Table 1: Annual Respondent Burden and Cost – NESHAP for Semiconductor Manufacturing (40 CFR Part 63, Subpart BBBBB) (Renewal) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
117.92 |
147.4 |
57.02 |
|
Updated labor rates |
|
|
Burden item |
(A) |
(B) |
(C) |
(D) |
(E) |
(F) |
(G) |
(H) |
|
|
|
|
Person hours per occurrence |
No. of occurrences per respondent per year |
Person hours per respondent per year |
Respondents per year a |
Technical person- hours per year |
Management person hours per year |
Clerical person hours per year |
Total Cost |
|
|
|
|
|
|
(C=AxB) |
|
(E=CxD) |
(Ex0.05) |
(Ex0.1) |
Per year b |
|
|
|
1. Applications |
N/A |
|
|
|
|
|
|
|
|
|
|
2. Survey and Studies |
N/A |
|
|
|
|
|
|
|
|
|
|
3. Reporting requirements |
|
|
|
|
|
|
|
|
|
|
|
A. Familiarization with rule requirement |
4 |
1 |
4 |
1 |
4 |
0.2 |
0.4 |
$523.97 |
|
|
|
B. Process/review information d |
4 |
2 |
8 |
1 |
8 |
0.4 |
0.8 |
$1,047.94 |
|
|
|
C. Write Report |
|
|
|
|
|
|
|
|
|
|
|
Initial notification c |
2 |
1 |
2 |
0 |
0 |
0 |
0 |
$0 |
|
|
|
Notification of performance evaluation c |
2 |
1 |
2 |
0 |
0 |
0 |
0 |
$0 |
|
|
|
Notification of compliance status c |
2 |
1 |
2 |
0 |
0 |
0 |
0 |
$0 |
|
|
|
Performance evaluation reports c |
2 |
1 |
2 |
0 |
0 |
0 |
0 |
$0 |
|
|
|
Develop a startup, shutdown, malfunction (SSM) report e |
1 |
4 |
4 |
0 |
0 |
0 |
0 |
$0 |
|
|
|
Develop a semiannual summary report f |
4 |
2 |
8 |
1 |
8 |
0.4 |
0.8 |
$1,047.94 |
|
|
|
Subtotal for Reporting Requirements |
|
|
|
|
23 |
$2,620 |
|
|
|
4. Recordkeeping requirements |
|
|
|
|
|
|
|
|
|
|
|
A. Familiarization with rule requirement |
See 3A |
|
|
|
|
|
|
|
|
|
|
B. Plan activities |
8 |
1 |
8 |
1 |
8 |
0.4 |
0.8 |
$1,047.94 |
|
|
|
C. Implement activities |
|
|
|
|
|
|
|
|
|
|
|
Control devices |
|
|
|
|
|
|
|
|
|
|
|
Design analysis |
15 |
1 |
15 |
0 |
0 |
0 |
0 |
$0 |
|
|
|
Performance evaluation |
40 |
1 |
40 |
0 |
0 |
0 |
0 |
$0 |
|
|
|
Equipment inspection |
1 |
52 |
52 |
0 |
0 |
0 |
0 |
$0 |
|
|
|
Monitoring activities |
1 |
52 |
52 |
0 |
0 |
0 |
0 |
$0 |
|
|
|
Maintenance |
2 |
52 |
104 |
0 |
0 |
0 |
0 |
$0 |
|
|
|
D. Develop record system |
|
|
|
|
|
|
|
|
|
|
|
Develop SSM plan |
8 |
1 |
8 |
0 |
0 |
0 |
0 |
$0 |
|
|
|
Control equipment/maintenance plan |
12 |
1 |
12 |
0 |
0 |
0 |
0 |
$0 |
|
|
|
E. Time to enter information |
|
|
|
|
|
|
|
|
|
|
|
Control equipment testing |
1 |
1 |
1 |
0 |
0 |
0 |
0 |
$0 |
|
|
|
Control equipment inspection |
0.5 |
52 |
26 |
0 |
0 |
0 |
0 |
$0 |
|
|
|
Control equipment monitoring |
0.5 |
52 |
26 |
0 |
0 |
0 |
0 |
$0 |
|
|
|
F. Time to train personnel |
|
|
|
|
|
|
|
|
|
|
|
Control equipment inspection and Monitoring |
40 |
1 |
40 |
0 |
0 |
0 |
0 |
$0 |
|
|
|
G. Store, file and maintain records g |
2 |
2 |
4 |
1 |
4 |
0.2 |
0.4 |
$523.97 |
|
|
|
H. Retrieve records/reports h |
2 |
2 |
4 |
1 |
4 |
0.2 |
0.4 |
$523.97 |
|
|
|
Subtotal for Recordkeeping Requirements |
|
|
|
|
18 |
$2,096 |
|
|
|
TOTAL ANNUAL BURDEN AND COSTS (rounded) i |
|
|
|
|
41 |
$4,720 |
|
|
|
TOTAL CAPITAL/O&M COST (rounded): i |
|
|
|
|
|
|
|
$550 |
|
21 |
hr/resp |
GRAND TOTAL (rounded): i |
|
|
|
|
|
|
|
$5,270 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Assumptions: |
|
|
|
|
|
|
|
|
|
|
|
a We have assumed that there is approximately 1 existing major source currently subject to this rule. There will be no additional new sources that will become subject to the rule over the three-year period of this ICR. |
b This ICR uses the following labor rates: $147.40 per hour for Managerial labor; $117.92 per hour for Technical labor, and $57.02 per hour for Clerical labor. These rates are from the United States Department of Labor, Bureau of Labor Statistics, June 2018 “Table 2. Civilian Workers, by Occupational and Industry group.” The rates are from column 1, “Total Compensation.” The rates have been increased by 110 percent to account for the benefit packages available to those employed by private industry. |
c This is a one-time only activity. |
|
|
|
|
|
|
|
|
|
|
|
d We have assumed that it will take the respondent 4 hours twice a year to process and review information. |
|
|
|
|
|
|
|
|
|
|
|
e We have assumed that it will take each respondent 1 hour four times a year to write the startup, shutdown, malfunction (SSM) report. |
|
|
|
|
|
|
|
|
|
|
|
f We have assumed that it will take the respondent 4 hours two times a year to complete the semiannual report. |
|
|
|
|
|
|
|
|
|
|
|
g We have assumed that the respondent will take 2 hours two times per year to store, file and maintain records. |
|
|
|
|
|
|
|
|
|
|
|
h We have assumed that the respondent will take 2 hours two times per year to retrieve records/reports. |
|
|
|
|
|
|
|
|
|
|
|