NSPS for Petroleum Dry Cleaners (40 CFR Part 60, Subpart JJJ) (Renewal)

ICR 201902-2060-004

OMB: 2060-0079

Federal Form Document

Forms and Documents
Document
Name
Status
Supplementary Document
2019-02-06
Supporting Statement A
2019-02-06
IC Document Collections
ICR Details
2060-0079 201902-2060-004
Active 201509-2060-004
EPA/OAR 0997.12
NSPS for Petroleum Dry Cleaners (40 CFR Part 60, Subpart JJJ) (Renewal)
Extension without change of a currently approved collection   No
Regular
Approved without change 04/08/2019
Retrieve Notice of Action (NOA) 03/04/2019
In accordance with 5 CFR 1320, the information collection is approved for three years.
  Inventory as of this Action Requested Previously Approved
04/30/2022 36 Months From Approved 04/30/2019
84 0 84
1,850 0 1,850
0 0 0

The New Source Performance Standards (NSPS) for Petroleum Dry Cleaners (40 CFR Part 60, Subpart JJJ) apply to the following existing and new facilities located at a petroleum dry cleaning plant with a total manufacturers rated dryer capacity equal to or greater than 38 kilograms (84 pounds): petroleum solvent dry cleaning dryers, washers, filters, stills, and settling tanks. In general, NSPS standards require initial notification reports, performance tests, and periodic reports by the owners/operators of the affected facilities. They are also required to maintain records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility, or any period during which the monitoring system is inoperative. These notifications, reports, and records are generally considered essential in determining compliance, and are required of all affected facilities subject to NSPS. For this source category, only recordkeeping and initial notifications and reports are considered essential in determining compliance with 40 CFR Part 60, Subpart JJJ.

US Code: 42 USC 7401 et.seq. Name of Law: Clean Air Act
  
None

Not associated with rulemaking

  82 FR 29552 06/29/2017
84 FR 7365 03/04/2019
No

1
IC Title Form No. Form Name
NSPS for Petroleum Dry Cleaners (40 CFR Part 60, Subpart JJJ) (Renewal)

  Total Approved Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 84 84 0 0 0 0
Annual Time Burden (Hours) 1,850 1,850 0 0 0 0
Annual Cost Burden (Dollars) 0 0 0 0 0 0
No
No

$33,600
No
    No
    No
No
No
No
Uncollected
Patrick Yellin 202 564-2970 [email protected]

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
03/04/2019


© 2024 OMB.report | Privacy Policy