FERC-725P1 60-day notice (published)

FERC-725P1 60-day notice (published).pdf

FERC-725P1, Mandatory Reliability Standards, PRC-005-6 Reliability Standard

FERC-725P1 60-day notice (published)

OMB: 1902-0280

Document [pdf]
Download: pdf | pdf
khammond on DSKBBV9HB2PROD with NOTICES

Federal Register / Vol. 84, No. 105 / Friday, May 31, 2019 / Notices

25249

Docket Numbers: ER19–1966–000.
Applicants: Southern California
Edison Company.
Description: Tariff Cancellation:
Cancel LGIA Golden Oasis Project SA
No. 188 to be effective 7/3/2019.
Filed Date: 5/23/19.
Accession Number: 20190523–5089.
Comments Due: 5 p.m. ET 6/13/19.
Docket Numbers: ER19–1967–000.
Applicants: El Paso Electric Company.
Description: Compliance filing: Order
No. 819 Compliance—Market-Based
Rate Tariff to be effective 5/24/2019.
Filed Date: 5/23/19.
Accession Number: 20190523–5094.
Comments Due: 5 p.m. ET 6/13/19.
Docket Numbers: ER19–1968–000.
Applicants: AEP Indiana Michigan
Transmission Company, Inc., Indiana
Michigan Power Company, PJM
Interconnection, L.L.C.
Description: § 205(d) Rate Filing: AEP
submits ILDSA, Service Agreement Nos.
1262 and 5120 and Prairie Ronde FA to
be effective 6/1/2019.
Filed Date: 5/23/19.
Accession Number: 20190523–5113.
Comments Due: 5 p.m. ET 6/13/19.
Docket Numbers: ER19–1969–000.
Applicants: Louisville Gas and
Electric Company.
Description: § 205(d) Rate Filing:
Amendment LGE–KU Joint Short Form
MBR Tariff to be effective 7/23/2019.
Filed Date: 5/23/19.
Accession Number: 20190523–5119.
Comments Due: 5 p.m. ET 6/13/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: http://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.

DEPARTMENT OF ENERGY

DEPARTMENT OF ENERGY

Federal Energy Regulatory
Commission

Federal Energy Regulatory
Commission

Combined Notice of Filings

[Docket No. EL19–68–000]

Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:

Notice of Institution of Section 206
Proceeding and Refund Effective Date:
New Brunswick Energy Marketing
Corporation

Dated: May 23, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.

Dated: May 23, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.

[FR Doc. 2019–11355 Filed 5–30–19; 8:45 am]

[FR Doc. 2019–11358 Filed 5–30–19; 8:45 am]

BILLING CODE 6717–01–P

BILLING CODE 6717–01–P

VerDate Sep<11>2014

16:42 May 30, 2019

Jkt 247001

Filings Instituting Proceedings
Docket Numbers: RP19–1231–000.
Applicants: Discovery Gas
Transmission LLC.
Description: § 4(d) Rate Filing: 2019
FL&U Submittal to be effective 7/1/
2019.
Filed Date: 5/21/19.
Accession Number: 20190521–5057.
Comments Due: 5 p.m. ET 6/3/19.
Docket Numbers: RP19–1232–000.
Applicants: Elba Express Company,
L.L.C.
Description: Compliance filing
Annual Cashout True-up 2019.
Filed Date: 5/22/19.
Accession Number: 20190522–5017.
Comments Due: 5 p.m. ET 6/3/19.
Docket Numbers: RP19–1233–000.
Applicants: Transwestern Pipeline
Company, LLC.
Description: § 4(d) Rate Filing:
Negotiated Rate Filing (BP Energy) on
5–22–19 to be effective 6/1/2019.
Filed Date: 5/22/19.
Accession Number: 20190522–5032.
Comments Due: 5 p.m. ET 6/3/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: http://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.

PO 00000

Frm 00019

Fmt 4703

Sfmt 4703

On May 24, 2019, the Commission
issued an order in Docket No. EL19–68–
000, pursuant to section 206 of the
Federal Power Act (FPA), 16 U.S.C.
824e (2012), instituting an investigation
into whether New Brunswick Energy
Marketing Corporation’s market-based
rate authority in the New Brunswick
System Operator balancing authority
area is just and reasonable. New
Brunswick Energy Marketing
Corporation, 167 FERC ¶ 61,172 (2019).
The refund effective date in Docket
No. EL19–68–000, established pursuant
to section 206(b) of the FPA, will be the
date of publication of this notice in the
Federal Register. Any interested person
desiring to be heard in Docket No.
EL19–68–000 must file a notice of
intervention or motion to intervene, as
appropriate, with the Federal Energy
Regulatory Commission, 888 First Street
NE, Washington, DC 20426, in
accordance with Rule 214 of the
Commission’s Rules of Practice and
Procedure, 18 CFR 385.214 (2018),
within 21 days of the date of issuance
of the order.
Dated: May 24, 2019.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2019–11365 Filed 5–30–19; 8:45 am]
BILLING CODE 6717–01–P

DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. IC19–23–000]

Commission Information Collection
Activities (FERC–725P1); Consolidated
Comment Request; Extension
Federal Energy Regulatory
Commission.
ACTION: Notice of information
collections and request for comments.
AGENCY:

In compliance with the
requirements of the Paperwork
Reduction Act of 1995, the Federal
Energy Regulatory Commission
(Commission or FERC) is soliciting
public comment on the requirements
and burden of the information
collections described below.

SUMMARY:

E:\FR\FM\31MYN1.SGM

31MYN1

25250

Federal Register / Vol. 84, No. 105 / Friday, May 31, 2019 / Notices

Comments on the collections of
information are due July 30, 2019.
ADDRESSES: You may submit comments
(identified by Docket No. IC19–23–000)
by either of the following methods:
• eFiling at Commission’s Website:
http://www.ferc.gov/docs-filing/
efiling.asp.
• Mail/Hand Delivery/Courier:
Federal Energy Regulatory Commission,
Secretary of the Commission, 888 First
Street NE, Washington, DC 20426.
Please reference the specific
collection number and/or title in your
comments.
Instructions: All submissions must be
formatted and filed in accordance with
submission guidelines at: http://
www.ferc.gov/help/submissionguide.asp. For user assistance contact
FERC Online Support by email at
[email protected], or by phone
at: (866) 208–3676 (toll-free), or (202)
502–8659 for TTY.
Docket: Users interested in receiving
automatic notification of activity in this
docket or in viewing/downloading
comments and issuances in this docket
may do so at http://www.ferc.gov/docsfiling/docs-filing.asp.
FOR FURTHER INFORMATION CONTACT:
Ellen Brown may be reached by email
at [email protected], telephone
at (202) 502–8663, and fax at (202) 273–
0873.
SUPPLEMENTARY INFORMATION:
Type of Request: Three-year extension
of the information collection
requirements for all collections
described below with no changes to the
DATES:

current reporting requirements. Please
note the three collections are distinct.
Comments: Comments are invited on:
(1) Whether the collections of
information are necessary for the proper
performance of the functions of the
Commission, including whether the
information will have practical utility;
(2) the accuracy of the agency’s
estimates of the burden and cost of the
collections of information, including the
validity of the methodology and
assumptions used; (3) ways to enhance
the quality, utility and clarity of the
information collections; and (4) ways to
minimize the burden of the collections
of information on those who are to
respond, including the use of automated
collection techniques or other forms of
information technology.
Title: FERC–725P1 (Mandatory
Reliability Standards: PRC–005–6
Reliability Standard).
OMB Control No.: 1902–0280.
Abstract: The Commission requires
the information collected by the FERC–
725P1 to Ok. implement the statutory
provisions of section 215 of the Federal
Power Act (FPA).1 On August 8, 2005,
Congress enacted into law the
Electricity Modernization Act of 2005,
which is Title XII, Subtitle A, of the
Energy Policy Act of 2005 (EPAct
2005).2 EPAct 2005 added a new section
215 to the FPA, which required a
Commission-certified Electric
Reliability Organization (ERO) to
develop mandatory and enforceable
Reliability Standards, which are subject
to Commission review and approval.
Once approved, the Reliability

Standards may be enforced by the ERO
subject to Commission oversight, or the
Commission can independently enforce
Reliability Standards.3
On February 3, 2006, the Commission
issued Order No. 672, implementing
section 215 of the FPA.4 Pursuant to
Order No. 672, the Commission certified
one organization, North American
Electric Reliability Corporation (NERC),
as the ERO.5 The Reliability Standards
developed by the ERO and approved by
the Commission apply to users, owners
and operators of the Bulk-Power System
as set forth in each Reliability Standard.
On November 13, 2015, the North
American Electric Reliability
Corporation (NERC) filed a petition for
Commission approval of proposed
Reliability Standard PRC–005–6
(Protection System, Automatic
Reclosing, and Sudden Pressure
Relaying Maintenance). NERC also
requested approval of the proposed
implementation plan for PRC–005–6,
and the retirement of previous versions
of Reliability Standard PRC–005.
NERC explained in its petition that
Reliability Standard PRC–005–6
represents an improvement upon the
most recently-approved version of the
standard, PRC–005–4. FERC approved
the proposed Reliability Standard PRC–
005–6 on December 18, 2015.
Type of Respondent: Transmission
Owners (TO), Generator Owners (GO),
and Distribution Providers.
Estimate of Annual Burden: The
Commission estimates the annual public
reporting burden for the information
collection as:

FERC–725K—MANDATORY RELIABILITY STANDARDS FOR THE SERC REGION 6
Number of
respondents

Annual
number of
responses per
respondent

Total number
of responses

Average burden
hrs. & cost per
response 7

Total annual burden
hours & total annual
cost 8

(1)

(2)

(1) * (2) = (3)

(4)

(3) * (4) = (5)

2 hrs.; $133.80 ...........

1,992 hrs.; $133,265.10

9 996

PRC–005–6 Reliability Standard .............

One-time reporting requirements
related to the implementation of the
PRC–005–6 Reliability Standard are
1 16

U.S.C. 824o (2012).
Policy Act of 2005, Public Law 109–58,
Title XII, Subtitle A, 119 Stat. 594, 941 (codified at
16 U.S.C. 824o).
3 16 U.S.C. 824o(e)(3).
4 Rules Concerning Certification of the Electric
Reliability Organization; and Procedures for the
Establishment, Approval, and Enforcement of
Electric Reliability Standards, Order No. 672, FERC
Stats. & Regs. ¶ 31,204, order on reh’g, Order No.
672–A, FERC Stats. & Regs. ¶ 31,212 (2006).
5 North American Electric Reliability Corp., 116
FERC ¶ 61,062, order on reh’g and compliance, 117

khammond on DSKBBV9HB2PROD with NOTICES

2 Energy

VerDate Sep<11>2014

16:42 May 30, 2019

Jkt 247001

1

996

being removed from the FERC–725P1
information collection. A list of those

removed reporting requirements and
their related burdens follows:

FERC ¶ 61,126 (2006), order on compliance, 118
FERC ¶ 61,190, order on reh’g, 119 FERC ¶ 61,046
(2007), aff’d sub nom. Alcoa Inc. v. FERC, 564 F.3d
1342 (D.C. Cir. 2009).
6 Entities affected by the PRC–005–6 Reliability
Standard are registered to serve any of the following
roles:
• PC=Planning Coordinators;
• GO=Generator Owners.
Some entities are registered to serve both roles.
7 The estimated hourly cost (salary plus benefits)
provided in this section is based on the salary

figures (http://www.bls.gov/oes/current/naics2_
22.htm) and benefits (http://www.bls.gov/
news.release/ecec.nr0.htm) for May 2017 posted by
the Bureau of Labor Statistics for the Utilities
sector. The hourly estimates for salary plus benefits
are $66.90/hour based on the Electrical Engineering
career (Occupation Code: 17–2071).
8 Total Annual Cost is rounded-up from
$133,264.80 to $133,265.
9 20 (PC role only) + 927 (GO role only) + 49 (joint
role as PC and GO) = 996 unique entities.
10 This number is rounded from $133,264.80.

PO 00000

Frm 00020

Fmt 4703

Sfmt 4703

E:\FR\FM\31MYN1.SGM

31MYN1

Federal Register / Vol. 84, No. 105 / Friday, May 31, 2019 / Notices

khammond on DSKBBV9HB2PROD with NOTICES

• One-time review of existing plant
and substation sites: 937 responses and
1,874 hours.
• One-time review and adjustment of
existing programs for reclosing relays
and associated equipment: 288
responses and 2,448 hours.
• One-time review and adjustment of
existing program for sudden pressure
relays: 1,287 responses and 10,296
hours.
The previous table presents the
FERC–725P1 burden estimate after these
three one-time requirements were
removed and the burden was reduced.

Description: Tariff Amendment:
Deferral of Commission Action in ER19–
1463 to be effective 12/31/9998.
Filed Date: 5/23/19.
Accession Number: 20190523–5050.
Comments Due: 5 p.m. ET 6/13/19.
Docket Numbers: ER19–1954–000.
Applicants: Southwest Power Pool,
Inc.
Description: Compliance filing: Order
Nos. 845 and 845–A Compliance Filing
to be effective 12/31/9998.
Filed Date: 5/22/19.
Accession Number: 20190522–5165.
Comments Due: 5 p.m. ET 6/12/19.
Dated: May 23, 2019.
Docket Numbers: ER19–1955–000.
Nathaniel J. Davis, Sr.,
Applicants: Public Service Company
of New Mexico.
Deputy Secretary.
Description: Compliance filing: Order
[FR Doc. 2019–11357 Filed 5–30–19; 8:45 am]
845 Compliance Filing to be effective
BILLING CODE 6717–01–P
5/22/2019.
Filed Date: 5/22/19.
Accession Number: 20190522–5176.
DEPARTMENT OF ENERGY
Comments Due: 5 p.m. ET 6/12/19.
Federal Energy Regulatory
Docket Numbers: ER19–1956–000.
Commission
Applicants: Cube Yadkin
Transmission LLC.
Combined Notice of Filings #1
Description: Compliance filing: Order
845 Compliance Filing to be effective
Take notice that the Commission
5/22/2019.
received the following electric rate
Filed Date: 5/22/19.
filings:
Accession Number: 20190522–5178.
Docket Numbers: ER11–47–010;
Comments Due: 5 p.m. ET 6/12/19.
ER12–1540–008; ER12–1541–008;
ER12–1542–008; ER12–1544–008;
Docket Numbers: ER19–1957–000.
ER12–2343–008; ER13–1896–014;
Applicants: Alabama Power
ER14–594–012; ER16–323–006; ER17–
Company.
1930–002; ER17–1931–002; ER17–1932–
Description: Compliance filing: Order
002; ER11–41–010; ER11–46–013.
Nos. 845 and 845–A Interconnection
Applicants: Appalachian Power
Reform Compliance Filing to be
Company, Indiana Michigan Power
effective 5/22/2019.
Company, Kentucky Power Company,
Filed Date: 5/22/19.
Kingsport Power Company, Wheeling
Accession Number: 20190522–5181.
Power Company, AEP Texas Inc., Public
Comments Due: 5 p.m. ET 6/12/19.
Service Company of Oklahoma,
Docket Numbers: ER19–1958–000.
Southwestern Electric Power Company,
Applicants: PJM Interconnection,
Ohio Power Company, AEP Energy
L.L.C.
Partners, Inc., AEP Retail Energy
Description: Compliance filing:
Partners LLC, AEP Energy, Inc., AEP
Compliance filing to Order No. 845 re:
Generation Resources Inc., Ohio Valley
Large Generator Interconnection to be
Electric Corporation.
effective 12/31/9998.
Description: Notice of Non-Material
Filed Date: 5/22/19.
Change in Status of the AEP Companies.
Accession Number: 20190522–5182.
Filed Date: 5/22/19.
Comments Due: 5 p.m. ET 6/12/19.
Accession Number: 20190522–5208.
Docket Numbers: ER19–1959–000.
Comments Due: 5 p.m. ET 6/12/19.
Applicants: Avista Corporation.
Docket Numbers: ER11–2029–006.
Description: Compliance filing: Avista
Applicants: Cedar Creek II, LLC, Flat
Corp
OATT Order 845/845A
Ridge 2 Wind Energy LLC, Fowler Ridge
Compliance Filing to be effective
II Wind Farm LLC, Mehoopany Wind
5/22/2019.
Energy LLC.
Filed Date: 5/22/19.
Description: Notice of Change in
Accession Number: 20190522–5186.
Status of Cedar Creek II, LLC, et al.
Comments Due: 5 p.m. ET 6/12/19.
Filed Date: 5/22/19.
Accession Number: 20190522–5219.
Docket Numbers: ER19–1960–000.
Comments Due: 5 p.m. ET 6/12/19.
Applicants: Midcontinent
Independent System Operator, Inc.
Docket Numbers: ER19–1463–001.
Description: Compliance filing: 2019–
Applicants: Upper Michigan Energy
05–22_Attachment X Compliance
Resources Corporation.

VerDate Sep<11>2014

16:42 May 30, 2019

Jkt 247001

PO 00000

Frm 00021

Fmt 4703

Sfmt 4703

25251

relative to RM17–8 (Order 845) to be
effective 12/31/9998.
Filed Date: 5/22/19.
Accession Number: 20190522–5187.
Comments Due: 5 p.m. ET 6/12/19.
Docket Numbers: ER19–1961–000.
Applicants: GridLiance High Plains
LLC.
Description: Compliance filing:
Compliance Filing to be effective
5/22/2019.
Filed Date: 5/22/19.
Accession Number: 20190522–5188.
Comments Due: 5 p.m. ET 6/12/19.
Docket Numbers: ER19–1961–001.
Applicants: GridLiance High Plains
LLC.
Description: Compliance filing:
Supplemental Filing to Order No. 845
Compliance Filing to be effective
5/22/2019.
Filed Date: 5/23/19.
Accession Number: 20190523–5056.
Comments Due: 5 p.m. ET 6/13/19.
Docket Numbers: ER19–1962–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
1166R33 Oklahoma Municipal Power
Authority NITSA and NOA to be
effective 7/1/2019.
Filed Date: 5/23/19.
Accession Number: 20190523–5036.
Comments Due: 5 p.m. ET 6/13/19.
Docket Numbers: ER19–1963–000.
Applicants: Midcontinent
Independent System Operator, Inc.,
MidAmerican Energy Company.
Description: § 205(d) Rate Filing:
2019–05–23_MidAmerican Revisions to
Modify Posting Date of Projected Net
Rev Req to be effective 8/1/2019.
Filed Date: 5/23/19.
Accession Number: 20190523–5048.
Comments Due: 5 p.m. ET 6/13/19.
Docket Numbers: ER19–1964–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) Rate Filing:
1518R17 Arkansas Electric Cooperative
Corp NITSA NOA to be effective
7/1/2019.
Filed Date: 5/23/19.
Accession Number: 20190523–5049.
Comments Due: 5 p.m. ET 6/13/19.
Docket Numbers: ER19–1965–000.
Applicants: Alcoa Power Generating
Inc.
Description: Order Nos. 845 and 845–
A Compliance Filing of Alcoa Power
Generating Inc.
Filed Date: 5/22/19.
Accession Number: 20190522–5220.
Comments Due: 5 p.m. ET 6/12/19.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.

E:\FR\FM\31MYN1.SGM

31MYN1


File Typeapplication/pdf
File Modified2019-05-31
File Created2019-05-31

© 2024 OMB.report | Privacy Policy