Background: Showcase Project(s) demonstrate that Better Buildings Challenge Partners are taking immediate, concrete actions resulting in significant and real savings. The information collected in this form will be used to highlight the development, implementation and results of these projects and the resulting energy, water, and cost reductions. Partners are encouraged to have multiple showcase projects; however, the first showcase project should be submitted within 6 months of joining the program. Please submit individual forms for each showcase project.
Expected/actual Implementation Start Date
Click here to enter text.
Expected/actual Implementation End Date
Click here to enter text.
Project Cost
Costs should include all capital and operational expenses needed to complete the energy efficiency-related aspects of this project only, not the full project cost if non-energy savings measures were taken.
Click here to enter text.
Expected/actual Annual Savings
Please provide figures for after project implementation is complete. Quantify water savings in gallons or gallons/square feet, energy savings in kBtu or kBtu/square feet, and data center savings in PUE or percent (see the paragraph on Savings and Data above for details on the baseline and actual periods).
Click here to enter text.
Expected/actual Annual cost savings
Please provide figures for after project implementation is complete, in dollars or percent (see the paragraph on Savings and Data above for details on the baseline and actual periods).
Click here to enter text.
Background
First
paragraph (80 words
max): Provide high
level content about the facility and the energy-efficiency
components of the project (e.g., why it was selected? How does it
fit into a broader energy efficiency plan?) Provide any additional
background content you would like to convey, while maintaining a
focus on the energy efficiency aspects of the project (e.g., what
was the process for identifying the opportunity, defining the
project, and deciding to proceed?). Links to PDFs or other
presentations, or to videos, are welcome.
Click here to enter text.
Solutions
Provide details on each of the energy efficiency measures taken at this facility. If possible, include the savings (estimated or actual) of each mesure, as well as other technical details (such as technologies used, wattage, flow rates, etc.). Links to PDFs or other presentations, or to videos, are welcome.
Savings Measure |
Cost |
Savings Achieved |
Notes |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Other Benefits
First paragraph (80 words max): Provide a brief summary of the other benefits expected from this project (e.g., ENERGY STAR rating, productivity improvements, maintenance savings, improved safety, etc.) once implementation is complete.
Click here to enter text.
Photo(s)
Provide up to three vertical photo of the project (either completed or in process) as an attachment. Please include short captions below. Additional photos are welcomed and may be used for other promotional purposes. For examples of acceptable photos, please review completed showcase projects here: http://www4.eere.energy.gov/challenge/showcase
File type options: high resolution .ai, .eps, .jif, .jpg, .png, or. tiff (11 MB maximum).
Click here to enter text.
This
data is being collected to support the Department of Energy Better
Buildings Initiative. The data you supply will be used for
developing best practices to facilitate reductions in energy
intensity by commercial, manufacturing, and community
organizations. Public
reporting burden for this collection of information is estimated to
average 2 hours per response, including the time for reviewing
instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the
collection of information. Send comments regarding this burden
estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Office of the
Chief Information Officer, Enterprise Policy Development &
Implementation Office, IM-22, Paperwork Reduction Project
(1910-5141), U.S. Department of Energy, 1000 Independence Ave SW,
Washington, DC, 20585-1290; and to the Office of Management and
Budget (OMB), OIRA, Paperwork Reduction Project (1910-5141),
Washington, DC 20503. Notwithstanding
any other provision of the law, no person is required to respond
to, nor shall any person be subject to a penalty for failure to
comply with a collection of information subject to the requirements
of the Paperwork Reduction Act unless that collection of
information displays a currently valid OMB control number.
Submission
of this data is voluntary.
Learn
more
at
energy.gov/betterbuildingschallenge
File Type | application/vnd.openxmlformats-officedocument.wordprocessingml.document |
Author | Khan, Nyla |
File Modified | 0000-00-00 |
File Created | 2021-01-16 |