliance Information System (ICIS). ICIS is EPA’s database for the collection, maintenance, and retrieval of compliance data for industrial and government-owned facilities. The growth rate for the industry is based on our consultations with the Agency’s internal industry experts. Approximately 19 respondents will be subject to these standards over the three-year period covered by this ICR.


Industry trade association(s) and other interested parties were provided an opportunity to comment on the burden associated with these standards as they were being developed and these same standards have been reviewed previously to determine the minimum information needed for compliance purposes. In developing this ICR, we contacted both the National Marine Manufacturers Association, at (312) 946-6231, and The Truck and Engine Manufacturers Association, at (312) 929-1970.


It is our policy to respond after a thorough review of comments received since the last ICR renewal, as well as those submitted in response to the first Federal Register notice. In this case, no comments were received.


3(d) Effects of Less-Frequent Collection


Less-frequent information collection would decrease the margin of assurance that facilities are continuing to meet these standards. Requirements for information gathering and recordkeeping are useful techniques to ensure that good operation and maintenance practices are applied and emission limitations are met. If the information required by these same standards was collected less frequently, the proper operation and maintenance of control equipment and the possibility of detecting violations would be less likely.


3(e) General Guidelines


These reporting or recordkeeping requirements do not violate any of the regulations promulgated by OMB under 5 CFR Part 1320, Section 1320.5.


These standards require the respondents to maintain all records, including reports and notifications for at least five years. This is consistent with the General Provisions as applied to these standards. EPA believes that the five-year records retention requirement is consistent with the Part 70 permit program and the five-year statute of limitations on which the permit program is based. The retention of records for five years allows EPA to establish the compliance history of a source, any pattern of non-compliance and to determine the appropriate level of enforcement action. EPA has found that the most flagrant violators have violations extending beyond five years. In addition, EPA would be prevented from pursuing the violators due to either the destruction or nonexistence of essential records.



3(f) Confidentiality


Any information submitted to the Agency for which a claim of confidentiality is made will be safeguarded according to the Agency policies set forth in Title 40, chapter 1, part 2, subpart B - Confidentiality of Business Information (CBI) (see 40 CFR 2; 41 FR 36902, September 1, 1976; amended by 43 FR 40000, September 8, 1978; 43 FR 42251, September 20, 1978; 44 FR 17674, March 23, 1979).


3(g) Sensitive Questions


The reporting or recordkeeping requirements in these standards do not include sensitive questions.


4. The Respondents and the Information Requested


4(a) Respondents/SIC Codes


The respondents to the recordkeeping and reporting requirements are engine test cells/stands. The United States Standard Industrial Classification (SIC) codes and their corresponding North American Industry Classification System (NAICS) codes are listed below for each source category.


Standard (40 CFR Part 63, Subpart PPPPP)

SIC Codes

NAICS Codes

Turbine and Turbine Generator Set Units Manufacturing

3511

333611

Other Engine Equipment Manufacturing

3519

333618

All Other Motor Vehicle Parts Manufacturing

3519

336399

Hand and Edge Tool Manufacturing

3523

332212

Lawn and Garden Tractors and Home Lawn and Garden Equipment Manufacturing

3524

333112

Hand and Edge Tool Manufacturing

3524

332212

Construction Machinery Manufacturing

3531

333120

Farm Machinery and Equipment Manufacturing

3559

333111

Other Commercial and Service Industry Machinery Manufacturing

3559

333319

Speed Changers, Industrial High-Speed Drives, and Gears Manufacturing

3566

333612

Motors and Generator Manufacturing

3621

335312

Automobile Manufacturing

3711

336111

Heavy Duty Truck Manufacturing

3711

336120

Light Truck and Utility Vehicle Manufacturing

3711

336112

Military Armored Vehicle, Tank, and Tank Component Manufacturing

3711

336992

Gasoline Engine and Engine Parts Manufacturing

3714

336312

Motor Vehicle Transmission and Power Parts Manufacturing

3714

336350

Aircraft Manufacturing

3721

336411

Research and Development in the Physical, Engineering, and Life Sciences

3721

541710

Aircraft Engine and Engine Parts Manufacturing

3724

336412

Research and Development in the Physical, Engineering, and Life Sciences

3724

541710

Guided Missile and Space Vehicle Manufacturing

3761

336414

Research and Development in the Physical, Engineering, and Life Sciences

3761

541710

Guided Missile and Space Vehicle Propulsion Unit and Propulsion Unit Parts Manufacturing

3764

336415

Research and Development in the Physical, Engineering, and Life Sciences

3764

541710

Scheduled Passenger Air Transportation

4512

481111

Other Support Activities for Air Transportation

4581

488190

Research and Development in the Physical, Engineering, and Life Sciences

8731

541710

Testing Laboratories

8734

541380

Automobile Driving Schools

8299

611692

General Automotive Repair

7538

811111

Other Automotive Mechanical and Electrical Repair and Maintenance

7539

811118

Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

7699

811310

Home and Garden Equipment Repair and Maintenance

7699

811411

Space Research and Technology

9661

927110

National Security

9711

928110






4(b) Information Requested


(i) Data Items


In this ICR, all the data that is either recorded or reported is required by the NESHAP for Engine Test Cells/Stands (40 CFR Part 63, Subpart PPPPP).


A source must make the following reports:



Notifications

Initial notification

63.9345(b), 63.5(d), 63.9(b)

Notification of compliance status

63.9345(c), 63.9(h)

Notification of intent to conduct CEMS performance evaluation

63.9345(d), 63.8(e)(2)

Initial performance evaluation

63.9320(b), 63.9345(d), 63.8(e)(2)

Notification of alternative monitoring method

63.8(f)(4)

Waiver of recordkeeping or reporting requirements

63.10(f)

Additional notification

63.8(e), 63.8(f)(4 and 6), 63.9(b), 63.9(g)(1 and 3), 63.9(h), 63.9(j)



Reports

Semiannual compliance report (including reports of deviations)

63.9340(b), 63.9350(a-d), 63.10(a), 63.10(e)

Startup, shutdown, or malfunction (SSM) report (required only if control device/monitoring equipment SSM deviates from SSM plan)

63.9350(e), 63.10(d)(5)

SSM Plan (only for control devices, not for engine test cells)

63.9305(c)

Inspection and maintenance plan for catalytic oxidizers, if applicable

63.9324(b)(4)






A source must keep the following records:



Recordkeeping

Maintain records of emission test results and other data needed to determine compliance with emission limitation

63.9355(a)(4-7)

Maintain records of all reports and notifications

63.9355(a), 63.10(b)

Maintain records of applicability

63.10(b)(3)

Maintain records for sources with continuous monitoring systems

63.9355(a)(2), 63.9355(b), 63.9355(c), 63.10(b), 63.10(c)

Maintain records of each control device malfunction.

63.9355(3)

Maintain records for initial notification and notification of compliance status

63.9355(a)(1), 63.10(b)(2)(xiv)


Electronic Reporting


Some of the respondents are using monitoring equipment that automatically records parameter data. Although personnel at the affected facility must still evaluate the data, internal automation has significantly reduced the burden associated with monitoring and recordkeeping at a plant site.


(ii) Respondent Activities



Respondent Activities


Familiarization with the regulatory requirements.


Install, calibrate, maintain, and operate CMS for temperature, air flow direction, air facial velocity, pressure drop across enclosure, gas flowrate, duct static pressure, carbon monoxide or total hydrocarbon concentrations, adjusted for oxygen. The exact CMS requirements will depend on the control device used or the emission limit the unit is complying with.


Write the notifications and reports listed above.


Enter information required to be recorded above.


Submit the required reports developing, acquiring, installing, and utilizing technology and systems for the purpose of collecting, validating, and verifying information.


Develop, acquire, install, and utilize technology and systems for the purpose of processing and maintaining information.


Develop, acquire, install, and utilize technology and systems for the purpose of disclosing and providing information.

Adjust the existing ways to comply with any previously applicable instructions and requirements.


Train personnel to be able to respond to a collection of information.


Transmit, or otherwise disclose the information.


5. The Information Collected: Agency Activities, Collection Methodology, and Information Management


5(a) Agency Activities


EPA conducts the following activities in connection with the acquisition, analysis, storage, and distribution of the required information.



Agency Activities

Observe initial performance tests and repeat performance tests if necessary.


Review notifications and reports, including performance test reports, and excess emissions reports, required to be submitted by industry.


Audit facility records.

Input, analyze, and maintain data in the Enforcement and Compliance History Online (ECHO) and ICIS.


5(b) Collection Methodology and Management


Following notification of startup, the reviewing authority could inspect the source to determine whether the pollution control devices are properly installed and operated. Performance test reports are used by the Agency to discern a source’s initial capability to comply with the emission standard. Data and records maintained by the respondents are tabulated and published for use in compliance and enforcement programs. The semiannual reports are used for problem identification, as a check on source operation and maintenance, and for compliance determinations.


Information contained in the reports is reported by state and local governments in the ICIS Air database, which is operated and maintained by EPA’s Office of Compliance. ICIS is EPA’s database for the collection, maintenance, and retrieval of compliance data for industrial and government-owned facilities. EPA uses ICIS for tracking air pollution compliance and enforcement by local and state regulatory agencies, EPA regional offices and EPA headquarters. EPA and its delegated Authorities can edit, store, retrieve and analyze the data.


The records required by this regulation must be retained by the owner/operator for five years.


5(c) Small Entity Flexibility


There are no small entities (i.e., small businesses) affected by this regulation.


5(d) Collection Schedule


The specific frequency for each information collection activity within this request is shown below in both Table 1a: Annual Respondent Burden and Cost for Private Facilities – NESHAP for Engine Test Cells/Stands (40 CFR Part 63, Subpart PPPPP) (Renewal) and Table 1b: Annual Respondent Burden and Cost for Federal Facilities – NESHAP for Engine Test Cells/Stands (40 CFR Part 63, Subpart PPPPP) (Renewal).


6. Estimating the Burden and Cost of the Collection


Tables 1a and 1b document the computation of individual burdens for the recordkeeping and reporting requirements applicable to the industry for the subpart included in this ICR. The individual burdens are expressed under standardized headings believed to be consistent with the concept of “Burden” under the Paperwork Reduction Act. Where appropriate, specific tasks and major assumptions have been identified. Responses to this information collection are mandatory.


The Agency may neither conduct nor sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB Control Number.


6(a) Estimating Respondent Burden


The average annual burden to industry over the next three years from these recordkeeping and reporting requirements is estimated to be 2,150 hours (Total Labor Hours from Tables 1a and 1b below; see also the summary of burden in Table 1c). These hours are based on Agency studies and background documents from the development of the regulation, Agency knowledge and experience with the NESHAP program, the previously-approved ICR, and any comments received.





6(b) Estimating Respondent Costs


(i) Estimating Labor Costs

For private facilities, this ICR uses the following labor rates:


Managerial $149.35 ($71.12 + 110%)

Technical $112.98 ($53.80 + 110%)

Clerical $54.81 ($26.10 + 110%)


These rates are from the United States Department of Labor, Bureau of Labor Statistics, June 2017, “Table 2. Civilian Workers, by occupational and industry group.” The rates are from column 1, “Total compensation.” The rates have been increased by 110 percent to account for the benefit packages available to those employed by private industry.


For Federal facilities, this ICR uses the following labor rates:


Managerial $64.80 (GS-13, Step 5, $40.50 + 60%)

Technical $48.08 (GS-12, Step 1, $30.05 + 60%)

Clerical $26.02 (GS-6, Step 3, $16.26 + 60%)


These rates are from the Office of Personnel Management (OPM), 2017 General Schedule, which excludes locality rates of pay. The rates have been increased by 60 percent to account for the benefit packages available to Federal government employees


(ii) Estimating Capital/Startup and Operation and Maintenance Costs


The type of industry costs associated with the information collection activities in the subject standard are both labor costs which are addressed elsewhere in this ICR and the costs associated with continuous monitoring. The capital/startup costs are one-time costs when a facility becomes subject to the regulations and include the cost to purchase monitors. The annual operation and maintenance costs are the ongoing costs to maintain the monitor(s) and other costs such as photocopying and postage.











(iii) Capital/Startup vs. Operation and Maintenance (O&M) Costs



Capital/Startup vs. Operation and Maintenance (O&M) Costs


(A)

Continuous Monitoring Device


(B)

Capital/Startup Cost for One Respondent


(C)

Number of New Respondents


(D)

Total Capital/Startup Cost, (B X C)


(E)

Annual O&M Costs for One Respondent


(F)

Number of Respondents with O&M


(G)

Total O&M,

(E X F)

CPMS

$500

1

$500

$300

19

$5,700

Note: Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.


The total capital/startup costs for this ICR are $500. This is the total of column D in the above table.


The total operation and maintenance (O&M) costs for this ICR are $5,700. This is the total of column G.


The average annual cost for capital/startup and operation and maintenance costs to industry over the next three years of the ICR is estimated to be $6,200. These are the record-keeping costs.


6(c) Estimating Agency Burden and Cost


The only costs to the Agency are those costs associated with analysis of the reported information. EPA’s overall compliance and enforcement program includes such activities as the examination of records maintained by the respondents, periodic inspection of sources of emissions, and the publication and distribution of collected information.


The average annual Agency cost during the three years of the ICR is estimated to be $8,130.


This cost is based on the average hourly labor rate as follows:


Managerial $64.80 (GS-13, Step 5, $40.50 + 60%)

Technical $48.08 (GS-12, Step 1, $30.05 + 60%)

Clerical $26.02 (GS-6, Step 3, $16.26 + 60%)


These rates are from the Office of Personnel Management (OPM), 2017 General Schedule, which excludes locality rates of pay. The rates have been increased by 60 percent to account for the benefit packages available to Federal government employees. Details upon which this estimate is based appear below in Table 2: Average Annual EPA Burden and Cost – NESHAP for Engine Test Cells/Stands (40 CFR Part 63, Subpart PPPPP) (Renewal).


6(d) Estimating the Respondent Universe and Total Burden and Costs


Based on our research for this ICR, on average over the next three years, approximately 18 existing respondents will be subject to these standards. It is also estimated that one additional respondent will become subject to these same standards over the same three-year period. The overall average number of respondents, as shown in the table below, is 19 per year.


The number of respondents is calculated using the following table that addresses the three years covered by this ICR:



Number of Respondents




Respondents That Submit Reports


Respondents That Do Not Submit Any Reports





Year


(A)

Number of New Respondents 1


(B)

Number of Existing Respondents


(C)

Number of Existing Respondents that keep records but do not submit reports


(D)

Number of Existing Respondents That Are Also New Respondents


(E)

Number of Respondents

(E=A+B+C-D)

1

1

18

0

0

19

2

0

19

0

0

19

3

0

19

0

0

19

Average

0.3

19

0

0

19

1 New respondents include sources with constructed, reconstructed and modified affected facilities.


Column D is subtracted to avoid double-counting respondents. As shown above, the average Number of Respondents over the three-year period of this ICR is 19.


The total number of annual responses per year is calculated using the following table:



Total Annual Responses


(A)


Information Collection Activity


(B)


Number of Respondents


(C)


Number of Responses


(D)

Number of Existing Respondents That Keep Records But Do Not Submit Reports


(E)

Total Annual Responses

E=(BxC)+D

Compliance status report

19

2

0

38

Initial notifications

1

0.3

0

0.3

Notification of construction/reconstruction

1

0.3

0

0.3

Notification of actual startup

1

0.3

0

0.3

Start-up Shutdown and Malfunction Plan

1

0.3

0

0.3

Performance evaluation report

1

0.3

0

0.3




Total

40


The number of Total Annual Responses is 40.


The total annual labor costs are $198,000. Details regarding these estimates may be found below in both Table 1a: Annual Respondent Burden and Cost for Private Facilities – NESHAP for Engine Test Cells/Stands (40 CFR Part 63, Subpart PPPPP) (Renewal) and Table 1b: Annual Respondent Burden and Cost for Federal Facilities – NESHAP for Engine Test Cells/Stands (40 CFR Part 63, Subpart PPPPP) (Renewal); see also the summary in Table 1c.


6(e) Bottom Line Burden Hours and Cost Tables


The detailed bottom line burden hours and cost calculations for the respondents and the Agency are shown below in Tables 1 and 2, respectively, and summarized below.


(i) Respondent Tally


The total annual labor hours are 2,150 hours. Details regarding these estimates may be found below in both Table 1a: Annual Respondent Burden and Cost for Private Facilities – NESHAP for Engine Test Cells/Stands (40 CFR Part 63, Subpart PPPPP) (Renewal) and Table 1b: Annual Respondent Burden and Cost for Federal Facilities – NESHAP for Engine Test Cells/Stands (40 CFR Part 63, Subpart PPPPP) (Renewal); see also the summary in Table 1c.


We assume that burdens for managerial tasks take 5% of the time required for technical tasks because the typical tasks for managers are to review and approve reports. Clerical burdens are assumed to take 10% of the time required for technical tasks because the typical duties of clerical staff are to proofread the reports, make copies and maintain records.


Furthermore, the annual public reporting and recordkeeping burden for this collection of information is estimated to average 54 hours per response.


The total annual capital/startup and O&M costs to the regulated entity are $6,200. The cost calculations are detailed in Section 6(b)(iii), Capital/Startup vs. Operation and Maintenance (O&M) Costs.






(ii) The Agency Tally


The average annual Agency burden and cost over next three years is estimated to be 173 labor hours at a cost of $8,130; see below in Table 2: Average Annual EPA Burden and Cost – NESHAP for Engine Test Cells/Stands (40 CFR Part 63, Subpart PPPPP) (Renewal).


We assume that burdens for managerial tasks take 5% of the time required for technical tasks because the typical tasks for managers are to review and approve reports. Clerical burdens are assumed to take 10% of the time required for technical tasks because the typical duties of clerical staff are to proofread the reports, make copies and maintain records.


6(f) Reasons for Change in Burden


There is an increase in the total estimated burden, number of responses, and Capital/Startup and O&M costs from the most recently approved ICR due to several adjustments. First, based on consultations with internal Agency experts, there is an increase in the number of new sources. This renewal reflects burden for an increase in the total number of sources and incorporates burden for one-time requirements for the new source. Second, this renewal includes time for each affected facility to review rule requirements each year.


6(g) Burden Statement


The annual public reporting and recordkeeping burden for this collection of information is estimated to average 54 hours per response. “Burden” means the total time, effort, or financial resources expended by persons to generate, maintain, retain, or disclose or provide information to or for a Federal agency. This includes the time needed to review instructions; develop, acquire, install, and utilize technology and systems for the purposes of collecting, validating, and verifying information, processing and maintaining information, and disclosing and providing information; adjust the existing ways to comply with any previously applicable instructions and requirements; train personnel to be able to respond to a collection of information; search data sources; complete and review the collection of information; and transmit or otherwise disclose the information.


An agency may neither conduct nor sponsor, and a person is not required to respond to, a collection of information unless it displays a valid OMB Control Number. The OMB Control Numbers for EPA regulations are listed at 40 CFR Part 9 and 48 CFR Chapter 15.


To comment on the Agency’s need for this information, the accuracy of the provided burden estimates, and any suggested methods for minimizing respondent burden, including the use of automated collection techniques, EPA has established a public docket for this ICR under Docket ID Number EPA-HQ-OECA-2014-0091. An electronic version of the public docket is available at http://www.regulations.gov/, which may be used to obtain a copy of the draft collection of information, submit or view public comments, access the index listing of the contents of the docket, and to access those documents in the public docket that are available electronically. When in the system, select “search,” then key in the docket ID number identified in this document. The documents are also available for public viewing at the Enforcement and Compliance Docket and Information Center in the EPA Docket Center (EPA/DC), WJC West, Room 3334, 1301 Constitution Ave., NW, Washington, DC. The EPA Docket Center Public Reading Room is open from 8:30 a.m. to 4:30 p.m., Monday through Friday, excluding legal holidays. The telephone number for the Reading Room is (202) 566-1744, and the telephone number for the docket center is (202) 566-1752. Also, you can send comments to the Office of Information and Regulatory Affairs, Office of Management and Budget, 725 17th Street, NW, Washington, DC 20503, Attention: Desk Officer for EPA. Please include the EPA Docket ID Number EPA-HQ-OECA-2014-0091 and OMB Control Number 2060-0483 in any correspondence.


Part B of the Supporting Statement


This part is not applicable because no statistical methods were used in collecting this information.

Table 1a: Annual Respondent Burden and Cost for Private Facilities– NESHAP for Engine Test Cells/Stands (40 CFR Part 63, Subpart PPPPP) (Renewal)


Burden item

(A)
Person hours per occurrence

(B)
No. of occurrences per respondent per year

(C)
Person hours per respondent per year
(C=AxB)

(D)
Respondents per year
a

(E)
Technical person- hours per year
(E=CxD)

(F)
Management person hours per year
(Ex0.05)

(G)
Clerical person hours per year
(Ex0.1)

(H)
Total Cost per year
b

1. Applications

N/A

 

 

 

 

 

 

 

2. Surveys and studies

N/A

 

 

 

 

 

 

 

3. Reporting requirements

 

 

 

 

 

 

 

 

A. Familiarization with regulatory requirements a

4

1

4

16

64

3.2

6.4

$8,059.42

B. Notifications c








 

Initial notifications

2

0.3

0.6

1

0.6

0.03

0.06

$75.56

Notification of construction/ reconstruction

2

0.3

0.6

1

0.6

0.03

0.06

$75.56

Notification of actual startup

2

0.3

0.6

1

0.6

0.03

0.06

$75.56

C. Create information

See 3B







 

D. Gather existing information

See 3E







 

E. Write report








 

Start-up Shutdown and Malfunction Plan d

20

0.3

6

1

6

0

1

$755.57

Compliance status report e

4

2

8

16

128

6

13

$16,118.85

Performance evaluation report

16

0.3

4.8

1

4.8

0.2

0.5

$604.46

Subtotal for Reporting Requirements





235

$25,765

4. Recordkeeping requirements








 

A. Initial performance evaluation f

330

0.3

99

1

99

5.0

9.9

$12,466.92

B. Monitoring demonstration g

148

0.3

44.4

1

44.4

2.2

4.4

$5,591.23

C. Repeat performance evaluation h

330

1

330

0

0

0

0

$0

D. Maintain records of CEMS performance i

1.5

52

78

16

1248

62.4

124.8

$157,158.77

Subtotal for Recordkeeping Requirements





1,600

$175,217

TOTAL LABOR BURDEN AND COST (rounded)j

 

 

 

1,840

$201,000

Total CAPITAL and O&M COST (rounded)j  

 

 

 

 

 

$5,300

GRAND TOTAL (rounded)j

 

 

 

 

 

 

 

$206,000


Assumptions:

a We have assumed that the average number of private sources subject to the rule will be 15, and that one new facility will become subject to the rule over the three-year period of this ICR. This ICR assumes that all sources will incur a burden to re-familiarize themselves with the regulatory requirements each year.

b This ICR uses the following labor rates: $149.35 per hour for Managerial labor; $112.98 per hour for Technical labor, and $54.31 per hour for Clerical labor. These rates are from the United States Department of Labor, Bureau of Labor Statistics, June 2017, Table 2. Civilian Workers, by Occupational and Industry group. The rates are from column 1, Total Compensation. The rates have been increased by 110 percent to account for the benefit packages available to those employed by private industry.

c We have assumed that there will be one new or reconstructed source over the next three years.

d We have assumed that the one new source will use controls to comply with the standard and therefore the one-time SSM plan requirement will occur during this ICR period. We have assumed that this one new source will not develop a site-specific monitoring and inspection plan for catalytic oxidizer controls.

e Compliance status reports are required semiannually. We have assumed that deviations get reported as part of the semiannual compliance status report. We have assumed that all of the sources that had an SSM of a control device was consistent with the SSM plan and therefore no separate SSM report burden is estimated.

f The technical persons-hours per occurrence were taken from the ESD manual Table 4 “Burden of Performance Tests and Continuous Monitoring System (CMS) Demonstrations” (Volume X, Section 2.2).

g Since there is only one new respondent, we have assumed that it will not have to repeat the performance evaluations due to failure.

h We have assumed that owners and operators will maintain monitoring records on a weekly basis.

i We assume all of the recordkeeping and reporting burden from the rule at federal facilities will be conducted by federal employees.

j Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.

Table 1b: Annual Respondent Burden and Cost for Federal Facilities – NESHAP for Engine Test Cells/Stands (40 CFR Part 63, Subpart PPPPP) (Renewal)


Burden item

(A)
Person hours per occurrence

(B)
No. of occurrences per respondent per year

(C)
Person hours per respondent per year
(C=AxB)

(D)
Respondents per year
a

(E)
Technical person- hours per year
(E=CxD)

(F)
Management person hours per year
(Ex0.05)

(G)
Clerical person hours per year
(Ex0.1)

(H)
Total Cost per year
b

1. Applications

N/A

 

 

 

 

 

 

 

2. Surveys and studies

N/A

 

 

 

 

 

 

 

3. Reporting requirements

 

 

 

 

 

 

 

 

A. Familiarization with regulatory requirements c

4

1

4

3

12

0.6

1.2

$647.06

B. Notifications c








 

Initial notifications

2

1

2

0

0

0

0

$0

Notification of construction/reconstruction

2

1

2

0

0

0

0

$0

Notification of actual startup

2

1

2

0

0

0

0

$0

C. Create information

See 3B







 

D. Gather existing information

See 3E







 

E. Write report








 

Start-up Shutdown and Malfunction Plan c

20

0.3

6

0

0

0

0

$0

Compliance status report d

4

2

8

3

24

1.2

2.4

$1,294.13

Performance evaluation report e

16

1

16

0

0

0

0

$0

Subtotal for Reporting Requirements





41

$1,941

4. Recordkeeping requirements








 

A. Initial performance evaluation f, g

330

1

330

0

0

0

0

$0

B. Monitoring demonstration f, g

148

1

148

0

0

0

0

$0

C. Repeat performance evaluation f, g, h

330

1

330

0

0

0

0

$0

D. Maintain records of CEMS performance i

1.5

52

78

3

234

11.7

23.4

$12,617.75

Subtotal for Recordkeeping Requirements k





269

$12,618

TOTAL LABOR BURDEN AND COST (rounded)k 

 

 

 

310

$14,600

Total CAPITAL and O&M COST (rounded)k 

 

 

 

 

 

 

$900

GRAND TOTAL (rounded)k

 

 

 

 

 

 

$15,500


Assumptions:

a We have assumed that the average number of existing Federal sources subject to the rule will be 3, and that no new Federal facilities will become subject to the rule over the three-year period of this ICR. This ICR assumes that all sources will incur a burden to re-familiarize themselves with the regulatory requirements each year.

b This cost is based on the following hourly labor rates, increased by 60% to account for the benefit packages available to government employees: $64.80 for Managerial (GS-13, Step 5, $40.50+60%), $48.08 for Technical (GS-12, Step 1, $30.05 + 60%) and $26.02 Clerical (GS-6, Step 3, $16.26 + 60%). These rates are from the Office of Personnel Management (OPM) “2017 General Schedule” which excludes locality rates of pay.

c We have assumed that there will be no new or reconstructed Federal sources over the next three years.

d Compliance status reports are required semiannually. We have assumed that deviations get reported as part of the semiannual compliance status report. We have assumed that all of the sources that had an SSM of a control device was consistent with the SSM plan and therefore no separate SSM report burden is estimated.

e We have assumed that no Federal respondents need to conduct the initial performance evaluation, since there are no new or reconstructed Federal sources over the next three years.

f We have assumed that no Federal respondents need to keep records for initial performance evaluation related activities, since there are no new or reconstructed Federal sources over the next three years.

g The technical persons-hours per occurrence were taken from the ESD manual Table 4 “Burden of Performance Tests and Continuous Monitoring System (CMS) Demonstrations” (Volume X, Section 2.2).

h Since there are no new respondents, it is assumed no respondents will have to repeat the performance evaluations due to failure.

i We have assumed that owners and operators will maintain monitoring records on a weekly basis.

j We assume all of the recordkeeping and reporting burden from the rule at federal facilities will be conducted by federal employees.

k Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.


Table 1c: Annual Respondent Burden and Cost Breakdown by Affected Sector– NESHAP for Engine Test Cells/Stands (40 CFR Part 63, Subpart PPPPP) (Renewal)


Affected Sector

Number of Responses

Labor Hours

Labor Costs

Capital/Startup and O&M Costs

Reporting

Recordkeeping

Total

Private

34

235

1,600

1,840

$183,000

$5,300

Public (Federal)

6

41

269

310

$14,600

$900

Total

40

276

1,869

2,150

$198,000

$6,200





Table 2: Average Annual EPA Burden and Cost - NESHAP for Engine Test Cells/Stands (40 CFR Part 63, Subpart PPPPP) (Renewal)


Activity

(A)
EPA person- hours per occurrence

(B)
No. of occurrences per plant per year

(C)
EPA person- hours per plant per year
(C=AxB)

(D)
Plants per year
a

(E)
Technical person- hours per year
(E=CxD)

(F)
Management person-hours per year
(Ex0.05)

(G)
Clerical person-hours per year
(Ex0.1)

(H)
Cost, $
b

1. Attend CEMS performance evaluation

32

0.3

9.6

1

9.6

0.48

0.96

$517.65

2. Repeat performance evaluation








 

a. Retesting preparation

12

1

12

0

0

0

0

$0

b. Attend retesting

32

1

32

0

0

0

0

$0

3. Deviation – enforcement activities c

16

1

16

4

64

3.2

6.4

$3,451.01

4. Reporting requirements








 

a.  Review waivers d

2

2

4

0

0

0

0

$0

b.  Review reports








 

Review initial notifications

2

0.3

0.6

1

0.6

0.03

0.06

$32

Compliance status report e

2

2

4

19

76

3.8

7.6

$4,098.07

Performance evaluation report

2

0.3

0.6

1

0.6

0.0

0.06

$32.35

Subtotals Labor Burden and Cost





150.8

7.54

15.08

$8,131.44

TOTAL ANNUAL BURDEN AND COST (rounded)f

 

 

 

 

173

$8,130


Assumptions:

a We have assumed that the average number of existing sources subject to the rule will be 18, and that one new facility will become subject to the rule over the three-year period of this ICR. That facility is not assumed to require repeat performance evaluation testing.

b This cost is based on the following hourly labor rates, increased by 60% to account for the benefit packages available to government employees: $64.80 for Managerial (GS-13, Step 5, $40.50+60%), $48.08 for Technical (GS-12, Step 1, $30.05 + 60%) and $26.02 Clerical (GS-6, Step 3, $16.26 + 60%). These rates are from the Office of Personnel Management (OPM) “2017 General Schedule” which excludes locality rates of pay.

c We have assumed that 20 percent of all respondents will be out of compliance.

d We have assumed that none of the respondents are submitting waivers for recordkeeping and reporting requirements.

e Compliance status reports review is required semiannually. We assumed that deviations get reported as part of the semiannual compliance status report.

f Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.

1 We assume all 3 federal facilities are operated by Federal government employees.

File Typeapplication/vnd.openxmlformats-officedocument.wordprocessingml.document
File TitleICR Package Instructions
Authorrmarshal
File Modified0000-00-00
File Created2021-01-20

© 2024 OMB.report | Privacy Policy