Labor Rates | ||||
Professional/Technical Level | Labor Rate ($/hr) | Overhead Multiplier | Loaded Labor Rate ($/hr) | Comment |
Junior Technician (TEC1) | $14.94 | 1.90 | $28.38 | |
Senior Technician (TEC2) | $22.29 | 1.83 | $40.86 | |
Junior Professional (PRO1) | $25.19 | 1.75 | $44.12 | |
Mid-level Professional (PRO2) | $30.02 | 1.64 | $49.26 | |
Staff Professional (PRO3) | $35.43 | 1.57 | $55.47 | |
Senior Professional (PRO4) | $40.89 | 1.43 | $58.59 | |
Contractor | $25.00 | 1.00 | $25.00 | |
Labor rates based on year | 2019 |
Inflation Adjustment for | 1997 | 1998 | 1999 | 2000 | 2001 | 2002 | 2003 | 2004 | 2005 | 2006 | 2007 | 2008 | 2009 | 2010 | 2011 | 2012 | 2013 | 2014 | 2015 | 2016 | 2017 | 2018 | 2019 | 2020 | 2021 | Comment |
Year 1 | 1.158 | 1.045 | 1.032 | 1.053 | 1.074 | 1.086 | 1.108 | 1.130 | 1.153 | 1.176 | 1.199 | 1.223 | 1.248 | 1.273 | 1.298 | 1.324 | 1.351 | 1.378 | 1.405 | |||||||
Year 2 | 1.1803 | 1.065 | 1.052 | 1.073 | 1.094 | 1.116 | 1.138 | 1.161 | 1.184 | 1.208 | 1.232 | 1.257 | 1.282 | 1.308 | 1.334 | 1.360 | 1.388 | 1.415 | 1.444 | |||||||
Year 3 | 1.2042 | 1.086 | 1.073 | 1.094 | 1.116 | 1.139 | 1.161 | 1.185 | 1.208 | 1.223 | 1.247 | 1.272 | 1.297 | 1.323 | 1.350 | 1.377 | 1.404 | 1.432 | 1.461 | |||||||
Year 1 = 2013 |
Monitoring | ||||||||||||||||||||||||||||||||||||||||||||||||
Equipment | ||||||||||||||||||||||||||||||||||||||||||||||||
Costs | Routine Visits | Maintenance | Special Items | |||||||||||||||||||||||||||||||||||||||||||||
Pollutant | Analyzer | Year | Supplies | Year | SpareParts/ Supplies |
Year | Filters | Year | Item 1 | Cost | Year | Item 2 | Cost | Year | Item 3 | Cost | Year | Item 4 | Cost | Year | Year | Item 5 | Cost | Year | Item 6 | Cost | Year | Item 7 | Cost | Year | Item 8 | Cost | Year | Item 9 | Cost | Year | Item 10 | Cost | Year | Item 11 | Cost | Year | Item 12 | Cost | Year | Item 13 | Cost | Year |
CO | $10,000 | 2019 | $800 | 2019 | $1,000 | 2019 | ||||||||||||||||||||||||||||||||||||||||||
Generic Network | Multigas calibrator | $14,000 | 2019 | Zero air supply | $5,980 | 2019 | Ambient air intake manifold assembly | $1,500 | 2019 | Shelter (large, temp controlled) | $30,000 | 2019 | 2019 | Shelter delivery charges | $1,500 | 2019 | Other shelter equipment/accessories | $5,000 | 2019 | Site preparation | $4,500 | 2019 | Power drop | $800 | 2019 | Land/Lease | $4,000 | 2019 | Rent | $284 | 2019 | Miscellaneous equipment | $2,500 | 2019 | Utilities | $1,500 | 2019 | Vehicle | $75,000 | 2019 | ||||||||
NATTS | Analysis (grant to RO) | $129,385 | 2019 | |||||||||||||||||||||||||||||||||||||||||||||
NO2 | $11,700 | 2019 | $800 | 2019 | $1,000 | 2019 | ||||||||||||||||||||||||||||||||||||||||||
O3 | $11,000 | 2019 | $800 | 2019 | $1,000 | 2019 | ||||||||||||||||||||||||||||||||||||||||||
PAMSVOC | $100,000 | 2019 | $16,000 | 2019 | $3,000 | 2019 | Gas cleaning system | 5667 | 2019 | |||||||||||||||||||||||||||||||||||||||
PAMSNMOC | $11,426 | 2019 | $800 | 2019 | $1,000 | 2019 | ||||||||||||||||||||||||||||||||||||||||||
PAMSNOx | $20,500 | 2019 | $800 | 2019 | $1,000 | 2019 | ||||||||||||||||||||||||||||||||||||||||||
PAMSSurfMet | $17,285 | 2019 | $750 | 2019 | $2,000 | 2019 | ||||||||||||||||||||||||||||||||||||||||||
PAMSUpperAir | 2019 | $1,000 | 2019 | $2,000 | 2019 | Cielometer | $26,500 | 2019 | Radar profiler | $125,000 | 2019 | Rawindsondes | $45,000 | 2019 | SODAR | $65,000 | 2019 | 2019 | Computer hardware & software | $8,000 | 2019 | |||||||||||||||||||||||||||
PAMSCarbD | $16,000 | 2019 | $250 | 2019 | $3,400 | 2019 | Carbonyl sample cartridges | $2,900 | 2019 | HPLC/UV with autosampler | $59,000 | 2019 | Equipment (auxiliary) | $1,000 | 2019 | Supplies/reagents | $1,200 | 2019 | 2019 | Calibration Stds | $1,500 | 2019 | ||||||||||||||||||||||||||
PAMSCarbE | $16,000 | 2019 | $750 | 2019 | $10,200 | 2019 | Carbonyl sample cartridges | $8,500 | 2019 | HPLC/UV with autosampler | $59,000 | 2019 | Equipment (auxiliary) | $1,000 | 2019 | Supplies/reagents | $2,400 | 2019 | 2019 | Calibration Stds | $4,500 | 2019 | ||||||||||||||||||||||||||
PAMSHalfD | $16,000 | 2019 | $125 | 2019 | $1,700 | 2019 | Carbonyl sample cartridges | $1,450 | 2019 | HPLC/UV with autosampler | $59,000 | 2019 | Equipment (auxiliary) | $1,000 | 2019 | Supplies/reagents | $600 | 2019 | 2019 | Calibration Stds | $1,500 | 2019 | ||||||||||||||||||||||||||
Pb | $4,000 | 2019 | $150 | 2019 | $300 | 2019 | $150 | 2019 | Audit Cal Kit | $125 | 2019 | Lab Services | $1,610 | 2019 | ||||||||||||||||||||||||||||||||||
PM10 | $5,500 | 2019 | $950 | 2019 | 2019 | Continuous Sampler | $17,600 | 2019 | Sampling Platform | $2,000 | 2019 | Filters | $1,033 | 2019 | Filter Tape | $500 | 2019 | 2019 | Audit/Calibration Kits (Filter Based) | $125 | 2019 | Audit/Calibration Kits (Continuous) | $360 | 2019 | Spare Parts - Continuous | $555 | 2019 | |||||||||||||||||||||
PM25 | $7,000 | 2019 | $950 | 2019 | $400 | 2019 | Sequential Sampler | $11,000 | 2019 | Continuous Sampler | $18,300 | 2019 | Speciation Sampler | $12,000 | 2019 | Data acquisition (laptop/PDA) | $400 | 2019 | 2019 | Speciation sampling national contract | $3,455,984 | 2019 | Microbalance | $3,000 | 2019 | Clean Room for Weighing | $75,000 | 2019 | Filter-based calibration kit | $120 | 2019 | Continuous calibration kit | $75 | 2019 | ||||||||||||||
SO2 | $10,000 | 2019 | $800 | 2019 | $1,000 | 2019 |
Data Entry for | SO2 | Updated on | November 8, 2018 | Year 1 | 2019 | Year 2 | 2020 | Year 3 | 2021 | Average Yearly Costs | Equipment | |||||||||
Spare Factor | Report Org | 113 | ||||||||||||||||||
5.00% | Report Org | Sites | 506 | Report Org | Sites | 506 | Report Org | Sites | 506 | Sites | 506 | |||||||||
Overall Comment | 113 | Spares | 25 | 113 | Spares | 25 | 113 | Spares | 25 | Spares | 25 | |||||||||
General Costs | Labor | Non Labor O & M |
||||||||||||||||||
Element 1 - Network Design | Years Amoritized | 7 | Comment | Element 1 - Network Design | Element 1 - Network Design | Element 1 - Network Design | ||||||||||||||
a) Network Design (by Reporting Organization) | Per RO | Per RO | Entire Network | Per RO | Entire Network | Per RO | Entire Network | |||||||||||||
Labor Category | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Total | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | ||||
Hours per RO | 0 | 0 | 0 | 10 | 10 | 10 | 30 | NA | 3390 | 484 | NA | 3,390 | 484 | NA | 3,390 | 484 | 484 | NA | NA | |
Costs per RO | 0 | 0 | 0 | 493 | 555 | 586 | $1,634 | $2,207 | $249,415 | $35,631 | $2,267 | $256,227 | $36,604 | $2,295 | $259,297 | $37,042 | $36,426 | NA | NA | |
b) Site Selection (Reporting Organization) | ||||||||||||||||||||
Hours per RO | 0 | 0 | 0 | 4 | 4 | 0 | 8 | NA | 904 | 129 | NA | 904 | 129 | NA | 904 | 129 | 129 | NA | NA | |
Costs per RO | 0 | 0 | 0 | 197 | 222 | 0 | $419 | $566 | $63,956 | $9,137 | $581 | $65,703 | $9,386 | $588 | $66,491 | $9,499 | $9,340 | NA | NA | |
Sub Total - Hours | 0 | 0 | 0 | 14 | 14 | 10 | 38 | NA | 4,294 | 613 | NA | 4294 | 613 | NA | 4,294 | 613 | 613 | NA | NA | |
Sub Total - Costs | $0 | $0 | $0 | $690 | $777 | $586 | $2,053 | $2,773 | $313,371 | $44,767 | $2,849 | $321,930 | $45,990 | $2,883 | $325,788 | $46,541 | $45,766 | NA | NA | |
Element 2 - Site Installation | Years Amoritized | 7 | Comment | Element 2 - Site Installation | Element 2 - Site Installation | Element 2 - Site Installation | ||||||||||||||
Unit cost | Year | Per Site | Entire Network | Per Site | Entire Network | Per Site | Entire Network | |||||||||||||
Materials | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | |||||||||||
Analyzers | $10,000 | 2019 | $13,508 | $6,835,057 | $976,437 | $13,877 | $7,021,741 | $1,003,106 | $14,043 | $7,105,882 | $1,015,126 | NA | NA | $998,223 | ||||||
Spare Analyzers | $341,753 | $48,822 | $351,087 | $50,155 | $355,294 | $50,756 | NA | NA | $49,911 | |||||||||||
Labor | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Per Site Total | |||||||||||||
Procurement Hours per site | 0 | 0 | 0 | 4 | 0 | 0 | 4 | NA | 2,125 | 304 | NA | 2,125 | 304 | NA | 2,125 | 304 | 304 | NA | NA | |
Cost per site | 0 | 0 | 0 | 197 | 0 | 0 | $197 | $266 | $141,383 | $20,198 | $273 | $138,328 | $19,761 | $277 | $139,986 | $19,998 | $19,986 | NA | NA | |
Installation Hours per site | 0 | 8 | 8 | 0 | 0 | 0 | 16 | NA | 8096 | 1157 | NA | 8,096 | 1157 | NA | 8,096 | 1157 | 1,157 | NA | NA | |
Cost per site | 0 | 327 | 353 | 0 | 0 | 0 | $680 | $919 | $464,784 | $66,398 | $944 | $477,478 | $68,211 | $955 | $483,200 | $69,029 | $67,879 | NA | NA | |
Sub Total - Hours | 0 | 8 | 8 | 4 | 0 | 0 | 20 | NA | 10,221 | 1,460 | NA | 10,221 | 1,460 | NA | 10,221 | 1,460 | 1,460 | NA | NA | |
Sub Total - Costs | $0 | $327 | $353 | $197 | $0 | $0 | $877 | $1,185 | $1,111,854 | $1,217 | $1,141,234 | $1,232 | $1,154,909 | $87,865 | NA | $1,048,134 | ||||
Element 3 - Supplies and Site Visits | Comment | Element 3 - Supplies and Site Visits | Element 3 - Supplies and Site Visits | Element 3 - Supplies and Site Visits | ||||||||||||||||
Per Site | Entire Network | Per Site | Entire Network | Per Site | Entire Network | |||||||||||||||
Supplies | Unit cost | Year | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | |||||||||
$800 | 2019 | $1,081 | $546,805 | $546,805 | $1,110 | $561,739 | $561,739 | $1,123 | $568,471 | $568,471 | NA | $559,005 | NA | |||||||
Routine visits | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Per Site Total | |||||||||||||
Hours per site | 0 | 60 | 60 | 0 | 0 | 0 | 120 | NA | 60,720 | 60,720 | NA | 60,720 | 60,720 | NA | 60,720 | 60,720 | 60,720 | NA | NA | |
Cost per site | 0 | 2451 | 2647 | 0 | 0 | 0 | $5,098 | $6,886 | $3,484,512 | $3,484,512 | $7,074 | $3,579,683 | $3,579,683 | $7,159 | $3,622,579 | $3,622,579 | $3,562,258 | NA | NA | |
Sub Total - Hours | 0 | 60 | 60 | 0 | 0 | 0 | 120 | NA | 60,720 | 60,720 | NA | 60,720 | 60,720 | NA | 60,720 | 60,720 | 60,720 | NA | NA | |
Sub Total - Costs | $0 | $60 | $60 | $0 | $0 | $0 | $5,898 | $7,967 | $4,031,317 | $4,031,317 | $8,185 | $4,141,423 | $4,141,423 | $8,283 | $4,191,049 | $4,191,049 | $4,121,263 | $559,005 | NA | |
Element 4 - Maintenance | Comment | Element 4 - Maintenance | Element 4 - Maintenance | Element 4 - Maintenance | ||||||||||||||||
Per Site | Entire Network | Per Site | Entire Network | Per Site | Entire Network | |||||||||||||||
Spare parts/supplies | Unit cost | Year | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | |||||||||
$1,000 | 2019 | $1,351 | $683,506 | $683,506 | $1,388 | $702,174 | $702,174 | $1,404 | $710,588 | $710,588 | NA | $698,756 | NA | |||||||
Remedial Repairs | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Per Site Total | |||||||||||||
Hours per site | 0 | 6 | 3 | 3 | 0 | 0 | 12 | NA | 6,072 | 6,072 | NA | 6,072 | 6,072 | NA | 6,072 | 6,072 | 6,072 | NA | NA | |
Cost per site | 0 | 245 | 132 | 148 | 0 | 0 | $525 | $709 | $358,841 | $358,841 | $729 | $368,641 | $368,641 | $737 | $373,059 | $373,059 | $366,847 | NA | NA | |
Routine Maint. Hours per site | 0 | 16 | 8 | 32 | 0 | 0 | 56 | NA | 28,336 | 28,336 | NA | 28,336 | 28,336 | NA | 28,336 | 28,336 | 28,336 | NA | NA | |
Cost per site | 0 | 654 | 353 | 1576 | 0 | 0 | $2,583 | $3,489 | $1,765,495 | $1,765,495 | $3,584 | $1,813,716 | $1,813,716 | $3,627 | $1,835,449 | $1,835,449 | $1,804,887 | NA | NA | |
Sub Total - Hours | 0 | 22 | 11 | 35 | 0 | 0 | 68 | NA | 34,408 | 34,408 | NA | 34,408 | 34,408 | NA | 34,408 | 34,408 | 34,408 | NA | NA | |
Sub Total - Costs | $0 | $899 | $485 | $1,724 | $0 | $0 | $4,108 | $5,549 | $2,807,842 | $2,807,842 | $5,701 | $2,884,531 | $2,884,531 | $5,769 | $2,919,096 | $2,919,096 | $2,171,734 | $698,756 | NA | |
Element 5 - Data Management | Comment | Element 5 - Data Management | Element 5 - Data Management | Element 5 - Data Management | ||||||||||||||||
Per Site | Per Site | Entire Network | Per Site | Entire Network | Per Site | Entire Network | ||||||||||||||
Data aquisition/processing | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Total | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | ||||
Hours per site | 0 | 6 | 3 | 3 | 2 | 0 | 14 | NA | 7,084 | 7,084 | NA | 7,084 | 7,084 | NA | 7,084 | 7,084 | 7,084 | NA | NA | |
Cost per site | 0 | 245 | 132 | 148 | 111 | 0 | $636 | $859 | $434,710 | $434,710 | $883 | $446,583 | $446,583 | $893 | $451,934 | $451,934 | $444,409 | NA | NA | |
Data reporting Hours per site | 0 | 1 | 2 | 4 | 2 | 0 | 9 | NA | 4,554 | 4,554 | NA | 4,554 | 4,554 | NA | 4,554 | 4,554 | 4,554 | NA | NA | |
Cost per site | 0 | 41 | 88 | 197 | 111 | 0 | $437 | $590 | $298,692 | $298,692 | $606 | $306,850 | $306,850 | $614 | $310,527 | $310,527 | $305,356 | NA | NA | |
Data validation Hours per site | 0 | 0 | 4 | 8 | 0 | 0 | 12 | NA | 6,072 | 6,072 | NA | 6,072 | 6,072 | NA | 6,072 | 6,072 | 6,072 | NA | NA | |
Cost per site | 0 | 0 | 176 | 394 | 0 | 0 | $570 | $770 | $389,598 | $389,598 | $791 | $400,239 | $400,239 | $800 | $405,035 | $405,035 | $398,291 | NA | NA | |
Data distribution Hours per site | 0 | 1 | 1 | 2 | 0 | 0 | 4 | NA | 2,024 | 2,024 | NA | 2,024 | 2,024 | NA | 2,024 | 2,024 | 2,024 | NA | NA | |
Cost per site | 0 | 41 | 44 | 99 | 0 | 0 | $184 | $249 | $125,765 | $125,765 | $255 | $129,200 | $129,200 | $258 | $130,748 | $130,748 | $128,571 | NA | NA | |
Sub Total - Hours | 0 | 8 | 10 | 17 | 4 | 0 | 39 | NA | 19,734 | 19,734 | NA | 19,734 | 19,734 | NA | 19,734 | 19,734 | 19,734 | NA | NA | |
Sub Total - Costs | $0 | $327 | $440 | $838 | $222 | $0 | $1,827 | $2,468 | $1,248,765 | $1,248,765 | $2,535 | $1,282,872 | $1,282,872 | $2,566 | $1,298,245 | $1,298,245 | $1,276,627 | NA | NA | |
Element 6 - Quality Assurance | Comment | Element 6 - Quality Assurance | Element 6 - Quality Assurance | Element 6 - Quality Assurance | Labor | Non Labor O & M |
Equipment | |||||||||||||
Per Site | Per Site | Entire Network | Per Site | Entire Network | Per Site | Entire Network | ||||||||||||||
TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Total | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | |||||
Audits Hours per site | 0 | 0 | 0 | 20 | 16 | 0 | 36 | NA | 18,216 | 18,216 | NA | 18,216 | 18,216 | NA | 18,216 | 18,216 | 18,216 | NA | NA | |
Cost per site | 0 | 0 | 0 | 985 | 887 | 0 | $1,872 | $2,529 | $1,279,523 | $1,279,523 | $2,598 | $1,314,470 | $1,314,470 | $2,629 | $1,330,221 | $1,330,221 | $1,308,071 | NA | NA | |
Routine Calibrations Hours per site | 0 | 26 | 0 | 0 | 0 | 0 | 26 | NA | 13,156 | 13,156 | NA | 13,156 | 13,156 | NA | 13,156 | 13,156 | 13,156 | NA | NA | |
Cost per site | 0 | 1062 | 0 | 0 | 0 | 0 | $1,062 | $1,435 | $725,883 | $725,883 | $1,474 | $745,709 | $745,709 | $1,491 | $754,645 | $754,645 | $742,079 | NA | NA | |
Coordination/implementation | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Total | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | |||||||
Hours per site | 0 | 0 | 0 | 2 | 2 | 0 | 4 | NA | 2,024 | 2,024 | NA | 2,024 | 2,024 | NA | 2,024 | 2,024 | 2,024 | NA | NA | |
Cost per site | 0 | 0 | 0 | 99 | 111 | 0 | $210 | $284 | $143,536 | $143,536 | $291 | $147,457 | $147,457 | $295 | $149,224 | $149,224 | $146,739 | NA | NA | |
Training Hours per site | 0 | 1 | 1 | 2 | 1 | 0 | 5 | NA | 2,530 | 2,530 | NA | 2,530 | 2,530 | NA | 2,530 | 2,530 | 2,530 | NA | NA | |
Cost per site | 0 | 41 | 44 | 99 | 55 | 0 | $239 | $323 | $163,358 | $163,358 | $332 | $167,820 | $167,820 | $336 | $169,831 | $169,831 | $167,003 | NA | NA | |
Reporting Hours per site | 0 | 0 | 0 | 3 | 3 | 0 | 6 | NA | 3,036 | 3,036 | NA | 3,036 | 3,036 | NA | 3,036 | 3,036 | 3,036 | NA | NA | |
Cost per site | 0 | 0 | 0 | 148 | 166 | 0 | $314 | $424 | $214,621 | $214,621 | $436 | $220,483 | $220,483 | $441 | $223,125 | $223,125 | $219,409 | NA | NA | |
QA Plan review (annual) | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Labor per RO | Adjusted per RO | Total | Yearly Cost | Adjusted per RO | Total | Yearly Cost | |||||||
Hours per RO | 0 | 0 | 0.2 | 0.3 | 0 | 0 | 0.5 | NA | 57 | 57 | NA | 57 | 57 | NA | 57 | 57 | 57 | NA | NA | |
Cost | 0 | 0 | 9 | 15 | 0 | 0 | $24 | $32 | $3,663 | $3,663 | $33 | $3,763 | $3,763 | $34 | $3,809 | $3,809 | $3,745 | NA | NA | |
QA Plan preparation | Years Amoritized | 5 | Per RO | Per RO | Entire Network | Per RO | Entire Network | |||||||||||||
Hours per RO | 0 | 0 | 0 | 5 | 5 | 5 | 15 | NA | 1695 | 339 | NA | 1695 | 339 | NA | 1695 | 339 | 339 | NA | NA | |
Cost per RO | 0 | 0 | 0 | 246 | 277 | 293 | $816 | $1,102 | $124,555 | $24,911 | $1,132 | $127,957 | $25,591 | $1,146 | $129,490 | $25,898 | $25,467 | NA | NA | |
Sub Total - Hours | 0 | 27 | 1 | 32 | 27 | 5 | 93 | NA | NA | 39,358 | NA | NA | 39,358 | NA | NA | 39,358 | 39,358 | |||
Sub Total - Costs | $0 | $1,103 | $53 | $1,592 | $1,496 | $293 | $4,537 | $6,129 | NA | $2,555,495 | $6,296 | NA | $2,625,292 | $6,371 | NA | $2,656,751 | $2,612,513 | |||
Element 7 - Supervision | Comment | Element 7 - Supervision | Element 7 - Supervision | Element 7 - Supervision | ||||||||||||||||
Per Site | Per Site | Entire Network | Per Site | Entire Network | Per Site | Entire Network | ||||||||||||||
Planning/coordination | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Total | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | ||||
Hours per site | 0 | 0 | 0 | 0 | 8 | 4 | 12 | NA | 6,072 | 6,072 | NA | 6,072 | 6072 | NA | 6,072 | 6,072 | 6,072 | NA | NA | |
Cost per site | 0 | 0 | 0 | 0 | 444 | 234 | $678 | $916 | $463,417 | $463,417 | $941 | $476,074 | $476,074 | $952 | $481,779 | $481,779 | $473,757 | NA | NA | |
Supervision/review Hours per site | 0 | 0 | 16 | 8 | 4 | 2 | 30 | NA | 15,180 | 15,180 | NA | 15,180 | 15,180 | NA | 15,180 | 15,180 | 15,180 | NA | NA | |
Cost per site | 0 | 0 | 706 | 394 | 222 | 117 | $1,439 | $1,944 | $983,565 | $983,565 | $1,997 | $1,010,429 | $1,010,429 | $2,021 | $1,022,536 | $1,022,536 | $1,005,510 | NA | NA | |
Sub Total - Hours | 0 | 0 | 16 | 8 | 12 | 6 | 42 | NA | 21252 | 21252 | NA | 21252 | 21252 | NA | 21252 | 21,252 | 21,252 | NA | NA | |
Sub Total - Costs | $0 | $0 | $706 | $394 | $666 | $351 | $2,117 | $2,860 | $1,446,982 | $1,446,982 | $2,938 | $1,486,503 | $1,486,503 | $2,973 | $1,504,315 | $1,504,315 | $1,479,266 | NA | NA | |
Summary by Element | SO2 | Year 1 | 2019 | Year 2 | 2020 | Year 3 | 2021 | |||||||||||||
TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Total | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | |||||
1 - Network Design Hours | 0 | 0 | 0 | 14 | 14 | 10 | 38 | NA | 4,294 | 613 | NA | 4,294 | 613 | NA | 4,294 | 613 | 613 | |||
Costs | $0 | $0 | $0 | $690 | $777 | $586 | $2,053 | $2,773 | $313,371 | $44,767 | $2,849 | $321,930 | $45,990 | $2,883 | $325,788 | $46,541 | $45,766 | NA | NA | |
2 - Site Installation Hours | 0 | 8 | 8 | 4 | 0 | 0 | 20 | NA | 10,221 | 1,460 | NA | 10,221 | 1,460 | NA | 10,221 | 1,460 | 1,460 | |||
Costs | $0 | $327 | $353 | $197 | $0 | $0 | $877 | $1,185 | $0 | $1,111,854 | $1,217 | $0 | $1,141,234 | $1,232 | $0 | $1,154,909 | $87,865 | NA | $1,048,134 | |
3 - Supplies & site visits Hours | 0 | 60 | 60 | 0 | 0 | 0 | 120 | NA | 60720 | 60720 | NA | 60720 | 60720 | NA | 60720 | 60720 | 60720 | NA | NA | |
Costs | $0 | $60 | $60 | $0 | $0 | $0 | $5,898 | $7,967 | $4,031,317 | $4,031,317 | $8,185 | $4,141,423 | $4,141,423 | $8,283 | $4,191,049 | $4,191,049 | $4,121,263 | $559,005 | NA | |
4 - Maintenance Hours | 0 | 22 | 11 | 35 | 0 | 0 | 68 | NA | 34408 | 34408 | NA | 34408 | 34408 | NA | 34408 | 34408 | 34408 | |||
Costs | $0 | $899 | $485 | $1,724 | $0 | $0 | $4,108 | $5,549 | $2,807,842 | $2,807,842 | $5,701 | $2,884,531 | $2,884,531 | $5,769 | $2,919,096 | $2,919,096 | $2,171,734 | $698,756 | NA | |
5 - Data Managment Hours | 0 | 8 | 10 | 17 | 4 | 0 | 39 | NA | 19734 | 19734 | NA | 19734 | 19734 | NA | 19734 | 19734 | 19734 | NA | NA | |
Costs | $0 | $327 | $440 | $838 | $222 | $0 | $1,827 | $2,468 | $1,248,765 | $1,248,765 | $2,535 | $1,282,872 | $1,282,872 | $2,566 | $1,298,245 | $1,298,245 | $1,276,627 | NA | NA | |
6 - Quality Assurance Hours | 0 | 27 | 1 | 32 | 27 | 5 | 93 | NA | NA | 39358 | NA | NA | 39358 | NA | NA | 39358 | 39358 | NA | NA | |
Costs | $0 | $1,103 | $53 | $1,592 | $1,496 | $293 | $4,537 | $6,129 | NA | $2,555,495 | $6,296 | NA | $2,625,292 | $6,371 | NA | $2,656,751 | $2,612,513 | $0 | NA | |
7 - Supervision Hours | 0 | 0 | 16 | 8 | 12 | 6 | 42 | NA | 21252 | 21252 | NA | 21252 | 21252 | NA | 21252 | 21252 | 21252 | NA | NA | |
Costs | $0 | $0 | $706 | $394 | $666 | $351 | $2,117 | $2,860 | $1,446,982 | $1,446,982 | $2,938 | $1,486,503 | $1,486,503 | $2,973 | $1,504,315 | $1,504,315 | $1,479,266 | NA | NA | |
Total | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Total | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | ||||
Hours | 0 | 125 | 106 | 110 | 57 | 21 | 420 | NA | 150,629 | 177,545 | NA | 150,629 | 177,545 | NA | 150,629 | 177,545 | 177,545 | NA | ||
Costs | $0 | $2,716 | $2,097 | $5,435 | $3,161 | $1,230 | $21,417 | $28,930 | 9,848,276 | $13,247,021 | $29,720 | 10,117,259 | $13,607,844 | $30,076 | 10,238,493 | $13,770,907 | $11,795,034 | $1,257,761 | $1,048,134 |
Data Entry for | CO | Updated on | August 19, 2018 | Year 1 | 2019 | Year 2 | 2020 | Year 3 | 2021 | Average Yearly Costs | Equipment | |||||||||
Spare Factor | Report Org | 92 | ||||||||||||||||||
5.00% | Report Org | Sites | 304 | Report Org | Sites | 304 | Report Org | Sites | 304 | Sites | 304 | |||||||||
Overall Comment | 92 | Spares | 15 | 92 | Spares | 15 | 92 | Spares | 15 | Spares | 15 | |||||||||
General Costs | Labor | Non Labor O & M |
||||||||||||||||||
Element 1 - Network Design | Years Amoritized | 7 | Comment | Element 1 - Network Design | Element 1 - Network Design | Element 1 - Network Design | ||||||||||||||
a) Network Design (by Reporting Organization) | Per RO | Per RO | Entire Network | Per RO | Entire Network | Per RO | Entire Network | |||||||||||||
Labor Category | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Total | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | ||||
Hours per RO | 0 | 0 | 0 | 10 | 10 | 10 | 30 | NA | 2760 | 394 | NA | 2,760 | 394 | NA | 2,760 | 394 | 394 | NA | NA | |
Costs per RO | 0 | 0 | 0 | 493 | 555 | 586 | $1,634 | $2,207 | $203,063 | $29,009 | $2,267 | $208,610 | $29,801 | $2,295 | $211,109 | $30,158 | $29,656 | NA | NA | |
b) Site Selection (Reporting Organization) | ||||||||||||||||||||
Hours per RO | 0 | 0 | 0 | 4 | 4 | 0 | 8 | NA | 736 | 105 | NA | 736 | 105 | NA | 736 | 105 | 105 | NA | NA | |
Costs per RO | 0 | 0 | 0 | 197 | 222 | 0 | $419 | $566 | $52,071 | $7,439 | $581 | $53,493 | $7,642 | $588 | $54,134 | $7,733 | $7,605 | NA | NA | |
Sub Total - Hours | 0 | 0 | 0 | 14 | 14 | 10 | 38 | NA | 3,496 | 499 | NA | 3496 | 499 | NA | 3,496 | 499 | 499 | NA | NA | |
Sub Total - Costs | $0 | $0 | $0 | $690 | $777 | $586 | $2,053 | $2,773 | $255,134 | $36,448 | $2,849 | $262,102 | $37,443 | $2,883 | $265,243 | $37,892 | $37,261 | NA | NA | |
Element 2 - Site Installation | Years Amoritized | 7 | Comment | Element 2 - Site Installation | Element 2 - Site Installation | Element 2 - Site Installation | ||||||||||||||
Unit cost | Year | Per Site | Entire Network | Per Site | Entire Network | Per Site | Entire Network | |||||||||||||
Materials | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | |||||||||||
Analyzers | $10,000 | 2019 | $13,508 | $4,106,438 | $586,634 | $13,877 | $4,218,595 | $602,656 | $14,043 | $4,269,147 | $609,878 | NA | NA | $599,723 | ||||||
Spare Analyzers | $205,322 | $29,332 | $210,930 | $30,133 | $213,457 | $30,494 | NA | NA | $29,986 | |||||||||||
Labor | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Per Site Total | |||||||||||||
Procurement Hours per site | 0 | 0 | 0 | 4 | 0 | 0 | 4 | NA | 1,277 | 182 | NA | 1,277 | 182 | NA | 1,277 | 182 | 182 | NA | NA | |
Cost per site | 0 | 0 | 0 | 197 | 0 | 0 | $197 | $266 | $84,942 | $12,135 | $273 | $83,106 | $11,872 | $277 | $84,102 | $12,015 | $12,007 | NA | NA | |
Installation Hours per site | 0 | 8 | 8 | 0 | 0 | 0 | 16 | NA | 4864 | 695 | NA | 4,864 | 695 | NA | 4,864 | 695 | 695 | NA | NA | |
Cost per site | 0 | 327 | 353 | 0 | 0 | 0 | $680 | $919 | $279,238 | $39,891 | $944 | $286,864 | $40,981 | $955 | $290,302 | $41,472 | $40,781 | NA | NA | |
Sub Total - Hours | 0 | 8 | 8 | 4 | 0 | 0 | 20 | NA | 6,141 | 877 | NA | 6,141 | 877 | NA | 6,141 | 877 | 877 | NA | NA | |
Sub Total - Costs | $0 | $327 | $353 | $197 | $0 | $0 | $877 | $1,185 | $667,991 | $1,217 | $685,642 | $1,232 | $693,858 | $52,788 | NA | $629,709 | ||||
Element 3 - Supplies and Site Visits | Comment | Element 3 - Supplies and Site Visits | Element 3 - Supplies and Site Visits | Element 3 - Supplies and Site Visits | ||||||||||||||||
Per Site | Entire Network | Per Site | Entire Network | Per Site | Entire Network | |||||||||||||||
Supplies | Unit cost | Year | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | |||||||||
$800 | 2019 | $1,081 | $328,515 | $328,515 | $1,110 | $337,488 | $337,488 | $1,123 | $341,532 | $341,532 | NA | $335,845 | NA | |||||||
Routine visits | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Per Site Total | |||||||||||||
Hours per site | 0 | 60 | 60 | 0 | 0 | 0 | 120 | NA | 36,480 | 36,480 | NA | 36,480 | 36,480 | NA | 36,480 | 36,480 | 36,480 | NA | NA | |
Cost per site | 0 | 2451 | 2647 | 0 | 0 | 0 | $5,098 | $6,886 | $2,093,462 | $2,093,462 | $7,074 | $2,150,640 | $2,150,640 | $7,159 | $2,176,411 | $2,176,411 | $2,140,171 | NA | NA | |
Sub Total - Hours | 0 | 60 | 60 | 0 | 0 | 0 | 120 | NA | 36,480 | 36,480 | NA | 36,480 | 36,480 | NA | 36,480 | 36,480 | 36,480 | NA | NA | |
Sub Total - Costs | $0 | $60 | $60 | $0 | $0 | $0 | $5,898 | $7,967 | $2,421,977 | $2,421,977 | $8,185 | $2,488,127 | $2,488,127 | $8,283 | $2,517,943 | $2,517,943 | $2,476,016 | $335,845 | NA | |
Element 4 - Maintenance | Comment | Element 4 - Maintenance | Element 4 - Maintenance | Element 4 - Maintenance | ||||||||||||||||
Per Site | Entire Network | Per Site | Entire Network | Per Site | Entire Network | |||||||||||||||
Spare parts/supplies | Unit cost | Year | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | |||||||||
$1,000 | 2019 | $1,351 | $410,644 | $410,644 | $1,388 | $421,860 | $421,860 | $1,404 | $426,915 | $426,915 | NA | $419,806 | NA | |||||||
Remedial Repairs | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Per Site Total | |||||||||||||
Hours per site | 0 | 6 | 3 | 3 | 0 | 0 | 12 | NA | 3,648 | 3,648 | NA | 3,648 | 3,648 | NA | 3,648 | 3,648 | 3,648 | NA | NA | |
Cost per site | 0 | 245 | 132 | 148 | 0 | 0 | $525 | $709 | $215,588 | $215,588 | $729 | $221,476 | $221,476 | $737 | $224,130 | $224,130 | $220,398 | NA | NA | |
Routine Maint. Hours per site | 0 | 16 | 8 | 32 | 0 | 0 | 56 | NA | 17,024 | 17,024 | NA | 17,024 | 17,024 | NA | 17,024 | 17,024 | 17,024 | NA | NA | |
Cost per site | 0 | 654 | 353 | 1576 | 0 | 0 | $2,583 | $3,489 | $1,060,693 | $1,060,693 | $3,584 | $1,089,663 | $1,089,663 | $3,627 | $1,102,721 | $1,102,721 | $1,084,359 | NA | NA | |
Sub Total - Hours | 0 | 22 | 11 | 35 | 0 | 0 | 68 | NA | 20,672 | 20,672 | NA | 20,672 | 20,672 | NA | 20,672 | 20,672 | 20,672 | NA | NA | |
Sub Total - Costs | $0 | $899 | $485 | $1,724 | $0 | $0 | $4,108 | $5,549 | $1,686,925 | $1,686,925 | $5,701 | $1,732,999 | $1,732,999 | $5,769 | $1,753,765 | $1,753,765 | $1,304,757 | $419,806 | NA | |
Element 5 - Data Management | Comment | Element 5 - Data Management | Element 5 - Data Management | Element 5 - Data Management | ||||||||||||||||
Per Site | Per Site | Entire Network | Per Site | Entire Network | Per Site | Entire Network | ||||||||||||||
Data aquisition/processing | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Total | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | ||||
Hours per site | 0 | 6 | 3 | 3 | 2 | 0 | 14 | NA | 4,256 | 4,256 | NA | 4,256 | 4,256 | NA | 4,256 | 4,256 | 4,256 | NA | NA | |
Cost per site | 0 | 245 | 132 | 148 | 111 | 0 | $636 | $859 | $261,169 | $261,169 | $883 | $268,303 | $268,303 | $893 | $271,518 | $271,518 | $266,997 | NA | NA | |
Data reporting Hours per site | 0 | 1 | 2 | 4 | 2 | 0 | 9 | NA | 2,736 | 2,736 | NA | 2,736 | 2,736 | NA | 2,736 | 2,736 | 2,736 | NA | NA | |
Cost per site | 0 | 41 | 88 | 197 | 111 | 0 | $437 | $590 | $179,451 | $179,451 | $606 | $184,353 | $184,353 | $614 | $186,562 | $186,562 | $183,455 | NA | NA | |
Data validation Hours per site | 0 | 0 | 4 | 8 | 0 | 0 | 12 | NA | 3,648 | 3,648 | NA | 3,648 | 3,648 | NA | 3,648 | 3,648 | 3,648 | NA | NA | |
Cost per site | 0 | 0 | 176 | 394 | 0 | 0 | $570 | $770 | $234,067 | $234,067 | $791 | $240,460 | $240,460 | $800 | $243,341 | $243,341 | $239,289 | NA | NA | |
Data distribution Hours per site | 0 | 1 | 1 | 2 | 0 | 0 | 4 | NA | 1,216 | 1,216 | NA | 1,216 | 1,216 | NA | 1,216 | 1,216 | 1,216 | NA | NA | |
Cost per site | 0 | 41 | 44 | 99 | 0 | 0 | $184 | $249 | $75,558 | $75,558 | $255 | $77,622 | $77,622 | $258 | $78,552 | $78,552 | $77,244 | NA | NA | |
Sub Total - Hours | 0 | 8 | 10 | 17 | 4 | 0 | 39 | NA | 11,856 | 11,856 | NA | 11,856 | 11,856 | NA | 11,856 | 11,856 | 11,856 | NA | NA | |
Sub Total - Costs | $0 | $327 | $440 | $838 | $222 | $0 | $1,827 | $2,468 | $750,246 | $750,246 | $2,535 | $770,737 | $770,737 | $2,566 | $779,973 | $779,973 | $766,986 | NA | NA | |
Element 6 - Quality Assurance | Comment | Element 6 - Quality Assurance | Element 6 - Quality Assurance | Element 6 - Quality Assurance | Labor | Non Labor O & M |
Equipment | |||||||||||||
Per Site | Per Site | Entire Network | Per Site | Entire Network | Per Site | Entire Network | ||||||||||||||
TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Total | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | |||||
Audits Hours per site | 0 | 0 | 0 | 20 | 16 | 0 | 36 | NA | 10,944 | 10,944 | NA | 10,944 | 10,944 | NA | 10,944 | 10,944 | 10,944 | NA | NA | |
Cost per site | 0 | 0 | 0 | 985 | 887 | 0 | $1,872 | $2,529 | $768,725 | $768,725 | $2,598 | $789,721 | $789,721 | $2,629 | $799,184 | $799,184 | $785,877 | NA | NA | |
Routine Calibrations Hours per site | 0 | 26 | 0 | 0 | 0 | 0 | 26 | NA | 7,904 | 7,904 | NA | 7,904 | 7,904 | NA | 7,904 | 7,904 | 7,904 | NA | NA | |
Cost per site | 0 | 1062 | 0 | 0 | 0 | 0 | $1,062 | $1,435 | $436,104 | $436,104 | $1,474 | $448,015 | $448,015 | $1,491 | $453,383 | $453,383 | $445,834 | NA | NA | |
Coordination/implementation | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Total | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | |||||||
Hours per site | 0 | 0 | 0 | 2 | 2 | 0 | 4 | NA | 1,216 | 1,216 | NA | 1,216 | 1,216 | NA | 1,216 | 1,216 | 1,216 | NA | NA | |
Cost per site | 0 | 0 | 0 | 99 | 111 | 0 | $210 | $284 | $86,235 | $86,235 | $291 | $88,591 | $88,591 | $295 | $89,652 | $89,652 | $88,159 | NA | NA | |
Training Hours per site | 0 | 1 | 1 | 2 | 1 | 0 | 5 | NA | 1,520 | 1,520 | NA | 1,520 | 1,520 | NA | 1,520 | 1,520 | 1,520 | NA | NA | |
Cost per site | 0 | 41 | 44 | 99 | 55 | 0 | $239 | $323 | $98,144 | $98,144 | $332 | $100,824 | $100,824 | $336 | $102,033 | $102,033 | $100,334 | NA | NA | |
Reporting Hours per site | 0 | 0 | 0 | 3 | 3 | 0 | 6 | NA | 1,824 | 1,824 | NA | 1,824 | 1,824 | NA | 1,824 | 1,824 | 1,824 | NA | NA | |
Cost per site | 0 | 0 | 0 | 148 | 166 | 0 | $314 | $424 | $128,942 | $128,942 | $436 | $132,464 | $132,464 | $441 | $134,051 | $134,051 | $131,819 | NA | NA | |
QA Plan review (annual) | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Labor per RO | Adjusted per RO | Total | Yearly Cost | Adjusted per RO | Total | Yearly Cost | |||||||
Hours per RO | 0 | 0 | 0.2 | 0.3 | 0 | 0 | 0.5 | NA | 46 | 46 | NA | 46 | 46 | NA | 46 | 46 | 46 | NA | NA | |
Cost | 0 | 0 | 9 | 15 | 0 | 0 | $24 | $32 | $2,983 | $2,983 | $33 | $3,064 | $3,064 | $34 | $3,101 | $3,101 | $3,049 | NA | NA | |
QA Plan preparation | Years Amoritized | 5 | Per RO | Per RO | Entire Network | Per RO | Entire Network | |||||||||||||
Hours per RO | 0 | 0 | 0 | 5 | 5 | 5 | 15 | NA | 1380 | 276 | NA | 1380 | 276 | NA | 1380 | 276 | 276 | NA | NA | |
Cost per RO | 0 | 0 | 0 | 246 | 277 | 293 | $816 | $1,102 | $101,407 | $20,281 | $1,132 | $104,177 | $20,835 | $1,146 | $105,425 | $21,085 | $20,734 | NA | NA | |
Sub Total - Hours | 0 | 27 | 1 | 32 | 27 | 5 | 93 | NA | NA | 23,730 | NA | NA | 23,730 | NA | NA | 23,730 | 23,730 | |||
Sub Total - Costs | $0 | $1,103 | $53 | $1,592 | $1,496 | $293 | $4,537 | $6,129 | NA | $1,541,414 | $6,296 | NA | $1,583,514 | $6,371 | NA | $1,602,489 | $1,575,806 | |||
Element 7 - Supervision | Comment | Element 7 - Supervision | Element 7 - Supervision | Element 7 - Supervision | ||||||||||||||||
Per Site | Per Site | Entire Network | Per Site | Entire Network | Per Site | Entire Network | ||||||||||||||
Planning/coordination | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Total | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | ||||
Hours per site | 0 | 0 | 0 | 0 | 8 | 4 | 12 | NA | 3,648 | 3,648 | NA | 3,648 | 3648 | NA | 3,648 | 3,648 | 3,648 | NA | NA | |
Cost per site | 0 | 0 | 0 | 0 | 444 | 234 | $678 | $916 | $278,416 | $278,416 | $941 | $286,021 | $286,021 | $952 | $289,448 | $289,448 | $284,628 | NA | NA | |
Supervision/review Hours per site | 0 | 0 | 16 | 8 | 4 | 2 | 30 | NA | 9,120 | 9,120 | NA | 9,120 | 9,120 | NA | 9,120 | 9,120 | 9,120 | NA | NA | |
Cost per site | 0 | 0 | 706 | 394 | 222 | 117 | $1,439 | $1,944 | $590,916 | $590,916 | $1,997 | $607,056 | $607,056 | $2,021 | $614,330 | $614,330 | $604,101 | NA | NA | |
Sub Total - Hours | 0 | 0 | 16 | 8 | 12 | 6 | 42 | NA | 12768 | 12768 | NA | 12768 | 12768 | NA | 12768 | 12,768 | 12,768 | NA | NA | |
Sub Total - Costs | $0 | $0 | $706 | $394 | $666 | $351 | $2,117 | $2,860 | $869,333 | $869,333 | $2,938 | $893,077 | $893,077 | $2,973 | $903,778 | $903,778 | $888,729 | NA | NA | |
Summary by Element | CO | Year 1 | 2019 | Year 2 | 2020 | Year 3 | 2021 | |||||||||||||
TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Total | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | |||||
1 - Network Design Hours | 0 | 0 | 0 | 14 | 14 | 10 | 38 | NA | 3,496 | 499 | NA | 3,496 | 499 | NA | 3,496 | 499 | 499 | |||
Costs | $0 | $0 | $0 | $690 | $777 | $586 | $2,053 | $2,773 | $255,134 | $36,448 | $2,849 | $262,102 | $37,443 | $2,883 | $265,243 | $37,892 | $37,261 | NA | NA | |
2 - Site Installation Hours | 0 | 8 | 8 | 4 | 0 | 0 | 20 | NA | 6,141 | 877 | NA | 6,141 | 877 | NA | 6,141 | 877 | 877 | |||
Costs | $0 | $327 | $353 | $197 | $0 | $0 | $877 | $1,185 | $0 | $667,991 | $1,217 | $0 | $685,642 | $1,232 | $0 | $693,858 | $52,788 | NA | $629,709 | |
3 - Supplies & site visits Hours | 0 | 60 | 60 | 0 | 0 | 0 | 120 | NA | 36480 | 36480 | NA | 36480 | 36480 | NA | 36480 | 36480 | 36480 | NA | NA | |
Costs | $0 | $60 | $60 | $0 | $0 | $0 | $5,898 | $7,967 | $2,421,977 | $2,421,977 | $8,185 | $2,488,127 | $2,488,127 | $8,283 | $2,517,943 | $2,517,943 | $2,476,016 | $335,845 | NA | |
4 - Maintenance Hours | 0 | 22 | 11 | 35 | 0 | 0 | 68 | NA | 20672 | 20672 | NA | 20672 | 20672 | NA | 20672 | 20672 | 20672 | |||
Costs | $0 | $899 | $485 | $1,724 | $0 | $0 | $4,108 | $5,549 | $1,686,925 | $1,686,925 | $5,701 | $1,732,999 | $1,732,999 | $5,769 | $1,753,765 | $1,753,765 | $1,304,757 | $419,806 | NA | |
5 - Data Managment Hours | 0 | 8 | 10 | 17 | 4 | 0 | 39 | NA | 11856 | 11856 | NA | 11856 | 11856 | NA | 11856 | 11856 | 11856 | NA | NA | |
Costs | $0 | $327 | $440 | $838 | $222 | $0 | $1,827 | $2,468 | $750,246 | $750,246 | $2,535 | $770,737 | $770,737 | $2,566 | $779,973 | $779,973 | $766,986 | NA | NA | |
6 - Quality Assurance Hours | 0 | 27 | 1 | 32 | 27 | 5 | 93 | NA | NA | 23730 | NA | NA | 23730 | NA | NA | 23730 | 23730 | NA | NA | |
Costs | $0 | $1,103 | $53 | $1,592 | $1,496 | $293 | $4,537 | $6,129 | NA | $1,541,414 | $6,296 | NA | $1,583,514 | $6,371 | NA | $1,602,489 | $1,575,806 | $0 | NA | |
7 - Supervision Hours | 0 | 0 | 16 | 8 | 12 | 6 | 42 | NA | 12768 | 12768 | NA | 12768 | 12768 | NA | 12768 | 12768 | 12768 | NA | NA | |
Costs | $0 | $0 | $706 | $394 | $666 | $351 | $2,117 | $2,860 | $869,333 | $869,333 | $2,938 | $893,077 | $893,077 | $2,973 | $903,778 | $903,778 | $888,729 | NA | NA | |
Total | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Total | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | ||||
Hours | 0 | 125 | 106 | 110 | 57 | 21 | 420 | NA | 91,413 | 106,883 | NA | 91,413 | 106,883 | NA | 91,413 | 106,883 | 106,883 | NA | ||
Costs | $0 | $2,716 | $2,097 | $5,435 | $3,161 | $1,230 | $21,417 | $28,930 | 5,983,615 | $7,974,334 | $29,720 | 6,147,043 | $8,191,540 | $30,076 | 6,220,703 | $8,289,699 | $7,102,343 | $755,651 | $629,709 |
Data Entry for | NO2 | Updated on | August 19, 2018 | Year 1 | 2019 | Year 2 | 2020 | Year 3 | 2021 | Average Yearly Costs | Equipment | |||||||||
Spare Factor | Report Org | 87 | ||||||||||||||||||
5.00% | Report Org | Sites | 451 | Report Org | Sites | 451 | Report Org | Sites | 451 | Sites | 451 | |||||||||
Overall Comment | 87 | Spares | 23 | 87 | Spares | 23 | 87 | Spares | 23 | Spares | 23 | |||||||||
General Costs | Labor | Non Labor O & M |
||||||||||||||||||
Element 1 - Network Design | Years Amoritized | 7 | Comment | Element 1 - Network Design | Element 1 - Network Design | Element 1 - Network Design | ||||||||||||||
a) Network Design (by Reporting Organization) | Per RO | Per RO | Entire Network | Per RO | Entire Network | Per RO | Entire Network | |||||||||||||
Labor Category | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Total | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | ||||
Hours per RO | 0 | 0 | 0 | 10 | 10 | 10 | 30 | NA | 2610 | 373 | NA | 2,610 | 373 | NA | 2,610 | 373 | 373 | NA | NA | |
Costs per RO | 0 | 0 | 0 | 493 | 555 | 586 | $1,634 | $2,207 | $192,027 | $27,432 | $2,267 | $197,272 | $28,182 | $2,295 | $199,636 | $28,519 | $28,045 | NA | NA | |
b) Site Selection (Reporting Organization) | ||||||||||||||||||||
Hours per RO | 0 | 0 | 0 | 4 | 4 | 0 | 8 | NA | 696 | 99 | NA | 696 | 99 | NA | 696 | 99 | 99 | NA | NA | |
Costs per RO | 0 | 0 | 0 | 197 | 222 | 0 | $419 | $566 | $49,241 | $7,034 | $581 | $50,586 | $7,227 | $588 | $51,192 | $7,313 | $7,191 | NA | NA | |
Sub Total - Hours | 0 | 0 | 0 | 14 | 14 | 10 | 38 | NA | 3,306 | 472 | NA | 3306 | 472 | NA | 3,306 | 472 | 472 | NA | NA | |
Sub Total - Costs | $0 | $0 | $0 | $690 | $777 | $586 | $2,053 | $2,773 | $241,268 | $34,467 | $2,849 | $247,858 | $35,408 | $2,883 | $250,828 | $35,833 | $35,236 | NA | NA | |
Element 2 - Site Installation | Years Amoritized | 7 | Comment | Element 2 - Site Installation | Element 2 - Site Installation | Element 2 - Site Installation | ||||||||||||||
Unit cost | Year | Per Site | Entire Network | Per Site | Entire Network | Per Site | Entire Network | |||||||||||||
Materials | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | |||||||||||
Analyzers | $11,700 | 2019 | $15,804 | $7,127,776 | $1,018,254 | $16,236 | $7,322,455 | $1,046,065 | $16,431 | $7,410,199 | $1,058,600 | NA | NA | $1,040,973 | ||||||
Spare Analyzers | $356,389 | $50,913 | $366,123 | $52,303 | $370,510 | $52,930 | NA | NA | $52,049 | |||||||||||
Labor | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Per Site Total | |||||||||||||
Procurement Hours per site | 0 | 0 | 0 | 4 | 0 | 0 | 4 | NA | 1,894 | 271 | NA | 1,894 | 271 | NA | 1,894 | 271 | 271 | NA | NA | |
Cost per site | 0 | 0 | 0 | 197 | 0 | 0 | $197 | $266 | $126,015 | $18,002 | $273 | $129,457 | $18,494 | $277 | $131,009 | $18,716 | $18,404 | NA | NA | |
Installation Hours per site | 0 | 8 | 8 | 0 | 0 | 0 | 16 | NA | 7216 | 1031 | NA | 7,216 | 1031 | NA | 7,216 | 1031 | 1,031 | NA | NA | |
Cost per site | 0 | 327 | 353 | 0 | 0 | 0 | $680 | $919 | $414,264 | $59,181 | $944 | $425,579 | $60,797 | $955 | $430,678 | $61,525 | $60,501 | NA | NA | |
Sub Total - Hours | 0 | 8 | 8 | 4 | 0 | 0 | 20 | NA | 9,110 | 1,301 | NA | 9,110 | 1,301 | NA | 9,110 | 1,301 | 1,301 | NA | NA | |
Sub Total - Costs | $0 | $327 | $353 | $197 | $0 | $0 | $877 | $1,185 | $1,146,349 | $1,217 | $1,177,659 | $1,232 | $1,191,771 | $78,905 | NA | $1,093,021 | ||||
Element 3 - Supplies and Site Visits | Comment | Element 3 - Supplies and Site Visits | Element 3 - Supplies and Site Visits | Element 3 - Supplies and Site Visits | ||||||||||||||||
Per Site | Entire Network | Per Site | Entire Network | Per Site | Entire Network | |||||||||||||||
Supplies | Unit cost | Year | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | |||||||||
$800 | 2019 | $1,081 | $487,369 | $487,369 | $1,110 | $500,681 | $500,681 | $1,123 | $506,680 | $506,680 | NA | $498,243 | NA | |||||||
Routine visits | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Per Site Total | |||||||||||||
Hours per site | 0 | 60 | 60 | 0 | 0 | 0 | 120 | NA | 54,120 | 54,120 | NA | 54,120 | 54,120 | NA | 54,120 | 54,120 | 54,120 | NA | NA | |
Cost per site | 0 | 2451 | 2647 | 0 | 0 | 0 | $5,098 | $6,886 | $3,105,761 | $3,105,761 | $7,074 | $3,190,587 | $3,190,587 | $7,159 | $3,228,820 | $3,228,820 | $3,175,056 | NA | NA | |
Sub Total - Hours | 0 | 60 | 60 | 0 | 0 | 0 | 120 | NA | 54,120 | 54,120 | NA | 54,120 | 54,120 | NA | 54,120 | 54,120 | 54,120 | NA | NA | |
Sub Total - Costs | $0 | $60 | $60 | $0 | $0 | $0 | $5,898 | $7,967 | $3,593,130 | $3,593,130 | $8,185 | $3,691,268 | $3,691,268 | $8,283 | $3,735,500 | $3,735,500 | $3,673,300 | $498,243 | NA | |
Element 4 - Maintenance | Comment | Element 4 - Maintenance | Element 4 - Maintenance | Element 4 - Maintenance | ||||||||||||||||
Per Site | Entire Network | Per Site | Entire Network | Per Site | Entire Network | |||||||||||||||
Spare parts/supplies | Unit cost | Year | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | |||||||||
$1,000 | 2019 | $1,351 | $609,212 | $609,212 | $1,388 | $625,851 | $625,851 | $1,404 | $633,350 | $633,350 | NA | $622,804 | NA | |||||||
Remedial Repairs | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Per Site Total | |||||||||||||
Hours per site | 0 | 0 | 8 | 8 | 0 | 0 | 16 | NA | 7,216 | 7,216 | NA | 7,216 | 7,216 | NA | 7,216 | 7,216 | 7,216 | NA | NA | |
Cost per site | 0 | 0 | 353 | 394 | 0 | 0 | $747 | $1,009 | $455,081 | $455,081 | $1,037 | $467,511 | $467,511 | $1,049 | $473,113 | $473,113 | $465,235 | NA | NA | |
Routine Maint. Hours per site | 0 | 0 | 30 | 40 | 0 | 0 | 70 | NA | 31,570 | 31,570 | NA | 31,570 | 31,570 | NA | 31,570 | 31,570 | 31,570 | NA | NA | |
Cost per site | 0 | 0 | 1324 | 1971 | 0 | 0 | $3,295 | $4,451 | $2,007,352 | $2,007,352 | $4,572 | $2,062,178 | $2,062,178 | $4,627 | $2,086,889 | $2,086,889 | $2,052,140 | NA | NA | |
Sub Total - Hours | 0 | 0 | 38 | 48 | 0 | 0 | 86 | NA | 38,786 | 38,786 | NA | 38,786 | 38,786 | NA | 38,786 | 38,786 | 38,786 | NA | NA | |
Sub Total - Costs | $0 | $0 | $1,677 | $2,365 | $0 | $0 | $5,042 | $6,811 | $3,071,645 | $3,071,645 | $6,997 | $3,155,540 | $3,155,540 | $7,081 | $3,193,353 | $3,193,353 | $2,517,375 | $622,804 | NA | |
Element 5 - Data Management | Comment | Element 5 - Data Management | Element 5 - Data Management | Element 5 - Data Management | ||||||||||||||||
Per Site | Per Site | Entire Network | Per Site | Entire Network | Per Site | Entire Network | ||||||||||||||
Data aquisition/processing | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Total | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | ||||
Hours per site | 0 | 0 | 8 | 8 | 4 | 0 | 20 | NA | 9,020 | 9,020 | NA | 9,020 | 9,020 | NA | 9,020 | 9,020 | 9,020 | NA | NA | |
Cost per site | 0 | 0 | 353 | 394 | 222 | 0 | $969 | $1,309 | $590,326 | $590,326 | $1,345 | $606,449 | $606,449 | $1,361 | $613,717 | $613,717 | $603,497 | NA | NA | |
Data reporting Hours per site | 0 | 0 | 3 | 4 | 3 | 0 | 10 | NA | 4,510 | 4,510 | NA | 4,510 | 4,510 | NA | 4,510 | 4,510 | 4,510 | NA | NA | |
Cost per site | 0 | 0 | 132 | 197 | 166 | 0 | $495 | $669 | $301,560 | $301,560 | $687 | $309,796 | $309,796 | $695 | $313,508 | $313,508 | $308,288 | NA | NA | |
Data validation Hours per site | 0 | 0 | 5 | 10 | 0 | 0 | 15 | NA | 6,765 | 6,765 | NA | 6,765 | 6,765 | NA | 6,765 | 6,765 | 6,765 | NA | NA | |
Cost per site | 0 | 0 | 221 | 493 | 0 | 0 | $714 | $964 | $434,977 | $434,977 | $991 | $446,857 | $446,857 | $1,003 | $452,212 | $452,212 | $444,682 | NA | NA | |
Data distribution Hours per site | 0 | 0 | 2 | 3 | 0 | 0 | 5 | NA | 2,255 | 2,255 | NA | 2,255 | 2,255 | NA | 2,255 | 2,255 | 2,255 | NA | NA | |
Cost per site | 0 | 0 | 88 | 148 | 0 | 0 | $236 | $319 | $143,774 | $143,774 | $327 | $147,701 | $147,701 | $331 | $149,471 | $149,471 | $146,982 | NA | NA | |
Sub Total - Hours | 0 | 0 | 18 | 25 | 7 | 0 | 50 | NA | 22,550 | 22,550 | NA | 22,550 | 22,550 | NA | 22,550 | 22,550 | 22,550 | NA | NA | |
Sub Total - Costs | $0 | $0 | $794 | $1,232 | $388 | $0 | $2,414 | $3,261 | $1,470,637 | $1,470,637 | $3,350 | $1,510,804 | $1,510,804 | $3,390 | $1,528,908 | $1,528,908 | $1,503,450 | NA | NA | |
Element 6 - Quality Assurance | Comment | Element 6 - Quality Assurance | Element 6 - Quality Assurance | Element 6 - Quality Assurance | Labor | Non Labor O & M |
Equipment | |||||||||||||
Per Site | Per Site | Entire Network | Per Site | Entire Network | Per Site | Entire Network | ||||||||||||||
TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Total | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | |||||
Audits Hours per site | 0 | 0 | 0 | 36 | 36 | 0 | 72 | NA | 32,472 | 32,472 | NA | 32,472 | 32,472 | NA | 32,472 | 32,472 | 32,472 | NA | NA | |
Cost per site | 0 | 0 | 0 | 1773 | 1997 | 0 | $3,770 | $5,093 | $2,296,728 | $2,296,728 | $5,232 | $2,359,458 | $2,359,458 | $5,294 | $2,387,731 | $2,387,731 | $2,347,972 | NA | NA | |
Routine Calibrations Hours per site | 0 | 24 | 24 | 0 | 0 | 0 | 48 | NA | 21,648 | 21,648 | NA | 21,648 | 21,648 | NA | 21,648 | 21,648 | 21,648 | NA | NA | |
Cost per site | 0 | 981 | 1059 | 0 | 0 | 0 | $2,040 | $2,756 | $1,242,792 | $1,242,792 | $2,831 | $1,276,736 | $1,276,736 | $2,865 | $1,292,035 | $1,292,035 | $1,270,521 | NA | NA | |
Coordination/implementation | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Total | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | |||||||
Hours per site | 0 | 0 | 0 | 2 | 2 | 0 | 4 | NA | 1,804 | 1,804 | NA | 1,804 | 1,804 | NA | 1,804 | 1,804 | 1,804 | NA | NA | |
Cost per site | 0 | 0 | 0 | 99 | 111 | 0 | $210 | $284 | $127,934 | $127,934 | $291 | $131,429 | $131,429 | $295 | $133,004 | $133,004 | $130,789 | NA | NA | |
Training Hours per site | 0 | 1 | 1 | 2 | 1 | 0 | 5 | NA | 2,255 | 2,255 | NA | 2,255 | 2,255 | NA | 2,255 | 2,255 | 2,255 | NA | NA | |
Cost per site | 0 | 41 | 44 | 99 | 55 | 0 | $239 | $323 | $145,602 | $145,602 | $332 | $149,578 | $149,578 | $336 | $151,371 | $151,371 | $148,850 | NA | NA | |
Reporting Hours per site | 0 | 0 | 0 | 3 | 3 | 0 | 6 | NA | 2,706 | 2,706 | NA | 2,706 | 2,706 | NA | 2,706 | 2,706 | 2,706 | NA | NA | |
Cost per site | 0 | 0 | 0 | 148 | 166 | 0 | $314 | $424 | $191,292 | $191,292 | $436 | $196,517 | $196,517 | $441 | $198,872 | $198,872 | $195,561 | NA | NA | |
QA Plan review (annual) | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Labor per RO | Adjusted per RO | Total | Yearly Cost | Adjusted per RO | Total | Yearly Cost | |||||||
Hours per RO | 0 | 0 | 0.2 | 0.3 | 0 | 0 | 0.5 | NA | 44 | 44 | NA | 44 | 44 | NA | 44 | 44 | 44 | NA | NA | |
Cost | 0 | 0 | 9 | 15 | 0 | 0 | $24 | $32 | $2,820 | $2,820 | $33 | $2,898 | $2,898 | $34 | $2,932 | $2,932 | $2,883 | NA | NA | |
QA Plan preparation | Years Amoritized | 5 | Per RO | Per RO | Entire Network | Per RO | Entire Network | |||||||||||||
Hours per RO | 0 | 0 | 0 | 5 | 5 | 5 | 15 | NA | 1305 | 261 | NA | 1305 | 261 | NA | 1305 | 261 | 261 | NA | NA | |
Cost per RO | 0 | 0 | 0 | 246 | 277 | 293 | $816 | $1,102 | $95,896 | $19,179 | $1,132 | $98,515 | $19,703 | $1,146 | $99,696 | $19,939 | $19,607 | NA | NA | |
Sub Total - Hours | 0 | 25 | 25 | 48 | 47 | 5 | 151 | NA | NA | 61,190 | NA | NA | 61,190 | NA | NA | 61,190 | 61,190 | |||
Sub Total - Costs | $0 | $1,022 | $1,112 | $2,380 | $2,606 | $293 | $7,413 | $10,013 | NA | $4,026,348 | $10,287 | NA | $4,136,318 | $10,410 | NA | $4,185,883 | $4,116,183 | |||
Element 7 - Supervision | Comment | Element 7 - Supervision | Element 7 - Supervision | Element 7 - Supervision | ||||||||||||||||
Per Site | Per Site | Entire Network | Per Site | Entire Network | Per Site | Entire Network | ||||||||||||||
Planning/coordination | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Total | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | ||||
Hours per site | 0 | 0 | 0 | 0 | 8 | 4 | 12 | NA | 5,412 | 5,412 | NA | 5,412 | 5412 | NA | 5,412 | 5,412 | 5,412 | NA | NA | |
Cost per site | 0 | 0 | 0 | 0 | 444 | 234 | $678 | $916 | $413,045 | $413,045 | $941 | $424,327 | $424,327 | $952 | $429,412 | $429,412 | $422,261 | NA | NA | |
Supervision/review Hours per site | 0 | 0 | 16 | 8 | 4 | 2 | 30 | NA | 13,530 | 13,530 | NA | 13,530 | 13,530 | NA | 13,530 | 13,530 | 13,530 | NA | NA | |
Cost per site | 0 | 0 | 706 | 394 | 222 | 117 | $1,439 | $1,944 | $876,656 | $876,656 | $1,997 | $900,599 | $900,599 | $2,021 | $911,391 | $911,391 | $896,215 | NA | NA | |
Sub Total - Hours | 0 | 0 | 16 | 8 | 12 | 6 | 42 | NA | 18942 | 18942 | NA | 18942 | 18942 | NA | 18942 | 18,942 | 18,942 | NA | NA | |
Sub Total - Costs | $0 | $0 | $706 | $394 | $666 | $351 | $2,117 | $2,860 | $1,289,701 | $1,289,701 | $2,938 | $1,324,926 | $1,324,926 | $2,973 | $1,340,803 | $1,340,803 | $1,318,477 | NA | NA | |
Summary by Element | NO2 | Year 1 | 2019 | Year 2 | 2020 | Year 3 | 2021 | |||||||||||||
TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Total | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | |||||
1 - Network Design Hours | 0 | 0 | 0 | 14 | 14 | 10 | 38 | NA | 3,306 | 472 | NA | 3,306 | 472 | NA | 3,306 | 472 | 472 | |||
Costs | $0 | $0 | $0 | $690 | $777 | $586 | $2,053 | $2,773 | $241,268 | $34,467 | $2,849 | $247,858 | $35,408 | $2,883 | $250,828 | $35,833 | $35,236 | NA | NA | |
2 - Site Installation Hours | 0 | 8 | 8 | 4 | 0 | 0 | 20 | NA | 9,110 | 1,301 | NA | 9,110 | 1,301 | NA | 9,110 | 1,301 | 1,301 | |||
Costs | $0 | $327 | $353 | $197 | $0 | $0 | $877 | $1,185 | $0 | $1,146,349 | $1,217 | $0 | $1,177,659 | $1,232 | $0 | $1,191,771 | $78,905 | NA | $1,093,021 | |
3 - Supplies & site visits Hours | 0 | 60 | 60 | 0 | 0 | 0 | 120 | NA | 54120 | 54120 | NA | 54120 | 54120 | NA | 54120 | 54120 | 54,120 | NA | NA | |
Costs | $0 | $60 | $60 | $0 | $0 | $0 | $5,898 | $7,967 | $3,593,130 | $3,593,130 | $8,185 | $3,691,268 | $3,691,268 | $8,283 | $3,735,500 | $3,735,500 | $3,673,300 | $498,243 | NA | |
4 - Maintenance Hours | 0 | 0 | 38 | 48 | 0 | 0 | 86 | NA | 38786 | 38786 | NA | 38786 | 38786 | NA | 38786 | 38786 | 38,786 | |||
Costs | $0 | $0 | $1,677 | $2,365 | $0 | $0 | $5,042 | $6,811 | $3,071,645 | $3,071,645 | $6,997 | $3,155,540 | $3,155,540 | $7,081 | $3,193,353 | $3,193,353 | $2,517,375 | $622,804 | NA | |
5 - Data Managment Hours | 0 | 0 | 18 | 25 | 7 | 0 | 50 | NA | 22550 | 22550 | NA | 22550 | 22550 | NA | 22550 | 22550 | 22,550 | NA | NA | |
Costs | $0 | $0 | $794 | $1,232 | $388 | $0 | $2,414 | $3,261 | $1,470,637 | $1,470,637 | $3,350 | $1,510,804 | $1,510,804 | $3,390 | $1,528,908 | $1,528,908 | $1,503,450 | NA | NA | |
6 - Quality Assurance Hours | 0 | 25 | 25 | 48 | 47 | 5 | 151 | NA | NA | 61190 | NA | NA | 61190 | NA | NA | 61190 | 61,190 | NA | NA | |
Costs | $0 | $1,022 | $1,112 | $2,380 | $2,606 | $293 | $7,413 | $10,013 | NA | $4,026,348 | $10,287 | NA | $4,136,318 | $10,410 | NA | $4,185,883 | $4,116,183 | $0 | NA | |
7 - Supervision Hours | 0 | 0 | 16 | 8 | 12 | 6 | 42 | NA | 18942 | 18942 | NA | 18942 | 18942 | NA | 18942 | 18942 | 18,942 | NA | NA | |
Costs | $0 | $0 | $706 | $394 | $666 | $351 | $2,117 | $2,860 | $1,289,701 | $1,289,701 | $2,938 | $1,324,926 | $1,324,926 | $2,973 | $1,340,803 | $1,340,803 | $1,318,477 | NA | NA | |
Total | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Total | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | ||||
Hours | 0 | 93 | 165 | 147 | 80 | 21 | 507 | NA | 146,814 | 197,361 | NA | 146,814 | 197,361 | NA | 146,814 | 197,361 | 197,361 | NA | ||
Costs | $0 | $1,409 | $4,702 | $7,258 | $4,437 | $1,230 | $25,814 | $34,870 | 9,666,381 | $14,632,277 | $35,822 | 9,930,396 | $15,031,923 | $36,251 | 10,049,391 | $15,212,050 | $13,242,924 | $1,121,048 | $1,093,021 |
Data Entry for | O3 | Updated on | August 19, 2018 | Year 1 | 2019 | Year 2 | 2020 | Year 3 | 2021 | Average Yearly Costs | Equipment | |||||||||
Spare Factor | Report Org | Sites | Report Org | Sites | Report Org | Sites | Sites | |||||||||||||
20.00% | 153 | 4 month | 9 | 153 | 4 month | 9 | 153 | 4 month | 9 | 4 month | 9 | |||||||||
Overall Comment | 5 month | 81 | 5 month | 81 | 5 month | 81 | 5 month | 81 | ||||||||||||
6 month | 124 | 6 month | 124 | 6 month | 124 | 6 month | 124 | |||||||||||||
7 month | 401 | 7 month | 401 | 7 month | 401 | 7 month | 401 | |||||||||||||
8 month | 188 | 8 month | 188 | 8 month | 188 | 8 month | 188 | |||||||||||||
9 month | 38 | 9 month | 38 | 9 month | 38 | 9 month | 38 | |||||||||||||
12 month | 424 | 12 month | 424 | 12 month | 424 | 12 month | 424 | |||||||||||||
Total Sites | 1265 | Total Sites | 1265 | Total Sites | 1265 | Total Sites | 1265 | |||||||||||||
Avg Percent Sampled | 72.0% | Avg Percent Sampled | 72.0% | Avg Percent Sampled | 72.0% | |||||||||||||||
Spares | 253 | Spares | 253 | Spares | 253 | Report Org | 153 | |||||||||||||
General Costs | Labor | Non Labor O & M | ||||||||||||||||||
Element 1 - Network design | Years Amoritized | 7 | Comment | Element 1 - Network Design | Element 1 - Network Design | Element 1 - Network Design | ||||||||||||||
a) Network Design (by Reporting Organization) | Per RO | Per RO | Entire Network | Per RO | Entire Network | Per RO | Entire Network | |||||||||||||
Labor Category | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Total | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | ||||
Hours per RO | 0 | 0 | 0 | 10 | 10 | 10 | 30 | NA | 4590 | 656 | NA | 4,590 | 656 | NA | 4,590 | 656 | 656 | NA | NA | |
Costs per RO | 0 | 0 | 0 | 493 | 555 | 586 | $1,634 | $2,207 | $337,703 | $48,243 | $2,267 | $346,927 | $49,561 | $2,295 | $351,084 | $50,155 | $49,320 | NA | NA | |
b) Site Selection (Reporting Organization) | ||||||||||||||||||||
Hours per RO | 0 | 0 | 0 | 4 | 4 | 0 | 8 | NA | 1224 | 175 | NA | 1224 | 175 | NA | 1224 | 175 | 175 | NA | NA | |
Costs per RO | 0 | 0 | 0 | 197 | 222 | 0 | $419 | $566 | $86,596 | $12,371 | $581 | $88,961 | $12,709 | $588 | $90,027 | $12,861 | $12,647 | NA | NA | |
Sub Total - Hours | 0 | 0 | 0 | 14 | 14 | 10 | 38 | NA | 5,814 | 831 | NA | 5814 | 831 | NA | 5,814 | 831 | 831 | NA | NA | |
Sub Total - Costs | $0 | $0 | $0 | $690 | $777 | $586 | $2,053 | $2,773 | $424,299 | $60,614 | $2,849 | $435,888 | $62,270 | $2,883 | $441,111 | $63,016 | $61,967 | NA | NA | |
Element 2 - Site Installation | Years Amoritized | 7 | Comment | Element 2 - Site Installation | Element 2 - Site Installation | Element 2 - Site Installation | ||||||||||||||
Unit cost | Year | Per Site | Entire Network | Per Site | Entire Network | Per Site | Entire Network | |||||||||||||
Materials | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | |||||||||||
Analyzers | $11,000 | 2019 | $14,859 | $18,796,408 | $2,685,201 | $15,265 | $19,309,787 | $2,758,541 | $15,448 | $19,541,176 | $2,791,597 | NA | NA | $2,745,113 | ||||||
Spare Analyzers | $3,759,282 | $537,040 | $3,861,957 | $551,708 | $3,908,235 | $558,319 | NA | NA | $549,023 | |||||||||||
Labor | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Per Site Total | |||||||||||||
Procurement Hours per site | 0 | 0 | 0 | 4 | 0 | 0 | 4 | NA | 6,072 | 867 | NA | 6,072 | 867 | NA | 6,072 | 867 | 867 | NA | NA | |
Cost per site | 0 | 0 | 0 | 197 | 0 | 0 | $197 | $266 | $403,952 | $57,707 | $273 | $345,821 | $49,403 | $277 | $349,965 | $49,995 | $52,368 | NA | NA | |
Installation Hours per site | 0 | 8 | 8 | 0 | 0 | 0 | 16 | NA | 20240 | 2891 | NA | 20,240 | 2891 | NA | 20,240 | 2891 | 2,891 | NA | NA | |
Cost per site | 0 | 327 | 353 | 0 | 0 | 0 | $680 | $919 | $1,161,960 | $165,994 | $944 | $1,193,696 | $170,528 | $955 | $1,208,000 | $172,571 | $169,698 | NA | NA | |
Sub Total - Hours | 0 | 8 | 8 | 4 | 0 | 0 | 20 | NA | 26,312 | 3,759 | NA | 26,312 | 3,759 | NA | 26,312 | 3,759 | 3,759 | NA | NA | |
Sub Total - Costs | $0 | $327 | $353 | $197 | $0 | $0 | $877 | $1,185 | $3,445,943 | $1,217 | $3,530,180 | $1,232 | $3,572,482 | $222,066 | NA | $3,294,135 | ||||
Element 3 - Supplies and Site Visits (1) | Comment | Element 3 - Supplies and Site Visits | Element 3 - Supplies and Site Visits | Element 3 - Supplies and Site Visits | ||||||||||||||||
Per Site | Entire Network | Per Site | Entire Network | Per Site | Entire Network | |||||||||||||||
Supplies | Unit cost | Year | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | |||||||||
$800 | 2019 | $778 | $983,924 | $983,924 | $799 | $1,010,798 | $1,010,798 | $809 | $1,022,910 | $1,022,910 | NA | $1,005,877 | NA | |||||||
TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Per Site Total | ||||||||||||||
Routine visits Hours per site | 0 | 60 | 60 | 0 | 0 | 0 | 120 | NA | 109,260 | 109,260 | NA | 109,260 | 109,260 | NA | 109,260 | 109,260 | 109,260 | NA | NA | |
Cost per site | 0 | 2451 | 2647 | 0 | 0 | 0 | $5,098 | $4,957 | $6,270,056 | $6,270,056 | $5,092 | $6,441,308 | $6,441,308 | $5,153 | $6,518,494 | $6,518,494 | $6,409,953 | NA | NA | |
Sub Total - Hours | 0 | 60 | 60 | 0 | 0 | 0 | 120 | NA | 109,260 | 109,260 | NA | 109,260 | 109,260 | NA | 109,260 | 109,260 | 109,260 | NA | NA | |
Sub Total - Costs | $0 | $60 | $60 | $0 | $0 | $0 | $5,898 | $5,734 | $7,253,980 | $7,253,980 | $5,891 | $7,452,106 | $7,452,106 | $5,962 | $7,541,404 | $7,541,404 | $6,409,953 | $1,005,877 | NA | |
Element 4 - Maintenance (1) | Comment | Element 4 - Maintenance | Element 4 - Maintenance | Element 4 - Maintenance | ||||||||||||||||
Per Site | Entire Network | Per Site | Entire Network | Per Site | Entire Network | |||||||||||||||
Spare parts/supplies | Unit cost | Year | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | |||||||||
$1,000 | 2019 | $972 | $1,229,905 | $1,229,905 | $999 | $1,263,497 | $1,263,497 | $1,011 | $1,278,637 | $1,278,637 | NA | $1,257,347 | NA | |||||||
TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Per Site Total | ||||||||||||||
Remedial Repairs Hours per site | 0 | 6 | 3 | 3 | 0 | 0 | 12 | NA | 10,926 | 10,926 | NA | 10,926 | 10,926 | NA | 10,926 | 10,926 | 10,926 | NA | NA | |
Cost per site | 0 | 245 | 132 | 148 | 0 | 0 | $525 | $510 | $645,700 | $645,700 | $524 | $663,336 | $663,336 | $531 | $671,285 | $671,285 | $660,107 | NA | NA | |
Routine Maintenance Hours per site | 0 | 16 | 8 | 32 | 0 | 0 | 56 | NA | 50,988 | 50,988 | NA | 50,988 | 50,988 | NA | 50,988 | 50,988 | 50,988 | NA | NA | |
Cost per site | 0 | 654 | 353 | 1576 | 0 | 0 | $2,583 | $2,511 | $3,176,845 | $3,176,845 | $2,580 | $3,263,613 | $3,263,613 | $2,611 | $3,302,721 | $3,302,721 | $3,247,726 | NA | NA | |
Sub Total - Hours | 0 | 22 | 11 | 35 | 0 | 0 | 68 | NA | 61,914 | 61,914 | NA | 61,914 | 61,914 | NA | 61,914 | 61,914 | 61,914 | NA | NA | |
Sub Total - Costs | $0 | $899 | $485 | $1,724 | $0 | $0 | $4,108 | $3,994 | $5,052,450 | $5,052,450 | $4,103 | $5,190,446 | $5,190,446 | $4,152 | $5,252,643 | $5,252,643 | $3,907,833 | $1,257,347 | NA | |
Element 5 - Data Management (1) | Comment | Element 5 - Data Management | Element 5 - Data Management | Element 5 - Data Management | ||||||||||||||||
Per Site | Per Site | Entire Network | Per Site | Entire Network | Per Site | Entire Network | ||||||||||||||
Data aquisition/processing | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Total | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | ||||
Hours per site | 0 | 6 | 3 | 3 | 2 | 0 | 14 | NA | 12,747 | 12,747 | NA | 12,747 | 12,747 | NA | 12,747 | 12,747 | 12,747 | NA | NA | |
Cost per site | 0 | 245 | 132 | 148 | 111 | 0 | $636 | $618 | $782,220 | $782,220 | $635 | $803,584 | $803,584 | $643 | $813,213 | $813,213 | $799,672 | NA | NA | |
Data reporting Hours per site | 0 | 1 | 2 | 4 | 2 | 0 | 9 | NA | 8,195 | 8,195 | NA | 8,195 | 8,195 | NA | 8,195 | 8,195 | 8,195 | NA | NA | |
Cost per site | 0 | 41 | 88 | 197 | 111 | 0 | $437 | $425 | $537,469 | $537,469 | $436 | $552,148 | $552,148 | $442 | $558,765 | $558,765 | $549,460 | NA | NA | |
Data validation Hours per site | 0 | 0 | 4 | 8 | 0 | 0 | 12 | NA | 10,926 | 10,926 | NA | 10,926 | 10,926 | NA | 10,926 | 10,926 | 10,926 | NA | NA | |
Cost per site | 0 | 0 | 176 | 394 | 0 | 0 | $570 | $554 | $701,046 | $701,046 | $569 | $720,193 | $720,193 | $576 | $728,823 | $728,823 | $716,688 | NA | NA | |
Data distribution Hours per site | 0 | 1 | 1 | 2 | 0 | 0 | 4 | NA | 3,642 | 3,642 | NA | 3,642 | 3,642 | NA | 3,642 | 3,642 | 3,642 | NA | NA | |
Cost per site | 0 | 41 | 44 | 99 | 0 | 0 | $184 | $179 | $226,303 | $226,303 | $184 | $232,483 | $232,483 | $186 | $235,269 | $235,269 | $231,352 | NA | NA | |
Sub Total - Hours | 0 | 8 | 10 | 17 | 4 | 0 | 39 | NA | 35,510 | 35,510 | NA | 35,510 | 35,510 | NA | 35,510 | 35,510 | 35,510 | NA | NA | |
Sub Total - Costs | $0 | $327 | $440 | $838 | $222 | $0 | $1,827 | $1,776 | $2,247,037 | $2,247,037 | $1,825 | $2,308,409 | $2,308,409 | $1,847 | $2,336,071 | $2,336,071 | $2,297,172 | NA | NA | |
Element 6 - Quality Assurance (1) | Comment | Element 6 - Quality Assurance | Element 6 - Quality Assurance | Element 6 - Quality Assurance | ||||||||||||||||
Per Site | Per Site | Entire Network | Per Site | Entire Network | Per Site | Entire Network | ||||||||||||||
TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Total | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | |||||
Audits Hours per site | 0 | 0 | 0 | 20 | 16 | 0 | 36 | NA | 32,778 | 32,778 | NA | 32,778 | 32,778 | NA | 32,778 | 32,778 | 32,778 | NA | NA | |
Cost per site | 0 | 0 | 0 | 985 | 887 | 0 | $1,872 | $1,820 | $2,302,382 | $2,302,382 | $1,870 | $2,365,266 | $2,365,266 | $1,892 | $2,393,609 | $2,393,609 | $2,353,753 | NA | NA | |
Routine Calibrations Hours per site | 0 | 26 | 0 | 0 | 0 | 0 | 26 | NA | 23,673 | 23,673 | NA | 23,673 | 23,673 | NA | 23,673 | 23,673 | 23,673 | NA | NA | |
Cost per site | 0 | 1062 | 0 | 0 | 0 | 0 | $1,062 | $1,033 | $1,306,159 | $1,306,159 | $1,061 | $1,341,834 | $1,341,834 | $1,073 | $1,357,913 | $1,357,913 | $1,335,302 | NA | NA | |
Coordination/implementation | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Total | |||||||||||||
Hours per site | 0 | 0 | 0 | 2 | 2 | 0 | 4 | NA | 3,642 | 3,642 | NA | 3,642 | 3,642 | NA | 3,642 | 3,642 | 3,642 | NA | NA | |
Cost per site | 0 | 0 | 0 | 99 | 111 | 0 | $210 | $204 | $258,280 | $258,280 | $210 | $265,334 | $265,334 | $212 | $268,514 | $268,514 | $264,043 | NA | NA | |
Training Hours per site | 0 | 1 | 1 | 2 | 1 | 0 | 5 | NA | 6,325 | 6,325 | NA | 6,325 | 6,325 | NA | 6,325 | 6,325 | 6,325 | NA | NA | |
Cost per site | 0 | 41 | 44 | 99 | 55 | 0 | $239 | $323 | $408,395 | $408,395 | $332 | $419,549 | $419,549 | $336 | $424,576 | $424,576 | $417,507 | NA | NA | |
Reporting Hours per site | 0 | 0 | 0 | 3 | 2 | 0 | 5 | NA | 4,553 | 4,553 | NA | 4,553 | 4,553 | NA | 4,553 | 4,553 | 4,553 | NA | NA | |
Cost per site | 0 | 0 | 0 | 148 | 111 | 0 | $259 | $252 | $318,545 | $318,545 | $259 | $327,246 | $327,246 | $262 | $331,167 | $331,167 | $325,653 | NA | NA | |
Per RO | ||||||||||||||||||||
QA Plan review (annual) | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Labor | |||||||||||||
Hours per reporting organization | 0 | 0 | 0.2 | 0.3 | 0 | 0 | 0.5 | NA | 77 | 77 | NA | 77 | 77 | NA | 77 | 77 | 77 | NA | NA | |
Cost per reporting organization | 0 | 0 | 9 | 15 | 0 | 0 | $24 | $32 | $4,960 | $4,960 | $33 | $5,096 | $5,096 | $34 | $5,157 | $5,157 | $5,071 | NA | NA | |
Years Amoritized | 5 | Per RO | ||||||||||||||||||
QA Plan preparation | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Labor | |||||||||||||
Hours per reporting organization | 0 | 0 | 0 | 5 | 5 | 5 | 15 | NA | 2295 | 459 | NA | 2295 | 459 | NA | 2295 | 459 | 459 | NA | NA | |
Cost per reporting organization | 0 | 0 | 0 | 246 | 277 | 293 | $816 | $1,102 | $168,645 | $33,729 | $1,132 | $173,251 | $34,650 | $1,146 | $175,327 | $35,065 | $34,482 | NA | NA | |
Sub Total - Hours | 0 | 27 | 1 | 32 | 26 | 5 | 92 | NA | NA | 71,506 | NA | NA | 71,506 | NA | NA | 71,506 | 71,506 | |||
Sub Total - Costs | $0 | $1,103 | $53 | $1,592 | $1,441 | $293 | $4,482 | $4,766 | NA | $4,632,451 | $4,896 | NA | $4,758,975 | $4,955 | NA | $4,816,002 | $4,735,809 | |||
Element 7 - Supervision (1) | Comment | Element 7 - Supervision | Element 7 - Supervision | Element 7 - Supervision | ||||||||||||||||
Per Site | Per Site | Entire Network | Per Site | Entire Network | Per Site | Entire Network | ||||||||||||||
TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Total | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | |||||
Planning/coordination Hours per site | 0 | 0 | 0 | 0 | 8 | 4 | 12 | NA | 10,926 | 10,926 | NA | 10,926 | 10,926 | NA | 10,926 | 10,926 | 10,926 | NA | NA | |
Cost per site | 0 | 0 | 0 | 0 | 444 | 234 | $678 | $659 | $833,876 | $833,876 | $677 | $856,651 | $856,651 | $685 | $866,916 | $866,916 | $852,481 | NA | NA | |
Supervision/review Hours per site | 0 | 0 | 16 | 8 | 4 | 2 | 30 | NA | 27,315 | 27,315 | NA | 27,315 | 27,315 | NA | 27,315 | 27,315 | 27,315 | NA | NA | |
Cost per site | 0 | 0 | 706 | 394 | 222 | 117 | $1,439 | $1,399 | $1,769,833 | $1,769,833 | $1,437 | $1,818,172 | $1,818,172 | $1,455 | $1,839,959 | $1,839,959 | $1,809,322 | NA | NA | |
Sub Total - Hours | 0 | 0 | 16 | 8 | 12 | 6 | 42 | NA | 38,241 | 38,241 | NA | 38,241 | 38,241 | NA | 38,241 | 38241 | 38,241 | NA | NA | |
Sub Total - Costs | $0 | $0 | $706 | $394 | $666 | $351 | $2,117 | $2,058 | $2,603,709 | $2,603,709 | $2,114 | $2,674,823 | $2,674,823 | $2,140 | $2,706,876 | $2,706,876 | $2,661,803 | NA | NA | |
Summary by Element | O3 | Year 1 | 2019 | Year 2 | 2020 | Year 3 | 2021 | |||||||||||||
TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Total | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | |||||
1 - Network Design Hours | 0 | 0 | 0 | 14 | 14 | 10 | 38 | NA | 5,814 | 831 | NA | 5,814 | 831 | NA | 5,814 | 831 | 831 | |||
Costs | $0 | $0 | $0 | $690 | $777 | $586 | $2,053 | $2,773 | $424,299 | $60,614 | $2,849 | $435,888 | $62,270 | $2,883 | $441,111 | $63,016 | $61,967 | NA | NA | |
2 - Site Installation Hours | 0 | 8 | 8 | 4 | 0 | 0 | 20 | NA | 26,312 | 3,759 | NA | 26,312 | 3,759 | NA | 26,312 | 3,759 | 3,759 | |||
Costs | $0 | $327 | $353 | $197 | $0 | $0 | $877 | $1,185 | $0 | $3,445,943 | $1,217 | $0 | $3,530,180 | $1,232 | $0 | $3,572,482 | $222,066 | NA | $3,294,135 | |
3 - Supplies and Site Visits Hours | 0 | 60 | 60 | 0 | 0 | 0 | 120 | NA | 109260 | 109260 | NA | 109260 | 109260 | NA | 109260 | 109260 | 109260 | NA | NA | |
Costs | $0 | $60 | $60 | $0 | $0 | $0 | $5,898 | $5,734 | $7,253,980 | $7,253,980 | $5,891 | $7,452,106 | $7,452,106 | $5,962 | $7,541,404 | $7,541,404 | $6,409,953 | $1,005,877 | NA | |
4 - Maintenance Hours | 0 | 22 | 11 | 35 | 0 | 0 | 68 | NA | 61914 | 61914 | NA | 61914 | 61914 | NA | 61914 | 61914 | 61914 | |||
Costs | $0 | $899 | $485 | $1,724 | $0 | $0 | $4,108 | $3,994 | $5,052,450 | $5,052,450 | $4,103 | $5,190,446 | $5,190,446 | $4,152 | $5,252,643 | $5,252,643 | $3,907,833 | $1,257,347 | NA | |
5 - Data Management Hours | 0 | 8 | 10 | 17 | 4 | 0 | 39 | NA | 35509.5 | 35509.5 | NA | 35509.5 | 35509.5 | NA | 35509.5 | 35509.5 | 35509.5 | NA | NA | |
Costs | $0 | $327 | $440 | $838 | $222 | $0 | $1,827 | $1,776 | $2,247,037 | $2,247,037 | $1,825 | $2,308,409 | $2,308,409 | $1,847 | $2,336,071 | $2,336,071 | $2,297,172 | NA | NA | |
6 - Quality Assurance Hours | 0 | 27 | 1 | 32 | 26 | 5 | 92 | NA | NA | 71506 | NA | NA | 71506 | NA | NA | 71506 | 71506 | NA | NA | |
Costs | $0 | $1,103 | $53 | $1,592 | $1,441 | $293 | $4,482 | $4,766 | NA | $4,632,451 | $4,896 | NA | $4,758,975 | $4,955 | NA | $4,816,002 | $4,735,809 | $0 | NA | |
7 - Supervision Hours | 0 | 0 | 16 | 8 | 12 | 6 | 42 | NA | 38241 | 38241 | NA | 38241 | 38241 | NA | 38241 | 38241 | 38241 | NA | NA | |
Costs | $0 | $0 | $706 | $394 | $666 | $351 | $2,117 | $2,058 | $2,603,709 | $2,603,709 | $2,114 | $2,674,823 | $2,674,823 | $2,140 | $2,706,876 | $2,706,876 | $2,661,803 | NA | NA | |
Total | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Total | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | ||||
Hours | 0 | 125 | 106 | 110 | 56 | 21 | 419 | NA | 277,051 | 321,020 | NA | 277,051 | 321,020 | NA | 277,051 | 321,020 | 321,020 | NA | ||
Costs | $0 | $2,716 | $2,097 | $5,435 | $3,106 | $1,230 | $21,362 | $22,287 | 17,581,475 | $25,296,184 | $22,896 | 18,061,671 | $25,977,209 | $23,170 | 18,278,104 | $26,288,493 | $20,296,603 | $2,263,224 | $3,294,135 | |
1) Per site operating costs are weighted by the average percent sampling. For example, the operating expenses for a site operated for 6 months per year are assummed to be half that of a site operated for 12 months per year. |
Data Entry for | PM10 | Updated on | August 19, 2018 | Year 1 | 2019 | Year 2 | 2020 | Year 3 | 2021 | Average Yearly Costs | Equipment | |||||||||
Analyzer Spare Factor | Filter-Based | 1/1 (daily) | 42 | Filter-Based | 1/1 (daily) | 42 | Filter-Based | 1/1 (daily) | 42 | |||||||||||
3.50% | Sites | 1/2 | 0 | Samplers | 1/2 | 0 | Samplers | 1/2 | 0 | |||||||||||
Overall Comment | 1/3 | 86 | 1/3 | 86 | 1/3 | 86 | ||||||||||||||
Report Org | 1/6 | 214 | Report Org | 1/6 | 214 | Report Org | 1/6 | 214 | ||||||||||||
116 | collocated | 110 | 116 | collocated | 110 | 116 | collocated | 110 | ||||||||||||
Total | 452 | Total | 452 | Total | 452 | Total | 452 | |||||||||||||
Samplers | 664 | Samplers | 664 | Samplers | 664 | Samplers | 664 | |||||||||||||
Spares | 23 | Spares | 23 | Spares | 23 | Spares | 23 | |||||||||||||
Avg Percent Sampled | 24% | Avg Percent Sampled | 24% | Avg Percent Sampled | 24% | |||||||||||||||
Continuous Sites | 362 | Continuous Sites | 268 | Continuous Sites | 268 | Cont Samplers | 299 | |||||||||||||
Spares | 13 | Spares | 9 | Spares | 9 | Spares | 10 | |||||||||||||
Platforms | 947 | Platforms | 947 | Platforms | 947 | Platforms | 947 | |||||||||||||
General Costs | Labor | Non Labor O & M |
||||||||||||||||||
Element 1 - Network Design | Years Amoritized | 7 | Comment | Element 1 - Network Design | Element 1 - Network Design | Element 1 - Network Design | ||||||||||||||
a) Network Design (by Reporting Organization) | Per RO | Per RO | Entire Network | Per RO | Entire Network | Per RO | Entire Network | |||||||||||||
Labor Category | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Total | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | ||||
Hours per RO | 0 | 0 | 0 | 10 | 10 | 10 | 30 | NA | 3,480 | 497 | NA | 3,480 | 497 | NA | 0 | 0 | 331 | NA | NA | |
Costs per RO | 0 | 0 | 0 | 493 | 555 | 586 | $1,634 | $2,207 | $256,036 | $36,577 | $2,267 | $263,029 | $37,576 | $2,295 | $266,181 | $38,026 | $37,393 | NA | NA | |
b) Site Selection (Reporting Organization) | ||||||||||||||||||||
Hours per RO | 0 | 6 | 2 | 2 | 0 | 0 | 10 | NA | 1,160 | 166 | NA | 1,160 | 166 | NA | 1,160 | 166 | 166 | NA | NA | |
Costs per RO | 0 | 245 | 88 | 99 | 0 | 0 | $432 | $584 | $67,691 | $9,670 | $599 | $69,540 | $9,934 | $607 | $70,374 | $10,053 | $9,886 | NA | NA | |
Sub Total - Hours | 0 | 6 | 2 | 12 | 10 | 10 | 40 | NA | 4,640 | 663 | NA | 4,640 | 663 | NA | 1,160 | 166 | 497 | NA | NA | |
Sub Total - Costs | $0 | $245 | $88 | $592 | $555 | $586 | $2,066 | $2,791 | $323,728 | $46,247 | $2,867 | $332,570 | $47,510 | $2,901 | $336,555 | $48,079 | $47,279 | NA | NA | |
Element 2 - Site Installation | Years Amoritized | 7 | Comment | Element 2 - Site Installation | Element 2 - Site Installation | Element 2 - Site Installation | ||||||||||||||
Unit cost | Year | Per Site | Entire Network | Per Site | Entire Network | Per Site | Entire Network | |||||||||||||
Materials | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | |||||||||||
Analyzers | $5,500 | 2019 | $7,429 | $3,358,093 | $479,728 | $7,632 | $3,449,812 | $492,830 | $7,724 | $3,491,151 | $498,736 | NA | NA | $490,431 | ||||||
Spare Analyzers | $172,659 | $24,666 | $177,375 | $25,339 | $179,501 | $25,643 | NA | NA | $25,216 | |||||||||||
Continuous Analyzers | $17,600 | 2019 | $23,774 | $8,606,229 | $1,229,461 | $24,423 | $8,841,288 | $1,263,041 | $24,716 | $8,947,232 | $1,278,176 | NA | NA | $1,256,893 | ||||||
Continuous Spare Analyzers | $301,218 | $43,031 | $309,445 | $44,206 | $313,153 | $44,736 | NA | NA | $43,991 | |||||||||||
Sampling Platform | $2,000 | 2019 | $2,702 | $2,558,419 | $365,488 | $2,775 | $2,558,419 | $365,488 | $2,809 | $2,558,419 | $365,488 | NA | NA | $365,488 | ||||||
Labor | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Per Site Total | |||||||||||||
Procurement Hours per site | 0 | 0 | 4 | 0 | 0 | 0 | 4 | NA | 3,400 | 486 | NA | 3,010 | 430 | NA | 3,010 | 430 | 449 | NA | NA | |
Cost per site | 0 | 0 | 176 | 0 | 0 | 0 | $176 | $238 | $202,059 | $28,866 | $244 | $183,816 | $26,259 | $247 | $186,018 | $26,574 | $27,233 | NA | NA | |
Installation | ||||||||||||||||||||
a) Sampler Hours per site | 0 | 4 | 0 | 0 | 0 | 0 | 4 | NA | 1808 | 258 | NA | 1,808 | 258 | NA | 1,808 | 258 | 258 | NA | NA | |
Cost per site | 0 | 163 | 0 | 0 | 0 | 0 | $163 | $220 | $99,522 | $14,217 | $226 | $102,240 | $14,606 | $229 | $103,465 | $14,781 | $14,535 | NA | NA | |
b) Cont Sampler Hours per site | 0 | 0 | 0 | 10 | 0 | 0 | 10 | NA | 3620 | 517 | NA | 2680 | 383 | NA | 2680 | 383 | 428 | NA | NA | |
Cost per site | 0 | 0 | 0 | 493 | 0 | 0 | $493 | $666 | $241,072 | $34,439 | $684 | $247,657 | $35,380 | $692 | $250,624 | $35,803 | $35,207 | NA | NA | |
Sub Total - Hours | 0 | 4 | 4 | 0 | 0 | 0 | 8 | NA | 5,208 | 1,261 | NA | 4,818 | 1,071 | NA | 4,818 | 1,071 | 1,135 | NA | NA | |
Sub Total - Costs | $0 | $163 | $176 | $0 | $0 | $0 | $339 | $35,029 | $15,065,393 | $2,219,896 | $35,986 | $15,383,230 | $2,267,150 | $36,417 | $15,536,910 | $2,289,938 | $76,975 | NA | $2,182,020 | |
Element 3 - Sampling and Analysis | Comment | Element 3 - Supplies and Site Visits | Element 3 - Supplies and Site Visits | Element 3 - Supplies and Site Visits | ||||||||||||||||
Per Site | Entire Network | Per Site | Entire Network | Per Site | Entire Network | |||||||||||||||
Supplies | Unit cost | Year | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | |||||||||
Filters | $1,033 | 2019 | $328 | $218,009 | $218,009 | $337 | $223,964 | $223,964 | $341 | $226,648 | $226,648 | NA | $222,874 | NA | ||||||
Filter Tape | $500 | 2019 | $675 | $244,495 | $244,495 | $694 | $185,951 | $185,951 | $702 | $188,179 | $188,179 | NA | $206,209 | NA | ||||||
Laboratory Service | $86 | 2019 | $116 | $76,880 | $76,880 | $119 | $78,980 | $78,980 | $120 | $79,926 | $79,926 | NA | NA | $78,595 | ||||||
Routine visits | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Per Site Total | |||||||||||||
1/1 and 1/2 sites Hours per site | 0 | 45 | 50 | 25 | 0 | 0 | 120 | NA | 5,040 | 5,040 | NA | 5,040 | 5,040 | NA | 5,040 | 5,040 | 5,040 | NA | NA | |
Cost per site | 0 | 1839 | 2206 | 1232 | 0 | 0 | $5,277 | $7,128 | $299,384 | $299,384 | $7,323 | $307,561 | $307,561 | $1,998 | $83,931 | $83,931 | $230,292 | NA | NA | |
1/3 and 1/6 sites Hours per site | 0 | 15 | 65 | 100 | 0 | 0 | 180 | NA | 73,800 | 73,800 | NA | 73,800 | 73,800 | NA | 73,800 | 73,800 | 73,800 | NA | NA | |
Cost per site | 0 | 613 | 2868 | 4926 | 0 | 0 | $8,407 | $11,356 | $4,656,038 | $4,656,038 | $11,666 | $4,783,207 | $4,783,207 | $1,998 | $819,325 | $819,325 | $3,419,524 | NA | NA | |
Continuous sites Hours per site | 0 | 0 | 30 | 2 | 0 | 0 | 32 | NA | 11,584 | 11,584 | NA | 14,464 | 14,464 | NA | 14,464 | 14,464 | 13,504 | NA | NA | |
Cost per site | 0 | 0 | 1324 | 99 | 0 | 0 | $1,423 | $1,922 | $695,833 | $695,833 | $1,975 | $892,560 | $892,560 | $1,998 | $903,256 | $903,256 | $830,550 | NA | NA | |
Laboratory Hours per site | 0 | 24 | 24 | 0 | 0 | 0 | 48 | 11.3 | 7,498 | 7,498 | 11.3 | 7,498 | 7,498 | 11.3 | 7,498 | 7,498 | 7,498 | NA | NA | |
Cost per site | 0 | 981 | 1059 | 0 | 0 | 0 | $2,040 | $2,756 | $1,829,742 | $1,829,742 | $2,831 | $1,879,717 | $1,879,717 | $1,998 | $1,326,907 | $1,326,907 | $1,678,789 | NA | NA | |
Sub Total - Hours | 0 | 84 | 169 | 127 | 0 | 0 | 380 | NA | 97,922 | 97,922 | NA | 100,802 | 100,802 | NA | 100,802 | 100,802 | 13,504 | NA | NA | |
Sub Total - Costs | $0 | $3,433 | $7,457 | $6,257 | $0 | $0 | $17,147 | $23,162 | $7,480,997 | $7,480,997 | $23,795 | $7,863,045 | $7,863,045 | $7,993 | $3,133,419 | $3,133,419 | $6,159,154 | $429,082 | $78,595 | |
Element 4 - Maintenance | Comment | Element 4 - Maintenance | Element 4 - Maintenance | Element 4 - Maintenance | ||||||||||||||||
Per Site | Entire Network | Per Site | Entire Network | Per Site | Entire Network | |||||||||||||||
Spare parts/supplies | Unit cost | Year | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | |||||||||
Filter Based | $950 | 2019 | $1,283 | $580,034 | $580,034 | $1,318 | $595,877 | $595,877 | $1,334 | $603,017 | $603,017 | NA | $592,976 | NA | ||||||
Spare Parts - Continuous | $555 | 2019 | $750 | $271,390 | $271,390 | $770 | $206,406 | $206,406 | $779 | $208,879 | $208,879 | NA | $228,892 | NA | ||||||
Remedial Repairs | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Per Site Total | |||||||||||||
Filter Hours per site | 0 | 85 | 0 | 0 | 0 | 0 | 85 | 20 | 9,038 | 9,038 | 20 | 9,038 | 9,038 | 20 | 9,038 | 9,038 | 9,038 | NA | NA | |
Cost per site | $0 | $3,473 | $0 | $0 | $0 | $0 | $3,473 | $1,104 | $498,845 | $498,845 | $1,134 | $512,470 | $512,470 | $1,147 | $518,611 | $518,611 | $509,975 | NA | NA | |
Continuous Hours per site | 0 | 0 | 6 | 1 | 0.5 | 0 | 8 | 7.5 | 2,715 | 2,715 | 7.5 | 2,010 | 2,010 | 7.5 | 2,010 | 2,010 | 2,245 | NA | NA | |
Cost per site | $0 | $0 | $265 | $49 | $28 | $0 | $342 | $462 | $167,235 | $167,235 | $475 | $127,191 | $127,191 | $480 | $128,715 | $128,715 | $141,047 | NA | NA | |
Routine Maint. Filter Hours per site | 0 | 0 | 50 | 25 | 0 | 0 | 75 | 18 | 7,975 | 7,975 | 18 | 7,975 | 7,975 | 18 | 7,975 | 7,975 | 7,975 | NA | NA | |
Cost per site | $0 | $0 | $2,206 | $1,232 | $0 | $0 | $3,438 | $1,093 | $493,818 | $493,818 | $1,122 | $507,306 | $507,306 | $1,136 | $513,385 | $513,385 | $504,836 | NA | NA | |
Continuous Hours per site | 0 | 5 | 5 | 4 | 0 | 0 | 14 | 14 | 5,068 | 5,068 | 14 | 3,752 | 3,752 | 14 | 3,752 | 3,752 | 4,191 | NA | NA | |
Cost per site | $0 | $204 | $221 | $197 | $0 | $0 | $622 | $840 | $304,152 | $304,152 | $863 | $231,323 | $231,323 | $873 | $234,095 | $234,095 | $256,524 | NA | NA | |
Sub Total - Hours | 0 | 85 | 50 | 25 | 0 | 0 | 160 | NA | 17,013 | 17,013 | NA | 17,013 | 17,013 | NA | 17,013 | 17,013 | 17,013 | NA | NA | |
Sub Total - Costs | $0 | $3,473 | $2,206 | $1,232 | $0 | $0 | $7,861 | $3,479 | $1,572,698 | $1,572,698 | $3,574 | $1,615,652 | $1,615,652 | $3,617 | $1,635,012 | $1,635,012 | $1,014,811 | $821,868 | NA | |
Element 5 - Data Management | Comment | Element 5 - Data Management | Element 5 - Data Management | Element 5 - Data Management | ||||||||||||||||
Per Site | Per Site | Entire Network | Per Site | Entire Network | Per Site | Entire Network | ||||||||||||||
Data aquisition/processing | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Total | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | ||||
Filter - based Hours per site | 0 | 0 | 96 | 0 | 0 | 0 | 96 | 23 | 14,996 | 14,996 | 23 | 43,392 | 43,392 | 23 | 43,392 | 43,392 | 33,927 | NA | NA | |
Cost per site | $0 | $0 | $4,236 | $0 | $0 | $0 | $4,236 | $1,346 | $893,813 | $893,813 | $5,878 | $2,656,982 | $2,656,982 | $5,949 | $2,688,821 | $2,688,821 | $2,079,872 | NA | NA | |
Continuous Hours per site | 0 | 0 | 6 | 6 | 0 | 0 | 12 | 12 | 4,344 | 4,344 | 12 | 3,216 | 3,216 | 12 | 3,216 | 3,216 | 3,592 | NA | NA | |
Cost per site | $0 | $0 | $265 | $296 | $0 | $0 | $561 | $758 | $274,324 | $274,324 | $778 | $208,637 | $208,637 | $788 | $211,137 | $211,137 | $231,366 | NA | NA | |
Data reporting Filter Hours per site | 0 | 0 | 0 | 38 | 0 | 0 | 38 | 9 | 4,041 | 4,041 | 9 | 4,041 | 4,041 | 9 | 4,041 | 4,041 | 4,041 | NA | NA | |
Cost per site | $0 | $0 | $0 | $1,872 | $0 | $0 | $1,872 | $595 | $268,885 | $268,885 | $611 | $276,229 | $276,229 | $618 | $279,539 | $279,539 | $274,885 | NA | NA | |
Continuous Hours per site | 0 | 0 | 6 | 12 | 0 | 0 | 18 | 18 | 6,516 | 6,516 | 18 | 4,824 | 4,824 | 18 | 4,824 | 4,824 | 5,388 | NA | NA | |
Cost per site | $0 | $0 | $265 | $591 | $0 | $0 | $856 | $1,156 | $418,576 | $418,576 | $1,188 | $318,349 | $318,349 | $1,202 | $322,163 | $322,163 | $353,029 | NA | NA | |
Data validation Filter Hours per site | 0 | 0 | 24 | 72 | 48 | 0 | 144 | 34 | 15,312 | 15,312 | 34 | 15,312 | 15,312 | 34 | 15,312 | 15,312 | 15,312 | NA | NA | |
Cost per site | $0 | $0 | $1,059 | $3,547 | $2,662 | $0 | $7,268 | $2,310 | $1,043,941 | $1,043,941 | $2,373 | $1,072,454 | $1,072,454 | $2,401 | $1,085,305 | $1,085,305 | $1,067,233 | NA | NA | |
Continuous Hours per site | 0 | 0 | 6 | 14 | 0 | 0 | 20 | 20 | 7,240 | 7,240 | 20 | 5,360 | 5,360 | 20 | 5,360 | 5,360 | 5,987 | NA | NA | |
Cost per site | $0 | $0 | $265 | $690 | $0 | $0 | $955 | $1,290 | $466,986 | $466,986 | $1,325 | $355,167 | $355,167 | $1,341 | $359,423 | $359,423 | $393,858 | NA | NA | |
Data distribution Hours per site | 0 | 0 | 6 | 7 | 0 | 0 | 13 | 13 | 5,876 | 5,876 | 13 | 5,876 | 5,876 | 13 | 5,876 | 5,876 | 5,876 | NA | NA | |
Cost per site | $0 | $0 | $265 | $345 | $0 | $0 | $610 | $194 | $87,618 | $87,618 | $199 | $90,011 | $90,011 | $202 | $91,089 | $91,089 | $89,572 | NA | NA | |
Continuous Hours per site | 0 | 0 | 2 | 2 | 2 | 0 | 6 | 6 | 2,172 | 2,172 | 6 | 1,608 | 1,608 | 6 | 1,608 | 1,608 | 1,796 | NA | NA | |
Cost per site | $0 | $0 | $88 | $99 | $111 | $0 | $298 | $403 | $145,719 | $145,719 | $414 | $110,827 | $110,827 | $418 | $112,155 | $112,155 | $122,900 | NA | NA | |
Sub Total - Hours | 0 | 0 | 146 | 151 | 50 | 0 | 347 | 134 | 60,496 | 60,496 | 134 | 83,629 | 83,629 | 134 | 83,629 | 83,629 | 75,918 | NA | NA | |
Sub Total - Costs | $0 | $0 | $6,443 | $7,440 | $2,773 | $0 | $16,656 | $8,051 | $3,599,861 | $3,599,861 | $12,766 | $5,088,656 | $5,088,656 | $12,919 | $5,149,633 | $5,149,633 | $4,612,716 | NA | NA | |
Element 6 - Quality Assurance | Comment | Element 6 - Quality Assurance | Element 6 - Quality Assurance | Element 6 - Quality Assurance | Labor | Non Labor O & M |
Equipment | |||||||||||||
Years Amoritized | 7 | Per Site | Entire Network | Per Site | Entire Network | Per Site | Entire Network | |||||||||||||
Unit cost | Year | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | ||||||||||
Audit/Calibration Kits (Filter Based) | $125 | 2019 | $169 | $57,747 | $1,650 | $173 | $59,324 | $1,695 | $176 | $60,035 | $1,715 | NA | $1,687 | NA | ||||||
Audit/Calibration Kits (Continuous) | $360 | 2019 | $486 | $176,036 | $5,030 | $500 | $133,885 | $3,825 | $506 | $135,489 | $3,871 | NA | $4,242 | NA | ||||||
Per Site | Per Site | Entire Network | Per Site | Entire Network | Per Site | Entire Network | ||||||||||||||
TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Total | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | |||||
Audits - Filter based Hours per site | 0 | 0 | 0 | 35 | 34 | 0 | 69 | 16.2 | 7,337 | 7,337 | 16.2 | 7,337 | 7,337 | 16.2 | 7,337 | 7,337 | 7,337 | NA | NA | |
Cost per site | 0 | 0 | 0 | 1724 | 1886 | 0 | $3,610 | $1,147 | $518,523 | $518,523 | $1,179 | $532,686 | $532,686 | $1,193 | $539,069 | $539,069 | $530,093 | NA | NA | |
Audits - Continuous Hours per site | 0 | 0 | 12 | 0 | 0 | 0 | 12 | NA | 4,344 | 4,344 | NA | 3,216 | 3,216 | NA | 3,216 | 3,216 | 3,592 | NA | NA | |
Cost per site | 0 | 0 | 529 | 0 | 0 | 0 | $529 | $715 | $258,676 | $258,676 | $734 | $196,736 | $196,736 | $743 | $199,094 | $199,094 | $218,169 | NA | NA | |
Training - Filter Hours per site | 0 | 0 | 0 | 4 | 0 | 0 | 4 | NA | 1,368 | 1,368 | NA | 1,808 | 1,808 | NA | 1,808 | 1,808 | 1,661 | NA | NA | |
Cost per site | 0 | 0 | 0 | 197 | 0 | 0 | $197 | $266 | $91,009 | $91,009 | $273 | $93,495 | $93,495 | $277 | $94,615 | $94,615 | $93,040 | NA | NA | |
Training - Continuous Hours per site | 0 | 0 | 2 | 2 | 1 | 0 | 5 | NA | 1,810 | 1,810 | NA | 1,340 | 1,340 | NA | 1,340 | 1,340 | 1,497 | NA | NA | |
Cost per site | 0 | 0 | 88 | 99 | 55 | 0 | $242 | $327 | $118,336 | $118,336 | $336 | $90,000 | $90,000 | $340 | $91,079 | $91,079 | $99,805 | NA | NA | |
Reporting - Filter Hours per site | 0 | 0 | 0 | 6 | 6 | 0 | 12 | NA | 5,424 | 5,424 | NA | 5,424 | 5,424 | NA | 5,424 | 5,424 | 5,424 | NA | NA | |
Cost per site | 0 | 0 | 0 | 296 | 333 | 0 | $629 | $850 | $384,044 | $384,044 | $873 | $394,533 | $394,533 | $883 | $399,261 | $399,261 | $392,612 | NA | NA | |
Reporting - Cont Hours per site | 0 | 0 | 2 | 2 | 1 | 0 | 5 | NA | 1,810 | 1,810 | NA | 2,260 | 2,260 | NA | 2,260 | 2,260 | 2,110 | NA | NA | |
Cost per site | 0 | 0 | 88 | 99 | 55 | 0 | $242 | $327 | $118,336 | $118,336 | $336 | $90,000 | $90,000 | $340 | $91,079 | $91,079 | $99,805 | NA | NA | |
QA Plan review (annual) | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Labor per RO | Adjusted per RO | Total | Yearly Cost | Adjusted per RO | Total | Yearly Cost | |||||||
Hours per RO | 0 | 0 | 0.2 | 0.3 | 0 | 0 | 0.5 | NA | 58 | 58 | NA | 0 | 0 | NA | 0 | 0 | 19 | NA | NA | |
Cost | 0 | 0 | 9 | 15 | 0 | 0 | $24 | $32 | $3,761 | $3,761 | $33 | $0 | $0 | $34 | $0 | $0 | $1,254 | NA | NA | |
QA Plan preparation | Years Amoritized | 5 | Per RO | Per RO | Entire Network | Per RO | Entire Network | |||||||||||||
Hours per RO | 0 | 0 | 6 | 5 | 5 | 0 | 16 | NA | 1856 | 371 | NA | 0 | 0 | NA | 0 | 0 | 124 | NA | NA | |
Cost per RO | 0 | 0 | 265 | 246 | 277 | 0 | $788 | $1,064 | $123,474 | $24,695 | $1,094 | $0 | $0 | $1,107 | $0 | $0 | $8,232 | NA | NA | |
Sub Total - Hours | 0 | 0 | 22 | 54 | 47 | 0 | 124 | NA | 24,007 | 22,522 | NA | 21,385 | 21,385 | NA | 21,385 | 21,385 | 21,764 | |||
Sub Total - Costs | $0 | $0 | $979 | $2,676 | $2,606 | $0 | $6,261 | $4,728 | $1,616,158 | $1,517,379 | $4,857 | $1,397,450 | $1,397,450 | $4,915 | $1,414,196 | $1,414,196 | $1,443,008 | $5,929 | NA | |
Element 7 - Supervision | Comment | Element 7 - Supervision | Element 7 - Supervision | Element 7 - Supervision | ||||||||||||||||
Per Site | Per Site | Entire Network | Per Site | Entire Network | Per Site | Entire Network | ||||||||||||||
Planning/coordination | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Total | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | ||||
Filter Based Hours per site | 0 | 0 | 0 | 2 | 2 | 0 | 4 | NA | 1,368 | 1,368 | NA | 1,368 | 1,368 | NA | 1,368 | 1,368 | 1,368 | NA | NA | |
Cost per site | 0 | 0 | 0 | 99 | 111 | 0 | $210 | $284 | 97,015 | $97,015 | $291 | 99,664 | $99,664 | $295 | 100,859 | $100,859 | $99,179 | NA | NA | |
Continuous Hours per site | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Total | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | ||||
Hours per site | 0 | 0 | 0 | 6 | 12 | 0 | 18 | NA | 6,516 | 6,516 | NA | 4,824 | 4,824 | NA | 4,824 | 4,824 | 5,388 | NA | NA | |
Cost per site | 0 | 0 | 0 | 296 | 666 | 0 | $962 | $1,299 | $470,409 | $470,409 | $1,335 | $357,770 | $357,770 | $1,351 | $362,057 | $362,057 | $396,745 | NA | NA | |
Supervision/review | ||||||||||||||||||||
Filter Based Hours per site | 0 | 0 | 0 | 0 | 3 | 3 | 6 | NA | 2,052 | 2,052 | NA | 2,052 | 2,052 | NA | 2,052 | 2,052 | 2,052 | NA | NA | |
Cost per site | 0 | 0 | 0 | 0 | 166 | 176 | $342 | $462 | $157,995 | $157,995 | $475 | $162,310 | $162,310 | $480 | $164,255 | $164,255 | $161,520 | NA | NA | |
Continuous Hours per site | 0 | 0 | 0 | 3 | 3 | 0 | 6 | NA | 2,172 | 2,172 | NA | 1,608 | 1,608 | NA | 1,608 | 1,608 | 1,796 | NA | NA | |
Cost per site | 0 | 0 | 0 | 148 | 166 | 0 | $314 | $424 | $153,543 | $153,543 | $436 | $116,777 | $116,777 | $441 | $118,177 | $118,177 | $129,499 | NA | NA | |
Sub Total - Hours | 0 | 0 | 0 | 11 | 20 | 3 | 34 | NA | 12,108 | 12108 | NA | 9852 | 9852 | NA | 9852 | 9852 | 10,604 | NA | NA | |
Sub Total - Costs | $0 | $0 | $0 | $543 | $1,109 | $176 | $1,828 | NA | $878,961 | $878,961 | NA | $736,522 | $736,522 | NA | $745,348 | $745,348 | $786,944 | NA | NA | |
Summary by Element | PM10 | Year 1 | 2019 | Year 2 | 2020 | Year 3 | 2021 | |||||||||||||
TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Total | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | |||||
1 - Network Design Hours | 0 | 6 | 2 | 12 | 10 | 10 | 40 | NA | 4,640 | 663 | NA | 4,640 | 663 | NA | 1,160 | 166 | 497 | |||
Costs | $0 | $245 | $88 | $592 | $555 | $586 | $2,066 | $2,791 | $323,728 | $46,247 | $2,867 | $332,570 | $47,510 | $2,901 | $336,555 | $48,079 | $47,279 | NA | NA | |
2 - Site Installation Hours | 0 | 4 | 4 | 0 | 0 | 0 | 8 | NA | 5,208 | 1,261 | NA | 4,818 | 1,071 | NA | 4,818 | 1,071 | 1,135 | |||
Costs | $0 | $163 | $176 | $0 | $0 | $0 | $339 | $35,029 | $15,065,393 | $2,219,896 | $35,986 | $15,383,230 | $2,267,150 | $36,417 | $15,536,910 | $2,289,938 | $76,975 | NA | $2,182,020 | |
3 - Supplies & site visits Hours | 0 | 84 | 169 | 127 | 0 | 0 | 380 | NA | 97,922 | 97,922 | NA | 100,802 | 100,802 | NA | 100,802 | 100,802 | 13,504 | NA | NA | |
Costs | $0 | $3,433 | $7,457 | $6,257 | $0 | $0 | $17,147 | $23,162 | $7,480,997 | $7,480,997 | $23,795 | $7,863,045 | $7,863,045 | $7,993 | $3,133,419 | $3,133,419 | $6,159,154 | $429,082 | NA | |
4 - Maintenance Hours | 0 | 85 | 50 | 25 | 0 | 0 | 160 | NA | 17,013 | 17,013 | NA | 17,013 | 17,013 | NA | 17,013 | 17,013 | 17,013 | |||
Costs | $0 | $3,473 | $2,206 | $1,232 | $0 | $0 | $7,861 | $3,479 | $1,572,698 | $1,572,698 | $3,574 | $1,615,652 | $1,615,652 | $3,617 | $1,635,012 | $1,635,012 | $1,014,811 | $821,868 | NA | |
5 - Data Managment Hours | 0 | 0 | 146 | 151 | 50 | 0 | 347 | 134 | 60,496 | 60,496 | 134 | 83,629 | 83,629 | 134 | 83,629 | 83,629 | 75,918 | NA | NA | |
Costs | $0 | $0 | $6,443 | $7,440 | $2,773 | $0 | $16,656 | $8,051 | $3,599,861 | $3,599,861 | $12,766 | $5,088,656 | $5,088,656 | $12,919 | $5,149,633 | $5,149,633 | $4,612,716 | NA | NA | |
6 - Quality Assurance Hours | 0 | 0 | 22 | 54 | 47 | 0 | 124 | NA | 24007 | 22522 | NA | 21385 | 21385 | NA | 21385 | 21385 | 21764 | NA | NA | |
Costs | $0 | $0 | $979 | $2,676 | $2,606 | $0 | $6,261 | $4,728 | $1,616,158 | $1,517,379 | $4,857 | $1,397,450 | $1,397,450 | $4,915 | $1,414,196 | $1,414,196 | $1,443,008 | $5,929 | NA | |
7 - Supervision Hours | 0 | 0 | 0 | 11 | 20 | 3 | 34 | NA | 12108 | 12108 | NA | 9852 | 9852 | NA | 9852 | 9852 | 10604 | NA | NA | |
Costs | $0 | $0 | $0 | $543 | $1,109 | $176 | $1,828 | NA | $878,961 | $878,961 | NA | $736,522 | $736,522 | NA | $745,348 | $745,348 | $786,944 | NA | NA | |
Total | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Total | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | ||||
Hours | 0 | 179 | 393 | 380 | 127 | 13 | 1,093 | NA | 197,387 | 211,986 | NA | 220,754 | 234,415 | NA | 217,274 | 233,918 | 140,435 | NA | ||
Costs | $0 | $7,314 | $17,349 | $18,740 | $7,043 | $762 | $52,158 | NA | 28,921,638 | $17,316,038 | NA | 31,019,675 | $19,015,986 | NA | 26,536,876 | $14,415,625 | $14,140,887 | $1,256,878 | $2,182,020 | |
Data Entry for | PAMSVOC | Updated on | August 19, 2018 | Year 1 | 2019 | Year 2 | 2020 | Year 3 | 2021 | Average Yearly Costs | Equipment | |||||||||
Spare Factor | Report Org | 39 | ||||||||||||||||||
0.00% | Report Org | Auto GC Sites | 43 | Report Org | Sites | 43 | Report Org | Sites | 43 | Sites | 43 | |||||||||
Overall Comment | 39 | Canister Sites | 0 | 39 | Canister Sites | 0 | 39 | Canister Sites | 0 | Canister Sites | 0 | |||||||||
General Costs | Labor | Non Labor O & M |
||||||||||||||||||
Element 1 - Network Design | Years Amoritized | 5 | Comment | Element 1 - Network Design | Element 1 - Network Design | Element 1 - Network Design | ||||||||||||||
a) Network Design (by Reporting Organization) | Per RO | Per RO | Entire Network | Per RO | Entire Network | Per RO | Entire Network | |||||||||||||
Labor Category | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Total | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | ||||
Hours per RO | 0 | 0 | 0 | 10 | 10 | 10 | 30 | NA | 1170 | 234 | NA | 1,170 | 234 | NA | 1,170 | 234 | 234 | NA | NA | |
Costs per RO | 0 | 0 | 0 | 493 | 555 | 586 | $1,634 | $2,207 | $86,081 | $17,216 | $2,267 | $88,432 | $17,686 | $2,295 | $89,492 | $17,898 | $17,600 | NA | NA | |
b) Site Selection (Reporting Organization) | ||||||||||||||||||||
Hours per RO | 0 | 0 | 0 | 4 | 4 | 0 | 8 | NA | 312 | 62 | NA | 312 | 62 | NA | 312 | 62 | 62 | NA | NA | |
Costs per RO | 0 | 0 | 0 | 197 | 222 | 0 | $419 | $566 | $22,073 | $4,415 | $581 | $22,676 | $4,535 | $588 | $22,948 | $4,590 | $4,513 | NA | NA | |
Sub Total - Hours | 0 | 0 | 0 | 14 | 14 | 10 | 38 | NA | 1,482 | 296 | NA | 1482 | 296 | NA | 1,482 | 296 | 296 | NA | NA | |
Sub Total - Costs | $0 | $0 | $0 | $690 | $777 | $586 | $2,053 | $2,773 | $108,155 | $21,631 | $2,849 | $111,109 | $22,222 | $2,883 | $112,440 | $22,488 | $22,114 | NA | NA | |
Element 2 - Site Installation | Years Amoritized | 5 | Comment | Element 2 - Site Installation | Element 2 - Site Installation | Element 2 - Site Installation | ||||||||||||||
Unit cost | Year | Per Site | Entire Network | Per Site | Entire Network | Per Site | Entire Network | |||||||||||||
Materials | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | |||||||||||
Analyzers | $100,000 | 2019 | $135,080 | $5,808,448 | $1,161,690 | $138,770 | $5,967,092 | $1,193,418 | $140,432 | $6,038,596 | $1,207,719 | NA | NA | $1,187,609 | ||||||
Canister sampling system | $16,000 | 2019 | $21,613 | $0 | $0 | $22,203 | $954,735 | $190,947 | $22,469 | $966,175 | $193,235 | $128,061 | ||||||||
Gas cleaning system | $5,667 | 2019 | $7,655 | $329,165 | $65,833 | $7,864 | $338,155 | $67,631 | $7,958 | $342,207 | $68,441 | NA | NA | $67,302 | ||||||
Labor | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Per Site Total | |||||||||||||
Procurement Hours per site | 0 | 0 | 0 | 8 | 0 | 0 | 8 | NA | 344 | 69 | NA | 344 | 69 | NA | 344 | 69 | 69 | NA | NA | |
Cost per site | 0 | 0 | 0 | 394 | 0 | 0 | $394 | $532 | $22,885 | $4,577 | $547 | $23,510 | $4,702 | $553 | $23,792 | $4,758 | $4,679 | NA | NA | |
Installation Hours per site | 0 | 0 | 0 | 10 | 5 | 0 | 15 | NA | 645 | 129 | NA | 645 | 129 | NA | 645 | 129 | 129 | NA | NA | |
Cost per site | 0 | 0 | 0 | 493 | 277 | 0 | $770 | $1,040 | $44,725 | $8,945 | $1,069 | $45,947 | $9,189 | $1,081 | $46,497 | $9,299 | $9,145 | NA | NA | |
Sub Total - Hours | 0 | 0 | 0 | 18 | 5 | 0 | 23 | NA | 989 | 198 | NA | 989 | 198 | NA | 989 | 198 | 198 | NA | NA | |
Sub Total - Costs | $0 | $0 | $0 | $887 | $277 | $0 | $1,164 | $1,572 | 67,610 | $1,241,045 | $1,615 | 69,457 | $1,465,888 | $1,635 | 70,289 | $1,483,453 | $13,824 | NA | $1,382,972 | |
Element 3 - Supplies and Site Visits | Comment | Element 3 - Supplies and Site Visits | Element 3 - Supplies and Site Visits | Element 3 - Supplies and Site Visits | ||||||||||||||||
Per Site | Entire Network | Per Site | Entire Network | Per Site | Entire Network | |||||||||||||||
Supplies | Unit cost | Year | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | |||||||||
$16,000 | 2019 | $21,613 | $929,352 | $929,352 | $22,203 | $954,735 | $954,735 | $22,469 | $966,175 | $966,175 | NA | $950,087 | NA | |||||||
Routine visits | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Per Site Total | |||||||||||||
Hours per site | 0 | 0 | 0 | 88 | 0 | 0 | 88 | NA | 3,784 | 3,784 | NA | 3,784 | 3,784 | NA | 3,784 | 3,784 | 3,784 | NA | NA | |
Cost per site | 0 | 0 | 0 | 4335 | 0 | 0 | $4,335 | $5,856 | $251,796 | $251,796 | $6,016 | $258,673 | $258,673 | $6,088 | $261,773 | $261,773 | $257,414 | NA | NA | |
Sub Total - Hours | 0 | 0 | 0 | 88 | 0 | 0 | 88 | NA | 3,784 | 3,784 | NA | 3,784 | 3,784 | NA | 3,784 | 3,784 | 3,784 | NA | NA | |
Sub Total - Costs | $0 | $0 | $0 | $4,335 | $0 | $0 | $20,335 | $27,469 | $1,181,148 | $1,181,148 | $28,219 | $1,213,408 | $1,213,408 | $28,557 | $1,227,948 | $1,227,948 | $1,207,501 | $950,087 | NA | |
Element 4 - Maintenance | Comment | Element 4 - Maintenance | Element 4 - Maintenance | Element 4 - Maintenance | ||||||||||||||||
Per Site | Entire Network | Per Site | Entire Network | Per Site | Entire Network | |||||||||||||||
Spare parts/supplies | Unit cost | Year | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | |||||||||
$3,000 | 2019 | $4,052 | $174,253 | $174,253 | $4,163 | $179,013 | $179,013 | $4,213 | $181,158 | $181,158 | NA | $178,141 | NA | |||||||
Remedial Repairs | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Per Site Total | |||||||||||||
Hours per site | 0 | 0 | 0 | 24 | 8 | 0 | 32 | NA | 1,376 | 1,376 | NA | 1,376 | 1,376 | NA | 1,376 | 1,376 | 1,376 | NA | NA | |
Cost per site | 0 | 0 | 0 | 1182 | 444 | 0 | $1,626 | $2,196 | $94,445 | $94,445 | $2,256 | $97,025 | $97,025 | $2,283 | $98,188 | $98,188 | $96,553 | NA | NA | |
Routine Maint. Hours per site | 0 | 0 | 0 | 48 | 16 | 0 | 64 | NA | 2,752 | 2,752 | NA | 2,752 | 2,752 | NA | 2,752 | 2,752 | 2,752 | NA | NA | |
Cost per site | 0 | 0 | 0 | 2365 | 887 | 0 | $3,252 | $4,393 | $188,891 | $188,891 | $4,513 | $194,050 | $194,050 | $4,567 | $196,375 | $196,375 | $193,105 | NA | NA | |
Sub Total - Hours | 0 | 0 | 0 | 72 | 24 | 0 | 96 | NA | 4,128 | 4,128 | NA | 4,128 | 4,128 | NA | 4,128 | 4,128 | 4,128 | NA | NA | |
Sub Total - Costs | $0 | $0 | $0 | $3,547 | $1,331 | $0 | $7,878 | $10,642 | $457,590 | $457,590 | $10,932 | $470,088 | $470,088 | $11,063 | $475,721 | $475,721 | $289,658 | $178,141 | NA | |
Element 5 - Data Management | Comment | Element 5 - Data Management | Element 5 - Data Management | Element 5 - Data Management | ||||||||||||||||
Per Site | Per Site | Entire Network | Per Site | Entire Network | Per Site | Entire Network | ||||||||||||||
Data aquisition/processing | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Total | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | ||||
Hours per site | 0 | 0 | 0 | 24 | 0 | 0 | 24 | NA | 1,032 | 1,032 | NA | 1,032 | 1,032 | NA | 1,032 | 1,032 | 1,032 | NA | NA | |
Cost per site | 0 | 0 | 0 | 1182 | 0 | 0 | $1,182 | $1,597 | $68,656 | $68,656 | $1,640 | $70,531 | $70,531 | $1,660 | $71,376 | $71,376 | $70,188 | NA | NA | |
Data reporting Hours per site | 0 | 0 | 0 | 8 | 1 | 1 | 10 | NA | 430 | 430 | NA | 430 | 430 | NA | 430 | 430 | 430 | NA | NA | |
Cost per site | 0 | 0 | 0 | 394 | 55 | 59 | $508 | $686 | $29,507 | $29,507 | $705 | $30,313 | $30,313 | $713 | $30,676 | $30,676 | $30,165 | NA | NA | |
Data validation Hours per site | 0 | 0 | 0 | 32 | 8 | 0 | 40 | NA | 1,720 | 1,720 | NA | 1,720 | 1,720 | NA | 1,720 | 1,720 | 1,720 | NA | NA | |
Cost per site | 0 | 0 | 0 | 1576 | 444 | 0 | $2,020 | $2,729 | $117,331 | $117,331 | $2,803 | $120,535 | $120,535 | $2,837 | $121,980 | $121,980 | $119,949 | NA | NA | |
Data distribution Hours per site | 0 | 0 | 0 | 70 | 30 | 10 | 110 | NA | 4,730 | 4,730 | NA | 4,730 | 4,730 | NA | 4,730 | 4,730 | 4,730 | NA | NA | |
Cost per site | 0 | 0 | 0 | 3448 | 1664 | 586 | $5,698 | $7,697 | $330,965 | $330,965 | $7,907 | $340,005 | $340,005 | $8,002 | $344,079 | $344,079 | $338,350 | NA | NA | |
Sub Total - Hours | 0 | 0 | 0 | 134 | 39 | 11 | 184 | NA | 7,912 | 7,912 | NA | 7,912 | 7,912 | NA | 7,912 | 7,912 | 7,912 | NA | NA | |
Sub Total - Costs | $0 | $0 | $0 | $6,600 | $2,163 | $645 | $9,408 | $12,708 | $546,459 | $546,459 | $13,055 | $561,384 | $561,384 | $13,212 | $568,111 | $568,111 | $558,651 | NA | NA | |
Element 6 - Quality Assurance | Comment | Element 6 - Quality Assurance | Element 6 - Quality Assurance | Element 6 - Quality Assurance | Labor | Non Labor O & M |
Equipment | |||||||||||||
Per Site | Per Site | Entire Network | Per Site | Entire Network | Per Site | Entire Network | ||||||||||||||
TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Total | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | |||||
Audits Hours per site | 0 | 0 | 0 | 8 | 8 | 0 | 16 | NA | 688 | 688 | NA | 688 | 688 | NA | 688 | 688 | 688 | NA | NA | |
Cost per site | 0 | 0 | 0 | 394 | 444 | 0 | $838 | $1,132 | $48,675 | $48,675 | $1,163 | $50,004 | $50,004 | $1,177 | $50,603 | $50,603 | $49,761 | NA | NA | |
Routine Calibrations Hours per site | 0 | 0 | 0 | 16 | 0 | 0 | 16 | NA | 688 | 688 | NA | 688 | 688 | NA | 688 | 688 | 688 | NA | NA | |
Cost per site | 0 | 0 | 0 | 788 | 0 | 0 | $788 | $1,064 | $45,771 | $45,771 | $1,094 | $47,021 | $47,021 | $1,107 | $47,584 | $47,584 | $46,792 | NA | NA | |
Coordination/implementation | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Total | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | |||||||
Hours per site | 0 | 0 | 0 | 4 | 5 | 0 | 9 | NA | 387 | 387 | NA | 387 | 387 | NA | 387 | 387 | 387 | NA | NA | |
Cost per site | 0 | 0 | 0 | 197 | 277 | 0 | $474 | $640 | $27,532 | $27,532 | $658 | $28,284 | $28,284 | $666 | $28,623 | $28,623 | $28,146 | NA | NA | |
Training Hours per site | 0 | 0 | 0 | 0 | 20 | 0 | 20 | NA | 860 | 860 | NA | 860 | 860 | NA | 860 | 860 | 860 | NA | NA | |
Cost per site | 0 | 0 | 0 | 0 | 1109 | 0 | $1,109 | $1,498 | $64,416 | $64,416 | $1,539 | $66,175 | $66,175 | $1,557 | $66,968 | $66,968 | $65,853 | NA | NA | |
Reporting Hours per site | 0 | 0 | 0 | 6 | 2 | 0 | 8 | NA | 344 | 344 | NA | 344 | 344 | NA | 344 | 344 | 344 | NA | NA | |
Cost per site | 0 | 0 | 0 | 296 | 111 | 0 | $407 | $550 | $23,640 | $23,640 | $565 | $24,286 | $24,286 | $572 | $24,577 | $24,577 | $24,168 | NA | NA | |
QA Plan review (annual) | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Labor per RO | Adjusted per RO | Total | Yearly Cost | Adjusted per RO | Total | Yearly Cost | |||||||
Hours per RO | 0 | 0 | 0 | 0 | 0 | 0 | 0 | NA | 0 | 0 | NA | 0 | 0 | NA | 0 | 0 | 0 | NA | NA | |
Cost | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | NA | NA | |
QA Plan preparation | Years Amoritized | 5 | Per RO | Per RO | Entire Network | Per RO | Entire Network | |||||||||||||
Hours per RO | 0 | 0 | 0 | 0 | 10 | 5 | 15 | NA | 585 | 117 | NA | 585 | 117 | NA | 585 | 117 | 117 | NA | NA | |
Cost per RO | 0 | 0 | 0 | 0 | 555 | 293 | $848 | $1,145 | $44,674 | $8,935 | $1,177 | $45,894 | $9,179 | $1,191 | $46,444 | $9,289 | $9,134 | NA | NA | |
Sub Total - Hours | 0 | 0 | 0 | 34 | 45 | 5 | 84 | NA | NA | 3,084 | NA | NA | 3,084 | NA | NA | 3,084 | 3,084 | |||
Sub Total - Costs | $0 | $0 | $0 | $1,675 | $2,496 | $293 | $4,464 | $6,030 | NA | $218,968 | $6,195 | NA | $224,949 | $6,269 | NA | $227,644 | $223,854 | |||
Element 7 - Supervision | Comment | Element 7 - Supervision | Element 7 - Supervision | Element 7 - Supervision | ||||||||||||||||
Per Site | Per Site | Entire Network | Per Site | Entire Network | Per Site | Entire Network | ||||||||||||||
Planning/coordination | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Total | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | ||||
Hours per site | 0 | 0 | 0 | 0 | 20 | 0 | 20 | NA | 860 | 860 | NA | 860 | 860 | NA | 860 | 860 | 860 | NA | NA | |
Cost per site | 0 | 0 | 0 | 0 | 1109 | 0 | $1,109 | $1,498 | $64,416 | $64,416 | $1,539 | $66,175 | $66,175 | $1,557 | $66,968 | $66,968 | $65,853 | NA | NA | |
Supervision/review Hours per site | 0 | 0 | 0 | 0 | 16 | 8 | 24 | NA | 1,032 | 1,032 | NA | 1,032 | 1,032 | NA | 1,032 | 1,032 | 1,032 | NA | NA | |
Cost per site | 0 | 0 | 0 | 0 | 887 | 469 | $1,356 | $1,832 | $78,763 | $78,763 | $1,882 | $80,914 | $80,914 | $1,904 | $81,883 | $81,883 | $80,520 | NA | NA | |
Sub Total - Hours | 0 | 0 | 0 | 0 | 36 | 8 | 44 | NA | 1892 | 1892 | NA | 1892 | 1892 | NA | 1892 | 1,892 | 1,892 | NA | NA | |
Sub Total - Costs | $0 | $0 | $0 | $0 | $1,996 | $469 | $2,465 | $3,330 | $143,178 | $143,178 | $3,421 | $147,089 | $147,089 | $3,462 | $148,851 | $148,851 | $146,373 | NA | NA | |
Summary by Element | PAMSVOC | Year 1 | 2019 | Year 2 | 2020 | Year 3 | 2021 | |||||||||||||
TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Total | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | |||||
1 - Network Design Hours | 0 | 0 | 0 | 14 | 14 | 10 | 38 | NA | 1,482 | 296 | NA | 1,482 | 296 | NA | 1,482 | 296 | 296 | |||
Costs | $0 | $0 | $0 | $690 | $777 | $586 | $2,053 | $2,773 | $108,155 | $21,631 | $2,849 | $111,109 | $22,222 | $2,883 | $112,440 | $22,488 | $22,114 | NA | NA | |
2 - Site Installation Hours | 0 | 0 | 0 | 18 | 5 | 0 | 23 | NA | 989 | 198 | NA | 989 | 198 | NA | 989 | 198 | 198 | |||
Costs | $0 | $0 | $0 | $887 | $277 | $0 | $1,164 | $1,572 | $67,610 | $1,241,045 | $1,615 | $69,457 | $1,465,888 | $1,635 | $70,289 | $1,483,453 | $13,824 | NA | $1,382,972 | |
3 - Supplies & site visits Hours | 0 | 0 | 0 | 88 | 0 | 0 | 88 | NA | 3784 | 3784 | NA | 3784 | 3784 | NA | 3784 | 3784 | 3784 | NA | NA | |
Costs | $0 | $0 | $0 | $4,335 | $0 | $0 | $20,335 | $27,469 | $1,181,148 | $1,181,148 | $28,219 | $1,213,408 | $1,213,408 | $28,557 | $1,227,948 | $1,227,948 | $1,207,501 | $950,087 | NA | |
4 - Maintenance Hours | 0 | 0 | 0 | 72 | 24 | 0 | 96 | NA | 4128 | 4128 | NA | 4128 | 4128 | NA | 4128 | 4128 | 4128 | |||
Costs | $0 | $0 | $0 | $3,547 | $1,331 | $0 | $7,878 | $10,642 | $457,590 | $457,590 | $10,932 | $470,088 | $470,088 | $11,063 | $475,721 | $475,721 | $289,658 | $178,141 | NA | |
5 - Data Managment Hours | 0 | 0 | 0 | 134 | 39 | 11 | 184 | NA | 7912 | 7912 | NA | 7912 | 7912 | NA | 7912 | 7912 | 7912 | NA | NA | |
Costs | $0 | $0 | $0 | $6,600 | $2,163 | $645 | $9,408 | $12,708 | $546,459 | $546,459 | $13,055 | $561,384 | $561,384 | $13,212 | $568,111 | $568,111 | $558,651 | NA | NA | |
6 - Quality Assurance Hours | 0 | 0 | 0 | 34 | 45 | 5 | 84 | NA | NA | 3084 | NA | NA | 3084 | NA | NA | 3084 | 3084 | NA | NA | |
Costs | $0 | $0 | $0 | $1,675 | $2,496 | $293 | $4,464 | $6,030 | NA | $218,968 | $6,195 | NA | $224,949 | $6,269 | NA | $227,644 | $223,854 | $0 | NA | |
7 - Supervision Hours | 0 | 0 | 0 | 0 | 36 | 8 | 44 | NA | 1892 | 1892 | NA | 1892 | 1892 | NA | 1892 | 1892 | 1892 | NA | NA | |
Costs | $0 | $0 | $0 | $0 | $1,996 | $469 | $2,465 | $3,330 | $143,178 | $143,178 | $3,421 | $147,089 | $147,089 | $3,462 | $148,851 | $148,851 | $146,373 | NA | NA | |
Total | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Total | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | ||||
Hours | 0 | 0 | 0 | 360 | 163 | 34 | 557 | NA | 20,187 | 21,294 | NA | 20,187 | 21,294 | NA | 20,187 | 21,294 | 21,294 | NA | ||
Costs | $0 | $0 | $0 | $17,734 | $9,040 | $1,993 | $47,767 | $64,524 | 2,504,139 | $3,810,018 | $66,286 | 2,572,534 | $4,105,027 | $67,080 | 2,603,361 | $4,154,217 | $2,461,975 | $1,128,229 | $1,382,972 |
Data Entry for | PAMSNMOC | Updated on | August 19, 2018 | Year 1 | Year 2 | 1 | Year 3 | 2 | Average Yearly Costs | Equipment | ||||||||||
Spare Factor | Report Org | 0 | ||||||||||||||||||
0.00% | Report Org | Sites | 0 | Report Org | Sites | 0 | Report Org | Sites | 0 | Sites | 0 | |||||||||
Overall Comment | 0 | Spares | 0 | 0 | Spares | 0 | 0 | Spares | 0 | Spares | 0 | |||||||||
General Costs | Labor | Non Labor O & M |
||||||||||||||||||
Element 1 - Network Design | Years Amoritized | 5 | Comment | Element 1 - Network Design | Element 1 - Network Design | Element 1 - Network Design | ||||||||||||||
a) Network Design (by Reporting Organization) | Per RO | Per RO | Entire Network | Per RO | Entire Network | Per RO | Entire Network | |||||||||||||
Labor Category | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Total | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | ||||
Hours per RO | 0 | 0 | 0 | 0 | 0 | 0 | 0 | NA | 0 | 0 | NA | 0 | 0 | NA | 0 | 0 | 0 | NA | NA | |
Costs per RO | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | NA | NA | |
b) Site Selection (Reporting Organization) | ||||||||||||||||||||
Hours per RO | 0 | 0 | 0 | 0 | 0 | 0 | 0 | NA | 0 | 0 | NA | 0 | 0 | NA | 0 | 0 | 0 | NA | NA | |
Costs per RO | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | NA | NA | |
Sub Total - Hours | 0 | 0 | 0 | 0 | 0 | 0 | 0 | NA | 0 | 0 | NA | 0 | 0 | NA | 0 | 0 | 0 | NA | NA | |
Sub Total - Costs | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | NA | NA | |
Element 2 - Site Installation | Years Amoritized | 5 | Comment | Element 2 - Site Installation | Element 2 - Site Installation | Element 2 - Site Installation | ||||||||||||||
Unit cost | Year | Per Site | Entire Network | Per Site | Entire Network | Per Site | Entire Network | |||||||||||||
Materials | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | |||||||||||
Analyzers | $11,426 | 2019 | $15,434 | $0 | $0 | $15,856 | $0 | $0 | $16,046 | $0 | $0 | NA | NA | $0 | ||||||
Spare Analyzers | $0 | $0 | $0 | $0 | $0 | $0 | NA | NA | $0 | |||||||||||
Labor | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Per Site Total | |||||||||||||
Procurement Hours per site | 0 | 0 | 0 | 4 | 0 | 0 | 4 | NA | 0 | 0 | NA | 0 | 0 | NA | 0 | 0 | 0 | NA | NA | |
Cost per site | 0 | 0 | 0 | 197 | 0 | 0 | $197 | $266 | $0 | $0 | $273 | $0 | $0 | $277 | $0 | $0 | $0 | NA | NA | |
Installation Hours per site | 0 | 8 | 8 | 0 | 0 | 0 | 16 | NA | 0 | 0 | NA | 0 | 0 | NA | 0 | 0 | 0 | NA | NA | |
Cost per site | 0 | 327 | 353 | 0 | 0 | 0 | $680 | $919 | $0 | $0 | $944 | $0 | $0 | $955 | $0 | $0 | $0 | NA | NA | |
Sub Total - Hours | 0 | 8 | 8 | 4 | 0 | 0 | 20 | NA | 0 | 0 | NA | 0 | 0 | NA | 0 | 0 | 0 | NA | NA | |
Sub Total - Costs | $0 | $327 | $353 | $197 | $0 | $0 | $877 | $1,185 | $0 | $1,217 | $0 | $1,232 | $0 | $0 | NA | $0 | ||||
Element 3 - Supplies and Site Visits | Comment | Element 3 - Supplies and Site Visits | Element 3 - Supplies and Site Visits | Element 3 - Supplies and Site Visits | ||||||||||||||||
Per Site | Entire Network | Per Site | Entire Network | Per Site | Entire Network | |||||||||||||||
Supplies | Unit cost | Year | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | |||||||||
$800 | 2019 | $1,081 | $0 | $0 | $1,110 | $0 | $0 | $1,123 | $0 | $0 | NA | $0 | NA | |||||||
Routine visits | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Per Site Total | |||||||||||||
Hours per site | 0 | 60 | 60 | 0 | 0 | 0 | 120 | NA | 0 | 0 | NA | 0 | 0 | NA | 0 | 0 | 0 | NA | NA | |
Cost per site | 0 | 2451 | 2647 | 0 | 0 | 0 | $5,098 | $6,886 | $0 | $0 | $7,074 | $0 | $0 | $7,159 | $0 | $0 | $0 | NA | NA | |
Sub Total - Hours | 0 | 60 | 60 | 0 | 0 | 0 | 120 | NA | 0 | 0 | NA | 0 | 0 | NA | 0 | 0 | 0 | NA | NA | |
Sub Total - Costs | $0 | $60 | $60 | $0 | $0 | $0 | $5,898 | $7,967 | $0 | $0 | $8,185 | $0 | $0 | $8,283 | $0 | $0 | $0 | $0 | NA | |
Element 4 - Maintenance | Comment | Element 4 - Maintenance | Element 4 - Maintenance | Element 4 - Maintenance | ||||||||||||||||
Per Site | Entire Network | Per Site | Entire Network | Per Site | Entire Network | |||||||||||||||
Spare parts/supplies | Unit cost | Year | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | |||||||||
$1,000 | 2019 | $1,351 | $0 | $0 | $1,388 | $0 | $0 | $1,404 | $0 | $0 | NA | $0 | NA | |||||||
Remedial Repairs | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Per Site Total | |||||||||||||
Hours per site | 0 | 6 | 3 | 3 | 0 | 0 | 12 | NA | 0 | 0 | NA | 0 | 0 | NA | 0 | 0 | 0 | NA | NA | |
Cost per site | 0 | 245 | 132 | 148 | 0 | 0 | $525 | $709 | $0 | $0 | $729 | $0 | $0 | $737 | $0 | $0 | $0 | NA | NA | |
Routine Maint. Hours per site | 0 | 16 | 8 | 32 | 0 | 0 | 56 | NA | 0 | 0 | NA | 0 | 0 | NA | 0 | 0 | 0 | NA | NA | |
Cost per site | 0 | 654 | 353 | 1576 | 0 | 0 | $2,583 | $3,489 | $0 | $0 | $3,584 | $0 | $0 | $3,627 | $0 | $0 | $0 | NA | NA | |
Sub Total - Hours | 0 | 22 | 11 | 35 | 0 | 0 | 68 | NA | 0 | 0 | NA | 0 | 0 | NA | 0 | 0 | 0 | NA | NA | |
Sub Total - Costs | $0 | $899 | $485 | $1,724 | $0 | $0 | $4,108 | $5,549 | $0 | $0 | $5,701 | $0 | $0 | $5,769 | $0 | $0 | $0 | $0 | NA | |
Element 5 - Data Management | Comment | Element 5 - Data Management | Element 5 - Data Management | Element 5 - Data Management | ||||||||||||||||
Per Site | Per Site | Entire Network | Per Site | Entire Network | Per Site | Entire Network | ||||||||||||||
Data aquisition/processing | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Total | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | ||||
Hours per site | 0 | 6 | 3 | 3 | 2 | 0 | 14 | NA | 0 | 0 | NA | 0 | 0 | NA | 0 | 0 | 0 | NA | NA | |
Cost per site | 0 | 245 | 132 | 148 | 111 | 0 | $636 | $859 | $0 | $0 | $883 | $0 | $0 | $893 | $0 | $0 | $0 | NA | NA | |
Data reporting Hours per site | 0 | 1 | 2 | 4 | 2 | 0 | 9 | NA | 0 | 0 | NA | 0 | 0 | NA | 0 | 0 | 0 | NA | NA | |
Cost per site | 0 | 41 | 88 | 197 | 111 | 0 | $437 | $590 | $0 | $0 | $606 | $0 | $0 | $614 | $0 | $0 | $0 | NA | NA | |
Data validation Hours per site | 0 | 0 | 4 | 8 | 0 | 0 | 12 | NA | 0 | 0 | NA | 0 | 0 | NA | 0 | 0 | 0 | NA | NA | |
Cost per site | 0 | 0 | 176 | 394 | 0 | 0 | $570 | $770 | $0 | $0 | $791 | $0 | $0 | $800 | $0 | $0 | $0 | NA | NA | |
Data distribution Hours per site | 0 | 1 | 1 | 2 | 0 | 0 | 4 | NA | 0 | 0 | NA | 0 | 0 | NA | 0 | 0 | 0 | NA | NA | |
Cost per site | 0 | 41 | 44 | 99 | 0 | 0 | $184 | $249 | $0 | $0 | $255 | $0 | $0 | $258 | $0 | $0 | $0 | NA | NA | |
Sub Total - Hours | 0 | 8 | 10 | 17 | 4 | 0 | 39 | NA | 0 | 0 | NA | 0 | 0 | NA | 0 | 0 | 0 | NA | NA | |
Sub Total - Costs | $0 | $327 | $440 | $838 | $222 | $0 | $1,827 | $2,468 | $0 | $0 | $2,535 | $0 | $0 | $2,566 | $0 | $0 | $0 | NA | NA | |
Element 6 - Quality Assurance | Comment | Element 6 - Quality Assurance | Element 6 - Quality Assurance | Element 6 - Quality Assurance | Labor | Non Labor O & M |
Equipment | |||||||||||||
Per Site | Per Site | Entire Network | Per Site | Entire Network | Per Site | Entire Network | ||||||||||||||
TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Total | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | |||||
Audits Hours per site | 0 | 0 | 0 | 20 | 16 | 0 | 36 | NA | 0 | 0 | NA | 0 | 0 | NA | 0 | 0 | 0 | NA | NA | |
Cost per site | 0 | 0 | 0 | 985 | 887 | 0 | $1,872 | $2,529 | $0 | $0 | $2,598 | $0 | $0 | $2,629 | $0 | $0 | $0 | NA | NA | |
Routine Calibrations Hours per site | 0 | 26 | 0 | 0 | 0 | 0 | 26 | NA | 0 | 0 | NA | 0 | 0 | NA | 0 | 0 | 0 | NA | NA | |
Cost per site | 0 | 1062 | 0 | 0 | 0 | 0 | $1,062 | $1,435 | $0 | $0 | $1,474 | $0 | $0 | $1,491 | $0 | $0 | $0 | NA | NA | |
Coordination/implementation | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Total | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | |||||||
Hours per site | 0 | 0 | 0 | 2 | 2 | 0 | 4 | NA | 0 | 0 | NA | 0 | 0 | NA | 0 | 0 | 0 | NA | NA | |
Cost per site | 0 | 0 | 0 | 99 | 111 | 0 | $210 | $284 | $0 | $0 | $291 | $0 | $0 | $295 | $0 | $0 | $0 | NA | NA | |
Training Hours per site | 0 | 1 | 1 | 2 | 1 | 0 | 5 | NA | 0 | 0 | NA | 0 | 0 | NA | 0 | 0 | 0 | NA | NA | |
Cost per site | 0 | 41 | 44 | 99 | 55 | 0 | $239 | $323 | $0 | $0 | $332 | $0 | $0 | $336 | $0 | $0 | $0 | NA | NA | |
Reporting Hours per site | 0 | 0 | 0 | 3 | 3 | 0 | 6 | NA | 0 | 0 | NA | 0 | 0 | NA | 0 | 0 | 0 | NA | NA | |
Cost per site | 0 | 0 | 0 | 148 | 166 | 0 | $314 | $424 | $0 | $0 | $436 | $0 | $0 | $441 | $0 | $0 | $0 | NA | NA | |
QA Plan review (annual) | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Labor per RO | Adjusted per RO | Total | Yearly Cost | Adjusted per RO | Total | Yearly Cost | |||||||
Hours per RO | 0 | 0 | 0.2 | 0.3 | 0 | 0 | 0.5 | NA | 0 | 0 | NA | 0 | 0 | NA | 0 | 0 | 0 | NA | NA | |
Cost | 0 | 0 | 9 | 15 | 0 | 0 | $24 | $32 | $0 | $0 | $33 | $0 | $0 | $34 | $0 | $0 | $0 | NA | NA | |
QA Plan preparation | Years Amoritized | 5 | Per RO | Per RO | Entire Network | Per RO | Entire Network | |||||||||||||
Hours per RO | 0 | 0 | 0 | 5 | 5 | 5 | 15 | NA | 0 | 0 | NA | 0 | 0 | NA | 0 | 0 | 0 | NA | NA | |
Cost per RO | 0 | 0 | 0 | 246 | 277 | 293 | $816 | $1,102 | $0 | $0 | $1,132 | $0 | $0 | $1,146 | $0 | $0 | $0 | NA | NA | |
Sub Total - Hours | 0 | 27 | 1 | 32 | 27 | 5 | 93 | NA | NA | 0 | NA | NA | 0 | NA | NA | 0 | 0 | |||
Sub Total - Costs | $0 | $1,103 | $53 | $1,592 | $1,496 | $293 | $4,537 | $6,129 | NA | $0 | $6,296 | NA | $0 | $6,371 | NA | $0 | $0 | |||
Element 7 - Supervision | Comment | Element 7 - Supervision | Element 7 - Supervision | Element 7 - Supervision | ||||||||||||||||
Per Site | Per Site | Entire Network | Per Site | Entire Network | Per Site | Entire Network | ||||||||||||||
Planning/coordination | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Total | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | ||||
Hours per site | 0 | 0 | 0 | 0 | 8 | 4 | 12 | NA | 0 | 0 | NA | 0 | 0 | NA | 0 | 0 | 0 | NA | NA | |
Cost per site | 0 | 0 | 0 | 0 | 444 | 234 | $678 | $916 | $0 | $0 | $941 | $0 | $0 | $952 | $0 | $0 | $0 | NA | NA | |
Supervision/review Hours per site | 0 | 0 | 16 | 8 | 4 | 2 | 30 | NA | 0 | 0 | NA | 0 | 0 | NA | 0 | 0 | 0 | NA | NA | |
Cost per site | 0 | 0 | 706 | 394 | 222 | 117 | $1,439 | $1,944 | $0 | $0 | $1,997 | $0 | $0 | $2,021 | $0 | $0 | $0 | NA | NA | |
Sub Total - Hours | 0 | 0 | 16 | 8 | 12 | 6 | 42 | NA | 0 | 0 | NA | 0 | 0 | NA | 0 | 0 | 0 | NA | NA | |
Sub Total - Costs | $0 | $0 | $706 | $394 | $666 | $351 | $2,117 | $2,860 | $0 | $0 | $2,938 | $0 | $0 | $2,973 | $0 | $0 | $0 | NA | NA | |
Summary by Element | PAMSNMOC | Year 1 | 0 | Year 2 | 1 | Year 3 | 2 | |||||||||||||
TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Total | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | |||||
1 - Network Design Hours | 0 | 0 | 0 | 0 | 0 | 0 | 0 | NA | 0 | 0 | NA | 0 | 0 | NA | 0 | 0 | 0 | |||
Costs | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | NA | NA | |
2 - Site Installation Hours | 0 | 8 | 8 | 4 | 0 | 0 | 20 | NA | 0 | 0 | NA | 0 | 0 | NA | 0 | 0 | 0 | |||
Costs | $0 | $327 | $353 | $197 | $0 | $0 | $877 | $1,185 | $0 | $0 | $1,217 | $0 | $0 | $1,232 | $0 | $0 | $0 | NA | $0 | |
3 - Supplies & site visits Hours | 0 | 60 | 60 | 0 | 0 | 0 | 120 | NA | 0 | 0 | NA | 0 | 0 | NA | 0 | 0 | 0 | NA | NA | |
Costs | $0 | $60 | $60 | $0 | $0 | $0 | $5,898 | $7,967 | $0 | $0 | $8,185 | $0 | $0 | $8,283 | $0 | $0 | $0 | $0 | NA | |
4 - Maintenance Hours | 0 | 22 | 11 | 35 | 0 | 0 | 68 | NA | 0 | 0 | NA | 0 | 0 | NA | 0 | 0 | 0 | |||
Costs | $0 | $899 | $485 | $1,724 | $0 | $0 | $4,108 | $5,549 | $0 | $0 | $5,701 | $0 | $0 | $5,769 | $0 | $0 | $0 | $0 | NA | |
5 - Data Managment Hours | 0 | 8 | 10 | 17 | 4 | 0 | 39 | NA | 0 | 0 | NA | 0 | 0 | NA | 0 | 0 | 0 | NA | NA | |
Costs | $0 | $327 | $440 | $838 | $222 | $0 | $1,827 | $2,468 | $0 | $0 | $2,535 | $0 | $0 | $2,566 | $0 | $0 | $0 | NA | NA | |
6 - Quality Assurance Hours | 0 | 27 | 1 | 32 | 27 | 5 | 93 | NA | NA | 0 | NA | NA | 0 | NA | NA | 0 | 0 | NA | NA | |
Costs | $0 | $1,103 | $53 | $1,592 | $1,496 | $293 | $4,537 | $6,129 | NA | $0 | $6,296 | NA | $0 | $6,371 | NA | $0 | $0 | $0 | NA | |
7 - Supervision Hours | 0 | 0 | 16 | 8 | 12 | 6 | 42 | NA | 0 | 0 | NA | 0 | 0 | NA | 0 | 0 | 0 | NA | NA | |
Costs | $0 | $0 | $706 | $394 | $666 | $351 | $2,117 | $2,860 | $0 | $0 | $2,938 | $0 | $0 | $2,973 | $0 | $0 | $0 | NA | NA | |
Total | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Total | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | ||||
Hours | 0 | 125 | 106 | 96 | 43 | 11 | 382 | NA | 0 | 0 | NA | 0 | 0 | NA | 0 | 0 | 0 | NA | ||
Costs | $0 | $2,716 | $2,097 | $4,745 | $2,384 | $644 | $19,364 | $26,157 | 0 | $0 | $26,871 | 0 | $0 | $27,193 | 0 | $0 | $0 | $0 | $0 |
Data Entry for | PAMSNOx | Updated on | August 19, 2018 | Year 1 | 2019 | Year 2 | 2020 | Year 3 | 2021 | Average Yearly Costs | Equipment | |||||||||
Spare Factor | Report Org | 39 | ||||||||||||||||||
0.00% | Report Org | Precursor NOy | 43 | Report Org | Precursor NOy | 43 | Report Org | Precursor NOy | 43 | Precursor NOy | 43 | |||||||||
Other | 0 | Other | 0 | Other | 0 | Other | 0 | |||||||||||||
Overall Comment | 39 | Spares | 0 | 39 | Spares | 0 | 39 | Spares | 0 | Spares | 0 | |||||||||
General Costs | Labor | Non Labor O & M |
||||||||||||||||||
Element 1 - Network Design (1) | Years Amoritized | 5 | Comment | Element 1 - Network Design | Element 1 - Network Design | Element 1 - Network Design | ||||||||||||||
a) Network Design (by Reporting Organization) | Per RO | Per RO | Entire Network | Per RO | Entire Network | Per RO | Entire Network | |||||||||||||
Labor Category | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Total | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | ||||
Hours per RO | 0 | 0 | 0 | 0 | 0 | 0 | 0 | NA | 0 | 0 | NA | 0 | 0 | NA | 0 | 0 | 0 | NA | NA | |
Costs per RO | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | NA | NA | |
b) Site Selection (Reporting Organization) | ||||||||||||||||||||
Hours per RO | 0 | 0 | 0 | 0 | 0 | 0 | 0 | NA | 0 | 0 | NA | 0 | 0 | NA | 0 | 0 | 0 | NA | NA | |
Costs per RO | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | NA | NA | |
Sub Total - Hours | 0 | 0 | 0 | 0 | 0 | 0 | 0 | NA | 0 | 0 | NA | 0 | 0 | NA | 0 | 0 | 0 | NA | NA | |
Sub Total - Costs | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | NA | NA | |
Element 2 - Site Installation (1) | Years Amoritized | 5 | Comment | Element 2 - Site Installation | Element 2 - Site Installation | Element 2 - Site Installation | ||||||||||||||
Unit cost | Year | Per Site | Entire Network | Per Site | Entire Network | Per Site | Entire Network | |||||||||||||
Materials | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | |||||||||||
Analyzers | $20,500 | 2019 | $27,691 | $1,190,732 | $238,146 | $28,448 | $1,223,254 | $244,651 | $28,789 | $1,237,912 | $247,582 | NA | NA | $243,460 | ||||||
Spare Analyzers | $0 | $0 | $0 | $0 | $0 | $0 | NA | NA | $0 | |||||||||||
Labor | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Per Site Total | |||||||||||||
Procurement Hours per site | 0 | 0 | 0 | 0 | 0 | 0 | 0 | NA | 0 | 0 | NA | 0 | 0 | NA | 0 | 0 | 0 | NA | NA | |
Cost per site | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | NA | NA | |
Installation Hours per site | 0 | 0 | 0 | 0 | 0 | 0 | 0 | NA | 0 | 0 | NA | 0 | 0 | NA | 0 | 0 | 0 | NA | NA | |
Cost per site | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | NA | NA | |
Sub Total - Hours | 0 | 0 | 0 | 0 | 0 | 0 | 0 | NA | 0 | 0 | NA | 0 | 0 | NA | 0 | 0 | 0 | NA | NA | |
Sub Total - Costs | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $238,146 | $0 | $244,651 | $0 | $247,582 | $0 | NA | $243,460 | ||||
Element 3 - Supplies and Site Visits (1) | Comment | Element 3 - Supplies and Site Visits | Element 3 - Supplies and Site Visits | Element 3 - Supplies and Site Visits | ||||||||||||||||
Per Site | Entire Network | Per Site | Entire Network | Per Site | Entire Network | |||||||||||||||
Supplies | Unit cost | Year | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | |||||||||
$800 | 2019 | $1,081 | $46,468 | $46,468 | $1,110 | $47,737 | $47,737 | $1,123 | $48,309 | $48,309 | NA | $47,504 | NA | |||||||
Routine visits | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Per Site Total | |||||||||||||
Hours per site | 0 | 0 | 0 | 0 | 0 | 0 | 0 | NA | 0 | 0 | NA | 0 | 0 | NA | 0 | 0 | 0 | NA | NA | |
Cost per site | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | NA | NA | |
Sub Total - Hours | 0 | 0 | 0 | 0 | 0 | 0 | 0 | NA | 0 | 0 | NA | 0 | 0 | NA | 0 | 0 | 0 | NA | NA | |
Sub Total - Costs | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $1,081 | $46,468 | $46,468 | $1,110 | $47,737 | $47,737 | $1,123 | $48,309 | $48,309 | $47,504 | $47,504 | NA | |
Element 4 - Maintenance (1) | Comment | Element 4 - Maintenance | Element 4 - Maintenance | Element 4 - Maintenance | ||||||||||||||||
Per Site | Entire Network | Per Site | Entire Network | Per Site | Entire Network | |||||||||||||||
Spare parts/supplies | Unit cost | Year | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | |||||||||
$1,000 | 2019 | $1,351 | $58,084 | $58,084 | $1,388 | $59,671 | $59,671 | $1,404 | $60,386 | $60,386 | NA | $59,380 | NA | |||||||
Remedial Repairs | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Per Site Total | |||||||||||||
Hours per site | 0 | 0 | 0 | 0 | 0 | 0 | 0 | NA | 0 | 0 | NA | 0 | 0 | NA | 0 | 0 | 0 | NA | NA | |
Cost per site | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | NA | NA | |
Routine Maint. Hours per site | 0 | 0 | 0 | 0 | 0 | 0 | 0 | NA | 0 | 0 | NA | 0 | 0 | NA | 0 | 0 | 0 | NA | NA | |
Cost per site | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | NA | NA | |
Sub Total - Hours | 0 | 0 | 0 | 0 | 0 | 0 | 0 | NA | 0 | 0 | NA | 0 | 0 | NA | 0 | 0 | 0 | NA | NA | |
Sub Total - Costs | $0 | $0 | $0 | $0 | $0 | $0 | 0 | $1,351 | $58,084 | $58,084 | $1,388 | $59,671 | $59,671 | $1,404 | $60,386 | $60,386 | $0 | $59,380 | NA | |
Element 5 - Data Management | Comment | Element 5 - Data Management | Element 5 - Data Management | Element 5 - Data Management | ||||||||||||||||
Per Site | Per Site | Entire Network | Per Site | Entire Network | Per Site | Entire Network | ||||||||||||||
Data aquisition/processing | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Total | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | ||||
Hours per site | 0 | 0 | 0 | 0 | 0 | 0 | 0 | NA | 0 | 0 | NA | 0 | 0 | NA | 0 | 0 | 0 | NA | NA | |
Cost per site | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | NA | NA | |
Data reporting Hours per site | 0 | 0 | 0 | 0 | 0 | 0 | 0 | NA | 0 | 0 | NA | 0 | 0 | NA | 0 | 0 | 0 | NA | NA | |
Cost per site | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | NA | NA | |
Data validation Hours per site | 0 | 0 | 5 | 10 | 0 | 0 | 15 | NA | 645 | 645 | NA | 645 | 645 | NA | 645 | 645 | 645 | NA | NA | |
Cost per site | 0 | 0 | 221 | 493 | 0 | 0 | $714 | $964 | $41,472 | $41,472 | $991 | $42,605 | $42,605 | $1,003 | $43,116 | $43,116 | $42,398 | NA | NA | |
Data distribution Hours per site | 0 | 0 | 2 | 3 | 0 | 0 | 5 | NA | 215 | 215 | NA | 215 | 215 | NA | 215 | 215 | 215 | NA | NA | |
Cost per site | 0 | 0 | 88 | 148 | 0 | 0 | $236 | $319 | $13,708 | $13,708 | $327 | $14,082 | $14,082 | $331 | $14,251 | $14,251 | $14,014 | NA | NA | |
Sub Total - Hours | 0 | 0 | 7 | 13 | 0 | 0 | 20 | NA | 860 | 860 | NA | 860 | 860 | NA | 860 | 860 | 860 | NA | NA | |
Sub Total - Costs | $0 | $0 | $309 | $641 | $0 | $0 | $950 | $1,283 | $55,180 | $55,180 | $1,318 | $56,687 | $56,687 | $1,334 | $57,367 | $57,367 | $56,411 | NA | NA | |
Element 6 - Quality Assurance (1) | Comment | Element 6 - Quality Assurance | Element 6 - Quality Assurance | Element 6 - Quality Assurance | Labor | Non Labor O & M |
Equipment | |||||||||||||
Per Site | Per Site | Entire Network | Per Site | Entire Network | Per Site | Entire Network | ||||||||||||||
TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Total | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | |||||
Audits Hours per site | 0 | 0 | 36 | 36 | 0 | 0 | 72 | NA | 3,096 | 3,096 | NA | 3,096 | 3,096 | NA | 3,096 | 3,096 | 3,096 | NA | NA | |
Cost per site | 0 | 0 | 1588 | 1773 | 0 | 0 | $3,361 | $4,540 | $195,222 | $195,222 | $4,664 | $200,554 | $200,554 | $4,720 | $202,957 | $202,957 | $199,578 | NA | NA | |
Routine Calibrations Hours per site | 0 | 24 | 24 | 0 | 0 | 0 | 48 | NA | 2,064 | 2,064 | NA | 2,064 | 2,064 | NA | 2,064 | 2,064 | 2,064 | NA | NA | |
Cost per site | 0 | 981 | 1059 | 0 | 0 | 0 | $2,040 | $2,756 | $118,492 | $118,492 | $2,831 | $121,729 | $121,729 | $2,865 | $123,187 | $123,187 | $121,136 | NA | NA | |
Coordination/implementation | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Total | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | |||||||
Hours per site | 0 | 0 | 0 | 2 | 2 | 0 | 4 | NA | 172 | 172 | NA | 172 | 172 | NA | 172 | 172 | 172 | NA | NA | |
Cost per site | 0 | 0 | 0 | 99 | 111 | 0 | $210 | $284 | $12,198 | $12,198 | $291 | $12,531 | $12,531 | $295 | $12,681 | $12,681 | $12,470 | NA | NA | |
Training Hours per site | 0 | 1 | 1 | 2 | 1 | 0 | 5 | NA | 215 | 215 | NA | 215 | 215 | NA | 215 | 215 | 215 | NA | NA | |
Cost per site | 0 | 41 | 44 | 99 | 55 | 0 | $239 | $323 | $13,882 | $13,882 | $332 | $14,261 | $14,261 | $336 | $14,432 | $14,432 | $14,192 | NA | NA | |
Reporting Hours per site | 0 | 0 | 3 | 3 | 0 | 0 | 6 | NA | 258 | 258 | NA | 258 | 258 | NA | 258 | 258 | 258 | NA | NA | |
Cost per site | 0 | 0 | 132 | 148 | 0 | 0 | $280 | $378 | $16,264 | $16,264 | $389 | $16,708 | $16,708 | $393 | $16,908 | $16,908 | $16,627 | NA | NA | |
QA Plan review (annual) | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Labor per RO | Adjusted per RO | Total | Yearly Cost | Adjusted per RO | Total | Yearly Cost | |||||||
Hours per RO | 0 | 0 | 0 | 0 | 0 | 0 | 0 | NA | 0 | 0 | NA | 0 | 0 | NA | 0 | 0 | 0 | NA | NA | |
Cost | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | NA | NA | |
QA Plan preparation | Years Amoritized | 5 | Per RO | Per RO | Entire Network | Per RO | Entire Network | |||||||||||||
Hours per RO | 0 | 0 | 5 | 5 | 5 | 0 | 15 | NA | 585 | 117 | NA | 585 | 117 | NA | 585 | 117 | 117 | NA | NA | |
Cost per RO | 0 | 0 | 221 | 246 | 277 | 0 | $744 | $1,005 | $39,195 | $7,839 | $1,032 | $40,265 | $8,053 | $1,045 | $40,748 | $8,150 | $8,014 | NA | NA | |
Sub Total - Hours | 0 | 25 | 69 | 48 | 8 | 0 | 150 | NA | NA | 5,922 | NA | NA | 5,922 | NA | NA | 5,922 | 5,922 | |||
Sub Total - Costs | $0 | $1,022 | $3,044 | $2,365 | $443 | $0 | $6,874 | $9,285 | NA | $363,897 | $9,539 | NA | $373,836 | $9,653 | NA | $378,315 | $372,016 | |||
Element 7 - Supervision | Comment | Element 7 - Supervision | Element 7 - Supervision | Element 7 - Supervision | ||||||||||||||||
Per Site | Per Site | Entire Network | Per Site | Entire Network | Per Site | Entire Network | ||||||||||||||
Planning/coordination | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Total | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | ||||
Hours per site | 0 | 0 | 0 | 0 | 8 | 4 | 12 | NA | 516 | 516 | NA | 516 | 516 | NA | 516 | 516 | 516 | NA | NA | |
Cost per site | 0 | 0 | 0 | 0 | 444 | 234 | $678 | $916 | $39,381 | $39,381 | $941 | $40,457 | $40,457 | $952 | $40,942 | $40,942 | $40,260 | NA | NA | |
Supervision/review Hours per site | 0 | 0 | 16 | 8 | 4 | 2 | 30 | NA | 1,290 | 1,290 | NA | 1,290 | 1,290 | NA | 1,290 | 1,290 | 1,290 | NA | NA | |
Cost per site | 0 | 0 | 706 | 394 | 222 | 117 | $1,439 | $1,944 | $83,584 | $83,584 | $1,997 | $85,866 | $85,866 | $2,021 | $86,895 | $86,895 | $85,448 | NA | NA | |
Sub Total - Hours | 0 | 0 | 16 | 8 | 12 | 6 | 42 | NA | 1806 | 1806 | NA | 1806 | 1806 | NA | 1806 | 1,806 | 1,806 | NA | NA | |
Sub Total - Costs | $0 | $0 | $706 | $394 | $666 | $351 | $2,117 | $2,860 | $122,965 | $122,965 | $2,938 | $126,323 | $126,323 | $2,973 | $127,837 | $127,837 | $125,708 | NA | NA | |
Summary by Element | PAMSNOx | Year 1 | 2019 | Year 2 | 2020 | Year 3 | 2021 | |||||||||||||
TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Total | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | |||||
1 - Network Design Hours | 0 | 0 | 0 | 0 | 0 | 0 | 0 | NA | 0 | 0 | NA | 0 | 0 | NA | 0 | 0 | 0 | |||
Costs | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | NA | NA | |
2 - Site Installation Hours | 0 | 0 | 0 | 0 | 0 | 0 | 0 | NA | 0 | 0 | NA | 0 | 0 | NA | 0 | 0 | 0 | |||
Costs | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $238,146 | $0 | $0 | $244,651 | $0 | $0 | $247,582 | $0 | NA | $243,460 | |
3 - Supplies & site visits Hours | 0 | 0 | 0 | 0 | 0 | 0 | 0 | NA | 0 | 0 | NA | 0 | 0 | NA | 0 | 0 | 0 | NA | NA | |
Costs | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $1,081 | $46,468 | $46,468 | $1,110 | $47,737 | $47,737 | $1,123 | $48,309 | $48,309 | $47,504 | $47,504 | NA | |
4 - Maintenance Hours | 0 | 0 | 0 | 0 | 0 | 0 | 0 | NA | 0 | 0 | NA | 0 | 0 | NA | 0 | 0 | 0 | |||
Costs | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $1,351 | $58,084 | $58,084 | $1,388 | $59,671 | $59,671 | $1,404 | $60,386 | $60,386 | $0 | $59,380 | NA | |
5 - Data Managment Hours | 0 | 0 | 7 | 13 | 0 | 0 | 20 | NA | 860 | 860 | NA | 860 | 860 | NA | 860 | 860 | 860 | NA | NA | |
Costs | $0 | $0 | $309 | $641 | $0 | $0 | $950 | $1,283 | $55,180 | $55,180 | $1,318 | $56,687 | $56,687 | $1,334 | $57,367 | $57,367 | $56,411 | NA | NA | |
6 - Quality Assurance Hours | 0 | 25 | 69 | 48 | 8 | 0 | 150 | NA | NA | 5922 | NA | NA | 5922 | NA | NA | 5922 | 5922 | NA | NA | |
Costs | $0 | $1,022 | $3,044 | $2,365 | $443 | $0 | $6,874 | $9,285 | NA | $363,897 | $9,539 | NA | $373,836 | $9,653 | NA | $378,315 | $372,016 | $0 | NA | |
7 - Supervision Hours | 0 | 0 | 16 | 8 | 12 | 6 | 42 | NA | 1806 | 1806 | NA | 1806 | 1806 | NA | 1806 | 1806 | 1806 | NA | NA | |
Costs | $0 | $0 | $706 | $394 | $666 | $351 | $2,117 | $2,860 | $122,965 | $122,965 | $2,938 | $126,323 | $126,323 | $2,973 | $127,837 | $127,837 | $125,708 | NA | NA | |
Total | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Total | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | ||||
Hours | 0 | 25 | 92 | 69 | 20 | 6 | 212 | NA | 2,666 | 8,588 | NA | 2,666 | 8,588 | NA | 2,666 | 8,588 | 8,588 | NA | ||
Costs | $0 | $1,022 | $4,059 | $3,400 | $1,109 | $351 | $9,941 | $15,860 | 282,697 | $884,740 | $16,293 | 290,418 | $908,905 | $16,488 | 293,898 | $919,796 | $601,640 | $106,885 | $243,460 | |
1) includes costs for Precursor NOy analyzers only, NO2 analyzers are covered in NO2 network costs (see seperate spreadsheet) |
Data Entry for | PAMSSurfMet | Updated on | August 19, 2018 | Year 1 | 2019 | Year 2 | 2020 | Year 3 | 2021 | Average Yearly Costs | Equipment | |||||||||
Spare Factor | Report Org | 39 | ||||||||||||||||||
5.00% | Report Org | Sites | 43 | Report Org | Sites | 43 | Report Org | Sites | 43 | Sites | 43 | |||||||||
Overall Comment | 39 | Spares | 2 | 39 | Spares | 2 | 39 | Spares | 2 | Spares | 2 | |||||||||
General Costs | Labor | Non Labor O & M |
||||||||||||||||||
Element 1 - Network Design | Years Amoritized | 5 | Comment | Element 1 - Network Design | Element 1 - Network Design | Element 1 - Network Design | ||||||||||||||
Network Design and Site Selection | Per RO | Per RO | Entire Network | Per RO | Entire Network | Per RO | Entire Network | |||||||||||||
Labor Category | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Total | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | ||||
Hours per RO | 0 | 0 | 0 | 5 | 12 | 2 | 19 | NA | 741 | 148 | NA | 741 | 148 | NA | 741 | 148 | 148 | NA | NA | |
Costs per RO | 0 | 0 | 0 | 246 | 666 | 117 | $1,029 | $1,390 | $54,209 | $10,842 | $1,428 | $55,690 | $11,138 | $1,445 | $56,357 | $11,271 | $11,084 | NA | NA | |
Sub Total - Hours | 0 | 0 | 0 | 5 | 12 | 2 | 19 | NA | 741 | 148 | NA | 741 | 148 | NA | 741 | 148 | 148 | NA | NA | |
Sub Total - Costs | $0 | $0 | $0 | $246 | $666 | $117 | $1,029 | $1,390 | $54,209 | $10,842 | $1,428 | $55,690 | $11,138 | $1,445 | $56,357 | $11,271 | $11,084 | NA | NA | |
Element 2 - Site Installation | Years Amoritized | 5 | Comment | Element 2 - Site Installation | Element 2 - Site Installation | Element 2 - Site Installation | ||||||||||||||
Unit cost | Year | Per Site | Entire Network | Per Site | Entire Network | Per Site | Entire Network | |||||||||||||
Materials | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | |||||||||||
Analyzers | $17,285 | 2019 | $23,349 | $1,003,990 | $200,798 | $23,986 | $1,031,412 | $206,282 | $24,274 | $1,043,771 | $208,754 | NA | NA | $205,278 | ||||||
Spare Analyzers | $50,200 | $10,040 | $51,571 | $10,314 | $52,189 | $10,438 | NA | NA | $10,264 | |||||||||||
Labor | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Per Site Total | |||||||||||||
Procurement Hours per site | 0 | 0 | 0 | 4 | 4 | 0 | 8 | NA | 361 | 72 | NA | 361 | 72 | NA | 361 | 72 | 72 | NA | NA | |
Cost per site | 0 | 0 | 0 | 197 | 222 | 0 | $419 | $566 | $25,554 | $5,111 | $581 | $25,002 | $5,000 | $588 | $25,302 | $5,060 | $5,057 | NA | NA | |
Installation Hours per site | 0 | 8 | 8 | 0 | 0 | 0 | 16 | NA | 688 | 138 | NA | 688 | 138 | NA | 688 | 138 | 138 | NA | NA | |
Cost per site | 0 | 327 | 353 | 0 | 0 | 0 | $680 | $919 | $39,497 | $7,899 | $944 | $40,576 | $8,115 | $955 | $41,062 | $8,212 | $8,076 | NA | NA | |
Sub Total - Hours | 0 | 8 | 8 | 4 | 4 | 0 | 24 | NA | 1,049 | 210 | NA | 1,049 | 210 | NA | 1,049 | 210 | 210 | NA | NA | |
Sub Total - Costs | $0 | $327 | $353 | $197 | $222 | $0 | $1,099 | $1,485 | $223,848 | $1,525 | $229,712 | $1,543 | $232,465 | $13,133 | NA | $215,542 | ||||
Element 3 - Supplies and Site Visits | Comment | Element 3 - Supplies and Site Visits | Element 3 - Supplies and Site Visits | Element 3 - Supplies and Site Visits | ||||||||||||||||
Per Site | Entire Network | Per Site | Entire Network | Per Site | Entire Network | |||||||||||||||
Supplies | Unit cost | Year | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | |||||||||
$750 | 2019 | $1,013 | $43,563 | $43,563 | $1,041 | $44,753 | $44,753 | $1,053 | $45,289 | $45,289 | NA | $44,535 | NA | |||||||
Routine visits | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Per Site Total | |||||||||||||
Hours per site | 0 | 60 | 60 | 0 | 0 | 0 | 120 | NA | 5,160 | 5,160 | NA | 5,160 | 5,160 | NA | 5,160 | 5,160 | 5,160 | NA | NA | |
Cost per site | 0 | 2451 | 2647 | 0 | 0 | 0 | $5,098 | $6,886 | $296,115 | $296,115 | $7,074 | $304,202 | $304,202 | $7,159 | $307,848 | $307,848 | $302,722 | NA | NA | |
Sub Total - Hours | 0 | 60 | 60 | 0 | 0 | 0 | 120 | NA | 5,160 | 5,160 | NA | 5,160 | 5,160 | NA | 5,160 | 5,160 | 5,160 | NA | NA | |
Sub Total - Costs | $0 | $2,451 | $2,647 | $0 | $0 | $0 | $5,848 | $7,899 | $339,678 | $339,678 | $8,115 | $348,956 | $348,956 | $8,212 | $353,137 | $353,137 | $347,257 | $44,535 | NA | |
Element 4 - Maintenance | Comment | Element 4 - Maintenance | Element 4 - Maintenance | Element 4 - Maintenance | ||||||||||||||||
Per Site | Entire Network | Per Site | Entire Network | Per Site | Entire Network | |||||||||||||||
Spare parts/supplies | Unit cost | Year | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | |||||||||
$2,000 | 2019 | $2,702 | $116,169 | $116,169 | $2,775 | $119,342 | $119,342 | $2,809 | $120,772 | $120,772 | NA | $118,761 | NA | |||||||
Remedial Repairs | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Per Site Total | |||||||||||||
Hours per site | 0 | 0 | 8 | 8 | 0 | 0 | 16 | NA | 688 | 688 | NA | 688 | 688 | NA | 688 | 688 | 688 | NA | NA | |
Cost per site | 0 | 0 | 353 | 394 | 0 | 0 | $747 | $1,009 | $43,389 | $43,389 | $1,037 | $44,574 | $44,574 | $1,049 | $45,108 | $45,108 | $44,357 | NA | NA | |
Routine Maint. Hours per site | 0 | 0 | 30 | 40 | 0 | 0 | 70 | NA | 3,010 | 3,010 | NA | 3,010 | 3,010 | NA | 3,010 | 3,010 | 3,010 | NA | NA | |
Cost per site | 0 | 0 | 1324 | 1971 | 0 | 0 | $3,295 | $4,451 | $191,388 | $191,388 | $4,572 | $196,616 | $196,616 | $4,627 | $198,972 | $198,972 | $195,659 | NA | NA | |
Sub Total - Hours | 0 | 0 | 38 | 48 | 0 | 0 | 86 | NA | 3,698 | 3,698 | NA | 3,698 | 3,698 | NA | 3,698 | 3,698 | 3,698 | NA | NA | |
Sub Total - Costs | $0 | $0 | $1,677 | $2,365 | $0 | $0 | $6,042 | $8,162 | $350,946 | $350,946 | $8,384 | $360,532 | $360,532 | $8,485 | $364,852 | $364,852 | $240,016 | $118,761 | NA | |
Element 5 - Data Management | Comment | Element 5 - Data Management | Element 5 - Data Management | Element 5 - Data Management | ||||||||||||||||
Per Site | Per Site | Entire Network | Per Site | Entire Network | Per Site | Entire Network | ||||||||||||||
Data aquisition/processing | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Total | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | ||||
Hours per site | 0 | 0 | 8 | 8 | 4 | 0 | 20 | NA | 860 | 860 | NA | 860 | 860 | NA | 860 | 860 | 860 | NA | NA | |
Cost per site | 0 | 0 | 353 | 394 | 222 | 0 | $969 | $1,309 | $56,284 | $56,284 | $1,345 | $57,821 | $57,821 | $1,361 | $58,514 | $58,514 | $57,540 | NA | NA | |
Data reporting Hours per site | 0 | 0 | 3 | 4 | 3 | 0 | 10 | NA | 430 | 430 | NA | 430 | 430 | NA | 430 | 430 | 430 | NA | NA | |
Cost per site | 0 | 0 | 132 | 197 | 166 | 0 | $495 | $669 | $28,752 | $28,752 | $687 | $29,537 | $29,537 | $695 | $29,891 | $29,891 | $29,393 | NA | NA | |
Data validation Hours per site | 0 | 0 | 5 | 10 | 0 | 0 | 15 | NA | 645 | 645 | NA | 645 | 645 | NA | 645 | 645 | 645 | NA | NA | |
Cost per site | 0 | 0 | 221 | 493 | 0 | 0 | $714 | $964 | $41,472 | $41,472 | $991 | $42,605 | $42,605 | $1,003 | $43,116 | $43,116 | $42,398 | NA | NA | |
Data distribution Hours per site | 0 | 0 | 2 | 3 | 0 | 0 | 5 | NA | 215 | 215 | NA | 215 | 215 | NA | 215 | 215 | 215 | NA | NA | |
Cost per site | 0 | 0 | 88 | 148 | 0 | 0 | $236 | $319 | $13,708 | $13,708 | $327 | $14,082 | $14,082 | $331 | $14,251 | $14,251 | $14,014 | NA | NA | |
Sub Total - Hours | 0 | 0 | 18 | 25 | 7 | 0 | 50 | NA | 2,150 | 2,150 | NA | 2,150 | 2,150 | NA | 2,150 | 2,150 | 2,150 | NA | NA | |
Sub Total - Costs | $0 | $0 | $794 | $1,232 | $388 | $0 | $2,414 | $3,261 | $140,216 | $140,216 | $3,350 | $144,046 | $144,046 | $3,390 | $145,772 | $145,772 | $143,344 | NA | NA | |
Element 6 - Quality Assurance | Comment | Element 6 - Quality Assurance | Element 6 - Quality Assurance | Element 6 - Quality Assurance | Labor | Non Labor O & M |
Equipment | |||||||||||||
Per Site | Per Site | Entire Network | Per Site | Entire Network | Per Site | Entire Network | ||||||||||||||
TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Total | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | |||||
Audits Hours per site | 0 | 0 | 0 | 36 | 36 | 0 | 72 | NA | 3,096 | 3,096 | NA | 3,096 | 3,096 | NA | 3,096 | 3,096 | 3,096 | NA | NA | |
Cost per site | 0 | 0 | 0 | 1773 | 1997 | 0 | $3,770 | $5,093 | $218,978 | $218,978 | $5,232 | $224,959 | $224,959 | $5,294 | $227,655 | $227,655 | $223,864 | NA | NA | |
Routine Calibrations Hours per site | 0 | 24 | 24 | 0 | 0 | 0 | 48 | NA | 2,064 | 2,064 | NA | 2,064 | 2,064 | NA | 2,064 | 2,064 | 2,064 | NA | NA | |
Cost per site | 0 | 981 | 1059 | 0 | 0 | 0 | $2,040 | $2,756 | $118,492 | $118,492 | $2,831 | $121,729 | $121,729 | $2,865 | $123,187 | $123,187 | $121,136 | NA | NA | |
Coordination/implementation | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Total | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | |||||||
Hours per site | 0 | 0 | 0 | 2 | 2 | 0 | 4 | NA | 172 | 172 | NA | 172 | 172 | NA | 172 | 172 | 172 | NA | NA | |
Cost per site | 0 | 0 | 0 | 99 | 111 | 0 | $210 | $284 | $12,198 | $12,198 | $291 | $12,531 | $12,531 | $295 | $12,681 | $12,681 | $12,470 | NA | NA | |
Training Hours per site | 0 | 1 | 1 | 2 | 1 | 0 | 5 | NA | 215 | 215 | NA | 215 | 215 | NA | 215 | 215 | 215 | NA | NA | |
Cost per site | 0 | 41 | 44 | 99 | 55 | 0 | $239 | $323 | $13,882 | $13,882 | $332 | $14,261 | $14,261 | $336 | $14,432 | $14,432 | $14,192 | NA | NA | |
Reporting Hours per site | 0 | 0 | 0 | 3 | 3 | 0 | 6 | NA | 258 | 258 | NA | 258 | 258 | NA | 258 | 258 | 258 | NA | NA | |
Cost per site | 0 | 0 | 0 | 148 | 166 | 0 | $314 | $424 | $18,239 | $18,239 | $436 | $18,737 | $18,737 | $441 | $18,961 | $18,961 | $18,645 | NA | NA | |
QA Plan review (annual) | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Labor per RO | Adjusted per RO | Total | Yearly Cost | Adjusted per RO | Total | Yearly Cost | |||||||
Hours per RO | 0 | 0 | 0.2 | 0.3 | 0 | 0 | 0.5 | NA | 20 | 20 | NA | 20 | 20 | NA | 20 | 20 | 20 | NA | NA | |
Cost | 0 | 0 | 9 | 15 | 0 | 0 | $24 | $32 | $1,264 | $1,264 | $33 | $1,299 | $1,299 | $34 | $1,314 | $1,314 | $1,293 | NA | NA | |
QA Plan preparation | Years Amoritized | 5 | Per RO | Per RO | Entire Network | Per RO | Entire Network | |||||||||||||
Hours per RO | 0 | 0 | 0 | 5 | 5 | 5 | 15 | NA | 585 | 117 | NA | 585 | 117 | NA | 585 | 117 | 117 | NA | NA | |
Cost per RO | 0 | 0 | 0 | 246 | 277 | 293 | $816 | $1,102 | $42,988 | $8,598 | $1,132 | $44,162 | $8,832 | $1,146 | $44,691 | $8,938 | $8,789 | NA | NA | |
Sub Total - Hours | 0 | 25 | 25 | 48 | 47 | 5 | 151 | NA | NA | 5,942 | NA | NA | 5,942 | NA | NA | 5,942 | 5,942 | |||
Sub Total - Costs | $0 | $1,022 | $1,112 | $2,380 | $2,606 | $293 | $7,413 | $10,013 | NA | $391,651 | $10,287 | NA | $402,348 | $10,410 | NA | $407,170 | $400,390 | |||
Element 7 - Supervision | Comment | Element 7 - Supervision | Element 7 - Supervision | Element 7 - Supervision | ||||||||||||||||
Per Site | Per Site | Entire Network | Per Site | Entire Network | Per Site | Entire Network | ||||||||||||||
Planning/coordination | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Total | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | ||||
Hours per site | 0 | 0 | 0 | 0 | 8 | 4 | 12 | NA | 516 | 516 | NA | 516 | 516 | NA | 516 | 516 | 516 | NA | NA | |
Cost per site | 0 | 0 | 0 | 0 | 444 | 234 | $678 | $916 | $39,381 | $39,381 | $941 | $40,457 | $40,457 | $952 | $40,942 | $40,942 | $40,260 | NA | NA | |
Supervision/review Hours per site | 0 | 0 | 16 | 8 | 4 | 2 | 30 | NA | 1,290 | 1,290 | NA | 1,290 | 1,290 | NA | 1,290 | 1,290 | 1,290 | NA | NA | |
Cost per site | 0 | 0 | 706 | 394 | 222 | 117 | $1,439 | $1,944 | $83,584 | $83,584 | $1,997 | $85,866 | $85,866 | $2,021 | $86,895 | $86,895 | $85,448 | NA | NA | |
Sub Total - Hours | 0 | 0 | 16 | 8 | 12 | 6 | 42 | NA | 1806 | 1806 | NA | 1806 | 1806 | NA | 1806 | 1,806 | 1,806 | NA | NA | |
Sub Total - Costs | $0 | $0 | $706 | $394 | $666 | $351 | $2,117 | $2,860 | $122,965 | $122,965 | $2,938 | $126,323 | $126,323 | $2,973 | $127,837 | $127,837 | $125,708 | NA | NA | |
Summary by Element | PAMSSurfMet | Year 1 | 2019 | Year 2 | 2020 | Year 3 | 2021 | |||||||||||||
TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Total | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | |||||
1 - Network Design Hours | 0 | 0 | 0 | 5 | 12 | 2 | 19 | NA | 741 | 148 | NA | 741 | 148 | NA | 741 | 148 | 148 | |||
Costs | $0 | $0 | $0 | $246 | $666 | $117 | $1,029 | $1,390 | $54,209 | $10,842 | $1,428 | $55,690 | $11,138 | $1,445 | $56,357 | $11,271 | $11,084 | NA | NA | |
2 - Site Installation Hours | 0 | 8 | 8 | 4 | 4 | 0 | 24 | NA | 1,049 | 210 | NA | 1,049 | 210 | NA | 1,049 | 210 | 210 | |||
Costs | $0 | $327 | $353 | $197 | $222 | $0 | $1,099 | $1,485 | $0 | $223,848 | $1,525 | $0 | $229,712 | $1,543 | $0 | $232,465 | $13,133 | NA | $215,542 | |
3 - Supplies & site visits Hours | 0 | 60 | 60 | 0 | 0 | 0 | 120 | NA | 5160 | 5160 | NA | 5160 | 5160 | NA | 5160 | 5160 | 5160 | NA | NA | |
Costs | $0 | $2,451 | $2,647 | $0 | $0 | $0 | $5,848 | $7,899 | $339,678 | $339,678 | $8,115 | $348,956 | $348,956 | $8,212 | $353,137 | $353,137 | $347,257 | $44,535 | NA | |
4 - Maintenance Hours | 0 | 0 | 38 | 48 | 0 | 0 | 86 | NA | 3698 | 3698 | NA | 3698 | 3698 | NA | 3698 | 3698 | 3698 | |||
Costs | $0 | $0 | $1,677 | $2,365 | $0 | $0 | $6,042 | $8,162 | $350,946 | $350,946 | $8,384 | $360,532 | $360,532 | $8,485 | $364,852 | $364,852 | $240,016 | $118,761 | NA | |
5 - Data Managment Hours | 0 | 0 | 18 | 25 | 7 | 0 | 50 | NA | 2150 | 2150 | NA | 2150 | 2150 | NA | 2150 | 2150 | 2150 | NA | NA | |
Costs | $0 | $0 | $794 | $1,232 | $388 | $0 | $2,414 | $3,261 | $140,216 | $140,216 | $3,350 | $144,046 | $144,046 | $3,390 | $145,772 | $145,772 | $143,344 | NA | NA | |
6 - Quality Assurance Hours | 0 | 25 | 25 | 48 | 47 | 5 | 151 | NA | NA | 5942 | NA | NA | 5942 | NA | NA | 5942 | 5942 | NA | NA | |
Costs | $0 | $1,022 | $1,112 | $2,380 | $2,606 | $293 | $7,413 | $10,013 | NA | $391,651 | $10,287 | NA | $402,348 | $10,410 | NA | $407,170 | $400,390 | $0 | NA | |
7 - Supervision Hours | 0 | 0 | 16 | 8 | 12 | 6 | 42 | NA | 1806 | 1806 | NA | 1806 | 1806 | NA | 1806 | 1806 | 1806 | NA | NA | |
Costs | $0 | $0 | $706 | $394 | $666 | $351 | $2,117 | $2,860 | $122,965 | $122,965 | $2,938 | $126,323 | $126,323 | $2,973 | $127,837 | $127,837 | $125,708 | NA | NA | |
Total | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Total | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | ||||
Hours | 0 | 93 | 165 | 138 | 82 | 13 | 492 | NA | 14,604 | 19,114 | NA | 14,604 | 19,114 | NA | 14,604 | 19,114 | 19,114 | NA | ||
Costs | $0 | $3,800 | $7,289 | $6,814 | $4,548 | $761 | $25,962 | $35,070 | 1,008,014 | $1,580,147 | $36,027 | 1,035,546 | $1,623,055 | $36,459 | 1,047,955 | $1,642,504 | $1,280,932 | $163,296 | $215,542 |
Data Entry for | PAMSUpperAir | Updated on | August 19, 2018 | Year 1 | 2019 | Year 2 | 2020 | Year 3 | 2021 | Average Yearly Costs | Equipment | ||||||||||
Spare Factor | Report Org | 39 | |||||||||||||||||||
0.00% | Report Org | Sites | 43 | Report Org | Sites | 43 | Report Org | Sites | 43 | Sites | 43 | ||||||||||
Overall Comment | 39 | Spares | 0 | 39 | Spares | 0 | 39 | Spares | 0 | Spares | 0 | ||||||||||
General Costs | Labor | Non Labor O & M |
|||||||||||||||||||
Element 1 - Network Design | Years Amoritized | 5 | Comment | Element 1 - Network Design | Element 1 - Network Design | Element 1 - Network Design | |||||||||||||||
Network Design and Site Selection (by Reporting Organization) | Per RO | Per RO | Entire Network | Per RO | Entire Network | Per RO | Entire Network | ||||||||||||||
Labor Category | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Total | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | |||||
Hours per RO | 0 | 0 | 0 | 5 | 12 | 2 | 19 | NA | 741 | 148 | NA | 741 | 148 | NA | 741 | 148 | 148 | NA | NA | ||
Costs per RO | 0 | 0 | 0 | 246 | 666 | 117 | $1,029 | $1,390 | $54,209 | $10,842 | $1,428 | $55,690 | $11,138 | $1,445 | $56,357 | $11,271 | $11,084 | NA | NA | ||
Sub Total - Hours | 0 | 0 | 0 | 5 | 12 | 2 | 19 | NA | 741 | 148 | NA | 741 | 148 | NA | 741 | 148 | 148 | NA | NA | ||
Sub Total - Costs | $0 | $0 | $0 | $246 | $666 | $117 | $1,029 | $1,390 | $54,209 | $10,842 | $1,428 | $55,690 | $11,138 | $1,445 | $56,357 | $11,271 | $11,084 | NA | NA | ||
Element 2 - Site Installation | Years Amoritized | 5 | Comment | Element 2 - Site Installation | Element 2 - Site Installation | Element 2 - Site Installation | |||||||||||||||
Unit cost | Year | Per Site | Entire Network | Per Site | Entire Network | Per Site | Entire Network | ||||||||||||||
Materials | Sites | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | |||||||||||
Cielometer | $26,500 | 2019 | 43 | $35,796 | $1,539,239 | $307,848 | $36,774 | $1,581,279 | $316,256 | $37,215 | $1,600,228 | $320,046 | NA | NA | $314,716 | ||||||
Radar profiler | $125,000 | 2019 | 0 | $168,850 | $0 | $0 | $173,462 | $0 | $0 | $175,541 | $0 | $0 | NA | NA | $0 | ||||||
Rawindsondes | $45,000 | 2019 | 0 | $60,786 | $0 | $0 | $62,446 | $0 | $0 | $63,195 | $0 | $0 | NA | NA | $0 | ||||||
SODAR | $65,000 | 2019 | 0 | $87,802 | $0 | $0 | $90,200 | $0 | $0 | $91,281 | $0 | $0 | NA | NA | $0 | ||||||
LAP/RASS +NEXRAD | $125,000 | 2019 | 0 | $168,850 | $0 | $0 | $173,462 | $0 | $0 | $175,541 | $0 | $0 | NA | NA | $0 | ||||||
Computer hardware & software | $8,000 | 2019 | $10,806 | $464,676 | $92,935 | $11,102 | $477,367 | $95,473 | $11,235 | $483,088 | $96,618 | NA | NA | $95,009 | |||||||
Total | $2,003,915 | $400,783 | $2,058,647 | $411,729 | $2,083,315 | $416,663 | NA | NA | $409,725 | ||||||||||||
Labor | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Contractor | Per Site Total | |||||||||||||
Acceptance Testing Hours per site | 0 | 24 | 0 | 24 | 0 | 0 | 12 | 60 | NA | 2,580 | 516 | NA | 2,580 | 516 | NA | 2,580 | 516 | 516 | NA | NA | |
Cost per site | $0 | $981 | $0 | $1,182 | $0 | $0 | $300 | $2,463 | $3,327 | $143,062 | $28,612 | $3,418 | $146,969 | $29,394 | $3,459 | $148,731 | $29,746 | $29,251 | NA | NA | |
Procurement Hours per site | 0 | 0 | 0 | 8 | 8 | 0 | 0 | 16 | NA | 688 | 138 | NA | 688 | 138 | NA | 688 | 138 | 138 | NA | NA | |
Cost per site | $0 | $0 | $0 | $394 | $444 | $0 | $0 | $838 | $1,132 | $48,675 | $9,735 | $1,163 | $50,004 | $10,001 | $1,177 | $50,603 | $10,121 | $9,952 | NA | NA | |
Installation Hours per site | 0 | 0 | 0 | 12 | 7 | 0 | 0 | 19 | NA | 817 | 163 | NA | 817 | 163 | NA | 817 | 163 | 163 | NA | NA | |
Cost per site | $0 | $0 | $0 | $591 | $388 | $0 | $0 | $979 | $1,322 | $56,865 | $11,373 | $1,359 | $58,418 | $11,684 | $1,375 | $59,118 | $11,824 | $11,627 | NA | NA | |
Sub Total - Hours | 0 | 0 | 0 | 20 | 15 | 0 | 35 | NA | 4,085 | 817 | NA | 4,085 | 817 | NA | 4,085 | 817 | 817 | NA | NA | ||
Sub Total - Costs | $0 | $0 | $0 | $985 | $832 | $0 | $1,817 | $450,503 | $462,808 | $468,353 | $50,830 | NA | $409,725 | ||||||||
Element 3 - Supplies and Site Visits | Comment | Element 3 - Supplies and Site Visits | Element 3 - Supplies and Site Visits | Element 3 - Supplies and Site Visits | |||||||||||||||||
Per Site | Entire Network | Per Site | Entire Network | Per Site | Entire Network | ||||||||||||||||
Supplies | Unit cost | Year | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | ||||||||||
$1,000 | 2019 | $1,351 | $58,084 | $58,084 | $1,388 | $59,671 | $59,671 | $1,404 | $60,386 | $60,386 | NA | $59,380 | NA | ||||||||
Routine field service checks | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Contractor | Per Site Total | |||||||||||||
Hours per site | 0 | 0 | 0 | 16 | 0 | 0 | 16 | NA | 688 | 688 | NA | 688 | 688 | NA | 688 | 688 | 688 | NA | NA | ||
Cost per site | $0 | $0 | $0 | $788 | $0 | $0 | $788 | $1,064 | $45,771 | $45,771 | $1,094 | $47,021 | $47,021 | $1,107 | $47,584 | $47,584 | $46,792 | NA | NA | ||
Sub Total - Hours | 0 | 0 | 0 | 16 | 0 | 0 | 16 | NA | 688 | 688 | NA | 688 | 688 | NA | 688 | 688 | 688 | NA | NA | ||
Sub Total - Costs | $0 | $0 | $0 | $16 | $0 | $0 | $1,788 | $2,415 | $103,855 | $103,855 | $2,481 | $106,692 | $106,692 | $2,511 | $107,970 | $107,970 | $106,172 | $59,380 | NA | ||
Element 4 - Maintenance | Comment | Element 4 - Maintenance | Element 4 - Maintenance | Element 4 - Maintenance | |||||||||||||||||
Per Site | Entire Network | Per Site | Entire Network | Per Site | Entire Network | ||||||||||||||||
Spare parts/supplies | Unit cost | Year | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | ||||||||||
$2,000 | 2019 | $2,702 | $116,169 | $116,169 | $2,775 | $119,342 | $119,342 | $2,809 | $120,772 | $120,772 | NA | $118,761 | NA | ||||||||
Remedial Field Service | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Contractor | Per Site Total | |||||||||||||
Hours per site | 0 | 0 | 0 | 5 | 0 | 0 | 5 | NA | 215 | 215 | NA | 215 | 215 | NA | 215 | 215 | 215 | NA | NA | ||
Cost per site | $0 | $0 | $0 | $246 | $0 | $0 | $246 | $332 | $14,289 | $14,289 | $341 | $14,679 | $14,679 | $345 | $14,855 | $14,855 | $14,608 | NA | NA | ||
Sub Total - Hours | 0 | 0 | 0 | 5 | 0 | 0 | 0 | 5 | NA | 215 | 215 | NA | 215 | 215 | NA | 215 | 215 | 215 | NA | NA | |
Sub Total - Costs | $0 | $0 | $0 | $246 | $0 | $0 | $0 | $246 | $332 | $14,289 | $14,289 | $341 | $14,679 | $14,679 | $345 | $14,855 | $14,855 | $14,608 | $118,761 | NA | |
Element 5 - Data Management | Comment | Element 5 - Data Management | Element 5 - Data Management | Element 5 - Data Management | |||||||||||||||||
Per Site | Per Site | Entire Network | Per Site | Entire Network | Per Site | Entire Network | |||||||||||||||
Data aquisition/processing, etc. | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Contractor | Total | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | ||||
Hours per site | 0 | 0 | 3 | 3 | 0 | 0 | 6 | NA | 258 | 258 | NA | 258 | 258 | NA | 258 | 258 | 258 | NA | NA | ||
Cost per site | $0 | $0 | $132 | $148 | $0 | $0 | $280 | $378 | $16,264 | $16,264 | $389 | $16,708 | $16,708 | $393 | $16,908 | $16,908 | $16,627 | NA | NA | ||
Data validation Hours per site | 0 | 0 | 0 | 4 | 0 | 0 | 4 | NA | 172 | 172 | NA | 172 | 172 | NA | 172 | 172 | 172 | NA | NA | ||
Cost per site | $0 | $0 | $0 | $197 | $0 | $0 | $197 | $266 | $11,443 | $11,443 | $273 | $11,755 | $11,755 | $277 | $11,896 | $11,896 | $11,698 | NA | NA | ||
Sub Total - Hours | 0 | 0 | 3 | 7 | 0 | 0 | 0 | 10 | NA | 430 | 430 | NA | 430 | 430 | NA | 430 | 430 | 430 | NA | NA | |
Sub Total - Costs | $0 | $0 | $132 | $345 | $0 | $0 | $0 | $477 | $644 | $27,706 | $27,706 | $662 | $28,463 | $28,463 | $670 | $28,804 | $28,804 | $28,324 | NA | NA | |
Element 6 - Quality Assurance | Comment | Element 6 - Quality Assurance | Element 6 - Quality Assurance | Element 6 - Quality Assurance | Labor | Non Labor O & M |
Equipment | ||||||||||||||
Per Site | Per Site | Entire Network | Per Site | Entire Network | Per Site | Entire Network | |||||||||||||||
TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Contractor | Total | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | |||||
Audits Hours per site | 0 | 0 | 0 | 18 | 18 | 0 | 36 | NA | 1,548 | 1,548 | NA | 1,548 | 1,548 | NA | 1,548 | 1,548 | 1,548 | NA | NA | ||
Cost per site | $0 | $0 | $0 | $887 | $998 | $0 | $1,885 | $2,546 | $109,489 | $109,489 | $2,616 | $112,480 | $112,480 | $2,647 | $113,828 | $113,828 | $111,932 | NA | NA | ||
Routine Calibrations Hours per site | 0 | 0 | 18 | 12 | 0 | 0 | 30 | NA | 1,290 | 1,290 | NA | 1,290 | 1,290 | NA | 1,290 | 1,290 | 1,290 | NA | NA | ||
Cost per site | $0 | $0 | $794 | $591 | $0 | $0 | $1,385 | $1,871 | $80,447 | $80,447 | $1,922 | $82,644 | $82,644 | $1,945 | $83,635 | $83,635 | $82,242 | NA | NA | ||
Coordination/implementation | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Contractor | Total | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | |||||||
Hours per site | 0 | 0 | 0 | 1 | 1 | 0 | 2 | NA | 86 | 86 | NA | 86 | 86 | NA | 86 | 86 | 86 | NA | NA | ||
Cost per site | $0 | $0 | $0 | $49 | $55 | $0 | $104 | $140 | $6,041 | $6,041 | $144 | $6,206 | $6,206 | $146 | $6,280 | $6,280 | $6,176 | NA | NA | ||
Training Hours per site | 0 | 1 | 1 | 2 | 1 | 0 | 5 | NA | 215 | 215 | NA | 215 | 215 | NA | 215 | 215 | 215 | NA | NA | ||
Cost per site | $0 | $41 | $44 | $99 | $55 | $0 | $239 | $323 | $13,882 | $13,882 | $332 | $14,261 | $14,261 | $336 | $14,432 | $14,432 | $14,192 | NA | NA | ||
Reporting Hours per site | 0 | 0 | 0 | 3 | 3 | 0 | 6 | NA | 258 | 258 | NA | 258 | 258 | NA | 258 | 258 | 258 | NA | NA | ||
Cost per site | $0 | $0 | $0 | $148 | $166 | $0 | $314 | $424 | $18,239 | $18,239 | $436 | $18,737 | $18,737 | $441 | $18,961 | $18,961 | $18,645 | NA | NA | ||
QA Plan review (annual) | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Contractor | Labor per RO | Adjusted per RO | Total | Yearly Cost | Adjusted per RO | Total | Yearly Cost | |||||||
Hours per RO | 0 | 0 | 0.2 | 0.3 | 0 | 0 | 0.5 | NA | 20 | 20 | NA | 20 | 20 | NA | 20 | 20 | 20 | NA | NA | ||
Cost | $0 | $0 | $9 | $15 | $0 | $0 | $24 | $32 | $1,264 | $1,264 | $33 | $1,299 | $1,299 | $34 | $1,314 | $1,314 | $1,293 | NA | NA | ||
QA Plan preparation | Years Amoritized | 5 | Per RO | Per RO | Entire Network | Per RO | Entire Network | ||||||||||||||
Hours per RO | 0 | 0 | 0 | 6 | 18 | 0 | 24 | NA | 936 | 187 | NA | 936 | 187 | NA | 936 | 187 | 187 | NA | NA | ||
Cost per RO | $0 | $0 | $0 | $296 | $998 | $0 | $1,294 | $1,748 | $68,170 | $13,634 | $1,796 | $70,031 | $14,006 | $1,817 | $70,871 | $14,174 | $13,938 | NA | NA | ||
Sub Total - Hours | 0 | 1 | 19 | 42 | 41 | 0 | 104 | NA | NA | 3,604 | NA | NA | 3,604 | NA | NA | 3,604 | 3,604 | ||||
Sub Total - Costs | $0 | $41 | $847 | $2,085 | $2,272 | $0 | $5,245 | $7,085 | NA | $242,996 | $7,278 | NA | $249,633 | $7,366 | NA | $252,624 | $248,418 | ||||
Element 7 - Supervision | Comment | Element 7 - Supervision | Element 7 - Supervision | Element 7 - Supervision | |||||||||||||||||
Per Site | Per Site | Entire Network | Per Site | Entire Network | Per Site | Entire Network | |||||||||||||||
Planning/coordination | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Contractor | Total | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | ||||
Hours per site | 0 | 0 | 0 | 0 | 6 | 6 | 12 | NA | 516 | 516 | NA | 516 | 516 | NA | 516 | 516 | 516 | NA | NA | ||
Cost per site | 0 | $0 | $0 | $0 | $333 | $352 | $685 | $925 | $39,788 | $39,788 | $951 | $40,875 | $40,875 | $962 | $41,364 | $41,364 | $40,676 | NA | NA | ||
Supervision/review Hours per site | 0 | 0 | 16 | 8 | 4 | 2 | 30 | NA | 1,290 | 1,290 | NA | 1,290 | 1,290 | NA | 1,290 | 1,290 | 1,290 | NA | NA | ||
Cost per site | $0 | $0 | $706 | $394 | $222 | $117 | $1,439 | $1,944 | $83,584 | $83,584 | $1,997 | $85,866 | $85,866 | $2,021 | $86,895 | $86,895 | $85,448 | NA | NA | ||
Sub Total - Hours | 0 | 0 | 16 | 8 | 10 | 8 | 42 | NA | 1806 | 1806 | NA | 1806 | 1806 | NA | 1806 | 1,806 | 1,806 | NA | NA | ||
Sub Total - Costs | $0 | $0 | $706 | $394 | $555 | $469 | $2,124 | $2,869 | $123,371 | $123,371 | $2,947 | $126,741 | $126,741 | $2,983 | $128,260 | $128,260 | $126,124 | NA | NA | ||
Summary by Element | PAMSUpperAir | Year 1 | 2019 | Year 2 | 2020 | Year 3 | 2021 | ||||||||||||||
TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Total | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | ||||||
1 - Network Design Hours | 0 | 0 | 0 | 5 | 12 | 2 | 19 | NA | 741 | 148 | NA | 741 | 148 | NA | 741 | 148 | 148 | ||||
Costs | $0 | $0 | $0 | $246 | $666 | $117 | $1,029 | $1,390 | $54,209 | $10,842 | $1,428 | $55,690 | $11,138 | $1,445 | $56,357 | $11,271 | $11,084 | NA | NA | ||
2 - Site Installation Hours | 0 | 0 | 0 | 20 | 15 | 0 | 35 | NA | 4,085 | 817 | NA | 4,085 | 817 | NA | 4,085 | 817 | 817 | ||||
Costs | $0 | $0 | $0 | $985 | $832 | $0 | $1,817 | $0 | $0 | $450,503 | $0 | $0 | $462,808 | $0 | $0 | $468,353 | $50,830 | NA | $409,725 | ||
3 - Supplies & site visits Hours | 0 | 0 | 0 | 16 | 0 | 0 | 16 | NA | 688 | 688 | NA | 688 | 688 | NA | 688 | 688 | 688 | NA | NA | ||
Costs | $0 | $0 | $0 | $16 | $0 | $0 | $1,788 | $2,415 | $103,855 | $103,855 | $2,481 | $106,692 | $106,692 | $2,511 | $107,970 | $107,970 | $106,172 | $59,380 | NA | ||
4 - Maintenance Hours | 0 | 0 | 0 | 5 | 0 | 0 | 5 | NA | 215 | 215 | NA | 215 | 215 | NA | 215 | 215 | 215 | ||||
Costs | $0 | $0 | $0 | $246 | $0 | $0 | $246 | $332 | $14,289 | $14,289 | $341 | $14,679 | $14,679 | $345 | $14,855 | $14,855 | $14,608 | $118,761 | NA | ||
5 - Data Managment Hours | 0 | 0 | 3 | 7 | 0 | 0 | 10 | NA | 430 | 430 | NA | 430 | 430 | NA | 430 | 430 | 430 | NA | NA | ||
Costs | $0 | $0 | $132 | $345 | $0 | $0 | $477 | $644 | $27,706 | $27,706 | $662 | $28,463 | $28,463 | $670 | $28,804 | $28,804 | $28,324 | NA | NA | ||
6 - Quality Assurance Hours | 0 | 1 | 19 | 42 | 41 | 0 | 104 | NA | NA | 3604 | NA | NA | 3604 | NA | NA | 3604 | 3604 | NA | NA | ||
Costs | $0 | $41 | $847 | $2,085 | $2,272 | $0 | $5,245 | $7,085 | NA | $242,996 | $7,278 | NA | $249,633 | $7,366 | NA | $252,624 | $248,418 | $0 | NA | ||
7 - Supervision Hours | 0 | 0 | 16 | 8 | 10 | 8 | 42 | NA | 1806 | 1806 | NA | 1806 | 1806 | NA | 1806 | 1806 | 1806 | NA | NA | ||
Costs | $0 | $0 | $706 | $394 | $555 | $469 | $2,124 | $2,869 | $123,371 | $123,371 | $2,947 | $126,741 | $126,741 | $2,983 | $128,260 | $128,260 | $126,124 | NA | NA | ||
Total | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Total | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | |||||
Hours | 0 | 1 | 38 | 103 | 78 | 10 | 231 | NA | 7,965 | 7,708 | NA | 7,965 | 7,708 | NA | 7,965 | 7,708 | 7,708 | NA | |||
Costs | $0 | $41 | $1,685 | $4,317 | $4,325 | $586 | $12,726 | $14,736 | 323,431 | $973,563 | $15,138 | 332,264 | $1,000,153 | $15,320 | 336,246 | $1,012,138 | $585,559 | $178,141 | $409,725 |
Data Entry for | NATTS | Updated on | August 19, 2018 | Year 1 | 2019 | Year 2 | 2020 | Year 3 | 2021 | Average Yearly Costs | Equipment | ||||||||||
Spare Factor | Report Org | 22 | |||||||||||||||||||
0.00% | Report Org | Sites | 27 | Report Org | Sites | 27 | Report Org | Sites | 27 | Sites | 27 | ||||||||||
Overall Comment | 22 | Spares | 0 | 22 | Spares | 0 | 22 | Spares | 0 | Spares | 0 | ||||||||||
General Costs | Labor | Non Labor O & M |
|||||||||||||||||||
Element 1 - Network Design | Comment | Element 1 - Network Design | Element 1 - Network Design | Element 1 - Network Design | |||||||||||||||||
Costs included with other pollutants | |||||||||||||||||||||
Sub Total - Hours | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | |||||||||
Sub Total - Costs | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | |||||||||
Element 2 - Site Installation | Comment | Element 2 - Site Installation | Element 2 - Site Installation | Element 2 - Site Installation | |||||||||||||||||
Costs included with other pollutants | |||||||||||||||||||||
Sub Total - Hours | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | |||||||||
Sub Total - Costs | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | |||||||||
Element 3 - Supplies and Site Visits | Comment | Element 3 - Supplies and Site Visits | Element 3 - Supplies and Site Visits | Element 3 - Supplies and Site Visits | |||||||||||||||||
Per Site | Entire Network | Per Site | Entire Network | Per Site | Entire Network | ||||||||||||||||
Supplies | Unit cost | Year | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | ||||||||||
Analysis (grant to RO) | $129,385 | 2019 | $174,773 | $3,845,017 | $3,845,017 | $179,547 | $3,950,035 | $3,950,035 | $181,699 | $3,997,368 | $3,997,368 | NA | NA | $3,930,806 | |||||||
Sub Total - Hours | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | |||||||||
Sub Total - Costs | $174,773 | $3,845,017 | $3,845,017 | $179,547 | $3,950,035 | $3,950,035 | $181,699 | $3,997,368 | $3,997,368 | NA | NA | 3,930,806 | |||||||||
Element 4 - Maintenance | Comment | Element 4 - Maintenance | Element 4 - Maintenance | Element 4 - Maintenance | |||||||||||||||||
Costs included with other pollutants | |||||||||||||||||||||
Sub Total - Hours | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | |||||||||
Sub Total - Costs | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | |||||||||
Element 5 - Data Management | Comment | Element 5 - Data Management | Element 5 - Data Management | Element 5 - Data Management | |||||||||||||||||
Costs included with other pollutants | |||||||||||||||||||||
Sub Total - Hours | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | |||||||||
Sub Total - Costs | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | |||||||||
Element 6 - Quality Assurance | Comment | Element 6 - Quality Assurance | Element 6 - Quality Assurance | Element 6 - Quality Assurance | Labor | Non Labor O & M |
Equipment | ||||||||||||||
Costs included with other pollutants | |||||||||||||||||||||
Sub Total - Hours | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | |||||||||
Sub Total - Costs | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | |||||||||
Element 7 - Supervision | Comment | Element 7 - Supervision | Element 7 - Supervision | Element 7 - Supervision | |||||||||||||||||
Costs included with other pollutants | |||||||||||||||||||||
Sub Total - Hours | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | |||||||||
Sub Total - Costs | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | |||||||||
Summary by Element | NATTS | Year 1 | 2019 | Year 2 | 2020 | Year 3 | 2021 | ||||||||||||||
TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Total | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | ||||||
1 - Network Design Hours | 0 | 0 | 0 | 0 | 0 | 0 | 0 | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | ||||
Costs | $0 | $0 | $0 | $0 | $0 | $0 | $0 | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | ||
2 - Site Installation Hours | 0 | 0 | 0 | 0 | 0 | 0 | 0 | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | ||||
Costs | $0 | $0 | $0 | $0 | $0 | $0 | $0 | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | ||
3 - Supplies & site visits Hours | 0 | 0 | 0 | 0 | 0 | 0 | 0 | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | ||
Costs | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $174,773 | $3,845,017 | $3,845,017 | $179,547 | $3,950,035 | $3,950,035 | $181,699 | $3,997,368 | $3,997,368 | NA | NA | 3,930,806 | ||
4 - Maintenance Hours | 0 | 0 | 0 | 0 | 0 | 0 | 0 | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | ||||
Costs | $0 | $0 | $0 | $0 | $0 | $0 | $0 | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | ||
5 - Data Managment Hours | 0 | 0 | 0 | 0 | 0 | 0 | 0 | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | ||
Costs | $0 | $0 | $0 | $0 | $0 | $0 | $0 | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | ||
6 - Quality Assurance Hours | 0 | 0 | 0 | 0 | 0 | 0 | 0 | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | ||
Costs | $0 | $0 | $0 | $0 | $0 | $0 | $0 | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | ||
7 - Supervision Hours | 0 | 0 | 0 | 0 | 0 | 0 | 0 | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | ||
Costs | $0 | $0 | $0 | $0 | $0 | $0 | $0 | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | ||
Total | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Total | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | |||||
Hours | 0 | 0 | 0 | 0 | 0 | 0 | 0 | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | NA | ||
Costs | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $174,773 | $3,845,017 | $3,845,017 | $179,547 | $3,950,035 | $3,950,035 | $181,699 | $3,997,368 | $3,997,368 | NA | NA | $3,930,806 |
Data Entry for | Generic Network | Updated on | August 19, 2018 | Year 1 | 2019 | Year 2 | 2020 | Year 3 | 2021 | Average Yearly Costs | Equipment | ||||||||||
Report Org | 168 | ||||||||||||||||||||
Small Shelter Sites | 1,789 | Small Shelter Sites | 1,789 | Small Shelter Sites | 1,789 | Sites | 1789 | ||||||||||||||
Large Shelter Sites | 444 | Large Shelter Sites | 444 | Large Shelter Sites | 444 | ||||||||||||||||
Total Shelter Sites | 2,233 | Total Shelter Sites | 2,233 | Total Shelter Sites | 2,233 | ||||||||||||||||
Other Sites | 0 | Other Sites | 0 | Other Sites | 0 | ||||||||||||||||
Total Sites | 2,233 | Total Sites | 2,233 | Total Sites | 2,233 | ||||||||||||||||
Report Org | QA Orgs | Report Org | QA Orgs | Report Org | QA Orgs | ||||||||||||||||
Overall Comment | 168 | 156 | 168 | 156 | 168 | 156 | |||||||||||||||
General Costs | Labor | Non Labor O & M |
|||||||||||||||||||
Element 1 - Network Design | Years Amoritized | 7 | Comment | Element 1 - Network Design | Element 1 - Network Design | Element 1 - Network Design | |||||||||||||||
a) Network Design (see individual pollutants) | Entire Network | Entire Network | Entire Network | ||||||||||||||||||
b) Site Selection (see individual pollutants) | Base year | 1998 | Adjusted | Adjusted | Adjusted | ||||||||||||||||
c) Travel other than monitoring sites | Hours | 35,000 | 35,000 | 35,000 | 35,000 | 35,000 | NA | NA | |||||||||||||
Costs (not linked to hours) | $1,052,498 | $1,218,793 | $1,242,263 | $1,267,418 | $1,242,825 | NA | NA | ||||||||||||||
d) Saturation studies | Hours | 21,475 | 21,475 | 21,475 | 21,475 | 21,475 | NA | NA | |||||||||||||
Costs (not linked to hours) | $828,343 | $959,221 | $977,693 | $997,491 | $978,135 | NA | NA | ||||||||||||||
e) Additional indirect cost adj ($2/hour) | Base year | 2005 | Costs (not linked to hours) | $4,211,427 | $4,345,772 | $4,429,158 | $4,518,862 | NA | $4,431,264 | ||||||||||||
Sub Total - Hours | 56,475 | 56,475 | 56,475 | 56,475 | 56,475 | NA | NA | ||||||||||||||
Sub Total - Costs | $6,092,268 | $4,345,772 | $4,429,158 | $4,518,862 | $2,220,960 | NA | 4,431,264 | ||||||||||||||
Element 2 - Site Installation | Comment | Element 2 - Site Installation | Element 2 - Site Installation | Element 2 - Site Installation | |||||||||||||||||
Per Site | Entire Network | Per Site | Entire Network | Per Site | Entire Network | ||||||||||||||||
Materials | Unit cost | Year | Years Amoritized | 7 | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | ||||||||
Multigas calibrator | $14,000 | 2019 | $18,911 | $42,228,767 | $6,032,681 | $19,428 | $43,382,147 | $6,197,450 | $19,661 | $43,901,994 | $6,271,713 | NA | NA | $6,167,281 | |||||||
Zero air supply | $5,980 | 2019 | $8,078 | $18,037,716 | $2,576,817 | $8,298 | $18,530,374 | $2,647,196 | $8,398 | $18,752,423 | $2,678,918 | NA | NA | $2,634,310 | |||||||
Ambient air intake manifold assembly | $1,500 | 2019 | $2,026 | $4,524,511 | $646,359 | $2,082 | $4,648,087 | $664,012 | $2,106 | $4,703,785 | $671,969 | NA | NA | $660,780 | |||||||
Shelters | Unit cost | Year | Years Amoritized | 10 | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | ||||||||
Shelter (large, temp controlled) | $30,000 | 2019 | $40,524 | $17,992,681 | $1,799,268 | $41,631 | $18,484,108 | $1,848,411 | $42,130 | $18,705,603 | $1,870,560 | NA | NA | $1,839,413 | |||||||
Shelter (small, temp controlled) | $13,000 | 2019 | $17,560 | $31,415,599 | $3,141,560 | $18,040 | $32,273,642 | $3,227,364 | $18,256 | $32,660,376 | $3,266,038 | NA | NA | $3,211,654 | |||||||
Shelter delivery charges | $1,500 | 2019 | $2,026 | $4,524,511 | $452,451 | $2,082 | $4,648,087 | $464,809 | $2,106 | $4,703,785 | $470,379 | NA | NA | $462,546 | |||||||
Other shelter equipment/accessories | $5,000 | 2019 | $6,754 | $15,081,703 | $1,508,170 | $6,938 | $15,493,624 | $1,549,362 | $7,022 | $15,679,283 | $1,567,928 | NA | NA | $1,541,820 | |||||||
Other | |||||||||||||||||||||
Site preparation | $4,500 | 2019 | $6,079 | $13,573,532 | $1,939,076 | $6,245 | $13,944,261 | $1,992,037 | $6,319 | $14,111,355 | $2,015,908 | NA | NA | $1,982,340 | |||||||
Power drop | $800 | 2019 | $1,081 | $2,413,072 | $344,725 | $1,110 | $2,478,980 | $354,140 | $1,123 | $2,508,685 | $358,384 | NA | NA | $352,416 | |||||||
Land/Lease | $4,000 | 2019 | $5,403 | $12,065,362 | $12,065,362 | $5,551 | $12,394,899 | $12,394,899 | $5,617 | $12,543,427 | $12,543,427 | NA | NA | $12,334,563 | |||||||
Rent | $284 | 2019 | $383 | $856,188 | $856,188 | $394 | $879,573 | $879,573 | $399 | $890,113 | $890,113 | NA | NA | $875,291 | |||||||
Sub Total - Hours | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | NA | |||||||||
Sub Total - Costs | $162,713,642 | $31,362,656 | $167,157,781 | $32,219,253 | $169,160,829 | $32,605,336 | NA | NA | $32,062,415 | ||||||||||||
Element 3 - Sampling and Analysis | Comment | Element 3 - Supplies and Site Visits | Element 3 - Supplies and Site Visits | Element 3 - Supplies and Site Visits | |||||||||||||||||
Per Site | Entire Network | Per Site | Entire Network | Per Site | Entire Network | ||||||||||||||||
Supplies | Unit cost | Year | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | ||||||||||
Utilities | $1,500 | 2019 | $2,026 | $4,524,511 | $4,524,511 | $2,082 | $4,648,087 | $4,648,087 | $2,106 | $4,703,785 | $4,703,785 | NA | $4,625,461 | NA | |||||||
Vehicle | $75,000 | 2019 | $101,310 | $101,310 | $101,310 | $104,077 | $104,077 | $104,077 | $105,324 | $105,324 | $105,324 | NA | $103,571 | NA | |||||||
Subtotal | $76,500 | $103,336 | $4,625,821 | $4,625,821 | $106,159 | $4,752,164 | $4,752,164 | $107,431 | $4,809,109 | $4,809,109 | NA | $4,729,032 | $0 | ||||||||
Open Path Monitoring | Hours | 2,610 | 2,610 | 2,610 | 2,610 | 2,610 | 2,610 | 2,610 | 2,610 | NA | NA | ||||||||||
Costs (not linked to hours) | $108,460 | $125,597 | $125,597 | $128,015 | $128,015 | $130,608 | $130,608 | $128,073 | NA | NA | |||||||||||
Routine visits | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Per Site Total | ||||||||||||||
Hours per site | 0 | 0 | 0 | 0 | 1.6 | 1.6 | 3.2 | 3.2 | 7,146 | 7,146 | 3.2 | 7,146 | 7,146 | 3.2 | 7,146 | 7,146 | 7,146 | NA | NA | ||
Cost per site | 0 | 0 | 0 | 0 | 89 | 94 | $183 | $247 | $551,990 | $551,990 | $254 | $567,067 | $567,067 | $257 | $573,862 | $573,862 | $564,306 | NA | NA | ||
Sub Total - Hours | 0 | 0 | 0 | 0 | 1.6 | 1.6 | 3.2 | 3.2 | 9,756 | 9,756 | 3 | 9,756 | 9,756 | 3 | 9,756 | 9,756 | 9,756 | NA | NA | ||
Sub Total - Costs | $0 | $0 | $0 | $0 | $2 | $2 | $183 | $247 | $677,587 | $677,587 | $254 | $695,082 | $695,082 | $257 | $704,469 | $704,469 | $692,379 | NA | NA | ||
Element 4 - Maintenance - see individual pollutants | Comment | Element 4 - Maintenance | Element 4 - Maintenance | Element 4 - Maintenance | |||||||||||||||||
Per Site | Entire Network | Per Site | Entire Network | Per Site | Entire Network | ||||||||||||||||
Sub Total - Hours | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | NA | |||||||||
Sub Total - Costs | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | NA | |||||||||
Element 5 - Data Management | Comment | Element 5 - Data Management | Element 5 - Data Management | Element 5 - Data Management | |||||||||||||||||
Per Site | Per Site | Entire Network | Per Site | Entire Network | Per Site | Entire Network | |||||||||||||||
Analysis and Trends (Rep. Org.) | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Total | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | |||||
Hours per site | 0 | 0 | 1040 | 0 | 0 | 0 | 1040 | 1040 | 174,720 | 174,720 | 1040 | 174,720 | 174,720 | 1040 | 174,720 | 174,720 | 174,720 | NA | NA | ||
Cost per site | 0 | 0 | 45885 | 0 | 0 | 0 | $45,885 | $61,982 | 10,412,899 | $10,412,899 | $63,674 | 10,697,303 | $10,697,303 | $64,437 | 10,825,488 | $10,825,488 | $10,645,230 | NA | NA | ||
Sub Total - Hours | 0 | 0 | 1040 | 0 | 0 | 0 | 1040 | 1,040 | 174,720 | 174,720 | 1,040 | 174,720 | 174,720 | 1,040 | 174,720 | 174,720 | 174,720 | NA | NA | ||
Sub Total - Costs | $0 | $0 | $45,885 | $0 | $0 | $0 | $45,885 | $61,982 | $10,412,899 | $10,412,899 | $63,674 | $10,697,303 | $10,697,303 | $64,437 | $10,825,488 | $10,825,488 | $10,645,230 | NA | NA | ||
Element 6 - Quality Assurance | Comment | Element 6 - Quality Assurance | Element 6 - Quality Assurance | Element 6 - Quality Assurance | Labor | Non Labor O & M |
Equipment | ||||||||||||||
Per Site | Entire Network | Per Site | Entire Network | Per Site | Entire Network | ||||||||||||||||
Equipment | Unit cost | Year | Years Amoritized | 7 | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | ||||||||
Multigas calibrator | $14,000 | 2019 | $18,911 | $2,950,151 | $421,450 | $19,428 | $3,030,728 | $432,961 | $19,661 | $3,067,045 | $438,149 | NA | NA | $430,854 | |||||||
Zero air supply | $5,980 | 2019 | $8,078 | $1,260,136 | $180,019 | $8,298 | $1,294,554 | $184,936 | $8,398 | $1,310,066 | $187,152 | NA | NA | $184,036 | |||||||
Miscellaneous equipment | $2,500 | 2019 | $3,377 | $526,813 | $75,259 | $3,469 | $541,201 | $77,314 | $3,511 | $547,687 | $78,241 | NA | NA | $76,938 | |||||||
Sub Total - Hours | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||||||||
Sub Total - Costs | $30,366 | $4,737,100 | $676,729 | $31,195 | $4,866,483 | $695,212 | $31,569 | $4,924,798 | $703,543 | $691,828 | |||||||||||
Element 7 - Supervision - see individual pollutants | Comment | Element 7 - Supervision | Element 7 - Supervision | Element 7 - Supervision | |||||||||||||||||
Per Site | Per Site | Entire Network | Per Site | Entire Network | Per Site | Entire Network | |||||||||||||||
Sub Total - Hours | 0 | $0 | 0 | 0 | $0 | 0 | 0 | $0 | 0 | 0 | 0 | NA | NA | ||||||||
Sub Total - Costs | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | NA | NA | ||||||||
Summary by Element | Generic Network | Year 1 | 2019 | Year 2 | 2020 | Year 3 | 2021 | ||||||||||||||
TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Total | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | ||||||
1 - Network Design Hours | 0 | 0 | 0 | 0 | 0 | 0 | 56,475 | 56,475 | 0 | 0 | 56,475 | 0 | 0 | 56,475 | 56,475 | ||||||
Costs | $0 | $0 | $0 | $0 | $0 | $0 | $6,092,268 | $4,345,772 | $0 | $0 | $4,429,158 | $0 | $0 | $4,518,862 | $2,220,960 | NA | 4,431,264 | ||||
2 - Site Installation Hours | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||
Costs | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $162,713,642 | $31,362,656 | $0 | $167,157,781 | $32,219,253 | $0 | $169,160,829 | $32,605,336 | NA | NA | $32,062,415 | ||
3 - Sampling and Analysis Hours | 0 | 0 | 0 | 0 | 1.6 | 1.6 | 3.2 | 3.2 | 9,756 | 9,756 | 3.2 | 9,756 | 9,756 | 3.2 | 9,756 | 9,756 | 9755.6 | NA | NA | ||
Costs | $0 | $0 | $0 | $0 | $2 | $2 | $183 | $247 | $677,587 | $677,587 | $254 | $695,082 | $695,082 | $257 | $704,469 | $704,469 | $692,379 | $4,729,032 | NA | ||
4 - Maintenance Hours | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||
Costs | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | NA | ||
5 - Data Managment Hours | 0 | 0 | 1040 | 0 | 0 | 0 | 1040 | 1040 | 174,720 | 174,720 | 1040 | 174,720 | 174,720 | 1040 | 174,720 | 174,720 | 174720 | NA | NA | ||
Costs | $0 | $0 | $45,885 | $0 | $0 | $0 | $45,885 | $61,982 | $10,412,899 | $10,412,899 | $63,674 | $10,697,303 | $10,697,303 | $64,437 | $10,825,488 | $10,825,488 | $10,645,230 | NA | NA | ||
6 - Quality Assurance Hours | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | NA | NA | NA | ||
Costs | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $30,366 | $4,737,100 | $676,729 | $31,195 | $4,866,483 | $695,212 | $31,569 | $4,924,798 | $703,543 | NA | $0 | 703,543 | ||
7 - Supervision Hours | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | NA | NA | ||
Costs | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | NA | NA | ||
Total | TEC1 | TEC2 | PRO1 | PRO2 | PRO3 | PRO4 | Total | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | Adjusted | Total | Yearly Cost | |||||
Hours | 0 | 0 | 1,040 | 0 | 2 | 2 | 57,518 | NA | 184,476 | 184,476 | NA | 184,476 | 240,951 | NA | 184,476 | 240,951 | 240,951 | NA | |||
Costs | $0 | $0 | $45,885 | $0 | $2 | $2 | $6,138,336 | $4,438,367 | $178,541,228 | $43,129,871 | $95,124 | 178,550,166 | $48,736,008 | $96,264 | 180,690,786 | $49,357,698 | $13,558,569 | $4,729,032 | $37,889,049 |
Cost Element | Average 2019-2021 SO2 | Average 2019-2021 CO | Average 2019-2021 NO2 | |||||||||||||
Labor Hours | Labor Costs | Non-labor O & M | Equipment Contract | Total Cost | Labor Hours | Labor Costs | Non-labor O & M | Equipment Contract | Total Cost | Labor Hours | Labor Costs | Non-labor O & M | Equipment Contract | Total Cost | ||
1. Network Design | 613 | $45,766 | $45,766 | 499 | $37,261 | $37,261 | 472 | $35,236 | $35,236 | |||||||
2. Site Installation | 1,460 | $87,865 | $1,048,134 | $1,135,999 | 877 | $52,788 | $629,709 | $682,497 | 1,301 | $78,905 | $1,093,021 | $1,171,926 | ||||
3. Sampling & Analysis | 60,720 | $4,121,263 | $559,005 | $4,680,268 | 36,480 | $2,476,016 | $335,845 | $2,811,860 | 54,120 | $3,673,300 | $498,243 | $4,171,543 | ||||
4. Maintenance | 34,408 | $2,171,734 | $698,756 | $2,870,490 | 20,672 | $1,304,757 | $419,806 | $1,724,563 | 38,786 | $2,517,375 | $622,804 | $3,140,179 | ||||
5. Data Management | 19,734 | $1,276,627 | $1,276,627 | 11,856 | $766,986 | $766,986 | 22,550 | $1,503,450 | $1,503,450 | |||||||
6. Quality Assurance | 39,358 | $2,612,513 | $2,612,513 | 23,730 | $1,575,806 | $1,575,806 | 61,190 | $4,116,183 | $4,116,183 | |||||||
7. Supervision | 21,252 | $1,479,266 | $1,479,266 | 12,768 | $888,729 | $888,729 | 18,942 | $1,318,477 | $1,318,477 | |||||||
Totals | 177,545 | $11,795,034 | $1,257,761 | $1,048,134 | $14,100,929 | 106,883 | $7,102,343 | $755,651 | $629,709 | $8,487,702 | 197,361 | $13,242,924 | $1,121,048 | $1,093,021 | $15,456,994 | |
Cost Element | Average 2019-2021 O3 | Average 2019-2021 PM 10 | Average 2019-2021 PM 2.5 | |||||||||||||
Labor Hours | Labor Costs | Non-labor O & M | Equipment Contract | Total Cost | Labor Hours | Labor Costs | Non-labor O & M | Equipment Contract | Total Cost | Labor Hours | Labor Costs | Non-labor O & M | Equipment Contract | Total Cost | ||
1. Network Design | 831 | $61,967 | $61,967 | 497 | $47,279 | $47,279 | 387 | 28,350 | 28,350 | |||||||
2. Site Installation | 3,759 | $222,066 | $3,294,135 | $3,516,202 | 1,135 | $76,975 | 2,182,020 | $2,258,995 | 6,287 | 531,134 | 7,078,898 | 7,610,033 | ||||
3. Sampling & Analysis | 109,260 | $6,409,953 | $1,005,877 | $7,415,830 | 13,504 | $6,159,154 | 429,082 | 78,595 | $6,666,831 | 31,136 | 14,782,888 | 365,604 | 4,787,897 | 19,936,388 | ||
4. Maintenance | 61,914 | $3,907,833 | $1,257,347 | $5,165,180 | 17,013 | $1,014,811 | 821,868 | $1,836,679 | 64,874 | 4,117,378 | 713,810 | 4,831,189 | ||||
5. Data Management | 35,510 | $2,297,172 | $2,297,172 | 75,918 | $4,612,716 | $4,612,716 | 218,929 | 14,523,782 | 14,523,782 | |||||||
6. Quality Assurance | 71,506 | $4,735,809 | $4,735,809 | 21,764 | $1,443,008 | 5,929 | $1,448,937 | 72,512 | 4,682,391 | 6,440 | 4,688,831 | |||||
7. Supervision | 38,241 | $2,661,803 | $2,661,803 | 10,604 | $786,944 | $786,944 | 105,714 | 7,631,297 | 7,631,297 | |||||||
Totals | 321,020 | $20,296,603 | $2,263,224 | $3,294,135 | $25,853,962 | 140,435 | $14,140,887 | $1,250,950 | $2,266,544 | $17,658,381 | 499,839 | 46,297,220 | 1,079,414 | 11,873,235 | 59,249,869 | |
Cost Element | Average 2019-2021 Pb | Average 2019-2021 NATTS | Average 2019-2021 PAMS | |||||||||||||
Labor Hours | Labor Costs | Non-labor O & M | Equipment Contract | Total Cost | Labor Hours | Labor Costs | Non-labor O & M | Equipment Contract | Total Cost | Labor Hours | Labor Costs | Non-labor O & M | Equipment Contract | Total Cost | ||
1. Network Design | 268 | $18,465 | $18,465 | $0 | 593 | 44,469 | 44,469 | |||||||||
2. Site Installation | 117 | $5,574 | $41,502 | $47,076 | $0 | 1,345 | 502,899 | 2,441,716 | 2,944,615 | |||||||
3. Sampling & Analysis | 4,590 | $272,768 | $21,128 | $113,389 | $407,285 | $3,930,806 | $3,930,806 | 10,320 | 1,755,966 | 2,629,841 | 712,565 | 5,098,373 | ||||
4. Maintenance | 816 | $46,060 | $21,128 | $67,188 | $0 | 18,361 | 1,495,550 | 976,571 | 2,472,121 | |||||||
5. Data Management | 1,071 | $71,344 | $71,344 | $0 | 16,856 | 1,160,596 | 1,160,596 | |||||||||
6. Quality Assurance | 1,238 | $67,076 | $67,076 | $0 | 21,139 | 1,421,693 | 515,630 | 1,937,323 | ||||||||
7. Supervision | 510 | $36,904 | $36,904 | $0 | 10,406 | 756,564 | 756,564 | |||||||||
Totals | 8,609 | $518,191 | $42,257 | $154,891 | $715,339 | 0 | $0 | $0 | $3,930,806 | $3,930,806 | 79,020 | 7,137,736 | 4,122,042 | 3,154,281 | 14,414,060 | |
Cost Element | Average 2019-2021 General Network | |||||||||||||||
Labor Hours | Labor Costs | Non-labor O & M | Equipment Contract | Total Cost | ||||||||||||
1. Network Design | 56,475 | 2,220,960 | 4,431,264 | $6,652,224 | ||||||||||||
2. Site Installation | 32,062,415 | $32,062,415 | ||||||||||||||
3. Sampling & Analysis | 9,756 | 692,379 | 4,729,032 | $5,421,411 | ||||||||||||
4. Maintenance | $0 | |||||||||||||||
5. Data Management | 174,720 | 10,645,230 | $10,645,230 | |||||||||||||
6. Quality Assurance | 703,543 | $703,543 | ||||||||||||||
7. Supervision | $0 | |||||||||||||||
Totals | 240,951 | $13,558,569 | $4,729,032 | $37,197,222 | $55,484,823 | |||||||||||
Cost Element | Grand Total Average 2019-2021 | |||||||||||||||
Labor Hours | Labor Costs | Non-labor O & M | Equipment Contract | Total Cost | ||||||||||||
1. Network Design | 60,636 | $2,539,752 | $0 | $4,431,264 | $6,971,016 | |||||||||||
2. Site Installation | 16,281 | $1,558,206 | $0 | $49,871,551 | $51,429,758 | |||||||||||
3. Sampling & Analysis | 329,886 | $40,343,685 | $10,573,658 | $9,623,253 | $60,540,596 | |||||||||||
4. Maintenance | 256,844 | $16,575,498 | $5,532,090 | $0 | $22,107,588 | |||||||||||
5. Data Management | 577,143 | $36,857,902 | $0 | $0 | $36,857,902 | |||||||||||
6. Quality Assurance | 312,435 | $20,654,480 | $515,630 | $715,911 | $21,886,021 | |||||||||||
7. Supervision | 218,437 | $15,559,984 | $0 | $0 | $15,559,984 | |||||||||||
Totals | 1,771,662 | $134,089,507 | $16,621,377 | $64,641,979 | $215,352,864 | |||||||||||
Table 1. Grand Total Average 2019-2021 Renewal for Labor Hours & Costs | ||||||||
Cost Element | Labor Hours | Labor Costs | Non-labor O & M | Equipment Contract | Total Cost | |||
1. Network Design | 60,636 | $2,539,752 | $0 | $4,431,264 | $6,971,016 | $15,118 | ||
2. Site Installation | 16,281 | $1,558,206 | $0 | $49,871,551 | $51,429,758 | $9,275 | ||
3. Sampling & Analysis | 329,886 | $40,343,685 | $10,573,658 | $9,623,253 | $60,540,596 | $240,141 | ||
4. Maintenance | 256,844 | $16,575,498 | $5,532,090 | $0 | $22,107,588 | $98,664 | ||
5. Data Management | 577,143 | $36,857,902 | $0 | $0 | $36,857,902 | $219,392 | ||
6. Quality Assurance | 312,435 | $20,654,480 | $515,630 | $715,911 | $21,886,021 | $122,943 | ||
7. Supervision | 218,437 | $15,559,984 | $0 | $0 | $15,559,984 | $92,619 | ||
Totals | 1,771,662 | $134,089,507 | $16,621,377 | $64,641,979 | $215,352,864 | $798,152 | 10545.605085335 |