Burden Calculations Tables

1078t12.xlsx

NSPS for Phosphate Rock Plants (40 CFR Part 60, Subpart NN) (Renewal)

Burden Calculations Tables

OMB: 2060-0111

Document [xlsx]
Download: xlsx | pdf

Overview

Table 1
Table 2
Respondents and O&M


Sheet 1: Table 1

Table 1: Annual Respondent Burden and Cost – NSPS for Phosphate Rock Plants (40 CFR Part 60, Subpart NN) (Renewal)












120.27 141.06 58.67
Burden Item (A)
Person- hours per occurrence
(B)
No. of occurrences per respondent per year
(C)
Person- hours per respondent per year (AxB)
(D) Respondents per yeara (E) Technical person- hours per year (CxD) (F) Management person-hours per year (Ex0.05) (G) Clerical person-hours per year (Ex0.1) (H)
Cost b
($)
1. Applications N/A






2. Survey and Studies N/A






3. Reporting requirements






A. Familiarization with Regulatory Requirements 1 1 1 15 15 0.75 1.50 $1,997.85
B. Required activities







Initial emissions tests 32 1 32 0 0 0 0 $0
Report performance test c 32 1 32 0 0 0 0 $0
C. Create Information See 3B






D. Gather existing information See 3B






E. Write report







Notification of construction/‌reconstruction 2 1 2 0 0 0 0 $0
Notification of actual startup 2 1 2 0 0 0 0 $0
Notification of physical or operational change which may increase the emission rate d 2 1 2 0 0 0 0 $0
Notification of CMS demonstration e 2 1 2 0 0 0 0 $0
Notification of initial performance test 2 1 2 0 0 0 0 $0
Report of initial performance test 2 1 2 0 0 0 0 $0
Semiannual report on excess emissions f 8 2 16 15 240 12.00 24.00 $31,965.60
Reporting Subtotal



293 $33,963
4. Recordkeeping requirements







A. Familiarization with Regulatory Requirements See 3E






B. Plan activities See 3E






C. Implement activities See 3E






D. Develop record system See 3E






E. Time to enter information







Record operating parameters g 0.25 350 87.5 15 1,312.50 65.63 131.25 $174,811.88
F. Time to transmit or disclose information N/A






G. Train personnel N/A






H. Audits N/A






Recordkeeping Subtotal



1,509 $174,812
TOTAL ANNUAL BURDEN AND COST (Rounded) h



1,800 $209,000
TOTAL CAPITAL AND O&M COSTS (Rounded) h
$126,000
GRAND TOTAL (Rounded) h
$335,000






60 hr/response
Assumptions:







a We have assumed that the average number of respondents that will be subject to the rule will be 15, with no new sources expected to become subject to the rule over the three-year period of this ICR.







b This ICR uses the following labor rates: $141.06 per hour for Executive, Administrative, and Managerial labor; $120.27 per hour for Technical labor, and $58.67 per hour for Clerical labor. These rates are from the United States Department of Labor, Bureau of Labor Statistics, June 2019, “Table 2. Civilian Workers, by Occupational and Industry group.” The rates are from column 1, “Total Compensation.” The rates have been increased by 110 percent to account for the benefit packages available to those employed by private industry.







c We have assumed that 20 percent of initial performance test will be repeated due to failure.







d We have assumed that no facility will be engaged in physical or operational changes.







e We have assumed that it will take each respondent 2 hours each to write CMS notification report.







f We have assumed that each respondent will take 8 hours, two times per year, to write semiannual report on excess emissions.







g We have assumed that each respondent will take 15 minutes per day to record operating parameters information.







h Totals are rounded to three significant figures. Figures may not add exactly due to rounding.








Sheet 2: Table 2

Table 2: Average Annual EPA Burden and Cost – NSPS for Phosphate Rock Plants (40 CFR Part 60, Subpart NN) (Renewal)












49.44 66.62 26.75
Activity (A) EPA person- hours per occurrence (B) No. of occurrences per plant per year (C) EPA person- hours per plant per year
(AxB)
(D) Plants per year a (E) Technical person- hours per year
(CxD)
(F) Management person-hours per year (Ex0.05) (G) Clerical person-hours per year
(Ex0.1)
(H) Cost b ($)
Initial performance tests







New or modified facility 24 1 24 0 0 0 0 0
Repeat performance test







New or modified facility c 24 1 24 0 0 0 0 0
Report Review







New or modified facility







Notification of construction/reconstruction 2 1 2 0 0 0 0 0
Notification of actual startup 2 1 2 0 0 0 0 0
Notification of physical or operational change which may increase the emission rate d 2 1 2 0 0 0 0 0
Notification of CEMS demonstration e 2 1 2 0 0 0 0 0
Notification of initial performance test 2 1 2 0 0 0 0 0
Report on initial performance test 8 1 8 0 0 0 0 0
Semiannual report on excess emissions f 4 2 8 15 120 6 12 $6,653.52
TOTAL (Rounded) g



140 $6,650









Assumptions:







a We have assumed that the average number of respondents that will be subject to the rule will be 15, with no new sources expected to become subject to the rule over the three-year period of this ICR.







b The cost is based on the following labor rate which incorporates a 1.6 benefits multiplication factor to account for government overhead expenses. Managerial rates of $66.62 (GS-13, Step 5, $41.64 x 1.6), Technical rate of $49.44 (GS-12, Step 1, $30.90 x 1.6), and Clerical rate of $26.75 (GS-6, Step 3, $16.72 x 1.6). These rates are from the Office of Personnel Management (OPM), 2019 General Schedule, which excludes locality rates of pay.







c We have assumed that 20 percent of initial performance test will be repeated due to failure.







d We have assumed that no facility will be engaged in physical or operational changes.







e We have assumed that it will take each respondent 2 hours each to review CMS notification report.







f We have assumed that each respondent will take 8 hours two times per year to review semiannual report on excess emissions.







g Totals are rounded to three significant figures. Figures may not add up exactly due to rounding.








Sheet 3: Respondents and O&M


Capital/Startup vs. Operation and Maintenance (O&M) Costs







(A) (B) (C) (D) (E) (F) (G)
Continuous Monitoring Device Capital/Startup Cost for One Respondent Number of New Respondents a Total Capital/Startup Cost,
(B X C) b
Annual O&M Costs for One Respondent Number of Respondents with O&M Total O&M,
(E X F) b
Continuous Opacity Monitor $37,000 0 $0 $8,400 15 $126,000
Total

$0

$126,000







a It is assumed that one new source will become subject to the rule over the three-year period of this ICR.





b Totals have been rounded to three significant figures. Figures may not add exactly due to rounding.

















C/S and O&M $126,000





















Number of Respondents

Respondents that submit reports Respondents that do not submit any reports

Year (A)
Number of New Respondents 1
(B)
Number of Existing Respondents
(C)
Number of Existing Respondents that keep records but do not submit reports
(D)
Number of Existing Respondents that are also new respondents
(E)
Number of Respondents
(E=A+B+C+D)

1 0 15 0 0 15
2 0 15 0 0 15
3 0 15 0 0 15
Average 0 15 0 0 15







1 New respondents include sources with constructed, reconstructed, and modified affected facilities





























Total Annual Responses








(A) (B) (C) (D) (E)

Information Collection Activity Number of Respondents Number of Responses Number of Existing Respondents That Keep Records But Do Not Submit Reports Total Annual Responses
E=(BxC)+D









Notification of construction or modification 0 1 N/A 0

Notification of actual startup 0 1 N/A 0

Notification of physical or operational change which may increase the emission rate 0 1 N/A 0

Notification of demonstration of CMS 0 1 N/A 0

Notification of initial performance tests 0 1 N/A 0

Report of initial performance test 0 1 N/A 0

Semiannual report on excess emissions 15 2 N/A 30




TOTAL (rounded) 30

File Typeapplication/vnd.openxmlformats-officedocument.spreadsheetml.sheet
File Modified0000-00-00
File Created0000-00-00

© 2024 OMB.report | Privacy Policy