All Facilities | Flares | Tanks | ||||
Flare Count | #Facilities | # FXRT beneath VP cutoffs | ||||
Number of Existing | 177 | 27 | 16 | 171 | ||
Number of New | 4 | 0 | 0 | 0 | ||
Total | 181 | |||||
Leak Detection and Repair Program (Method 21) | ||||||
Parameter | Capital Cost | Annual Cost | ||||
Nationwide Cost | $- | $29,651 | ||||
Estimate of current uncontrolled OLD FXRT subject to LDAR : | 149 | |||||
# Facilities with applicable tanks | 85 | |||||
AVERAGE PER FACILITY | #DIV/0! | $349 | ||||
HAP Content Monitoring for tanks less than 5% HAP | Current rule has EPA Method 311 required for initial applicability with <5% HAP. Propose repeating test every 5 years or with tank content changes | |||||
Parameter | Value | |||||
Number of tanks assumed to be <5% HAP: | 90 | |||||
Once every 5 year testing cost/tank: | $1,257 | |||||
Total cost every 5 years ($): | $113,126 | |||||
# Facilities | 40 | set equal to facilities purchasing VP analyzer | ||||
Avg. Cost Per Facility | $2,828 | |||||
Assumed fraction of tanks <5% HAP that change contents every year | 0.02 | |||||
Estimated tanks per year with retest for <5% HAP content: | 2 | |||||
Total tank retest cost per year: | $2,514 | |||||
VP Monitoring | Compliance measure: initial and repeating every 5 years or with tank content changes to ensure which control regime the tank falls under (i.e., below or above 95% control thresholds). | |||||
Parameter | Value | |||||
ASTM D2879 analyzer cost ($) | $7,440 | |||||
Annualized Analyzer cost ($/yr) | $964 | |||||
Number of facilities purchasing analyzer: | 40 | Assumes half of the 79 facilities assumed to be larger OLD will need to purchase an analyzer and may have tanks below regulatory threshold vapor pressures | ||||
FXRT>5,000 gallons subject to LDAR because they are below 95% control VP thresholds | 91 | (Assumes all EFRs and IFRs are at controlled level, no further improvements necessary) | ||||
Testing labor cost/tank | $182 | |||||
Total annual labor cost ($/yr): | $16,538 | |||||
# Facilities with vapor testing | 40 | set equal to facilities purchasing VP analyzer | ||||
Average annual labor cost per facility ($/yr) | $413 | |||||
# Retests | 2 | assume retests occur at separate facilities | ||||
Average annual labor cost per retest ($/yr) | $182 | |||||
Connectors monitoring (leak definition of 500 ppmv) | these costs are not included in burden, but facility count of 180 is | |||||
Option | By Model | National | ||||
TCI | Incremental TAC w/o Recovery Credits | No. of Affected Facilities | TCI | Incremental TAC w/o Recovery Credits | ||
Small model requiring admin costs | $3,038 | $417 | 0 | $0 | $0 | |
Medium model requiring admin costs | $13,693 | $6,642 | 57 | $780,497 | $378,572 | |
Large model requiring admin costs | $49,209 | $11,938 | 13 | $639,711 | $155,194 | |
Small model requiring no admin costs | $1,184 | $177 | 105 | $124,305 | $18,537 | |
Medium model requiring no admin costs | $11,839 | $1,765 | 4 | $47,354 | $7,062 | |
Large model requiring no admin costs | $47,354 | $7,062 | 1 | $47,354 | $7,062 | |
Total | 180 | $1,639,221 | $566,428 | |||
Avg per facility: | $9,110 | $3,150 | ||||
Flare Management Plan - One-time cost | **RLSO indicates paragraph (o) of 63.670 doesn't apply if operators choose to follow provisions of 63.670 to show compliance (which is what we're assuming they'll do), so removed from burden estimate. | |||||
Parameter | Value | |||||
Cost Per Flare | ||||||
Total Flares | ||||||
Avg. Cost Per Facility (16 facilities) | ||||||
Avg. Cost Per Facility (all existing facilities) | ||||||
Flare Monitor Costs (costs pulled from Flare Impacts memo) | ||||||
Monitoring Equipment | Capital Equipment Cost ($/flare) | Annualized Cost ($/yr/flare) | Number of Flares Impacted | Nationwide Capital Equipment Cost ($) | Nationwide Total Annualized Cost ($/yr) | 27 flares are at 16 facilities |
Engineering Calculation Costs (Dedicated Flares)* | 7,000 | 13,160 | 27 | $189,000 | $355,320 | |
Avg. Cost Per Facility | $12,000 | $22,000 | ||||
*We assume that the owner or operator would likely follow the provisions at 40 CFR 63.670(i)(4) and (k)(2)(ii) in order to determine compliance with the flare tip velocity standard on a 15-minute block average basis. These provisions allow use of a continuous pressure/temperature monitoring system and engineering calculations in lieu of the more intricate monitoring options also specified in 40 CFR part 63, subpart CC. | ||||||
Industry Wages | ||||||
May 2016 National Industry-Specific Occupational Employment and Wage Estimates | ||||||
NAICS 325000 - Chemical Manufacturing | ||||||
Category | Occupation Code | Title | 2016 Wage | Loaded Wage | ||
Technical | 17-2081 | Environmental Engineer | 49.95 | 104.90 | ||
Clerical | 43-0000 | Office and Administrative Support Occupations | 20.66 | 43.39 | ||
Managerial | 11-9041 | Architectural and Engineering Managers | 68.36 | 143.56 | ||
https://www.bls.gov/oes/2016/may/naics3_325000.htm | ||||||
EPA Wages | ||||||
Hourly Mean Wage | With Fringe & Overhead | |||||
(GS- 12, step 1) - Tech. | 29.76 | $47.62 | ||||
(GS- 13, step 5) - Mgmt. | 40.1 | $64.16 | ||||
(GS-6, step 3) - Cler. | 16.1 | $25.76 | ||||
https://www.opm.gov/policy-data-oversight/pay-leave/salaries-wages/salary-tables/pdf/2016/GS_h.pdf | ||||||
or https://www.opm.gov/policy-data-oversight/pay-leave/salaries-wages/ | ||||||
Capital/Startup and O&M Costs | ||||||
(A) | (B) | (C) | (D) | (E) | (F) | (G) |
Source & Monitor Type | Capital/Startup Costs for One Respondent | Number of Respondents with Capital/Startup Costs | Total Capital/ Startup Cost (B X C) |
Annual Cost (O&M and Capital) for One Respondent | Number of Respondentsa | Total Annual Cost, (E X F) |
Storage Tanks - HAP Content | ||||||
Initial Monitoring | $0 | 0 | $0 | $2,828 | 40 | $113,120 |
Retest | $0 | 0 | $0 | $1,257 | 4 | $5,028 |
Storage Tanks - Vapor Pressure | ||||||
Monitor | $7,440 | 40 | $297,600 | $964 | 53 | $51,066 |
Initial Monitoring | $0 | 0 | $0 | $413 | 40 | $16,520 |
Retest | $0 | 0 | $0 | $182 | 4 | $728 |
Flare Monitors | $12,000 | 16 | $192,000 | $22,000 | 21 | $462,000 |
TOTAL | $489,600 | $648,462 | ||||
(a) Within a given year, there are a maximum of 40 respondents for storage tanks and 16 respondents for flares, however the values in column F reflect the sum of these respondents for years 2 and 3. | ||||||
Total Annual Responses | ||||||
(A) | (B) | (C) | (D) | (E) | ||
Information Collection Activity | Number of Respondents | Number of Responses | Number of Existing Respondents That Keep Records But Do Not Submit Reports | Total Annual Responses E=(BxC)+D |
||
Notification of Compliance Status | ||||||
Storage Tanks | 40 | 1 | 0 | 40 | ||
Connectors | 180 | 1 | 0 | 180 | ||
Flares | 16 | 1 | 0 | 16 | ||
Periodic Reports | ||||||
Storage Tanks | 53 | 2 | 0 | 106 | ||
Connectors | 240 | 2 | 0 | 480 | ||
Flares | 21 | 2 | 0 | 42 | ||
TOTAL | 864 |
Table 1 - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Organic Liquid Distribution (Non-Gasoline) RTR - Year 1 | ||||||||||||||
Burden Item | (A) Respondent Hours per Occurrence (Technical hours) |
(B) Non-Labor Costs Per Occurrence |
(C) Number of Occurrences Per Respondent Per Year |
(D) Technical Hours per Respondent Per Year (A X C) |
(E) Number of Respondents Per Year |
(F) Technical Hours per Year (D X E) |
(G) Clerical Hours per Year (F X 0.1) |
(H) Management Hours per Year (F X .05) |
(I) Total Hours per Year (F + G + H) |
(J) Total Labor Costs Per Year |
(K) Total Non-Labor Costs Per Year (B x C x E) |
(L) Total Number of Responses per Year (C X E) |
Footnotes | |
1. Applications | NA | |||||||||||||
2. Surveys and Studies | NA | |||||||||||||
3. Reporting Requirements | ||||||||||||||
A. Read Rule | 24 | $0 | 1 | 24 | 181 | 4,344 | 434 | 217 | 4,996 | $505,691 | $0 | 0 | a, b | |
B. Required Activities | ||||||||||||||
1. Storage Tanks | ||||||||||||||
a. HAP Content Monitoring (Method 311) | ||||||||||||||
i. Initial Monitoring | 0 | $2,828 | 1 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c,d | |
ii. Retest for Changing Tank Contents | 0 | $1,257 | 1 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | h | |
b. VP Monitoring - ASTM D2879 analyzer purchase | ||||||||||||||
i. Capital Cost | 0 | $7,440 | 1 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c,d | |
ii. Annualized Cost | 0 | $964 | 1 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c,d | |
c. VP Monitoring | ||||||||||||||
i. Initial Monitoring | 0 | $413 | 1 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c,d | |
ii. Retest for Changing Tank Contents | 0 | $182 | 1 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | h | |
2. Flare Monitoring | ||||||||||||||
a. Capital Cost | 0 | $12,000 | 1 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c,e,f | |
b. Annualized Cost | 0 | $22,000 | 1 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c,e,f | |
C. Create Information | Inc. in 3B | |||||||||||||
D. Gather Information | Inc. in 3E | |||||||||||||
E. Report Preparation | ||||||||||||||
1. Notification of Compliance Status | ||||||||||||||
a. Storage Tanks | 1 | $0 | 1 | 1 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c,d | |
b. Connectors | 4 | $0 | 1 | 4 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c,g | |
c. Flares | 5 | $0 | 1 | 5 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c,f | |
2. Compliance Report | ||||||||||||||
a. Storage Tanks | 1 | $0 | 2 | 2 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c,d | |
b. Connectors | 4 | $0 | 2 | 8 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c,g | |
c. Flares | 5 | $0 | 2 | 10 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c,f | |
Reporting Subtotal | 4,344 | 434 | 217 | 4,996 | $505,691 | $0 | 0 | |||||||
4. Recordkeeping Requirements | ||||||||||||||
A. Read Instructions | Inc. in 3.A | |||||||||||||
B. Implement Activities | NA | |||||||||||||
C. Develop Record System | NA | |||||||||||||
D. Record information | ||||||||||||||
1. Storage Tanks | 5 | $0 | 1 | 5 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c,d | |
2. Connectors | 8 | $0 | 1 | 8 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c,g | |
3. Flares | 0.4 | $0 | 365 | 146 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | c,f | |
4. Flow events from bypass lines | 25 | $0 | 1 | 25 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | i | |
E. Personnel Training | 16 | $0 | 1 | 16 | 181 | 2,896 | 290 | 145 | 3,330 | $337,127 | $0 | 0 | ||
F. Time for Audits | NA | |||||||||||||
Recordkeeping Subtotal | 2,896 | 290 | 145 | 3,330 | $337,127 | $0 | 0 | |||||||
TOTAL | 7,240 | 724 | 362 | 8,326 | $842,818 | $0 | 0 | |||||||
Total Hours | Labor | Non-Labor | Total | |||||||||||
Summary of Respondent Burden | 8,326 | $842,818 | $0 | $842,818 | ||||||||||
Initial Capital and Startup | $505,691 | |||||||||||||
Annualized Capital/Start-up and O & M | $0 | |||||||||||||
Footnotes: | ||||||||||||||
(a) There are 177 currently operating facilities, and 4 facilities are expected to commence operations within three years after promulgation of the rule. As such, costs are estimated for 181 facilities. | ||||||||||||||
(b) This is a one-time cost (e.g., to read rule or develop plan). | ||||||||||||||
(c) Assumed facilities will read the rule and perform certain one-time activities (e.g., personnel training) in year 1. Assumed that one-third of the facilities would begin complying in year 2 and the remaining two-thirds of the facilities in year 3. | ||||||||||||||
(d) Assumed 40 facilities would have storage tanks applicable to HAP content monitoring and vapor pressure monitoring requirements. | ||||||||||||||
(e) Flare monitoring includes costs for continuous pressure/temperature monitoring system and engineering calculations in lieu of the more intricate monitoring options (e.g. H2 analyzer, calorimeter, flare gas flow monitor, steam controls/flow monitor, and air controls/flow monitor). | ||||||||||||||
(f) 16 facilities have flares applicable to monitoring requirements. | ||||||||||||||
(g) 180 facilities are subject to connector monitoring requirements. | ||||||||||||||
(h) Assumed 2 tanks (i.e., facilities) would change tanks contents within a year. | ||||||||||||||
(i) Assumed that bypass lines were not used during the 3-year period, so costs for bypass lines would not be incurred. |
Table 2 - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Organic Liquid Distribution (Non-Gasoline) RTR - Year 2 | ||||||||||||||
Burden Item | (A) Respondent Hours per Occurrence (Technical hours) |
(B) Non-Labor Costs Per Occurrence |
(C) Number of Occurrences Per Respondent Per Year |
(D) Technical Hours per Respondent Per Year (A X C) |
(E) Number of Respondents Per Year |
(F) Technical Hours per Year (D X E) |
(G) Clerical Hours per Year (F X 0.1) |
(H) Management Hours per Year (F X .05) |
(I) Total Hours per Year (F + G + H) |
(J) Total Labor Costs Per Year |
(K) Total Non-Labor Costs Per Year (B x C x E) |
(L) Total Number of Responses per Year (C X E) |
Footnotes | |
1. Applications | NA | |||||||||||||
2. Surveys and Studies | NA | |||||||||||||
3. Reporting Requirements | ||||||||||||||
A. Read Rule | 24 | $0 | 1 | 24 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | a, b | |
B. Required Activities | ||||||||||||||
1. Storage Tanks | ||||||||||||||
a. HAP Content Monitoring (Method 311) | ||||||||||||||
i. Initial Monitoring | 0 | $2,828 | 1 | 0 | 13 | 0 | 0 | 0 | 0 | $0 | $36,764 | 0 | c,d | |
ii. Retest for Changing Tank Contents | 0 | $1,257 | 1 | 0 | 2 | 0 | 0 | 0 | 0 | $0 | $2,514 | 0 | h | |
b. VP Monitoring - ASTM D2879 analyzer purchase | ||||||||||||||
i. Capital Cost | 0 | $7,440 | 1 | 0 | 13 | 0 | 0 | 0 | 0 | $0 | $96,720 | 0 | c,d | |
ii. Annualized Cost | 0 | $964 | 1 | 0 | 13 | 0 | 0 | 0 | 0 | $0 | $12,526 | 0 | c,d | |
c. VP Monitoring | ||||||||||||||
i. Initial Monitoring | 0 | $413 | 1 | 0 | 13 | 0 | 0 | 0 | 0 | $0 | $5,369 | 0 | c,d | |
ii. Retest for Changing Tank Contents | 0 | $182 | 1 | 0 | 2 | 0 | 0 | 0 | 0 | $0 | $364 | 0 | h | |
2. Flare Monitoring | ||||||||||||||
a. Capital Cost | 0 | $12,000 | 1 | 0 | 5 | 0 | 0 | 0 | 0 | $0 | $60,000 | 0 | c,e,f | |
b. Annualized Cost | 0 | $22,000 | 1 | 0 | 5 | 0 | 0 | 0 | 0 | $0 | $110,000 | 0 | c,e,f | |
C. Create Information | Inc. in 3B | |||||||||||||
D. Gather Information | Inc. in 3E | |||||||||||||
E. Report Preparation | ||||||||||||||
1. Notification of Compliance Status | ||||||||||||||
a. Storage Tanks | 1 | $0 | 1 | 1 | 13 | 13 | 1 | 1 | 15 | $1,513 | $0 | 13 | c,d | |
b. Connectors | 4 | $0 | 1 | 4 | 60 | 240 | 24 | 12 | 276 | $27,939 | $0 | 60 | c,g | |
c. Flares | 5 | $0 | 1 | 5 | 5 | 25 | 3 | 1 | 29 | $2,910 | $0 | 5 | c,f | |
2. Compliance Report | ||||||||||||||
a. Storage Tanks | 1 | $0 | 2 | 2 | 13 | 26 | 3 | 1 | 30 | $3,027 | $0 | 26 | c,d | |
b. Connectors | 4 | $0 | 2 | 8 | 60 | 480 | 48 | 24 | 552 | $55,877 | $0 | 120 | c,g | |
c. Flares | 5 | $0 | 2 | 10 | 5 | 50 | 5 | 3 | 58 | $5,821 | $0 | 10 | c,f | |
Reporting Subtotal | 834 | 83 | 42 | 959 | $97,087 | $167,537 | 234 | |||||||
4. Recordkeeping Requirements | ||||||||||||||
A. Read Instructions | Inc. in 3.A | |||||||||||||
B. Implement Activities | NA | |||||||||||||
C. Develop Record System | NA | |||||||||||||
D. Record information | ||||||||||||||
1. Storage Tanks | 5 | $0 | 1 | 5 | 13 | 65 | 7 | 3 | 75 | $7,567 | $0 | 0 | c,d | |
2. Connectors | 8 | $0 | 1 | 8 | 60 | 480 | 48 | 24 | 552 | $55,877 | $0 | 0 | c,g | |
3. Flares | 0.4 | $0 | 365 | 146 | 5 | 730 | 73 | 37 | 840 | $84,980 | $0 | 0 | c,f | |
4. Flow events from bypass lines | 25 | $0 | 1 | 25 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | i | |
E. Personnel Training | 16 | $0 | 1 | 16 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||
F. Time for Audits | NA | |||||||||||||
Recordkeeping Subtotal | 1,275 | 128 | 64 | 1,466 | $148,424 | $0 | 0 | |||||||
TOTAL | 2,109 | 211 | 105 | 2,425 | $245,511 | $167,537 | 234 | |||||||
Total Hours | Labor | Non-Labor | Total | |||||||||||
Summary of Respondent Burden | 2,425 | $245,511 | $167,537 | $413,048 | ||||||||||
Initial Capital and Startup | $156,720 | |||||||||||||
Annualized Capital/Start-up and O & M | $167,537 | |||||||||||||
Footnotes: | ||||||||||||||
(a) There are 177 currently operating facilities, and 4 facilities are expected to commence operations within three years after promulgation of the rule. As such, costs are estimated for 181 facilities. | ||||||||||||||
(b) This is a one-time cost (e.g., to read rule or develop plan). | ||||||||||||||
(c) Assumed facilities will read the rule and perform certain one-time activities (e.g., personnel training) in year 1. Assumed that one-third of the facilities would begin complying in year 2 and the remaining two-thirds of the facilities in year 3. | ||||||||||||||
(d) Assumed 40 facilities would have storage tanks applicable to HAP content monitoring and vapor pressure monitoring requirements. | ||||||||||||||
(e) Flare monitoring includes costs for continuous pressure/temperature monitoring system and engineering calculations in lieu of the more intricate monitoring options (e.g. H2 analyzer, calorimeter, flare gas flow monitor, steam controls/flow monitor, and air controls/flow monitor). | ||||||||||||||
(f) 16 facilities have flares applicable to monitoring requirements. | ||||||||||||||
(g) 180 facilities are subject to connector monitoring requirements. | ||||||||||||||
(h) Assumed 2 tanks (i.e., facilities) would change tanks contents within a year. | ||||||||||||||
(i) Assumed that bypass lines were not used during the 3-year period, so costs for bypass lines would not be incurred. |
Table 3 - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Organic Liquid Distribution (Non-Gasoline) RTR - Year 3 | ||||||||||||||
Burden Item | (A) Respondent Hours per Occurrence (Technical hours) |
(B) Non-Labor Costs Per Occurrence |
(C) Number of Occurrences Per Respondent Per Year |
(D) Technical Hours per Respondent Per Year (A X C) |
(E) Number of Respondents Per Year |
(F) Technical Hours per Year (D X E) |
(G) Clerical Hours per Year (F X 0.1) |
(H) Management Hours per Year (F X .05) |
(I) Total Hours per Year (F + G + H) |
(J) Total Labor Costs Per Year |
(K) Total Non-Labor Costs Per Year (B x C x E) |
(L) Total Number of Responses per Year (C X E) |
Footnotes | |
1. Applications | NA | |||||||||||||
2. Surveys and Studies | NA | |||||||||||||
3. Reporting Requirements | ||||||||||||||
A. Read Rule | 24 | $0 | 1 | 24 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | a, b | |
B. Required Activities | ||||||||||||||
1. Storage Tanks | ||||||||||||||
a. HAP Content Monitoring (Method 311) | ||||||||||||||
i. Initial Monitoring | 0 | $2,828 | 1 | 0 | 27 | 0 | 0 | 0 | 0 | $0 | $76,356 | 0 | c,d | |
ii. Retest for Changing Tank Contents | 0 | $1,257 | 1 | 0 | 2 | 0 | 0 | 0 | 0 | $0 | $2,514 | 0 | h | |
b. VP Monitoring - ASTM D2879 analyzer purchase | ||||||||||||||
i. Capital Cost | 0 | $7,440 | 1 | 0 | 27 | 0 | 0 | 0 | 0 | $0 | $200,880 | 0 | c,d | |
ii. Annualized Cost | 0 | $964 | 1 | 0 | 40 | 0 | 0 | 0 | 0 | $0 | $38,541 | 0 | c,d | |
c. VP Monitoring | ||||||||||||||
i. Initial Monitoring | 0 | $413 | 1 | 0 | 27 | 0 | 0 | 0 | 0 | $0 | $11,151 | 0 | c,d | |
ii. Retest for Changing Tank Contents | 0 | $182 | 1 | 0 | 2 | 0 | 0 | 0 | 0 | $0 | $364 | 0 | h | |
2. Flare Monitoring | ||||||||||||||
a. Capital Cost | 0 | $12,000 | 1 | 0 | 11 | 0 | 0 | 0 | 0 | $0 | $132,000 | 0 | c,e,f | |
b. Annualized Cost | 0 | $22,000 | 1 | 0 | 16 | 0 | 0 | 0 | 0 | $0 | $352,000 | 0 | c,e,f | |
C. Create Information | Inc. in 3B | |||||||||||||
D. Gather Information | Inc. in 3E | |||||||||||||
E. Report Preparation | ||||||||||||||
1. Notification of Compliance Status | ||||||||||||||
a. Storage Tanks | 1 | $0 | 1 | 1 | 27 | 27 | 3 | 1 | 31 | $3,143 | $0 | 27 | c,d | |
b. Connectors | 4 | $0 | 1 | 4 | 120 | 480 | 48 | 24 | 552 | $55,877 | $0 | 120 | c,g | |
c. Flares | 5 | $0 | 1 | 5 | 11 | 55 | 6 | 3 | 63 | $6,403 | $0 | 11 | c,f | |
2. Compliance Report | ||||||||||||||
a. Storage Tanks | 1 | $0 | 2 | 2 | 40 | 80 | 8 | 4 | 92 | $9,313 | $0 | 80 | c,d | |
b. Connectors | 4 | $0 | 2 | 8 | 180 | 1440 | 144 | 72 | 1656 | $167,632 | $0 | 360 | c,g | |
c. Flares | 5 | $0 | 2 | 10 | 16 | 160 | 16 | 8 | 184 | $18,626 | $0 | 32 | c,f | |
Reporting Subtotal | 2,242 | 224 | 112 | 2,578 | $260,994 | $480,925 | 630 | |||||||
4. Recordkeeping Requirements | ||||||||||||||
A. Read Instructions | Inc. in 3.A | |||||||||||||
B. Implement Activities | NA | |||||||||||||
C. Develop Record System | NA | |||||||||||||
D. Record information | ||||||||||||||
1. Storage Tanks | 5 | $0 | 1 | 5 | 40 | 200 | 20 | 10 | 230 | $23,282 | $0 | 0 | c,d | |
2. Connectors | 8 | $0 | 1 | 8 | 180 | 1,440 | 144 | 72 | 1,656 | $167,632 | $0 | 0 | c,g | |
3. Flares | 0.4 | $0 | 365 | 146 | 16 | 2,336 | 234 | 117 | 2,686 | $271,937 | $0 | 0 | c,f | |
4. Flow events from bypass lines | 25 | $0 | 1 | 25 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | i | |
E. Personnel Training | 16 | $0 | 1 | 16 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | ||
F. Time for Audits | NA | |||||||||||||
Recordkeeping Subtotal | 3,976 | 398 | 199 | 4,572 | $462,851 | $0 | 0 | |||||||
TOTAL | 6,218 | 622 | 311 | 7,151 | $723,845 | $480,925 | 630 | |||||||
Total Hours | Labor | Non-Labor | Total | |||||||||||
Summary of Respondent Burden | 7,151 | $723,845 | $480,925 | $1,204,770 | ||||||||||
Initial Capital and Startup | $332,880 | |||||||||||||
Annualized Capital/Start-up and O & M | $480,925 | |||||||||||||
Footnotes: | ||||||||||||||
(a) There are 177 currently operating facilities, and 4 facilities are expected to commence operations within three years after promulgation of the rule. As such, costs are estimated for 181 facilities. | ||||||||||||||
(b) This is a one-time cost (e.g., to read rule or develop plan). | ||||||||||||||
(c) Assumed facilities will read the rule and perform certain one-time activities (e.g., personnel training) in year 1. Assumed that one-third of the facilities would begin complying in year 2 and the remaining two-thirds of the facilities in year 3. | ||||||||||||||
(d) Assumed 40 facilities would have storage tanks applicable to HAP content monitoring and vapor pressure monitoring requirements. | ||||||||||||||
(e) Flare monitoring includes costs for continuous pressure/temperature monitoring system and engineering calculations in lieu of the more intricate monitoring options (e.g. H2 analyzer, calorimeter, flare gas flow monitor, steam controls/flow monitor, and air controls/flow monitor). | ||||||||||||||
(f) 16 facilities have flares applicable to monitoring requirements. | ||||||||||||||
(g) 180 facilities are subject to connector monitoring requirements. | ||||||||||||||
(h) Assumed 2 tanks (i.e., facilities) would change tanks contents within a year. | ||||||||||||||
(i) Assumed that bypass lines were not used during the 3-year period, so costs for bypass lines would not be incurred. |
Table 4 - Summary of Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Organic Liquid Distribution (Non-Gasoline) RTR | |||||||
Year | Technical Hours | Clerical Hours | Management Hours | Total Labor Hours | Labor Costs | Non-Labor (Annualized Capital/Startup and O&M) Costs | Total Costs |
1 | 7,240 | 724 | 362 | 8,326 | $842,818 | $0 | $842,818 |
2 | 2,109 | 211 | 105 | 2,425 | $245,511 | $167,537 | $413,048 |
3 | 6,218 | 622 | 311 | 7,151 | $723,845 | $480,925 | $1,204,770 |
Total | 15,567 | 1,557 | 778 | 17,902 | $1,812,174 | $648,462 | $2,460,636 |
Average | 5,189 | 519 | 259 | 5,967 | $604,058 | $216,154 | $820,212 |
Year | Number of Respondents | Number of Responses | Reporting Hours | Recordkeeping Hours | Total Hours | Hours per Response | Hours Per Respondent |
1 | 181 | 0 | 4,996 | 3,330 | 8,326 | -- | 46 |
2 | 60 | 234 | 959 | 1,466 | 2,425 | 10 | 40 |
3 | 180 | 630 | 2,578 | 4,572 | 7,151 | 11 | 40 |
Total | 421 | 864 | 8,533 | 9,369 | 17,902 | 21 | 43 |
Average | 140 | 288 | 2,844 | 3,123 | 5,967 | 21 | 43 |
Table 5 - Annual Agency Burden and Cost of Recordkeeping and Reporting Requirements for the Organic Liquid Distribution (Non-Gasoline) RTR - Year 1 | ||||||||||||||||||||||||
(A) | (B) | (C) | (D) | (E) | (F) | (G) | Footnotes | |||||||||||||||||
Burden Item | Number of Occurrences Per Year | Technical Hours Per Occurrence | Tech Hours Per Year (C=A x B) |
Management Hours Per Year (D = C x 0.05) |
Clerical Hours Per Year (E = C x 0.1) |
Total Hours Per Year (C+D+E) | Total Cost Per Year | |||||||||||||||||
1. | Applications | not applicable | ||||||||||||||||||||||
2. | Read and Understand Rule Requirements | 46 | 24 | 1104 | 55 | 110 | 1270 | $58,954 | a | |||||||||||||||
3. | Required Activities | |||||||||||||||||||||||
A. | Observe stack tests | 0 | 16 | 0 | 0 | 0 | 0 | $0 | ||||||||||||||||
B. | Excess emissions -- Enforcement Activities | 0 | 24 | 0 | 0 | 0 | 0 | $0 | ||||||||||||||||
C. | Create Information | not applicable | ||||||||||||||||||||||
D. | Gather Information | not applicable | ||||||||||||||||||||||
E. | Report Reviews | |||||||||||||||||||||||
1. | Review notification of compliance status | |||||||||||||||||||||||
a. Storage Tanks | 0 | 2 | 0 | 0 | 0 | 0 | $0 | |||||||||||||||||
b. Connectors | 0 | 2 | 0 | 0 | 0 | 0 | $0 | |||||||||||||||||
c. Flares | 0 | 2 | 0 | 0 | 0 | 0 | $0 | |||||||||||||||||
2. | Review compliance reports | 0 | 0 | 0 | 0 | $0 | ||||||||||||||||||
a. Storage Tanks | 0 | 2 | 0 | 0 | 0 | 0 | $0 | |||||||||||||||||
b. Connectors | 0 | 2 | 0 | 0 | 0 | 0 | $0 | |||||||||||||||||
c. Flares | 0 | 2 | 0 | 0 | 0 | 0 | $0 | |||||||||||||||||
F. | Prepare annual summary report | 1 | 10 | 10 | 1 | 1 | 12 | $534 | ||||||||||||||||
4. | Travel expenses: (1 person * 30 hours per year / 8 hours per day * $75 per diem) + ($600 per round trip) = | $0 | per trip | $0 | ||||||||||||||||||||
TOTAL | 1114 | 56 | 111 | 1281 | $59,488 | |||||||||||||||||||
Footnotes: | ||||||||||||||||||||||||
a | Number of occurrences is the number of states and EPA Regions with affected sources (36 states + 10 EPA regions = 46 respondents). | |||||||||||||||||||||||
Percent of Stack Tests Observed | 20% | |||||||||||||||||||||||
Estimated Percent Retesting | 10% | |||||||||||||||||||||||
Estimated Percent Emission Exceedences | 10% |
Table 6 - Annual Agency Burden and Cost of Recordkeeping and Reporting Requirements for the Organic Liquid Distribution (Non-Gasoline) RTR - Year 2 | ||||||||||||||||||||||||
(A) | (B) | (C) | (D) | (E) | (F) | (G) | Footnotes | |||||||||||||||||
Burden Item | Number of Occurrences Per Year | Technical Hours Per Occurrence | Tech Hours Per Year (C=A x B) |
Management Hours Per Year (D = C x 0.05) |
Clerical Hours Per Year (E = C x 0.1) |
Total Hours Per Year (C+D+E) | Total Cost Per Year | |||||||||||||||||
1. | Applications | not applicable | ||||||||||||||||||||||
2. | Read and Understand Rule Requirements | 0 | 24 | 0 | 0 | 0 | 0 | $0 | ||||||||||||||||
3. | Required Activities | |||||||||||||||||||||||
A. | Observe stack tests | 0 | 16 | 0 | 0 | 0 | 0 | $0 | ||||||||||||||||
B. | Excess emissions -- Enforcement Activities | 0 | 24 | 0 | 0 | 0 | 0 | $0 | ||||||||||||||||
C. | Create Information | not applicable | ||||||||||||||||||||||
D. | Gather Information | not applicable | ||||||||||||||||||||||
E. | Report Reviews | |||||||||||||||||||||||
1. | Review notification of compliance status | |||||||||||||||||||||||
a. Storage Tanks | 13 | 2 | 26 | 1 | 3 | 30 | $1,388 | |||||||||||||||||
b. Connectors | 60 | 2 | 120 | 6 | 12 | 138 | $6,408 | |||||||||||||||||
c. Flares | 5 | 2 | 10 | 1 | 1 | 12 | $534 | |||||||||||||||||
2. | Review compliance reports | 0 | 0 | 0 | 0 | $0 | ||||||||||||||||||
a. Storage Tanks | 26 | 2 | 52 | 3 | 5 | 60 | $2,777 | |||||||||||||||||
b. Connectors | 120 | 2 | 240 | 12 | 24 | 276 | $12,816 | |||||||||||||||||
c. Flares | 10 | 2 | 20 | 1 | 2 | 23 | $1,068 | |||||||||||||||||
F. | Prepare annual summary report | 1 | 10 | 10 | 1 | 1 | 12 | $534 | ||||||||||||||||
4. | Travel expenses: (1 person * 30 hours per year / 8 hours per day * $75 per diem) + ($600 per round trip) = | $0 | per trip | $0 | ||||||||||||||||||||
TOTAL | 478 | 24 | 48 | 550 | $25,525 | |||||||||||||||||||
Percent of Stack Tests Observed | 20% | |||||||||||||||||||||||
Estimated Percent Retesting | 10% | |||||||||||||||||||||||
Estimated Percent Emission Exceedences | 10% |
Table 7 - Annual Agency Burden and Cost of Recordkeeping and Reporting Requirements for the Organic Liquid Distribution (Non-Gasoline) RTR - Year 3 | ||||||||||||||||||||||||
(A) | (B) | (C) | (D) | (E) | (F) | (G) | Footnotes | |||||||||||||||||
Burden Item | Number of Occurrences Per Year | Technical Hours Per Occurrence | Tech Hours Per Year (C=A x B) |
Management Hours Per Year (D = C x 0.05) |
Clerical Hours Per Year (E = C x 0.1) |
Total Hours Per Year (C+D+E) | Total Cost Per Year | |||||||||||||||||
1. | Applications | not applicable | ||||||||||||||||||||||
2. | Read and Understand Rule Requirements | 0 | 24 | 0 | 0 | 0 | 0 | $0 | ||||||||||||||||
3. | Required Activities | |||||||||||||||||||||||
A. | Observe stack tests | 0 | 16 | 0 | 0 | 0 | 0 | $0 | ||||||||||||||||
B. | Excess emissions -- Enforcement Activities | 0 | 24 | 0 | 0 | 0 | 0 | $0 | ||||||||||||||||
C. | Create Information | not applicable | ||||||||||||||||||||||
D. | Gather Information | not applicable | ||||||||||||||||||||||
E. | Report Reviews | |||||||||||||||||||||||
1. | Review notification of compliance status | |||||||||||||||||||||||
a. Storage Tanks | 27 | 2 | 54 | 3 | 5 | 62 | $2,884 | |||||||||||||||||
b. Connectors | 120 | 2 | 240 | 12 | 24 | 276 | $12,816 | |||||||||||||||||
c. Flares | 11 | 2 | 22 | 1 | 2 | 25 | $1,175 | |||||||||||||||||
2. | Review compliance reports | 0 | 0 | 0 | 0 | $0 | ||||||||||||||||||
a. Storage Tanks | 80 | 2 | 160 | 8 | 16 | 184 | $8,544 | |||||||||||||||||
b. Connectors | 360 | 2 | 720 | 36 | 72 | 828 | $38,448 | |||||||||||||||||
c. Flares | 32 | 2 | 64 | 3 | 6 | 74 | $3,418 | |||||||||||||||||
F. | Prepare annual summary report | 1 | 10 | 10 | 1 | 1 | 12 | $534 | ||||||||||||||||
4. | Travel expenses: (1 person * 30 hours per year / 8 hours per day * $75 per diem) + ($600 per round trip) = | $0 | per trip | $0 | ||||||||||||||||||||
TOTAL | 1270 | 64 | 127 | 1461 | $67,818 | |||||||||||||||||||
Percent of Stack Tests Observed | 20% | |||||||||||||||||||||||
Estimated Percent Retesting | 10% | |||||||||||||||||||||||
Estimated Percent Emission Exceedences | 10% |
Table 8 - Summary of Annual Agency Burden and Cost of Recordkeeping and Reporting Requirements for the Organic Liquid Distribution (Non-Gasoline) RTR | |||||||
Year | Technical Hours | Management Hours | Clerical Hours | Total Hours | Labor Costs | Non-Labor Costs | Total Costs |
1 | 1,114 | 56 | 111 | 1,281 | $59,488 | $0 | $59,488 |
2 | 478 | 24 | 48 | 550 | $25,525 | $0 | $25,525 |
3 | 1,270 | 64 | 127 | 1,461 | $67,818 | $0 | $67,818 |
Total | 2,862 | 143 | 286 | 3,291 | $152,831 | $0 | $152,831 |
Average | 954 | 48 | 95 | 1,097 | $50,944 | $0 | $50,944 |