Burden Calculation Tables

1717t12.xlsx

NESHAP for Off-Site Waste and Recovery Operations (40 CFR part 63, subpart DD) (Renewal)

Burden Calculation Tables

OMB: 2060-0313

Document [xlsx]
Download: xlsx | pdf

Overview

No of Respondents
Capital&O&M
No of Responses
Industry Burden
Agency Burden


Sheet 1: No of Respondents


Number of Respondents




Respondents That Submit Reports Respondents That Do Not Submit Any Reports







(A) (B) (C) (D) (E)
Year Number of New Respondents 1 Number of Existing Respondents Number of Existing Respondents that keep records but do not submit reports Number of Existing Respondents That Are Also New Respondents Number of Respondents





(E=A+B+C-D)
1 0 50 0 0 50
2 0 50 0 0 50
3 0 50 0 0 50
Average 0 50 0 0 50

Sheet 2: Capital&O&M



Capital/Startup vs. Operation and Maintenance (O&M) Costs








(A) (B) (C) (D) (E) (F) (G)
Continuous Monitoring Device Capital/Startup Cost for One Respondent Number of New Respondents Total Capital/Startup Cost, (B X C) Annual O&M Costs for One Respondent Number of Respondents with O&M Total O&M,






(E X F)








O&M $0 0 $0 $1,505.00 50 $75,250
LDAR $41,254 0 $0 $11,876 50 $593,800
PRD Monitoring Equipment $27,000 0 $0 $4,000 50 $200,000
Storage Tanks Duct Work1 $76,412 0 $0 $20,797 1 $20,797
Photocopy and Postage


$22.71 100 $2,271
Total

$0

$892,000 $892,000
Note: Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.






1 Costs shown are the total costs for the estimated 21 additional tanks captured under the new 2015 threshold from the March 2015 final rule.
2 Reflects updated costs for PRD monitoring for stationary sources from the January 29, 2018 final rule (83 FR 3986). The annualized costs per facility (assuming a 15-year equipment life and a seven percent interest rate) are estimated to be approximately $4,000. See memorandum from Carey, A., EPA, “Pressure Relief Device Control Options and Impacts for Off-Site Waste and Recovery Operations (OSWRO) June 26, 2017”, Docket Id. No. EPA-HQ-OAR-2012-0360-0133.

Sheet 3: No of Responses


Total Annual Responses





(A) (B) (C) (D) (E)



Number of Existing Respondents That Keep Records But Do Not Submit Reports Total Annual Responses
Information Collection Activity Number of Respondents Number of Responses
E=(BxC)+D
Initial notification (PRD) 50 0 0 0
Semiannual Report 50 2 0 100



Total 100

Sheet 4: Industry Burden






120.27 141.06 58.67



Burden Items (A) Person Hours per Occurrence (B) No of occurrences per respondent per year (C) Person hours per respondent per year (C=AxB) (D) Respondents per year a (E) Technical person hours per year (CxD) (F) Managerial person hours per year (Ex0.05) (G) Clerical person hours per year (Ex0.1) (H) Total costs per year $ b


1. Applications N/A









2. Survey and Studies N/A









3. Reporting Requirements










A. Familiarize with rule requirement c ,d 4 1 4 50 200 10 20 $26,638


B. Required Activities See 4C









C. Create Information See 4C









D. Gather Existing Information c See 4C









E. Write Reports










Initial Notification Report c, e 1 1 1 0 0 0 0 $0


Performance Test Notification Report c, e 1 1 1 0 0 0 0 $0


Compliance Status Notification c, e 2 1 2 0 0 0 0 $0


Performance Test Reports c, e 8 1 8 0 0 0 0 $0


Startup/Shutdown/Malfunction Report N/A









Semiannual Summary Report f 8 2 16 50 800 40 80 $106,552


Subtotal for Reporting Requirements



1,150 $133,190


4. Recordkeeping Requirements










A. Familiarize with rule requirements c See 3A









B. Planned Activities c 40 1 40 0 0 0 0 $0


C. Implementation of Activities










a. VOHAP concentration determination










Commercial Facilities g 2 260 520 25 13,000 650 1,300 $1,731,470


Other Facilities h 2 12 24 25 600 30 60 $79,914


b. Vapor Pressure Determination










Commercial Facilities g 1 260 260 25 6,500 325 650 $865,735


Other Facilities h 1 12 12 25 300 15 30 $39,957


c. Control Equipment Visual Inspection










Large Cover 0.25 10 2.5 50 125 6.25 12.5 $16,649 Note to EPA: These costs were omitted from the prior ICR file uploaded to reginfo, however, are included in the proposal and final rule RTR ICRs uploaded to the docket (which were approved following the last renewal). We have added them back in.See https://www.regulations.gov/document?D=EPA-HQ-OAR-2012-0360-0099.

Small Cover 0.05 1000 50 50 2500 125 250 $332,975 Note to EPA: These costs were omitted from the prior ICR file uploaded to reginfo, however, are included in the proposal and final rule RTR ICRs uploaded to the docket (which were approved following the last renewal). We have added them back in.See https://www.regulations.gov/document?D=EPA-HQ-OAR-2012-0360-0099.

Closed Vent System 0.5 5 2.5 50 125 6.25 12.5 $16,649 Note to EPA: These costs were omitted from the prior ICR file uploaded to reginfo, however, are included in the proposal and final rule RTR ICRs uploaded to the docket (which were approved following the last renewal). We have added them back in.See https://www.regulations.gov/document?D=EPA-HQ-OAR-2012-0360-0099.

d. Control Equipment Leak Monitoring









Cover Vented to Control Device 1 5 5 50 250 12.5 25 $33,298


Closed Vent System 1 5 5 50 250 12.5 25 $33,298


e. Control Devices










Performance Determination c 40 1 40 0 0 0 0 $0


Continuous Monitoring System 8 5 40 50 2,000 100 200 $266,380


f. LDAR Program










Identify Affected Waste Streams c 40 1 40 0 0 0 0 $0


Perform Monitoring/Repair 80 1 80 50 4,000 200 400 $532,760


g. PRD monitoring










Identification of PRD devices c 8 1 8 0 0 0 0 $0


Perform Monitoring/Repair 16 1 16 50 800 40 80 $106,552


D. Develop Record System c










Control Equipment 16 1 16 0 0 0 0 $0


LDAR Program 40 1 40 0 0 0 0 $0


PRD Program 8 1 8 0 0 0 0 $0


E. Time to Enter Information










Cover Designs 40 1 40 0 0 0 0 $0


Control Device Design c 40 1 40 0 0 0 0 $0


Control Equipment Testing c 1 1 1 0 0 0 0 $0


Control Equipment Inspections c 1 1 1 50 50 2.5 5 $6,660


Control Equipment Monitoring 1 1 1 50 50 2.5 5 $6,660


Control Device CMS 1 52 52 50 2,600 130 260 $346,294


LDAR Program 4 16 64 50 3,200 160 320 $426,208


PRD Program 2 16 32 50 1,600 80 160 $213,104


Off-site Material Determinations 1 52 52 50 2,600 130 260 $346,294


F. Time to Train Personnel c










Waste Determination Methods 40 1 40 0 0 0 0 $0


Control equipment inspect and monitor 40 1 40 0 0 0 0 $0


LDAR Program 8 1 8 0 0 0 0 $0


PRD Program 8 1 8 0 0 0 0 $0


G. Time for Audits N/A









Subtotal for Recordkeeping Requirements



46,633 $5,400,855


TOTAL ANNUAL BURDEN AND COSTS (rounded): i



47,800 $5,530,000
478 hr per resp
Capital and O&M Cost (see Section 6(b)(iii)): i






$892,000


TOTAL COST: j






$6,420,000














Assumptions:










a We have assumed that there are approximately 50 respondents, with no additional new or reconstructed sources becoming subject to the rule over the next three years.










b This ICR uses the following labor rates: Managerial $141.06; Technical $120.27; and Clerical $58.67. These rates are from the United States Department of Labor, Bureau of Labor Statistics, June 2019, “Table 2. Civilian Workers, by occupational and industry group.” The rates are from column 1, “Total compensation.” The rates have been increased by 110 percent to account for the benefit packages available to those employed by private industry.










c This activity is a one-time activity following promulgation of the March 15, 2018 final rule.










d It is assumed that it will take 4 hours to read instructions.










e It is assumed that there will be no new sources.










f The burden of one annual summary report was included in the burden estimate for the semiannual report.










g It is assumed that 50 percent of the facilities, the owner or operator manages, for a fee, off-site materials received from other generators.










h It is assumed that 50 percent of the owners or operators accept the off-site material at another location and ship it to the facility for storage, treatment, or disposal.










i Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.











Sheet 5: Agency Burden






49.44 66.62 26.75
Activity (A) EPA Hours/ Occurrence (B) Occurrences/ Plant/ Year (C) EPA Hours/ Year (AxB) (D) Plants/ Year a (E) Technical Hours/ Year (CxD) (F) Managerial Hours/ Year (Ex0.05) (G) Clerical Hours/ Year (Ex0.1) (H) Costs, $ b
Report Review







New Plants c, d







Initial notification (PRD) 2 1 2 0 0 0 0 $0
Performance test notification 1 1 1 0 0 0 0 $0
Compliance status notification 4 1 4 0 0 0 0 $0
Performance test report e 16 1 16 0 0 0 0 $0
Existing Plants







Startup/shutdown report N/A
Semiannual summary report f 4 2 8 50 400 20 40 $22,178
TOTAL ANNUAL BURDEN AND COST (rounded) g



460 $22,200









Assumptions:







a We have assumed that there are approximately 50 respondents, with no additional new or reconstructed sources becoming subject to the rule over the next three years.







b This ICR uses the following labor rates: Managerial $66.62; Technical $49.44; and Clerical $26.75. These rates are from the Office of Personnel Management (OPM), 2019 General Schedule, which excludes locality rates of pay. The rates have been increased by 60 percent to account for the benefit packages available to government employees.







c There will be no travel expenses associated with this ICR since we have assumed that no new sources will become subject to this rule over the three year period of this ICR.







d It is assumed that there will be no new sources over the three year period of this ICR.







e It is assumed that it will take 16 hours to review each performance test report.







f It is assumed that each facility will take 4 hours twice a year to submit report.







g Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.