Burden Calculation Tables

2050t08.xlsx

NESHAP for Taconite Iron Ore Processing (40 CFR part 63 subpart RRRRR) (Proposed Rule)

Burden Calculation Tables

OMB: 2060-0538

Document [xlsx]
Download: xlsx | pdf

Overview

Table 1
Table 2


Sheet 1: Table 1

Table 1: Annual Respondent Burden and Cost – NESHAP for Taconite Iron Ore Processing (40 CFR Part 63, Subpart RRRRR)









$119.47 $139.63 $58.15 Labor Cost Per Hour



Burden item (A) (B) (C) (D) (E) (F) (G) (H)



Person hours per occurrence No. of occurrences per respondent per year Person hours per respondent per year (C=AxB) Respondents per year a Technical person- hours per year (E=CxD) Management person hours per year (Ex0.05) Clerical person hours per year (Ex0.1) Total Cost Per year b



1. Applications N/A










2. Survey and Studies N/A










3. Reporting Requirements











A. Familiarization with rule requirements 2 1 2 8 16 0.8 1.6 $2,116



B. Required activities








Ind. Furnaces and ore dryers
53
i. Method 5 performance test - facility labor c 40 1 40 2.7 107 5.3 10.7 $14,108
OCH and PH operations
115
ii. Method 5 performance test - contractor costs d - - - - - - - $438,000



iii. SSM Plan N/A










C. Create information N/A










D. Gather existing information N/A










E. Write report








No. of responses

i. Initial Notifications e 2 1 2 0 0 0 0 $0
0

ii. Compliance Extension Request e 2 1 2 0 0 0 0 $0
0

iv. Site-specific Test Plan e 40 1 40 0 0

$0
0

v. Operation and Maintenance Plan e 40 1 40 0 0 0 0 $0
0

vi. Fugitive Dust Emission Control Plan e 20 1 20 0 0 0 0 $0
0

vii. Site-specific Monitoring Plan e 80 1 80 0 0 0 0 $0
0

viii. Petition for Alternative Monitoring Requirements e 40 1 40 0 0 0 0 $0
0

ix. Notification of Performance Test 4 1 4 8 32 2 3 $4,232
8

x. Semiannual compliance reports 40 2 80 8 640 32 64 $84,650
16

x. Report of performance test (through CEDRI using ERT) f 8 1 8 8 64 3 6 $8,465
8

Subtotal for Reporting Requirements



987 $551,572
32

4. Recordkeeping Requirements











A. Familiarization with rule requirements See 3A










B. Plan activities e 3 1 3 0 0 0 0 $0



C. Develop record system e 16 1 16 0 0 0 0 $0



D. Time to Enter Information See 3E x.










E. Time to train personnel e 3 1 3 0 0 0 0 $0



F. Time to Transmit of Disclose Information See 3E x.










G. Time for audits N/A










Subtotal for Recordkeeping Requirements



0 $0
Hours per response

TOTAL LABOR BURDEN AND COST (unrounded)






$551,572



TOTAL LABOR BURDEN AND COST (rounded) g



1,000 $550,000
31














Assumptions:











a There are approximately 8 existing sources currently subject to this rule. We estimate there will be no additional new source that will become subject to the rule each year over the 3-year period of this ICR.



b This ICR uses the following labor rates: $139.63 per hour for Executive, Administrative, and Managerial labor; $119.47 per hour for Technical labor, and $58.15 per hour for Clerical labor. These rates are from the United States Department of Labor, Bureau of Labor Statistics, December 2018, “Table 2. Civilian Workers, by Occupational and Industry group.” The rates are from column 1, “Total Compensation.” The rates have been increased by 110% to account for the benefit packages available to those employed by private industry.



c Assumes that 1/3 of all sources will conduct performance test in each of the 3 years. Includes 40 hours per facility per year to set up testing contractor, oversee tests, and review test reports.



d Testing contractor cost are based on the following: (51 indurating furnace Method 5 PM tests, twice/5 yr term @ $10,000/test) + (117 OCH, PH, and Ore dryer Method 5 PM tests, once/5 yr term @ $10,000/test) = $438,000/year.



e These requirements are one-time requirements that apply to new respondents. There are no new respondents estimated over the 3-year period of this ICR.



f Submittal of performance test data through the EPA's CEDRI in ERT format is estimated to require 8 hours annually, includes keeping records of failures to meet the standards and the actions taken to minimize emissions.



g Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.












Sheet 2: Table 2

Table 2: Average Annual EPA Burden and Cost – Average Annual EPA Burden and Cost − NESHAP for Taconite Iron Ore Processing (40 CFR Part 63, Subpart RRRRR)












$48.75 $65.71 $26.38 Labor Cost per Hour
Activity (A) (B) (C) (D) (E) (F) (G) (H)
EPA person- hours per occurrence No. of occurrences per plant per year EPA person- hours per plant per year (C=AxB) Plants per year a Technical person- hours per year (E=CxD) Management person-hours per year (Ex0.05) Clerical person-hours per year (Ex0.1) Cost, $ b
New Respondents c







i. Notification of compliance status 4 1 4 0 0 0 0 $0
ii. Notification of intent to construct a major source and review application 4 1 4 0 0 0 0 $0
iii. Notification of start of construction 2 1 2 0 0 0 0 $0
iv. Notification of actual startup 2 1 2 0 0 0 0 $0
v. Notification of initial performance test and test plan 4 1 4 0 0 0 0 $0
Existing Respondents



0 0 0 $0
i. Performance test report for Method 5 d 8 5.5 44 8 352 17.6 35.2 $19,245
ii. Review semiannual compliance reports e 6 2 12 8 96 4.8 9.6 $5,249
Subtotals Labor Burden and Cost



515 $24,494
TOTAL ANNUAL BURDEN AND COST (rounded) f



515 $24,500









Assumptions:







a There are 8 existing sources currently subject to this rule. We expect there will be no additional new source that will become subject to the rule each year over the 3-year period of this ICR.
b This cost is based on the following labor rates which incorporates a 1.6 benefits multiplication factor to account for government overhead expenses: Managerial rate of $65.71 (GS-13, Step 5, $41.07 + 60%), Technical rate of $48.75 (GS-12, Step 1, $30.47 + 60%), and Clerical rate of $26.38 (GS-6, Step 3, $16.49 + 60%). These rates are from the Office of Personnel Management (OPM) “2018 General Schedule” which excludes locality rates of pay.
c These requirements are one-time requirements that apply to new respondents. There are no new respondents estimated over the 3 year period of this ICR.
d 51 Indurating furnaces conduct two Method 5 PM test every 5 years for an average of 20.4 tests/yr (51 x 2/5). 117 OCH, PH, and ore dryers conduct one Method 5 PM test every 5 years for an average of 23.4 tests/yr (117/5). That is a total of 43.8 tests/yr (20.4 + 23.4). 43.8 tests/yr distributed over 8 plants is 5.5 tests/yr/plant.
e Sources are required to submit electronic semiannual compliance reports to CEDRI.
f Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.







File Typeapplication/vnd.openxmlformats-officedocument.spreadsheetml.sheet
File Modified0000-00-00
File Created0000-00-00

© 2024 OMB.report | Privacy Policy