NESHAP for Benzene Waste Operations (40 CFR part 61, subpart FF) (Renewal)

ICR 201902-2060-012

OMB: 2060-0183

Federal Form Document

Forms and Documents
Document
Name
Status
Supplementary Document
2019-02-11
Supporting Statement A
2019-02-11
IC Document Collections
ICR Details
2060-0183 201902-2060-012
Active 201509-2060-005
EPA/OAR 1541.12
NESHAP for Benzene Waste Operations (40 CFR part 61, subpart FF) (Renewal)
Extension without change of a currently approved collection   No
Regular
Approved without change 03/13/2019
Retrieve Notice of Action (NOA) 02/11/2019
In accordance with 5 CFR 1320, the information collection is approved for three years.
  Inventory as of this Action Requested Previously Approved
03/31/2022 36 Months From Approved 03/31/2019
978 0 978
19,500 0 19,200
0 0 0

The National Emission Standards for Hazardous Air Pollutants (NESHAP) for Benzene Waste Operations (40 CFR Part 61, Subpart FF) apply to existing facilities and new facilities that generate waste containing benzene, such as chemical manufacturing plants, coke by product recovery plants, petroleum refineries, and those owners and operators of hazardous waste treatment, storage, and disposal facilities (TSDF) that receive wastes from the above facilities. In general, all NESHAP standards require initial notifications, performance tests, and periodic reports by the owners/operators of the affected facilities. They are also required to maintain records of the occurrence and duration of any startup, shutdown, or malfunction in the operation of an affected facility, or any period during which the monitoring system is inoperative. These notifications, reports, and records are essential in determining compliance with 40 CFR Part 61, Subpart FF.

US Code: 44 USC 3501 et.seq. Name of Law: Clean Air Act
  
None

Not associated with rulemaking

  82 FR 29552 06/29/2017
84 FR 3158 02/11/2019
No

1
IC Title Form No. Form Name
NESHAP for Benzene Waste Operations (40 CFR part 61, subpart FF) (Renewal)

  Total Approved Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 978 978 0 0 0 0
Annual Time Burden (Hours) 19,500 19,200 0 300 0 0
Annual Cost Burden (Dollars) 0 0 0 0 0 0
Yes
Miscellaneous Actions
No
There is an adjustment increase in the total estimated burden as currently identified in the OMB Inventory of Approved Burdens. This increase is not due to any program changes, but reflects the addition of burden hours to account for the time spent by existing facilities to re-familiarize themselves annually with the rule requirements.

$72,800
No
    No
    No
No
No
No
Uncollected
Patrick Yellin 202 564-2970 [email protected]

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
02/11/2019


© 2024 OMB.report | Privacy Policy