FERC-725K 30-day notice (published)

FERC-725K 30-day notice (published).pdf

FERC-725K, Mandatory Reliability Standards for the SERC Region

FERC-725K 30-day notice (published)

OMB: 1902-0260

Document [pdf]
Download: pdf | pdf
Federal Register / Vol. 84, No. 53 / Tuesday, March 19, 2019 / Notices
require special accommodations due to
a disability, please contact Menice
Santistevan at least seven days in
advance of the meeting at the telephone
number listed above. Written statements
may be filed with the Committees either
before or after the meeting. Individuals
who wish to make oral statements
pertaining to agenda items should
contact Menice Santistevan at the
address or telephone number listed
above. Requests must be received five
days prior to the meeting and reasonable
provision will be made to include the
presentation in the agenda. The Deputy
Designated Federal Officer is
empowered to conduct the meeting in a
fashion that will facilitate the orderly
conduct of business. Individuals
wishing to make public comments will
be provided a maximum of five minutes
to present their comments.
Minutes: Minutes will be available by
writing or calling Menice Santistevan at
the address or phone number listed
above. Minutes and other Board
documents are on the internet at: http://
energy.gov/em/nnmcab/meetingmaterials.
Signed in Washington, DC on March 13,
2019.
LaTanya Butler,
Deputy Committee Management Officer.
[FR Doc. 2019–05035 Filed 3–18–19; 8:45 am]
BILLING CODE 6450–01–P

DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. IC19–9–000]

Commission Information Collection
Activities (FERC–725k); Comment
Request
Federal Energy Regulatory
Commission, Department of Energy.
ACTION: Comment request.
AGENCY:

In compliance with the
requirements of the Paperwork
Reduction Act of 1995, the Federal
Energy Regulatory Commission
(Commission or FERC) is submitting its
information collection FERC–725K
(Mandatory Reliability Standards for the
SERC Region) to the Office of
Management and Budget (OMB) for
review of the information collection
requirements. Any interested person
may file comments directly with OMB
and should address a copy of those
comments to the Commission as
explained below. The Commission
previously published a Notice in the
Federal Register on December 10, 2018
(83 FR 63494), requesting public

SUMMARY:

VerDate Sep<11>2014

17:54 Mar 18, 2019

Jkt 247001

comments. The Commission received no
comments and is making this notation
in its submittal to OMB.
DATES: Comments on the collection of
information are due by April 18, 2019.
ADDRESSES: Comments filed with OMB,
identified by the OMB Control No.
1902–0260, should be sent via email to
the Office of Information and Regulatory
Affairs: [email protected].
Attention: Federal Energy Regulatory
Commission Desk Officer.
A copy of the comments should also
be sent to the Commission, in Docket
No. IC19–9–000, by either of the
following methods:
• eFiling at Commission’s Website:
http://www.ferc.gov/docs-filing/
efiling.asp.
• Mail/Hand Delivery/Courier:
Federal Energy Regulatory Commission,
Secretary of the Commission, 888 First
Street NE, Washington, DC 20426.
Instructions: All submissions must be
formatted and filed in accordance with
submission guidelines at: http://
www.ferc.gov/help/submissionguide.asp. For user assistance contact
FERC Online Support by email at
[email protected], or by phone
at: (866) 208–3676 (toll-free), or (202)
502–8659 for TTY.
Docket: Users interested in receiving
automatic notification of activity in this
docket or in viewing/downloading
comments and issuances in this docket
may do so at http://www.ferc.gov/docsfiling/docs-filing.asp.
FOR FURTHER INFORMATION CONTACT:
Ellen Brown may be reached by email
at [email protected], by
telephone at (202) 502–8663, and by fax
at (202) 273–0873.
SUPPLEMENTARY INFORMATION:
Title: Mandatory Reliability Standards
for the SERC Region.
OMB Control No.: 1902–0260.
Type of Request: Three-year extension
of the FERC–725K information
collection requirements with no changes
to the current reporting requirements.
Abstract: Section 215 of the Federal
Power Act (FPA) requires a
Commission-certified Electric
Reliability Organization (ERO) to
develop mandatory and enforceable
Reliability Standards, which are subject
to Commission review and approval.
Once approved, the Reliability
Standards may be enforced by NERC,
subject to Commission oversight, or by
the Commission independently.
Reliability Standards that NERC
proposes to the Commission may
include Reliability Standards that are
proposed by a Regional Entity to be
effective in that region. In Order No.
672, the Commission noted that:

PO 00000

Frm 00036

Fmt 4703

Sfmt 4703

10055

As a general matter, we will accept the
following two types of regional differences,
provided they are otherwise just, reasonable,
not unduly discriminatory or preferential and
in the public interest, as required under the
statute: (1) A regional difference that is more
stringent than the continent-wide Reliability
Standard, including a regional difference that
addresses matters that the continent-wide
Reliability Standard does not; and (2) a
regional Reliability Standard that is
necessitated by a physical difference in the
Bulk-Power System.

When NERC reviews a regional
Reliability Standard that would be
applicable on an interconnection-wide
basis and that has been proposed by a
Regional Entity organized on an
interconnection-wide basis, NERC must
rebuttably presume that the regional
Reliability Standard is just, reasonable,
not unduly discriminatory or
preferential, and in the public interest.
In turn, the Commission must give ‘‘due
weight’’ to the technical expertise of
NERC and of a Regional Entity
organized on an interconnection-wide
basis.
On April 19, 2007, the Commission
accepted delegation agreements between
NERC and each of the eight Regional
Entities. In the order, the Commission
accepted SERC as a Regional Entity
organized on less than an
interconnection-wide basis. As a
Regional Entity, SERC oversees BulkPower System reliability within the
SERC Region, which covers a
geographic area of approximately
560,000 square miles in a sixteen-state
area in the southeastern and central
United States (all of Missouri, Alabama,
Tennessee, North Carolina, South
Carolina, Georgia, Mississippi, and
portions of Iowa, Illinois, Kentucky,
Virginia, Oklahoma, Arkansas,
Louisiana, Texas and Florida). The
SERC Region is currently geographically
divided into five subregions that are
identified as Southeastern, Central,
VACAR, Delta, and Gateway.
Type of Respondents: Entities
registered with the North American
Electric Reliability Corporation (within
the SERC region).
Estimate of Annual Burden: 1 The
Commission estimates the annual
reporting burden and cost for the
information collection as:
1 ‘‘Burden’’ is defined as the total time, effort, or
financial resources expended by persons to
generate, maintain, retain, or disclose or provide
information to or for a Federal agency. For further
explanation of what is included in the information
collection burden, refer to 5 Code of Federal
Regulations 1320.3.

E:\FR\FM\19MRN1.SGM

19MRN1

10056

Federal Register / Vol. 84, No. 53 / Tuesday, March 19, 2019 / Notices
FERC–725K—MANDATORY RELIABILITY STANDARDS FOR THE SERC REGION
Annual
number of
responses per
respondent

Total number
of responses

Average burden hrs. & cost
per response 2

Total annual burden hours &
total annual cost

Cost per
respondent
($)

(1)

(2)

(1) * (2) = (3)

(4)

(3) * (4) = (5)

(5) ÷ (1)

3 21

1

21

8 hrs.; $535.20 ....................

168 hrs.; $11,239.20 ...........

$535.20

3 21

1

21

16 hrs.; $1,070.40 ...............

336 hrs.; $22,478.40 ...........

1,070.40

4 104

1

104

16 hrs.; $1,070.40 ...............

1,664 hrs.; $111,321.60 ......

1,070.40

4 104

1

104

4 hrs.; $267.60 ....................

416 hrs.; $27,830.40 ...........

267.60

........................

........................

125

..............................................

2,584 hrs.; $172,869.60 ......

2,943.60

PCs: Design and Document Automatic UFLS Program.
PCs: Provide Documentation and
Data to SERC.
GOs: Provide Documentation and
Data to SERC.
GOs: Record Retention ................
Total .......................................

Number of
respondents

Comments: Comments are invited on:
(1) Whether the collection of
information is necessary for the proper
performance of the functions of the
Commission, including whether the
information will have practical utility;
(2) the accuracy of the agency’s estimate
of the burden and cost of the collection
of information, including the validity of
the methodology and assumptions used;
(3) ways to enhance the quality, utility
and clarity of the information collection;
and (4) ways to minimize the burden of
the collection of information on those
who are to respond, including the use
of automated collection techniques or
other forms of information technology.
Dated: March 11, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019–05047 Filed 3–18–19; 8:45 am]
BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2814–025]

Great Falls Hydroelectric Company;
Notice of Application Tendered for
Filing With The Commission and
Soliciting Additional Study Requests
and Establishing Procedural Schedule
for Relicensing and a Deadline for
Submission of Final Amendments
Take notice that the following
hydroelectric application has been filed
2 The estimated hourly cost (salary plus benefits)
provided in this section is based on the salary
figures (http://www.bls.gov/oes/current/naics2_
22.htm) and benefits (http://www.bls.gov/
news.release/ecec.nr0.htm) for May 2017 posted by
the Bureau of Labor Statistics for the Utilities
sector. The hourly estimates for salary plus benefits
are $66.90/hour based on the Engineering career
(Occupation Code: 17–2071).
3 Both figures for PC respondents are not to be
totaled. They represent the same set of respondents.
4 Both figures for GO respondents are not to be
totaled. They represent the same set of respondents.

VerDate Sep<11>2014

19:27 Mar 18, 2019

Jkt 247001

with the Commission and is available
for public inspection.
a. Type of Application: New Major
License.
b. Project No.: 2814–025.
c. Date Filed: February 28, 2019.
d. Applicant: Great Falls
Hydroelectric Company and the City of
Paterson, New Jersey, as co-licensees.
e. Name of Project: Great Falls
Hydroelectric Project.
f. Location: On the Passaic River, near
the City of Paterson, Passaic County,
New Jersey. The project does not occupy
federal land.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791 (a)–825 (r).
h. Applicant Contact: Mr. Robert
Gates, Senior Vice President of
Operations, Eagle Creek Renewable
Energy, 65 Madison Avenue, Suite 500,
Morristown, NJ 07960; (973) 998–8400;
email—[email protected]
and/or Ben-David Seligman, 2nd
Assistant Corp. Counsel, City of
Paterson, 155 Market Street, Paterson,
NJ; (973) 321–1366; email—bseligman@
patersonnj.gov.
i. FERC Contact: Christopher Millard
at (202) 502–8256; or email at
[email protected].
j. Cooperating agencies: Federal, state,
local, and tribal agencies with
jurisdiction and/or special expertise
with respect to environmental issues
that wish to cooperate in the
preparation of the environmental
document should follow the
instructions for filing such requests
described in item l below. Cooperating
agencies should note the Commission’s
policy that agencies that cooperate in
the preparation of the environmental
document cannot also intervene. See, 94
FERC ¶ 61,076 (2001).
k. Pursuant to section 4.32(b)(7) of 18
CFR of the Commission’s regulations, if
any resource agency, Indian Tribe, or
person believes that an additional
scientific study should be conducted in
order to form an adequate factual basis
for a complete analysis of the

PO 00000

Frm 00037

Fmt 4703

Sfmt 4703

application on its merit, the resource
agency, Indian Tribe, or person must file
a request for a study with the
Commission not later than 60 days from
the date of filing of the application, and
serve a copy of the request on the
applicant.
l. Deadline for filing additional study
requests and requests for cooperating
agency status: April 29, 2019.
The Commission strongly encourages
electronic filing. Please file additional
study requests and requests for
cooperating agency status using the
Commission’s eFiling system at http://
www.ferc.gov/docs-filing/efiling.asp. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). In lieu of
electronic filing, please send a paper
copy to: Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426. The first
page of any filing should include docket
number P–2814–025.
m. This application is not ready for
environmental analysis at this time.
n. The existing project works consist
of: (1) The Society for the Establishment
of Useful Manufactures dam, an
overflow granite stone gravity structure
about 315 feet long, with a maximum
height of 15 feet and having a crest
elevation of 114.6 feet mean sea level
(msl); (2) a reservoir with a surface area
of 202 acres and a storage capacity of
1,415 acre-feet at elevation 114.6 feet
msl; (3) a forebay inlet structure; (4) a
headgate control structure containing
three trashracks and three steel gates; (5)
three penstocks, each 8.5 feet in
diameter and approximately 55 feet
long; (6) a powerhouse containing three
turbine-generator units with a total rated
capacity of 10.95 megawatts; (7) a 37foot-long 4.16-kilovolt (kV)
underground transmission line
connecting the powerhouse to a 4.16/
26.4-kV step-up transformer which in
turn is connected to a 26.4-kV

E:\FR\FM\19MRN1.SGM

19MRN1


File Typeapplication/pdf
File Modified0000-00-00
File Created0000-00-00

© 2024 OMB.report | Privacy Policy