IC LIST For OMB Docket No. 0572-0079
Preloan Procedures and Requirements for Telecommunications Programs
There are no “formal paper forms” for this collection. All Information is submitted through the RDApply electronic intake system. The following is a list of required information from the Public:
| 
 | FORM | 
| 
 | NO(s) | 
| 
 | 
				 | 
| DESCRIPTION | 
				 | 
| 
 | 
				 | 
| 
 | 
 | 
| 
				 | 
				 | 
| Loan Requirements & Preloan Procedures | RDApply | 
| NOTE: Applicants must complete the seven (7) requirements listed below. Per response time of 275.5 hours is a combined total of each requirement's individual per response time. | 
 | 
| 
 | 
 | 
| The completed loan application -- Loan appplication form | none | 
| Supplementary information and toll settlement data (includes RUS 291) | none | 
| General Information & Area Coverage Survey (ACS) | none | 
| Loan Design Summary | none | 
| Construction Cost Estimates | none | 
| Narrative portion of Loan Design | none | 
| 
 | 
 | 
| Loan Processing Procedures | 
 | 
| Prerequisites to Release and Advance of Funds | none | 
| 
 | 
 | 
| 
 | 
 | 
| 
 | 
 | 
| 
 | 
				 | 
| 
 | 
				 | 
| 
 | 
				 | 
| 
				 | 
				 | 
| 
 | 
				 | 
| 
 
 
 
 
 | 
				 | 
| 
				 | 
				 | 