5900-465 Snowmobile Averaging, Banking, and Trading Template

Certification and Compliance Requirements for Nonroad Spark-ignition Engines (Renewal)

abt-template-snow-v12 (1).xlsx

Certification and Compliance Requirements for Nonroad Spark-ignition Engines (Renewal)

OMB: 2060-0338

Document [xlsx]
Download: xlsx | pdf

Overview

Field Descriptions
Current MY Credit Calc
Summary
Phase-In


Sheet 1: Field Descriptions

Field Description










Engine Family Name or Test Group Enter the 12-character engine family name or test group name.










Model Name Enter the applicable model name (optional).










Test Engine Power Enter the test engine power rating for the engine family name. Note that this value does not affect credit calculations.










Phase Select the phase that applies. If the engine family is subject to the current standards, select Phase 1. If Phase 1 credits will be accrued in the current model year, you may elect to designate certain engine families as Phase 2 Early Reduction Credits (ERCs). Phase 1 and 2 CO credits are maintained as separate balances in the Current MY worksheet but are combined in the Summary sheet since the standards are consistent.










Unique Design? (Y/N) If the snowmobiles in the associated engine family are considered "unique design", select "Y" from the dropdown list. Otherwise, select "N" (see Section 1051.630).










Useful Life (kW-hr) Enter the useful life (UL) of the engine family (or subset) in terms of kW-hr. If UL is in kilometers, you may convert to kW-hr using the following equation: UL (kW-hr) = UL (km) x maximum test power (kW) / 30 km/hr. Note that the rule specifies minimum useful life as 8,000 km.










U.S. Production Enter number of engines/vehicles manufactured for U.S. production.










HC FEL (g/kW-hr) Enter the established HC family emission limit (FEL) for the engine family (or subset) in terms of g/kW-hr.










CO FEL (g/kW-hr) Enter the established CO family emission limit (FEL) for the engine family (or subset) in terms of g/kW-hr.

















































Paperwork Reduction Act Notice
The public reporting and recordkeeping burden for this collection of information is estimated to average 453.79 hours per respondent. Send comments on the Agency's need for this information, the accuracy of the provided burden estimates, and any suggested methods for minimizing respondent burden, including through the use of automated collection techniques to the Director, Collection Strategies Division, U.S. Environmental Protection Agency (2822T), 1200 Pennsylvania Ave., NW, Washington, D.C. 20460. Include the OMB control number 2060-0338 in any correspondence. Do not send the completed form to this address.


































































































Sheet 2: Current MY Credit Calc

Engine Family Name or Test Group Model Name Test Engine Power Phase Unique Design? (Y/N) Useful Life (kW-hr) U.S. Production HC FEL (g/kW-hr) CO FEL (g/kW-hr) Messages





















































































































































































































































































































































































































































































































































































































































































































































































































Data Element Phase 1 Early Reduction Credits: Phase 2
















HC (g/kW-hr) CO (g/kW-hr) HC (g/kW-hr) CO (g/kW-hr)



















Standard 100 275 75 275



















Emission Level 0.0 0.0 0.0 0.0



















Credit Balance 0.0 0.0 0.0 0.0





























































































































































































































































































































































































































































Sheet 3: Summary






Credits HC (g/kW-hr) CO (g/kW-hr)
Phase 1 Phase 2 (ERCs) Phase 1 and Phase 2 (ERCs)
Current Credit Balances




Current MY Credits 1 0.0 0.0 0.0

Credits acquired via trading



Credits banked from prior model years


Application of Traded or Banked Credits to Current MY Balance




Apply credits acquired via trading



Apply banked credits


Credit Balances after Application of Traded or Banked Credits




Credits acquired via trading 0.0
0.0

Banked Credits 0.0
0.0
Total Credit Balance 2 0.0 0.0 0.0

Total Banked Credits 0.0 0.0 0.0





1 Includes credits/deficits associated with the standards in Table 1 of Section 1051.103. Note that since the same standard applies to CO Phase 1 and Phase 2, the credit totals from the 'Current MY Credit Calc' worksheet are combined in the CO column of this worksheet.





2 This balance should be at or above zero. The 'Total Banked Credits' reflects the sum of the preceding two rows: the 'Banked Credits' (adjusted based on the number of credits applied to the current MY credits balance) and the 'Total Credit Balance.'

Sheet 4: Phase-In

Engine Family Name or Test Group Participating in ABT? (Y/N) U.S. Production




























































































































































































































































































































































































Total Production in ABT 0








Total Production not in ABT 0








Total Production 0

































Phase-In % #DIV/0!
































Note: Providing the data and information necessary to calculate phase-in percentages is optional.








File Typeapplication/vnd.openxmlformats-officedocument.spreadsheetml.sheet
File Modified0000-00-00
File Created0000-00-00

© 2024 OMB.report | Privacy Policy