NESHAP for Asphalt Processing and Asphalt Roofing Manufacturing (40 CFR Part 63, Subpart LLLLL) (Final Rule)

ICR 202003-2060-008

OMB: 2060-0724

Federal Form Document

Forms and Documents
Document
Name
Status
Supplementary Document
2020-03-12
Supporting Statement A
2020-03-12
IC Document Collections
ICR Details
2060-0724 202003-2060-008
Received in OIRA 201905-2060-001
EPA/OAR 2598.02
NESHAP for Asphalt Processing and Asphalt Roofing Manufacturing (40 CFR Part 63, Subpart LLLLL) (Final Rule)
New collection (Request for a new OMB Control Number)   No
Regular 03/12/2020
  Requested Previously Approved
36 Months From Approved
3 0
69 0
88,400 0

The National Emission Standards for Hazardous Air Pollutants (NESHAP) for Asphalt Processing and Asphalt Roofing Manufacturing were proposed on November 21, 2001 (66 FR 58609), promulgated on May 7, 2003 (68 FR 24561), and amended on May 17, 2005 (70 FR 28360). These regulations apply to existing facilities and new facilities that manufacture asphalt roofing products or oxidized asphalt that are major sources of hazardous air pollutants (HAPs), or are collocated at major sources. New facilities include those that commenced construction or reconstruction after the date of the original proposal (November 21, 2001). As part of the residual risk and technology review (RTR) for the NESHAP, the EPA is finalizing amendments to remove the startup, shutdown, and malfunction (SSM) exemption; remove the SSM plan and associated periodic report requirements; require periodic performance testing every five years, require electronic submittal of the notification of compliance status, results of performance evaluations of continuous monitoring systems, compliance reports, and performance test results; and make miscellaneous technical and editorial changes. The remaining portions of the NESHAP remain unchanged.

US Code: 42 USC 7401 et seq. Name of Law: Clean Air Act
  
None

2060-AT34 Final or interim final rulemaking 85 FR 14526 03/12/2020

No

1
IC Title Form No. Form Name
NESHAP for Asphalt Processing and Asphalt Roofing Manufacturing (40 CFR Part 63, Subpart LLLLL)

  Total Request Previously Approved Change Due to New Statute Change Due to Agency Discretion Change Due to Adjustment in Estimate Change Due to Potential Violation of the PRA
Annual Number of Responses 3 0 0 3 0 0
Annual Time Burden (Hours) 69 0 0 69 0 0
Annual Cost Burden (Dollars) 88,400 0 0 88,400 0 0
Yes
Changing Regulations
No
EPA is finalizing amendments to remove the startup, shutdown, and malfunction (SSM) exemption; remove the SSM plan and associated periodic report requirements; require periodic performance testing every five years, require electronic submittal of the notification of compliance status, results of performance evaluations of continuous monitoring systems, compliance reports, and performance test results; and make miscellaneous technical and editorial changes.

$1,730
No
    No
    No
No
No
No
No
Tonisha Dawson 919 541-1454 [email protected]

  No

On behalf of this Federal agency, I certify that the collection of information encompassed by this request complies with 5 CFR 1320.9 and the related provisions of 5 CFR 1320.8(b)(3).
The following is a summary of the topics, regarding the proposed collection of information, that the certification covers:
 
 
 
 
 
 
 
    (i) Why the information is being collected;
    (ii) Use of information;
    (iii) Burden estimate;
    (iv) Nature of response (voluntary, required for a benefit, or mandatory);
    (v) Nature and extent of confidentiality; and
    (vi) Need to display currently valid OMB control number;
 
 
 
If you are unable to certify compliance with any of these provisions, identify the item by leaving the box unchecked and explain the reason in the Supporting Statement.
03/12/2020


© 2024 OMB.report | Privacy Policy