Form FHWA-534 State Highway Capital Outlay and Maintenance Expenditure

A Guide to Reporting Highway Statistics

534BS.xls

A Guide to Reporting Highway Statistics

OMB: 2125-0032

Document [xlsx]
Download: xlsx | pdf
U. S. Department of Transportation
STATE:
Federal Highway Administration







YEAR ENDING (mm/yy):
STATE HIGHWAY CAPITAL OUTLAY

AND MAINTENANCE EXPENDITURES
NOTE: This collection of information is required by 23 U.S.C. 104 (b) and 105 (b); and 23 C.F.R. 1.5 and 420.105(b). Public reporting burden is estimated to average126 hours per response, including the time for reviewing instructions searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. The Guide data is used by FHWA in administering the Federal-Aid Highway Program; in assessing highway policies, programs and performance of the Nation’s highway transportation system; in identifying future highway system investment needs; and in making policy and program recommendations. Please note that an agency may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. The OMB control number for this collection is 2125-0032, which expires on XX/XX/XXXX. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to: Information Collection Clearance Officer, Federal Highway Administration, 1200 New Jersey Avenue, SE, Washington, DC 20590. AREA AND FUNCTIONAL SYSTEM:












EXPENDITURES ON NATIONAL OFF NATIONAL
BY IMPROVEMENT TYPES HIGHWAY SYSTEM HIGHWAY SYSTEM TOTAL




I. CAPITAL OUTLAY


A. NEW FACILITIES


1. RIGHT-OF-WAY COSTS

2. ENGINEERING COSTS

3. CONSTRUCTION OF NEW ROADS

4. CONSTRUCTION OF NEW BRIDGES

5. TOTAL
B. CAPACITY ADDITIONS TO EXISTING FACILITES


1. RIGHT-OF-WAY COSTS

2. ENGINEERING COSTS

3. RELOCATION WITH ADDED CAPACITY

4. RECONSTRUCTION WITH ADDED CAPACITY

5. MAJOR WIDENING

6. BRIDGE REPLACEMENT WITH ADDED CAPACITY

7. BRIDGE REHABILITATION WITH ADDED CAPACITY

8. TOTAL
C. SYSTEM PRESERVATION


1. RIGHT-OF-WAY COSTS

2. ENGINEERING COSTS

3. RELOCATION WITH NO ADDED CAPACITY

4. RECONSTRUCTION WITH NO ADDED CAPACITY

5. RESTORATION, REHABILITATION, & RESURFACING

6. MINOR WIDENING

7. BRIDGE REPLACEMENT WITH NO ADDED CAPACITY

8. BRIDGE REHABILITATION WITH NO ADDED CAPACITY

9. TOTAL
D. SYSTEM ENHANCEMENT AND OPERATION


1. ENGINEERING COSTS

2. SAFETY IMPROVEMENTS

3. TRAFFIC MANAGEMENT / TRAFFIC ENGINEERING

4. ENVIRONMENTAL IMPROVEMENTS

5. OTHER ENHANCEMENTS

6. TOTAL
E. TOTAL CAPITAL OUTLAY (Lines A + B + C + D)
II. MAINTENANCE

FORM FHWA-534 (Rev. 06-2000) PREVIOUS EDITIONS OBSOLETE
Excel
File Typeapplication/vnd.ms-excel
File Modified0000-00-00
File Created0000-00-00

© 2024 OMB.report | Privacy Policy