Burden Calculation Tables

1963t07.xlsx

NESHAP for Organic Liquids Distribution (Non-Gasoline) Facilities (40 CFR part 63, subpart EEEE) (Proposed Rule)

Burden Calculation Tables

OMB: 2060-0539

Document [xlsx]
Download: xlsx | pdf

Overview

OLD Inputs
MemoTables
YR1
YR2
YR3
summary
EPA_YR1
EPA_YR2
EPA_YR3
EPA summary


Sheet 1: OLD Inputs


All Facilities Flares Tanks

Flare Count #Facilities # FXRT beneath VP cutoffs

Number of Existing 177 27 16 171

Number of New 4 0 0 0

Total 181











Leak Detection and Repair Program (Method 21)





Parameter Capital Cost Annual Cost



Nationwide Cost $- $29,651



Estimate of current uncontrolled OLD FXRT subject to LDAR :
149



# Facilities with applicable tanks
85



AVERAGE PER FACILITY #DIV/0! $349










HAP Content Monitoring for tanks less than 5% HAP Current rule has EPA Method 311 required for initial applicability with <5% HAP. Propose repeating test every 5 years or with tank content changes



Parameter Value




Number of tanks assumed to be <5% HAP: 90




Once every 5 year testing cost/tank: $1,257




Total cost every 5 years ($): $113,126




# Facilities 40 set equal to facilities purchasing VP analyzer



Avg. Cost Per Facility $2,828




Assumed fraction of tanks <5% HAP that change contents every year 0.02




Estimated tanks per year with retest for <5% HAP content: 2




Total tank retest cost per year: $2,514











VP Monitoring Compliance measure: initial and repeating every 5 years or with tank content changes to ensure which control regime the tank falls under (i.e., below or above 95% control thresholds).



Parameter Value




ASTM D2879 analyzer cost ($) $7,440




Annualized Analyzer cost ($/yr) $964




Number of facilities purchasing analyzer: 40 Assumes half of the 79 facilities assumed to be larger OLD will need to purchase an analyzer and may have tanks below regulatory threshold vapor pressures



FXRT>5,000 gallons subject to LDAR because they are below 95% control VP thresholds 91 (Assumes all EFRs and IFRs are at controlled level, no further improvements necessary)



Testing labor cost/tank $182




Total annual labor cost ($/yr): $16,538




# Facilities with vapor testing 40 set equal to facilities purchasing VP analyzer



Average annual labor cost per facility ($/yr) $413




# Retests 2 assume retests occur at separate facilities



Average annual labor cost per retest ($/yr) $182











Connectors monitoring (leak definition of 500 ppmv) these costs are not included in burden, but facility count of 180 is
Option By Model National
TCI Incremental TAC w/o Recovery Credits No. of Affected Facilities TCI Incremental TAC w/o Recovery Credits
Small model requiring admin costs $3,038 $417 0 $0 $0
Medium model requiring admin costs $13,693 $6,642 57 $780,497 $378,572
Large model requiring admin costs $49,209 $11,938 13 $639,711 $155,194
Small model requiring no admin costs $1,184 $177 105 $124,305 $18,537
Medium model requiring no admin costs $11,839 $1,765 4 $47,354 $7,062
Large model requiring no admin costs $47,354 $7,062 1 $47,354 $7,062


Total 180 $1,639,221 $566,428


Avg per facility:
$9,110 $3,150







Flare Management Plan - One-time cost
**RLSO indicates paragraph (o) of 63.670 doesn't apply if operators choose to follow provisions of 63.670 to show compliance (which is what we're assuming they'll do), so removed from burden estimate.


Parameter Value


Cost Per Flare



Total Flares



Avg. Cost Per Facility (16 facilities)



Avg. Cost Per Facility (all existing facilities)

















Flare Monitor Costs (costs pulled from Flare Impacts memo)





Monitoring Equipment Capital Equipment Cost ($/flare) Annualized Cost ($/yr/flare) Number of Flares Impacted Nationwide Capital Equipment Cost ($) Nationwide Total Annualized Cost ($/yr) 27 flares are at 16 facilities
Engineering Calculation Costs (Dedicated Flares)* 7,000 13,160 27 $189,000 $355,320
Avg. Cost Per Facility


$12,000 $22,000
*We assume that the owner or operator would likely follow the provisions at 40 CFR 63.670(i)(4) and (k)(2)(ii) in order to determine compliance with the flare tip velocity standard on a 15-minute block average basis. These provisions allow use of a continuous pressure/temperature monitoring system and engineering calculations in lieu of the more intricate monitoring options also specified in 40 CFR part 63, subpart CC.









Industry Wages





May 2016 National Industry-Specific Occupational Employment and Wage Estimates





NAICS 325000 - Chemical Manufacturing





Category Occupation Code Title 2016 Wage Loaded Wage

Technical 17-2081 Environmental Engineer 49.95 104.90

Clerical 43-0000 Office and Administrative Support Occupations 20.66 43.39

Managerial 11-9041 Architectural and Engineering Managers 68.36 143.56















https://www.bls.gov/oes/2016/may/naics3_325000.htm












EPA Wages






Hourly Mean Wage With Fringe & Overhead



(GS- 12, step 1) - Tech. 29.76 $47.62



(GS- 13, step 5) - Mgmt. 40.1 $64.16



(GS-6, step 3) - Cler. 16.1 $25.76



https://www.opm.gov/policy-data-oversight/pay-leave/salaries-wages/salary-tables/pdf/2016/GS_h.pdf





or https://www.opm.gov/policy-data-oversight/pay-leave/salaries-wages/













Sheet 2: MemoTables

Capital/Startup and O&M Costs
(A) (B) (C) (D) (E) (F) (G)
Source & Monitor Type Capital/Startup Costs for One Respondent Number of Respondents with Capital/Startup Costs Total Capital/ Startup Cost
(B X C)
Annual Cost (O&M and Capital) for One Respondent Number of Respondentsa Total Annual Cost,
(E X F)
Storage Tanks - HAP Content





Initial Monitoring $0 0 $0 $2,828 40 $113,120
Retest $0 0 $0 $1,257 4 $5,028
Storage Tanks - Vapor Pressure





Monitor $7,440 40 $297,600 $964 53 $51,066
Initial Monitoring $0 0 $0 $413 40 $16,520
Retest $0 0 $0 $182 4 $728
Flare Monitors $12,000 16 $192,000 $22,000 21 $462,000
TOTAL

$489,600

$648,462
(a) Within a given year, there are a maximum of 40 respondents for storage tanks and 16 respondents for flares, however the values in column F reflect the sum of these respondents for years 2 and 3.



















Total Annual Responses

(A) (B) (C) (D) (E)

Information Collection Activity Number of Respondents Number of Responses Number of Existing Respondents That Keep Records But Do Not Submit Reports Total Annual Responses
E=(BxC)+D


Notification of Compliance Status





Storage Tanks 40 1 0 40

Connectors 180 1 0 180

Flares 16 1 0 16

Periodic Reports





Storage Tanks 53 2 0 106

Connectors 240 2 0 480

Flares 21 2 0 42

TOTAL 864


Sheet 3: YR1

Table 1 - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Organic Liquid Distribution (Non-Gasoline) RTR - Year 1
Burden Item (A)
Respondent Hours per Occurrence (Technical hours)
(B)
Non-Labor Costs Per Occurrence
(C)
Number of Occurrences Per Respondent Per Year
(D)
Technical Hours per Respondent Per Year
(A X C)
(E)
Number of Respondents Per Year
(F)
Technical Hours per Year
(D X E)
(G)
Clerical Hours per Year
(F X 0.1)
(H)
Management Hours per Year
(F X .05)
(I)
Total Hours per Year
(F + G + H)
(J)
Total Labor Costs Per Year
(K)
Total Non-Labor Costs Per Year
(B x C x E)
(L)
Total Number of Responses per Year
(C X E)
Footnotes
1. Applications NA












2. Surveys and Studies NA












3. Reporting Requirements













A. Read Rule 24 $0 1 24 181 4,344 434 217 4,996 $505,691 $0 0 a, b
B. Required Activities













1. Storage Tanks













a. HAP Content Monitoring (Method 311)













i. Initial Monitoring 0 $2,828 1 0 0 0 0 0 0 $0 $0 0 c,d
ii. Retest for Changing Tank Contents 0 $1,257 1 0 0 0 0 0 0 $0 $0 0 h
b. VP Monitoring - ASTM D2879 analyzer purchase













i. Capital Cost 0 $7,440 1 0 0 0 0 0 0 $0 $0 0 c,d
ii. Annualized Cost 0 $964 1 0 0 0 0 0 0 $0 $0 0 c,d
c. VP Monitoring













i. Initial Monitoring 0 $413 1 0 0 0 0 0 0 $0 $0 0 c,d
ii. Retest for Changing Tank Contents 0 $182 1 0 0 0 0 0 0 $0 $0 0 h
2. Flare Monitoring













a. Capital Cost 0 $12,000 1 0 0 0 0 0 0 $0 $0 0 c,e,f
b. Annualized Cost 0 $22,000 1 0 0 0 0 0 0 $0 $0 0 c,e,f
C. Create Information Inc. in 3B












D. Gather Information Inc. in 3E












E. Report Preparation













1. Notification of Compliance Status













a. Storage Tanks 1 $0 1 1 0 0 0 0 0 $0 $0 0 c,d
b. Connectors 4 $0 1 4 0 0 0 0 0 $0 $0 0 c,g
c. Flares 5 $0 1 5 0 0 0 0 0 $0 $0 0 c,f
2. Compliance Report













a. Storage Tanks 1 $0 2 2 0 0 0 0 0 $0 $0 0 c,d
b. Connectors 4 $0 2 8 0 0 0 0 0 $0 $0 0 c,g
c. Flares 5 $0 2 10 0 0 0 0 0 $0 $0 0 c,f
Reporting Subtotal




4,344 434 217 4,996 $505,691 $0 0

4. Recordkeeping Requirements













A. Read Instructions Inc. in 3.A












B. Implement Activities NA












C. Develop Record System NA












D. Record information













1. Storage Tanks 5 $0 1 5 0 0 0 0 0 $0 $0 0 c,d
2. Connectors 8 $0 1 8 0 0 0 0 0 $0 $0 0 c,g
3. Flares 0.4 $0 365 146 0 0 0 0 0 $0 $0 0 c,f
4. Flow events from bypass lines 25 $0 1 25 0 0 0 0 0 $0 $0 0 i
E. Personnel Training 16 $0 1 16 181 2,896 290 145 3,330 $337,127 $0 0

F. Time for Audits NA












Recordkeeping Subtotal




2,896 290 145 3,330 $337,127 $0 0

TOTAL




7,240 724 362 8,326 $842,818 $0 0
























Total Hours Labor Non-Labor Total







Summary of Respondent Burden

8,326 $842,818 $0 $842,818






















Initial Capital and Startup




$505,691







Annualized Capital/Start-up and O & M




$0

















Footnotes:













(a) There are 177 currently operating facilities, and 4 facilities are expected to commence operations within three years after promulgation of the rule. As such, costs are estimated for 181 facilities.

(b) This is a one-time cost (e.g., to read rule or develop plan).













(c) Assumed facilities will read the rule and perform certain one-time activities (e.g., personnel training) in year 1. Assumed that one-third of the facilities would begin complying in year 2 and the remaining two-thirds of the facilities in year 3.

(d) Assumed 40 facilities would have storage tanks applicable to HAP content monitoring and vapor pressure monitoring requirements.

(e) Flare monitoring includes costs for continuous pressure/temperature monitoring system and engineering calculations in lieu of the more intricate monitoring options (e.g. H2 analyzer, calorimeter, flare gas flow monitor, steam controls/flow monitor, and air controls/flow monitor).

(f) 16 facilities have flares applicable to monitoring requirements.

(g) 180 facilities are subject to connector monitoring requirements.

(h) Assumed 2 tanks (i.e., facilities) would change tanks contents within a year.













(i) Assumed that bypass lines were not used during the 3-year period, so costs for bypass lines would not be incurred.


Sheet 4: YR2

Table 2 - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Organic Liquid Distribution (Non-Gasoline) RTR - Year 2
Burden Item (A)
Respondent Hours per Occurrence (Technical hours)
(B)
Non-Labor Costs Per Occurrence
(C)
Number of Occurrences Per Respondent Per Year
(D)
Technical Hours per Respondent Per Year
(A X C)
(E)
Number of Respondents Per Year
(F)
Technical Hours per Year
(D X E)
(G)
Clerical Hours per Year
(F X 0.1)
(H)
Management Hours per Year
(F X .05)
(I)
Total Hours per Year
(F + G + H)
(J)
Total Labor Costs Per Year
(K)
Total Non-Labor Costs Per Year
(B x C x E)
(L)
Total Number of Responses per Year
(C X E)
Footnotes
1. Applications NA












2. Surveys and Studies NA












3. Reporting Requirements













A. Read Rule 24 $0 1 24 0 0 0 0 0 $0 $0 0 a, b
B. Required Activities













1. Storage Tanks













a. HAP Content Monitoring (Method 311)













i. Initial Monitoring 0 $2,828 1 0 13 0 0 0 0 $0 $36,764 0 c,d
ii. Retest for Changing Tank Contents 0 $1,257 1 0 2 0 0 0 0 $0 $2,514 0 h
b. VP Monitoring - ASTM D2879 analyzer purchase













i. Capital Cost 0 $7,440 1 0 13 0 0 0 0 $0 $96,720 0 c,d
ii. Annualized Cost 0 $964 1 0 13 0 0 0 0 $0 $12,526 0 c,d
c. VP Monitoring













i. Initial Monitoring 0 $413 1 0 13 0 0 0 0 $0 $5,369 0 c,d
ii. Retest for Changing Tank Contents 0 $182 1 0 2 0 0 0 0 $0 $364 0 h
2. Flare Monitoring













a. Capital Cost 0 $12,000 1 0 5 0 0 0 0 $0 $60,000 0 c,e,f
b. Annualized Cost 0 $22,000 1 0 5 0 0 0 0 $0 $110,000 0 c,e,f
C. Create Information Inc. in 3B












D. Gather Information Inc. in 3E












E. Report Preparation













1. Notification of Compliance Status













a. Storage Tanks 1 $0 1 1 13 13 1 1 15 $1,513 $0 13 c,d
b. Connectors 4 $0 1 4 60 240 24 12 276 $27,939 $0 60 c,g
c. Flares 5 $0 1 5 5 25 3 1 29 $2,910 $0 5 c,f
2. Compliance Report













a. Storage Tanks 1 $0 2 2 13 26 3 1 30 $3,027 $0 26 c,d
b. Connectors 4 $0 2 8 60 480 48 24 552 $55,877 $0 120 c,g
c. Flares 5 $0 2 10 5 50 5 3 58 $5,821 $0 10 c,f
Reporting Subtotal




834 83 42 959 $97,087 $167,537 234

4. Recordkeeping Requirements













A. Read Instructions Inc. in 3.A












B. Implement Activities NA












C. Develop Record System NA












D. Record information













1. Storage Tanks 5 $0 1 5 13 65 7 3 75 $7,567 $0 0 c,d
2. Connectors 8 $0 1 8 60 480 48 24 552 $55,877 $0 0 c,g
3. Flares 0.4 $0 365 146 5 730 73 37 840 $84,980 $0 0 c,f
4. Flow events from bypass lines 25 $0 1 25 0 0 0 0 0 $0 $0 0 i
E. Personnel Training 16 $0 1 16 0 0 0 0 0 $0 $0 0

F. Time for Audits NA












Recordkeeping Subtotal




1,275 128 64 1,466 $148,424 $0 0

TOTAL




2,109 211 105 2,425 $245,511 $167,537 234
























Total Hours Labor Non-Labor Total







Summary of Respondent Burden

2,425 $245,511 $167,537 $413,048






















Initial Capital and Startup




$156,720







Annualized Capital/Start-up and O & M




$167,537

















Footnotes:













(a) There are 177 currently operating facilities, and 4 facilities are expected to commence operations within three years after promulgation of the rule. As such, costs are estimated for 181 facilities.

(b) This is a one-time cost (e.g., to read rule or develop plan).













(c) Assumed facilities will read the rule and perform certain one-time activities (e.g., personnel training) in year 1. Assumed that one-third of the facilities would begin complying in year 2 and the remaining two-thirds of the facilities in year 3.

(d) Assumed 40 facilities would have storage tanks applicable to HAP content monitoring and vapor pressure monitoring requirements.

(e) Flare monitoring includes costs for continuous pressure/temperature monitoring system and engineering calculations in lieu of the more intricate monitoring options (e.g. H2 analyzer, calorimeter, flare gas flow monitor, steam controls/flow monitor, and air controls/flow monitor).

(f) 16 facilities have flares applicable to monitoring requirements.

(g) 180 facilities are subject to connector monitoring requirements.

(h) Assumed 2 tanks (i.e., facilities) would change tanks contents within a year.













(i) Assumed that bypass lines were not used during the 3-year period, so costs for bypass lines would not be incurred.


Sheet 5: YR3

Table 3 - Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Organic Liquid Distribution (Non-Gasoline) RTR - Year 3
Burden Item (A)
Respondent Hours per Occurrence (Technical hours)
(B)
Non-Labor Costs Per Occurrence
(C)
Number of Occurrences Per Respondent Per Year
(D)
Technical Hours per Respondent Per Year
(A X C)
(E)
Number of Respondents Per Year
(F)
Technical Hours per Year
(D X E)
(G)
Clerical Hours per Year
(F X 0.1)
(H)
Management Hours per Year
(F X .05)
(I)
Total Hours per Year
(F + G + H)
(J)
Total Labor Costs Per Year
(K)
Total Non-Labor Costs Per Year
(B x C x E)
(L)
Total Number of Responses per Year
(C X E)
Footnotes
1. Applications NA












2. Surveys and Studies NA












3. Reporting Requirements













A. Read Rule 24 $0 1 24 0 0 0 0 0 $0 $0 0 a, b
B. Required Activities













1. Storage Tanks













a. HAP Content Monitoring (Method 311)













i. Initial Monitoring 0 $2,828 1 0 27 0 0 0 0 $0 $76,356 0 c,d
ii. Retest for Changing Tank Contents 0 $1,257 1 0 2 0 0 0 0 $0 $2,514 0 h
b. VP Monitoring - ASTM D2879 analyzer purchase













i. Capital Cost 0 $7,440 1 0 27 0 0 0 0 $0 $200,880 0 c,d
ii. Annualized Cost 0 $964 1 0 40 0 0 0 0 $0 $38,541 0 c,d
c. VP Monitoring













i. Initial Monitoring 0 $413 1 0 27 0 0 0 0 $0 $11,151 0 c,d
ii. Retest for Changing Tank Contents 0 $182 1 0 2 0 0 0 0 $0 $364 0 h
2. Flare Monitoring













a. Capital Cost 0 $12,000 1 0 11 0 0 0 0 $0 $132,000 0 c,e,f
b. Annualized Cost 0 $22,000 1 0 16 0 0 0 0 $0 $352,000 0 c,e,f
C. Create Information Inc. in 3B












D. Gather Information Inc. in 3E












E. Report Preparation













1. Notification of Compliance Status













a. Storage Tanks 1 $0 1 1 27 27 3 1 31 $3,143 $0 27 c,d
b. Connectors 4 $0 1 4 120 480 48 24 552 $55,877 $0 120 c,g
c. Flares 5 $0 1 5 11 55 6 3 63 $6,403 $0 11 c,f
2. Compliance Report













a. Storage Tanks 1 $0 2 2 40 80 8 4 92 $9,313 $0 80 c,d
b. Connectors 4 $0 2 8 180 1440 144 72 1656 $167,632 $0 360 c,g
c. Flares 5 $0 2 10 16 160 16 8 184 $18,626 $0 32 c,f
Reporting Subtotal




2,242 224 112 2,578 $260,994 $480,925 630

4. Recordkeeping Requirements













A. Read Instructions Inc. in 3.A












B. Implement Activities NA












C. Develop Record System NA












D. Record information













1. Storage Tanks 5 $0 1 5 40 200 20 10 230 $23,282 $0 0 c,d
2. Connectors 8 $0 1 8 180 1,440 144 72 1,656 $167,632 $0 0 c,g
3. Flares 0.4 $0 365 146 16 2,336 234 117 2,686 $271,937 $0 0 c,f
4. Flow events from bypass lines 25 $0 1 25 0 0 0 0 0 $0 $0 0 i
E. Personnel Training 16 $0 1 16 0 0 0 0 0 $0 $0 0

F. Time for Audits NA












Recordkeeping Subtotal




3,976 398 199 4,572 $462,851 $0 0

TOTAL




6,218 622 311 7,151 $723,845 $480,925 630
























Total Hours Labor Non-Labor Total







Summary of Respondent Burden

7,151 $723,845 $480,925 $1,204,770






















Initial Capital and Startup




$332,880







Annualized Capital/Start-up and O & M




$480,925

















Footnotes:













(a) There are 177 currently operating facilities, and 4 facilities are expected to commence operations within three years after promulgation of the rule. As such, costs are estimated for 181 facilities.

(b) This is a one-time cost (e.g., to read rule or develop plan).













(c) Assumed facilities will read the rule and perform certain one-time activities (e.g., personnel training) in year 1. Assumed that one-third of the facilities would begin complying in year 2 and the remaining two-thirds of the facilities in year 3.

(d) Assumed 40 facilities would have storage tanks applicable to HAP content monitoring and vapor pressure monitoring requirements.

(e) Flare monitoring includes costs for continuous pressure/temperature monitoring system and engineering calculations in lieu of the more intricate monitoring options (e.g. H2 analyzer, calorimeter, flare gas flow monitor, steam controls/flow monitor, and air controls/flow monitor).

(f) 16 facilities have flares applicable to monitoring requirements.

(g) 180 facilities are subject to connector monitoring requirements.

(h) Assumed 2 tanks (i.e., facilities) would change tanks contents within a year.













(i) Assumed that bypass lines were not used during the 3-year period, so costs for bypass lines would not be incurred.


Sheet 6: summary

Table 4 - Summary of Annual Respondent Burden and Cost of Recordkeeping and Reporting Requirements for the Organic Liquid Distribution (Non-Gasoline) RTR
Year Technical Hours Clerical Hours Management Hours Total Labor Hours Labor Costs Non-Labor (Annualized Capital/Startup and O&M) Costs Total Costs
1 7,240 724 362 8,326 $842,818 $0 $842,818
2 2,109 211 105 2,425 $245,511 $167,537 $413,048
3 6,218 622 311 7,151 $723,845 $480,925 $1,204,770
Total 15,567 1,557 778 17,902 $1,812,174 $648,462 $2,460,636
Average 5,189 519 259 5,967 $604,058 $216,154 $820,212








Year Number of Respondents Number of Responses Reporting Hours Recordkeeping Hours Total Hours Hours per Response Hours Per Respondent
1 181 0 4,996 3,330 8,326 -- 46
2 60 234 959 1,466 2,425 10 40
3 180 630 2,578 4,572 7,151 11 40
Total 421 864 8,533 9,369 17,902 21 43
Average 140 288 2,844 3,123 5,967 21 43

Sheet 7: EPA_YR1

Table 5 - Annual Agency Burden and Cost of Recordkeeping and Reporting Requirements for the Organic Liquid Distribution (Non-Gasoline) RTR - Year 1
















(A) (B) (C) (D) (E) (F) (G) Footnotes











Burden Item Number of Occurrences Per Year Technical Hours Per Occurrence Tech Hours Per Year
(C=A x B)
Management Hours Per Year
(D = C x 0.05)
Clerical Hours Per Year
(E = C x 0.1)
Total Hours Per Year (C+D+E) Total Cost Per Year











1. Applications


not applicable











2. Read and Understand Rule Requirements


46 24 1104 55 110 1270 $58,954 a











3. Required Activities
















A. Observe stack tests 0 16 0 0 0 0 $0













B. Excess emissions -- Enforcement Activities

0 24 0 0 0 0 $0













C. Create Information

not applicable












D. Gather Information

not applicable












E. Report Reviews
















1. Review notification of compliance status























a. Storage Tanks
0 2 0 0 0 0 $0















b. Connectors
0 2 0 0 0 0 $0















c. Flares
0 2 0 0 0 0 $0














2. Review compliance reports


0 0 0 0 $0















a. Storage Tanks
0 2 0 0 0 0 $0















b. Connectors
0 2 0 0 0 0 $0















c. Flares
0 2 0 0 0 0 $0













F. Prepare annual summary report

1 10 10 1 1 12 $534












4. Travel expenses: (1 person * 30 hours per year / 8 hours per day * $75 per diem) + ($600 per round trip) =





$0 per trip
$0













TOTAL




1114 56 111 1281 $59,488





































Footnotes:























a Number of occurrences is the number of states and EPA Regions with affected sources (36 states + 10 EPA regions = 46 respondents).































































































































































































































































































































































































































































































































































Percent of Stack Tests Observed 20%





















Estimated Percent Retesting 10%





















Estimated Percent Emission Exceedences 10%

Sheet 8: EPA_YR2

Table 6 - Annual Agency Burden and Cost of Recordkeeping and Reporting Requirements for the Organic Liquid Distribution (Non-Gasoline) RTR - Year 2
















(A) (B) (C) (D) (E) (F) (G) Footnotes











Burden Item Number of Occurrences Per Year Technical Hours Per Occurrence Tech Hours Per Year
(C=A x B)
Management Hours Per Year
(D = C x 0.05)
Clerical Hours Per Year
(E = C x 0.1)
Total Hours Per Year (C+D+E) Total Cost Per Year











1. Applications


not applicable











2. Read and Understand Rule Requirements


0 24 0 0 0 0 $0












3. Required Activities
















A. Observe stack tests 0 16 0 0 0 0 $0













B. Excess emissions -- Enforcement Activities

0 24 0 0 0 0 $0













C. Create Information

not applicable












D. Gather Information

not applicable












E. Report Reviews
















1. Review notification of compliance status























a. Storage Tanks
13 2 26 1 3 30 $1,388















b. Connectors
60 2 120 6 12 138 $6,408















c. Flares
5 2 10 1 1 12 $534














2. Review compliance reports


0 0 0 0 $0















a. Storage Tanks
26 2 52 3 5 60 $2,777















b. Connectors
120 2 240 12 24 276 $12,816















c. Flares
10 2 20 1 2 23 $1,068













F. Prepare annual summary report

1 10 10 1 1 12 $534












4. Travel expenses: (1 person * 30 hours per year / 8 hours per day * $75 per diem) + ($600 per round trip) =





$0 per trip
$0













TOTAL




478 24 48 550 $25,525
































































































































































































































































































































































































































































































































































































































Percent of Stack Tests Observed 20%





















Estimated Percent Retesting 10%





















Estimated Percent Emission Exceedences 10%

Sheet 9: EPA_YR3

Table 7 - Annual Agency Burden and Cost of Recordkeeping and Reporting Requirements for the Organic Liquid Distribution (Non-Gasoline) RTR - Year 3
















(A) (B) (C) (D) (E) (F) (G) Footnotes











Burden Item Number of Occurrences Per Year Technical Hours Per Occurrence Tech Hours Per Year
(C=A x B)
Management Hours Per Year
(D = C x 0.05)
Clerical Hours Per Year
(E = C x 0.1)
Total Hours Per Year (C+D+E) Total Cost Per Year











1. Applications


not applicable











2. Read and Understand Rule Requirements


0 24 0 0 0 0 $0












3. Required Activities
















A. Observe stack tests 0 16 0 0 0 0 $0













B. Excess emissions -- Enforcement Activities

0 24 0 0 0 0 $0













C. Create Information

not applicable












D. Gather Information

not applicable












E. Report Reviews
















1. Review notification of compliance status























a. Storage Tanks
27 2 54 3 5 62 $2,884















b. Connectors
120 2 240 12 24 276 $12,816















c. Flares
11 2 22 1 2 25 $1,175














2. Review compliance reports


0 0 0 0 $0















a. Storage Tanks
80 2 160 8 16 184 $8,544















b. Connectors
360 2 720 36 72 828 $38,448















c. Flares
32 2 64 3 6 74 $3,418













F. Prepare annual summary report

1 10 10 1 1 12 $534












4. Travel expenses: (1 person * 30 hours per year / 8 hours per day * $75 per diem) + ($600 per round trip) =





$0 per trip
$0













TOTAL




1270 64 127 1461 $67,818
































































































































































































































































































































































































































































































































































































































Percent of Stack Tests Observed 20%





















Estimated Percent Retesting 10%





















Estimated Percent Emission Exceedences 10%

Sheet 10: EPA summary

Table 8 - Summary of Annual Agency Burden and Cost of Recordkeeping and Reporting Requirements for the Organic Liquid Distribution (Non-Gasoline) RTR
Year Technical Hours Management Hours Clerical Hours Total Hours Labor Costs Non-Labor Costs Total Costs
1 1,114 56 111 1,281 $59,488 $0 $59,488
2 478 24 48 550 $25,525 $0 $25,525
3 1,270 64 127 1,461 $67,818 $0 $67,818
Total 2,862 143 286 3,291 $152,831 $0 $152,831
Average 954 48 95 1,097 $50,944 $0 $50,944