Table 1
Table 2
O&M


Sheet 1: Table 1






117.92 147.4 57.02



Activity (A)
Person hours per occurrence
(B)
No. of occurrences per respondent per year
(C)
Person hours per respondent per year (AxB)
(D) Respondents per year (E) Technical person hours per year (CxD) (F) Management person hours per year (Ex0.05) (G) Clerical person hours per year (Ex0.1) (H)
Cost, $a



1. Applications










2. Survey and Studies










3. Acquisition, Installation, & Utilization of Tech. & Systems










4. Reporting Requirements










A. Familiarize with rule requirements b 1 1 1 1,800 1,800 90 180 $235,785.60


B. Required Activities:










i. Quarterly control equipment inspection c 1 4 4 1,284 5,136 256.8 513.6 $672,774.91


ii. Daily cyclone performance measures 0.1 365 36.5 1,284 46,866 2343.3 4686.6 $6,139,071.07


C. Create information










D. Gather existing information










E. Write report










Initial Notification b 0.5 1 0.5 0 0 0 0 $0


Notification of Compliance Status b 1 1 1 0 0 0 0 $0


Annual Compliance Certification 1 1 1 1,800 1,800 90 180 $235,785.60


Subtotal for Reporting Requirements



63,942 $7,283,417.18


5. Recordkeeping Requirements










A. Familiarize with rule requirements b See 4A









B. Plan activities










C. Implement activities










D. Develop record system










E. Time to enter information










F. Time to train personnel










G. Time to transmit or disclose information d 0.1 1 0.1 1,800 180 9 18 $23,578.56


I. Time for audits 0.1 1 0.1 0 0 0 0 $0


Subtotal for Recordkeeping Requirements



207 $23,578.56
36 hr/response
TOTAL LABOR BURDEN AND COSTS (rounded)e



64,100 $7,310,000
Previously: 64,100 hr, $6,490,000
TOTAL CAPITAL AND O&M COST (rounded)e






$37,200


GRAND TOTAL(rounded)e






$7,350,000






a This ICR uses the following labor rates: $147.40 per hour for Executive, Administrative, and Managerial labor; $117.92 per hour for Technical labor, and $57.02 per hour for Clerical labor. These rates are from the United States Department of Labor, Bureau of Labor Statistics, June 2018, Table 2. Civilian Workers, by occupational and industry group. The rates are from column 1, Total compensation. The rates have been increased by 110 percent to account for the benefit packages available to those employed by private industry.


b We have assumed that it will take one hour for each respondent to familiarize with regulatory requirements, one hour to complete the initial notification, and one hour to complete the Notification of Compliance Status.


c The NESHAP requires that existing and new facilities with a daily production level greater than 50 tons per day install and operate a cyclone to reduce emissions from pelleting operations. These facilities are required to install a device on the cyclone to monitor inlet flow rate, inlet velocity, pressure drop, or amperage. We estimate 1,284 of the 1,800 facilities have production greater than 50 tons per day.


d We have assumed that it will take one hour for each respondent to transmit or disclose information.


e Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.



Sheet 2: Table 2

Activity (A) (B) (C) (D) Plants per year (E) Technical person hours per year (CxD) (F) Management person hours per year (Ex0.05) (G) Clerical person hours per year (Ex0.1) (H)
EPA person hours per occurrence No. of occurrences per plant per year EPA person hours per plant per year (AxB) Cost, $ (a)
Report Review







Initial Notification b 1 1 1 0 0 0 0 $0
Notification of Compliance Status c 2 1 2 0 0 0 0 $0
Annual Compliance Certification 2 1 2 1,800 3,600 180 360 $196,824.60
TOTAL BURDEN AND COST d



4,140 $197,000









a This cost is based on the following labor rates which incorporates a 1.6 benefits multiplication factor to account for government overhead expenses: $65.71 Managerial rate (GS-13, Step 5, $41.07 x 1.6), $48.75 Technical rate (GS-12, Step 1, $30.47 x 1.6), and $26.38 Clerical rate (GS-6, Step 3, $16.49 x 1.6). These rates are from the Office of Personnel Management (OPM) 2014 General Schedule, which excludes locality rates of pay.







b We have assumed that it will take 1 hour to review the initial notification of applicability report.

c We have assumed that it will take 2 hours to review the initial notification of compliance status report.
d Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.




















EPA rate 48.75 65.71 26.38

Sheet 3: O&M

Capital/Startup vs. Operation and Maintenance (O&M) Costs
(A) (B) (C) (D) (E) (F) (G)
Continuous Monitoring Device Capital/Startup Cost for One Respondent Number of New Respondents Total Capital/Startup Cost, (B X C) Annual O&M Costs for One Respondent Number of Respondents with O&M Total O&M,






(E X F)
Cyclone Monitor $295 0 $0 $29 1,284 $37,236
Total (rounded)




$37,200