CTAC
OMB No. 2060-0336,
Approval Expires 05/31/2019
Federal Operating Permit Program (40 CFR Part 71) CERTIFICATION OF TRUTH, ACCURACY, AND COMPLETENESS (CTAC) |
This form must be completed, signed by the “Responsible Official” designated for the facility or emission unit, and sent with each submission of documents (i.e., application forms, updates to applications, reports, or any information required by a part 71 permit).
|
A. Responsible Official
Name: (Last) _____________________ (First) ____________________ (MI) ____
Title ___________________________________________________
Street or P.O. Box ________________________________________
City ________________________________ State _____ ZIP _________ - _____
Telephone (____) ____ - ________ Ext. ______ Facsimile (____) ____ - ________
|
B. Certification of Truth, Accuracy and Completeness (to be signed by the responsible official)
I certify under penalty of law, based on information and belief formed after reasonable inquiry, the statements and information contained in these documents are true, accurate and complete.
Name (signed) _________________________________
Name (typed) _________________________________ Date: _____ /_____ /_______
|
INSTRUCTIONS FOR CTAC
CERTIFICATION OF TRUTH, ACURACY, and COMPLETENESS
Information Collection Burden Estimates
The public reporting and recordkeeping burden for this collection of information is estimated to average 247 hours per respondent per year. Send comments on the Agency's need for this information, the accuracy of the provided burden estimates, and any suggested methods for minimizing respondent burden, including through the use of automated collection techniques to the Director, Collection Strategies Division, U.S. Environmental Protection Agency (2822T), 1200 Pennsylvania Ave., NW, Washington, D.C. 20460. Include the OMB control number in any correspondence. Do not send the completed form to this address.
DETAILED INSTRUCTIONS
This form is for the responsible official to certify that submitted documents (i.e., permit applications, updates to application, reports, and any other information required to be submitted as a condition of a permit) are true, accurate, and complete.
This form should be completed and submitted with each set of documents sent to the permitting authority. It may be used at time of initial application, at each step of a phased application submittal, for application updates, as well as to accompany routine submittals required as a term or condition of a permit.
Section A - Title V permit applications must be signed by a responsible official. The definition of responsible official can be found at 40 CFR 70.2.
Section B - The responsible official must sign and date the certification of truth, accuracy and completeness. This should be done after all application forms are complete and the responsible official has reviewed the information. Normally this would be the last form completed before the package of forms is mailed to the permitting authority.
EPA Form 5900-02
File Type | application/msword |
File Modified | 0000-00-00 |
File Created | 0000-00-00 |